Recycling method for old bridge precast beam

By exposing the prestressed steel strands and steel bars when the prefabricated beams of the old bridge are dismantled, and installing anchor blocks and connectors at the new bridge position, the problem that the precast beams of the old bridge cannot be restored to a continuous system is solved, and the reuse and reuse of the old bridge are realized. Efficient use of resources.

CN118792969APending Publication Date: 2024-10-18GUANGXI COMM PLANNING SURVEYING & DESIGNING INST
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411202512.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-29
Publication Date
2024-10-18

AI Technical Summary

Technical Problem

The prefabricated beams of the old bridge cannot be restored to a continuous system after being dismantled, resulting in difficulties in overall reuse at the new bridge location, resource waste and environmental pollution problems.

Method used

Expose the prestressed steel strands and steel bars when dismantling the old bridge. Install anchor blocks and extend the prestressed steel strands through connectors. Change the prestressed tension position to overcome the problems of mortar closure and limited space at the anchorage and restore the pier. Top prestressed.

Benefits of technology

It realizes the continuous system reuse of the prefabricated beams of the old bridge in the new bridge position, improves the mechanical performance, and reduces construction waste and resource waste.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118792969A_ABST
    Figure CN118792969A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of resource recycling, in particular to an old bridge precast beam recycling method, which is characterized in that an old precast beam is treated when an old bridge is dismantled, so that a pier top cast-in-place area is formed after the old beam is installed at a new bridge site, and an anchor block is arranged in the pier top cast-in-place area to provide a pier top prestress tension counter-force point; the original hogging moment prestressed steel strands of the old beam are lengthened and then penetrate through the anchor blocks, so that the tensioning positions of the prestressed tendons are changed, and the defects that mortar is poured into the anchoring positions of the original prestressed tendons of the old beam, the space of the pier top is small, and tensioning cannot be conducted at the original anchoring points are overcome; according to the method, the old beam obtained by dismantling the old bridge can be recovered into a continuous system at the new bridge site to be integrally reused, good stress performance is ensured, the reusable old beam obtained when the old bridge is dismantled is applied to construction of the new bridge site, reuse of the precast beam of the old bridge is achieved, construction waste is reduced, and resource waste is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of resource recycling, and in particular to a method for recycling prefabricated beams of old bridges. Background Art

[0002] With the development of economy and technology, some of the original bridges can no longer meet the use needs and need to be renovated or rebuilt. When dismantling the existing prefabricated beam old bridges, they are separated into beam sections by cutting and then lifted and crushed. The concrete fragments are recycled as basic materials, and the steel bars and prestressed steel bars are recycled into new iron or steel. The recycling efficiency is low and it is easy to generate a large amount of construction waste, increase carbon emissions, and put pressure on the environment. Therefore, the concept of reusing the prefabricated beams of old bridges as a whole instead of recycling aggregates after crushing them has received widespread attention.

[0003] However, since the wet joints and pier top concrete need to be removed when dismantling the old precast beam bridge, only the simple supported structure of the precast beam body can be retained. The continuous structural system has been destroyed after dismantling and needs to be restored to a continuous system when reused to ensure the overall stability and safety of the bridge structure. However, this process has great difficulties, mainly reflected in: (1) If reinforcing steel bars are added to the negative bending moment area at the pier top, a bridge deck wire mesh is laid, and the bridge deck pavement is recast, only the integrity and continuity of the bridge deck can be restored. The resistance at the pier top is small, and there is a high possibility of cracking in the negative bending moment section at the pier top. (2) If the continuous characteristics of prestressed tendons are considered to effectively resist the deformation caused by external loads, so as to improve the bearing capacity and stability of the bridge and obtain better stress-bearing performance, then in order to ensure that the wet joint concrete on the pier top can be loaded with prestress, it is necessary to tension the prestressed tendons after pouring the concrete. However, the anchorages on both sides of the stress tendons of the precast beams of the old bridge have been poured with mortar, and the space on the pier top is small, so tensioning cannot be performed at the original anchorage points.

[0004] Therefore, the difficulty of restoring the precast beams of the old bridge into a continuous system at the new bridge location restricts the recycling of the precast beams of the old bridge. How to achieve the overall reuse of the precast beams of the old bridge at the new bridge location has become a technical problem that needs to be solved urgently. Summary of the invention

[0005] The purpose of the present invention is to overcome the deficiency in the prior art that the existing prefabricated beams of old bridges cannot be restored into a continuous system at the new bridge site for overall reuse, resulting in waste of resources, and to provide a method for reusing prefabricated beams of old bridges.

[0006] The present invention provides a method for reusing prefabricated beams of old bridges, comprising the following steps: S1: The old bridge was demolished to obtain reusable old beams, which exposed the negative moment prestressed steel strands and longitudinal steel bars of the wet joints along the bridge and the transverse steel bars of the wet joints across the bridge, and part of the top plate was chiseled off; S2: installing the old beams at the new bridge site, and forming a cast-in-place area on the pier top between the two old beams; S3: Anchor blocks are arranged in the cast-in-place area of ​​the pier top, and both sides of the anchor blocks along the bridge direction have slope surfaces and pre-buried anchors; S4: Connect the pier top extension prestressed steel strand using a connector, extend the negative bending moment prestressed steel strand, and insert the pier top extension prestressed steel strand into the anchor block and out of the anchor; S5: Using the anchor block to bear the load and tension the prestressed tendons to restore the negative bending moment prestress on the pier top.

[0007] The present invention discloses a method for recycling precast beams of an old bridge. When dismantling an old bridge, the precast beams and old beams are processed so that the old beams form a cast-in-place area on the pier top after being installed at the new bridge position. Anchor blocks are set in the cast-in-place area on the pier top to provide a prestressed tensioning reaction point on the pier top, and the prestressed steel strands on the pier top are connected by connectors. The original negative bending moment prestressed steel strands of the old beams are extended and then passed through the anchor blocks, so that the prestressed tensioning position is changed, and the defects that mortar has been poured at the original prestressed tendon anchoring position of the old beams and the space on the pier top is small and tensioning cannot be performed at the original anchoring point are overcome. The old beams obtained by dismantling the old bridge can be restored to a continuous system at the new bridge position for overall reuse, and better stress-bearing performance is ensured, so that the reusable old beams obtained when dismantling the old bridge can be used in the construction of the new bridge position, so that the precast beams of the old bridge can be reused, the generation of construction waste is reduced, and the waste of resources is avoided.

[0008] Preferably, in S1, the longitudinal reinforcement is exposed by removing the concrete of the continuous cast-in-place section on the top of the old bridge pier; the transverse reinforcement is exposed by removing the cast-in-place wet joint concrete between the old beams; the negative moment prestressed steel strand is exposed by chiseling off part of the top plate of the old beam; the exposed length of the negative moment prestressed steel strand is not less than 0.2m, and the exposed lengths of the longitudinal reinforcement and the transverse reinforcement are determined according to the way of restoring continuity; the lower limit of the demolition width of the continuous cast-in-place section on the top of the pier along the bridge direction meets the requirement that it is not less than 15cm on both sides of the span splitting line; the upper limit of the demolition width meets the requirement that at least 3cm of concrete protective layer is reserved for the positive moment prestressed anchor head of the web. In S1, the demolition of the old bridge is carried out based on the reuse of the old beams, so that the obtained old beams can be reused, can be used for the installation and use of the new bridge position, and provide a basis for the subsequent setting of anchor blocks and prestressing to ensure the safe reuse of the old beams.

[0009] Preferably, in S1, the width of the top plate chiseled along the bridge direction meets the following requirements: not less than 1.5m on both sides of the span-dividing hole line; the width of the top plate chiseled transverse to the bridge direction meets the following requirements: not less than 0.5m on both sides of the center line of the box beam and not less than 5cm from the center line of the outermost prestressed pipe. The negative bending moment prestressed steel strands are exposed by chiseling away part of the top plate of the old beam, and a suitable range of cast-in-place area on the top of the pier is formed to ensure the smooth setting of the anchor block on the top of the pier and provide sufficient tensioning space for prestressing.

[0010] Preferably, the method of restoring continuity includes any one of double-sided welding, single-sided welding and concrete anchoring; when double-sided welding is adopted, the retained length is not less than 5 times the diameter of the steel bar; when single-sided welding is adopted, the retained length is not less than 10 times the diameter of the steel bar; when concrete anchoring is adopted, the retained length is not less than 30 times the diameter of the steel bar.

[0011] The exposed length is determined by retaining the old beam reinforcement according to the subsequent restoration of the transverse and longitudinal reinforcements, so that the transverse and longitudinal reinforcements after restoration of continuous use can have sufficient strength to meet the needs of the new bridge.

[0012] Preferably, S1 further comprises: chiseling away the pavement layer on the top of the old beam, exposing the protruding steel bars on the top of the beam and roughening them, and the retention of the protruding steel bars on the top of the beam is used to determine the rebar planting scheme for the bridge deck pavement of the new bridge. By chiseling away the pavement layer on the top of the beam and exposing the protruding steel bars on the top of the beam, preparation is provided for the installation of the bridge deck pavement layer of the new bridge.

[0013] Preferably, the anchor block is provided with positioning steel bars, which are used to change the extension direction of the pier top extension prestressed steel strand, so that the pier top extension prestressed steel strand is extended in a state of turning 4°-6° upward after entering the anchor block along the bridge direction; the pier top extension prestressed steel strand is perpendicular to the extended slope surface. The pier top extension prestressed steel strand is turned after entering the anchor block along the bridge direction and is guided out of the concrete pouring range, and can be prestressed after the concrete pouring is completed, so that the old beam is not restricted by the original anchor point that has been poured with mortar and insufficient space to be tensioned at the original anchor point, and can be prestressed again to form a continuous structural system to meet the reuse at the new bridge site.

[0014] Preferably, the top of the anchor block is higher than the top plate of the old beam; the prestressed tensioning reaction point on the anchor block is not less than 0.75m away from the span hole line; the outer side of the tensioning end of the connector is not less than 0.4m away from the edge of the cast-in-place area of ​​the pier top along the bridge direction; the distance between the prestressed tensioning reaction point and the top surface of the anchor block is not less than 7cm and not greater than the distance between the top of the old beam and the top surface of the anchor block. By limiting the height of the anchor block and the layout of the prestressed tensioning reaction point, the smooth progress of prestressed tensioning is ensured, and the tensioning safety and tensioning quality are ensured.

[0015] Preferably, the vertical bending radius of the prestressed steel strands on the top of the pier in the anchor block is not less than 6m; the length of the straight section under the anchor of the prestressed steel strands on the top of the pier in the anchor block is greater than or equal to 0.8m and less than or equal to 1.5m. The steering angle of the prestressed steel strands on the top of the pier does not affect the safety and quality of the prestressing tensioning.

[0016] Preferably, the anchor block is pre-embedded with local pressure-bearing grid steel bars and spiral bars under the anchor, and the arrangement is determined according to the anchor block force calculation; the pier top extension prestressed steel strand is tensioned in the form of a single strand, and after completing the second tensioning, at least one tensioning is performed in the order from the middle to both sides, so as to ensure that the anchor block force meets the tensioning requirements.

[0017] Preferably, after the tensioning is completed, concrete is poured at the top plate of the old beam, a steel mesh is laid in the cast-in-place section, concrete is poured at the cast-in-place section of the pier top, and the bridge deck is restored; the thickness of the protective layer of the steel mesh at the top of the anchor block is not less than 3 cm, so as to restore the bridge deck and form a new bridge for use.

[0018] Compared with the prior art, the present invention has the following beneficial effects: 1. The present invention provides a method for reusing prefabricated beams of an old bridge. When dismantling the old bridge, the old prefabricated beams are processed so that the old beams form a cast-in-place area on the pier top after being installed at the new bridge position. Anchor blocks are set in the cast-in-place area on the pier top to provide a prestressed tensioning reaction point on the pier top. The original negative bending moment prestressed steel strands of the old beams are connected to the pier top through connectors. The extended prestressed steel strands are passed through the anchor blocks after being extended, thereby changing the prestressed tensioning position. The defects that the original prestressed tendon anchorage of the old beams has been poured with mortar and the space on the pier top is small, so tensioning cannot be performed at the original anchorage point, are overcome. 2. The present invention provides a method for recycling prefabricated beams of old bridges, which restores the old beams obtained from the dismantling of the old bridge into a continuous system at the new bridge site for overall reuse, and ensures that better stress-bearing performance is obtained, so that the reusable old beams obtained when dismantling the old bridge are used in the construction of the new bridge site, thereby realizing the reuse of prefabricated beams of old bridges, reducing the generation of construction waste, and avoiding waste of resources. BRIEF DESCRIPTION OF THE DRAWINGS Figure 1 A schematic diagram of a process for reusing prefabricated beams of an old bridge according to the present invention; Figure 2 This is a schematic diagram of the exposed state of the longitudinal reinforcement of the old beam described in Example 1; Figure 3 This is a schematic diagram of the exposed state of the transverse reinforcement of the old beam described in Example 1; Figure 4 It is a schematic diagram of the longitudinal side surface of the concrete cut of the cast-in-place continuous section of the old beam pier top described in Example 1; Figure 5It is a schematic diagram of the concrete cut end surface of the cast-in-place continuous section of the old beam pier top described in Example 1; Figure 6 is a schematic diagram of the structure of the anchor block described in Example 1; Figure 7 It is a structural schematic diagram of the combined state of the two old beams in Example 1; Figure 8 This is a position and size relationship diagram of the anchor block and the prestressed steel strand connected to the pier top in Example 1; Markings in the figure: 1-old beam, 11-top plate, 12-web plate, 21-negative bending moment prestressed steel strand, 22-pier top extension prestressed steel strand, 3-longitudinal reinforcement, 4-transverse reinforcement, 5-cast-in-place area on pier top, 6-anchor block, 61-slope, 62-positioning reinforcement, 63-grid reinforcement, 64-anchor spiral reinforcement, 7-anchor, 8-connector, 9-bridge span dividing line, 10-center line of box girder. DETAILED DESCRIPTION

[0020] The present invention is further described in detail below in conjunction with specific embodiments. However, this should not be understood as the scope of the above subject matter of the present invention being limited to the following embodiments, and all technologies realized based on the content of the present invention belong to the scope of the present invention.

[0021] Unless otherwise specified, in the description of the specific embodiments of the present invention, the terms indicating the orientation or position relationship such as "up", "down", "left", "right", "center", "inside", "outside", etc. are all expressions based on the orientation or position relationship shown in the drawings, or are the orientation or position relationship when the invented product / equipment / device is usually used. These terms of orientation or position relationship are only for the convenience of describing the scheme of the present invention or simplifying the description in the specific embodiments, so as to facilitate the technicians to quickly understand the scheme, and do not indicate or imply that a specific device / component / element must have a specific orientation, or be constructed and operated in a specific position relationship, and therefore cannot be understood as a limitation on the present invention.

[0022] In addition, if the terms "horizontal", "vertical", "overhanging", "parallel" and the like appear, it does not mean that the corresponding devices / components / elements are required to be absolutely horizontal or vertical or overhanging or parallel, but may be slightly tilted or have deviations. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but may be slightly tilted. Alternatively, it can be simplified to mean that the corresponding devices / components / elements are set in directions such as "horizontal", "vertical", "overhanging", "parallel", etc., and can have an error / deviation of ±10% relative to the corresponding direction setting, more preferably an error / deviation within ±8%, more preferably an error / deviation within ±6%, more preferably an error / deviation within ±5%, and more preferably an error / deviation within ±4%. As long as the corresponding device / component / element is within the error / deviation range, it can still achieve its role in the scheme of the present invention.

[0023] In addition, the expressions “first”, “second”, “third”, etc., which appear in the terms, are merely used to distinguish the description of the same or similar components and should not be understood as emphasizing or implying the relative importance of specific components.

[0024] In addition, in the description of the embodiments of the present invention, "several", "plurality" and "a number" represent at least 2. It can be any number such as 2, 3, 4, 5, 6, 7, 8, 9, and even more than 9.

[0025] In addition, in the description of the technical solution of the present invention, unless otherwise clearly specified / defined / restricted, the terms "set", "install", "connect", "connected", "provided with", "laid", and "arranged" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection, and can be welding, riveting, bolting, threading, and other commonly used connection means in the field. This connection can be a mechanical connection, an electrical connection, or a communication connection; it can be a direct connection, or an indirect connection through an intermediate medium, and it can be the internal connection of two elements.

[0026] Example 1 This embodiment provides a method for reusing prefabricated beams of an old bridge, which may include reusing prefabricated box beams and prefabricated T beams after the old bridge is dismantled. This embodiment is described by taking prefabricated box beams as an example. Figure 1 As shown, by setting an anchor block 6 on the pier top, using a connector 8 to connect the pier top extension prestressed steel strand 22, extending the negative bending moment prestressed steel strand 21 exposed in the old beam, passing the pier top extension prestressed steel strand 22 into the anchor block 6 and passing through the anchor 7 pre-buried in the anchor block 6, using the anchor block 6 to bear the force, tensioning the pier top extension prestressed steel strand 22, restoring the negative bending moment prestress on the pier top, and restoring the old beam to a continuous structural system, the specific steps include: S1: The old bridge is demolished to obtain the reusable old beam 1, wherein the old beam 1 exposes the negative bending moment prestressed steel strands 21 and longitudinal steel bars 3 of the wet joint along the bridge to the pier top, and the transverse steel bars 4 of the wet joint across the bridge, and a part of the top plate 11 is chiseled off.

[0027] In an optional implementation manner, the old bridge can be demolished by first selecting an appropriate position on the pier top to cut off the old beam 1, so that the continuous structural system of the old beam 1 is transformed into a simply supported system, and then selecting an appropriate position at the transverse cast-in-place wet joint to cut off the old beam 1, so that it is transformed from a one-span bridge as a whole into a component of a single superstructure, and the cutting position can be selected according to the actual conditions of the old bridge demolition, beam storage, and transportation, retaining some transverse wet joints and longitudinal pier top continuous section concrete, and centrally collecting and storing them, and when necessary, cutting and chiseling of individual old beams 1 can be carried out, so that after the old beam 1 is processed to meet the design requirements, it can be transported to the new bridge site, and hoisted to the designated location for use using equipment such as bridge erection machines or double guide beams.

[0028] In an optional implementation, step S1 can be performed by removing the concrete of the continuous cast-in-place section on the top of the old bridge pier and roughening it to expose the longitudinal steel bars 3 of the old beam 1. When the cast-in-place section on the top of the pier considers welding to restore the connection of the longitudinal steel bars 3, if double-sided welding is used, the retained length of the longitudinal steel bars 3 shall not be less than 5 times the diameter of the steel bars, and if single-sided welding is used, the retained length of the longitudinal steel bars 3 shall not be less than 10 times the diameter of the steel bars; when the cast-in-place section on the top of the pier considers not welding and only anchoring the longitudinal steel bars 3 of the old beam 1 in the cast-in-place concrete on the top of the pier, the retained length of the longitudinal steel bars 3 shall not be less than 30 times the diameter of the steel bars. The longitudinal steel bars 3 after continuous use can have sufficient strength to meet the needs of the new bridge.

[0029] Preferably, the method of restoring the continuity of the steel bars can be determined according to actual conditions. Among them, welding can form a firm connection between the steel bars, with high tensile, compressive and shear strengths, and the corresponding retained length can be relatively short, but it has high requirements on construction technology, and the welding quality is greatly affected by the skill level of the operator. The welding process is also easily affected by welding defects and the welding quality is difficult to guarantee under severe weather conditions. The anchoring method has the characteristics of simple construction, no need for complex equipment and technology, relatively easy operation, low requirements for the construction environment, and less impact by external factors such as weather, but the steel bars need to be retained for a long time. When the retainable length of the steel bars does not meet 30 times the diameter of the steel bars, they can only be restored by steel bar welding.

[0030] like Figure 2 As shown, the lower limit of the demolition width of the cast-in-place continuous section of the pier top along the bridge direction meets the requirement of not less than 15 cm on both sides of the bridge span dividing hole line 9; but the width cannot be too wide, and the upper limit of the demolition width meets the requirement of retaining at least 3 cm of concrete protection layer for the positive bending moment prestressed anchor head of the web 12.

[0031] In an optional embodiment, in order to ensure the tensioning space required for restoring the prestress, step S1 can be adopted to chisel out part of the top plate 11 on both sides of the center line 10 of the box beam at the end of the old beam 1, so that after the demolition of the cast-in-place continuous section on the pier top and the partial chiseling of the top plate 11, the negative bending moment prestressed steel strands 21 and the longitudinal steel bars 3 on the pier top can be exposed, and after the two old beams 1 are installed at the new bridge position, a suitable range of cast-in-place pier top area 5 can be formed between the ends of the two old beams 1, providing space for the subsequent setting of the pier top anchor blocks 6 and prestressing.

[0032] Preferably, the exposed length of the negative bending moment prestressed steel strand 21 is not less than 0.2 m.

[0033] like Figure 4 , Figure 5 As shown, the width of the top plate 11 removed along the bridge direction meets the following requirements: not less than 1.5m on both sides of the bridge span dividing hole line 9; the width of the top plate 11 removed in the transverse direction meets the following requirements: not less than 0.5m on both sides of the box girder centerline 10 and not less than 5cm from the centerline of the outermost prestressed pipe.

[0034] In an optional embodiment, if Figure 3 As described above, step S1 can be performed by removing the cast-in-place wet joint concrete of the old beam 1 and chiseling it clean to expose the transverse reinforcement 4 of the old beam 1. When the transverse bridge is connected to the cast-in-place wet joint, welding is considered to be used to restore the connection of the transverse reinforcement 4. If double-sided welding is used, the retained length of the transverse reinforcement 4 is not less than 5 times the diameter of the reinforcement. If single-sided welding is considered, the retained length of the transverse reinforcement 4 is not less than 10 times the diameter of the reinforcement. When the transverse bridge is connected to the cast-in-place wet joint without welding, the transverse reinforcement 4 of the old beam 1 is only anchored in the cast-in-place concrete of the pier top, and the retained length of the transverse reinforcement 4 is not less than 30 times the diameter of the reinforcement. The transverse reinforcement 4 after continuous use can have sufficient strength to meet the needs of the new bridge.

[0035] In an optional implementation, step S1 further includes: chiseling away the pavement layer on the top of the old beam 1, exposing the protruding steel bars on the top of the beam and roughening them, and the retention of the protruding steel bars on the top of the beam is used to determine the rebar planting scheme for the bridge deck pavement of the new bridge. By chiseling away the pavement layer on the top of the beam to expose the protruding steel bars on the top of the beam, it is determined whether to come up with a rebar planting scheme based on the retention of the protruding steel bars on the top of the old beam 1, in preparation for setting up the bridge deck pavement layer of the new bridge.

[0036] S2: Install the old beams 1 at the new bridge location, and form a cast-in-place area 5 on the pier top between the two old beams 1.

[0037] In an optional embodiment, if Figure 7As shown, step S2 adopts the relative arrangement of the ends of the two old beams 1 on the bridge pier, combined with the partial chiseling of the top plates 11 of the two old beams 1, to form a T-shaped pier top cast-in-place area 5 between the two old beams 1, and the pier top cast-in-place area 5 is composed of the chiseled top plates 11 of the old beams 1 and the gap space between the two old beams 1.

[0038] S3: Anchor blocks 6 are arranged in the cast-in-place area 5 on the pier top, and the two sides of the anchor blocks 6 along the bridge direction have slope surfaces 61 and pre-embedded anchors 7.

[0039] In an optional embodiment, the anchor block 6 is a reinforced concrete structural member. Step S3 can be performed by casting concrete of a grade not lower than that of the original cast-in-place concrete at the pier top in the cast-in-place area 5 at the pier top to form the anchor block 6. The anchor block 6 includes a cast-in-place concrete portion that fills between the two old beams 1 and crosses the bridge span dividing hole line 9, and a cast-in-place concrete portion that continues to be cast upward to the upper part of the web 12 of the old beam 1 and is higher than the original top surface of the old beam 1. The anchor block 6 is cast with slope surfaces 61 on both sides along the bridge direction as anchor plate reaction points, and anchors 7 are pre-embedded.

[0040] In an optional embodiment, the anchor block 6 of step S3 is provided with a positioning steel bar 62, and the positioning steel bar 62 is used to change the extension direction of the pier top extension prestressed steel strand 22, so that the pier top extension prestressed steel strand 22 passes through the anchor block 6 along the bridge direction and extends in a state of turning upward by 4°-6°; the pier top extension prestressed steel strand 22 is perpendicular to the extended slope surface 61. The pier top extension prestressed steel strand 22 is turned after passing through the anchor block 6 and is led out of the concrete pouring range. After the concrete pouring is completed, the anchor block 6 can bear the load to carry out prestressing tensioning, so that the old beam 1 is not restricted by the original anchor point that has been poured with mortar and insufficient space to be tensioned at the original anchor point, and can be prestressed again to form a continuous structural system to meet the reuse at the new bridge position.

[0041] In an optional embodiment, the positioning steel bars 62 can be made of ordinary steel bars, and a spot welding combination of straight steel bars, U-shaped steel bars, etc. can be used to position and limit the prestressing force, so as to determine the extension direction of the pier top extended prestressed steel strand 22 in the anchor block 6.

[0042] In an optional implementation, the anchor 7 may be a low-retraction anchor 7, which is generally composed of a low-retraction anchor plate, a working clip, a nut and a steel pad.

[0043] Preferably, in this embodiment, the thickness of the steel plate is not less than 25 mm, the distance from the center point of the negative bending moment bundle connected steel strand to the edge of the steel plate is not less than 40 mm, and the spacing between the center points of the negative bending moment bundle connected steel strand is not less than 65 mm.

[0044] In an optional embodiment, if Figure 6As shown, the anchor block 6 is pre-embedded with local pressure-bearing grid steel bars 63 and under-anchor spiral bars 64, and the arrangement form is determined according to the force calculation of the anchor block 6.

[0045] Preferably, in this embodiment, the diameter of the grid steel bars 63 should be not less than 12 mm, the spacing between the steel bars should be not less than 10 cm, and the number of steel mesh layers should be not less than 4, with the interlayer spacing being between 30 and 80 mm; the diameter of the spiral reinforcement 64 under the anchor should be not less than 8 mm, and the length of the spiral reinforcement turns should not be less than the length of the trumpet tube of the anchor 7, with the interlayer spacing being between 30 and 50 mm.

[0046] S4: Use the connector 8 to connect the pier top extension prestressed steel strand 22, extend the negative bending moment prestressed steel strand 21, and pass the pier top extension prestressed steel strand 22 into the anchor block 6 and out of the anchor 7.

[0047] In an optional implementation manner, the negative bending moment prestressed steel strand 21 is connected to the pier top extension prestressed steel strand 22 via a connector 8 to extend the negative bending moment prestressed steel strand 21 .

[0048] In an optional embodiment, the connector 8 can adopt an integral connector 8, which is composed of a flat anchor plate, a working clip, a connecting plate and an extrusion sleeve. The fixed end of the connector 8 adopts a double-layer flat anchor, and the negative bending moment prestressed steel strand 21 of the top plate 11 of the old beam 1 is fixed with a flat anchor plate and a working clip. The tensioning end of the connector 8 is fixed with a single-layer extrusion sleeve to facilitate the fixation of the steel strand at the tensioning end and the tensioning operation, and is beneficial to reducing the folding angle of the tensioning end.

[0049] In an optional embodiment, the low retraction anchor 7 can be anchored in a single layer, and the prestressed steel strand 22 on the pier top is extended through the anchor block 6 and out of the anchor 7, and fixed with a circular steel anchor plate, a working clip and a nut.

[0050] like Figure 8As shown, the preferred description of the position and size relationship between the anchor block 6 and the pier top extension prestressed steel strand 22 is made by recycling a prefabricated box girder, wherein the top of the anchor block 6 is 7-10 cm higher than the top surface of the top plate 11 of the old beam 1; the distance a from the position of the top plate 11 of the old beam 1 to the span dividing hole line 9 along the bridge direction is not less than 1.5 m; the distance b from the prestressed tensioning reaction point on the anchor block 6 to the span dividing hole line 9 is not less than 0.75 m; the distance c from the outer side of the tensioning end of the connector 8 to the edge of the cast-in-place area 5 of the pier top along the bridge direction is not less than 0.4 m; the distance d from the center of the negative bending moment prestressed steel strand 21 of the old beam 1 to the top of the old beam 1 is between 8 and 10 cm. 9cm; the distance e from the top of the old beam 1 to the top surface of the anchor block 6 is between 7-10cm; the distance f between the prestressed tensioning reaction point and the top surface of the anchor block 6 is not less than 7cm and not greater than the distance e from the top of the old beam 1 to the top surface of the anchor block 6; the vertical bending moment radius R of the pier top extended prestressed steel strand 22 in the anchor block 6 is not less than 6m; the angle a between the tensioning end of the reaction point and the vertical plane is between 4-6°; the length of the straight section under the anchor of the pier top extended prestressed steel strand 22 in the anchor block 6 is (d+ef) / sinα-R / tan(90°-α / 2), which is greater than or equal to 0.8m and less than or equal to 1.5m.

[0051] Furthermore, in order to ensure that the vertical bending starting point of the pier top extended prestressed steel strand 22 is within the pier top prestressed tensioning reaction point, (d+ef) / tanα+R / tan(90°-α / 2)≤2b should also be satisfied.

[0052] S5: The anchor block 6 is used to tension the pier top extension prestressed steel strand 22 to restore the negative bending moment prestress on the pier top.

[0053] In an optional embodiment, the pier top extension prestressed steel strand 22 is tensioned in the form of a single tensioning wire, and after completing the second tensioning, at least one tensioning is performed in the order from the middle to both sides.

[0054] In an optional implementation, after tensioning is completed, concrete is poured at the top plate 11 of the old beam 1, a steel mesh is laid in the cast-in-place section, 5 sections of concrete are poured in the cast-in-place area of ​​the pier top, and the bridge deck pavement is restored; the protective layer thickness of the steel mesh on the top of the anchor block 6 is not less than 3 cm.

[0055] The present embodiment provides a method for recycling precast beams of old bridges. When dismantling the old bridge, the precast beams 1 are processed so that the old beams 1 form a cast-in-place area 5 on the pier top after being installed at the new bridge position. Anchor blocks 6 are set in the cast-in-place area 5 on the pier top to provide a prestressed tensioning reaction point on the pier top. The original negative bending moment prestressed steel strands 21 of the old beams 1 are connected to the pier top through connectors 8 and then pass through the anchor blocks 6 to change the prestressed tensioning position. The defects that the original prestressed tendon anchorage of the old beams 1 has been poured with mortar and the space on the pier top is small, making it impossible to tension at the original anchoring point are overcome. The old beams 1 obtained by dismantling the old bridge can be restored to a continuous structural system at the new bridge position for overall reuse, and better stress-bearing performance is ensured. The reusable old beams 1 obtained when dismantling the old bridge are used in the construction of the new bridge position, thereby realizing the reuse of precast beams of the old bridge, reducing the generation of construction waste, and avoiding waste of resources.

[0056] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for reusing prefabricated beams of old bridges, characterized in that: The steps include: S1: dismantling the old bridge to obtain the reusable old beam (1), wherein the old beam (1) exposes the negative bending moment prestressed steel strand (21) and longitudinal steel bars (3) of the wet joint along the bridge to the pier top, and the transverse steel bars (4) of the wet joint across the bridge, and a part of the top plate (11) is chiseled off; S2: installing the old beam (1) at the new bridge position, and forming a cast-in-place area (5) on the pier top between the two old beams (1); S3: Anchor blocks (6) are arranged in the cast-in-place area (5) on the top of the pier, wherein the anchor blocks (6) have slope surfaces (61) on both sides along the bridge direction and pre-buried anchors (7); S4: using a connector (8) to connect the pier top extension prestressed steel strand (22), extending the negative bending moment prestressed steel strand (21), and passing the pier top extension prestressed steel strand (22) through the anchor block (6) and out of the anchor (7); S5: Using the anchor block (6) to tension the pier top extension prestressed steel strand (22) to restore the negative bending moment prestress on the pier top.

2. The method for reusing prefabricated beams of an old bridge as claimed in claim 1, characterized in that: In S1, Exposing the longitudinal steel bars (3) by removing the cast-in-place continuous section of concrete on the top of the old bridge pier; By removing the cast-in-place wet joint concrete between the old beams (1), the transverse steel bars (4) are exposed; Exposing the negative moment prestressed steel strand (21) by chiseling away a portion of the top plate (11) of the old beam (1); The exposed length of the negative bending moment prestressed steel strand (21) is not less than 0.2 m; The exposed lengths of the longitudinal reinforcement (3) and the transverse reinforcement (4) are determined in a manner of restoring continuity; The lower limit of the demolition width of the cast-in-place continuous section of the pier top in the direction of the bridge meets the requirement that it is not less than 15 cm on both sides of the span dividing hole line (9); and the upper limit of the demolition width meets the requirement that at least 3 cm of concrete protective layer is retained for the positive bending moment prestressed anchor head of the web (12).

3. The method for reusing prefabricated beams of old bridges as claimed in claim 2, characterized in that: In S1, the width of the top plate (11) removed in the longitudinal direction of the bridge satisfies: not less than 1.5 m on both sides of the bridge span dividing hole line (9); the width of the top plate (11) removed in the transverse direction of the bridge satisfies: not less than 0.5 m on both sides of the box girder center line (10) and not less than 5 cm from the center line of the outermost prestressed pipe.

4. The method for reusing prefabricated beams of old bridges as claimed in claim 2, characterized in that: The method of restoring continuity includes any one of double-sided welding, single-sided welding and concrete anchoring; when double-sided welding is used, the retained length is not less than 5 times the diameter of the steel bar; when single-sided welding is used, the retained length is not less than 10 times the diameter of the steel bar; when concrete anchoring is used, the retained length is not less than 30 times the diameter of the steel bar.

5. The method for reusing prefabricated beams of old bridges as claimed in claim 1, characterized in that: The S1 also includes: chiseling away the pavement layer on the top of the old beam (1), exposing the protruding steel bars on the top of the beam and roughening them, and the retention of the protruding steel bars on the top of the beam is used to determine the reinforcement scheme for the new bridge deck pavement.

6. A method for reusing prefabricated beams of old bridges as claimed in any one of claims 1 to 5, characterized in that: The anchor block (6) is provided with a positioning steel bar (62), and the positioning steel bar (62) is used to change the extension direction of the prestressed steel strand (22) on the pier top, so that the prestressed steel strand passes through the anchor block (6) along the bridge direction and extends out in a state of turning 4°-6° upward; the prestressed steel strand (22) on the pier top is perpendicular to the extended slope surface (61).

7. The method for reusing prefabricated beams of old bridges as claimed in claim 6, characterized in that: The top of the anchor block (6) is higher than the top surface of the top plate (11) of the old beam (1); The distance between the prestressed tensioning reaction point on the anchor block (6) and the bridge span hole line (9) is not less than 0.75m; The distance between the outer side of the tensioning end of the connector (8) and the edge of the cast-in-place area (5) on the pier top along the bridge direction is not less than 0.4 m; The distance between the prestressed tensioning reaction point and the top surface of the anchor block (6) is not less than 7 cm and not greater than the distance between the top of the old beam (1) and the top surface of the anchor block (6).

8. The method for reusing prefabricated beams of old bridges as claimed in claim 7, characterized in that: The vertical bending radius of the prestressed steel strand (22) extending from the top of the pier in the anchor block (6) is not less than 6m; The length of the straight section under the anchor of the pier top extension prestressed steel strand (22) in the anchor block (6) is greater than or equal to 0.8 m and less than or equal to 1.5 m.

9. The method for reusing prefabricated beams of old bridges as claimed in claim 6, characterized in that: The anchor block (6) is pre-buried with local pressure-bearing grid steel bars (63) and under-anchor spiral bars (64), and the arrangement is determined according to the force calculation of the anchor block (6); The pier top extension prestressed steel strand (22) is tensioned in the form of a single tension, and after completing the second tension, at least one tension is performed in the order from the middle to both sides.

10. The method for reusing prefabricated beams of old bridges as claimed in claim 9, characterized in that: After the tensioning is completed, concrete is poured at the top plate (11) of the old beam (1), a steel mesh is laid in the cast-in-place section, concrete is poured at the cast-in-place section (5) of the pier top, and the bridge deck pavement is restored; the thickness of the protective layer of the steel mesh on the top of the anchor block (6) is not less than 3 cm.