Clearance control method and device of wind generating set and wind generating set

By determining and using unified pitch control reference values ​​and independent pitch control reference values ​​in downwind wind turbines to control blade pitch, the problem of reduced tower clearance under gusty winds is solved, and the risk of blades sweeping the tower is reduced. Improved safety and stability of wind turbines.

CN118793560AActive Publication Date: 2024-10-18BEIJING GOLDWIND SCI & CREATION WINDPOWER EQUIP CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202310391510.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-04-13
Publication Date
2024-10-18
Estimated Expiration
2043-04-13

AI Technical Summary

Technical Problem

Downwind wind turbines have reduced tower clearance under gusty conditions, leading to the risk of blades sweeping the tower. It is difficult to effectively solve this problem with existing technology.

Method used

By determining the unified pitch control reference value and independent pitch control reference value of all blades, the blade pitch is controlled based on the blade pitch moment and the preset pitch moment reference value to compensate for the wind thrust in gusts and avoid tower clearance. decrease.

Benefits of technology

It effectively improves the tower clearance under gusty conditions, reduces the risk of blades sweeping the tower, and improves the safety and stability of wind turbines.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118793560A_ABST
    Figure CN118793560A_ABST
Patent Text Reader

Abstract

The invention provides a clearance control method and device for a wind generating set and the wind generating set. The clearance control method comprises the steps that a unified variable pitch control reference value for all blades of the wind generating set is determined; in response to the gust condition of the wind generating set, determining an independent variable pitch control reference value of each blade based on the tilting moment of the collective of all the blades and a preset first tilting moment reference value; and for each blade, controlling the blade to change the pitch based on the unified pitch control reference value and the independent pitch control reference value of the blade. The problem that the tower clearance of the downwind type wind generating set can be reduced under the gust condition is solved, the thrust applied to the blades by wind in the gust and in the direction different from the downwind direction can be compensated, and tower clearance reduction caused by the gust effect is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present disclosure relates to the field of wind power generation, and more specifically, to a clearance control method and device for a wind power generator set and a wind power generator set. Background Art

[0002] For wind turbines, according to the different positions of wind direction, tower and impeller, they can be divided into upwind wind turbines (also called upwind wind turbines or windward wind turbines) and downwind wind turbines.

[0003] The impeller (or rotor) of an upwind wind turbine is installed in front of the nacelle in the direction of the wind. In the face of coherent wind gusts and wind direction changes, the thrust from the wind can be reduced by pitching the blades relative to the wind. This thrust will cause the blades to move away from the tower, that is, the tower clearance becomes larger. Here, the tower clearance can be the distance from the tip of the blade to the tower surface during the rotation of the impeller of the wind turbine, which can be used to determine whether the blade will sweep the tower during the rotation.

[0004] The layout diagram of a downwind wind turbine is shown in Figure 1. Figure 1 As shown, the impeller is installed at the rear of the nacelle 11 in the direction of the wind, referring to Figure 1 It can be seen that under the above-mentioned conditions of coherent gusts and wind direction changes, when the blades 12 of the downwind wind turbine are forced to leave the optimal rotor plane, as the wind speed increases, the thrust applied to the downwind wind turbine decreases, which leads to the same problem mentioned above. The blades 12 will be less away from the tower 13, so that the clearance distance between the blades 12 and the tower 13 is reduced.

[0005] It can be seen that for downwind wind turbines, unlike upwind wind turbines, the above action will pull the blades toward the tower, rather than away from it, so that in such extreme wind conditions, the tower clearance will be reduced. In addition, gusts will cause the rotor to tilt backwards, which will also cause the blades to pass through the tower with lower clearance. Summary of the invention

[0006] In view of the problem that the tower clearance of a downwind wind turbine generator set will be reduced under gust conditions, which may bring about the risk of blades sweeping the tower, the present disclosure provides a risk warning method and device for a variable pitch system and a wind turbine generator set.

[0007] A first aspect of the present disclosure provides a clearance control method for a wind turbine generator set, wherein the wind turbine generator set is a downwind type wind turbine generator set, wherein the clearance control method comprises: determining a unified pitch control reference value for all blades of the wind turbine generator set; in response to the wind turbine generator set being in a gust condition, determining an independent pitch control reference value for each blade based on the collective tilt moment of all blades and a preset first tilt moment reference value, wherein the gust condition refers to the presence of wind in a direction different from the downwind direction of the tower, and the first tilt moment reference value is used to compensate for the thrust applied to the blade by the wind in the different wind direction; for each blade, controlling the pitch of the blade based on the unified pitch control reference value and the independent pitch control reference value of the blade.

[0008] Optionally, the clearance control method further includes: when the pitch frequency increases or the change amount of the wind measurement data of the wind turbine generator set increases, it is determined that the wind turbine generator set is in a gust condition.

[0009] Optionally, the clearance control method also includes: in response to the wind turbine generator set not being in a gust condition, determining an independent pitch control reference value for each blade based on a current pitch moment of each blade and a preset second pitch moment reference value; for each blade, controlling the pitch action of the blade based on the unified pitch control reference value and the independent pitch control reference value of the blade.

[0010] Optionally, the direction of the first tilt moment reference value is different from the moment direction of winds of different wind directions.

[0011] Optionally, the independent pitch control reference value of each blade is determined in the following manner: based on the bending moment of each blade relative to the blade rotation plane and the azimuth angle of the impeller, the collective tilt moment of all blades is determined; based on the collective tilt moment of all blades and a preset first tilt moment reference value, a unified tilt control reference value of all blades is determined; based on the unified tilt control reference value, an independent pitch control reference value of each blade is determined.

[0012] Optionally, the wind turbine generator set is a two-blade wind turbine generator set, wherein the independent pitch control reference value of each blade is determined in the following manner: based on the unified tilt control reference value, the azimuth angle and the angle between the two blades, the independent pitch control reference value of each of the two blades is determined.

[0013] Optionally, the step of determining a unified pitch control reference value for all blades of the wind turbine generator set includes: determining a first pitch control reference value based on a difference between a generator speed and a preset generator speed reference value; determining a second pitch control reference value based on a vibration acceleration at the top of a tower of the wind turbine; and determining the unified pitch control reference value based on the first pitch control reference value and the second pitch control reference value.

[0014] Optionally, it is determined that the wind turbine generator set is in a gust condition based on at least one of the following methods: within a preset time period, the sum of the pitch angle changes of all blades is greater than a preset angle threshold; the pitch angle change rate of at least one blade is greater than a preset change rate threshold; the ambient wind speed in the condition in which the wind turbine generator set is located is greater than a preset wind speed threshold; the turbulence intensity in the condition in which the wind turbine generator set is located is greater than a preset intensity threshold; the air density in the condition in which the wind turbine generator set is located is greater than a preset density threshold.

[0015] Optionally, the first tilt moment reference value is in the range of 1%-10% of the tilt moment.

[0016] A second aspect of the present disclosure provides a clearance control device for a wind turbine generator set, wherein the wind turbine generator set is a downwind type wind turbine generator set, wherein the clearance control device comprises: a first determination unit, configured to determine a unified pitch control reference value for all blades of the wind turbine generator set; a second determination unit, configured to determine an independent pitch control reference value for each blade based on a current pitch moment of each blade and a preset first pitch moment reference value in response to the wind turbine generator set being in a gust condition, wherein the gust condition refers to the presence of wind in a direction different from the downwind direction of the tower, and the first pitch moment reference value is used to compensate for the thrust applied to the blade by the wind in the different wind direction; and a control unit, configured to control the pitch of each blade based on the sum of the unified pitch control reference value and the independent pitch control reference value of the blade.

[0017] A third aspect of the present disclosure provides a computer device, comprising: at least one processor; and at least one memory storing computer executable instructions, wherein the computer executable instructions, when executed by the at least one processor, prompt the wind turbine clearance control method according to the embodiment of the present disclosure.

[0018] A fourth aspect of the present disclosure provides a wind turbine generator set, which is a downwind type wind turbine generator set, and the wind turbine generator set includes a computer device according to an embodiment of the present disclosure, or the pitch control system of the wind turbine generator set is connected to the computer device according to an embodiment of the present disclosure.

[0019] A fifth aspect of the present disclosure provides a computer-readable storage medium. When instructions in the computer-readable storage medium are executed by at least one processor, the at least one processor is prompted to execute the clearance control method of the wind turbine generator set according to the embodiment of the present disclosure.

[0020] According to the clearance control method, device and wind turbine of the wind turbine disclosed in the present invention, in response to the wind turbine being in a gust condition, an independent pitch control reference value of each blade can be determined based on the collective tilt moment of all blades and a preset first tilt moment reference value. The independent pitch control reference value determined in this way is a reference value that takes the effect of gusts into consideration. Controlling the blade pitch based on this reference value can compensate for the thrust applied to the blades by the wind in the gust, thereby avoiding a reduction in tower clearance due to the effect of gusts. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 1 is a schematic diagram showing an exemplary structure of a downwind wind turbine generator system according to an exemplary embodiment of the present disclosure.

[0022] Figure 2 Schematic diagram showing the forces acting on a downwind wind turbine generator system under gust conditions according to an exemplary embodiment of the present disclosure.

[0023] Figure 3 is a schematic flow chart showing a clearance control method of a wind turbine generator system according to an exemplary embodiment of the present disclosure.

[0024] Figure 4 is a schematic flow chart showing determination of a unified pitch control reference value in a clearance control method of a wind turbine generator set according to an exemplary embodiment of the present disclosure.

[0025] Figure 5 Detailed description is a schematic flow chart showing determination of an independent pitch control reference value of each blade in a clearance control method of a wind turbine generator system according to an exemplary embodiment of the present disclosure.

[0026] Figure 6 is a schematic block diagram showing a controller for executing a clearance control method of a wind turbine generator set according to an exemplary embodiment of the present disclosure.

[0027] Fig. 7A and Figure 7B 4 is a schematic diagram of a comparative example of a clearance control method of a wind turbine generator set according to an exemplary embodiment of the present disclosure and an existing control method.

[0028] Figure 8 is a schematic block diagram showing a clearance control device of a wind turbine generator set according to an exemplary embodiment of the present disclosure. DETAILED DESCRIPTION

[0029] The following specific embodiments are provided to help the reader obtain a comprehensive understanding of the methods, devices and / or systems described herein. However, after understanding the disclosure of the present application, various changes, modifications and equivalents of the methods, devices and / or systems described herein will be clear. For example, the order of operations described herein is only an example and is not limited to those orders set forth herein, but can be changed as will be clear after understanding the disclosure of the present application, except for operations that must occur in a specific order. In addition, for greater clarity and simplicity, the description of features known in the art may be omitted.

[0030] The features described herein can be implemented in different forms and should not be construed as being limited to the examples described herein. Rather, the examples described herein have been provided to illustrate only some of the many possible ways to implement the methods, devices, and / or systems described herein, which will be clear after understanding the disclosure of the present application.

[0031] As used herein, the term "and / or" includes any one of the associated listed items and any combination of any two or more.

[0032] Although terms such as "first", "second", and "third" may be used herein to describe various members, components, regions, layers, or portions, these members, components, regions, layers, or portions should not be limited by these terms. Instead, these terms are only used to distinguish one member, component, region, layer, or portion from another member, component, region, layer, or portion. Therefore, without departing from the teachings of the examples described herein, the first member, first component, first region, first layer, or first portion referred to in the examples may also be referred to as the second member, second component, second region, second layer, or second portion.

[0033] In the specification, when an element (such as a layer, a region, or a substrate) is described as being “on”, “connected to”, or “coupled to” another element, the element may be directly “on”, “connected to”, or “coupled to” another element, or one or more other elements may be present therebetween. Conversely, when an element is described as being “directly on”, “directly connected to”, or “directly coupled to” another element, there may be no other elements present therebetween.

[0034] The terms used herein are only used to describe various examples and are not intended to limit the disclosure. Unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. The terms "comprise", "include" and "have" indicate the presence of the described features, quantities, operations, components, elements and / or combinations thereof, but do not exclude the presence or addition of one or more other features, quantities, operations, components, elements and / or combinations thereof.

[0035] Unless otherwise defined, all terms (including technical and scientific terms) used herein have the same meaning as those generally understood by a person of ordinary skill in the art to which the present disclosure belongs after understanding the present disclosure. Unless explicitly defined as such herein, terms (such as those defined in a general dictionary) should be interpreted as having a meaning consistent with their meaning in the context of the relevant art and the present disclosure, and should not be interpreted in an idealized or overly formal manner.

[0036] Furthermore, in the description of examples, when it is considered that a detailed description of a well-known related structure or function would cause vague interpretation of the present disclosure, such a detailed description will be omitted.

[0037] The current mainstream impeller configuration type is mostly upwind rather than downwind, which means that the impeller is located upwind of the wind turbine tower during normal operation. The largest wind turbine impeller diameter of the wind turbine has exceeded 250m in length. As the blade length increases, one of the problems is that the blade becomes long and flexible, so that the deflection of the blade during the operation of the wind turbine will cause the gap (clearance) between the tip of the blade and the wind turbine tower to exceed the safety constraint, resulting in tower sweep. For upwind wind turbines with windward configuration of the impeller, aerodynamics tend to push the rotating blades toward the tower, so the effect of aerodynamics needs to be considered when designing the blades to ensure that the gap between the blades and the tower is sufficient when passing through the tower position during rotation.

[0038] However, for leeward wind turbines with downwind configuration of the impeller, the impeller is located downwind of the wind turbine tower during normal operation. The blades designed for leeward wind turbines should be different from those designed for traditional upwind wind turbines. The tower clearance issue is also handled differently from that of upwind wind turbines. Aerodynamics tend to push the rotating blades away from the tower rather than towards it.

[0039] Gust refers to the instantaneous change in wind speed. Its characteristics can be expressed by the time of formation, strength and duration. For the typical handling strategy of gust conditions (especially coherent gusts and wind direction changes), the impeller of the upwind wind turbine can reduce the thrust from the wind by changing the pitch of the blades relative to the wind. This thrust will move the blades away from the tower, that is, the tower clearance will increase. However, adopting this handling strategy in the downwind wind turbine to change the pitch to escape the wind will result in a reduction in the thrust from the wind that pushes the blades away from the tower, making the blades less away from the tower, and thus reducing the tower clearance, which may lead to the risk of blades sweeping the tower.

[0040] In addition, in a gusty environment, the wind direction may also change, resulting in winds that are different from the design wind direction of the wind turbine. For example, for a downwind wind turbine, there may be winds with a direction different from the downwind direction directed from the tower to the blades. In this case, the blades may be subjected to thrust in a direction different from the downwind direction.

[0041] Specifically, in a gusty environment, the tilt moment and thrust forces on the downwind wind turbine and the tower clearance are Figure 2 shown.

[0042] Reference Figure 2 It can be seen that if the direction of the tilting moment points downward, the front of the nacelle 11 of the wind turbine generator set will tilt toward the ground (similar to a nodding action), and the tip of the blade 12 will be closer to the tower 13, and the tower clearance will be reduced. Figure 2 The moment to move the axis marked by the dashed line.

[0043] At the same time, if a uniform pitch action is used to relieve the loads on the blades, the thrust on the blades in the downwind direction will be reduced, which will cause the blades to move less away from the tower. Here, a uniform pitch action is any action to reduce high turbine speeds, such as in gusty situations. In addition, in gusty winds, the thrust of wind from a different wind direction than the downwind direction may also force the blades towards the tower. In particular, in the case of coherent gusts and wind direction changes, the thrust will be reduced anyway due to the direction change, and the tower clearance of downwind wind turbines will also be reduced due to the gust relief control action. Here, the thrust is the effect of the wind perpendicular to the rotor, usually in the same direction as the wind, but in the specific load case / wind case under such gusts, the wind direction is changing and the wind speed of the gust is also increasing, which means that the wind will increase and the wind direction will change towards the nacelle side. In addition, in addition to dealing with gusts, high wind speed operation will also lead to a reduction in tower clearance, which may bring the risk of blade sweeping the tower.

[0044] For upwind wind turbines, the simple solution in gusty conditions is to reduce thrust, which is more or less the same as reducing rotor torque, to reduce speed. However, for downwind wind turbines, as thrust and rotor torque decrease, tower clearance decreases rather than increases.

[0045] In view of the different situations of downwind wind turbines from upwind wind turbines, exemplary embodiments of the present disclosure provide a clearance control method for a wind turbine, a clearance control device for a wind turbine, a wind turbine, a computer device, and a computer-readable storage medium to solve or at least address the above problems.

[0046] Figure 3 1 is a schematic flow chart showing a clearance control method of a wind turbine generator set according to an exemplary embodiment of the present disclosure. The execution subject of the clearance control method may be, for example, a pitch controller of the wind turbine generator set or other controller connected to the pitch controller of the wind turbine generator set. For example, the controller may execute the method and send the execution result to the pitch controller of the wind turbine generator set, so that the pitch controller may control the blade pitch of the unit.

[0047] This method can be applied to downwind wind turbines to control clearance. Here, clearance refers to the clearance distance between the blades and the tower in downwind wind turbines. Figure 3 As shown, the clearance control method includes the following steps:

[0048] In step S310 , a unified pitch control reference value for all blades of the wind turbine generator system may be determined.

[0049] Here, the collective pitch control (CPC) reference value may be a pitch control reference value for all blades. For example, the collective pitch control may be a regulation control of the generator speed.

[0050] As an example, Figure 4 As shown, step S310 may include the following steps:

[0051] In step S410, a first pitch control reference value may be determined based on a difference between a generator speed and a preset generator speed reference value.

[0052] Here, the first pitch control reference value may be a control reference value for the generator speed. For example, the generator speed deviation may be controlled by a proportional integral (PI) or proportional integral differential (PID) controller.

[0053] As an example, the first pitch control signal can be determined based on PID control of a deviation signal representing the difference between the generator speed and a preset generator speed reference value. Specifically, the first pitch control reference value can be expressed by the following formula (1):

[0054]

[0055] Wherein, β1(t) is the first pitch control reference value, e(t) is the deviation signal representing the difference between the generator speed and the preset generator speed reference value, K p , K iand K d is a parameter of the PID controller, which can be determined based on linear control design or trial and error. In addition, in the above formula, the generator speed can be obtained by measurement, for example, it can be a generator speed after filtering.

[0056] In step S420, a second pitch control reference value may be determined based on the vibration acceleration of the top of the tower of the wind turbine.

[0057] Here, the second pitch control reference value may be a control reference value for the tower damping fore-aft. For example, the control of the tower damping fore-aft also belongs to the unified pitch control and can be defined as a bandpass filter of a constant multiple of the tower top fore-aft acceleration signal.

[0058] As an example, the second pitch control signal can be obtained by amplifying the tower top front and rear acceleration signal by a predetermined multiple. Specifically, the second pitch control reference value can be expressed by the following formula (2):

[0059] β2(t)=k fa ·a fa (t) (2)

[0060] Among them, β2(t) is the second pitch control reference value, a fa (t) is the acceleration signal before and after the tower top, for example, a filtered signal, k fa is a gain value, which can be set according to actual needs, for example, determined based on linear design or trial and error.

[0061] Although the process of determining the first pitch control reference value is described first and then the process of determining the second pitch control reference value is described as an example here, the embodiments of the present disclosure are not limited to this. For example, the second pitch control reference value may be determined first and then the first pitch control reference value may be determined, or the two determination processes may be performed in parallel.

[0062] In step S430, a unified pitch control reference value may be determined based on the first pitch control reference value and the second pitch control reference value.

[0063] As an example, the sum of the first pitch control reference value and the second pitch control reference value may be used as the unified pitch control reference value. For example, at time t, the unified pitch control reference value may be expressed by the following formula (3):

[0064] β cpc =β1+β2 (3)

[0065] Among them, β cpc is the unified pitch control reference value.

[0066] Although the unified pitch control reference value is described above by taking equations (1) to (3) as an example, it is not limited thereto, and other methods may be used to determine the unified pitch control reference value, as long as it is a pitch control reference value for all blades.

[0067] In step S320, in response to the wind turbine being in a gust condition, an independent pitch control reference value of each blade may be determined based on the collective pitch moment of all blades and a preset first pitch moment reference value.

[0068] Here, the gust condition may refer to the presence of wind in a direction different from the downwind direction of the tower. Specifically, the downwind direction of the tower may refer to the wind direction passing through the tower first and then passing through the blades, or the wind direction from the tower side to the impeller side, for example Figure 1 and Figure 2 Wind direction shown. For leeward wind turbines, the windward side of the blade (i.e., the side where the nacelle or tower is located) is the windward surface. Therefore, in non-gusty conditions, the windward side of the blade is affected by wind force; in gusty conditions, the air flow is unstable, backflow may occur, or irregular vortices may exist, which may make the direction of the wind blowing to the blade variable and irregular. Therefore, the blade will be affected by wind force in a direction different from the above-mentioned leeward direction. For example, the downwind side of the blade (i.e., the side facing away from the nacelle or tower) is affected by wind force, and the blade will be affected by thrust in the opposite direction to the leeward direction. The thrust may be the component of the wind force of the irregular wind direction in the gust that points to the leeward side of the blade in the horizontal direction.

[0069] It should be noted that the wind direction different from the downwind direction of the tower can be completely opposite to the downwind direction (such as Figure 2 The wind may be directed in the direction of thrust as shown in the figure, or may include a wind component in the direction completely opposite to the downwind direction. As long as the wind can exert a thrust on the blades in the opposite direction to the downwind direction, it is included in the above discussion.

[0070] As an example, it may be determined that the wind turbine generator set is in a gusty condition in response to an increase in pitch frequency or an increase in the amount of change in wind measurement data of the wind turbine generator set.

[0071] Specifically, whether the unit is currently in a gusty condition can be judged from two perspectives. On the one hand, since the wind speed and wind direction will change in gusty conditions, when entering a gusty condition from a normal wind condition, the unit's pitch action will also change accordingly. For example, when the rotor speed increases or the ambient wind speed increases, the pitch action will be performed frequently or the pitch action will be large, and the pitch angle may increase rapidly. Therefore, the increase in the unit's pitch frequency can be used to judge that the unit is currently in a gusty condition. At a high pitch rate, it may indicate that the thrust effect is rapidly decreasing, and the tower clearance may also be reduced accordingly. On the other hand, the wind measurement data near the unit can be directly obtained, and it can be judged based on the degree of change in the wind measurement data. For example, if the wind speed suddenly increases, the unit may be in a gusty condition.

[0072] Several examples of determining that a wind turbine is in a gusty condition will be described below. The wind turbine is determined to be in a gusty condition based on at least one of the following examples.

[0073] In one example, in response to the sum of pitch angle changes of all blades being greater than a preset angle threshold within a preset time period, it may be determined that the wind turbine generator system is in a gust condition.

[0074] Specifically, when the sum of the pitch angle changes of all blades within a certain period of time is large, it can be considered that the blade is currently in a frequent pitch change state or the pitch change action is large. Here, the preset duration can be set according to actual needs. As an example, it can be determined according to the sampling time of the controller that executes the method, for example, it can be k times the sampling time, where k is an integer greater than or equal to 1, that is, the preset duration T can be T=k·T s , where T s is the sampling time of the controller.

[0075] In this example, in one case, the pitch angle change amount can be determined by measuring the pitch angle of the actual pitch change; in another case, it can also be determined according to the pitch control reference value of each blade, for example, the sum ∑β of the pitch control reference values ​​of all blades can be obtained. ref As the sum of the pitch angle changes, in this way, it can be responded to satisfy ∑β ref [n]-∑β ref [nk]>γ β , determine that the wind turbine is in gusty conditions, where n represents the given sampling time, nk represents the sampling time of k steps back from the sampling time n, and γ β Here, the preset angle threshold γ β It can be expressed as in, Indicates the preset angle change threshold per unit sampling time, which can be set according to actual needs.

[0076] In one example, in response to a pitch angle change rate of at least one blade being greater than a preset change rate threshold, it may be determined that the wind turbine is in a gusty condition.

[0077] Specifically, when the pitch angle change rate is large, it can be considered that the blade is currently in a frequent pitch change state or the pitch change action is large. Here, the pitch angle change rate can be calculated based on the pitch angle change amount of the blade within a certain period of time. In addition, the preset change rate threshold can be set according to actual needs.

[0078] In one example, in response to the ambient wind speed of the wind turbine being greater than a preset wind speed threshold, it may be determined that the wind turbine is in a gusty condition.

[0079] Here, the ambient wind speed can be based on the measured wind speed v w Average value over time To determine, can respond to the ambient wind speed Greater than the preset wind speed threshold γ v ,Right now Determine that the wind turbine is in gusty conditions, where γ v It can be set according to actual needs. For example, it can be the minimum wind speed that can ensure the tower clearance meets the unit operation requirements. When the ambient wind speed is greater than the minimum wind speed, the tower clearance may not be guaranteed, and there is a risk of blade sweeping the tower.

[0080] In addition to the above examples, in other examples, it can be determined that the wind turbine is in a gust condition in response to the turbulence intensity of the wind turbine being greater than a preset intensity threshold, or in response to the air density of the wind turbine being greater than a preset density threshold.

[0081] Specifically, after entering the gusty state, the turbulence intensity and air density of the fluid environment will change, so the turbulence intensity or air density can be determined by direct measurement or calculation based on other wind measurement data to determine whether the current state is a gusty state. The above-mentioned preset intensity threshold and preset density threshold can be set according to actual needs.

[0082] Several gust condition judgment conditions for determining whether the wind turbine generator set is in a gust condition are described above. Returning to step S320, when the gust condition judgment conditions are met, the independent pitch control reference value of each blade can be determined based on the tilt moment of all blades and the preset first tilt moment reference value.

[0083] Here, the individual pitch control (IPC) reference value may be a pitch control reference value for a single blade, and the independent pitch control reference value may be determined for each blade of the unit, so each unit may have a set of independent pitch control reference values. The independent pitch control may be a control for alleviating or reducing blade loads, which may alleviate or reduce the tilt moment and yaw moment of the hub and alleviate or reduce flap and edgewise blade loads.

[0084] In addition, the first tilt moment reference value can be used to compensate for the thrust applied to the blade by wind from a different wind direction than the downwind direction of the tower in gusty conditions, which has the effect of lifting the entire impeller, thereby avoiding the blade from tilting in, for example, Figure 2 The blade moves towards the tower under the thrust shown, so that the tower clearance is reduced, causing the risk of tower sweeping. Here, "compensating thrust" refers to at least partially offsetting the thrust effect of wind from different wind directions on the blades, so that the blades are less close to the tower.

[0085] As an example, the direction of the first tilt moment reference value may be different from the moment direction of the wind in a different wind direction from the downwind direction described above to compensate for the thrust applied by the wind in the different wind direction. For example, the direction of the first tilt moment reference value may be opposite to the moment direction of the wind in the different wind direction described above.

[0086] Here, the first tilt moment reference value may be a value preselected for gusty conditions. The first tilt moment reference value may be set according to actual needs, for example, it may be determined according to trial and error of a high-fidelity simulation of the wind turbine generator set to obtain the desired lifting effect, but it is not limited thereto, for example, it may also be directly calculated according to a mathematical model of the wind turbine generator set. The first tilt moment reference value may depend on the required headroom increase and the torque level (e.g., tilt moment and yaw moment) of the actual unit, wherein the torque level depends on the size of the wind turbine generator and the blade stiffness, as an example, the first tilt moment reference value may be in the range of 1%-10% of the collective tilt moment of all blades.

[0087] As an example, Figure 5 As shown, the independent pitch control reference value of each blade can be determined by:

[0088] In step S510, the collective tilting moment of all blades may be determined based on the bending moment of each blade relative to the blade rotation plane and the azimuth angle of the impeller.

[0089] Here, the blade rotation plane may refer to the plane formed by the blade during the rotation process. Under the action of gusts, the blade will be subjected to a bending moment away from the plane (the blade out of plane bending moment), and the bending moment of the blade may also be referred to as blade load. Here, the bending moment of the blade may be, for example, a bending moment at the root of the blade, which may be measured at the root of the blade by a strain gauge or an optical fiber method. The azimuth angle of the impeller may be measured, for example, by a measuring device such as a tachometer or a bolt counter on the main shaft. Independent pitch control is based on the measurement of the blade bending moment, and it is measured in a rotating coordinate system when the rotor rotates.

[0090] In this step, the three bending moments can be synthesized based on the bending moments of the three blades and the azimuth angle of the impeller to obtain the tilting moment of all blades as a whole. For example, the bending moments of the blades can be combined into a 2D fixed coordinate system to obtain the tilting moment and yaw moment of all blades as a whole.

[0091] The method disclosed in the present invention can be applied to a two-blade wind turbine generator set or a three-blade wind turbine generator set. Here, taking a three-blade wind turbine generator set as an example, the collective tilting moment of all blades can be expressed by the following formula (4):

[0092]

[0093] Among them, M t (t) represents the collective tilting moment of all blades, M b1 (t), M b2 (t) and M b3 (t) represent the bending moments of the three blades respectively, and ψ(t) represents the azimuth angle of the impeller.

[0094] In addition, still taking the three-blade unit as an example, the collective yaw moment of all blades can be expressed by the following formula (5):

[0095]

[0096] Among them, M y (t) represents the collective yaw moment of all blades, M b1 (t), M b2 (t) and M b3 (t) represent the bending moments of the three blades respectively, and ψ(t) represents the azimuth angle of the impeller.

[0097] In step S520, a unified pitch control reference value of all blades may be determined based on the collective pitch moment of all blades and a preset first pitch moment reference value.

[0098] In this step, a unified tilt control reference value may be obtained through proportional-integral control based on the difference between the collective tilt moments of all blades and the first tilt moment reference value.

[0099] Here, still taking the three-blade unit as an example, the unified tilt control reference value of all blades can be expressed by the following formula (6):

[0100]

[0101] Among them, β t (t) represents the uniform pitch control reference value of all blades, M t,r (t) represents the first tilt moment reference value, M t (t) represents the collective tilting moment of all blades, K p and K i are constants respectively, which can be determined based on numerical simulation or linear control design.

[0102] Similarly, a unified yaw control reference value may be obtained through proportional integral control based on the difference between the collective yaw moment of all blades and a preset yaw moment reference value. Here, the yaw moment reference value may be set according to actual needs, for example, may be 0.

[0103] Still taking the three-blade unit as an example, the unified yaw control reference value of all blades can be expressed by the following formula (7):

[0104]

[0105] Among them, β y (t) represents the unified yaw control reference value of all blades, M y,r (t) represents the yaw moment reference value, M y (t) represents the collective yaw moment of all blades, K p and K i are constants respectively.

[0106] In addition, before calculating the unified tilt control reference value and the unified yaw control reference value, the tilt moment and the yaw moment can also be filtered. For example, the tilt moment and the yaw moment can be filtered by a notch filter with center frequencies P1 and P2. Here, P1 can be, for example, a frequency corresponding to the rotor speed of the wind turbine generator set, and P2 can be twice of P1.

[0107] Although the above description is made using a three-blade wind turbine as an example, it is understandable that the above calculation can also be applied to a two-blade wind turbine. Specifically, the azimuth angles of the three blades of the three-blade unit differ by 120 degrees, while the azimuth angles of the two blades of the two-blade unit differ by 180 degrees. Therefore, in a two-blade wind turbine, the bending moment of the two blades can be converted into the bending moment of the virtual three blades and then substituted into the above formula for calculation.

[0108] In step S530, an independent pitch control reference value for each blade may be determined based on the unified pitch control reference value.

[0109] As an example, for each blade, an independent pitch control reference value may be determined based on a unified pitch control reference value and a unified yaw control reference value.

[0110] Taking a three-blade wind turbine as an example, the independent pitch control reference value of each blade can be determined in the following way: based on the unified pitch control reference value, the azimuth angle of the impeller and the angle between the three blades, the independent pitch control reference value of each blade is determined.

[0111] Specifically, the independent pitch control reference values ​​of the three blades can be expressed by the following equations (8), (9) and (10), respectively:

[0112] β1(t)=β t (t)·cos(ψ(t))+β y (t)·sin(ψ(t)) (8)

[0113]

[0114]

[0115] Among them, β1(t), β2(t) and β3(t) represent the independent pitch control reference values ​​of the three blades.

[0116] Taking a two-blade wind turbine as an example, the independent pitch control reference value of each blade can be determined in the following way: based on the unified tilt control reference value, the azimuth angle of the impeller and the angle between the two blades, the independent pitch control reference value of each of the two blades is determined.

[0117] Specifically, the independent pitch control reference values ​​of the two blades can be expressed by the following equations (11) and (12), respectively:

[0118] β4(t)=β t (t)·cos(ψ(t))+β y (t)·sin(ψ(t))(11)

[0119] β5(t)=β t (t)·cos(ψ(t)+π)+β y (t)·sin(ψ(t)+π)(12)

[0120] Wherein, β4(t) and β5(t) represent the independent pitch control reference values ​​of the two blades.

[0121] The above describes the process of determining the unified pitch control reference value and the independent pitch control reference value. Figure 3 In step S330, for each blade, the pitch of the blade may be controlled based on the unified pitch control reference value and the independent pitch control reference value of the blade.

[0122] As an example, the pitch of each blade can be controlled based on the sum of a unified pitch control reference value and an independent pitch control reference value of each blade. However, it is not limited to this. As long as the independent pitch control reference value obtained by the above method is combined with the unified pitch control reference value to control the pitch, the problem of reduced tower clearance under gust conditions can be solved. For example, the independent pitch control reference value and / or the unified pitch control reference value can be weighted and added based on a preset weighting coefficient according to actual needs.

[0123] The above describes the blade pitch control process under gust conditions. According to an embodiment of the present disclosure, in response to the wind turbine generator set not being in a gust condition, an independent pitch control reference value for each blade can be determined based on the current pitch torque of each blade and a preset second pitch torque reference value; for each blade, the pitch action of the blade is controlled based on the unified pitch control reference value and the independent pitch control reference value of the blade.

[0124] For example, when the relevant data of the wind turbine generator set does not meet the gust judgment conditions given above, the independent pitch control reference value of each blade can be determined based on a preset second tilt torque reference value. Here, the second tilt torque reference value is different from the first tilt torque reference value. The second tilt torque reference value is a value that does not compensate for the effect of external wind in the thrust direction. For example, the second tilt torque reference value can be the tilt torque reference value used to calculate the independent pitch control reference value in the existing wind turbine generator set.

[0125] As an example, in the standard wind turbine coordinate system, the second tilt moment reference value can be 0, and the first tilt moment reference value can be a negative value, which means that the first tilt moment reference value compensates for the thrust applied from the leeward side of the blade to reverse the tilt moment, thereby lifting the rotor through the tilt moment to increase the tower clearance.

[0126] According to an embodiment of the present disclosure, for a downwind wind turbine generator set, an independent pitch control reference value can be determined based on the first tilt torque reference value while taking gust conditions into consideration, and in non-gust conditions, the independent pitch control reference value can be determined based on the second tilt torque reference value. In this way, different wind conditions can be distinguished, and the independent pitch control reference value can be determined using the first tilt torque reference value for compensating for gusts only when situations such as the pitch angle increases significantly in a short period of time or the ambient wind speed is greater than a preset wind speed threshold occur. In contrast, in normal wind conditions, the original pitch control strategy can be adopted, for example, the independent pitch control reference value can be determined based on the second tilt torque reference value.

[0127] Figure 6 is a schematic block diagram showing a controller for executing a clearance control method of a wind turbine generator set according to an exemplary embodiment of the present disclosure.

[0128] The controller may be a pitch controller of the wind turbine generator set or a controller connected to the wind turbine generator set. Figure 6 In the description, the controller 100 is taken as an example of a controller connected to a wind turbine generator set. It should be understood that the controller 100 may also be a part of the wind turbine generator set.

[0129] like Figure 6 As shown, the controller 100 may include a tower clearance function module 110, an IPC module 120, a CPC module 130, and a pitch summation module 140. The controller 100 may have, for example, a 1 / T s The sampling frequency is T s is the sampling time mentioned above.

[0130] The tower clearance function module 110 can be used to determine whether the unit is currently in a gust condition, and based on the judgment result, determine the tilt torque reference value (for example, the first tilt torque reference value or the second tilt torque reference value) used to calculate the independent pitch control reference value of each blade.

[0131] The tower clearance function module 110 can receive measurement data from the wind turbine generator set 200 (such as Figure 6 For example, the tower clearance function module 110 may receive the wind speed v measured by a laser radar or an anemometer. w , and it can be determined based on the wind speed whether the unit is currently in a gusty state. For another example, the tower clearance function module 110 can calculate the turbulence intensity based on the wind speed, and thus determine whether the unit is currently in a gusty state based on the turbulence intensity.

[0132] The IPC module 120 may receive the tilt moment reference value M from the tower clearance function module 110. t,r(eg, the first tilt moment reference value or the second tilt moment reference value) (eg, Figure 6 The IPC module 120 can also receive measurement data from the wind turbine generator set 200 (such as Figure 6 The IPC module 120 may receive the received tilt moment reference value M based on the received tilt moment reference value M. t,r and the measured data of the wind turbine generator set 200, determine the independent pitch control reference value β of each blade ipc , and the independent pitch control reference value β of each blade can be ipc Sent to the pitch summing module 140 (such as Figure 6 communication as shown in D).

[0133] The CPC module 130 can receive measurement data (such as Figure 6 The communication H shown in FIG. 1 ) includes the generator speed, the front and rear acceleration signals of the tower damper, and the lateral damping of the tower, so that the unified pitch control reference value β of all blades can be calculated based on the received measurement data. cpc The CPC module 130 can also set a uniform pitch control reference value β for all blades. cpc Sent to the pitch summing module 140 (such as Figure 6 communication E).

[0134] The pitch summation module 140 may be based on the independent pitch control reference value β of each blade. ipc and the uniform pitch control reference value β for all blades cpc , determine the pitch control reference value β for controlling the pitch of each blade ref , and the pitch control reference value β of each blade pitch ref The wind turbine generator set 200 is sent to the wind turbine generator set 200 so that the wind turbine generator set 200 can control the pitch of each blade based on the pitch control reference value β ref Control each blade to perform pitch change.

[0135] In addition, as an example, the pitch summation module 140 may be based on the independent pitch control reference value β of each blade. ipc , determine the sum of the pitch control reference values ​​of all blades ∑β ref , and the sum ∑β can be ref Sent to the tower clearance function module 110 (such as Figure 6 As shown in the communication J), the tower clearance function module 110 can control the pitch control reference values ​​of all blades according to the sum ∑βref To determine whether the unit is currently in gust conditions.

[0136] by Figure 6 For example, according to an embodiment of the present disclosure, for a downwind wind turbine generator set, the tower clearance function module can change the independent pitch control reference value, and it can be integrated into the existing controller. In this way, the output of the IPC module is added to the control of the CPC module. ref In the case of rapid increase, the tower clearance function module will achieve the lifting of the rotor by changing the tilt torque reference value of the IPC (for example, changing the second tilt torque reference value to the first tilt torque reference value). For example, when the pitch rate reference is higher than a certain threshold, or when the pitch stroke within a given time period exceeds a certain threshold, the tilt torque reference value can be changed.

[0137] Fig. 7A and Figure 7B is a schematic diagram of a comparative example of a clearance control method of a wind turbine generator set according to an exemplary embodiment of the present disclosure and an existing control method. Here, Fig. 7A and Figure 7B The intention is to show the trend of tower clearance and pitch angle over time.

[0138] exist Fig. 7A In the figure, the horizontal axis is time (in seconds, for example), and the vertical axis is tower clearance (in meters, for example). Fig. 7A The solid line represents the tower clearance distance of the existing pitch control method under gusty conditions, and the dotted line represents the tower clearance distance of the clearance control method of the exemplary embodiment of the present disclosure under gusty conditions. Fig. 7A As shown, by adopting the method disclosed in the present invention, the tower clearance can be effectively guaranteed even in gusty conditions, thereby avoiding the reduction of the tower clearance due to the influence of gusts.

[0139] exist Figure 7B In the graph, the horizontal axis is time (unit is, for example, seconds), and the vertical axis is the pitch angle (unit is, for example, degrees). Figure 7B The dashed line represents the unified pitch control signal in response to the gust, and the solid line and dotted line represent the pitch control reference values ​​of the two blade actuators of the two-blade wind turbine. Figure 7B As shown, the pitch control reference value of the blade can be changed in response to the gust condition, so as to better cope with the impact of the gust on the tower clearance.

[0140] As described above, since gust relief actions or simply high wind speed relief actions may result in a reduction in the tower clearance level under gust conditions, according to an exemplary embodiment of the present disclosure, a tilting moment is set to lift the rotor, thereby compensating for the thrust reduction due to the gust relief action, so that the rotor can be lifted using independent pitch control, and the independent pitch control reference value in the tilt direction is changed so that the blades will pass through the tower with a higher clearance, so that the tower clearance of the downwind wind turbine generator set can be better controlled, and the problem of reduced tower clearance can be alleviated by lifting the impeller.

[0141] In addition, according to an exemplary embodiment of the present disclosure, when the wind turbine generator set is in a gusty condition, the independent pitch control reference value of each blade can be determined based on the tilt moment of all blades and the preset first tilt moment reference value. When the wind turbine generator set is in a non-gusty condition, the existing pitch control method can be used to distinguish different wind conditions instead of directly using the first tilt moment reference value to calculate the independent pitch control reference value, which can reduce the pitch activity caused by the independent pitch control, thereby reducing the fatigue load of the blade bearing.

[0142] According to a second aspect of the present disclosure, a clearance control device for a wind turbine generator set is provided. Figure 8 is a schematic block diagram showing a clearance control device of a wind turbine generator set according to an exemplary embodiment of the present disclosure.

[0143] The wind turbine generator set is a downwind type wind turbine generator set. Figure 8 As shown, the clearance control device may include a first determination unit 810 , a second determination unit 820 and a control unit 830 .

[0144] The first determining unit 810 is configured to determine a unified pitch control reference value for all blades of the wind turbine generator set, wherein the unified pitch control reference value for all blades is the same.

[0145] The second determination unit 820 is configured to determine an independent pitch control reference value for each blade in response to the wind turbine being in a gust condition, based on the collective tilt moment of all blades and a preset first tilt moment reference value, wherein the gust condition refers to the presence of wind in a direction different from the downwind direction of the tower, and the first tilt moment reference value is used to compensate for the thrust applied to the blade by the wind in the different wind direction.

[0146] The control unit 830 is configured to control the pitch of each blade based on the sum of the unified pitch control reference value and the independent pitch control reference value of the blade.

[0147] As an example, the clearance control device further includes a third determination unit, which is configured to determine that the wind turbine generator set is in a gust condition in response to an increase in the pitch frequency of the wind turbine generator set or an increase in the change amount of the wind measurement data of the wind turbine generator set.

[0148] As an example, the control unit 830 is also configured to: in response to the wind turbine generator set not being in a gust condition, determine an independent pitch control reference value for each blade based on the current pitch moment of each blade and a preset second pitch moment reference value; for each blade, control the pitch action of the blade based on the unified pitch control reference value and the independent pitch control reference value of the blade.

[0149] As an example, the direction of the first tilt moment reference value is different from the moment directions of the winds of different wind directions.

[0150] As an example, the second determination unit 820 determines the independent pitch control reference value of each blade in the following manner: based on the bending moment of each blade relative to the blade rotation plane and the azimuth angle of the impeller, determining the collective tilt moment of all blades; based on the collective tilt moment of all blades and a preset first tilt moment reference value, determining a unified tilt control reference value for all blades; based on the unified tilt control reference value, determining the independent pitch control reference value for each blade.

[0151] As an example, the wind turbine generator set is a two-blade wind turbine generator set, wherein the second determination unit 820 determines the independent pitch control reference value of each blade in the following manner: based on the unified tilt control reference value, the azimuth angle and the angle between the two blades, the independent pitch control reference value of each of the two blades is determined.

[0152] As an example, the first determination unit 810 is also configured to: determine a first pitch control reference value based on the difference between the generator speed and a preset generator speed reference value; determine a second pitch control reference value based on the vibration acceleration at the top of the tower of the wind turbine; and determine a unified pitch control reference value based on the first pitch control reference value and the second pitch control reference value.

[0153] As an example, it is determined that the wind turbine is in a gust condition based on at least one of the following methods: within a preset time period, the sum of the pitch angle changes of all blades is greater than a preset angle threshold; the pitch angle change rate of at least one blade is greater than a preset change rate threshold; the ambient wind speed in the wind turbine is greater than a preset wind speed threshold; the turbulence intensity in the wind turbine is greater than a preset intensity threshold; the air density in the wind turbine is greater than a preset density threshold.

[0154] As an example, the first tilt moment reference value is in the range of 1%-10% of the tilt moment.

[0155] In this exemplary embodiment, other configurations and executable functions of the clearance control device are the same as those described in the above method embodiment, and thus will not be described in detail here.

[0156] According to a third aspect of the present disclosure, a computer device is provided, comprising: at least one processor; and at least one memory storing computer executable instructions, wherein the computer executable instructions, when executed by the at least one processor, prompt the at least one processor to execute the clearance control method for a wind turbine generator set according to the exemplary embodiment of the present disclosure.

[0157] As an example, the computer device can be a PC, a tablet device, a personal digital assistant, a smart phone, or other device capable of executing the above-mentioned instruction set. Here, the computer device is not necessarily a single electronic device, but can also be any device or circuit that can execute the above-mentioned instructions (or instruction sets) individually or jointly. The computer device can also be part of an integrated control system or system manager, or can be configured as a portable electronic device that is interconnected with a local or remote (e.g., via wireless transmission) interface.

[0158] In a computer device, a processor may include a central processing unit (CPU), a graphics processing unit (GPU), a programmable logic device, a dedicated processor system, a microcontroller or a microprocessor. As an example and not limitation, a processor may also include an analog processor, a digital processor, a microprocessor, a multi-core processor, a processor array, a network processor, etc.

[0159] The processor can execute instructions or codes stored in the memory, wherein the memory can also store data. Instructions and data can also be sent and received through the network via the network interface device, wherein the network interface device can adopt any known transmission protocol.

[0160] The memory may be integrated with the processor, for example, RAM or flash memory is arranged within an integrated circuit microprocessor or the like. In addition, the memory may include a separate device, such as an external disk drive, a storage array, or any other storage device that can be used by a database system. The memory and the processor may be operatively coupled, or may communicate with each other, such as through an I / O port, a network connection, etc., so that the processor can read files stored in the memory.

[0161] In addition, the computer device may also include a video display (such as a liquid crystal display) and a user interaction interface (such as a keyboard, a mouse, a touch input device, etc.) All components of the computer device may be connected to each other via a bus and / or a network.

[0162] According to a fourth aspect of the present disclosure, a wind turbine generator set is provided, which is a downwind type wind turbine generator set. The wind turbine generator set includes a computer device according to the exemplary embodiment of the present disclosure, or a pitch control system of the wind turbine generator set is connected to the computer device according to the exemplary embodiment of the present disclosure.

[0163] According to a fifth aspect of the present disclosure, a computer-readable storage medium is provided. When instructions in the computer-readable storage medium are executed by at least one processor, the at least one processor is prompted to execute the clearance control method of the wind turbine generator set according to the exemplary embodiment of the present disclosure.

[0164] The risk warning method of the pitch system according to the embodiment of the present disclosure can be written as a computer program and stored on a computer-readable storage medium. Examples of computer-readable storage media include: read-only memory (ROM), random access programmable read-only memory (PROM), electrically erasable programmable read-only memory (EEPROM), random access memory (RAM), dynamic random access memory (DRAM), static random access memory (SRAM), flash memory, non-volatile memory, CD-ROM, CD-R, CD+R, CD-RW, CD+RW, DVD-ROM, DVD-R, DVD+R, DVD-RW, DVD+RW, DVD-RAM, BD-ROM, BD-R, BD-R LTH, BD-RE, Blu-ray or optical disk storage, hard disk drive (HDD), solid state drive (SSD), card storage (such as, multimedia card, secure digital (SD) card or extreme digital (XD) card), magnetic tape, floppy disk, magneto-optical data storage device, optical data storage device, hard disk, solid state disk and any other device, any other device is configured to store computer program and any associated data, data files and data structures in a non-transitory manner and provide the computer program and any associated data, data files and data structures to a processor or computer so that the processor or computer can execute the computer program. In one example, the computer program and any associated data, data files and data structures are distributed on a networked computer system so that the computer program and any associated data, data files and data structures are stored, accessed and executed in a distributed manner by one or more processors or computers.

[0165] The specific implementation methods of the present disclosure have been described in detail above. Although some embodiments have been shown and described, those skilled in the art should understand that these embodiments may be modified and varied without departing from the principles and spirit of the present disclosure, the scope of which is defined by the claims and their equivalents. These modifications and variations should also be within the scope of protection of the claims of the present disclosure.

Claims

1. A clearance control method for a wind turbine generator set, characterized in that: The wind turbine generator set is a downwind type wind turbine generator set, wherein the clearance control method comprises: Determining a unified pitch control reference value for all blades of the wind turbine generator set; In response to the wind turbine generator being in a gusty condition, determining an independent pitch control reference value for each blade based on the collective pitch moment of all blades and a preset first pitch moment reference value, wherein the gusty condition refers to the presence of wind in a direction different from the downwind direction of the tower, and the first pitch moment reference value is used to compensate for the thrust applied to the blade by the wind in the different wind direction; For each blade, the pitch of the blade is controlled based on the unified pitch control reference value and the independent pitch control reference value of the blade.

2. The clearance control method according to claim 1, characterized in that: The clearance control method further includes: In response to an increase in the pitch frequency of the wind turbine generator set or an increase in the amount of change in the wind measurement data of the wind turbine generator set, it is determined that the wind turbine generator set is in a gust condition.

3. The clearance control method according to claim 1, characterized in that: The clearance control method further includes: In response to the wind turbine generator set not being in a gusty condition, determining an independent pitch control reference value for each blade based on a current pitch moment of each blade and a preset second pitch moment reference value; For each blade, the pitch action of the blade is controlled based on the unified pitch control reference value and the independent pitch control reference value of the blade.

4. The clearance control method according to claim 1, characterized in that: The direction of the first tilt moment reference value is different from the moment direction of the winds of different wind directions.

5. The clearance control method according to claim 1, characterized in that: The individual pitch control reference value for each blade is determined by: Determine the collective tilting moment of all blades based on the bending moment of each blade relative to the blade rotation plane and the azimuth angle of the impeller; Determining a unified pitch control reference value for all blades based on the collective pitch moment of all blades and a preset first pitch moment reference value; Based on the unified pitch control reference value, an independent pitch control reference value for each blade is determined.

6. The clearance control method according to claim 5, characterized in that: The wind turbine generator set is a two-blade wind turbine generator set, wherein the independent pitch control reference value of each blade is determined by the following method: An independent pitch control reference value of each of the two blades is determined based on the unified pitch control reference value, the azimuth angle, and the angle between the two blades.

7. The clearance control method according to claim 1, characterized in that: The step of determining a unified pitch control reference value for all blades of the wind turbine generator set comprises: Determining a first pitch control reference value based on a difference between a generator speed and a preset generator speed reference value; Determining a second pitch control reference value based on the vibration acceleration of the top of the tower of the wind turbine; The unified pitch control reference value is determined based on the first pitch control reference value and the second pitch control reference value.

8. The clearance control method according to claim 1, characterized in that: Determining that the wind turbine generator system is in a gusty condition is based on at least one of the following methods: Within a preset time period, the sum of the pitch angle changes of all blades is greater than a preset angle threshold; The pitch angle change rate of at least one blade is greater than a preset change rate threshold; The ambient wind speed of the wind turbine generator set is greater than a preset wind speed threshold; The turbulence intensity of the wind turbine generator set is greater than a preset intensity threshold; The air density in the wind turbine generator set is greater than a preset density threshold.

9. The clearance control method according to claim 1, characterized in that: The first tilt moment reference value is in the range of 1%-10% of the tilt moment.

10. A clearance control device for a wind turbine generator set, characterized in that: The wind turbine generator set is a downwind type wind turbine generator set, wherein the clearance control device comprises: A first determination unit is configured to determine a unified pitch control reference value for all blades of the wind turbine generator set; a second determining unit configured to determine, in response to the wind turbine being in a gusty condition, an independent pitch control reference value of each blade based on a current pitch moment of each blade and a preset first pitch moment reference value, wherein the gusty condition refers to the presence of wind in a direction different from the downwind direction of the tower, and the first pitch moment reference value is used to compensate for the thrust applied to the blade by the wind in the different wind direction; The control unit is configured to control the pitch of each blade based on the sum of the unified pitch control reference value and the independent pitch control reference value of the blade.

11. A computer device, characterized in that: include: at least one processor; at least one memory storing computer executable instructions, Wherein, when the computer executable instructions are executed by the at least one processor, the at least one processor is prompted to execute the clearance control method of the wind turbine generator set according to any one of claims 1-9.

12. A wind turbine generator set, characterized in that: The wind turbine generator set is a downwind type wind turbine generator set, and the wind turbine generator set includes the computer device according to claim 11, or the pitch control system of the wind turbine generator set is connected to the computer device according to claim 11.

13. A computer-readable storage medium, characterized in that: When the instructions in the computer-readable storage medium are executed by at least one processor, the at least one processor is prompted to execute the clearance control method for a wind turbine generator set according to any one of claims 1 to 9.

Citation Information

Patent Citations

  • Variable-pitch control method, device and system of wind turbine generator set

    CN105756854A

  • Variable pitch control method and equipment for wind turbine generator set

    CN110966143A

  • Control method and module for solving clearance problem of tower of wind generating set

    CN112610411A

  • Wind power frequency modulation load optimization control method and system based on radar feedforward control

    CN115370537A

  • Turbulence intensity estimation

    US20210239094A1