Hollow modular cutting structure for high-speed railway in permafrost areas of plateau
By laying reinforced concrete hollow modules in high-speed railway cuttings and using chimney principles and air vent pipes, the problem of subgrade settlement caused by the thawing of permafrost is solved, the cooling of the foundation and the protection of the permafrost is achieved, and the stability and durability of the subgrade are improved.
Patent Information
- Application Number
- CN201910772663.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-08-21
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2039-08-21
AI Technical Summary
In the permafrost area of the plateau, the strength and settlement of high-speed railway subgrades are reduced due to the melting of the permafrost, which cannot meet the settlement control standards. An effective road cutting structure is needed to protect the permafrost and reduce the ground temperature.
The hollow module road cutting structure is adopted. By laying a rectangular or cube hollow module of reinforced concrete prefabricated rectangular concrete in the road cutting, the compensatory foundation design and chimney principle are used, combined with the ventilation pipe and insulation board to reduce the ground temperature and protect the permafrost.
Effectively reducing ground temperature, reducing subgrade settlement, and protecting permafrost, providing a novel solution to the problems of thawing and foundation settlement of permafrost, and improving the stability and durability of the subgrade.
Smart Images

Figure CN110424193B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a high-speed railway cutting structure, in particular to a high-speed railway hollow module cutting structure in a plateau permafrost region. Background Art
[0002] The high-speed railway subgrade is the foundation for bearing the track structure and train loads, and is a key project to ensure the high-speed, safe and comfortable operation of the train system. In addition to the basic functions, the subgrade project should also have sufficient strength, rigidity, stability and durability to ensure the smoothness of the subgrade and the long-term stability and safety of the railway foundation. The post-construction settlement control standards for high-speed railway subgrades are shown in Table 1.
[0003]
[0004] However, when building high-speed railways in permafrost areas, the thawing and settlement of permafrost is the primary key technical issue that needs to be solved, especially in permafrost cuttings with high ice content. Because the burial depth of the permafrost becomes shallower or it is completely exposed to the atmosphere, the permafrost begins to melt, becomes saturated with water, and its strength drops sharply, causing the roadbed to sink. This is completely unable to meet the settlement control standards for high-speed railways. It is imperative to research and develop permafrost cutting structures suitable for high-speed railways. Summary of the invention
[0005] The purpose of the present invention is to provide a hollow module cutting structure for high-speed railways in permafrost areas of the plateau, so as to reduce ground temperature, cool the foundation and protect the frozen soil.
[0006] The technical solution adopted by the present invention is:
[0007] The hollow module cutting structure for high-speed railway in permafrost areas of the plateau is characterized by:
[0008] Hollow modules are laid in the road cutting, arranged in layers and in rows, as the bearing foundation of the track slab;
[0009] The hollow module is a hollow structure of a cuboid or a cube, wherein two symmetrical faces are open and ventilation holes are reserved on the other faces, which are correspondingly connected when docking with adjacent modules.
[0010] When assembling hollow modules, the open surfaces are along the line direction, the rows and columns are aligned, the bottom surface is smooth, and the vents of adjacent modules are facing each other.
[0011] A vertical ventilation duct is provided on the top surface of the hollow module located on the upper layer to connect the interior of the hollow module with the outside world.
[0012] The hollow core modules are prefabricated reinforced concrete structures.
[0013] Both sides of the assembled body of the hollow module are filled with 37% ash soil.
[0014] Longitudinal reinforced concrete side ditches are set on the surface of the Sanqi lime soil and on both sides of the assembly of the hollow modules, and concrete block slabs are laid on the side ditch platforms.
[0015] Insulation boards are laid on the shoulders and slopes on both sides of the road cutting. The insulation boards are laid inward to the outside of the assembled body of the hollow module and are located below the side ditch in the 37 gray soil.
[0016] A thermal insulation filler is laid on top of the thermal insulation board. The thermal insulation filler is coarse-grained soil and is laid inward to the outside of the side ditch.
[0017] Vertical baffles are longitudinally arranged on the shoulders on both sides of the road cutting, with insulation fillers extending from above the insulation board to below the natural upper limit of frozen soil.
[0018] The hollow modules are laid longitudinally in sections with a flat slope or a herringbone slope.
[0019] The present invention has the following advantages:
[0020] The present invention sets a hollow module assembly structure on the roadbed, applies the compensatory foundation design principle, the chimney working principle, and the frozen soil engineering design theory, and makes full use of the abundant cold energy of the plateau (artificial pre-cooling in summer). The external cold energy is "input" into the foundation through the ventilation pipe, and the foundation heat is "output" through the ventilation pipe, so as to reduce the ground temperature, cool the foundation, and protect the frozen soil. It provides a new idea, new method, and new approach to solving the technical problems of frozen soil thawing and foundation settlement of high-speed railways in permafrost areas of the plateau.
[0021] Specifically include:
[0022] (1) By applying the principle of compensatory foundation design, the frozen soil below the roadbed surface is excavated and hollow modules are assembled, which reduces the additional stress on the foundation and helps reduce roadbed settlement.
[0023] (2) Applying the working principle of chimneys, hollow modules are assembled below the roadbed surface to fully utilize the abundant cold energy of the plateau to discharge the heat in the foundation. After the external cold energy is input into the hollow modules, the ground temperature is lowered, the foundation is cooled, and the frozen soil is actively protected.
[0024] (3) Use technologies such as air precoolers and blowers to send precooled air into the hollow modules to lower the ground temperature, cool the foundation, and actively protect the frozen soil.
[0025] (4) The hollow modules are prefabricated in factories and quickly assembled on site, which can reduce the exposure time of frozen soil and reduce the thermal disturbance to the permafrost foundation, thus facilitating the recovery of the permafrost environment after construction.
[0026] (5) Assembling hollow modules saves filling earth, is a favorable measure to prevent soil erosion, and is beneficial to environmental protection. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 It is a cross-sectional view of the present invention.
[0028] Figure 2 This is the front view of the hollow module.
[0029] Figure 3 This is a side view of a hollow module.
[0030] Figure 4 This is a top view of the hollow module.
[0031] Figure 5 It is a construction flow chart of the present invention.
[0032] In the figure, 1-waterproof board, 2-natural upper limit of frozen soil, 3-insulation board, 4-insulation filler, 5-Sanqi ash soil, 6-ventilation pipe, 7-hollow module, 8-ventilation hole, 9-high ice content frozen soil. DETAILED DESCRIPTION
[0033] The present invention is described in detail below in conjunction with specific implementation modes.
[0034] The present invention relates to a hollow module road cutting structure for high-speed railway in permafrost areas of plateaus. Hollow modules 7 are laid in the road cutting and arranged in layers and in rows as the bearing basis of track plates. The hollow modules 7 are hollow structures of rectangular parallelepiped or cube, two symmetrical faces of which are open and ventilation holes 8 are reserved on the other faces, which are correspondingly connected when docking with adjacent modules.
[0035] When the hollow modules 7 are assembled, the open surface is along the line direction, the rows and columns are aligned, the bottom surface is smooth, and the vents 8 of adjacent modules are facing each other. A vertical ventilation pipe 6 is arranged on the top surface of the hollow module 7 located on the upper layer to connect the inside of the hollow module 7 with the outside. The hollow module 7 is a prefabricated reinforced concrete structure, and the hollow module 7 is laid longitudinally in sections according to a one-sided slope or a herringbone slope.
[0036] The two sides of the assembly of the hollow module 7 are filled with 37 lime soil 5. Longitudinal reinforced concrete side ditches are set on the surface of the 37 lime soil 5 and on both sides of the assembly of the hollow module 7, and concrete blocks are laid on the side ditch platform. Insulation boards 3 are laid on the shoulders and slopes on both sides of the road cut. The insulation boards 3 are laid inward to the outside of the assembly of the hollow module 7 and are located below the side ditches in the 37 lime soil 5. Insulation fillers 4 are laid above the insulation boards 3. The insulation fillers 4 are coarse-grained soil and are laid inward to the outside of the side ditches.
[0037] Vertical water-blocking plates 1 are longitudinally arranged on the shoulders on both sides of the road cutting, and the water-blocking plates 1 extend from the insulation filler 4 above the insulation plate 3 to below the natural upper limit 2 of the frozen soil.
[0038] The specific construction steps of the present invention are:
[0039] 1. The slope of the road cutting is 1:1.75, with reinforced concrete side ditches on both sides and concrete block slabs laid on the side ditch platform for protection.
[0040] 2. Excavate the permafrost under the slope and roadbed surface, with the excavation thickness being 1.4 times the natural upper limit, but not exceeding 4.0m. The excavation thickness can be reduced when installing insulation boards, which is determined based on thermal engineering calculations.
[0041] 3. Replace the slope with a coarse-grained soil insulation layer; assemble reinforced concrete hollow modules under the roadbed surface, and fill both sides of the assembly with 37% ash soil to prevent ground water from seeping in.
[0042] 4. Reinforced concrete hollow modules are prefabricated in the factory and assembled on site.
[0043] (1) The hollow module is a rectangular parallelepiped or cube, with two symmetrical faces open and the other four faces closed. A 20 cm diameter ventilation hole is reserved at the centroid of each panel.
[0044] (2) The module edge length is 1.0 to 2.0 m, which is designed based on the lifting equipment and roadbed replacement thickness.
[0045] (3) The module wall thickness is 0.2 to 0.3 m, which is designed based on the module size and upper load.
[0046] (4) The top module is equipped with a ventilation port, which is equipped with a 20cm diameter steel pipe.
[0047] (5) The modules are assembled layer by layer from bottom to top. During assembly, the opening surface is in the direction of the line, the rows and columns are aligned, the bottom surface is smooth, and the vents of adjacent modules are facing each other.
[0048] (6) To prevent water accumulation in the module, the longitudinal section (about 50m) should be designed with a flat slope or a herringbone slope, and the longitudinal slope of the water flow surface should not be less than 5‰. Once a large amount of water accumulates, it can be pumped out from the ventilation port.
[0049] (7) The module can start working after assembly. In winter, according to the working principle of the chimney, the external cold air will begin to convect with the warm air in the module, and the external cold will be automatically "input" into the foundation; in summer, a blower and an air precooler are staggered every 50 meters on both sides of the line. The blower is connected to the outer opening of the steel pipe at the ventilation port (some of the outer openings of the steel pipe should be closed, and the number of closures is determined according to the exhaust volume), and the cold air is transported into the module through the air precooler, and the external cold is passively "input" into the foundation.
[0050] The specific requirements for construction are:
[0051] 1. Road cutting construction should be arranged in the early warm season as much as possible. Replacement, insulation, protection, drainage and other projects should be completed before the spring thaw.
[0052] 2. Before construction, sufficient mechanical equipment and materials should be prepared, as well as cover cloths and temporary supports for rainy and snowy days, so as to facilitate timely covering of exposed areas.
[0053] 3. The road cutting adopts the full-width, segmented (about 50m in length) and layered excavation method, first excavating the shady slope and then the sunny slope. The frozen soil layer should be excavated by the scarifier method. When the construction is difficult, the frozen soil blasting method can be used for excavation. When the temperature is high during the day, temporary sunshade and heat insulation protection should be provided for the exposed frozen soil with high ice content.
[0054] 4. After the road cutting is excavated, the hollow blocks shall be assembled immediately, with the opening surface in the direction of the line (the longitudinal slope of the longitudinal flow surface shall not be less than 5‰), the rows and columns shall be aligned, the bottom surface shall be smooth, and the vents of adjacent modules shall face each other.
[0055] 5. After the module is assembled, connect the blower and air precooler and carry out a trial run.
[0056] 6. During the trial operation, the replacement operations of the ash soil layer and the slope insulation layer will be carried out simultaneously, with continuous operations and rapid construction.
[0057] 7. After the replacement is completed, construct side ditches, slope protection and other projects according to the design.
[0058] The content of the present invention is not limited to the embodiments listed, and any equivalent changes made to the technical solution of the present invention by ordinary technicians in this field after reading the description of the present invention are covered by the claims of the present invention.
Claims
1. A construction method for a hollow module cutting structure for a high-speed railway in a plateau permafrost region, characterized in that: The hollow module cutting structure is specifically: Laying hollow modules (7) in the road cutting, arranging them in layers and in rows closely, as the bearing foundation of the track slab; The hollow module (7) is a hollow structure of a cuboid or a cube, wherein two symmetrical faces are open and ventilation holes (8) are reserved on the remaining faces, which are correspondingly connected when docking with adjacent modules; When the hollow modules (7) are assembled, the open surfaces are aligned along the line direction, the rows and columns are aligned, the bottom surfaces are smooth, and the vents (8) of adjacent modules are facing each other; A vertical ventilation pipe (6) is provided on the top surface of the hollow module (7) located at the upper layer, connecting the interior of the hollow module (7) with the outside; The construction method comprises the following steps: Step 1: The slope of the cutting is 1:1.75, reinforced concrete side ditches are set on both sides, and concrete block slabs are laid on the side ditch platform for protection; Step 2: Excavate the permafrost under the slope and roadbed surface, with the excavation thickness being 1.4 times the natural upper limit, but not exceeding 4.0m; Step 3: Replace the slope with a coarse-grained soil insulation layer; assemble reinforced concrete hollow modules under the roadbed surface, and fill both sides of the assembly with 37-ash soil to prevent ground water from seeping in; Step 4: The reinforced concrete hollow modules are prefabricated in the factory and assembled on site; (1) The hollow module is a rectangular parallelepiped or cube, with two symmetrical faces open and the other four faces closed; a 20 cm diameter ventilation hole is reserved at the centroid of each panel; (2) The module edge length is 1.0 to 2.0 m, which is designed according to the lifting equipment and the thickness of the roadbed replacement; (3) The module wall thickness is 0.2 to 0.3 m, which is designed according to the module size and upper load; (4) The top module is equipped with a ventilation port, which is equipped with a 20 cm diameter steel pipe; (5) The modules are assembled layer by layer from bottom to top. During assembly, the opening surface is in the direction of the line, the rows and columns are aligned, the bottom surface is smooth, and the vents of adjacent modules are facing each other; (6) To prevent water accumulation in the module, the longitudinal section should be designed with a flat slope or a herringbone slope, and the longitudinal slope of the water flow surface should not be less than 5‰; once a large amount of water accumulates, it can be pumped out from the ventilation port; (7) The module can start working after being assembled. In winter, according to the working principle of the chimney, the external cold air will begin to convect with the warm air in the module, and the external cold will be automatically "input" into the foundation. In summer, a blower and an air precooler are staggered every 50 meters on both sides of the line. The blower is connected to the outer port of the steel pipe of the ventilation port, and the cold air is transported into the module through the air precooler, and the external cold is passively "input" into the foundation.
2. The construction method of the hollow module cutting structure for high-speed railway in permafrost region of plateau according to claim 1, characterized in that: The hollow module (7) is a prefabricated reinforced concrete structure.
3. The construction method of the hollow module cutting structure for high-speed railway in permafrost region of plateau according to claim 2, characterized in that: Both sides of the assembled body of the hollow module (7) are filled with 37 ash soil (5).
4. The construction method of the hollow module cutting structure for high-speed railway in permafrost region of plateau according to claim 3, characterized in that: Longitudinal reinforced concrete side ditches are arranged on the surface of the 37-ash soil (5) and on both sides of the assembled body of the hollow module (7), and concrete blocks are laid on the side ditch platform.
5. The construction method of the hollow module cutting structure for high-speed railway in permafrost region of plateau according to claim 4, characterized in that: Insulation boards (3) are laid on the shoulders and side slopes on both sides of the road cut. The insulation boards (3) are laid inwardly to the outside of the assembled body of the hollow module (7) and are located below the side ditch in the three-seven ash soil (5).
6. The construction method of the hollow module cutting structure for high-speed railway in permafrost region of plateau according to claim 5, characterized in that: A thermal insulation filler (4) is laid on the thermal insulation board (3); the thermal insulation filler (4) is coarse-grained soil; and the thermal insulation filler (4) is laid inwardly to the outside of the side ditch.
7. The construction method of the hollow module cutting structure for high-speed railway in permafrost region of plateau according to claim 6, characterized in that: Vertical water-blocking boards (1) are longitudinally arranged on the shoulders of both sides of the road cut, and the water-blocking boards (1) extend from the insulation filler (4) above the insulation board (3) to below the natural upper limit (2) of the frozen soil.
8. The construction method of the hollow module cutting structure for high-speed railway in permafrost region of plateau according to claim 7, characterized in that: The hollow modules (7) are laid longitudinally in sections in a one-sided slope or a herringbone slope.