Nuclear power plant equipment safety importance assessment method based on actual operation
Through probabilistic safety analysis combined with the actual operating status of the nuclear power plant, the safety importance of nuclear power plant equipment is quantitatively evaluated, which solves the problem that existing methods cannot accurately evaluate the safety importance of equipment under different conditions, and achieves more reasonable and accurate equipment. Safety importance assessment improves the safety management level of nuclear power plants.
Patent Information
- Application Number
- CN202310378820.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-04-10
- Publication Date
- 2024-10-15
AI Technical Summary
The existing safety importance assessment method of nuclear power plant equipment is based on the concept of determinism and cannot accurately assess the safety importance of equipment under different operating conditions, resulting in unreasonable assessment results and affecting the safe operation of nuclear power plants.
The method based on probabilistic safety analysis is used to analyze the internal and external risks of the nuclear power plant, combined with the actual operating conditions of the nuclear power plant, to quantitatively calculate the safety importance of the equipment under each risk and operating status, and conduct a comprehensive assessment.
Through this method, the safety importance of equipment under various risks and operating conditions is clarified. The results are comprehensive and reasonable, which improves equipment reliability and the safety level of nuclear power plants, and reduces errors in human judgment.
Smart Images

Figure CN118780588A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of nuclear power plant safety and risk guidance, and in particular to a method for evaluating the safety importance of nuclear power plant equipment based on actual operation. Background Art
[0002] In order to achieve safe, reliable and efficient operation of nuclear power plants, nuclear power equipment must ensure high availability and reliability. Therefore, during the design, construction and operation of nuclear power plants, strict requirements are imposed on the design, manufacturing, materials and testing of equipment, and these requirements are treated differently according to their safety importance. The existing equipment safety importance assessment process of nuclear power plants is based on the deterministic concept. The safety importance of the equipment is obtained by judging the safety importance of the function, which is divided into "safety-related" and "non-safety-related". However, through the actual operation data of nuclear power plants and probabilistic safety analysis (PSA), it can be found that there is room for optimization of the traditional equipment safety importance assessment method. Some "safety-related" equipment is not important to safety; some equipment that is more important to safety is "non-safety-related". Therefore, it is necessary to improve and optimize the traditional equipment safety importance method, and use the probabilistic safety analysis method to comprehensively and accurately analyze the safety importance of equipment and identify the equipment that is truly important to the safety of nuclear power plants.
[0003] During the actual operation of a nuclear power plant, it will experience different operating conditions. Under each operating condition, the power plant has different characteristic parameters and requires different hardware system configurations, control management methods and technical specifications. Therefore, the safety importance of nuclear power plant equipment under different operating conditions is different. However, the existing methods generally do not consider the evaluation of equipment importance in combination with the actual operating status of the power plant, resulting in the inability to clearly identify the safety-critical equipment under each operating state of the nuclear power plant in actual application, which is inconsistent with the actual operation; some equipment may be safety-critical under certain operating conditions, but the existing methods cannot reflect their safety importance, and the evaluation results are unreasonable, affecting the daily equipment management and operational safety level of the nuclear power plant. Therefore, it is necessary to optimize the equipment safety importance assessment method.
[0004] In summary, the existing methods are not comprehensive: the existing equipment safety importance assessment methods and their results can only give a single safety importance result for the equipment (without distinguishing the operating status), which leads to difficulties in actual application in nuclear power plants, and it is impossible to know the safety importance of the equipment under the current operating status of the nuclear power plant. The existing methods are unreasonable: some equipment may be safety-important under certain operating conditions, but the existing methods cannot reflect their safety importance, and the assessment results are unreasonable, which affects the safe operation of nuclear power plants. Summary of the invention
[0005] The purpose of the present invention is to provide a method for assessing the safety importance of nuclear power plant equipment based on actual operation, which solves the problem that the existing equipment safety importance assessment method and its results are unreasonable and inconsistent with the actual operation of nuclear power plants.
[0006] In order to achieve the above object, the present invention provides the following technical solutions:
[0007] A method for assessing the safety importance of nuclear power plant equipment based on actual operation includes the following steps:
[0008] Step 1: Analyze the internal and external risks of the nuclear power plant based on the probabilistic safety analysis model;
[0009] Step 2: Analyze the operating status of the nuclear power plant based on the actual operating conditions of the nuclear power plant;
[0010] Step 3: Use the probabilistic safety analysis method to quantitatively calculate the equipment safety importance under each assessment factor;
[0011] Step 4: Comprehensively analyze and determine the importance of equipment safety.
[0012] In step 1, internal risks include internal incidents, internal fires, and internal flooding.
[0013] In step 1, external risks include earthquakes and other external events.
[0014] In step 2, according to the changes in the parameters of various operating conditions of the nuclear power plant, the standard operating conditions are divided into different power plant operating states and evaluated.
[0015] Furthermore, the parameters used for the division of the operating status include: nuclear power, temperature / pressure of the primary loop system, decay heat removal mechanism, and opening state of the primary loop system.
[0016] Furthermore, nuclear power includes: zero power, low power, and full power.
[0017] Furthermore, the temperature and pressure of a loop system include pressure and temperature parameter trigger signals.
[0018] Furthermore, the decay heat removal mechanism includes input and isolation of a residual heat removal system.
[0019] Furthermore, the opening state of the primary circuit system includes: the manhole is open and closed.
[0020] In step 4, the equipment safety importance calculation results of each assessment factor are summarized and a comprehensive analysis is conducted.
[0021] Compared with the prior art, the safety importance assessment method for nuclear power plant equipment based on actual operation provided by the present invention has the following beneficial effects:
[0022] The present invention is based on actual operation and clarifies the safety importance of equipment under various risks and operating conditions. The results are comprehensive and reasonable, and improve the reliability level of important safety equipment and the safety level of nuclear power plants.
[0023] The present invention uses a probabilistic safety analysis method to quantitatively evaluate the safety importance of equipment. The result is objective and reliable, which reduces the error caused by human judgment and improves the accuracy of the result.
[0024] Through the present invention, based on the actual operation of the nuclear power plant, the risk importance of the nuclear power plant under various risks and operating conditions is comprehensively evaluated, the evaluation factors are subdivided and the actual operating conditions of the nuclear power plant are included, and the evaluation results are complete and comprehensive; through the present invention, the actual operating conditions of the nuclear power plant are subdivided, and the equipment safety importance under each actual operating condition is obtained by accurate calculation, and the results are accurate and detailed. A comprehensive evaluation is carried out, and the results are reasonable, ensuring that the importance of equipment safety is reflected. The present invention solves the defects of the existing methods that are incomplete and unreasonable. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0026] Figure 1 A flow chart of a method for assessing the safety importance of nuclear power plant equipment based on actual operation provided by an embodiment of the present invention;
[0027] Figure 2 The calculation results of the equipment safety importance under each risk type provided by the embodiment of the present invention;
[0028] Figure 3 The calculation results of the equipment safety importance under various operating conditions provided by the embodiment of the present invention. DETAILED DESCRIPTION
[0029] The following is further explained in detail through specific implementation methods.
[0030] like Figure 1 As shown, the present invention provides a method for assessing the safety importance of nuclear power plant equipment based on actual operation, analyzes the risks and operating status of the nuclear power plant in detail, and accurately calculates the safety importance of the equipment through a probabilistic safety analysis method, including the following steps:
[0031] Step 1: Nuclear power plant risk analysis.
[0032] Analyze the internal and external risks of nuclear power plants that need to be considered in the safety importance assessment of nuclear power plant equipment. Internal risks include internal events, internal fires, and internal flooding. External events include earthquakes and other external events (such as strong winds, external flooding, etc.). The risk analysis of nuclear power plant equipment is based on probabilistic safety analysis. Through the corresponding risk PSA model of nuclear power plants, the core damage frequency (CDF) of each risk is quantitatively calculated. Internal event risk is the main risk faced by nuclear power plants. Taking the internal event risk CDF as the benchmark, if a risk CDF is very small (<1%) relative to the internal event risk CDF, it is considered that the risk has a very small impact on the nuclear power plant and this risk is excluded; otherwise, it is considered that the risk has a certain impact on the nuclear power plant and needs to be considered in the subsequent equipment safety importance assessment process.
[0033] The specific formula is:
[0034] In the formula, X is the calculation result, CDF α风险 is the CDF of a certain risk (excluding internal event risk), CDF 内部事件风险 is the CDF of internal event risk. If X < 1%, this risk is not considered and is not included in the evaluation factors; if X ≥ 1%, this risk is considered and included in the evaluation factors. The risk analysis is shown in Table 1.
[0035] Table 1 Risk analysis
[0036]
[0037] In one embodiment, the risks faced by a nuclear power plant in my country are divided into internal risks and external risks. The internal risks are internal events, internal flooding, and internal fires, and the external risks are earthquakes. Calculated by the PSA model, the CDF of internal events of the nuclear power plant is 6.98E-6 / reactor·year, the CDF of internal flooding is 4.88E-7 / reactor·year, the CDF of internal fire is 3.8E-6 / reactor·year, and the CDF of earthquake is 1.66E-6 / reactor·year. The calculation is as follows:
[0038]
[0039]
[0040]
[0041] Through analysis, it can be obtained that the ratios of internal flooding CDF, internal fire CDF and earthquake CDF to internal event CDF are all greater than 1%. Therefore, this embodiment considers the nuclear power plant risks as internal event risks, internal flooding risks, internal fire risks and earthquake risks.
[0042] Step 2: Analysis of nuclear power plant operating status.
[0043] Since nuclear power plants have different characteristic parameters under different operating conditions and require different hardware system configurations, control management methods and technical specifications, the safety importance of nuclear power plant equipment under different operating conditions is different. In addition, in order to accurately evaluate the safety importance of equipment based on the actual operating parameters of nuclear power plants, it is necessary to subdivide or merge standard operating conditions. Therefore, for such a complex dynamic system that changes with time, the standard operating conditions should be divided into different power plant operating states and evaluated according to the changes in the parameters of each operating condition of the nuclear power plant. The main parameters for dividing the operating state include: nuclear power, temperature / pressure of the primary circuit system, decay heat removal mechanism, and opening state of the primary circuit system. Among them, nuclear power includes: zero power, low power, and full power; the temperature and pressure of the primary circuit system include: pressure / temperature parameters triggering corresponding signals; the decay heat removal mechanism includes: residual heat removal system input / isolation; the opening state of the primary circuit system includes: manhole open / closed.
[0044] Based on the standard operating conditions of nuclear power plants, the operating states are divided according to the changes in the operating parameters of nuclear power plants: operating conditions with similar parameters are combined into one operating state; operating conditions with different parameters are subdivided and divided into different operating states. It is ensured that the operating parameters of the nuclear power plant are relatively constant in each operating state, and that the divided operating states can cover the actual operating conditions of the power plant.
[0045] In this embodiment, various operating parameters of a nuclear power plant in my country are analyzed, including nuclear power, temperature, pressure and coolant loading of the primary circuit system, opening state of the primary circuit system, decay heat removal mechanism, etc. The operating states are divided according to the changes in the operating parameters of the nuclear power plant. For operating conditions with similar parameters, they are merged and divided into one operating state; for operating conditions with different parameters, they are subdivided and divided into different operating states.
[0046] In this embodiment, the standard operating conditions of a nuclear power plant are listed, including maintenance cold shutdown, normal cold shutdown, single-phase intermediate shutdown, two-phase intermediate shutdown, normal intermediate shutdown, hot shutdown, hot standby, and power operation. Among them, the main parameters (nuclear power) of the two types of operating conditions of hot shutdown and hot standby are similar, and they are merged into one operating state; the main parameters (decay heat removal mechanism) of the three types of operating conditions of normal cold shutdown, single-phase intermediate shutdown, and two-phase intermediate shutdown are similar, and they are merged into one operating state; the main operating parameters of the maintenance cold shutdown operating condition change (one-loop open state), so it is subdivided into two operating states. Therefore, through the analysis of the operating state of the nuclear power plant, the operating state of the nuclear power plant is divided into A / B / C / D / E / F (operating state division according to the main operating parameters in Table 2), as shown in Table 2. Among them, operating state A is power operation, and operating state B / C / D / E / F corresponds to low power / shutdown conditions. Based on this operating state division, the safety importance of the equipment in each operating state is calculated respectively.
[0047] Table 2 Classification of operating status of a nuclear power plant
[0048]
[0049] It should be noted that, in Table 2, RRA is the residual heat removal system, P11 and P12 are nuclear power plant operation signals, P is the nuclear power, and FP is the full power of the nuclear power plant.
[0050] Step 3: Calculate the equipment safety importance.
[0051] Through the first step of "Nuclear Power Plant Risk Analysis" and the second step of "Nuclear Power Plant Operation Status Analysis", the risks faced by the nuclear power plant and the operating status of the nuclear power plant are determined, which are the "assessment factors". Identify the equipment modeled in the PSA model of the nuclear power plant system, and quantitatively calculate the equipment safety importance of the equipment under each assessment factor through the PSA model (the risk contribution value and risk increase value of equipment failure to the nuclear power plant). According to the importance criteria, determine the safety importance of the equipment.
[0052] In this embodiment, the evaluation factors are determined through nuclear power plant risk analysis and nuclear power plant operation status analysis as shown in Table 3. The analysis object is a chemical and volume control system (RCV) system of a nuclear power plant in my country. A total of 100 equipment modeled in the PSA model under each evaluation factor of the system are identified, and the equipment modeled in the PSA model of the nuclear power plant system is identified. The equipment safety importance of the equipment under each evaluation factor (the risk contribution value and risk increase value of equipment failure to the nuclear power plant) is quantitatively calculated through the PSA model. According to the importance criterion, the equipment safety importance is determined.
[0053] Table 3 Evaluation factors
[0054]
[0055] In this embodiment, the safety importance of the RCV system equipment is calculated according to the PSA model. The importance criteria adopted are shown in Table 4, which is the general criteria in the industry (internationally). The calculation results of the equipment safety importance under each evaluation factor are as follows: Figure 2 and Figure 3 As shown, the safety importance calculation results of RCV system equipment under various evaluation factors are given.
[0056] Table 4 Safety importance criteria for equipment in a nuclear power plant
[0057]
[0058]
[0059] Step 4: Comprehensive assessment. That is, analyze the high safety importance / low safety importance equipment under each assessment factor and conduct a comprehensive assessment.
[0060] Summarize the calculation results of the equipment safety importance of each evaluation factor and conduct a comprehensive analysis. If the equipment is safety important under any evaluation factor, the equipment is classified as high safety importance; if the equipment is low safety important under all evaluation factors, the equipment is classified as low safety importance.
[0061] In this embodiment, the safety importance results of the equipment under each risk and each operating state are summarized and a comprehensive analysis is carried out. If the equipment is safety important under any evaluation factor, the equipment is classified as high safety importance; if the equipment is low safety important under all evaluation factors, the equipment is classified as low safety importance. In this embodiment, through summary analysis, the RCV system has a total of 89 high safety importance equipment and 11 low safety importance equipment, as shown in Table 5.
[0062] Table 5 Comprehensive evaluation results of equipment safety importance
[0063]
[0064]
[0065] In Table 5, "Assessment Factor-Risk Type" is obtained based on the risk analysis of the nuclear power plant in the first step of this embodiment; "Operation Status A / B / C / D / E / F" is obtained based on the analysis of the operation status of the nuclear power plant in the second step of this embodiment, which is consistent with the content in Table 3. Among them, the numbers in the "High Safety Importance / Low Safety Importance" column are calculated based on the safety importance of the equipment in the third step, which is consistent with the content in Table 3. Figure 2 and Figure 3 The content in is consistent.
[0066] This embodiment gives the safety importance assessment results of the RCV system equipment of a nuclear power plant in my country. Combined with the actual risks and operating conditions of the nuclear power plant, the PSA method is used to quantitatively calculate the safety importance of the equipment, and the safety importance results of the equipment are given through comprehensive assessment. Compared with the original technology, this embodiment is based on the actual operation of the nuclear power plant, clarifies the safety-important equipment of the RCV system, accurately obtains the safety importance of the RCV system equipment under various risks and operating conditions, and the equipment safety importance assessment results are consistent with the actual operation of the nuclear power plant; based on the actual operation, the safety importance of the RCV system equipment under various assessment factors is clarified, and the results are comprehensive and reasonable, which improves the reliability level of important safety equipment and the safety level of the nuclear power plant.
[0067] Therefore, the present invention solves the problem that the safety importance assessment results of the original method are incomplete and unreasonable. In the original method, the operating status of the nuclear power plant was not subdivided, but was generally classified into one category, resulting in RCV094VP and RCV096VP being classified as low safety importance. However, through this method, the safety importance of the equipment under various risks and operating conditions is comprehensively analyzed. The analysis shows that RCV094VP and RCV096VP are safety important in "operating state C". Therefore, these two devices are classified as safety important, which improves management requirements and improves the safety of nuclear power plants.
[0068] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily thought of by a person skilled in the art within the technical scope disclosed by the present invention should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.
Claims
1. A safety importance assessment method for nuclear power plant equipment based on actual operation. It is characterized in that The following steps are involved: Step 1: Analyze the internal and external risks of the nuclear power plant based on the probabilistic safety analysis model; Step 2: Analyze the operating status of the nuclear power plant based on the actual operating conditions of the nuclear power plant; Step 3: Use the probabilistic safety analysis method to quantitatively calculate the equipment safety importance under each assessment factor; Step 4: Comprehensively analyze and determine the importance of equipment safety.
2. According to the method for evaluating the safety importance of nuclear power plant equipment based on actual operation according to claim 1, It is characterized in that In step 1, internal risks include internal incidents, internal fires, and internal flooding.
3. According to the method for evaluating the safety importance of nuclear power plant equipment based on actual operation according to claim 1, It is characterized in that In step 1, external risks include earthquakes and other external events.
4. According to the method for evaluating the safety importance of nuclear power plant equipment based on actual operation according to claim 1, It is characterized in that In step 2, according to the changes in the parameters of various operating conditions of the nuclear power plant, the standard operating conditions are divided into different power plant operating states and evaluated.
5. According to the method for evaluating the safety importance of nuclear power plant equipment based on actual operation according to claim 4, It is characterized in that The parameters used for the classification of operating states include: nuclear power, temperature / pressure of the primary system, decay heat removal mechanism, and opening state of the primary system.
6. According to the method for evaluating the safety importance of nuclear power plant equipment based on actual operation according to claim 5, It is characterized in that Nuclear power includes: zero power, low power, and full power.
7. According to the method for evaluating the safety importance of nuclear power plant equipment based on actual operation according to claim 5, It is characterized in that The temperature and pressure of a primary circuit system include pressure and temperature parameters that trigger corresponding signals.
8. According to the method for evaluating the safety importance of nuclear power plant equipment based on actual operation according to claim 5, It is characterized in that The decay heat removal mechanism includes the input and isolation of the residual heat removal system.
9. According to the method for evaluating the safety importance of nuclear power plant equipment based on actual operation according to claim 5, It is characterized in that The opening status of a primary circuit system includes: manhole open and closed.
10. The method for evaluating the safety importance of nuclear power plant equipment based on actual operation according to claim 1, It is characterized in that In step 4, the equipment safety importance calculation results of each evaluation factor are summarized and a comprehensive analysis is conducted.