Roof cutting entry retaining advanced directional presplitting blasting pressure relief and parameter determination method
Through advanced directional pre-splitting blasting and parameter determination methods for top cutting and lane retention, the problem of stability control of deep coal mine tunnels has been solved. The blasting parameters have been optimized through energy-concentrating tubes and various detection systems, which has improved blasting safety and efficiency and reduced resource consumption.
Patent Information
- Application Number
- CN202411282590.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-13
- Publication Date
- 2024-10-18
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In deep coal mining, it is more difficult to control tunnel stability. The existing advance directional pre-splitting blasting and pressure relief technology is difficult to effectively determine the appropriate blasting parameters, affecting project safety and efficiency.
The method of advance directional pre-splitting blasting and parameter determination for top cutting and lane retention is adopted. By determining the advance blasting area and blasting parameters, the energy gathering tube and quick connection device are used for drilling and blasting, combined with the automatic drilling imager, acoustic wave detection system and loose circle detection. System, monitor and adjust blasting effects, optimize charge structure and blasting parameters.
It improves blasting safety and pressure relief effect, rationally determines the parameters of directional pre-split blasting holes, reduces labor intensity and resource consumption, and significantly improves charging efficiency and tunnel stability.
Smart Images

Figure CN118797969A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of soil layer or rock drilling and mine safety technology, and in particular provides a method for top cutting and tunnel retaining advanced directional pre-splitting blasting pressure relief and parameter determination. Background Art
[0002] As coal mining has gradually entered the deep mining stage, this stage also faces many challenges, including complex and changeable geological conditions, construction environment and structural forms. These challenges have brought many difficulties to the mining work, which need to be solved by corresponding technical and management measures. Therefore, it is necessary to strengthen technological innovation and management innovation, improve mining efficiency and safety, and adapt to the challenges of the deep mining stage. Under the environment of high-pressure ground stress, high temperature and karst water pressure, the coal rock mass has experienced multiple strong mining effects. This causes the plateau rock stress and mining stress to superimpose on each other, resulting in an increase in the deformation of the tunnel surrounding rock during mining, which significantly increases the difficulty of controlling the stability of the tunnel.
[0003] At present, the support problem of deep tunnels has received more and more attention. How to ensure the stability of the tunnels has become an urgent problem to be solved. The existing technology adopts advanced directional pre-splitting blasting unloading technology prevention and control measures. When selecting the advanced blasting unloading scheme, many factors must be considered comprehensively, mainly considering coal production, roof and floor geological conditions, physical and mechanical properties of rocks, and groundwater environment.
[0004] In underground engineering, the selection of directional pre-splitting blasting hole parameters has a decisive influence on the directional pre-splitting effect. Appropriate blasting parameters are the key to ensuring the stability of underground engineering. Therefore, how to determine the blasting parameters for tunnel advance blasting pressure relief and improve the safety and pressure relief effect of blasting is a problem that needs to be solved urgently. Summary of the invention
[0005] In order to solve the problem that the selection of directional pre-splitting blasting hole parameters affects the directional pre-splitting effect, the present invention provides a method for decompression and parameter determination of top cutting and lane retaining advanced directional pre-splitting blasting, and the specific technical scheme is as follows.
[0006] A method for unloading pressure and determining parameters by advanced directional pre-splitting blasting for cutting top and retaining lanes, the method comprising:
[0007] S1. Determine the advance blasting area and blasting parameters, wherein the blasting parameters include blasting hole position, blast hole depth, blast hole angle, blast hole spacing and charge length;
[0008] Energy-gathering tubes are used in the drilling and blasting process. The energy-gathering tubes are connected by a quick connection device. Positioning scales are set on the energy-gathering tubes, and bidirectional energy-gathering holes are also set on the energy-gathering tubes.
[0009] S2. Determine the drilling arrangement position for directional pre-blasting, monitor the blasting effect after construction blasting, detect and evaluate the cracks on the surface of the blasthole and the cracks inside the hole, and determine the loosening effect of the surrounding rock.
[0010] Preferably, the construction steps of advance blasting pressure relief include:
[0011] S101. Based on the center line of the roadway, accurately mark the positions of the holes to be drilled along the roof of the roadway on the coal mining side and install the drilling rig;
[0012] S102. Adjust the drill arm angle, mark the drilling position and operate the drill rig to drill;
[0013] S103. Clean the drill hole and check the verticality and deviation of the drill hole;
[0014] S104. In the drilling charge, the explosive is placed in the energy-gathering tube, and the charge amount, charge density and sealing length are calculated;
[0015] S105. Carry out blasting according to the designed blasting sequence, blasting time and blasting charge detonation method;
[0016] S106. Clean up the blasting site after the blasting is completed.
[0017] It is also preferred that the drilling construction process of the drilling rig includes: adjusting the position of the drilling rig to a stable position, adjusting the angle between the drill rod and the horizontal plane, calibrating the drilling position in the tunnel using a special drill bit, adjusting the drill rod to be perpendicular to the line connecting the marked drilling position, and starting the drilling rig to drill according to the set drilling diameter and depth.
[0018] It is also preferred that the blasthole angle is increased, the inclination direction of the coal seam within the blasting range is reduced, and the number of blastholes is increased; the blasthole angle is decreased, the degree of roof crushing is increased; when the mining height is greater than 1m, the blasthole angle is 0°~15°; when the mining height is less than or equal to 1m, the blasthole angle is 15°~20°.
[0019] It is also preferred that the distance between the blast holes is increased, and the degree of roof crushing is increased; the length of the sealing hole adjusts the release of blasting energy, thereby controlling the collapse of the roof.
[0020] It is also preferred that the uncoupling coefficient of the blasthole and the volume charge density are calculated as follows:
[0021]
[0022] in, Indicates the volume of explosives loaded per unit volume of the blasthole, kg / m 3 ρ e is the density of explosive in the blast hole, K d is the uncoupling coefficient, is the charge length, m; L is the borehole length, m; is the diameter of the medicine roll, m; is the blasthole diameter, m.
[0023] It is also preferred that the process of determining the surrounding rock loosening effect includes:
[0024] S201. Number the boreholes and use an automatic borehole imager to detect the drilling effect and crack conditions;
[0025] S202. Detecting the expansion of pre-cracks in the borehole;
[0026] S203. Evaluate the critical closure distance and determine the distance between the complete collapse position and the hydraulic support.
[0027] It is also preferred to use an acoustic wave detection system to evaluate the physical properties and integrity of the rock mass. By measuring the propagation speed of acoustic waves, the physical properties of the surrounding rock and the characteristics of the crack development can be obtained. The propagation speed of acoustic waves in the rock mass is closely related to the mechanical properties and crack state of the rock. The more cracks in the rock mass, the smaller the wave speed, and the fewer cracks in the rock mass, the greater the wave speed. The loosening effect of the surrounding rock is judged based on the acoustic wave detection results.
[0028] It is also preferred that the stability of the rock mass is evaluated using a loosening zone detection system. The greater the degree of loosening of the rock, the lower its strength and rigidity. By measuring the range and degree of the loosening zone, the loosening effect of the rock mass can be improved.
[0029] The beneficial effect of the method for decompression and parameter determination of advanced directional pre-splitting blasting for cutting top and retaining lane provided by the present invention is that the method can reasonably determine the parameters of the directional pre-splitting blasting holes, improve the blasting safety and the decompression effect at the same time, and determine the advanced blasting area based on the engineering conditions of the advanced directional pre-splitting blasting lane; determine the blasting parameters of multiple decompression holes in the advanced blasting area, the blasting parameters include the decompression hole position, blast hole depth, blast hole diameter, blast hole spacing, charge density and charge structure, fill the multiple blasting holes with permissible explosives for mining, blast the cutting top holes with the determined blasting parameters, improve the blasting safety and the pre-splitting blasting effect at the same time; in addition, the charge structure is optimized, the labor intensity is effectively reduced, human resources are saved, and the charging efficiency is significantly improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 The present invention is a flow chart of a method for unloading pressure and determining parameters of advanced directional pre-splitting blasting for cutting top and retaining lane; Figure 2 It is a schematic diagram of the spatial arrangement of the concentrated energy blasting holes; Figure 3 It is a schematic diagram of the charge structure of blasting; Figure 4 It is a diagram of the quick connection device of the energy-gathering tube; In the figure: 1-tunnel, 2-coal seam, 3-rock layer, 4-blast hole, 5-energy-focusing tube, 6-energy-focusing hole, 7-air, 8-explosive, 9-bladder bag (blast mud), 10-partial enlarged view of quick connection device, 11-laser scale line, 12-quick pin connection device. DETAILED DESCRIPTION
[0031] Combination Figures 1 to 4 As shown, a specific implementation method of a top cutting and lane retaining advanced directional pre-splitting blasting pressure relief and parameter determination method provided by the present invention is described.
[0032] A method for decompression and parameter determination of advanced directional pre-splitting blasting for cutting top and retaining lane is applied to the construction conditions of advanced directional pre-splitting blasting lanes and determines the advanced blasting area.
[0033] The construction steps of this method include:
[0034] S1. Determine the advance blasting area and blasting parameters, where the blasting parameters include blasting hole location, blasting hole depth, blasting hole angle, blasting hole spacing and charge length. Determine the blasting parameters to ensure the safety and pressure relief effect of blasting. In the determined blasting area, set up multiple blasting holes as needed, and carry out blasting according to the set blasting parameters; when charging, use mining-approved explosives to comply with safety regulations.
[0035] During the drilling and blasting process, a focusing tube is used. The focusing tubes are connected by a quick connection device. Positioning scales are set on the focusing tubes, and bidirectional focusing holes are also set on the focusing tubes. The positioning scale is a method of laser positioning burning and engraving. A row of equally spaced lines are arranged along the axial direction on the outer surface of the solid cylindrical rod, so that the size distribution of the main component in the axial direction can be visualized. When the focusing tube component is placed in the blasthole, it is convenient to observe the depth of the placement of the focusing tube, thereby realizing the controllability of the blasthole length.
[0036] The construction steps of advance blasting pressure relief include:
[0037] S101. Based on the center line of the roadway, accurately mark the positions of the holes along the top plate of the roadway on the coal mining side and install the drilling rig to ensure the stability and safety of the drilling rig;
[0038] S102. Adjust the drill arm angle, which can be achieved by adjusting the working parameters of the drilling rig or using corresponding adjustment devices, mark the drilling position and operate the drilling rig to drill; use a special drill bit to mark the drilling position on the tunnel roof.
[0039] S103. Clean the borehole and check the verticality and deviation of the borehole; this can be achieved by using measuring instruments and sensors to check the verticality and deviation of the borehole.
[0040] S104. In the drilling charge, the explosive is placed in the energy-gathering tube, and the charge amount, charge density and sealing length are calculated;
[0041] S105. Carry out blasting according to the designed blasting sequence, blasting time and blasting charge detonation method. When blasting, attention should be paid to the blasting sequence, blasting time and blasting charge detonation method, etc. The blasting sequence in the blasting parameters adopts single-hole detonation, interval detonation and continuous detonation.
[0042] S106. Clean up the blasting site after the blasting is completed. After cleaning up the blasting site, wait until the blasting smoke on the working face is blown away. The blaster, gas inspector and team leader must jointly inspect the blasting site to check ventilation, gas, coal dust, roof, support, explosion refusal, residual explosion, etc. If there is any dangerous situation, it must be dealt with immediately.
[0043] The drilling process includes: adjusting the drilling rig to a stable position, adjusting the angle between the drill rod and the horizontal plane, calibrating the drilling position in the tunnel using a special drill bit, adjusting the drill rod to be perpendicular to the line connecting the marked drilling position, and starting the drilling rig to drill according to the set drilling diameter and depth.
[0044] When the blasthole angle is increased, the coal seam inclination direction in the blasting range is reduced, and the number of blastholes is increased; when the blasthole angle is decreased, the degree of roof fragmentation is increased. If the blasthole angle is too large, the blasting range may be reduced in the coal seam inclination direction, thereby increasing the number of blastholes and the workload. On the contrary, if the blasthole angle is too small, although the blasting range in the coal seam inclination direction can be expanded, the distance between the charge position and the roof may be reduced, resulting in excessive fragmentation of the roof, increasing the difficulty of roof management during coal mining. Therefore, the blasthole angle must be reasonably selected to obtain the best blasting effect. The pressure relief angle of the blasthole is closely related to factors such as blasthole depth, coal seam inclination, top cutting height, charge density and charge structure. It is necessary to consider multiple factors for comprehensive judgment and optimization design. A large number of practices have proved that when the mining height is greater than 1m, the blasthole angle is 0°~15°; when the mining height is less than or equal to 1m, the blasthole angle is 15°~20°. It is better to have the blasthole direction parallel to the working surface. It is not easy to use a large diameter drill bit to drill the hole, so as not to affect the integrity of the rock layer below the roof.
[0045] The larger the spacing between blastholes, the greater the degree of roof fragmentation. If the spacing between blastholes is too large, the tunnel roof may be too fragmented, increasing the difficulty of roof management during face mining. Excessive spacing between blastholes will also cause the workload of drilling and blasting to increase exponentially, thereby increasing the cost and complexity of the entire project. When designing and implementing directional pre-splitting blasting, factors such as the spacing between blastholes, the caving effect of the roof rock, and the economy and safety of the project must be comprehensively considered. In an ideal state, the blasting cracks intersect with each other to form a crack network.
[0046] The length of the sealing hole adjusts the release of blasting energy, thereby controlling the collapse of the roof. The length of the sealing hole is crucial to the pressure relief effect. If the sealing hole length is too short, the blasting energy is easily lost and may also cause damage to the roof. On the contrary, if the sealing mud length is too long, it will affect the blasting effect and make it difficult for the roof to collapse in time after mining. Therefore, it is necessary to select an appropriate sealing hole length to avoid the loss of blasting energy and prevent the blasting hole from punching after the explosion to protect the integrity of the coal body on the side of the roadway.
[0047] The criterion for hole wall rock cracking is determined according to the following formula:
[0048]
[0049] When the pressure acting on the hole wall meets the above criteria, the hole wall rock will crack. In order to make the explosive column explosion energy act in the direction of the pre-cracked hole connection line, the condition that shear failure in the inclined direction does not occur must also be met:
[0050]
[0051] Among them, 𝑆 𝑡 is the dynamic uniaxial tensile strength of the rock mass, MPa; C is the dynamic cohesion of the rock mass, MPa; ϕ is the dynamic internal friction angle of the rock mass, °.
[0052] Charge density indicates the volume of explosives loaded per unit volume of the blasthole. The calculation method of the uncoupling coefficient of the blasthole and the volume charge density is:
[0053]
[0054] in, Indicates the volume of explosives loaded per unit volume of the blasthole, kg / m 3 ρ e is the density of explosive in the blast hole, K d is the uncoupling coefficient, is the charge length, m; L is the borehole length, m; is the diameter of the medicine roll, m; is the blasthole diameter, m.
[0055] S2. Determine the drilling arrangement position for directional pre-blasting, monitor the blasting effect after construction blasting, detect and evaluate the cracks on the surface of the blasthole and the cracks inside the hole, and determine the loosening effect of the surrounding rock.
[0056] The process of judging the loosening effect of surrounding rock includes:
[0057] S201. Drill hole numbering and use of automatic drilling imager to detect drilling effect and crack conditions; angle error rate: K1 = α 设计 -α 实际 / α设计 ≤10%. Drilling straightness: K2=L 坑洼 / L 钻孔 ≤10%
[0058] S202. Detect the expansion of pre-cracks in the borehole; use the borehole automatic imaging instrument to detect the expansion of the directional pre-cracks in the borehole in real time. 孔内裂缝 / L 有效钻孔长度 ≥70%.
[0059] S203. Evaluate the critical closure distance and determine the distance between the complete collapse position and the hydraulic support. The distance from the hydraulic support to the complete collapse position is K4≤20m.
[0060] The acoustic wave detection system is used to evaluate the physical properties and integrity of the rock mass. By measuring the propagation speed of the acoustic wave, the physical characteristics of the surrounding rock and the characteristics of the crack development can be obtained. The propagation speed of the acoustic wave in the rock mass is closely related to the mechanical properties and crack state of the rock. The more cracks in the rock mass, the smaller the wave speed, and the fewer cracks in the rock mass, the greater the wave speed. The loosening effect of the surrounding rock can be judged based on the acoustic wave detection results.
[0061] The loosening zone detection system is used to evaluate the stability of the rock mass. The greater the degree of rock loosening, the lower its strength and rigidity. By measuring the range and degree of the loosening zone, the loosening effect of the rock mass can be improved. In addition to the range of the loosening zone, the degree of the loosening zone is also an important indicator for measuring the loosening effect of the rock mass. The greater the degree of rock loosening, the lower its strength and rigidity will be, making the rock mass more susceptible to plastic deformation and stability. By accurately measuring the range and degree of the loosening zone, the loosening effect of the rock mass can be maximized, thereby improving mining efficiency and ensuring work safety.
[0062] The method can reasonably determine the parameters of directional pre-splitting blasting holes, improve the blasting safety and the pressure relief effect, and determine the advance blasting area based on the engineering conditions of the advance directional pre-splitting blasting tunnel; determine the blasting parameters of multiple pressure relief holes in the advance blasting area, the blasting parameters include the pressure relief hole position, blast hole depth, blast hole diameter, blast hole spacing, charge density and charge structure, fill the multiple blasting holes with mining-use permitted explosives, blast the top cut holes with the determined blasting parameters, improve the blasting safety and the pre-splitting blasting effect; in addition, the charge structure is optimized, which effectively reduces the labor intensity, saves human resources, and significantly improves the charging efficiency.
[0063] Of course, the above description is not a limitation of the present invention, and the present invention is not limited to the above examples. Changes, modifications, additions or substitutions made by technicians in this technical field within the essential scope of the present invention should also fall within the protection scope of the present invention.
Claims
1. A method for unloading pressure and determining parameters by advanced directional pre-splitting blasting for cutting top and retaining lanes, characterized in that: The method includes: S1. Determine the advance blasting area and blasting parameters, wherein the blasting parameters include blasting hole position, blast hole depth, blast hole angle, blast hole spacing and charge length; Energy-gathering tubes are used in the drilling and blasting process. The energy-gathering tubes are connected by a quick connection device. Positioning scales are set on the energy-gathering tubes, and bidirectional energy-gathering holes are also set on the energy-gathering tubes. S2. Determine the drilling arrangement position for directional pre-blasting, monitor the blasting effect after construction blasting, detect and evaluate the cracks on the surface of the blasthole and the cracks inside the hole, and determine the loosening effect of the surrounding rock.
2. A method for decompression and parameter determination of advanced directional pre-splitting blasting for top cutting and lane retention according to claim 1, characterized in that: The construction steps of advance blasting pressure relief include: S101. Based on the center line of the roadway, accurately mark the positions of the holes to be drilled along the roof of the roadway on the coal mining side and install the drilling rig; S102. Adjust the drill arm angle, mark the drilling position and operate the drill rig to drill; S103. Clean the drill hole and check the verticality and deviation of the drill hole; S104. In the drilling charge, the explosive is placed in the energy-gathering tube, and the charge amount, charge density and sealing length are calculated; S105. Carry out blasting according to the designed blasting sequence, blasting time and blasting charge detonation method; S106. Clean up the blasting site after the blasting is completed.
3. A method for decompression and parameter determination of advanced directional pre-splitting blasting for top cutting and lane retention according to claim 2, characterized in that: The drilling process of the drilling rig includes: adjusting the position of the drilling rig to a stable position, adjusting the angle between the drill rod and the horizontal plane, calibrating the drilling position in the tunnel using a special drill bit, adjusting the drill rod to be perpendicular to the line connecting the marked drilling position, and starting the drilling rig to drill according to the set drilling diameter and depth.
4. A method for decompression and parameter determination of advanced directional pre-splitting blasting for top cutting and lane retention according to claim 2, characterized in that: When the blasthole angle is increased, the inclination direction of the coal seam within the blasting range is reduced, and the number of blastholes is increased; when the blasthole angle is decreased, the degree of roof crushing is increased; when the mining height is greater than 1m, the blasthole angle is 0°~15°; when the mining height is less than or equal to 1m, the blasthole angle is 15°~20°.
5. A method for decompression and parameter determination of advanced directional pre-splitting blasting for top cutting and lane retention according to claim 2, characterized in that: The larger the distance between the blast holes, the greater the degree of roof crushing; the length of the sealing hole adjusts the release of blasting energy, thereby controlling the collapse of the roof.
6. A method for decompression and parameter determination of advanced directional pre-splitting blasting for top cutting and lane retention according to claim 2, characterized in that: The calculation method of the uncoupling coefficient and volume charge density of the blasthole is: in, Indicates the volume of explosives loaded per unit volume of the blasthole, kg / m 3 ρ e is the density of explosive in the blast hole, K d is the uncoupling coefficient, is the charge length, m; L is the borehole length, m; is the diameter of the medicine roll, m; is the blasthole diameter, m.
7. A method for decompression and parameter determination of top cutting and lane retaining advanced directional pre-splitting blasting according to claim 1, characterized in that: The process of judging the loosening effect of surrounding rock includes: S201. Number the boreholes and use an automatic borehole imager to detect the drilling effect and crack conditions; S202. Detecting the expansion of pre-cracks in the borehole; S203. Evaluate the critical closure distance and determine the distance between the complete collapse position and the hydraulic support.
8. A method for decompression and parameter determination of advanced directional pre-splitting blasting for top cutting and lane retention according to claim 7, characterized in that: The acoustic wave detection system is used to evaluate the physical properties and integrity of the rock mass. By measuring the propagation speed of the acoustic wave, the physical characteristics of the surrounding rock and the characteristics of the crack development can be obtained. The propagation speed of the acoustic wave in the rock mass is closely related to the mechanical properties and crack state of the rock. The more cracks in the rock mass, the smaller the wave speed, and the fewer cracks in the rock mass, the greater the wave speed. The loosening effect of the surrounding rock can be judged based on the acoustic wave detection results.
9. A method for decompression and parameter determination of advanced directional pre-splitting blasting for top cutting and lane retention according to claim 7, characterized in that: The loosening zone detection system is used to evaluate the stability of the rock mass. The greater the looseness of the rock, the lower its strength and stiffness. By measuring the range and degree of the loosening zone, the loosening effect of the rock mass can be improved.
Citation Information
Patent Citations
Method for determining presplitting blasting parameters for mining blasting
CN110378032A
Coal face ultra-deep hole blasting roof cutting pressure relief control method and blasting charge structure
CN112179227A
Advanced roof cutting pressure relief and surrounding rock control method for hard roof of gob-side roadway
CN113417638A
Advanced blasting pressure relief method for tunnel
CN117211802A
Releasing-cracking-supporting cooperative burst prevention method based on coal body pressure relief and roof pre-cracking
WO2023201906A1
Cited By
Water-containing rock stratum targeted cavitation impact fracturing pressure relief regulation and control method
CN119878158A
A method for targeted cavitation impact fracturing and pressure relief control in water-bearing strata
CN119878158B