Lining square steel formwork supporting system construction method for lap joint of double columns

By lining the square steel formwork support system and wooden formwork reinforcement, the problem of full-length cold joints, molding quality and construction delay in the construction of overlapping double columns is solved. The double columns are matched with the formwork and poured in one time, which improves the construction efficiency and materials. Utilization.

CN118793263APending Publication Date: 2024-10-18JIANGSU HUAJIAN CONSTR
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411084546.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-08
Publication Date
2024-10-18

AI Technical Summary

Technical Problem

The construction method of overlapping double columns in the prior art has problems such as long cold joints, difficulty in ensuring molding quality, delay in construction period, difficulty in reinforcing the formwork, and waste of materials.

Method used

A lined square steel formwork support system is used. Square steel and angle iron brackets are customized through measurements. When the double columns are overlapped, an overall rectangular column structure is formed. Wooden formwork and square and round buckle column hoops are used for reinforcement to achieve one-time overall pouring and formwork removal.

Benefits of technology

It improves the integrity, stiffness, strength, and stability of the double-column formwork support, saves materials, simplifies the construction process, shortens the construction period, and ensures the molding quality and construction convenience.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure SMS_1
    Figure SMS_1
Patent Text Reader

Abstract

The invention relates to the field of concrete double-column construction, in particular to a construction method of a lining square steel formwork supporting system for lap joint of double columns, and through arrangement of lining square steel, concrete on the two side faces of an internal corner of the lap joint of the double columns is subjected to internal supporting constraint equal to a steel formwork in a combined formwork system. Meanwhile, during construction, the square steel and the triangular supports are combined with the large columns and the small columns at the lap joint part to form a four-side stand column shape and then are fixed, one-time formwork supporting reinforcement and concrete pouring construction of the large columns and the small columns at the lap joint part are achieved, and after the double-column concrete reaches the design strength, the lining square steel and the triangular supports are dismantled after the formwork is dismantled; and the use in subsequent construction is facilitated. In the invention, the original steps of two-time formwork matching and two-time concrete pouring of the double columns are simplified into one step, so that not only are the integrity, rigidity, strength and stability of the double-column integral formwork support improved, but also the materials are saved, the structure is simple, the operation is quick, the construction is convenient, and the construction period is shortened.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of concrete double column construction, and in particular to a construction method of a lined square steel formwork support system for overlapping double columns. Background Art

[0002] In the main construction of the building project, there are overlapping double columns in the facade, which are secondary decorative columns attached to the outside of the large frame columns. The double-column concrete structure formwork support system of this shape is currently widely used to construct the large frame columns first and then the small columns overlapping the large frame columns. However, in the process of engineering construction practice, it is found that there are certain problems, such as:

[0003] 1. The conventional construction process is to cast the large frame column first and then the small column. However, if the overlapping double columns are cast separately, if the overlapping parts are not properly handled, a cold seam will be formed from top to bottom, causing hidden dangers of water seepage, especially on the facade. Once a cold seam is formed, it will cause water seepage on the facade, which will be difficult to handle later.

[0004] 2. Because the inner side of the small column constructed later is close to the large column and the side faces are not in the same plane, it is difficult to reinforce it with formwork, and it is difficult to ensure the molding quality of the small column at the later overlapping part.

[0005] 3. Constructing the large frame columns first and then constructing the small columns after the large frame columns are completed will cause delays in the construction period, and when the frame structure construction is at a critical line, this will affect the overall progress of the project.

[0006] 4. This construction process involves two steps of preparing the formwork and pouring concrete, which not only increases the workload, but also causes additional loss and waste in the formwork reinforcement support materials and increases investment. Summary of the invention

[0007] The purpose of the present invention is to solve the shortcomings of the prior art and to propose a construction method for an inner-lined square steel formwork support system for overlapping double columns.

[0008] In order to achieve the above object, the present invention adopts the following technical solutions:

[0009] The construction method of the inner-lined square steel formwork support system for overlapping double columns comprises the following steps:

[0010] S1. Construction preparation work:

[0011] a. According to the shape and position of the double columns to be overlapped, measure the size of the required inner lining square steel, place an order based on the size of the inner lining square steel, and then weld and manufacture the square steel in the factory;

[0012] b. After the inner lining square steel is manufactured, the matching inner lining square steel lower angle iron bracket support is manufactured in the factory according to the size and position of the inner lining square steel;

[0013] S2. Construction steps:

[0014] a. According to the plane position and size of the overlapping double columns in the main structure of the building, use tools to locate and lay out the plane position lines and control lines of the overlapping double columns on the floor surface;

[0015] b. After the laying out is completed, the vertical reinforcement of the double column structure is tied and installed at the same time. After the tying is completed, the double column reinforcement protective layer pad is placed;

[0016] c. After the protective layer pads are firmly fixed, first measure and locate the fixing position of the triangular iron support frame on the outer side of the floor structure side beam;

[0017] d. Install the fixed angle iron support frame on the side beam of the lower floor structure at the overlapping inner angles of the large and small double columns and the inner lining square steel parts;

[0018] e. Hoist the inner lining square steel and place it on the supporting base so that the two outer sides of the inner lining square steel and the outer sides of the overlapping large and small double columns together form an integral rectangular column;

[0019] f. Use wooden formwork to seal the inner lining square steel together with the steel bars of the double columns, so that the formwork support of the overlapping double columns forms a new formwork support system with steel inside and wood outside as a combination of an integral large column with inner lining square steel. Finally, use square and round buckle column hoops to reinforce the overall combined formwork support system;

[0020] g. After the formwork is sealed, the concrete of the large and small double column structures is poured in one go, and the formwork is removed after the concrete structure reaches the designed strength;

[0021] h. After loosening the square and round column hoops and removing the formwork, take out the inner lining square steel and the angle iron support at the bottom of the square steel, and reuse them for the double column overlap construction of the next floor.

[0022] Preferably, in step Aa, the inner lining square steel is made of QB235 with a wall thickness of 8 mm.

[0023] Preferably, in step Ab, the square steel lower angle iron bracket support is welded with 50*50*5mm angle iron, which is an integral right-angled triangle support, and the expansion bolt is Φ12.

[0024] Preferably, in step Bc, the protective layer pads are plastic pads with a spacing of 500 mm.

[0025] Preferably, in step Bd, the lower structure angle iron support frame is installed on the outer side of the lower floor structure side beam at the inner lining square steel portion, and two groups of angle iron support frames are used. The vertical height of the angle iron support frame is 400 mm, the horizontal width is 300 mm, and the vertical surface is fixed to the outer side of the structural floor side beam with three φ12 expansion bolts.

[0026] Preferably, in step Be, the hoisting is carried out by a tower crane and placed on the angle iron support, and manual fine-tuning is performed to ensure that the two outer side surfaces of the lining square steel are flush with the outer edge lines of the column, and the two inner sides are close to the steel bar protective layer pads, so as to ensure the thickness of the steel bar protective layer on the concrete surfaces of the two side surfaces of the inner angle of the overlapping double columns after forming, and to make the outer side surfaces of the overlapping large and small double columns and the outer side surfaces of the lining square steel form an integral rectangular column.

[0027] Preferably, in step Bf, the wooden formwork is made of plywood with a specification of 915mm×1830mm×15mm, the vertical keel is made of 40mm×90mm square wood, and the horizontal support is made of reinforcement.

[0028] Preferably, the reinforcement member is a 10# square round buckle column hoop.

[0029] Preferably, five inner supports should be evenly arranged within the vertical effective height range of the inner side of the square steel to ensure the lateral stiffness of the square steel.

[0030] Preferably, a triangular support made of angle iron is installed below the inner corner of the overlapping double columns and on the side of the beam, and serves as the supporting base of the inner lining square steel;

[0031] The inner corners of the overlapping large and small double columns are first lined with square steel, and then a wooden formwork is used in combination with a square column hoop formwork support system to support and reinforce the large and small double columns with the lined square steel as a whole;

[0032] The inner lining square steel supports and constrains the two sides of the inner angle inside the combined formwork system, and cooperates with the overall combined formwork support reinforcement of the outer wooden formwork and square column hoops to combine the overlapping double-column formwork support system into a whole, and the large and small double columns are cast and formed at one time.

[0033] The beneficial effects of the present invention are as follows: a triangular support made of angle iron is first installed below the inner corner of the overlapping large and small double columns and on the outer side of the side beam of the floor structure as a supporting base for the inner lining square steel, and the inner lining square steel is arranged at the inner corner of the overlapping large and small double columns. The inner lining square steel performs internal support constraints on the concrete on both sides of the inner corner equivalent to the steel formwork. At the same time, during construction, it is combined with the large column and the small column at the overlapping position to form a four-sided column shape, and the outer periphery is then used to use a wooden formwork and a formwork support system of square and round column hoops to support and reinforce the large and small double columns with the inner lining square steel as a whole, so that the overlapping double column formwork support system is combined into a whole, and the large and small double columns are matched with the formwork once and the concrete is poured and formed at one time. After the double column concrete is formed and demolded, the inner lining square steel and the angle brace can be removed for use in subsequent construction. The present invention simplifies the steps of matching the formwork twice and pouring the concrete twice for the double columns to once, which not only improves the integrity, rigidity, strength and stability of the overall formwork support of the double columns, but also saves materials, has a simple structure, is quick to operate, is convenient to construct, and reduces the construction period. DETAILED DESCRIPTION

[0034] The construction method of the inner-lined square steel formwork support system for overlapping double columns includes the following steps:

[0035] S1. Construction preparation work:

[0036] a. According to the double-column shape that needs to be overlapped, the size of the inner lining square steel is measured, and the materials are cut and shaped uniformly for batch processing and production;

[0037] b. After the inner lining square steel is manufactured, the matching inner lining square steel lower angle iron bracket support is manufactured in the factory according to the size and position of the inner lining square steel;

[0038] S2. Construction steps:

[0039] a. According to the plane position and size of the overlapping double columns in the main structure of the building, use tools to locate and lay out the plane position lines and control lines of the overlapping double columns on the floor surface;

[0040] b. After the laying out is completed, the vertical reinforcement of the double column structure is tied and installed at the same time. After the tying is completed, the double column reinforcement protective layer pad is placed;

[0041] c. After the protective layer pads are firmly fixed, first measure and locate the fixing position of the triangular iron support frame on the outer side of the floor structure side beam;

[0042] d. Install the fixed angle iron support frame on the side beam of the lower floor structure at the overlapping inner angles of the large and small double columns and the inner lining square steel parts;

[0043] e. Hoist the inner lining square steel and place it on the supporting base so that the two outer sides of the inner lining square steel and the outer sides of the overlapping large and small double columns together form an integral rectangular column;

[0044] f. Use wooden formwork to seal the inner lining square steel together with the steel bars of the double columns, so that the formwork support of the overlapping double columns forms a new formwork support system with steel inside and wood outside as a combination of an integral large column with inner lining square steel. Finally, use square and round buckle column hoops to reinforce the overall combined formwork support system;

[0045] g. After the formwork is sealed, the concrete of the large and small double column structures is poured in one go, and the formwork is removed after the concrete structure reaches the designed strength;

[0046] h. After loosening the square and round column hoops and removing the formwork, take out the inner lining square steel and the angle iron support at the bottom of the square steel, and reuse them for the double column overlap construction of the next floor.

[0047] Among them, in step Aa, the inner lining square steel is QB235 with a wall thickness of 8mm.

[0048] Among them, in step Ab, the square steel lower angle iron bracket support is welded with 50*50*5mm angle iron, which is an integral right-angle triangle support, and the expansion bolt is Φ12. Through the setting of the square steel lower angle iron bracket support, the subsequent installation of the lining square steel can be realized, thereby improving the stability of the lining square steel during subsequent use.

[0049] Among them, in step Bc, the protective layer pads are plastic pads with a spacing of 500mm. The protective layer is set to ensure the thickness of the steel bar protective layer on the concrete surface of the two sides of the inner angle of the overlapping double columns after forming.

[0050] Among them, in step Bd, the lower structure angle iron support frame is installed on the outer side of the lower floor structure side beam at the inner lining square steel part, and two groups of angle iron support frames are used. The vertical height of the angle iron support frame is 400mm, the horizontal width is 300mm, and the vertical surface is fixed to the outer side of the structural floor side beam with 3 φ12 expansion bolts.

[0051] Among them, in step Be, the hoisting is carried out by a tower crane and placed on the angle iron support, and manual fine-tuning is performed to ensure that the two outer side surfaces of the lining square steel are flush with the outer edge lines of the column, and the two inner sides are close to the steel bar protective layer pads, so as to ensure the thickness of the steel bar protective layer on the concrete surface of the two side surfaces of the inner angle of the overlapping double columns after forming, and to make the outer side surfaces of the overlapping large and small double columns and the outer side surfaces of the lining square steel form an integral rectangular column.

[0052] In step Bf, the wooden formwork is made of plywood with a specification of 915mm×1830mm×15mm, the vertical keel is made of 40mm×90mm square wood, and the horizontal support is made of reinforcements. The reinforcements are 10# square and round buckle column hoops.

[0053] Among them, five internal supports should be evenly arranged within the effective vertical height range of the inner side of the square steel to ensure the lateral stiffness of the square steel. The five internal supports arranged on the inner side of the square steel can improve the lateral stiffness of the inner lining square steel, thereby increasing the service life of the inner lining square steel.

[0054] Further, the strength test of the inner lining square steel is shown in the following table:

[0055]

[0056] Standard value of lateral pressure of newly poured concrete on formwork

[0057] G4k=ζγcH=0.8×24×4.1=78.72kN / m 2

[0058] Sbearing = γ0×(1.3G4k+γL×1.5Q2k)

[0059] =1×(1.3×78.720+0.9×1.5×4.000)=107.74kN / m 2

[0060] Basic combination of loads of newly poured concrete on steel square pipeline = 107.74 × 0.25 = 26.94 kN / m

[0061] Application example: The above-ground construction area of ​​the XX Construction Technology Park project is 1488,041,100 square meters, the underground construction area is 100,364.88 square meters, the total construction area is 249,168.99 square meters, the plot ratio is 3.07, the building density is 45.00%, and the greening rate is 15.10%. The main building is 4 high-rise scientific research buildings and 2 service podium buildings, which are connected by a large-span sky bridge at the top to form a "twin tower" shape. The project has two underground floors, with air defense and a mezzanine garage under the main building. The main building A1# has 17 floors and a planned height of 84m, A2# and A3# have 23 floors and a planned height of 113.8m, A4# has 15 floors and a planned height of 69.9m, and the comprehensive commercial building has 5 floors and a planned height of 24m.

[0062] After this project used the inner-lined square steel composite formwork support system construction method in practice, the double-column forming quality and size control effects were very good, and the owner was quite satisfied.

[0063] A customized internal welded cross-supported square steel, angle iron, expansion bolts, and square and round buckle column hoop combined formwork support system shaping device is used. After the overlapping large and small double column reinforcements are tied, during the overlapping double column formwork support construction, because the small column in the overlapping double column is the facade cantilever column, a triangular support base made of angle iron is first installed on the outer surface of the structural side beam below the overlapping double column inner corner. The inner lining square steel is placed on the support base, so that the overlapping double column and the square steel form an integral rectangular column. The inner lining square steel is used to perform internal support constraints on the concrete on both sides of the overlapping double column inner corner inside the combined formwork system, which is equivalent to the steel formwork.

[0064] Finally, the overlapping double columns and the outer periphery of the square steel are reinforced with wooden formwork and square column hoops, so that the formwork support of the overlapping double columns forms a new type of formwork support with a combination of integral large columns lined with square steel, ensuring the rigidity, strength and stability of the formwork support system. The operation is easy and the quality of the formwork construction and the wall concrete forming quality are guaranteed.

[0065] Compared with the traditional formwork support system, the construction process of the inner-lined square steel composite formwork support system for integral casting of overlapping double columns in the present invention optimizes the traditional process of secondary mold matching and secondary concrete casting of overlapping double columns to form a one-time mold matching of large and small overlapping double columns, and the large and small double columns are cast in one time. The reliability of the formwork support system is improved, the size of the concrete structure is guaranteed not to be deformed after forming, and the occurrence of common concrete quality problems is effectively controlled. At the same time, the construction period, cost, and materials are saved, the construction is convenient, and the economic benefits are remarkable.

[0066] In the present invention, by setting the inner lining square steel, the concrete on both sides of the inner corner of the overlapping double columns is supported and constrained by the internal support of the steel formwork in the combined formwork system. At the same time, during construction, it is combined with the large column and small column at the overlapping part to form a four-sided column shape, and is fixed by square and round buckle column hoops, so that the one-time formwork support reinforcement and concrete pouring construction of the large column and small column at the overlapping part can be realized, and after the double column concrete reaches the designed strength and the formwork is removed, the inner lining square steel and triangular support can be removed for subsequent construction. The present invention simplifies the steps of two times of formwork support and two times of concrete pouring for the double columns to one time, which not only improves the integrity, rigidity, strength and stability of the overall formwork support of the double columns, but also saves materials, has a simple structure, is quick to operate, is convenient to construct, and shortens the construction period.

[0067] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A construction method for a lined square steel formwork support system for overlapping double columns, characterized in that: The following steps are involved: S1. Construction preparation work: a. According to the double-column shape that needs to be overlapped, measure the size of the inner lining square steel, and uniformly cut and shape it for batch processing and production; b. After the inner lining square steel is manufactured, the matching inner lining square steel lower angle iron bracket support is manufactured in the factory according to the size and position of the inner lining square steel; S2. Construction steps: a. According to the plane position and size of the overlapping double columns in the main structure of the building, use tools to locate and lay out the plane position lines and control lines of the overlapping double columns on the floor surface; b. After the laying out is completed, the vertical reinforcement of the double column structure is tied and installed at the same time. After the tying is completed, the double column reinforcement protective layer pad is placed; c. After the protective layer pads are firmly fixed, first measure and locate the fixing position of the triangular iron support frame on the outer side of the floor structure side beam; d. Install the fixed angle iron support frame on the side beam of the lower floor structure at the overlapping inner angles of the large and small double columns and the inner lining square steel parts; e. Hoist the inner lining square steel and place it on the supporting base so that the two outer sides of the inner lining square steel and the outer sides of the overlapping large and small double columns together form an integral rectangular column; f. Use wooden formwork to seal the inner lining square steel together with the steel bars of the double columns, so that the formwork support of the overlapping double columns forms a new formwork support system with steel inside and wood outside as a combination of an integral large column with inner lining square steel. Finally, use square and round buckle column hoops to reinforce the overall combined formwork support system; g. After the formwork is sealed, the concrete of the large and small double column structures is poured in one go, and the formwork is removed after the concrete structure reaches the designed strength; h. After loosening the square and round column hoops and removing the formwork, take out the inner lining square steel and the angle iron support at the bottom of the square steel, and reuse them for the double column overlap construction of the next floor.

2. The construction method of the inner-lined square steel formwork support system for overlapping double columns according to claim 1 is characterized in that: In the step Aa, the inner lining square steel is made of QB235 with a wall thickness of 8 mm.

3. The construction method of the inner-lined square steel formwork support system for overlapping double columns according to claim 1 is characterized in that: In the step Ab, the lower angle iron bracket support of the square steel is welded with 50*50*5mm angle iron, which is an integral right-angled triangle support, and the expansion bolt is Φ12.

4. The construction method of the inner-lined square steel formwork support system for overlapping double columns according to claim 1 is characterized in that: In the step Bc, the protective layer pads are plastic pads with a spacing of 500 mm.

5. The construction method of the inner-lined square steel formwork support system for overlapping double columns according to claim 1 is characterized in that: In the step Bd, the lower structure angle iron support frame is installed on the outer side of the lower floor structure side beam at the inner lining square steel part. Two groups of angle iron support frames are used. The vertical height of the angle iron support frame is 400mm and the horizontal width is 300mm. The vertical surface is fixed to the outer side of the structural floor side beam with 3 φ12 expansion bolts.

6. The construction method of the inner-lined square steel formwork support system for overlapping double columns according to claim 1 is characterized in that: In the step Be, the square steel is hoisted by a tower crane and placed on the angle iron support. Manual fine-tuning is performed to ensure that the two outer side surfaces of the lining square steel are flush with the outer edge of the column, and the two inner sides are close to the steel bar protective layer pads, so as to ensure the thickness of the concrete steel bar protective layer on both sides of the inner angle of the overlapping double columns after forming, and to make the outer side surfaces of the overlapping large and small double columns and the outer side surfaces of the lining square steel form an integral rectangular column.

7. The construction method of the inner-lined square steel formwork support system for overlapping double columns according to claim 1 is characterized in that: In the step Bf, the wooden formwork is made of plywood with a specification of 915mm×1830mm×15mm, the vertical keel is made of 40mm×90mm square wood, and the horizontal support is made of reinforcement.

8. The construction method of the inner-lined square steel formwork support system for overlapping double columns according to claim 7 is characterized in that: The reinforcement member adopts 10# square and round buckle column hoop.

9. The construction method of the inner-lined square steel formwork support system for overlapping double columns according to claim 1 is characterized in that: Five internal supports should be evenly arranged within the vertical effective height range of the inner side of the square steel to ensure the lateral stiffness of the square steel.

10. The construction method of the inner-lined square steel formwork support system for overlapping double columns according to claim 1, characterized in that: A triangular support made of angle iron is installed below the inner corner of the overlapping double columns and on the side of the beam, and serves as the supporting base of the inner lining square steel; The inner corners of the overlapping large and small double columns are first lined with square steel, and then a wooden formwork is used in combination with a square column hoop formwork support system to support and reinforce the large and small double columns with the lined square steel as a whole; The inner lining square steel supports and constrains the two sides of the inner angle inside the combined formwork system, and cooperates with the overall combined formwork support reinforcement of the outer wooden formwork and square column hoops to combine the overlapping double-column formwork support system into a whole, and the large and small double columns are cast and formed at one time.