Intelligent security and protection system for conveyor

Through the sub-period division of the intelligent security system and machine learning model prediction, abnormal situations of the conveyor can be identified and controlled in advance, which solves the problem of inability to predict and control conveyor failures in advance in the existing technology, and improves the safety and security of the conveyor. Effect.

CN118790700AActive Publication Date: 2024-10-18HUAIBEI HEZHONG MACHINERY EQUIPMENT CO LTD

Patent Information

Application Number
CN202411175068.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-26
Publication Date
2024-10-18
Estimated Expiration
2044-08-26

AI Technical Summary

Technical Problem

The existing conveyor security system cannot predict in advance possible abnormalities on the conveyor in the future, resulting in the inability to control the emergency shutdown of the conveyor in advance, reducing the security effect.

Method used

An intelligent security system is used to obtain the security cycle of the conveyor through the sub-period division module, collect historical training data, train the machine learning model to predict the operating status of the next sub-period, and determine whether to enter the shutdown security mode based on real-time parameters, and formulate optimization instructions.

Benefits of technology

It achieves advance prediction and refined control of possible abnormal situations on the conveyor in the future, avoids the lag caused by emergency shutdown, and improves the security effect of the conveyor.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118790700A_ABST
    Figure CN118790700A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of conveying equipment, and discloses an intelligent security and protection system for a conveyor. Comprising the following steps: dividing a security period into sub-periods, collecting comprehensive operation parameters and operation state values of a conveyor in the sub-periods, training a machine learning model for predicting the operation state value of the next sub-period, judging whether to enter a shutdown security mode or not, marking adjustment parameters from the comprehensive operation parameters, and formulating a conveying optimization instruction; compared with the prior art, the security period of the conveyor is divided into the sub-periods, the security control duration of the conveyor can be finely controlled, and the running state of the conveyor in the next sub-period can be predicted based on the machine learning model; according to the method, the abnormal condition of the conveyor, which is about to occur at the future moment, is accurately predicted in advance, and an adaptive data optimization instruction is formulated, so that the hysteresis caused by emergency shutdown due to real-time evaluation of the running state is avoided, and the security effect of the conveyor is effectively improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of conveying equipment, and more specifically, to an intelligent security system for a conveyor. Background Art

[0002] Conveyors are widely used in many fields such as coal, mining, logistics, etc. During the operation of the conveyor, a series of problems may occur, such as overspeed, coal piling, deviation, tearing, etc., which may lead to serious accidents. At the same time, if the conveyor encounters problems such as jamming and motor overheating during operation, it may also cause equipment damage and production stagnation. Therefore, it is necessary to accurately monitor the operating status of the conveyor and develop a suitable security system to protect the operating status of the conveyor.

[0003] The patent application with reference publication number CN116280987A discloses a belt conveyor fault monitoring and early warning system, which uses an image acquisition system to collect images and conduct real-time monitoring of key parts of the belt conveyor during operation, and uses a data acquisition system to collect and conduct real-time monitoring of key data during the operation of the belt conveyor, thereby realizing real-time monitoring of the belt conveyor during operation, and uses an image data recognition system to identify and process relevant information collected by the image acquisition system and the data acquisition system, and uses a fault early warning system to re-identify abnormal information in the image and data, thereby confirming the abnormality, and then the fault early warning system can issue an early warning in time, so as to handle the fault in time, eliminating the safety hazard that cannot be discovered in time when the conveyor is abnormal;

[0004] The prior art has the following deficiencies:

[0005] The existing conveyor security system collects the real-time operating parameters of the conveyor during operation, and combines data calculation and analysis to evaluate the real-time operating status of the conveyor, and performs security processing based on the real-time operating status. Since the conveyor is in a continuous conveying state, the real-time analysis and evaluation of the conveyor operating status can only evaluate the operating status of the conveyor at the current moment, and cannot predict in advance the abnormal phenomena that will occur in the conveyor in the future. Therefore, when the operating status of the conveyor at a future moment is abnormal or even fails, the conveyor cannot be controlled to stop in advance, which leads to a lag in the security measures of the subsequent conveyor, reducing the security effect of the conveyor.

[0006] In view of this, the present invention proposes an intelligent security system for conveyors to solve the above problems. Summary of the invention

[0007] In order to overcome the above-mentioned defects of the prior art and to achieve the above-mentioned purpose, the present invention provides the following technical solution: a conveyor intelligent security system, applied to a conveyor control terminal, comprising:

[0008] The sub-period division module is used to obtain the security cycle of the conveyor and divide the security cycle into sub-periods based on the division criterion. The division criterion is: the time start point and time end point of any two adjacent sub-periods coincide with each other on the time line;

[0009] A data collection module is used to collect a historical training data set of the conveyor in a sub-period. The historical training data set includes comprehensive operating parameters and operating status values. The comprehensive operating parameters include bearing temperature values, smoke concentration values, speed over-limit values, coal pile height values, belt tearing degrees, and belt deviation degrees. The operating status values ​​include normal states and abnormal states.

[0010] A model training module is used to train a machine learning model that predicts the operating status value of the next sub-period based on a historical training data set;

[0011] The prediction and judgment module is used to collect real-time comprehensive operating parameters, input them into the trained machine learning model, predict the operating status value of the next sub-period, and determine whether to enter the shutdown security mode;

[0012] The instruction formulation module is used to mark adjustment parameters from the comprehensive operating parameters and formulate transportation optimization instructions based on the adjustment parameters.

[0013] Furthermore, the sub-period division method includes:

[0014] A point is randomly marked on the conveyor belt of the conveyor, which is recorded as the detection node;

[0015] Start the conveyor and continue to increase the operating power of the conveyor until the operating power of the conveyor reaches the rated power, then stop increasing it, and record the moment when the operating power of the conveyor reaches the rated power for the first time as the zero time;

[0016] After the zero point, two images of the detection node passing through the same position of the conveyor belt are captured by a camera to obtain a first image and a second image;

[0017] The time corresponding to the first image and the second image is queried one by one through the timestamp, recorded as the cycle start time and the cycle end time, and the duration between the cycle start time and the cycle end time is recorded as the security cycle;

[0018] Based on the preset division time, i+1 division points are marked in the security cycle;

[0019] Based on the i+1 division points, the security cycle is divided into i continuous sub-periods, and the time corresponding to the i+1th division point is recorded as the time start point of the i+1th sub-period and the time end point of the i-th sub-period.

[0020] Furthermore, the method for obtaining the coal pile height value includes:

[0021] Based on the preset height detection duration, p height detection moments are marked one by one in i sub-periods;

[0022] Along the conveying direction of the conveyor, the images of the conveyor head at p height detection moments are captured one by one by a camera to obtain p height detection images;

[0023] The areas corresponding to the conveyor belt and the coal in the p height detection images are identified one by one by using computer vision technology, and the belt area and the coal pile area are obtained respectively;

[0024] Draw a line horizontally along the upper boundary line of the tape area to obtain the tape level line;

[0025] Draw a line along the outer boundary line of the coal pile area to obtain the coal pile boundary line, and mark the pixel points on the coal pile boundary line one by one to obtain boundary pixel points;

[0026] Measure the vertical distance from the boundary pixel point to the tape horizontal line one by one, and record the maximum value of the vertical distance as the sub-height value, and obtain p sub-height values;

[0027] The p sub-height values ​​of the i sub-periods are accumulated and averaged to obtain the i coal pile height values;

[0028] The expression of coal pile height is:

[0029]

[0030] In the formula, DM gdi is the coal pile height value in the ith sub-period, GD zia is the ath sub-height value in the i-th sub-period.

[0031] Furthermore, the method for obtaining the tearing degree of the tape includes:

[0032] Taking the preset tear detection duration as the standard, s non-adjacent tear detection moments are marked in i sub-periods;

[0033] The tension sensor installed on the roller and in rolling contact with the conveyor belt measures the tension values ​​of the conveyor belt at s tear detection moments one by one to obtain s real-time tension values;

[0034] After subtracting the maximum value of i real-time tension values ​​from the minimum value of i real-time tension values, i tension change values ​​are obtained;

[0035] The expression of tension change value is:

[0036] ZL bhi =ZL zdi -ZL zxi ;

[0037] In the formula, ZL bhi is the tension change value of the ith sub-period, ZL zdi is the maximum value of the real-time tension value in the ith sub-period, ZL zxi is the minimum value of the real-time tension value in the i-th sub-period;

[0038] The time between the tear detection time corresponding to the maximum value of i real-time tension values ​​and the tear detection time corresponding to the minimum value of i real-time tension values ​​is recorded as the tear change time, and i tear change time is obtained;

[0039] Compare the i tension change values ​​with the i tear change durations in sequence to obtain the i tape tear degrees;

[0040] The expression of tape tearing degree is:

[0041]

[0042] In the formula, JD sli is the tape tearing degree of the i-th sub-period, SL bhi is the tearing change duration of the i-th sub-period.

[0043] Furthermore, the method for obtaining the belt deviation includes:

[0044] The midpoint of the i sub-periods is recorded as the deviation detection time, and i deviation detection times are obtained;

[0045] A camera installed above the conveyor belt is used to capture a top view image of the conveyor belt at i deviation detection moments, thereby obtaining i top view deviation images;

[0046] The conveyor belts in the i top-view deviation images are identified one by one by computer vision technology, and two long side lines and two short side lines are drawn along the outer boundary of the conveyor belt, and the areas within the two long side lines and the two short side lines are recorded as real-time areas, thereby obtaining i real-time areas;

[0047] Mark the midpoints of two long side lines in i real-time areas, draw a dividing line through the two midpoints, record the real-time area below the dividing line as the target area, and obtain i target areas;

[0048] Mark the pixels in the i target areas one by one, count the number of pixels, and obtain the total value of i pixels;

[0049] The standard area is obtained by querying the database, and i target areas are sequentially superimposed on the standard area, and the area outside the standard area is recorded as the deviation area, and i deviation areas are obtained;

[0050] Mark the pixels in the i deviation areas one by one, count the number of pixels, and obtain i deviation values;

[0051] Compare the i deviation values ​​with the i pixel total values ​​respectively to obtain the i tape deviation degrees;

[0052] The expression of belt deviation is:

[0053]

[0054] In the formula, JD ppi is the belt deviation in the ith sub-period, PP lzi is the deviation value of the ith sub-period, XS zli is the total pixel value of the i-th sub-period.

[0055] Furthermore, the training method of the machine learning model for predicting the operating state value of the next sub-period includes:

[0056] The comprehensive operation parameters are converted into multiple feature vectors using the sliding window method. The operation state value is converted into a label corresponding to the comprehensive operation parameter according to the sliding step. The normal state is converted to 0, and the abnormal state is converted to 1. One feature vector corresponds to one label and constitutes a set of training data. Multiple sets of training data constitute a training set. The comprehensive operation parameters are arranged in the order of collection time, and the prediction time step Z, sliding step Q and sliding window length N are preset.

[0057] The feature vector is used as the input of the machine learning model, and the operating status value of the next sub-period after the predicted time step Z is used as the output. The subsequent operating status value of each training set is used as the prediction target. The machine learning model is trained with the minimized sum of prediction errors as the training target to generate a machine learning model that predicts the operating status value of the next sub-period based on the comprehensive operating parameters of the previous sub-period.

[0058] Furthermore, the method for determining whether to enter the shutdown security mode includes:

[0059] When the output of the machine learning model is 0, the running status value of the next sub-period is normal;

[0060] When the output of the machine learning model is 1, the operation status value of the next sub-period is an abnormal state;

[0061] When the operation status value of the next sub-period is normal, it is determined not to enter the shutdown security mode;

[0062] When the operating status value of the next sub-period is abnormal, it is determined to enter the shutdown security mode.

[0063] Further, the marking method of adjusting the parameters includes:

[0064] Compare the bearing temperature value with a preset temperature safety value, and when the bearing temperature value is greater than the preset temperature safety value, mark the bearing temperature value as an adjustment parameter;

[0065] Compare the smoke concentration value with a preset concentration safety value, and when the smoke concentration value is greater than the preset concentration safety value, mark the smoke concentration value as an adjustment parameter;

[0066] The speed over-limit value is compared with a preset over-limit safety value, and when the speed over-limit value is greater than the preset over-limit safety value, the speed over-limit value is marked as an adjustment parameter;

[0067] Compare the coal pile height value with a preset height safety value, and when the coal pile height value is greater than the preset height safety value, mark the coal pile height value as an adjustment parameter;

[0068] Compare the tearing degree of the tape with a preset tearing safety value, and when the tearing degree of the tape is greater than the preset tearing safety value, mark the tearing degree of the tape as an adjustment parameter;

[0069] The belt deviation is compared with a preset deviation safety value. When the belt deviation is greater than the preset deviation safety value, the belt deviation is marked as an adjustment parameter.

[0070] Furthermore, the transport optimization instructions include instructions for reducing the bearing temperature value, instructions for reducing the smoke concentration value, instructions for reducing the speed limit value, instructions for reducing the coal pile height value, instructions for reducing the belt tearing degree and instructions for reducing the belt deviation degree.

[0071] Furthermore, the formulation method of the instruction for reducing the bearing temperature value, the instruction for reducing the smoke concentration value, the instruction for reducing the speed over-limit value, the instruction for reducing the coal pile height value, the instruction for reducing the belt tearing degree and the instruction for reducing the belt deviation degree includes:

[0072] When the adjustment parameter is the bearing temperature value, an instruction to reduce the bearing temperature value is formulated;

[0073] When the adjustment parameter is the smoke density value, an instruction to reduce the smoke density value is formulated;

[0074] When the adjustment parameter is the speed over-limit value, an instruction to reduce the speed over-limit value is formulated;

[0075] When the adjustment parameter is the coal pile height value, an instruction to reduce the coal pile height value is formulated;

[0076] When the adjustment parameter is the tearing degree of the tape, an instruction to reduce the tearing degree of the tape is formulated;

[0077] When the adjustment parameter is the belt deviation, an instruction to reduce the belt deviation is formulated.

[0078] Technical effects and advantages of the intelligent security system for conveyors of the present invention:

[0079] The present invention obtains the security cycle of the conveyor and divides the security cycle into sub-periods based on a division criterion, so as to collect a historical training data set of the conveyor in the sub-period, wherein the historical training data set includes comprehensive operating parameters and operating status values, and a machine learning model for predicting the operating status value of the next sub-period is trained based on the historical training data set, and the real-time comprehensive operating parameters are collected and input into the trained machine learning model to predict the operating status value of the next sub-period, and determine whether to enter the shutdown security mode, mark the adjustment parameters from the comprehensive operating parameters, and formulate a conveying optimization instruction based on the adjustment parameters; compared with the prior art, the present invention obtains the security cycle of the conveyor and divides the security cycle into sub-periods based on a division criterion, so as to collect a historical training data set of the conveyor in the sub-period, and the historical training data set includes comprehensive operating parameters and operating status values, and trains a machine learning model for predicting the operating status value of the next sub-period based on the historical training data set, and collects the real-time comprehensive operating parameters and inputs them into the trained machine learning model to predict the operating status value of the next sub-period, and determine whether to enter the shutdown security mode, mark the adjustment parameters from the comprehensive operating parameters, and formulate a conveying optimization instruction based on the adjustment parameters; compared with the prior art, the present invention obtains the security cycle of the conveyor and divides the security cycle into sub-periods based on a division criterion, and By dividing the security cycle into sub-periods, the security cycle with a larger time span can be subdivided, so as to fine-tune the security control time of the conveyor, and combine the comprehensive operating parameters of the past sub-periods, based on the machine learning model, it can predict the operating status of the conveyor in the next sub-period, so as to predict in advance and accurately the abnormal situation that will occur in the future of the conveyor, and enter the shutdown security mode in advance, and formulate appropriate data optimization instructions for the abnormal data to improve the safety of the conveyor's transportation operation status, thereby avoiding the lag caused by the emergency shutdown due to real-time evaluation of the operation status, and effectively improving the security effect of the conveyor. BRIEF DESCRIPTION OF THE DRAWINGS

[0080] Figure 1 A schematic diagram of an intelligent security system for a conveyor provided in Example 1 of the present invention;

[0081] Figure 2 A schematic flow chart of the intelligent security method for a conveyor provided in Example 2 of the present invention. DETAILED DESCRIPTION

[0082] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0083] Example 1: Please refer to Figure 1 As shown, the intelligent security system for conveyors described in this embodiment is applied to a conveyor control terminal, and includes:

[0084] A sub-period division module is used to obtain the security period of the conveyor and divide the security period into sub-periods based on the division criteria;

[0085] The security cycle refers to the time required for the conveyor to carry out a complete set of security data monitoring and security instruction formulation, which can be used to uniformly limit the time used for the conveyor's security operation and serve as the basis for subsequent sub-period division. The sub-period is the minimum unit of the security cycle and serves as the standard time for subsequent data collection. Since the security cycle is long, it contains more data. In order to break down the data in the security cycle into small pieces, it is necessary to divide the security cycle into multiple continuous and equal sub-periods through division criteria;

[0086] The division criterion is: the start and end points of any two adjacent sub-periods coincide with each other on the timeline.

[0087] The sub-period division methods include:

[0088] A point is randomly marked on the conveyor belt of the conveyor, which is recorded as the detection node;

[0089] Start the conveyor and continue to increase the operating power of the conveyor until the operating power of the conveyor reaches the rated power, then stop increasing it, and record the moment when the operating power of the conveyor reaches the rated power for the first time as the zero time; the rated power refers to the operating power when the conveyor reaches normal operation, ensuring that the conveyor can maintain normal operation; the rated power can be obtained by querying the technical parameter table of the conveyor;

[0090] After the zero point, two images of the detection node passing through the same position of the conveyor belt are captured by a camera to obtain a first image and a second image;

[0091] The time corresponding to the first image and the second image is queried one by one through the timestamp, recorded as the cycle start time and the cycle end time, and the duration between the cycle start time and the cycle end time is recorded as the security cycle;

[0092] Based on the preset division time, i+1 division points are marked in the security cycle; the preset division time is the minimum time for a complete and sufficient change of the security data in the conveyor to be collected, which can ensure that the security data in each sub-period can change, so as to accurately collect the security status in each sub-period; the preset division time is set according to the length of the security cycle of the actual conveyor; for example, if the security cycle is 40 seconds, the sub-period is 2 seconds;

[0093] Based on the i+1 division points, the security cycle is divided into i continuous sub-periods, and the time corresponding to the i+1th division point is recorded as the time start point of the i+1th sub-period and the time end point of the i-th sub-period.

[0094] It should be noted that by dividing the security cycle into sub-periods, the overall security cycle with a large time span can be subdivided, so that a large amount of security data can be distinguished according to different time periods, so as to facilitate the subsequent collection and analysis of security data, thereby avoiding data collection errors.

[0095] A data collection module is used to collect a historical training data set of the conveyor in a sub-period, wherein the historical training data set includes comprehensive operating parameters and operating status values, and the comprehensive operating parameters include bearing temperature value, smoke concentration value, speed over-limit value, coal pile height value, belt tearing degree and belt deviation degree;

[0096] Comprehensive operating parameters refer to the internal data of the conveyor itself and the external data of the environment in which the conveyor is located that may change during the process of conveying coal, so that these data can comprehensively represent the safety of the conveyor during the process of conveying coal, thereby specifically representing the operating status of the conveyor and facilitating the determination of whether the operating status of the conveyor is safe;

[0097] Comprehensive operating parameters include bearing temperature, smoke concentration, speed limit, coal pile height, belt tearing and belt deviation;

[0098] The bearing temperature value refers to the local temperature value generated by the rotation of the bearing at the connection between the roller and the conveyor belt during the conveying of coal by the conveyor. The larger the bearing temperature value, the higher the local temperature between the roller and the conveyor belt on the conveyor, which will cause excessive wear and even failure or fire of the roller and the conveyor belt due to high temperature, thereby causing the operating state of the conveyor to deteriorate. The bearing temperature value is obtained by detecting the temperature sensor installed between the conveyor roller and the conveyor belt.

[0099] The smoke concentration value refers to the smoke concentration value in the mine environment where the conveyor is located, which can indicate the smoke conditions in the environment where the conveyor is located. The larger the smoke concentration value, the larger the smoke concentration value in the environment where the conveyor is located. The greater the probability of fire in the environment where the conveyor is located, the worse the operating state of the conveyor will be. The smoke concentration value is obtained through detection by a smoke concentration sensor installed above the drive device of the conveyor and located at the downwind outlet.

[0100] The speed overlimit value refers to the extent to which the real-time conveying speed of the conveyor exceeds the safety speed when conveying coal. The larger the speed overlimit value, the greater the extent to which the real-time conveying speed of the conveyor exceeds the safety speed, the greater the probability of coal spilling on the conveyor or the conveyor malfunctioning, and the worse the operating condition of the conveyor. The speed overlimit value is obtained by detecting the real-time conveying speed of the conveyor through the speed sensor installed on the roller, and then subtracting the real-time conveying speed from the safety speed. The safety speed refers to the rated conveying speed of the conveyor when conveying coal under safe operating conditions, which is obtained by querying the technical parameter table of the conveyor.

[0101] The coal pile height value refers to the height value of the coal piled on the conveyor belt during the conveying process of the conveyor, which can be used to represent the height of the top position of the coal piled on the conveyor. The larger the coal pile height value, the higher the height of the coal piled on the conveyor belt, which leads to a greater probability of the coal on the conveyor belt collapsing and spilling, and the worse the operating state of the conveyor;

[0102] The method for obtaining the coal pile height value includes:

[0103] Taking the preset height detection time as the standard, p height detection moments are marked one by one in i sub-periods; the preset height detection time refers to the time interval when taking two adjacent height detection images, which can limit the time span between two adjacent height detection images, so that the pile of coal on the conveyor belt can be transported to a certain distance, so as to improve the relatively stable state of the pile of coal on the conveyor belt, and the coal pile will not collapse; the preset height detection time is set according to the actual running speed of the conveyor. When the running speed of the conveyor is higher, the preset height detection time is shorter; the specific value of the preset height detection time is not unique, as long as it meets the needs;

[0104] Along the conveying direction of the conveyor, the images of the conveyor head at p height detection moments are captured one by one by a camera to obtain p height detection images;

[0105] The areas corresponding to the conveyor belt and the coal in the p height detection images are identified one by one by using computer vision technology, and the belt area and the coal pile area are obtained respectively;

[0106] Draw a horizontal line along the upper boundary line of the tape area to obtain the tape horizontal line; the tape horizontal line serves as the dividing line between the tape and the coal pile, and can provide a reference basis for the subsequent data measurement of the coal pile height to ensure the accuracy of the calculation of the coal pile height;

[0107] Draw a line along the outer boundary line of the coal pile area to obtain the coal pile boundary line, and mark the pixel points on the coal pile boundary line one by one to obtain boundary pixel points;

[0108] Measure the vertical distance from the boundary pixel point to the tape horizontal line one by one, and record the maximum value of the vertical distance as the sub-height value, and obtain p sub-height values;

[0109] The p sub-height values ​​of the i sub-periods are accumulated and averaged to obtain the i coal pile height values;

[0110] The expression of coal pile height is:

[0111]

[0112] In the formula, DM gdi is the coal pile height value in the ith sub-period, GD zia is the ath sub-height value in the i-th sub-period.

[0113] The belt tearing degree refers to the severity of the longitudinal tearing of the conveyor belt during the conveying of coal. It can be used to numerically represent the tearing of the conveyor belt. The greater the belt tearing degree, the more serious the longitudinal tearing of the conveyor belt, the higher the probability of the conveyor belt breaking and causing operating failure, and the worse the operating state of the conveyor.

[0114] Methods for obtaining the tearing degree of the tape include:

[0115] Taking the preset tear detection time as the standard, s non-adjacent tear detection moments are marked in i sub-periods respectively; the preset tear detection time refers to the time interval for detecting two adjacent real-time tension values, which can limit the time span between two adjacent real-time tension values ​​to ensure that the longitudinal positions of the conveyor belt corresponding to the two adjacent real-time tension values ​​do not overlap; the preset tear detection time is specifically set according to the actual conveyor belt tension measurement length requirement;

[0116] The tension sensor installed on the roller and in rolling contact with the conveyor belt measures the tension values ​​of the conveyor belt at s tear detection moments one by one to obtain s real-time tension values;

[0117] After subtracting the maximum value of i real-time tension values ​​from the minimum value of i real-time tension values, i tension change values ​​are obtained;

[0118] The expression of tension change value is:

[0119] ZL bhi =ZL zdi -ZL zxi ;

[0120] In the formula, ZL bhi is the tension change value of the ith sub-period, ZL zdi is the maximum value of the real-time tension value in the ith sub-period, ZL zxiis the minimum value of the real-time tension value in the i-th sub-period;

[0121] The time between the tear detection time corresponding to the maximum value of i real-time tension values ​​and the tear detection time corresponding to the minimum value of i real-time tension values ​​is recorded as the tear change time, and i tear change time is obtained;

[0122] Compare the i tension change values ​​with the i tear change durations in sequence to obtain the i tape tear degrees;

[0123] The expression of tape tearing degree is:

[0124]

[0125] In the formula, JD sli is the tape tearing degree of the i-th sub-period, SL bhi is the tearing change duration of the i-th sub-period.

[0126] The belt deviation refers to the extent to which the conveyor belt deviates to one side during the conveying of coal by the conveyor, which causes the conveyor belt to tilt. It can be used to numerically represent the deviation of the conveyor belt to both sides. The greater the belt deviation, the greater the deviation of the conveyor belt to one side, the more serious the deviation of the conveyor belt, and the worse the running state of the conveyor.

[0127] Methods for obtaining belt deviation include:

[0128] The midpoint of the i sub-periods is recorded as the deviation detection time, and i deviation detection times are obtained;

[0129] A camera installed above the conveyor belt is used to capture a top view image of the conveyor belt at i deviation detection moments, thereby obtaining i top view deviation images;

[0130] The conveyor belts in the i top-view deviation images are identified one by one by computer vision technology, and two long side lines and two short side lines are drawn along the outer boundary of the conveyor belt, and the areas within the two long side lines and the two short side lines are recorded as real-time areas, thereby obtaining i real-time areas;

[0131] The midpoints of two long side lines are marked in i real-time areas, and a dividing line is drawn through the two midpoints. The real-time area below the dividing line is recorded as the target area, and i target areas are obtained. When the conveyor belt deviates, the area below the dividing line will be offset, so that the target area can accurately represent the area where the conveyor belt deviates.

[0132] Mark the pixels in the i target areas one by one, count the number of pixels, and obtain the total value of i pixels;

[0133] The standard area is obtained by querying the database, and i target areas are sequentially superimposed on the standard area, and the area outside the standard area is recorded as the deviation area, and i deviation areas are obtained; the standard area refers to the image of the standard area obtained by the above method and pre-stored in the database when the conveyor belt does not deviate, and serves as the basis for subsequent deviation area recognition of the target area;

[0134] Mark the pixels in the i deviation areas one by one, count the number of pixels, and obtain i deviation values;

[0135] Compare the i deviation values ​​with the i pixel total values ​​respectively to obtain the i tape deviation degrees;

[0136] The expression of belt deviation is:

[0137]

[0138] In the formula, JD ppi is the belt deviation in the ith sub-period, PP lzi is the deviation value of the ith sub-period, XS zli is the total pixel value of the i-th sub-period.

[0139] The operating status value refers to the overall operating status of the conveyor when the conveyor is transporting coal, which can indicate the safety of the conveyor during operation. The operating status value includes normal status and abnormal status. When the operating status value is in normal status, it means that the safety of the conveyor during operation is good. When the operating status value is in abnormal status, it means that the safety of the conveyor during operation is poor. The operating status value is obtained by collecting the corresponding bearing temperature values, smoke concentration values, speed limit values, coal pile height values, belt tearing degree and belt deviation degree under normal and abnormal conditions.

[0140] A model training module is used to train a machine learning model that predicts the operating status value of the next sub-period based on a historical training data set;

[0141] After obtaining the historical training data set, the machine learning model that can accurately predict the operating status value of the next sub-period can be trained based on the comprehensive operating parameters and operating status values, so as to make advance predictions on the future situations of the conveyor.

[0142] The training method of the machine learning model for predicting the operating status value of the next sub-period includes:

[0143] The comprehensive operation parameters are converted into multiple feature vectors using the sliding window method. The operation state value is converted into a label corresponding to the comprehensive operation parameter according to the sliding step. The normal state is converted to 0, and the abnormal state is converted to 1. One feature vector corresponds to one label and constitutes a set of training data. Multiple sets of training data constitute a training set. The comprehensive operation parameters are arranged in the order of collection time, and the prediction time step Z, sliding step Q and sliding window length N are preset.

[0144] The feature vector is used as the input of the machine learning model, and the operating status value of the next sub-period after the predicted time step Z is used as the output. The subsequent operating status value of each training set is used as the prediction target. The machine learning model is trained with the minimized sum of prediction errors as the training target to generate a machine learning model that predicts the operating status value of the next sub-period based on the comprehensive operating parameters of the previous sub-period.

[0145] Exemplarily, the machine learning model is any one of a CNN neural network model or AlexNet;

[0146] The calculation formula for the prediction error is:

[0147] zk=(ak-wk) 2

[0148] Where zk is the prediction error, k is the group number of the feature vector; ak is the predicted state value corresponding to the kth group of feature vectors, and wk is the actual state value corresponding to the kth group of training data;

[0149] In the machine learning model, the feature vector is the comprehensive operation parameter, and the state value is the operation state value;

[0150] Other model parameters of the machine learning model, target loss value, optimization algorithm, training set test set validation set ratio, and loss function optimization are all achieved through actual engineering implementation and continuous experimental tuning.

[0151] Specifically, a simple example of the sliding window method is as follows: assuming that a machine learning model is to be trained with comprehensive operating parameters (Q1, Q2, Q3, Q4, Q5, Q6) to predict the value of one time step in the future, a sliding window of length 4 and a sliding step of length 1 can be used to generate a predicted future training set and a predicted target. For example, the training sets are (Q1, Q2, Q3, Q4) and (Q2, Q3, Q4, Q5), and the predicted targets are (E5) and (E6), where E5 is the operating state value corresponding to the comprehensive operating parameters of the next sub-period of the sub-period where Q4 is located, and E6 is the operating state value corresponding to the comprehensive operating parameters of the next sub-period of the sub-period where Q5 is located;

[0152] The sliding window method can be used to accurately and in advance predict the operating status value at a future moment based on the existing historical data of the conveyor's coal transportation process, so that before the conveyor's operating status value changes abnormally, the change of the operating status value can be known in advance and provided to the conveying control terminal as a basis for safety assessment and emergency stop operation, thereby avoiding serious failures of the conveyor due to drastic changes in various parameters during the transportation process.

[0153] The prediction and judgment module is used to collect real-time comprehensive operating parameters, input them into the trained machine learning model, predict the operating status value of the next sub-period, and determine whether to enter the shutdown security mode;

[0154] After the machine learning model is trained, the real-time comprehensive operating parameters can be collected and input into the machine learning model. According to the output of the machine learning model, the operating status value of the conveyor can be obtained, and used as the basis for subsequent determination of whether to enter the shutdown safety mode. When entering the shutdown safety mode, it means that the operating status of the conveyor is poor at this time, and the conveyor needs to be shut down urgently, and instructions are given for the regulation of subsequent operating parameters.

[0155] The determination methods for whether to enter the shutdown security mode include:

[0156] When the output of the machine learning model is 0, the running status value of the next sub-period is normal;

[0157] When the output of the machine learning model is 1, the operation status value of the next sub-period is an abnormal state;

[0158] When the running status value of the next sub-period is in normal state, the running state of the conveyor is good at this time, and it is determined not to enter the shutdown security mode;

[0159] When the operating status value of the next sub-period is in an abnormal state, and the operating state of the conveyor is poor, it is determined to enter the shutdown security mode.

[0160] When entering the shutdown safety mode, the conveyor will first shut down urgently to prevent the conveyor from malfunctioning, thereby improving the safety of the conveyor's coal transportation process. At the same time, it also provides time for subsequent adjustments to the relevant parameters of the conveyor's operating status, thereby avoiding delays caused by the conveyor shutting down only when a malfunction occurs.

[0161] An instruction formulation module, used for marking adjustment parameters from comprehensive operation parameters, and formulating transportation optimization instructions based on the adjustment parameters;

[0162] The adjustment parameter refers to one or more parameters among the comprehensive operating parameters, including the bearing temperature value, smoke concentration value, speed overlimit value, coal pile height value, belt tearing degree and belt deviation degree, which may cause the conveyor to have an abnormal operating state, so that the adjustment parameter serves as the basis for optimizing the operating state of the conveyor;

[0163] Notational methods for adjusting parameters include:

[0164] Compare the bearing temperature value with the preset temperature safety value; the preset temperature safety value refers to the maximum value of the bearing temperature when the conveyor's operating state value is in a normal state, which can limit the maximum value of the bearing temperature in a normal state; the preset temperature safety value is obtained by collecting a large number of historical maximum values ​​of the bearing temperature when the conveyor's operating state value is in a normal state and calculating the average value;

[0165] When the bearing temperature value is greater than the preset temperature safety value, the local temperature between the conveyor roller and the conveyor belt is too high, which will have a significant negative impact on the operating state of the conveyor. In this case, the bearing temperature value is marked as an adjustment parameter.

[0166] Compare the smoke concentration value with the preset concentration safety value; the preset concentration safety value refers to the maximum value of the smoke concentration value when the operating state value of the conveyor is in a normal state, which can limit the maximum value of the smoke concentration value in a normal state; the preset concentration safety value is obtained by collecting a large number of historical maximum values ​​of the smoke concentration value when the operating state value of the conveyor is in a normal state and calculating the average value;

[0167] When the smoke concentration value is greater than the preset concentration safety value, the smoke concentration in the mine environment where the conveyor is located is too high, which will have a significant negative impact on the operating state of the conveyor, and the smoke concentration value is marked as an adjustment parameter;

[0168] The speed over-limit value is compared with the preset over-limit safety value; the preset over-limit safety value refers to the maximum value of the speed over-limit value when the running state value of the conveyor is in the normal state, which can limit the maximum value of the speed over-limit value in the normal state; the preset over-limit safety value is obtained by collecting the maximum values ​​of the speed over-limit values ​​of a large number of conveyor running state values ​​in the normal state in history and calculating their average value;

[0169] When the speed over-limit value is greater than the preset over-limit safety value, the real-time conveying speed of the conveyor exceeds the safety speed by too much, which will have a significant negative impact on the operating state of the conveyor. In this case, the speed over-limit value is marked as an adjustment parameter.

[0170] The coal pile height value is compared with a preset height safety value; the preset height safety value refers to the maximum value of the coal pile height value when the operating state value of the conveyor is in a normal state, which can limit the maximum value of the coal pile height value in a normal state; the preset height safety value is obtained by collecting a large number of historical maximum values ​​of the coal pile height values ​​when the operating state value of the conveyor is in a normal state, and then calculating the average value;

[0171] When the coal pile height value is greater than the preset height safety value, the coal pile height value on the conveyor belt during the conveyor conveying coal is too large, which will have a significant negative impact on the operating state of the conveyor, and the coal pile height value is marked as an adjustment parameter;

[0172] Compare the tearing degree of the tape with the preset tearing safety value; the preset tearing safety value refers to the maximum tearing degree of the tape when the running state value of the conveyor is in the normal state, which can limit the maximum tearing degree of the tape in the normal state; the preset tearing safety value is obtained by collecting a large number of historical conveyor running state values ​​as the maximum tearing degree of the tape when the running state value is in the normal state, and then calculating the average value;

[0173] When the tearing degree of the belt is greater than the preset tearing safety value, the greater the severity of the longitudinal tearing of the conveying belt during the conveying of coal, the greater the negative impact on the running state of the conveyor, and the belt tearing degree is marked as an adjustment parameter;

[0174] Compare the belt deviation with the preset deviation safety value; the preset deviation safety value refers to the maximum value of the belt deviation when the running state value of the conveyor is in the normal state, which can limit the maximum value of the belt deviation in the normal state; the preset deviation safety value is obtained by collecting a large number of historical conveyor running state values ​​as the maximum values ​​of the belt deviation when the running state value is in the normal state, and then calculating the average value;

[0175] When the belt deviation is greater than the preset deviation safety value, the conveyor belt deviates to one side during the conveyor conveying coal. The greater the conveyor belt tilts, the greater the negative impact on the operating state of the conveyor. The belt deviation is marked as an adjustment parameter.

[0176] When the adjustment parameters are marked, it means that there are parameters with abnormally large values ​​in the comprehensive operating parameters of the conveyor. It is necessary to formulate transportation optimization instructions related to the adjustment parameters according to the specific types of the adjustment parameters, so that the transportation optimization instructions can optimize the various adjustment parameters in the process of conveying coal by the conveyor, ensure that the conveyor can maintain a safe operating state, and avoid more serious faults in the subsequent operation of the conveyor;

[0177] The conveying optimization instructions include instructions for reducing the bearing temperature value, reducing the smoke concentration value, reducing the speed limit value, reducing the coal pile height value, reducing the belt tearing degree and reducing the belt deviation degree;

[0178] The formulation method of the instruction for reducing the bearing temperature value, the instruction for reducing the smoke concentration value, the instruction for reducing the speed over-limit value, the instruction for reducing the coal pile height value, the instruction for reducing the belt tearing degree and the instruction for reducing the belt deviation degree includes:

[0179] When the adjustment parameter is the bearing temperature value, it is necessary to cool down the local temperature between the conveyor roller and the conveyor belt, and an instruction to reduce the bearing temperature value is formulated;

[0180] When the adjustment parameter is the smoke concentration value, it is necessary to adsorb the smoke concentration value in the mine environment where the conveyor is located, and then formulate an instruction to reduce the smoke concentration value;

[0181] When the adjustment parameter is a speed over-limit value, the real-time conveying speed of the conveyor needs to be reduced, and an instruction to reduce the speed over-limit value is formulated;

[0182] When the adjustment parameter is the coal pile height value, it is necessary to sort out the coal accumulated on the conveyor belt during the coal conveying process of the conveyor, and then an instruction to reduce the coal pile height value is formulated;

[0183] When the adjustment parameter is the tearing degree of the belt, it is necessary to replace the conveying belt of the conveyor during the coal conveying process, and an instruction to reduce the tearing degree of the belt is formulated;

[0184] When the adjustment parameter is the belt deviation, it is necessary to adjust the deviation of the conveying belt during the conveyor conveying coal, and then an instruction to reduce the belt deviation is formulated.

[0185] It should be noted that, after the instructions for reducing the bearing temperature value, the smoke concentration value, the speed limit value, the coal pile height value, the belt tearing degree and the belt deviation degree are formulated, the conveying control terminal needs to control the corresponding mechanism and equipment to execute the conveying optimization instruction according to the actual conveying optimization instruction, so that the conveyor can contact the abnormal state to ensure the normal and safe operation of the subsequent conveyor;

[0186] Specifically, when an instruction to lower the bearing temperature value is formulated, the automatic sprinkler device will automatically sprinkle water on the connection between the roller and the conveyor belt to achieve a cooling effect. When an instruction to lower the smoke concentration value is formulated, the automatic sprinkler device and the exhaust fan work at the same time to achieve the effect of sprinkling water to extinguish the fire and exhausting air to reduce the smoke concentration. When an instruction to reduce the speed limit is formulated, the drive motor of the conveyor is controlled to reduce the speed to achieve a deceleration effect. When an instruction to reduce the coal pile height value is formulated, the automatic coal pushing equipment will push down and comb the coal on the conveyor belt to achieve the effect of lowering the height of the coal. When an instruction to reduce the tear degree of the belt is formulated, it is necessary to stop the machine to replace the conveyor belt. When an instruction to reduce the deviation of the belt is formulated, the conveyor needs to be stopped and the deviation of the conveyor belt can be adjusted by adjusting the offset of the roller.

[0187] In this embodiment, the security cycle of the conveyor is obtained, and based on the division criteria, the security cycle is divided into sub-periods, which are used to collect historical training data sets of the conveyor in the sub-periods, the historical training data sets include comprehensive operating parameters and operating status values, and based on the historical training data sets, a machine learning model that predicts the operating status value of the next sub-period is trained, and the real-time comprehensive operating parameters are collected and input into the trained machine learning model to predict the operating status value of the next sub-period, and determine whether to enter the shutdown security mode, mark the adjustment parameters from the comprehensive operating parameters, and formulate a conveying optimization instruction based on the adjustment parameters; compared with the prior art, by The security cycle can be divided into sub-periods, and the security cycle with a larger time span can be subdivided, so as to carry out fine control of the security control time of the conveyor, and combined with the comprehensive operating parameters of the past sub-periods, the operating status of the conveyor in the next sub-period can be predicted based on the machine learning model, so as to predict in advance and accurately the abnormal situation that will occur in the future of the conveyor, and enter the shutdown security mode in advance, and formulate appropriate data optimization instructions for the abnormal data to improve the safety of the conveyor's transportation operation status, thereby avoiding the lag caused by the emergency shutdown due to the real-time evaluation of the operation status, and effectively improving the security effect of the conveyor.

[0188] Example 2: Please refer to Figure 2 As shown, the part not described in detail in this embodiment is described in Example 1, and a conveyor intelligent security method is provided, which is applied to a conveyor control terminal and implemented based on a conveyor intelligent security system, including:

[0189] S1: Obtain the security cycle of the conveyor, and divide the security cycle into sub-periods based on a division criterion. The division criterion is: the start and end points of any two adjacent sub-periods coincide with each other on the timeline;

[0190] S2: Collect the historical training data set of the conveyor in the sub-period, the historical training data set includes comprehensive operating parameters and operating status values, the comprehensive operating parameters include bearing temperature value, smoke concentration value, speed limit value, coal pile height value, belt tearing degree and belt deviation degree, and the operating status value includes normal state and abnormal state;

[0191] S3: Based on the historical training data set, train a machine learning model to predict the operating status value of the next sub-period;

[0192] S4: Collect real-time comprehensive operating parameters, input them into the trained machine learning model, predict the operating status value of the next sub-period, and determine whether to enter the shutdown security mode; if entering the shutdown security mode, execute S5; if not entering the shutdown security mode, repeat S4;

[0193] S5: Mark adjustment parameters from the comprehensive operating parameters, and formulate transportation optimization instructions based on the adjustment parameters.

[0194] The above description is only a specific implementation mode of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. Conveyor intelligent security system, applied to conveyor control terminal, It is characterized in that include: The sub-period division module is used to obtain the security cycle of the conveyor and divide the security cycle into sub-periods based on the division criterion. The division criterion is: the time start point and time end point of any two adjacent sub-periods coincide with each other on the time line; A data collection module is used to collect a historical training data set of the conveyor in a sub-period. The historical training data set includes comprehensive operating parameters and operating status values. The comprehensive operating parameters include bearing temperature values, smoke concentration values, speed over-limit values, coal pile height values, belt tearing degrees, and belt deviation degrees. The operating status values ​​include normal states and abnormal states. A model training module is used to train a machine learning model that predicts the operating status value of the next sub-period based on a historical training data set; The prediction and judgment module is used to collect real-time comprehensive operating parameters, input them into the trained machine learning model, predict the operating status value of the next sub-period, and determine whether to enter the shutdown security mode; The instruction formulation module is used to mark adjustment parameters from the comprehensive operating parameters and formulate transportation optimization instructions based on the adjustment parameters.

2. According to claim 1, the intelligent security system for conveyors, It is characterized in that The method for dividing the sub-periods includes: A point is randomly marked on the conveyor belt of the conveyor, which is recorded as the detection node; Start the conveyor and continue to increase the operating power of the conveyor until the operating power of the conveyor reaches the rated power, then stop increasing it, and record the moment when the operating power of the conveyor reaches the rated power for the first time as the zero time; After the zero point, two images of the detection node passing through the same position of the conveyor belt are captured by a camera to obtain a first image and a second image; The time corresponding to the first image and the second image is queried one by one through the timestamp, recorded as the cycle start time and the cycle end time, and the duration between the cycle start time and the cycle end time is recorded as the security cycle; Based on the preset division time, i+1 division points are marked in the security cycle; Based on the i+1 division points, the security cycle is divided into i continuous sub-periods, and the time corresponding to the i+1th division point is recorded as the time start point of the i+1th sub-period and the time end point of the i-th sub-period.

3. According to claim 2, the intelligent security system for conveyors, It is characterized in that The method for obtaining the coal pile height value comprises: Based on the preset height detection duration, p height detection moments are marked one by one in i sub-periods; Along the conveying direction of the conveyor, the images of the conveyor head at p height detection moments are captured one by one by a camera to obtain p height detection images; The areas corresponding to the conveyor belt and the coal in the p height detection images are identified one by one by using computer vision technology, and the belt area and the coal pile area are obtained respectively; Draw a line horizontally along the upper boundary line of the tape area to obtain the tape level line; Draw a line along the outer boundary line of the coal pile area to obtain the coal pile boundary line, and mark the pixel points on the coal pile boundary line one by one to obtain boundary pixel points; Measure the vertical distance from the boundary pixel point to the tape horizontal line one by one, and record the maximum value of the vertical distance as the sub-height value, and obtain p sub-height values; The p sub-height values ​​of the i sub-periods are accumulated and averaged to obtain the i coal pile height values; The expression of coal pile height is: In the formula, DM gdi is the coal pile height value in the ith sub-period, GD zia is the ath sub-height value in the i-th sub-period.

4. According to claim 3, the intelligent security system for conveyors, It is characterized in that The method for obtaining the tearing degree of the adhesive tape comprises: Taking the preset tear detection duration as the standard, s non-adjacent tear detection moments are marked in i sub-periods; The tension sensor installed on the roller and in rolling contact with the conveyor belt measures the tension values ​​of the conveyor belt at s tear detection moments one by one to obtain s real-time tension values; After subtracting the maximum value of i real-time tension values ​​from the minimum value of i real-time tension values, i tension change values ​​are obtained; The expression of tension change value is: ZL bhi =ZL zdi -ZL zxi ; In the formula, ZL bhi is the tension change value of the ith sub-period, ZL zdi is the maximum value of the real-time tension value in the ith sub-period, ZL zxi is the minimum value of the real-time tension value in the i-th sub-period; The time between the tear detection time corresponding to the maximum value of i real-time tension values ​​and the tear detection time corresponding to the minimum value of i real-time tension values ​​is recorded as the tear change time, and i tear change time is obtained; Compare the i tension change values ​​with the i tear change durations in sequence to obtain the i tape tear degrees; The expression of tape tearing degree is: In the formula, JD sli is the tape tearing degree of the i-th sub-period, SL bhi is the tearing change duration of the i-th sub-period.

5. The intelligent security system for conveyors according to claim 4, It is characterized in that The method for obtaining the belt deviation degree includes: The midpoint of the i sub-periods is recorded as the deviation detection time, and i deviation detection times are obtained; A camera installed above the conveyor belt is used to capture a top view image of the conveyor belt at i deviation detection moments, thereby obtaining i top view deviation images; The conveyor belts in the i top-view deviation images are identified one by one by computer vision technology, and two long side lines and two short side lines are drawn along the outer boundary of the conveyor belt, and the areas within the two long side lines and the two short side lines are recorded as real-time areas, thereby obtaining i real-time areas; Mark the midpoints of two long side lines in i real-time areas, draw a dividing line through the two midpoints, record the real-time area below the dividing line as the target area, and obtain i target areas; Mark the pixels in the i target areas one by one, count the number of pixels, and obtain the total value of i pixels; The standard area is obtained by querying the database, and i target areas are sequentially superimposed on the standard area, and the area outside the standard area is recorded as the deviation area, and i deviation areas are obtained; Mark the pixels in the i deviation areas one by one, count the number of pixels, and obtain i deviation values; Compare the i deviation values ​​with the i pixel total values ​​respectively to obtain the i tape deviation degrees; The expression of belt deviation is: In the formula, JD ppi is the belt deviation in the ith sub-period, PP lzi is the deviation value of the ith sub-period, XS zli is the total pixel value of the i-th sub-period.

6. The intelligent security system for conveyors according to claim 5, It is characterized in that The training method of the machine learning model for predicting the operating state value of the next sub-period includes: The comprehensive operation parameters are converted into multiple feature vectors using the sliding window method. The operation state value is converted into a label corresponding to the comprehensive operation parameter according to the sliding step. The normal state is converted to 0, and the abnormal state is converted to 1. One feature vector corresponds to one label and constitutes a set of training data. Multiple sets of training data constitute a training set. The comprehensive operation parameters are arranged in the order of collection time, and the prediction time step Z, sliding step Q and sliding window length N are preset. The feature vector is used as the input of the machine learning model, and the operating status value of the next sub-period after the predicted time step Z is used as the output. The subsequent operating status value of each training set is used as the prediction target. The machine learning model is trained with the minimized sum of prediction errors as the training target to generate a machine learning model that predicts the operating status value of the next sub-period based on the comprehensive operating parameters of the previous sub-period.

7. The intelligent security system for conveyors according to claim 6, It is characterized in that The method for determining whether to enter the shutdown security mode includes: When the output of the machine learning model is 0, the running status value of the next sub-period is normal; When the output of the machine learning model is 1, the operation status value of the next sub-period is an abnormal state; When the operation status value of the next sub-period is normal, it is determined not to enter the shutdown security mode; When the operating status value of the next sub-period is abnormal, it is determined to enter the shutdown security mode.

8. The intelligent security system for conveyors according to claim 7, It is characterized in that The marking method of the adjustment parameter includes: Compare the bearing temperature value with a preset temperature safety value, and when the bearing temperature value is greater than the preset temperature safety value, mark the bearing temperature value as an adjustment parameter; Compare the smoke concentration value with a preset concentration safety value, and when the smoke concentration value is greater than the preset concentration safety value, mark the smoke concentration value as an adjustment parameter; The speed over-limit value is compared with a preset over-limit safety value, and when the speed over-limit value is greater than the preset over-limit safety value, the speed over-limit value is marked as an adjustment parameter; Compare the coal pile height value with a preset height safety value, and when the coal pile height value is greater than the preset height safety value, mark the coal pile height value as an adjustment parameter; Compare the tearing degree of the tape with a preset tearing safety value, and when the tearing degree of the tape is greater than the preset tearing safety value, mark the tearing degree of the tape as an adjustment parameter; The belt deviation is compared with a preset deviation safety value. When the belt deviation is greater than the preset deviation safety value, the belt deviation is marked as an adjustment parameter.

9. The intelligent security system for conveyors according to claim 8, It is characterized in that The transport optimization instructions include an instruction to reduce the bearing temperature value, an instruction to reduce the smoke concentration value, an instruction to reduce the speed over-limit value, an instruction to reduce the coal pile height value, an instruction to reduce the belt tearing degree and an instruction to reduce the belt deviation degree.

10. The intelligent security system for conveyors according to claim 9, It is characterized in that The method for formulating the instruction for reducing the bearing temperature value, the instruction for reducing the smoke concentration value, the instruction for reducing the speed over-limit value, the instruction for reducing the coal pile height value, the instruction for reducing the belt tearing degree and the instruction for reducing the belt deviation degree includes: When the adjustment parameter is the bearing temperature value, an instruction to reduce the bearing temperature value is formulated; When the adjustment parameter is the smoke density value, an instruction to reduce the smoke density value is formulated; When the adjustment parameter is the speed over-limit value, an instruction to reduce the speed over-limit value is formulated; When the adjustment parameter is the coal pile height value, an instruction to reduce the coal pile height value is formulated; When the adjustment parameter is the tearing degree of the tape, an instruction to reduce the tearing degree of the tape is formulated; When the adjustment parameter is the belt deviation, an instruction to reduce the belt deviation is formulated.

Citation Information

Patent Citations

  • Comprehensive protection control system of belt conveyor

    CN103708201A

  • Belt conveyor deviation detecting system

    CN110092137A

  • Anti-tearing emergency stop device suitable for belt conveyor head

    CN112693842A

  • Detection and early warning system and method for maintenance cycle of coal feeder

    CN115796828A

  • Coal conveying belt anomaly detection system based on AI technology

    CN118183215A

Cited By

  • Supply chain scheduling method based on port digital intelligent supply chain cloud platform management

    CN119250468A

  • Data-driven material conveyor fault early warning method and system

    CN119660290A

  • Agricultural transmission shaft reliability simulation system based on deep reinforcement learning

    CN120611611A