A city information visualization management system and method based on big data
Through a visual management system based on big data, the urban information distribution and traffic changes are monitored and analyzed in real time, and the traffic congestion situation is predicted, which solves the problem of urban traffic congestion and ensures smooth traffic in the area.
Patent Information
- Application Number
- CN202411273019.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-12
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2044-09-12
Smart Images

Figure CN118798490B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of information visualization, and in particular to a city information visualization management system and method based on big data. Background Art
[0002] Urban information visualization is to present various types of urban data through visualization methods such as charts, maps, and animations to help urban managers better understand and use these data. First of all, digital city data visualization can provide comprehensive information, allowing urban managers to understand the current situation and trends of the city at a glance. Through data visualization, urban managers can intuitively observe important indicators such as the city's population distribution, traffic flow, and environmental conditions, thereby providing a scientific basis for urban planning and resource allocation;
[0003] There is a close relationship between a city's architectural planning and its population, transportation, and environment. The rationality of architectural planning will affect the city's population attractiveness and the comfort of its living environment. Urban traffic planning will also take into account building layout, and reasonable building layout can reduce traffic congestion. People's residential choices or travel choices will also be affected by traffic flow. Generally, commercial and residential areas will have greater traffic flow. If commercial and residential areas are densely distributed, it will cause traffic congestion. Therefore, a city's architectural planning is very important. Traffic factors will be considered when the city is first planned. However, as time goes by, the types of buildings in various areas of the city will change, causing the previously normal traffic situation to become congested. It will also affect the city's population size and living environment, and affect the city's development. Summary of the invention
[0004] The purpose of the present invention is to provide a city information visualization management system and method based on big data to solve the problems raised in the above background technology.
[0005] In order to solve the above technical problems, the present invention provides the following technical solutions: a city information visualization management method based on big data, the management method comprising the following steps:
[0006] Step S100: Obtain a visualization image of the building distribution of the target city; divide the target city into regions, confirm the building type of each region, merge adjacent regions with the same building type, and generate several target regions of the target city; obtain the road density and congestion duration in a unit cycle in the target region, and calculate the influence degree of the building type in the target region;
[0007] Step S200: Periodically monitor the building distribution image. When the building type in the target area changes, analyze the change of the target area, adjust all the target areas of the target city to obtain several new target areas; obtain the traffic flow change value in two adjacent unit cycles in the new target area, and judge whether the current traffic flow is in a stable state; calculate the adaptation time required for the new target area according to the change of congestion before and after the change of the target area;
[0008] Step S300: When an expected reconstruction target is set for the target area, the simulation results of the target area after construction are visualized to generate a new building distribution image; the building types before and after the target area is constructed are determined, the same road length between the target area and the adjacent area after construction is obtained, and the theoretical traffic flow of the target area after construction is predicted; the theoretical congestion duration is calculated based on the road density of the target area after construction;
[0009] Step S400: Obtain the average vehicle speed of other target areas with the same building type as the expected building target to obtain the theoretical vehicle speed; calculate the theoretical road density of the target area after construction is completed based on the theoretical congestion duration and theoretical traffic volume after construction of the target area; obtain the average road density of other target areas with the same building type to determine whether to send an adjustable reminder to the expected building target.
[0010] Furthermore, step S100 includes the following steps:
[0011] Step S101: Obtain the distribution of historical buildings in the target city, extract the road data in the target city, and divide the target city into several areas according to the road distribution in the target city; obtain the building data in any area, determine the building type of each building, count the number of each building type in an area, and set the The number of building types is , calculate the first The proportion of building types is ,in, is the number of building types existing in an area; the building type with the largest number is selected as the building type of the area;
[0012] Step S102: Set the The building types in the area are , get the The building types of several areas adjacent to the first area. If there is an area with the same building type as the first area, If the areas are the same, the adjacent areas of the same building type are merged to obtain a new area; after comparing and merging all areas, several target areas of the target city are generated; all buildings are divided into areas by using roads, and each area is bounded by the divided roads, and the buildings are included in the area;
[0013] Step S103: Get the history The length of each road in the target area is obtained The total length of roads in the target area , where the total road length is the sum of the lengths of all roads in the target area, including the roads at the boundaries of the area and the roads inside the area, according to the formula: ,in, For the The area of the target area is calculated. Road density in target area ; Set a unit period , statistics in unit period The congestion duration of the road in the congested state , get the target area in unit period The proportion of congestion time in The congestion duration is the cumulative time when the vehicle's driving speed is significantly lower than the road design speed, or even zero.
[0014] Step S104: Get the The target area in one unit cycle Total traffic volume , according to the formula:
[0015]
[0016]
[0017] in, is the basic traffic flow in an area of the target city, and the first The impact of building types in target areas .
[0018] Further, step S200 includes the following steps:
[0019] Step S201: Set the current target city to have The building type of the target area changes, and the The boundary data of the location of the target area; if the boundary data contains building data, obtain the history All adjacent areas of the target area are generated to form an area to be divided; the building data of the area to be divided is obtained to obtain the building type of each building; the area to be divided is re-divided to obtain several new target areas;
[0020] Step S202: Set the history The target area is currently located in the target city target area, every unit cycle Get the real-time The traffic volume in the target area is set Moment The traffic volume in the target area is , Moment The traffic volume in the target area is ,get Time has come Moment The traffic flow change value of the target area is ; Set a stability threshold ,like , then judge the The traffic volume in the target area is stable;
[0021] Step S203: Get the The total length of roads in the target area and floor space , calculate the first Road density in target area , according to the formula:
[0022]
[0023] in, is the basic traffic volume in an area of the target city, For the The influence degree of building types in the target area is calculated. The target area in one unit cycle The duration of congestion ;
[0024] Step S204: Get the The average vehicle speed in the target area is , according to the formula:
[0025]
[0026]
[0027] in, For the history The target area in one unit cycle The traffic volume in For the history The total length of roads in the target area, For the The congestion duration of the target area is calculated. The target area is transformed into The time required to adapt to the target area ; When the building type in an area changes, it will lead to changes in traffic flow, but this change is not instantaneous, but a gradual process; therefore, calculating the adaptation time from the change of building type to the final stability can effectively reflect the relationship between traffic flow and changes in the target area; it is conducive to the subsequent prediction of traffic flow in the target area when it is in a stable state.
[0028] Further, step S300 includes the following steps:
[0029] Step S301: Set the There is an expected building target in the target area, get the Building types in target areas And the corresponding building type influence ; Extract the The expected building types in the target area are , and the corresponding building type influence degree is ;
[0030] Step S302: Get The building types of each target area adjacent to the target area are set. In the adjacent target area The building types of the target area are And the corresponding building type influence ; Get the same road length between the xth target area and the kth target area as , according to the formula:
[0031]
[0032] in, is the traffic flow of the kth target area, is the traffic volume of the x-th target area, For the The building type influence degree of the current building type in the target area, is the road length of the xth target area; The theoretical traffic volume after the construction of the target area is completed is ;
[0033] Step S303: Get the The total length of roads after construction in the target area and floor space , calculate the first Road density in target area , according to the formula:
[0034]
[0035] in, is the basic traffic volume in an area of the target city, is a unit period; the calculation results are After the target area is built, Theoretical congestion duration.
[0036] Further, step S400 includes the following steps:
[0037] Step S401: Set the The building types after the target area is completed are , get each building type in the target city The average vehicle speed in the target area , calculate the average value to get the building type Theoretical vehicle speed ;
[0038] Step S402: Set the The theoretical congestion duration after the target area is completed is and the theoretical traffic flow is ; According to the formula:
[0039]
[0040] in, For the current The traffic volume in the target area, For the The target area is transformed into During the process of reaching the target area, the adaptation time of the traffic flow in the changing process is For the current The congestion duration of the target area, For the current The total length of roads in the target area; calculate the Theoretical road length after construction of target area ; According to the formula: ,in, For the The area occupied by the target area after construction is completed is calculated to obtain the Theoretical road density after construction of target areas ;
[0041] Step S403: Obtain the type of each building in the target city. The road density in the target area is calculated by averaging to obtain the building type The average road density is ;like , then for The expected construction target of each target area sends an adjustable reminder; the road density is the road length per unit area, that is, the longer the road length per unit area, the more vehicles can be allowed to pass under the condition of fixed traffic volume, and the duration of congestion in the area will be shorter; therefore, by comparing the road density, the congestion situation of the target area after construction can be reflected and whether it is reasonable can be judged.
[0042] In order to better implement the above method, a city information visualization management system based on big data is also proposed. The management system includes a historical data analysis module, a regional change analysis module, a traffic flow prediction module and a regional congestion adjustment module;
[0043] The historical data analysis module is used to obtain a visualization image of the building distribution in the target city; divide the target city into regions, identify the building types in each region, merge adjacent regions with the same building type, and generate several target regions in the target city; obtain the road density and congestion duration in a unit cycle in the target region, and calculate the impact of the building type in the target region;
[0044] The regional change analysis module is used to periodically monitor the building distribution image. When the building type in the target area changes, the change of the target area is analyzed, and all the target areas of the target city are adjusted to obtain several new target areas; the traffic flow change value in two adjacent unit cycles in the new target area is obtained to determine whether the current traffic flow is in a stable state; according to the change of congestion before and after the change of the target area, the adaptation time required for the new target area is calculated;
[0045] The vehicle flow prediction module is used to visualize the simulation results of the target area after construction when an expected reconstruction target is set for the target area, and generate a new building distribution image; determine the building types before and after the target area is built, obtain the same road length between the target area and the adjacent area after the construction is completed, and predict the theoretical vehicle flow of the target area after the construction is completed; calculate the theoretical congestion duration based on the road density of the target area after the construction is completed;
[0046] The regional congestion adjustment module is used to obtain the average vehicle speed of other target areas with the same building type as the expected building target, and obtain the theoretical vehicle speed; calculate the theoretical road density of the target area after construction is completed based on the theoretical congestion duration and theoretical traffic flow after the target area is completed; obtain the average road density of other target areas with the same building type, and determine whether to send an adjustable reminder to the expected building target.
[0047] Furthermore, the historical data analysis module includes a target area setting unit and a building type impact analysis unit;
[0048] The target area setting unit is used to obtain the building distribution image of the target city and divide the target city into regions; confirm the building type of each region, merge adjacent regions with the same building type, and generate several target regions of the target city; the building type impact analysis unit is used to obtain the road density and congestion duration in a unit cycle in the target region, and calculate the impact degree of the building type in the target region.
[0049] Furthermore, the region change analysis module includes a target region adjustment unit, a stability judgment unit, and an adaptation duration calculation unit;
[0050] The target area adjustment unit is used to periodically monitor the building distribution image, and when the building type in the target area changes, analyze the change of the target area, and adjust all the target areas of the target city to obtain several new target areas; the stability judgment unit is used to obtain the traffic flow change value in two adjacent unit cycles in the new target area, and judge whether the current traffic flow is in a stable state; the adaptation time calculation unit is used to calculate the adaptation time required for the new target area according to the change of congestion before and after the change of the target area.
[0051] Furthermore, the traffic flow prediction module includes a theoretical traffic flow calculation unit and a theoretical congestion duration calculation unit;
[0052] The theoretical vehicle flow calculation unit is used to visualize the simulation results of the target area after construction when an expected reconstruction target is set for the target area, and generate a new building distribution image; determine the building types before and after the target area is built, obtain the same road length between the target area and the adjacent area after construction, and predict the theoretical vehicle flow of the target area after construction; the theoretical congestion duration calculation unit is used to calculate the theoretical congestion duration according to the road density of the target area after construction.
[0053] Further, the regional congestion adjustment module includes a road density calculation setting unit and an adjustment reminder judgment unit;
[0054] The road density calculation setting unit is used to obtain the average vehicle speed of other target areas with the same building type as the expected building target to obtain the theoretical vehicle speed; according to the theoretical congestion duration and theoretical traffic volume after the target area is built, the theoretical road density after the target area is built is calculated; the adjustment reminder judgment unit is used to obtain the average road density of other target areas with the same building type and judge whether to send an adjustable reminder to the expected building target.
[0055] Compared with the prior art, the beneficial effects achieved by the present invention are as follows: (1) The present invention analyzes the changes in each area in two time periods through the historical building layout and the current building layout of the target city, and accurately analyzes the relationship between the traffic flow and the building type in combination with the changes in the traffic flow; (2) Based on the relationship between the historical traffic flow and the building type, when the building type of the area changes in the future, the present invention can accurately predict the change process of the regional traffic flow and the final stable traffic flow, limit the driving speed in the area, and ensure smooth traffic in the area; (3) The present invention monitors the congestion time of all areas in real time. When the congestion time of a certain area is too long and is in a congested state for a long time, it means that there is a problem with the vehicle traffic in the area, and reasonable adjustments need to be made to avoid long-term congestion that causes the area to be unable to operate normally. BRIEF DESCRIPTION OF THE DRAWINGS
[0056] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0057] Figure 1 It is a schematic diagram of the steps of a method for visualizing urban information management based on big data;
[0058] Figure 2 It is a structural diagram of a city information visualization management system based on big data. DETAILED DESCRIPTION
[0059] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0060] See also Figure 1 to Figure 2 The present invention provides a technical solution: a city information visualization management method based on big data, the management method comprises the following steps:
[0061] Step S100: Obtain a visualization image of the building distribution of the target city; divide the target city into regions, confirm the building type of each region, merge adjacent regions with the same building type, and generate several target regions of the target city; obtain the road density and congestion duration in a unit cycle in the target region, and calculate the influence degree of the building type in the target region;
[0062] Wherein, step S100 includes the following steps:
[0063] Step S101: Obtain the distribution of historical buildings in the target city, extract the road data in the target city, and divide the target city into several areas according to the road distribution in the target city; obtain the building data in any area, determine the building type of each building, count the number of each building type in an area, and set the The number of building types is , calculate the first The proportion of building types is ,in, is the number of building types existing in an area; the building type with the largest number is selected as the building type of the area;
[0064] Step S102: Set the The building types in the area are , get the The building types of several areas adjacent to the first area. If there is an area with the same building type as the first area, If the areas are the same, the adjacent areas with the same building type are merged to obtain a new area; after comparing and merging all areas, several target areas of the target city are generated;
[0065] Step S103: Get the history The length of each road in the target area is obtained The total length of roads in the target area , according to the formula: ,in, For the The area of the target area is calculated. Road density in target area ; Set a unit period , statistics in unit period The congestion duration of the road in the congested state , get the target area in unit period The proportion of congestion time in ;
[0066] Step S104: Get the The target area in one unit cycle Total traffic volume , according to the formula:
[0067]
[0068]
[0069] in, is the basic traffic flow in an area of the target city, and the first The impact of building types in target areas .
[0070] Step S200: obtaining the current building layout of the target city, analyzing the changes in the current target area corresponding to the historical target area, adjusting the historical target area of the target city to obtain several new target areas; obtaining the traffic flow change value in two adjacent unit cycles in the new target area, and judging whether the current traffic flow is in a stable state; calculating the adaptation time required for the new target area according to the changes in the congestion between the historical target area and the corresponding new target area;
[0071] Wherein, step S200 includes the following steps:
[0072] Step S201: Obtain the current building layout of the target city, the history of The boundary data of the target area; if the boundary data contains building data, obtain the history All adjacent areas of the target area are generated to form an area to be divided; the building data of the area to be divided is obtained to obtain the building type of each building; the area to be divided is re-divided to obtain several new target areas;
[0073] Step S202: Set the history The target area is currently located in the target city target area, every unit cycle Get the real-time The traffic volume in the target area is set Moment The traffic volume in the target area is , Moment The traffic volume in the target area is ,get Time has come Moment The traffic flow change value of the target area is ; Set a stability threshold ,like , then judge the The traffic volume in the target area is stable;
[0074] Step S203: Get the The total length of roads in the target area and floor space , calculate the first Road density in target area , according to the formula:
[0075]
[0076] in, is the basic traffic volume in an area of the target city, For the The influence degree of building types in the target area is calculated. The target area in one unit cycle The duration of congestion ;
[0077] Step S204: Get the The theoretical driving speed of the target area is , according to the formula:
[0078]
[0079]
[0080] in, For the history The target area in one unit cycle The traffic volume in For the history The total length of roads in the target area, For the history The congestion duration of the target area is calculated. The target area is transformed into The time required to adapt to the target area .
[0081] Step S300: When an expected reconstruction target is set for the target area, the simulation results of the target area after construction are visualized to generate a new building distribution image; the building types before and after the target area is constructed are determined, the same road length between the target area and the adjacent area after construction is obtained, and the theoretical traffic flow of the target area after construction is predicted; the theoretical congestion duration is calculated based on the road density of the target area after construction;
[0082] Wherein, step S300 includes the following steps:
[0083] Step S301: Set the current target city to have The target area is under construction. Get the Building types in target areas And the corresponding building type influence ; Extract the The theoretical building types in the target area are , and the corresponding theoretical building type influence degree is ;
[0084] Step S302: Get The building types of each target area adjacent to the target area are set. In the adjacent target area The building types of the target area are And the corresponding building type influence ; Get the same road length between the xth target area and the kth target area as , according to the formula:
[0085]
[0086] in, is the traffic flow of the kth target area, is the traffic volume of the x-th target area, is the road length of the xth target area; The theoretical traffic volume after the construction of the target area is completed is ;
[0087] Step S303: Get the The total length of roads after construction in the target area and floor space , calculate the first Road density in target area , according to the formula:
[0088]
[0089] in, is the basic traffic volume in an area of the target city, is a unit period; the calculation results are After the target area is built, Theoretical congestion duration ;
[0090] Step S304: Get the The current road length of the target area is , according to the formula:
[0091]
[0092] in, For the The current congestion duration of the target area in a unit period T, For the The target area is transformed into During the process of the target area, the duration of the traffic flow in the changing process; the calculation results are Theoretical driving speed after the target area is built .
[0093] Step S400: Obtain the average vehicle speed of other target areas with the same building type as the expected building target to obtain the theoretical vehicle speed; calculate the theoretical road density of the target area after the construction is completed according to the theoretical congestion duration and theoretical vehicle flow after the construction of the target area is completed; obtain the average road density of other target areas with the same building type, and determine whether to send an adjustable reminder to the expected building target;
[0094] Wherein, step S400 includes the following steps:
[0095] Step S401: Set the The building types after the target area is completed are , get each building type in the target city The average vehicle speed in the target area , calculate the average value to get the building type Theoretical vehicle speed ;
[0096] Step S402: Set the The theoretical congestion duration after the target area is completed is and the theoretical traffic flow is ; According to the formula:
[0097]
[0098] in, For the current The traffic volume in the target area, For the The target area is transformed into During the process of reaching the target area, the adaptation time of the traffic flow in the changing process is For the current The congestion duration of the target area, For the current The total length of roads in the target area; calculate the Theoretical road length after construction of target area ; According to the formula: ,in, For the The area occupied by the target area after construction is completed is calculated to obtain the Theoretical road density after construction of target areas ;
[0099] Step S403: Obtain the type of each building in the target city. The road density in the target area is calculated by averaging to obtain the building type The average road density is ;like , then for Sends adjustable reminders based on expected construction targets in each target area.
[0100] A city information visualization management system based on big data, the management system includes a historical data analysis module, a regional change analysis module, a traffic flow prediction module and a regional congestion adjustment module;
[0101] The historical data analysis module is used to obtain a visualization image of the building distribution in the target city; divide the target city into regions, identify the building types in each region, merge adjacent regions with the same building type, and generate several target regions in the target city; obtain the road density and congestion duration in a unit cycle in the target region, and calculate the impact of the building type in the target region;
[0102] The regional change analysis module is used to periodically monitor the building distribution image. When the building type in the target area changes, the change of the target area is analyzed, and all the target areas of the target city are adjusted to obtain several new target areas; the traffic flow change value in two adjacent unit cycles in the new target area is obtained to determine whether the current traffic flow is in a stable state; according to the change of congestion before and after the change of the target area, the adaptation time required for the new target area is calculated;
[0103] The vehicle flow prediction module is used to visualize the simulation results of the target area after construction when an expected reconstruction target is set for the target area, and generate a new building distribution image; determine the building types before and after the target area is built, obtain the same road length between the target area and the adjacent area after the construction is completed, and predict the theoretical vehicle flow of the target area after the construction is completed; calculate the theoretical congestion duration based on the road density of the target area after the construction is completed;
[0104] The regional congestion adjustment module is used to obtain the average vehicle speed of other target areas with the same building type as the expected building target, and obtain the theoretical vehicle speed; calculate the theoretical road density of the target area after construction is completed based on the theoretical congestion duration and theoretical traffic flow after the target area is completed; obtain the average road density of other target areas with the same building type, and determine whether to send an adjustable reminder to the expected building target.
[0105] Among them, the historical data analysis module includes the target area setting unit and the building type impact analysis unit;
[0106] The target area setting unit is used to obtain the building distribution image of the target city and divide the target city into regions; confirm the building type of each region, merge adjacent regions with the same building type, and generate several target regions of the target city; the building type impact analysis unit is used to obtain the road density and congestion duration in a unit cycle in the target region, and calculate the impact degree of the building type in the target region.
[0107] Among them, the regional change analysis module includes a target region adjustment unit, a stability judgment unit and an adaptation time calculation unit;
[0108] The target area adjustment unit is used to periodically monitor the building distribution image, and when the building type in the target area changes, analyze the change of the target area, and adjust all the target areas of the target city to obtain several new target areas; the stability judgment unit is used to obtain the traffic flow change value in two adjacent unit cycles in the new target area, and judge whether the current traffic flow is in a stable state; the adaptation time calculation unit is used to calculate the adaptation time required for the new target area according to the change of congestion before and after the change of the target area.
[0109] Among them, the traffic flow prediction module includes a theoretical traffic flow calculation unit and a theoretical congestion duration calculation unit;
[0110] The theoretical vehicle flow calculation unit is used to visualize the simulation results of the target area after construction when an expected reconstruction target is set for the target area, and generate a new building distribution image; determine the building types before and after the target area is built, obtain the same road length between the target area and the adjacent area after construction, and predict the theoretical vehicle flow of the target area after construction; the theoretical congestion duration calculation unit is used to calculate the theoretical congestion duration according to the road density of the target area after construction.
[0111] Among them, the regional congestion adjustment module includes a road density calculation setting unit and an adjustment reminder judgment unit;
[0112] The road density calculation setting unit is used to obtain the average vehicle speed of other target areas with the same building type as the expected building target to obtain the theoretical vehicle speed; according to the theoretical congestion duration and theoretical traffic volume after the target area is built, the theoretical road density after the target area is built is calculated; the adjustment reminder judgment unit is used to obtain the average road density of other target areas with the same building type and judge whether to send an adjustable reminder to the expected building target.
[0113] The historical building layout of the target city is obtained, and the target city is divided into four target areas, of which the first target area is the residential area, the second target area is the commercial area, the third target area is the office area, and the fourth target area is the residential area; the total length of the roads in the residential area of the first target area is 10km, and the area is 1 , the road density of the residential area is 10 , set a unit cycle of 30×24h=720h, count the congestion time of the residential area as 30h, and get the congestion time ratio of the residential area as 1 / 24=4.17%; get the basic traffic flow of an area in the target city as 1800 vehicles / h, get the total traffic flow of the residential area as 7200 vehicles / h, according to the formula:
[0114]
[0115]
[0116] The calculated impact of building types in residential areas is 5.86;
[0117] Get the current building layout of the target city, and expand the residential area of the target area to 2 , the traffic volume of the residential area at time t is 7200 vehicles / h, the traffic volume at time t+T is 7210 vehicles / h, and the traffic volume change value is 10 vehicles / h. A stability threshold is set to 0.1, because 1 / 721<0.1, so the traffic volume of the residential area is in a stable state; the total length of the roads in the residential area is 20km, and the road density is 10 , assuming the building type impact level of the residential area is 5.86, according to the formula: 720h=30h, the congestion duration in the residential area is calculated to be 30h;
[0118] The theoretical driving speed in the residential area is 40km / h, according to the formula:
[0119]
[0120] The calculation shows that the adaptation time required after the residential area is expanded and the road length is increased is 0.05h;
[0121] When the residential area is rebuilt, the traffic volume of the commercial area adjacent to the residential area is 9000 vehicles / h, and the length of the same road between the residential area and the commercial area is 3km. According to the formula: , where the road length in the commercial area is 10km, and the theoretical traffic flow after the reconstruction of the residential area is 7470 vehicles / h.
[0122] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0123] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A method for visualizing urban information management based on big data, characterized in that: The management method comprises the following steps: Step S100: Obtain a visualization image of the building distribution of the target city; divide the target city into regions, confirm the building type of each region, merge adjacent regions with the same building type, and generate several target regions of the target city; obtain the road density and congestion duration in a unit cycle in the target region, and calculate the influence degree of the building type in the target region; Step S200: Periodically monitor the building distribution image. When the building type in the target area changes, analyze the change of the target area, adjust all the target areas of the target city to obtain several new target areas; obtain the traffic flow change value in two adjacent unit cycles in the new target area, and judge whether the current traffic flow is in a stable state; calculate the adaptation time required for the new target area according to the change of congestion before and after the change of the target area; Step S300: When an expected reconstruction target is set for the target area, the simulation results of the target area after construction are visualized to generate a new building distribution image; the building types before and after the target area is constructed are determined, the same road length between the target area and the adjacent area after construction is obtained, and the theoretical traffic flow of the target area after construction is predicted; the theoretical congestion duration is calculated based on the road density of the target area after construction; Step S400: Obtain the average vehicle speed of other target areas with the same building type as the expected building target to obtain the theoretical vehicle speed; calculate the theoretical road density of the target area after construction is completed based on the theoretical congestion duration and theoretical traffic volume after construction of the target area; obtain the average road density of other target areas with the same building type to determine whether to send an adjustable reminder to the expected building target.
2. The method for visualizing urban information based on big data according to claim 1 is characterized in that: The step S100 includes the following steps: Step S101: Obtain the distribution of historical buildings in the target city, extract the road data in the target city, and divide the target city into several areas according to the road distribution in the target city; obtain the building data in any area, determine the building type of each building, count the number of each building type in an area, and set the The number of building types is , calculate the first The proportion of building types is ,in, is the number of building types existing in an area; the building type with the largest number is selected as the building type of the area; Step S102: Set the The building types in the area are , get the The building types of several areas adjacent to the first area. If there is an area with the same building type as the first area, If the areas are the same, the adjacent areas with the same building type are merged to obtain a new area; after comparing and merging all areas, several target areas of the target city are generated; Step S103: Get the history The length of each road in the target area is obtained The total length of roads in the target area , according to the formula: ,in, For the The area of the target area is calculated. Road density in target area ; Set a unit period , statistics in unit period The congestion duration of the road in the congested state , get the target area in unit period The proportion of congestion time in ; Step S104: Get the The target area in one unit cycle Total traffic volume , according to the formula: in, is the basic traffic flow in an area of the target city, and the first The impact of building types in target areas .
3. The method for visualizing urban information based on big data according to claim 2 is characterized in that: The step S200 includes the following steps: Step S201: Set the current target city to have The building type of the target area changes, and the The boundary data of the location of the target area; if the boundary data contains building data, obtain the history All adjacent areas of the target area are generated to form an area to be divided; the building data of the area to be divided is obtained to obtain the building type of each building; the area to be divided is re-divided to obtain several new target areas; Step S202: Set the history The target area is currently located in the target city target area, every unit cycle Get the real-time The traffic volume in the target area is set Moment The traffic volume in the target area is , Moment The traffic volume in the target area is ,get Time has come Moment The traffic flow change value of the target area is ; Set a stability threshold ,like , then judge the The traffic volume in the target area is stable; Step S203: Get the The total length of roads in the target area and floor space , calculate the first Road density in target area , according to the formula: in, is the basic traffic volume in an area of the target city, For the The influence degree of building types in the target area is calculated. The target area in one unit cycle The duration of congestion ; Step S204: Get the The average vehicle speed in the target area is , according to the formula: in, For the history The target area in one unit cycle The traffic volume in For the history The total length of roads in the target area, For the The congestion duration of the target area is calculated. The target area is transformed into The time required to adapt to the target area .
4. The method for visualizing urban information based on big data according to claim 3 is characterized in that: The step S300 includes the following steps: Step S301: Set the There is an expected building target in the target area, get the Building types in target areas And the corresponding building type influence ; Extract the The expected building types in the target area are , and the corresponding building type influence degree is ; Step S302: Get The building types of each target area adjacent to the target area are set. In the adjacent target area The building types of the target area are And the corresponding building type influence ; Get the same road length between the xth target area and the kth target area as , according to the formula: in, is the traffic flow of the kth target area, is the traffic volume of the x-th target area, For the The building type influence degree of the current building type in the target area, is the road length of the xth target area; The theoretical traffic volume after the construction of the target area is completed is ; Step S303: Get the The total length of roads after construction in the target area and floor space , calculate the first Road density in target area , according to the formula: in, is the basic traffic volume in an area of the target city, is a unit period; the calculation results are After the target area is built, Theoretical congestion duration .
5. The method for visualizing urban information based on big data according to claim 4 is characterized in that: The step S400 includes the following steps: Step S401: Set the The building types after the target area is completed are , get each building type in the target city The average vehicle speed in the target area , calculate the average value to get the building type Theoretical vehicle speed ; Step S402: Set the The theoretical congestion duration after the target area is completed is and the theoretical traffic flow is ; According to the formula: in, For the current The traffic volume in the target area, For the The target area is transformed into During the process of reaching the target area, the adaptation time of the traffic flow in the changing process is For the current The congestion duration of the target area, For the current The total length of roads in the target area; calculate the Theoretical road length after construction of target area ; According to the formula: ,in, For the The area occupied by the target area after construction is completed is calculated to obtain the Theoretical road density after construction of target areas ; Step S403: Obtain the type of each building in the target city. The road density in the target area is calculated by averaging to obtain the building type The average road density is ;like , then for Sends adjustable reminders based on expected construction targets in each target area.
6. An urban information visualization management system using an urban information visualization management method based on big data according to any one of claims 1 to 5, characterized in that: The management system includes a historical data analysis module, a regional change analysis module, a vehicle flow prediction module and a regional congestion adjustment module; The historical data analysis module is used to obtain a visual image of the building distribution of the target city; divide the target city into regions, confirm the building type of each region, merge adjacent regions with the same building type, and generate several target regions of the target city; obtain the road density and congestion duration in a unit cycle in the target region, and calculate the impact of the building type in the target region; The area change analysis module is used to periodically monitor the building distribution image. When the building type in the target area changes, the change of the target area is analyzed, and all the target areas of the target city are adjusted to obtain several new target areas; the traffic flow change value in two adjacent unit cycles in the new target area is obtained to determine whether the current traffic flow is in a stable state; According to the changes in congestion before and after the target area is changed, the adaptation time required for the new target area is calculated; The vehicle flow prediction module is used to visualize the simulation results of the target area after construction when an expected reconstruction target is set for the target area, and generate a new building distribution image; determine the building types before and after the target area is built, obtain the same road length between the target area and the adjacent area after the construction, and predict the theoretical vehicle flow of the target area after the construction; calculate the theoretical congestion duration according to the road density of the target area after the construction; The regional congestion adjustment module is used to obtain the average vehicle driving speed of other target areas with the same building type as the expected building target, and obtain the theoretical vehicle driving speed; The theoretical road density of the target area after construction is calculated based on the theoretical congestion duration and theoretical traffic volume after construction of the target area is completed; the average road density of other target areas with the same building type is obtained to determine whether to send an adjustable reminder for the expected construction target.
7. The city information visualization management system according to claim 6, characterized in that: The historical data analysis module includes a target area setting unit and a building type impact analysis unit; The target area setting unit is used to obtain the building distribution image of the target city and divide the target city into regions; confirm the building type of each region, merge adjacent regions with the same building type, and generate several target regions of the target city; the building type impact analysis unit is used to obtain the road density and congestion duration in a unit cycle in the target region, and calculate the impact degree of the building type in the target region.
8. The city information visualization management system according to claim 6, characterized in that: The regional change analysis module includes a target region adjustment unit, a stability judgment unit and an adaptation time calculation unit; The target area adjustment unit is used to periodically monitor the building distribution image, and when the building type in the target area changes, analyze the change of the target area, and adjust all the target areas of the target city to obtain several new target areas; the stability judgment unit is used to obtain the traffic flow change value in two adjacent unit cycles in the new target area, and judge whether the current traffic flow is in a stable state; the adaptation time calculation unit is used to calculate the adaptation time required for the new target area according to the change of congestion before and after the change of the target area.
9. The city information visualization management system according to claim 6, characterized in that: The vehicle flow prediction module includes a theoretical vehicle flow calculation unit and a theoretical congestion duration calculation unit; The theoretical vehicle flow calculation unit is used to visualize the simulation results of the target area after construction when an expected reconstruction target is set for the target area, and generate a new building distribution image; determine the building types before and after the target area is built, obtain the same road length between the target area and the adjacent area after construction, and predict the theoretical vehicle flow of the target area after construction; the theoretical congestion duration calculation unit is used to calculate the theoretical congestion duration according to the road density of the target area after construction.
10. The city information visualization management system according to claim 6, characterized in that: The regional congestion adjustment module includes a road density calculation setting unit and an adjustment reminder judgment unit; The road density calculation setting unit is used to obtain the average vehicle speed of other target areas with the same building type as the expected building target to obtain the theoretical vehicle speed; according to the theoretical congestion duration and theoretical traffic volume after the target area is built, the theoretical road density after the target area is built is calculated; the adjustment reminder judgment unit is used to obtain the average road density of other target areas with the same building type and judge whether to send an adjustable reminder to the expected building target.
