Ventilation cooling parameter adjusting method based on high ground temperature tunnel construction period

By arranging sensors and wireless transmission modules in the high-temperature tunnel, combined with the central control system and cooling equipment, the ventilation and cooling parameters are dynamically adjusted, which solves the problem that traditional methods cannot monitor and adjust in real time, improves construction safety and efficiency, and provides construction workers with Provide a comfortable environment.

CN118793483APending Publication Date: 2024-10-18CHONGQING UNIV
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202410961404.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-18
Publication Date
2024-10-18

AI Technical Summary

Technical Problem

In the construction environment of high-temperature tunnels, traditional ventilation and cooling methods cannot be monitored and dynamically adjusted in real time, resulting in heatstroke among construction workers, overheating of equipment, sluggish air circulation, and accumulation of harmful gases, affecting construction progress and safety.

Method used

Arrange multiple temperature sensors and air flow rate sensors in the tunnel, transmit data to the central control system through wireless transmission modules, use novel algorithms to predict temperature and wind speed, and dynamically adjust ventilation and cooling parameters to ensure that the temperature and wind speed are within a reasonable range. High-pressure spray system and air cooler for cooling.

Benefits of technology

Improves the safety and efficiency of tunnel construction, provides construction personnel with a comfortable working environment, reduces the complexity and interference of wired connections, ensures the flexibility and reliability of data transmission, timely detects potential temperature and wind speed changes, and accurately controls cooling equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118793483A_ABST
    Figure CN118793483A_ABST
Patent Text Reader

Abstract

The invention discloses a ventilation cooling parameter adjusting method based on a high-ground-temperature tunnel construction period, and particularly relates to the technical field of underground construction environment safety. The ventilation cooling parameter adjusting method comprises the steps that S1, a plurality of temperature sensors and air velocity sensors are arranged in a tunnel; s2, arranging and installing a cooling water system and an air cooling system in the tunnel; s3, transmitting the sensor data to a central control system by using a wireless transmission module; s4, the central control system receives the sensor data and analyzes the sensor data through data analysis software; s5, the control system controls starting and stopping of cooling equipment and a fan through a control module; the control system judges whether the current temperature and wind speed exceed the set threshold value range or not according to the analysis result, if yes, the cooling device is started, and if not, the cooling device, the multiple temperature sensors and the air flow speed sensor are closed, the temperature and the air flow speed in the tunnel are monitored in real time, ventilation adjustment is effectively conducted, and the ventilation efficiency is improved. And the safety and comfort of the construction environment are ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of underground construction environment safety technology, and more specifically, to a method for adjusting ventilation and cooling parameters during a high ground temperature tunnel construction period. Background Art

[0002] Tunnel construction is usually accompanied by high ground temperatures and complex geological environments, which poses severe challenges to the working environment of construction workers and the operation of equipment. Traditional tunnel ventilation and cooling methods mainly rely on natural ventilation and mechanical ventilation, but these methods are often unsatisfactory when facing high ground temperatures and long-distance tunnels. In the high ground temperature tunnel construction environment, excessively high temperatures can cause problems such as heatstroke for construction workers and overheating of equipment, affecting the construction progress and quality. In addition, insufficient air flow rate can lead to poor air circulation in the tunnel and the accumulation of harmful gases such as carbon monoxide and sulfur dioxide, threatening the health of construction workers. Existing ventilation and cooling systems generally use fixed ventilation parameters, lack the ability to monitor and adjust dynamically in real time, and cannot adapt to the complex and changeable environmental conditions in the tunnel. Moreover, most traditional ventilation and cooling equipment relies on manual control, has slow response speed, and is not timely adjusted, making it difficult to provide effective control when the temperature and air flow rate change dramatically. In addition, due to the wide range of tunnel construction areas and complex environments, sensor layout and data transmission are also a major problem. The traditional wired connection method is not only complex to install and difficult to maintain, but also easily affected by external interference, affecting the accuracy of data and the stability of transmission.

[0003] In order to overcome the above problems, this patent proposes a method for adjusting ventilation and cooling parameters during the construction period of a high-ground temperature tunnel. This method arranges multiple temperature sensors and air flow rate sensors in the tunnel to collect temperature and air flow rate data in real time, and transmits the data to the central control system through a wireless transmission module. The central control system analyzes the data, uses a novel algorithm to predict the temperature and wind speed, and dynamically adjusts the ventilation and cooling parameters to ensure that the temperature and air flow rate in the tunnel are always within a reasonable range. This method can not only improve the safety and efficiency of tunnel construction, but also provide a more comfortable working environment for construction personnel.

[0004] In order to solve the above problems, the present invention proposes that by arranging multiple temperature sensors and air flow rate sensors in the tunnel, the temperature and air flow rate in the tunnel can be monitored in real time to ensure the safety and comfort of the construction environment. Secondly, the use of a wireless transmission module to transmit data reduces the limitations and complexity of wired connections and improves the flexibility and reliability of data transmission. Thirdly, the central control system analyzes and predicts the data, which can detect potential temperature and wind speed changes in advance and take timely measures to ensure the stability of the construction environment. Finally, the control system accurately controls the operating status of the cooling equipment through the PID control algorithm to ensure that the temperature and wind speed in the tunnel are always within a reasonable range, thereby improving the safety and efficiency of the construction. In addition, the use of a high-pressure spray system and an air cooler can not only effectively reduce the temperature in the tunnel, but also increase the air humidity, improve the air quality, and provide a more comfortable working environment for construction personnel. Summary of the invention

[0005] In order to overcome the above-mentioned defects of the prior art, the embodiment of the present invention provides a method for adjusting ventilation and cooling parameters based on the construction period of a high-temperature tunnel. This patent provides a method for adjusting ventilation and cooling parameters based on the construction period of a high-temperature tunnel. By arranging multiple temperature sensors and air flow rate sensors in the tunnel, the temperature and air flow rate data in the tunnel are collected in real time, and the data is transmitted to the central control system using a wireless transmission module. After receiving the sensor data, the central control system analyzes it through data analysis software, uses novel algorithms such as time series analysis algorithms to predict temperature and wind speed, calculates the current average temperature and wind speed, and determines the thresholds of temperature and wind speed. According to the analysis results, the control system determines whether the current temperature and wind speed exceed the set threshold range. If exceeded, the cooling device is started, and if not exceeded, the cooling device is turned off. The cooling device includes a high-pressure spray system and an air cooler. Through the method of high-pressure spray and air cooling, the temperature and wind speed in the tunnel are always within a reasonable range. By arranging multiple temperature sensors and air flow rate sensors in the tunnel, the temperature and air flow rate in the tunnel can be monitored in real time to ensure the safety and comfort of the construction environment. Secondly, the use of wireless transmission modules to transmit data reduces the limitations and complexity of wired connections and improves the flexibility and reliability of data transmission. Thirdly, the central control system analyzes and predicts the data, which can detect potential changes in temperature and wind speed in advance and take timely measures to ensure the stability of the construction environment. Finally, the control system accurately controls the operating status of the cooling equipment through the PID control algorithm to ensure that the temperature and wind speed in the tunnel are always within a reasonable range, improving the safety and efficiency of construction. In addition, the use of high-pressure spray systems and air coolers can not only effectively reduce the temperature in the tunnel, but also increase the air humidity, improve the air quality, and provide a more comfortable working environment for construction personnel.

[0006] To achieve the above object, the present invention provides the following technical solution: a method for adjusting ventilation and cooling parameters during the construction period of a high ground temperature tunnel, the method comprising the following steps:

[0007] S1: Arrange multiple temperature sensors and air velocity sensors in the tunnel;

[0008] S2: Arrange and install cooling water system and air cooling system in the tunnel;

[0009] S3: Use the wireless transmission module to transmit the sensor data to the central control system;

[0010] S4: The central control system receives the sensor data and analyzes it through the data analysis software;

[0011] S5: The control system controls the opening and closing of the cooling equipment and the fan through the control module;

[0012] In a preferred embodiment: in step S1, a set of temperature sensors and air flow rate sensors are installed at the entrance and exit of the tunnel respectively; a set of temperature sensors is installed every 50-100 meters in the middle section of the tunnel; a wireless communication module is installed on the side of each set of temperature sensors and air flow rate sensors, and each set of temperature sensors, air flow rate sensors and wireless communication modules are electrically connected through wires. Based on the thermoelectric effect, when the two conductor connection points of the thermocouple are at different temperatures, an electromotive force will be generated, and the electromotive force is proportional to the temperature difference: E=a+bT+cT 2 ,

[0013] Where, E is the thermocouple thermoelectric potential, T is the temperature, and a, b, c are the thermocouple material constants;

[0014] Based on the principle of heat conduction, the air flow rate is determined by measuring the change in heat dissipation of the heating resistor wire. The hot air flows through the heating wire, causing the resistance to change. The rate of change of resistance is proportional to the wind speed:

[0015] Where, V is wind speed, I is current, R is resistance, P0 is environmental loss, A is thermal conductivity, T wire is the resistance wire temperature, T air is the air temperature;

[0016] In a preferred embodiment: in step S2, the cooling water system includes: a nozzle, a pump and a liquid storage tank, a nozzle is installed every 50-100 meters in the tunnel, the nozzle is installed on the top of the tunnel, the nozzle is firmly installed through a bracket, the pump and the liquid storage tank are both installed at the entrance and exit of the tunnel, the nozzle, the pump and the liquid storage tank are connected through pipelines, an electrical control system is provided at the entrance of the tunnel, the electrical control system is connected to the control pump and the electric valve through wires; the air cooling system includes: a cold air transmission port and a cold air compression pump, a cold air transmission port is installed every 50-100 meters in the tunnel, the transmission port is installed on the top of the tunnel, the transmission port is firmly installed through a bracket, the cold air compression pump is installed at the entrance and exit of the tunnel, and the cold air transmission port and the cold air compression pump are connected through pipelines.

[0017] In a preferred embodiment: in step S3, the data collector packages the sensor data into a data packet for wireless transmission: Packet = {Header, Sensor ID, Timestamp, Data, Checksum}, where Header is the header information of the data packet, Sensor ID is the sensor identifier, Timestamp is the timestamp, Data is the sensor data, and Checksum is the checksum;

[0018] In step S3, the wireless transmission module sends the packaged data to the central control system via wireless signals: Among them, R is the transmission rate, D is the amount of data, and T is the transmission time;

[0019] In step S3, the data packet loss rate during the monitoring transmission process is: Among them, P loss is the data packet loss rate, N lost is the number of lost packets, N total is the total number of packets.

[0020] In a preferred embodiment: in step S4, the central control system receives the sensor data packet through the wireless receiving module and performs unpacking processing. After unpacking, the system stores the sensor ID, timestamp, sensor data and other information in the database. The system stores the received data in the database and performs data cleaning and preprocessing: Among them, Z is the standard score, X is the data value, μ is the standard value, and σ is the standard deviation;

[0021] Use time series analysis, namely the ARIMA model algorithm, to predict temperature and wind speed: T t+1 =α0+α1T t +…+α p T t-p +∈ t , where Tt+1 is the temperature at the next moment, α0, α1, …, α p is the model parameter, ∈ t is the error term; calculate the average temperature and wind speed, and determine the thresholds of temperature and wind speed, average temperature: Among them, T avg is the average temperature, T i is the data of the ith temperature sensor, n is the number of temperature sensors; finally, the decision is made based on the obtained data: T threshold =T avg +kT std , where T threshold is the temperature threshold, k is the adjustment coefficient, T std is the temperature standard deviation;

[0022] Average wind speed: Among them, V avg is the average wind speed, V i is the data of the ith temperature sensor, n is the number of wind speed sensors, and finally the decision is made based on the obtained data: V threshold =V avg +kV std , where V threshold is the wind speed threshold, k is the adjustment coefficient, V std is the standard deviation of wind speed.

[0023] In a preferred embodiment: in step S5, the control system determines whether the current temperature and wind speed exceed the threshold value according to the analysis result, and determines whether the control system controls the opening and closing of the cooling device through the control module: if You need to turn on the cooling equipment; if The cooling equipment needs to be turned off, where T current is the current temperature, T threshold is the temperature threshold, V current is the current temperature, V threshold is the temperature threshold.

[0024] Technical effects and advantages of the present invention: This patent provides a method for adjusting ventilation and cooling parameters during the construction period of a high-temperature tunnel. By arranging multiple temperature sensors and air flow rate sensors in the tunnel, the temperature and air flow rate data in the tunnel are collected in real time, and the data is transmitted to the central control system using a wireless transmission module. After receiving the sensor data, the central control system analyzes it through data analysis software, uses novel algorithms such as time series analysis algorithms to predict the temperature and wind speed, calculates the current average temperature and wind speed, and determines the thresholds of the temperature and wind speed. According to the analysis results, the control system determines whether the current temperature and wind speed exceed the set threshold range. If exceeded, the cooling device is started, and if not exceeded, the cooling device is turned off. The cooling device includes a high-pressure spray system and an air cooler. Through the method of high-pressure spray and air cooling, the temperature and wind speed in the tunnel are always within a reasonable range. By arranging multiple temperature sensors and air flow rate sensors in the tunnel, the temperature and air flow rate in the tunnel can be monitored in real time to ensure the safety and comfort of the construction environment. Secondly, the use of a wireless transmission module to transmit data reduces the limitations and complexity of wired connections and improves the flexibility and reliability of data transmission. Thirdly, the central control system analyzes and predicts the data, which can detect potential changes in temperature and wind speed in advance, take timely measures, and ensure the stability of the construction environment. Finally, the control system accurately controls the operating status of the cooling equipment through the PID control algorithm to ensure that the temperature and wind speed in the tunnel are always within a reasonable range, improving the safety and efficiency of construction. In addition, the use of high-pressure spray systems and air coolers can not only effectively reduce the temperature in the tunnel, but also increase air humidity, improve air quality, and provide a more comfortable working environment for construction personnel. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is a schematic diagram of the working steps of the present invention. DETAILED DESCRIPTION

[0026] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0027] Example embodiments will now be described more fully with reference to the accompanying drawings, S1: arranging a plurality of temperature sensors and air velocity sensors in a tunnel;

[0028] S2: Arrange and install cooling water system and air cooling system in the tunnel;

[0029] S3: Use the wireless transmission module to transmit the sensor data to the central control system;

[0030] S4: The central control system receives the sensor data and analyzes it through the data analysis software;

[0031] S5: The control system controls the opening and closing of the cooling equipment and the fan through the control module;

[0032] In step S1, a set of temperature sensors and air flow rate sensors are installed at the entrance and exit of the tunnel respectively; a set of temperature sensors is installed every 50-100 meters in the middle section of the tunnel; a wireless communication module is installed on the side of each set of temperature sensors and air flow rate sensors, and each set of temperature sensors, air flow rate sensors and wireless communication modules are electrically connected through wires. Based on the thermoelectric effect, when the two conductor connection points of the thermocouple are at different temperatures, an electromotive force will be generated, and the electromotive force is proportional to the temperature difference: E=a+bT+cT 2 ,

[0033] Where, E is the thermocouple thermoelectric potential, T is the temperature, and a, b, c are the thermocouple material constants;

[0034] Based on the principle of heat conduction, the air flow rate is determined by measuring the change in heat dissipation of the heating resistor wire. The hot air flows through the heating wire, causing the resistance to change. The rate of change of resistance is proportional to the wind speed:

[0035]

[0036] Where, V is wind speed, I is current, R is resistance, P0 is environmental loss, A is thermal conductivity, T wire is the resistance wire temperature, T air For air temperature; multiple temperature sensors and air flow rate sensors are installed at the entrance, exit, middle section and key construction areas of the tunnel. These sensors are fixed to the tunnel wall with protective covers to ensure that they are stable in the working environment and not damaged by external forces. The temperature sensor uses thermocouple and thermistor technology to measure the air temperature by using the electromotive force or resistance change generated by the material at different temperatures. The air flow rate sensor uses hot wire anemometer technology to determine the air flow rate by measuring the heat dissipation change of the heating resistor wire when the air flows. The purpose of installing these sensors is to monitor the temperature and air flow rate in the tunnel in real time to ensure the safety and comfort of the construction environment.

[0037] In step S2, the cooling water system includes: a nozzle, a pump and a liquid storage tank. A nozzle is installed every 50-100 meters in the tunnel. The nozzle is installed on the top of the tunnel and is firmly installed through a bracket. The pump and the liquid storage tank are installed at the entrance and exit of the tunnel. The nozzle, pump and liquid storage tank are connected through pipelines. An electrical control system is provided at the entrance of the tunnel. The electrical control system is connected to the control pump and the electric valve through wires; the air cooling system includes: a cold air transmission port and a cold air compression pump. A cold air transmission port is installed every 50-100 meters in the tunnel. The transmission port is installed on the top of the tunnel and is firmly installed through a bracket. The cold air compression pump is installed at the entrance and exit of the tunnel. The cold air transmission port and the cold air compression pump are connected through pipelines.

[0038] In step S3, the data collector packages the sensor data into a data packet for wireless transmission: Packet = {HeaderSensor ID, Timestamp, Data, Checksum}, where Header is the data packet header information, Sensor ID is the sensor identifier, Timestamp is the timestamp, Data is the sensor data, and Checksum is the checksum;

[0039] In step S3, the wireless transmission module sends the packaged data to the central control system via wireless signals: Among them, R is the transmission rate, D is the amount of data, and T is the transmission time;

[0040] In step S3, the data packet loss rate during the monitoring transmission process is: Among them, P loss is the data packet loss rate, N lost is the number of lost packets, N totalis the total number of data packets; the data collector sends the packaged data to the central control system through a wireless transmission module (such as LoRa or Zigbee). The wireless transmission module can stably transmit data in the complex environment of the tunnel, ensuring that the central control system receives the sensor data in real time. The central control system receives the data packet through the wireless receiving module, unpacks it, stores the unpacked sensor data in the database, and performs data cleaning and preprocessing to remove noise and outliers to ensure the accuracy of the data. The wireless transmission module such as LoRa or Zigbee sends the packaged data to the central control system through a wireless signal. LoRa is a long-distance, low-power wireless communication technology suitable for use in complex environments such as tunnels. Zigbee is a short-distance, low-power wireless communication technology suitable for device connections in local areas. The central control system receives the data packet through the wireless receiving module, stores the sensor data in the database after unpacking, and removes noise and outliers through data cleaning technology to ensure the accuracy and reliability of the data. The use of the wireless transmission module to transmit data reduces the limitations and complexity of wired connections and improves the flexibility and reliability of data transmission. In places such as tunnels with complex environments and wide construction areas, wireless transmission can effectively cover the entire area to ensure that data can be transmitted to the central control system in a timely manner. Through data cleaning and preprocessing, the quality of data can be further improved, providing a reliable basis for subsequent analysis and decision-making.

[0041] In step S4, in step S4, the central control system receives the sensor data packet through the wireless receiving module and performs unpacking processing. After unpacking, the system stores the sensor ID, timestamp, sensor data and other information in the database. The system stores the received data in the database and performs data cleaning and preprocessing: Among them, Z is the standard score, X is the data value, μ is the standard value, and σ is the standard deviation;

[0042] Use time series analysis, namely the ARIMA model algorithm, to predict temperature and wind speed: T t+1 =α0+α1T t +…+α p T t-p +∈ t , where T t+1 is the temperature at the next moment, α0, α1, …, α p is the model parameter, ∈ t is the error term; calculate the average temperature and wind speed, and determine the thresholds of temperature and wind speed, average temperature: Among them, T avg is the average temperature, T i is the data of the ith temperature sensor, n is the number of temperature sensors; finally, the decision is made based on the obtained data: T threshold =Tavg +kT std , where T threshold is the temperature threshold, k is the adjustment coefficient, T std is the temperature standard deviation;

[0043] Average wind speed: Among them, V avg is the average wind speed, V i is the data of the ith temperature sensor, n is the number of wind speed sensors, and finally the decision is made based on the obtained data: V threshold =V avg +kV std , where V threshold is the wind speed threshold, k is the adjustment coefficient, V std is the standard deviation of wind speed; after receiving the sensor data, the central control system analyzes it through data analysis software, and uses novel algorithms such as time series analysis algorithm to predict temperature and wind speed. The system calculates the current average temperature and wind speed, and determines the thresholds of temperature and wind speed. These analyses and predictions help to discover potential changes in temperature and wind speed in advance, so as to make corresponding adjustments and ensure the stability of the construction environment. Through such analysis, the system can provide real-time environmental status reports and provide a reliable basis for subsequent control decisions. The central control system analyzes and processes the received sensor data through data analysis software. The time series analysis algorithm can predict the future trend of temperature and wind speed changes based on historical data, so as to adjust the operating status of the cooling equipment in advance. The system calculates the current average temperature and wind speed, and determines the thresholds of temperature and wind speed based on historical data and current trends as the reference standard for the control equipment. Through the central control system, the data is analyzed and predicted, which can detect potential changes in temperature and wind speed in advance, take timely measures, and ensure the stability of the construction environment. The real-time environmental status report provided by the system can help construction management personnel understand the current environmental conditions, adjust the construction plan and equipment operation status as needed, and improve the safety and efficiency of construction.

[0044] In step S5, the control system determines whether the current temperature and wind speed exceed the threshold value based on the analysis results, and determines whether the control system controls the opening and closing of the cooling device through the control module: You need to turn on the cooling equipment; if The cooling equipment needs to be turned off, where T current is the current temperature, T threshold is the temperature threshold, V current is the current temperature, V thresholdis the temperature threshold; the control system determines whether the current temperature and wind speed exceed the set threshold range according to the analysis results. If the current temperature is higher than the set threshold and the current wind speed is lower than the set threshold, the system will start the cooling device; if the current temperature is lower than or equal to the set threshold and the current wind speed is higher than or equal to the set threshold, the system will shut down the cooling device. Using the PID control algorithm, the system determines the required control output by calculating the error of temperature and wind speed, and sends control signals to the high-pressure spray system and air cooler. The high-pressure spray system pressurizes water through a high-pressure pump, atomizes the water through a nozzle, absorbs heat from the air, and reduces the air temperature; the air cooler circulates refrigerant through a compressor, cools the air, and sends the cold air into the tunnel through the air duct system. According to the control signal, the cooling device starts or stops the operation accordingly to ensure that the temperature and wind speed in the tunnel are always within a reasonable range, providing a safe and comfortable working environment for construction personnel. The control system uses the PID control algorithm to calculate the required control output according to the deviation of the current temperature and wind speed from the set value. The PID control algorithm includes proportional control, integral control, and differential control. By adjusting the parameters of these three parts, the system can accurately control the operating status of the cooling device. The high-pressure spray system pressurizes water through a high-pressure pump and atomizes the water through a nozzle. When the water mist evaporates in the air, it absorbs heat, thereby reducing the air temperature. The air cooler circulates the refrigerant through the compressor to cool the air and sends the cold air into the tunnel through the duct system to ensure that the temperature in the tunnel remains within the set range.

[0045] The above embodiments can be implemented in whole or in part by software, hardware, firmware or any other combination. When implemented using software, the above embodiments can be implemented in whole or in part in the form of a computer program product. The computer program product includes one or more computer instructions or computer programs. When the computer instructions or computer programs are loaded or executed on a computer, the process or function described in the embodiment of the present application is generated in whole or in part. The computer can be a general-purpose computer, a special-purpose computer, a computer network, or other programmable devices. The computer instructions can be stored in a computer-readable storage medium, or transmitted from one computer-readable storage medium to another computer-readable storage medium. For example, the computer instructions can be transmitted from one website site, computer, server or data center to another website site, computer, server or data center by wired (e.g., infrared, wireless, microwave, etc.). The computer-readable storage medium can be any available medium that a computer can access or a data storage device such as a server or data center that contains one or more available media sets. The available medium can be a magnetic medium (e.g., a floppy disk, a hard disk, a tape), an optical medium (e.g., a DVD), or a semiconductor medium. The semiconductor medium can be a solid-state hard disk.

[0046] It should be understood that in the various embodiments of the present application, the size of the serial numbers of the above-mentioned processes does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.

[0047] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.

[0048] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0049] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit.

[0050] If the functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application can be essentially or partly embodied in the form of a software product that contributes to the prior art. The computer software product is stored in a storage medium, including several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the methods described in each embodiment of the present application. The aforementioned storage medium includes: various media that can store program codes, such as USB flash drives, mobile hard disks, read-only memories (ROM), random access memories (RAM), magnetic disks or optical disks.

[0051] The above description is only a specific implementation manner of the present application, but the protection scope of the present application is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application.

Claims

1. A method for adjusting ventilation and cooling parameters during the construction period of a high ground temperature tunnel, characterized in that: The ventilation and cooling parameter adjustment method comprises the following steps: S1: Arrange multiple temperature sensors and air velocity sensors in the tunnel; S2: Arrange and install cooling water system and air cooling system in the tunnel; S3: Use the wireless transmission module to transmit the sensor data to the central control system; S4: The central control system receives the sensor data and analyzes it through the data analysis software; S5: The control system controls the opening and closing of the cooling equipment and the fan through the control module.

2. The method for adjusting ventilation and cooling parameters during the construction period of a high ground temperature tunnel according to claim 1, characterized in that: In step S1, a set of temperature sensors and air flow rate sensors are installed at the entrance and exit of the tunnel respectively; a set of temperature sensors is installed every 50-100 meters in the middle section of the tunnel; a wireless communication module is installed on the side of each set of temperature sensors and air flow rate sensors, and each set of temperature sensors, air flow rate sensors and wireless communication modules are electrically connected through wires. Based on the thermoelectric effect, when the two conductor connection points of the thermocouple are at different temperatures, an electromotive force will be generated, and the electromotive force is proportional to the temperature difference: E=a+bT+cT 2 , Where, E is the thermocouple thermoelectric potential, T is the temperature, and a, b, and c are the thermocouple material constants; Based on the principle of heat conduction, the air flow rate is determined by measuring the change in heat dissipation of the heating resistor wire. The hot air flows through the heating wire, causing the resistance to change. The rate of change of resistance is proportional to the wind speed: Where V is wind speed, I is current, R is resistance, P0 is environmental loss, A is thermal conductivity, T wire is the resistance wire temperature, T air is the air temperature.

3. The method for adjusting ventilation and cooling parameters during the construction period of a high ground temperature tunnel according to claim 1, characterized in that: In step S2, the cooling water system includes: a nozzle, a pump and a liquid storage tank. A nozzle is installed every 50-100 meters in the tunnel. The nozzle is installed on the top of the tunnel and is firmly installed through a bracket. The pump and the liquid storage tank are both installed at the entrance and exit of the tunnel. The nozzle, pump and liquid storage tank are connected through pipelines. An electrical control system is provided at the entrance of the tunnel. The electrical control system is connected to the control pump and the electric valve through wires; the air cooling system includes: a cold air transmission port and a cold air compression pump. A cold air transmission port is installed every 50-100 meters in the tunnel. The transmission port is installed on the top of the tunnel and is firmly installed through a bracket. The cold air compression pump is installed at the entrance and exit of the tunnel. The cold air transmission port and the cold air compression pump are connected through pipelines.

4. The method for adjusting ventilation and cooling parameters during the construction period of a high ground temperature tunnel according to claim 1, characterized in that: In step S3, the data collector packages the sensor data into a data packet for wireless transmission: Packet = {Header, Sensor ID.Timestamp, Data, Checksum}, where Header is the data packet header information, Sensor ID is the sensor identifier, Timestamp is the timestamp, Data is the sensor data, and Checksum is the checksum; In step S3, the wireless transmission module sends the packaged data to the central control system via wireless signals: Among them, R is the transmission rate, D is the amount of data, and T is the transmission time; In step S3, the data packet loss rate during the monitoring transmission process is: Among them, P loss is the data packet loss rate, N lost is the number of lost packets, N total is the total number of packets.

5. The method for adjusting ventilation and cooling parameters during the construction period of a high ground temperature tunnel according to claim 1, characterized in that: In step S4, the central control system receives the sensor data packet through the wireless receiving module and performs unpacking processing. After unpacking, the system stores the information in the database. The system stores the received data in the database and performs data cleaning and preprocessing: Among them, Z is the standard score, X is the data value, μ is the standard value, and σ is the standard deviation; Use time series analysis, namely the ARIMA model algorithm, to predict temperature and wind speed: T t+1 =α0+α1T t +…+α p T t-p +∈ t , where T t+1 is the temperature at the next moment, α0, α1, ..., α p is the model parameter, ∈ t Calculate the average temperature and wind speed for the error term and determine the thresholds for temperature and wind speed, average temperature: Among them, T avg is the average temperature, T i is the data of the ith temperature sensor, n is the number of temperature sensors; finally, the decision is made based on the obtained data: T threshold =T avg +kT std , where T threshold is the temperature threshold, k is the adjustment coefficient, T std is the temperature standard deviation; Average wind speed: Among them, V avg is the average wind speed, V i is the data of the ith temperature sensor, n is the number of wind speed sensors, and finally the decision is made based on the obtained data: V threshold =V avg +kV std , where V threshold is the wind speed threshold, k is the adjustment coefficient, V std is the standard deviation of wind speed.

6. The method for adjusting ventilation and cooling parameters during the construction period of a high ground temperature tunnel according to claim 1, characterized in that: In step S5, the control system determines whether the current temperature and wind speed exceed the threshold value based on the analysis results, and determines whether the control system controls the opening and closing of the cooling device through the control module: You need to turn on the cooling equipment; if The cooling equipment needs to be turned off, where T current is the current temperature, T threshold is the temperature threshold, V current is the current temperature, V threshold is the temperature threshold.

Citation Information

Cited By

  • Intelligent cooling equipment and method for high-ground-temperature tunnel

    CN120798407A

  • High-temperature tunnel intelligent cooling device and method

    CN120798407B