Agile collaborative billboard system

By introducing to-be-planned, iterated and iterated overview areas into the agile collaborative Kanban system, combined with drag-and-drop operations and virtual list technology, the flexibility and performance issues of task planning and iteration management are solved, and an intuitive user interface and efficient projects are achieved. manage.

CN118780771APending Publication Date: 2024-10-15BEIYIN FINANCIAL TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410990492.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-23
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

The existing agile collaborative Kanban system lacks flexibility and dynamics in task planning and iteration management, resulting in low management efficiency, unintuitive user interfaces, and complex configuration processes. Performance issues and response delays may occur, especially in large teams and complex projects.

Method used

An agile collaborative Kanban system is designed that includes the area to be planned, the iteration area, the iteration overview area and the user operation dynamic display area. It realizes rapid assignment and adjustment of tasks through drag and drop operations, automatically updates iteration progress and task status, and uses virtual lists. Optimize big data processing, provide an intuitive user interface and simplified configuration process, and use Vue-Smooth-DND components and local indexDB database to improve user experience.

Benefits of technology

It improves task visualization and process optimization, simplifies user operations, promotes team collaboration and communication, supports iterative development and continuous improvement, improves project management efficiency and user experience, and solves performance issues and configuration complexity.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118780771A_ABST
    Figure CN118780771A_ABST
Patent Text Reader

Abstract

The invention discloses an agile collaborative billboard system. The billboard system comprises a to-be-planned area, an iteration area, an iteration overview area and a user operation dynamic display area, the to-be-planned area is used for displaying a to-be-planned task list; the iteration area is used for displaying task lists of various iteration periods; the iteration overview area is used for entering a specific iteration and watching detailed information of the whole iteration from a global view angle; and the user operation dynamic display area is used for processing data collected from each panel. The method is more visual and clear, conforms to the operation habit of a user, does not need extra excessive configuration, improves task visualization and process optimization, promotes team cooperation and communication, and supports iterative development and continuous improvement.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of project management, and in particular to an agile collaborative kanban system. Background Art

[0002] In order to help the team better manage projects and achieve project goals in a more effective way, an agile collaborative Kanban system was developed, which emphasizes rapid response to changes, continuous delivery, and team collaboration, so that team members can clearly understand the current status of the project and the next step. By observing the Kanban board, the team identifies bottlenecks and optimization opportunities to improve work efficiency. And continuously improve products or projects based on feedback to meet customer needs and market changes.

[0003] Kanban boards are usually created to represent different states in a workflow, such as To Do, In Progress, and Completed.

[0004] Then create task cards, which usually contain information such as the task title, description, assignee, deadline, etc.

[0005] In each column on the board, you create task cards that represent the work your team needs to accomplish. By dragging task cards, you move them from one column to another to reflect the status of the task.

[0006] Task planning and iteration management are usually carried out separately, lacking flexibility and dynamism, which may lead to inefficient task management.

[0007] The configuration process of existing technical solutions is extremely complicated. It may take some time for new users to become familiar with and master all functions, which may lead to a steep learning curve.

[0008] For larger teams and complex projects, Jira may experience performance issues, especially when processing large amounts of data and multiple operations at the same time. This can result in slow page loads and delayed response times.

[0009] The user interface may not be intuitive enough, resulting in a poor user experience. Some operations may require multiple steps to complete, making users confused during use.

[0010] Agile Collaborative Kanban is designed to support agile development methodology, is more intuitive and clear, conforms to user operating habits, does not require additional configuration, improves task visualization and process optimization, promotes team collaboration and communication, and supports iterative development and continuous improvement. It is designed to help teams better manage projects and achieve project goals in a more effective way. Summary of the invention

[0011] In view of the above problems, the present invention is proposed to provide an agile collaborative kanban system that overcomes the above problems or at least partially solves the above problems.

[0012] According to one aspect of the present invention, an agile collaborative kanban system is provided, the kanban system comprising: an area to be planned, an iteration area, an iteration overview area, and a user operation dynamic display area;

[0013] The area to be planned is used to display a list of tasks to be planned;

[0014] The iteration area is used to display task lists of various iteration cycles;

[0015] The iteration overview area is used to enter a specific iteration and view detailed information of the entire iteration from a global perspective;

[0016] The user operation dynamic display area is used to process the data collected from each panel.

[0017] Optionally, the displaying of the task list to be planned specifically includes:

[0018] Tasks are presented in a visual form, each task includes task name, description, and priority attributes;

[0019] Project team members can drag tasks in the planning panel to different iteration function areas by dragging and dropping to quickly allocate and adjust tasks.

[0020] Optionally, the task is presented in a visual form, specifically including: a card or an icon.

[0021] Optionally, each iteration panel in the iteration area corresponds to an iteration cycle, including all tasks in the iteration cycle;

[0022] Project team members can move tasks between iteration panels by dragging and dropping to redistribute and adjust tasks;

[0023] According to the drag and drop operation of the task, the iteration progress and task status are automatically updated, and the task is moved from the iteration area to the waiting planning area, realizing the two-way flow processing of the task.

[0024] Optionally, the iteration overview area includes: specific matters in the iteration, tasks that need to be delivered in each stage, completion goals, time nodes, various operation logs of project members on tasks during the entire iteration process, and the test plan associated with the entire iteration.

[0025] Optionally, the user operation dynamic display area includes the drag record of the task and the update of the iteration progress.

[0026] Optionally, the kanban system updates the kanban content in real time according to user operations, and generates corresponding data reports and statistical information.

[0027] The present invention provides an agile collaborative kanban system, which includes: an area to be planned, an iteration area, an iteration overview area, and a user operation dynamic display area; the area to be planned is used to display a list of tasks to be planned; the iteration area is used to display a list of tasks in multiple iteration cycles; the iteration overview area is used to enter a specific iteration and view the detailed information of the entire iteration from a global perspective; the user operation dynamic display area is used to process the data collected from each panel. It is more intuitive and clear, in line with user operation habits, does not require additional excessive configuration, improves task visualization and process optimization, promotes team collaboration and communication, and supports iterative development and continuous improvement.

[0028] The above description is only an overview of the technical solution of the present invention. In order to more clearly understand the technical means of the present invention, it can be implemented according to the contents of the specification. In order to make the above and other purposes, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are listed below. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying any creative work.

[0030] Figure 1 A block diagram of the composition of an agile collaborative kanban system provided by an embodiment of the present invention;

[0031] Figure 2 An iteration details diagram in an agile collaborative dashboard provided by an embodiment of the present invention;

[0032] Figure 3 A schematic diagram of a user operation dynamic display area provided in an embodiment of the present invention;

[0033] Figure 4 A schematic diagram of an agile collaborative dashboard provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0034] The exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although exemplary embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure may be implemented in various forms and should not be limited by the embodiments described herein. On the contrary, these embodiments are provided to enable a more thorough understanding of the present disclosure and to fully convey the scope of the present disclosure to those skilled in the art.

[0035] The terms "comprises" and "having" and any variations thereof in the description embodiments, claims and drawings of the present invention are intended to cover non-exclusive inclusions, for example, including a series of steps or units.

[0036] The technical solution of the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments.

[0037] Agile Collaboration Dashboard includes:

[0038] 1. To-be-planned area: used to display the list of tasks to be planned. Tasks are presented in a visual form, such as cards or icons, and each task contains attributes such as task name, description, priority, etc. Project team members can drag tasks in the To-be-planned panel to different iteration function areas through drag-and-drop operations to quickly allocate and adjust tasks.

[0039] 2. Iteration area: used to display task lists of different iteration cycles. Each iteration panel corresponds to an iteration cycle and contains all tasks within an iteration cycle. Project team members move tasks between iteration panels by dragging and dropping to achieve task redistribution and adjustment. At the same time, the system automatically updates the iteration progress and task status based on the drag and drop operation of the task to ensure the real-time and accuracy of project information. Of course, it also moves from the iteration area to the planning area to achieve two-way flow processing of tasks.

[0040] Use Vue-Smooth-DND component to achieve drag effect. Compared with other components, it provides smooth drag animation and enhances user experience. Supports horizontal and vertical drag, as well as complex layout structures. Customize the style and behavior of dragged cards.

[0041] Use virtual lists to solve the problem of loading large amounts of data. Use virtual lists to render only the data in the currently visible area, rather than rendering the entire data set at once. Reduce the rendering cost during page initialization and scrolling, and improve page loading speed and responsiveness. Since only the data in the visible area is actually rendered into the DOM, virtual lists significantly reduce the memory consumption required for the page. For large data sets, it means showing more data without sacrificing performance. Figure 1 shown.

[0042] 3. Iteration Overview Area: Enter a specific iteration and see the detailed information of the entire iteration more clearly from a global perspective.

[0043] It includes specific matters in the iteration, tasks that need to be delivered at each stage, completion goals, time nodes, various operation logs of project members on tasks during the entire iteration, and the test plan associated with the entire iteration.

[0044] This does not require complicated process configuration and operation. You only need to enter the planning information of this iteration when creating the iteration, and associate it with the test plan of the tester to automatically generate these visual view areas.

[0045] There are two main core technical points involved:

[0046] To solve the processing mechanism of task flow in the lane, a process flow panel configuration is needed. First, a general process flow template will be provided. Users will use the default configuration by default, and can also customize the configuration according to specific business logic. After the template is configured, the problem is to control the task flow path according to the user role information and the current flow status of the lane.

[0047] In order to improve the user experience, the swimlane view is added with a one-click switch to tile view or tree view. The problem is that when the amount of data is too large, it takes a long time to load the data each time, which makes the user experience very unfriendly. At the beginning, data caching was done. As the amount of data increased, it would cause excessive memory usage and cause page jams. Later, the local indexDB database was used for data caching, and the data was cleared after leaving the page, which perfectly solved this problem. Figure 2 shown.

[0048] 4. User operation dynamic display area: This module is responsible for processing the data collected from each panel, including the drag and drop records of tasks, updates of iteration progress, etc. The system will update the content of the dashboard in real time according to the user's operation, and generate corresponding data reports and statistical information to provide data support for project management. Figure 3 shown.

[0049] Through the Agile Collaboration Dashboard, teams can more effectively track workflows, manage tasks, and improve team collaboration efficiency. At the same time, the system also provides a wealth of interactive functions and data processing capabilities, providing strong support for project management. Figure 4 shown.

[0050] like Figure 1 As shown in the figure, the left side is the area to be planned, and the right side is the iteration area. The area to be planned is equivalent to a demand pool or a to-do pool. Multiple iterations are planned in the iteration area. What tasks are done in each iteration? In addition to being created directly in the iteration, the tasks in each iteration are also dragged in from the to-be-planned list and from other iterations. Some tasks in the iteration are also dragged back to the to-be-planned area due to time scheduling or priority issues, waiting for subsequent planning.

[0051] like Figure 2As shown in the figure, the iteration details diagram in the agile collaboration dashboard has the entire iteration process planning and time nodes on the top and the iteration task swimlane view on the bottom. It allows developers to view the status of each task more intuitively and perform quick operations.

[0052] like Figure 3 As shown in the figure, it is responsible for processing the data collected from each panel, including the creation, update and drag records of tasks, update of iteration progress, etc., which are displayed in real time in the dynamic area, allowing team members to more intuitively experience the real-time operations of the entire R&D team in the agile development process.

[0053] like Figure 4 As shown in the figure, the closed-loop process of the entire agile development starts with the product manager and project manager collecting and organizing requirements, creating corresponding planning areas and iteration areas through the agile board for distribution, and then screening out the tasks for this iteration based on their priorities, conducting requirements review, technical review, test case review, and other links. After the developers receive the corresponding tasks and evaluate the task hours, the iteration begins. The daily agile meeting will conduct risk assessment, problem feedback, and early exposure of problems based on the task board. Problem records will be made at each meeting, and problem tracking and subsequent problem review will be conducted. At the same time, feedback will be given to the product manager and project manager, who will judge whether to adjust the tasks for this iteration based on the specific situation.

[0054] Solve the current technical solutions that often require load configuration before they can be used; solve the problem of page freezes when the amount of data is large; solve the cumbersome user operation process, and make up for the operations that require multiple steps to complete in the current technical solutions; provide a more intuitive and visual interface. Provide a full perspective to see the various operation records of other team members.

[0055] Beneficial effects: Agile collaborative dashboard design supports agile development methodology, is more intuitive and clear, conforms to user operating habits, does not require excessive additional configuration, improves task visualization and process optimization, promotes team collaboration and communication, and supports iterative development and continuous improvement. It is designed to help teams better manage projects and achieve project goals in a more effective way.

[0056] The above specific implementation methods further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above are only specific implementation methods of the present invention and are not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.

Claims

1. An agile collaborative kanban system, characterized by: The kanban system includes: an area to be planned, an iteration area, an iteration overview area, and a user operation dynamic display area; The area to be planned is used to display a list of tasks to be planned; The iteration area is used to display task lists of various iteration cycles; The iteration overview area is used to enter a specific iteration and view detailed information of the entire iteration from a global perspective; The user operation dynamic display area is used to process the data collected from each panel.

2. The agile collaborative kanban system according to claim 1, characterized in that: The display of the task list to be planned specifically includes: Tasks are presented in a visual form, each task includes task name, description, and priority attributes; Project team members can drag tasks from the planning panel to different iteration function areas by dragging and dropping to quickly allocate and adjust tasks.

3. The agile collaborative kanban system according to claim 2, characterized in that: The tasks are presented in a visual form, specifically including: cards or icons.

4. The agile collaborative kanban system according to claim 1, characterized in that: Each iteration panel in the iteration area corresponds to an iteration cycle, including all tasks in the iteration cycle; Project team members can move tasks between iteration panels by dragging and dropping to redistribute and adjust tasks; According to the drag and drop operation of the task, the iteration progress and task status are automatically updated, and the task is moved from the iteration area to the area to be planned, realizing two-way flow processing of the task.

5. The agile collaborative kanban system according to claim 1, characterized in that: The iteration overview area includes: specific matters in the iteration, tasks that need to be delivered at each stage, completion goals, time nodes, various operation logs of project members on tasks during the entire iteration process, and the test plan associated with the entire iteration.

6. The agile collaborative kanban system according to claim 1, characterized in that: The user operation dynamic display area includes the drag record of the task and the update of the iteration progress.

7. The agile collaborative kanban system according to claim 1, characterized in that: The kanban system updates the kanban content in real time according to user operations and generates corresponding data reports and statistical information.