TBM control parameter optimization method considering rock breaking specific energy and net tunneling rate

The TBM control parameter optimization model trained through the SecOPSO-MONN algorithm automatically adjusts the cutterhead speed and penetration of the TBM, solving the problem of dependence on human experience in TBM construction, improving excavation efficiency and energy consumption management, and adapting to complex geological conditions.

CN118793453APending Publication Date: 2024-10-18YELLOW RIVER ENG CONSULTING CO LTD
View PDF 0 Cites 3 Cited by

Patent Information

Application Number
CN202411259881.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-10
Publication Date
2024-10-18

AI Technical Summary

Technical Problem

During the TBM construction process, the adjustment of control parameters mainly relies on human experience, which makes it difficult to achieve optimal cutterhead rock-breaking energy consumption and excavation rate under complex geological conditions, and there is a lack of scientific and systematic methods.

Method used

The SecOPSO-MONN algorithm is used to generate a TBM control parameter optimization model based on built engineering data training. By acquiring and preprocessing excavation parameters and surrounding rock grade data, the cutterhead speed and penetration are automatically output, and the model is updated through incremental training to adapt to different geological conditions.

Benefits of technology

It improves TBM excavation efficiency, reduces cutterhead rock breaking energy consumption, avoids human adjustment errors, and enhances the generalization performance of the model under different geological conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118793453A_ABST
    Figure CN118793453A_ABST
Patent Text Reader

Abstract

The invention discloses a TBM (Tunnel Boring Machine) control parameter optimization method considering rock breaking specific energy and net tunneling rate, which comprises the following steps of: taking obtained TBM initial section tunneling parameters and surrounding rock grade parameters as inputs of a preset TBM control parameter optimization model, and outputting cutter rotating speed and penetration values required in a TBM stable tunneling process; control parameters can be automatically output through the model 25 s after tunneling is started, and the output control parameter values improve the net tunneling speed of the TBM and meanwhile reduce the energy consumption of rock breaking of a cutter head. According to the method, in the modeling process of the TBM control parameter optimization model, the comprehensive influence of the geological conditions of the excavation face and various parameters of equipment is considered, and the defect that errors are likely to occur when control parameters are manually adjusted is overcome; the problems of tunneling energy consumption and construction speed in the TBM construction process are considered, new data generated in the construction process are used for continuously updating the model through incremental training, the output result of the model can better adapt to different geological conditions, and the generalization performance of the model under different geological conditions is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of tunnel boring machine construction, and in particular to a TBM control parameter optimization method suitable for considering rock breaking specific energy and net excavation rate. Background Art

[0002] Full-section tunnel boring machines (TBMs) have been increasingly widely used in deep and long tunnels. During the construction process, the selection and adjustment of full-section tunnel boring machine control parameters (cutterhead speed, penetration) have an important impact on TBM excavation efficiency. At present, the adjustment of control parameters during TBM construction has the following main shortcomings: First, the excavation face information obtained by TBM operators during the excavation process is very limited, and they mainly rely on human experience to control the TBM excavation process. Improper adjustment of control parameters or errors often occur, affecting excavation efficiency. Second, the TBM excavation parameter prediction model proposed at this stage is mainly fitted or trained based on historical data generated by human operations. Therefore, the output results of the model still largely reflect human experience preferences. It is difficult to obtain better cutterhead rock breaking energy consumption and excavation rate under specific geological conditions to achieve optimal excavation performance. There is a lack of scientific and systematic methods for adjusting TBM control parameters.

[0003] In view of the above shortcomings, in order to solve the problem of adjustment and optimization of TBM control parameters in complex strata, overcome the defect that manual adjustment is prone to errors, and improve the TBM excavation efficiency, the present invention proposes a TBM control parameter optimization method taking into account the rock breaking specific energy and net excavation rate. Summary of the invention

[0004] The present invention aims to provide a TBM control parameter optimization method taking into account rock breaking specific energy and net tunneling rate.

[0005] To achieve the above object, the present invention adopts the following technical solutions: The method for optimizing TBM control parameters considering rock breaking specific energy and net tunneling rate of the present invention comprises the following steps: S1, obtaining the excavation parameters and surrounding rock grade parameters of the TBM initial section and performing preprocessing; S2, using the SecOPSO-MONN algorithm to train and generate a TBM control parameter optimization model based on the excavation parameters and surrounding rock grade data of the existing project; S3, inputting the preprocessed excavation parameters and surrounding rock grade parameters into the TBM control parameter optimization model to obtain the cutter head speed and penetration rate; S4, the cutter head rotation speed and the penetration rate are taken as TBM control parameters and excavation is carried out until one excavation cycle is completed; S5, taking the excavation parameters and surrounding rock grade number in the previous excavation cycle as new data, pre-processing the new data, and performing incremental training on the TBM control parameter optimization model to update the model; S6, predicting TBM control parameters of the current excavation cycle using the updated model and the excavation parameters and surrounding rock grade of the starting section of the current excavation cycle.

[0006] Furthermore, the starting section is the first 25 seconds of the ascending section of a tunneling cycle.

[0007] Furthermore, the excavation parameters include cutter head thrust, cutter head torque, cutter head speed, cutter head power, and penetration.

[0008] Furthermore, the surrounding rock grade is determined according to standard specification requirements.

[0009] Furthermore, the preprocessing specifically includes calculating the mean value, the slope of the fitting line, and the fluctuation level measurement of each type of tunneling parameter in the starting section, and performing normalization processing; and assigning the surrounding rock grade according to preset rules.

[0010] Furthermore, the calculation formula of the fluctuation level measure r(X) is: , where X is any excavation parameter; f(t) is the fitted straight line function of the excavation parameter X in the rising section of an excavation cycle. t is the time series, in seconds.

[0011] Furthermore, the loss function used in training the TBM control parameter optimization model in step S1 is: ,in , The samples are k The cutterhead speed and penetration rate in the steady state section output in the TBM control parameter optimization model are: R k , P k The samples are k The actual cutterhead speed and penetration rate during the steady-state stage of TBM excavation. α is a penalty coefficient ranging from 0 to 1. Output of the cutterhead speed and penetration conditions for the TBM control parameter optimization model k The rock breaking specific energy evaluation value.

[0012] Furthermore, the rock breaking specific energy evaluation value It is determined by the cutterhead rock-breaking energy ratio assessment model; the cutterhead rock-breaking energy ratio assessment model is constructed based on the LGB algorithm, with excavation parameters, surrounding rock grade, cutterhead speed and penetration in the steady state as input, and the cutterhead rock-breaking energy ratio corresponding to the excavation cycle as output, and is trained and generated using data from existing projects.

[0013] The advantage of the present invention is that the acquired TBM initial section excavation parameters and surrounding rock grade parameters are used as the input of the preset TBM control parameter optimization model, and the cutter head rotation speed and penetration value required for the stable excavation process of the TBM are output. The control parameters can be automatically output through the model 25 seconds after the start of excavation. The output control parameter values ​​reduce the rock breaking energy consumption of the cutter head while improving the net excavation rate of the TBM.

[0014] The present invention takes into account the comprehensive influence of the geological conditions of the excavation surface and various equipment parameters in the process of modeling the TBM control parameter optimization model, thereby avoiding the defect that errors are prone to occur when manually adjusting the control parameters; the excavation energy consumption and construction speed issues in the TBM construction process are taken into account, and the new data generated in the construction process are used to continuously update the model through incremental training, so that the output results of the model can better adapt to different geological conditions, thereby improving the generalization performance of the model under different geological conditions. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 The figure is a schematic diagram of the process of the method of the present invention.

[0016] Figure 2 Schematic diagram of the training process of the TBM control parameter optimization model in the method of the present invention.

[0017] Figure 3 This is a schematic diagram of the optimization results of rock breaking specific energy using the method of the present invention.

[0018] Figure 4 The figure is a schematic diagram of the optimization result of the net advancement rate using the method of the present invention. DETAILED DESCRIPTION

[0019] The technical solutions in the embodiments of the present invention are described clearly and completely below. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0020] like Figure 1 As shown, the TBM control parameter optimization method considering rock breaking specific energy and net tunneling rate of the present invention comprises the following steps: S1, obtain the TBM initial section excavation parameters and surrounding rock grade parameters, and perform preprocessing.

[0021] The excavation parameters and surrounding rock grade parameters of the initial section are the excavation parameters and surrounding rock grade values ​​within the first 25 seconds of the ascending section of a excavation cycle. In this embodiment, the TBM obtains five parameters, namely, the TBM cutterhead thrust, cutterhead torque, cutterhead power, penetration, and cutterhead speed, at a collection frequency of 1 Hz.

[0022] The surrounding rock grade parameters of the excavation face can be obtained through preliminary geological surveys of the tunnel combined with on-site surveys according to national standards, and matched with TBM excavation parameters through tunnel mileage pile numbers.

[0023] The method for preprocessing each excavation parameter is as follows: First, the arithmetic mean m(X) of each tunneling parameter in the 25s acquisition interval is calculated. The slope k(X) of the fitted straight line of each tunneling parameter in 25s is obtained by the least squares method; and the fluctuation level measurement value r(X) of each tunneling parameter in 25s is calculated. The calculation formula of r(X) is: (1) Where X is any tunneling parameter; fX(t) is the fitted straight line function of the tunneling parameter X obtained by the least squares method within the first 25s sampling interval of the rising stage of a tunneling cycle; t is the time series in seconds.

[0024] Secondly, the above tunneling parameter calculation results are used as characteristic variables, and each characteristic variable is normalized as follows: (2) Where: x and x norm Respectively represent the characteristic variables before and after normalization; x min With x max They represent the minimum and maximum values ​​of the characteristic variable in the sample respectively.

[0025] The preprocessing of surrounding rock grades can be performed by assigning values ​​to surrounding rock grades according to preset rules. Specifically, surrounding rock grades of types I to V can be mapped to integers 1 to 5 for coding processing.

[0026] S2, using the SecOPSO-MONN algorithm to train and generate a TBM control parameter optimization model based on the data of built projects.

[0027] The data of completed projects include the cutterhead thrust, cutterhead torque, penetration, cutterhead speed, cutterhead power, surrounding rock grade, etc. of each cycle of the TBM. The collected historical data of completed projects need to be preprocessed in the same way as step S1.

[0028] The SecOPSO-MONN algorithm is a machine learning algorithm based on the combination of second-order oscillating particle swarm (SecOPSO) and multi-objective neural network (MONN). The SecOPSO-MONN algorithm is used to pre-process the historical data of the built project. The pre-processed excavation parameters and surrounding rock grade are used as model inputs, and the cutterhead speed and penetration are used as model output results to train the model, and the TBM control parameter optimization model is obtained.

[0029] The following loss function is used for each sample during the training process: (3) In the formula, , are the cutterhead speed (r / min) and penetration (m) of the steady-state section output by sample k in the control parameter optimization model, Rk and Pk are the actual cutterhead speed (r / min) and penetration (m) of sample k in the steady-state section of tunneling, α is a penalty coefficient ranging from 0 to 1, is the cutterhead rock breaking specific energy evaluation value of sample k under the conditions of cutterhead rotation speed and penetration output by the model.

[0030] The specific training process is as follows: First, initialize the particle position coordinates P 0=([ W 0, b 0]), which is a multidimensional coordinate composed of the initial value parameters of the connection weights and biases between neural network layers.

[0031] Second, input feature matrix X , the control parameter output value is calculated according to the particle position coordinates , .

[0032] Third, substitute the output result into formula (3) to calculate the fitness function value. According to the fitness calculation result, the optimal position of the particle and the global optimal position are obtained. The fitness function calculation method is as follows: (4) in, K is the number of samples, Indicates the corresponding sample k The loss function is calculated by formula (3).

[0033] For particles in a group i The position coordinates are updated as follows: (5) In the formula, Represents particles i In the t The "flying" speed at the iteration, is the inertia weight, c 1. c 2 is the learning factor, r 1. r 2 is a random number in (0, 1), P id is the historical optimal position coordinate of particle i, P g is the global optimal position coordinate, , is the second-order oscillation parameter, and its value is calculated as follows: when (6) when (7) In the formula, is the maximum number of iterations of SecOPSO.

[0034] Finally, determine whether the iteration requirements are met. If not, update the particle position and return to the second step. Otherwise, output the result. At this time, the global optimal position of the particle ( W t , b t ) is the final value of the neural network connection weights and biases, and the preset TBM control parameter optimization model training is completed.

[0035] Among them, the cutterhead rock breaking energy evaluation value The preset cutterhead rock breaking energy evaluation model is calculated based on the LGB (LightGBM) algorithm, and is also trained using existing engineering historical data samples and preprocessed. The cutterhead speed output by the preprocessed excavation parameters, surrounding rock grade, and TBM control parameter optimization model is , penetration As input, the cutterhead rock breaking energy evaluation value as output.

[0036] Among them, the cutter head rock breaking specific energy E s Calculate using the following formula: (8) Where F is the TBM cutterhead thrust (kN), P is the penetration (m), T is the cutterhead torque (kN·m), and R is the cutterhead radius (m).

[0037] S3, inputting the pre-processed excavation parameters and surrounding rock grade parameters into the TBM control parameter optimization model to obtain the cutter head rotation speed and penetration rate.

[0038] S4, the cutter head rotation speed and the penetration rate are taken as TBM control parameters and excavation is carried out until a excavation cycle is completed.

[0039] During the TBM excavation process, the control system automatically collects and records the changes in various excavation parameters. Figure 3 This is the optimization result of the rock-breaking specific energy of the model for the TBM construction data of a water diversion tunnel. Figure 4 This is the net excavation rate optimization result of the model for the TBM construction data of a water diversion tunnel.

[0040] S5, taking the parameters in the previous excavation cycle (including cutterhead thrust, cutterhead torque, cutterhead speed, penetration, cutterhead power, surrounding rock grade and other data) as new data, after preprocessing the new data, incremental training is performed on the TBM control parameter optimization model to update the model. Every 10 new data can be taken as a batch, and the preset TBM control parameter optimization model can be updated through incremental training using the new data, wherein, except that the initial parameters of the neural network use the parameters of the currently trained TBM control parameter optimization model, the incremental training process is the same as the preset TBM control parameter optimization model training process described in step 2.

[0041] S6, predicting TBM control parameters of the current excavation cycle using the updated model and the excavation parameters and surrounding rock grade of the starting section of the current excavation cycle.

Claims

1. A TBM control parameter optimization method considering rock breaking specific energy and net tunneling rate, characterized by: The following steps are involved: S1, obtaining the excavation parameters and surrounding rock grade parameters of the TBM initial section and performing preprocessing; S2, using the SecOPSO-MONN algorithm to train and generate a TBM control parameter optimization model based on the excavation parameters and surrounding rock grade data of the existing project; S3, inputting the preprocessed excavation parameters and surrounding rock grade parameters into the TBM control parameter optimization model to obtain the cutter head speed and penetration rate; S4, the cutter head rotation speed and the penetration rate are taken as TBM control parameters and excavation is carried out until one excavation cycle is completed; S5, taking the excavation parameters and surrounding rock grade number in the previous excavation cycle as new data, pre-processing the new data, and performing incremental training on the TBM control parameter optimization model to update the model; S6, predicting TBM control parameters of the current excavation cycle using the updated model and the excavation parameters and surrounding rock grade of the starting section of the current excavation cycle.

2. A TBM control parameter optimization method considering rock breaking specific energy and net tunneling rate according to claim 1, characterized in that: The starting section is the first 25 seconds of the ascending section of a tunneling cycle.

3. The method for optimizing TBM control parameters considering rock breaking specific energy and net tunneling rate according to claim 1, characterized in that: The excavation parameters include cutter head thrust, cutter head torque, cutter head speed, penetration, and cutter head power.

4. The method for optimizing TBM control parameters considering rock breaking specific energy and net tunneling rate according to claim 1, characterized in that: The surrounding rock grade is determined according to standard specifications.

5. The method for optimizing TBM control parameters considering rock breaking specific energy and net tunneling rate according to claim 1, characterized in that: The preprocessing specifically includes respectively calculating the mean value, the slope of the fitted straight line, and the fluctuation level measurement of each type of tunneling parameter in the starting section, and performing normalization processing; and assigning a value to the surrounding rock grade according to preset rules.

6. A TBM control parameter optimization method considering rock breaking specific energy and net tunneling rate according to claim 5, characterized in that: The calculation formula of the volatility level measure r(X) is: , where X is any excavation parameter; f(t) is the fitted straight line function of the excavation parameter X in the ascending section of an excavation cycle; t is the time series in seconds.

7. The method for optimizing TBM control parameters considering rock breaking specific energy and net tunneling rate according to claim 1, characterized in that: The loss function used in training the TBM control parameter optimization model in step S1 is: ,in , The samples are k The cutterhead speed and penetration rate in the steady state section output in the TBM control parameter optimization model are: R k , P k The samples are k The actual cutterhead speed and penetration rate during the steady-state stage of TBM excavation. α is a penalty coefficient ranging from 0 to 1. Output of the cutterhead speed and penetration conditions for the TBM control parameter optimization model k The rock breaking specific energy evaluation value.

8. The method for optimizing TBM control parameters considering rock breaking specific energy and net tunneling rate according to claim 7, characterized in that: The rock breaking specific energy evaluation value It is determined by the cutterhead rock-breaking energy ratio assessment model; the cutterhead rock-breaking energy ratio assessment model is constructed based on the LGB algorithm, with excavation parameters, surrounding rock grade, cutterhead speed and penetration in the steady state as input, and the cutterhead rock-breaking energy ratio corresponding to the excavation cycle as output, and is trained and generated using data from existing projects.

Citation Information

Cited By

  • TBM tunneling parameter prediction model training method and device and prediction method

    CN119229151A

  • Cutting control method and device for full-width transverse roller

    CN120684204A

  • Method and system for determining rock breaking parameters of full face tunnel boring machine

    CN122221546A