Double-layer optimization method for guiding EV to participate in IES scheduling based on dynamic electricity price of carbon quantity level
By adopting dynamic electricity prices and two-layer optimization methods based on carbon levels in the integrated energy system, the problem of carbon emission management and economic optimization when electric vehicles participate in dispatch is solved, and low-carbon dispatch and load optimization of the system are achieved.
Patent Information
- Application Number
- CN202410909254.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-08
- Publication Date
- 2024-10-18
AI Technical Summary
Existing technology fails to consider both the interests of electric vehicle users and carbon emissions in the integrated energy system, resulting in a lack of effective carbon emission management and economic optimization when electric vehicles participate in dispatch.
Dynamic electricity prices based on carbon levels are used to guide electric vehicles to participate in integrated energy system dispatch. By building a multi-integrated energy system model and an electric vehicle system model, using the fuzzy opportunity constraint method and CPLEX solution, a two-layer optimal dispatch model is established to reduce system carbon. Emissions and charging costs.
It achieves the reduction of system carbon emissions, improves the load curve, takes into account system economy and environmental protection, reduces load peak and valley differences, and reduces the charging cost of electric vehicles.
Smart Images

Figure CN118798564A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of low-carbon scheduling methods, and in particular relates to a double-layer optimization method for guiding EVs to participate in IES scheduling based on dynamic electricity prices at carbon levels. Background Art
[0002] Against the backdrop of the increasingly severe greenhouse effect, green and low-carbon development has become an inevitable choice. To facilitate low-carbon development, on the energy supply side, renewable energy is connected to the power grid; on the energy demand side, new forms of loads such as electric vehicles (EVs) and temperature control loads are increasing rapidly, with considerable potential for flexible scheduling. Integrated Energy Systems (IES) are an important carrier of the new power system, which can actively promote the participation of EV users and energy suppliers. Therefore, it is of great significance to ensure the electricity demand of EVs, reduce EV charging costs, and ensure the safe and stable operation of IES.
[0003] At present, there are a large number of literatures that study the scheduling of EV access to IES. For example, literature 1 (Guo Zun, Li Gengyin, Zhou Ming, et al. Optimal operation of commercial park energy hub considering comprehensive demand response [J]. Power System Technology) optimizes the park energy hub containing cold, hot and electric power. The results show that connecting EVs to the system and participating in the demand response process has a good effect in reducing system costs and improving loads. This literature does not take into account the interests of EV users. Since EV users and IES are different individuals, it is necessary to comprehensively consider the interests of these two entities when co-optimizing the two. Literature 2 (Cui Jindong, Luo Wenda, Zhou Niancheng. Research on pricing model and strategy for orderly charging and discharging of electric vehicles based on multiple perspectives [J]. Proceedings of the CSEE) introduces three types of EV charging and discharging price customization, namely, maximum benefit for charging stations, maximum benefit for EV users, and win-win for both. This literature adopts different price strategies to guide EV charging and discharging behavior, but it only starts from the economic efficiency of the system and lacks consideration of carbon emissions. As can be seen from the above, there is no solution in the existing technology that simultaneously considers the interests of EV users and carbon emissions.
[0004] Therefore, it is necessary to provide a new dynamic electricity price based on carbon level to guide EVs to participate in IES scheduling and solve the above technical problems. Summary of the invention
[0005] In view of the technical problems mentioned in the background technology, in order to tap the scheduling potential and carbon reduction feasibility of electric vehicles participating in the integrated energy system, the present invention proposes a two-layer optimization method based on dynamic electricity prices of carbon levels to guide EVs to participate in IES scheduling. On the one hand, a multi-integrated energy system with shared energy storage is built, and the fuzzy opportunity constraint method is used to deal with the "source-load" uncertainty problem; on the other hand, considering the value of EV as a flexible load, the dynamic electricity price derived from the carbon level is used to incentivize EVs to participate in the IES scheduling process, thereby reducing the carbon emissions of the overall system and the EV charging cost. During the scheduling cycle, the scheduling models of the upper multi-IES and lower EV charging and discharging are established with the minimum cost as the goal. The model comprehensively considers the unit, EV operation constraints, demand response constraints, shared energy storage constraints, etc., and is solved by CPLEX to verify the effectiveness of the method proposed in the present invention.
[0006] The technical solution adopted by the present invention to solve its technical problems is: a two-layer optimization method for guiding EVs to participate in IES scheduling based on dynamic electricity prices based on carbon levels, comprising the following steps: modeling step: building a multi-integrated energy system and electric vehicle system model, the multi-integrated energy system and electric vehicle system model including: a multi-regional interconnected integrated energy system containing a shared energy storage power station, multiple charging piles and multiple electric vehicles; the multi-regional interconnected integrated energy system containing a shared energy storage power station is used as an upper-level optimization system; multiple charging piles and multiple electric vehicles are used as a lower-level optimization system; model optimization step: on the basis of considering electric vehicles, with the goal of optimal economic performance, an upper-level optimization scheduling model based on fuzzy opportunity constraints is established, the dynamic charging and discharging price of electric vehicles is determined according to the carbon level of the integrated energy system, and electric vehicles are guided to connect to the integrated energy system in an orderly manner, and a lower-level electric vehicle charging and discharging model is established with the goal of minimizing the charging cost of electric vehicles.
[0007] Compared with the prior art, the present invention can reduce system carbon emissions, improve system load curves and reduce load peak-to-valley differences, and under certain conditions can take into account both system economy and environmental protection. BRIEF DESCRIPTION OF THE DRAWINGS
[0008] Figure 1 This is a schematic diagram of the structure of the multi-IES and EV system model in the present invention;
[0009] Figure 2 The present invention is a schematic diagram of an optimization process for solving the constructed IES and EV double-layer optimization model using CPLEX;
[0010] Figure 3 When performing case analysis for the present invention: IES1 power dispatch results are shown Figure 1 (dynamic electricity price);
[0011] Figure 4When performing case analysis for the present invention: IES1 power dispatch results are shown Figure 2 (Time-of-use electricity price);
[0012] Figure 5 When performing case analysis for the present invention: IES2 power dispatch results are shown Figure 1 (dynamic electricity price);
[0013] Figure 6 When performing case analysis for the present invention: IES2 power dispatch results are shown Figure 2 (Time-of-use electricity price);
[0014] Figure 7 When performing case analysis for the present invention: IES2 power dispatch results are shown Figure 1 (dynamic electricity price);
[0015] Figure 8 When performing case analysis for the present invention: IES2 power dispatch results are shown Figure 2 (Time-of-use electricity price);
[0016] Fig. 9 When performing case analysis for the present invention: schematic diagram of electrical load optimization results;
[0017] Fig.10 When analyzing the example for the present invention: the charging and discharging of EV under different electricity prices Figure 1 (dynamic electricity price);
[0018] Fig.11 When analyzing the example for the present invention: the charging and discharging of EV under different electricity prices Figure 2 (Time-of-use electricity price);
[0019] Fig.12 When performing case analysis for the present invention: cost diagram of IES and EV;
[0020] Fig.13 When performing case analysis for the present invention: cost diagrams under different parameter scenarios;
[0021] Fig.14 When performing case analysis for the present invention: IES total cost diagram of the cost under different numbers of charging piles;
[0022] Fig.15 When performing case analysis for the present invention: a schematic diagram of carbon trading costs under different numbers of charging piles;
[0023] Fig.16 When performing case analysis for the present invention: EV cost diagram of the cost under different numbers of charging piles;
[0024] Fig.17When performing example analysis for the present invention: a schematic diagram of the purchase and sale prices of electricity;
[0025] Fig.18 When performing case analysis for the present invention: Schematic diagram of electrical and thermal loads;
[0026] Fig.19 When performing case analysis for the present invention: Schematic diagram of disordered charging and carbon level;
[0027] Fig. 20 When performing case analysis for the present invention: Schematic diagram of dynamic electricity price of IES2 thermal dispatch results;
[0028] Fig.21 When performing case analysis for the present invention: Schematic diagram of time-of-use electricity price of IES2 thermal dispatch results;
[0029] Fig. 22 When performing case analysis for the present invention: Schematic diagram of dynamic electricity price of IES3 thermal dispatch results;
[0030] Fig.23 When performing case analysis for the present invention: Schematic diagram of time-of-use electricity price of IES3 thermal dispatch results;
[0031] Fig.24 When performing case analysis for the present invention: Dynamic electricity price diagram Figure 1 (IES1);
[0032] Fig.25 When performing case analysis for the present invention: Dynamic electricity price diagram Figure 2 (IES2);
[0033] Fig.26 When performing case analysis for the present invention: Dynamic electricity price diagram Figure 3 (IES3);
[0034] Fig. 27 When performing case analysis for the present invention: Carbon level diagram Figure 1 (IES1);
[0035] Fig.28 When performing case analysis for the present invention: Carbon level diagram Figure 2 (IES2);
[0036] Fig.29 When performing case analysis for the present invention: Carbon level diagram Figure 2 (IES3). DETAILED DESCRIPTION
[0037] The present invention is described in detail below in conjunction with the various embodiments shown in the accompanying drawings, but it should be noted that these embodiments are not limitations of the present invention, and any equivalent transformations or substitutions in functions, methods, or structures made by ordinary technicians in the field based on these embodiments are all within the scope of protection of the present invention.
[0038] Combine the following Figure 1-29 The present invention is further described.
[0039] The present invention discloses a two-layer optimization method for guiding EVs to participate in IES scheduling based on a dynamic electricity price of carbon content level, comprising the following steps: a modeling step: constructing a multi-integrated energy system and an electric vehicle system model, wherein the multi-integrated energy system and the electric vehicle system model comprises: a multi-region interconnected integrated energy system containing a shared energy storage power station, a plurality of charging piles and a plurality of electric vehicles; the multi-region interconnected integrated energy system containing a shared energy storage power station is used as an upper-layer optimization system; and a plurality of charging piles and a plurality of electric vehicles are used as a lower-layer optimization system; a model optimization step: on the basis of considering electric vehicles, with the goal of optimal economic performance, an upper-layer optimization scheduling model based on fuzzy opportunity constraints is established, the dynamic charging and discharging price of electric vehicles is determined according to the carbon content level of the integrated energy system, and the electric vehicles are guided to be orderly connected to the integrated energy system, and a lower-layer electric vehicle charging and discharging model is established with the goal of minimizing the charging cost of electric vehicles.
[0040] According to a specific embodiment of the present invention, the multi-regional interconnected integrated energy system containing a shared energy storage power station includes a first integrated energy system, a second integrated energy system and a third integrated energy system that can interact through a power grid, and the first integrated energy system, the second integrated energy system and the third integrated energy system transmit electric energy to each other through the shared energy storage power station.
[0041] According to a specific embodiment of the present invention, the first integrated energy system includes a fan and a photovoltaic module, and the load in the first integrated energy system is only an electrical load; the second integrated energy system includes: a photovoltaic module, a diesel generator, a cogeneration unit and a gas boiler, and the load of the second integrated energy system is an electrical load and a thermal load. In the second integrated energy system: the gas boiler and the cogeneration unit use natural gas to heat the thermal load, and the photovoltaic module and the diesel generator both supply energy to the electrical load; the third integrated energy system includes: a fan, a photovoltaic module, a diesel generator, a cogeneration unit and a gas boiler, and the load of the third integrated energy system is an electrical load and a thermal load. In the third integrated energy system: the gas boiler and the cogeneration unit use natural gas to heat the thermal load, and the fan, the photovoltaic module and the diesel generator both supply energy to the electrical load; the first integrated energy system, the second integrated energy system, the third integrated energy system, the shared energy storage power station, and the power grid consider the cost when performing electric energy interaction operations, and the cost is also considered when performing electric energy interaction operations between the first integrated energy system, the second integrated energy system and the third integrated energy system.
[0042] According to a specific embodiment of the present invention, the cogeneration unit includes a gas turbine and a waste heat boiler, and the mathematical model of the cogeneration unit is as follows:
[0043] In the formula, is the output power of GT in the i-th integrated energy system at time t; η GT is the power generation efficiency of GT; R is the lower calorific value of natural gas; is the thermal power of the waste heat boiler in the i-th integrated energy system at time t; η WH is the waste heat recovery efficiency of the boiler; V GT ,i,t represents the amount of natural gas consumed by GT in the i-th integrated energy system at time t.
[0044] According to a specific implementation of the present invention, when calculating the operating cost of the upper-level optimization system, the transaction form between the integrated energy system and the shared energy storage power station is represented by the purchase and sale of electricity.
[0045] According to a specific embodiment of the present invention, the implementation method of the model optimization step includes constructing a two-layer scheduling model of a multi-integrated energy system including electric vehicles. The method of constructing a two-layer scheduling model of a multi-integrated energy system including electric vehicles is as follows:
[0046] S21, constructing the upper-level multi-integrated energy system objective function considering shared energy storage power stations: the multi-integrated energy system considering shared energy storage power stations takes the optimal daily operating cost as the objective function, and the upper-level multi-integrated energy system objective function considering shared energy storage power stations is composed of nine parts: diesel generator cost, electricity purchase and sales cost, wind and solar operation cost, cogeneration unit operation cost, gas boiler operation cost, demand response cost, carbon trading cost, service fee paid to shared energy storage power stations and interaction cost between integrated energy systems. The sum of the nine parts minus the electric vehicle charging and discharging cost is the total cost of the multi-integrated energy system objective function considering shared energy storage power stations;
[0047] S22, constructing upper-level multi-integrated energy system constraints, wherein the upper-level multi-integrated energy system constraints include: cogeneration unit constraints, diesel generator constraints, power balance constraints, interaction constraints between integrated energy systems, and shared energy storage power station constraints; wherein:
[0048] The constraint formula of the combined heat and power unit is:
[0049] Where U GT With D GT They represent the upper and lower limits of the GT ramping power in the combined heat and power unit, respectively; Respectively represent the minimum and maximum values of GT output;
[0050] The constraint formula of diesel generator is:
[0051] In the formula, represents the 0-1 behavior variable of the i-th diesel generator at time t; Respectively represent the minimum and maximum output; U DIG , D DIG Respectively represent the upper and lower limits of the diesel generator climbing power;
[0052] The power balance constraint formula is:
[0053]
[0054]
[0055] In the formula, Indicates the thermal power of the gas boiler; Represents the heat load in the integrated energy system; Indicates fixed electrical load; They represent the charging and discharging power of the electric vehicle in the i-th integrated energy system at time t;
[0056] The interaction constraints between the integrated energy systems are:
[0057] In the formula, They represent the maximum power purchased and sold between integrated energy systems; They represent the 0-1 status of electricity purchase and sale between the i-th and j-th integrated energy systems respectively;
[0058] The constraints that need to be met between shared energy storage power stations are as follows:
[0059]
[0060] In the formula, is the capacity of the shared energy storage power station at time t; They are the charging and discharging efficiency of the shared energy storage power station; are the charging and discharging power of the shared energy storage power station at time t respectively; They are the maximum charging and discharging power of the shared energy storage power station respectively; They are the charging and discharging 0-1 status bits of the shared energy storage power station;
[0061] The power interaction and existence constraints between the shared energy storage power station and multiple integrated energy systems. The sum of the charging and discharging power of each integrated energy system is equal to the total charging and discharging power of the shared energy storage.
[0062]
[0063] S23, determining the objective function of the lower-level electric vehicle; the operating cost of the lower-level electric vehicle is mainly composed of the following two parts, which are the charging cost and the discharging benefit of the electric vehicle;
[0064]
[0065] In the formula, F1 and F2 represent the charging cost and discharging benefit of electric vehicles respectively; Respectively represent the charging and discharging prices of electric vehicles at time t;
[0066] S24, determining the lower-level electric vehicle constraint conditions;
[0067] S241, determining the overall power balance constraint of the electric vehicle according to a formula;
[0068]
[0069] In the formula, Respectively represent the total charging and discharging power of the electric vehicle at time t; Indicates the total charging power of the electric vehicle; Indicates the maximum charging power of electric vehicles;
[0070] S242, determine the capacity and charging and discharging power constraints of the electric vehicle according to the following formula:
[0071]
[0072] In the formula, and Respectively represent the charging and discharging efficiency of electric vehicles; and They are the upper and lower limits of the battery capacity of the electric vehicle at time t; Respectively represent the total capacity of electric vehicles at 1 o'clock and 24 o'clock; is the maximum charging and discharging power of the electric vehicle during period t;
[0073] S25, determining a dynamic pricing mechanism as follows;
[0074] S251, according to the following formula, the carbon level of the system at each moment is used to guide the charging and discharging behavior of electric vehicles, and the output of other units in the system is changed through the charging and discharging of electric vehicles to achieve the purpose of carbon reduction;
[0075]
[0076]
[0077]
[0078] In the formula, They represent the free carbon quota and actual carbon emissions of the i-th integrated energy system at time t respectively; represents the carbon level at time t;
[0079] S252, determine the dynamic charging and discharging price of the electric vehicle according to the following formula:
[0080]
[0081]
[0082] In the formula, is the relative carbon content coefficient. When it is greater than 1, it means that the carbon content level of the system is increased after considering electric vehicles. When it is less than 1, it means that the carbon content level of the system is reduced after considering electric vehicles. To consider the carbon level after electric vehicles; are the dynamic electricity prices for electric vehicles to sell and purchase electricity, which are used to replace the charging and discharging prices; s,i,t,max 、p s,i,t,min are the maximum and minimum values of the time-of-use electricity price; p g,i,t,max 、p g,i,t,min They are the maximum and minimum values of the time-of-use electricity price respectively.
[0083] According to a specific implementation of the present invention, the cost is calculated according to the following formulas:
[0084] Diesel Generator Cost
[0085] In the formula, p DIG Indicates the price per unit output of a diesel generator; represents the output of the diesel generator in the i-th integrated energy system at time t; 0-1 variables representing the start and stop of the diesel generator at time t; They represent the single start and stop costs of the diesel generator respectively;
[0086] Electricity purchase and sales costs
[0087] In the formula, p g,t 、p s,t They represent the purchase and sale prices of electricity between the integrated energy system and the power grid; They represent the purchased and sold power of the i-th integrated energy system and the power grid respectively;
[0088] Wind and solar operating costs
[0089] In the formula, p WT 、p PV Represent the unit operating costs of wind power and photovoltaic power respectively; They represent the output of wind power and photovoltaic power in the i-th integrated energy system at time t respectively;
[0090] Cogeneration unit operating costs
[0091] In the formula, p CHP Indicates the unit price of natural gas;
[0092] Gas boiler operating costs
[0093] In the formula, represents the thermal power of the gas boiler at time t in the i-th integrated energy system; η GB Indicates the heating efficiency of the gas boiler;
[0094] Demand response costs
[0095] In the formula, represents the time-of-use electricity price of the power grid in period t; represents the dispatchable electric load at time t; represents the dispatchable load factor;
[0096] The carbon trading costs are derived from carbon emissions from the power grid, diesel engines, gas boilers and gas turbines in cogeneration units.
[0097] According to a specific embodiment of the present invention, the carbon trading cost calculation formulas of the first integrated energy system, the second integrated energy system, and the third integrated energy system are as follows:
[0098]
[0099]
[0100]
[0101]
[0102] In the formula, represents free carbon allowances; represents the actual carbon emissions; α represents the base of free carbon quota; β represents the unit carbon emission cost of diesel generators; χ represents the unit carbon emission cost of the power grid;
[0103] δ represents the unit carbon emission cost of natural gas; c tr,i represents the unit cost corresponding to the i-th carbon emission interval; λ i represents the boundary value of the ith carbon emission interval; ε represents the unit price of the income of free carbon quota;
[0104] They represent the actual carbon trading cost and the carbon trading cost without considering carbon quotas;
[0105] Service fees paid to shared energy storage power stations
[0106] In the formula, They respectively represent the amount of electricity purchased and stored by the integrated energy system from the energy storage power station; Represents the service fee of the energy storage power station;
[0107] Interaction costs between integrated energy systems
[0108] In the formula, They represent the purchase and sale prices of electricity between integrated energy systems; They respectively represent the power purchased and sold between the integrated energy systems.
[0109] According to a specific embodiment of the present invention, the implementation method of the model optimization step includes constructing fuzzy chance constrained programming, and the method of constructing fuzzy chance constrained programming is as follows:
[0110] S31, construct fuzzy parameter membership function: When fuzzy variables appear in the optimization process, fuzzy chance programming constraints are used to make the possibility of the constraint conditions satisfy a certain confidence level σ; the original problem is converted into the form of chance constraints through the confidence level:
[0111]
[0112] Where f(x) represents the objective function; C r {g(x,ζ)≤0}≥σ represents the confidence level of the fuzzy variable constraint satisfaction condition; g() represents the fuzzy variable constraint; x and ζ are the optimization variable and fuzzy variable respectively;
[0113] The fuzzy parameters of intermittent output and load of wind and solar power in the dispatching period are expressed by triangular or trapezoidal functions:
[0114]
[0115] Where M F1 -M F4 Used to determine the shape of the membership function and represent the membership parameter; μ(M F ) represents the membership function; different membership parameters are determined according to the predicted values of wind power and load power:
[0116] M Fc =ω c P yuc (31)
[0117] Where M Fc is the cth membership parameter; ω c is the cth proportional coefficient, and its value range is [0,1]; P yuc is the parameter prediction value; in particular, when ω2=ω3, the fuzzy parameter is triangular, that is, M F2 =M F3 =P yuc ;
[0118] S32, the clear equivalent form is used to solve the fuzzy chance constrained programming problem, and equation (17) is transformed into the corresponding clear equivalent class of equation (32);
[0119]
[0120] In the formula, The triangular membership functions of wind power, photovoltaic power and load are represented respectively;
[0121] Formula (32) is used to replace the electric power balance constraint and combined with other constraints and objectives to establish a fuzzy chance constrained programming model for multi-integrated energy systems;
[0122] S33, two-layer model solution: using fuzzy multi-decision method to select the best compromise solution of two-layer optimization results,
[0123]
[0124] In the formula, represents the satisfaction of the jth objective function in the kth result; γ k represents the standard satisfaction of the kth result; Z fin represents the best compromise solution; Indicates the maximum and minimum values of the j-th target; Represents the jth target value in the kth result.
[0125] The specific implementation method, principle and effect of the present invention are further described below.
[0126] It should be noted that the names corresponding to the English abbreviations in the present invention are as follows:
[0127] EV: Electric Vehicle (EV).
[0128] IES: Integrated Energy Systems (IES). IES1 is the first integrated energy system, IES2 is the second integrated energy system, and IES3 is the third integrated energy system.
[0129] SESS: Sharing Energy Storage Station (SESS).
[0130] CHP: Combined Heating and Power (CHP) is a two-layer optimization method based on the dynamic electricity price of carbon level to guide EV to participate in IES scheduling.
[0131] 1. Multi-IES and EV system models
[0132] The distance between the multiple IES constructed by the present invention is relatively short, mainly including electric and thermal loads. The three IES can not only interact with the power grid, but also transmit electric energy to each other. The present invention uses a multi-IES system containing shared energy storage as an upper-level optimization system, which includes wind turbines (indTurbine, T), photovoltaic components (Photovoltaic, PV), shared energy storage power station (Sharing Energy Storage Station, SESS), gas boiler (Gas Boiler, GB), combined heat and power unit (Combined Heating and Power er, CHP) and diesel generator (Diesel Generator, DIG). Among them, the electric energy interaction between IES considers the cost issue, and the electric energy interaction between IES and SESS and the power grid considers a certain cost. The present invention uses electric vehicles as the lower-level optimization system, which includes multiple charging piles and multiple electric vehicles. The model structure of the multi-IES and EV system is as follows: Figure 1 As shown in the figure, IES1 only has electricity load, while IES2 and IES3 include electricity and heat load. IES2 and IES3 have more CHP units and gas boilers than IES1. Gas boilers and CHP units use natural gas to heat the heat load, and the other units supply energy to the electricity load.
[0133] 1.1 CHP unit model
[0134] The CHP unit of the present invention comprises a gas turbine and a waste heat boiler. Its mathematical model is as follows:
[0135]
[0136] In the formula, is the output power of GT in the i-th IES at time t; η GT is the power generation efficiency of GT; R is the lower calorific value of natural gas; is the thermal power of the waste heat boiler in the i-th IES at time t; η WH is the waste heat recovery efficiency of the boiler; V GT,i,t It represents the amount of natural gas consumed by GT in the i-th IES at time t.
[0137] 1.2 Shared Energy Storage Power Station
[0138] Shared energy storage power stations provide shared energy storage services for multiple categories of users in the same power distribution area. Users pay a certain service fee to the energy storage power station to meet the user's internal charging and discharging needs, which not only saves maintenance and installation costs, but also saves considerable investment costs. In order to facilitate the calculation of the operating cost of the entire upper system, the present invention represents the transaction form between IES and the shared energy storage power station in the form of purchasing and selling electricity.
[0139] 2. Multi-IES dual-layer scheduling model with EVs
[0140] 2.1 The upper layer considers the multi-IES objective function of SESS
[0141] Considering the multi-IES of SESS, the daily operating cost optimization is taken as the objective function. The upper objective function consists of the following parts, and the total cost is the sum of the 9 parts in this section minus the EV charging and discharging cost.
[0142] (1) Diesel generator cost
[0143]
[0144] In the formula, p DIG Indicates the price per unit output of a diesel generator; represents the output of the diesel generator in the i-th IES at time t; 0-1 variables representing the start and stop of the diesel generator at time t; They represent the single start and stop cost of the diesel generator respectively.
[0145] (2) Cost of purchasing and selling electricity
[0146]
[0147] In the formula, p g,t 、p s,t They represent the purchase and sale prices of electricity between IES and the power grid; They represent the power purchased and sold between the i-th IES and the power grid respectively.
[0148] (3) Wind and solar operating costs
[0149] In the formula, p WT 、p PV Represent the unit operating costs of wind power and photovoltaic power respectively; They represent the output of wind power and photovoltaic power in the i-th IES at time t respectively.
[0150] (4) CHP operating costs
[0151] In the formula, p CHPIndicates the unit price of natural gas.
[0152] (5) Gas boiler operating costs
[0153] In the formula, represents the thermal power of the gas boiler at time t in the i-th IES; η GB Indicates the heating efficiency of the gas boiler.
[0154] (6) Demand response costs
[0155] In the formula, represents the time-of-use electricity price of the power grid in period t; represents the dispatchable electric load at time t; Represents the dispatchable load factor.
[0156] (7) Carbon trading costs
[0157] The carbon emissions of the present invention mainly come from the power grid, diesel engines, gas boilers and gas turbines in CHP units. The calculation method of carbon trading costs of the three IES is as follows:
[0158]
[0159]
[0160]
[0161]
[0162] In the formula, represents free carbon allowances; represents the actual carbon emissions; α represents the base of free carbon quota; β represents the unit carbon emission cost of diesel generators; χ represents the unit carbon emission cost of the power grid; δ represents the unit carbon emission cost of natural gas; c tr,i represents the unit cost corresponding to the i-th carbon emission interval; λ i represents the boundary value of the ith carbon emission interval; ε represents the unit price of the income of free carbon quota; They represent the actual carbon trading cost and the carbon trading cost without considering carbon quotas respectively.
[0163] (8) Service fees paid to shared energy storage power stations
[0164] In the formula, They represent the amount of electricity purchased and stored by IES from the energy storage power station respectively; Represents the service fee of the energy storage power station.
[0165] (9) Interaction costs between IES
[0166] In the formula, Respectively represent the purchase and sale prices of electricity between IES; They represent the purchased and sold electricity power between IES respectively.
[0167] 2.2 Upper-level multi-IES constraints
[0168] (1) CHP unit constraints
[0169] Where U GT With D GT They respectively represent the upper and lower limits of the GT climbing power in the CHP unit. Respectively represent the minimum and maximum values of GT output.
[0170] (2) Diesel generator constraints
[0171] In the formula, represents the 0-1 behavior variable of the i-th diesel generator at time t; Respectively represent the minimum and maximum output; U DIG , D DIG Respectively represent the upper and lower limits of the diesel generator climbing power.
[0172] (3) Power balance constraints
[0173]
[0174]
[0175] In the formula, Indicates the thermal power of the gas boiler; Represents the heat load in IES; Indicates fixed electrical load; They represent the charging and discharging power of the electric vehicle in the i-th IES at time t.
[0176] (4) Interaction constraints between IES
[0177] In the formula, Respectively represent the maximum power purchased and sold between IES; They represent the 0-1 status of electricity purchase and sale between the i-th and j-th IES respectively.
[0178] (5) Constraints on shared energy storage power stations
[0179] The constraints that need to be met between shared energy storage power stations are as follows:
[0180] In the formula, is the capacity of SESS at time t; are the charge and discharge efficiency of SESS respectively; are the charge and discharge power of SESS at time t respectively; are the maximum charge and discharge power of SESS respectively; They are respectively the charge and discharge 0-1 status bits of the SESS.
[0181] There are constraints on the power interaction between the shared energy storage power station and multiple IES. The sum of the charging and discharging power of each IES is equal to the total charging and discharging power of the shared energy storage.
[0182] Other constraints such as demand response constraints, upper and lower limit constraints of unit output, and interconnection line constraints can refer to existing technologies.
[0183] 2.3 Lower-level EV objective function
[0184] The operating costs of the lower-level EVs are mainly composed of the following two parts, which are the charging cost and discharge benefit of electric vehicles.
[0185]
[0186] In the formula, F1 and F2 represent the charging cost and discharging benefit of electric vehicles respectively; They represent the charging and discharging prices of electric vehicles at time t respectively.
[0187] 2.4 Lower-level EV constraints
[0188] (1) Overall power balance constraints of EV
[0189]
[0190] In the formula, Respectively represent the total charging and discharging power of the electric vehicle at time t; Indicates the total charging power of the electric vehicle; Indicates the maximum charging power of an electric vehicle.
[0191] (2) EV capacity and charging and discharging power constraints
[0192]
[0193] In the formula, and Respectively represent the charging and discharging efficiency of electric vehicles; and They are the upper and lower limits of the battery capacity of the electric vehicle at time t; Respectively represent the total capacity of electric vehicles at 1 o'clock and 24 o'clock; is the maximum charging and discharging power of the electric vehicle during period t.
[0194] 2.5 Dynamic Pricing Mechanism
[0195] In the IES dispatch process, the large-scale access of electric vehicles to the system will lead to an increase in the overall carbon emission level of the IES, especially when the electric vehicles are connected to the system for charging. Therefore, this section uses the carbon level of the system at each moment to guide the charging and discharging behavior of electric vehicles, explore the potential of charging and discharging of electric vehicles to reduce IES carbon emissions, and change the output of other units in the system through the charging and discharging of electric vehicles to achieve the purpose of carbon reduction.
[0196]
[0197]
[0198]
[0199] In the formula, They represent the free carbon quota and actual carbon emissions of the i-th IES at time t respectively; Represents the carbon level at time t.
[0200] Dynamic charging and discharging price determination for electric vehicles:
[0201]
[0202]
[0203] In the formula, is the relative carbon content coefficient. When it is greater than 1, it means that the carbon content level of the system is increased after considering electric vehicles. When it is less than 1, it means that the carbon content level of the system is reduced after considering electric vehicles. To consider the carbon level after electric vehicles; are the dynamic electricity prices for electric vehicles to sell and purchase electricity, which are used to replace the charging and discharging prices in Section 2.3; s,i,t,max 、p s,i,t,min are the maximum and minimum values of the time-of-use electricity price; p g,i,t,max 、p g,i,t,min They are the maximum and minimum values of the time-of-use electricity price respectively.
[0204] In theory, controlling the charging and discharging prices of electric vehicles by carbon levels can reduce both the system's carbon emissions and the charging costs of electric vehicles. When the system's carbon level increases, the selling and purchasing prices of electric vehicles can be increased to guide electric vehicle charging; when the system's carbon level decreases, the charging and selling prices of electric vehicles can be reduced to guide electric vehicle discharging behavior.
[0205] 3. Fuzzy Chance Constrained Programming
[0206] 3.1 Fuzzy parameter membership function
[0207] When fuzzy variables appear in the optimization process, fuzzy chance programming constraints can be used to make the possibility of the constraint conditions satisfy a certain confidence level σ. The confidence level can be used to transform the original problem into a chance constraint:
[0208]
[0209] Where f(x) represents the objective function; C r {g(x,ζ)≤0}≥σ represents the confidence that the fuzzy variable constraint satisfies the condition; g() represents the constraint with fuzzy variables; x and ζ are the optimization variable and fuzzy variable respectively.
[0210] The fuzzy parameters of intermittent output and load of wind and solar power in the dispatching period can be expressed by triangular or trapezoidal functions:
[0211]
[0212] Where M F1 -M F4 It can be used to determine the shape of the membership function and represent the membership parameter; μ(M F ) represents the membership function. Different membership parameters can be determined according to the predicted values of wind power and load power:
[0213] M Fc =ω c P yuc (31)
[0214] Where M Fc is the cth membership parameter; ω c is the cth proportional coefficient, and its value range is [0,1]; P yuc is the parameter prediction value. In particular, when ω2=ω3, the fuzzy parameter is triangular, that is, M F2 =M F3 =P yuc .
[0215] 3.2 Clear Equivalence Classes of Fuzzy Chance Constraints
[0216] At present, the solution of fuzzy chance constraint programming problem mainly adopts fuzzy simulation and clear equivalent form. The present invention adopts the latter to transform the model, transform the chance constraint function and solve it according to the traditional method. According to previous research, when the confidence is greater than 0.5 and the constraint condition meets certain conditions, the chance constraint C r {g(x,ζ)≤0}≥σ is converted into a certain clear equivalent form. Therefore, the present invention converts formula (17) into the corresponding clear equivalent class shown in formula (32).
[0217]
[0218] In the formula, Represent the triangular membership functions of wind power, photovoltaic power and load respectively.
[0219] By replacing the power balance constraint with equation (32) and combining it with the other constraints and objectives mentioned above, a fuzzy chance constrained programming model for multiple IES can be established.
[0220] 3.3 Solution of the two-layer model
[0221] Since there is a conflict in the objective functions of the upper and lower models, the greater the charging cost of electric vehicles, the greater the profit of the upper IES will be, thereby reducing the cost of IES. Therefore, the fuzzy multi-decision method can be used to select the best compromise solution for the results of the two-layer optimization.
[0222]
[0223] In the formula, represents the satisfaction of the jth objective function in the kth result; γ k represents the standard satisfaction of the kth result; Z fi n represents the best compromise solution; Indicates the maximum and minimum values of the j-th target; Represents the jth target value in the kth result.
[0224] The IES and EV double-layer optimization model constructed in the present invention is solved by CPLEX, and its specific optimization process is as follows: Figure 2 shown.
[0225] 4. Example Analysis
[0226] 4.1 Basic data and parameter settings
[0227] In order to verify the effectiveness of the scheduling strategy and model proposed in this invention, the integrated energy system and electric vehicle model are taken as specific simulation objects. The operating parameters of each device in IES are shown in Table 5 (Operating parameters of equipment), and the purchase and sale prices of electricity between IES and the power grid and other IES are shown in Table 5. Fig.17As shown, the electrical and thermal load data of each IES are as follows Fig.18 As shown. Assuming that there are 15 electric vehicle charging piles in each IES, the charging power of each charging pile is 15k. The three IES consider a total of 90 electric vehicles as basic scheduling data, and the capacity of each electric vehicle is 60k. The disordered charging load of 90 electric vehicles is similar to that of IES without considering the carbon level of electric vehicles. Fig.19 As shown in the figure, IES stores and withdraws electricity from the shared energy storage power station by paying a service fee. The service fee of the shared energy storage power station is 0.21 yuan / k. The dynamic electricity price based on the carbon level is used to guide EVs to participate in the IES scheduling. The length of the carbon trading interval in each period is 50kg, and the carbon trading prices in each interval are 0.25 yuan, 0.334 yuan, 0.401 yuan, 0.468 yuan and 0.535 yuan respectively.
[0228] 4.2 Analysis of basic simulation results
[0229] The uncertainty of wind power, photovoltaic power and load is not considered in the basic simulation process, and the fuzzy membership parameters of the triangle are all set to 1. In order to verify the effectiveness of the proposed double-layer optimization strategy of multi-IES containing EVs based on carbon quantity guidance, the scheduling results of multi-IES and EVs are analyzed. The double-layer optimization model of EV charging and discharging guided by time-sharing and dynamic electricity prices is cycled 100 times, and the fuzzy multi-decision method is used to select the best compromise solution. The operation results are as follows.
[0230] 4.2.1 IES electricity and heat supply and demand analysis
[0231] The supply and demand of the electrical load in IES are as follows: Figure 3-8 The upper part of the horizontal axis is the supply power, and the lower part is the demand power.
[0232] Depend on Figure 3-4 It can be seen that the charging period of EV under the dynamic electricity price mechanism is less than that under the time-of-day electricity price, so the amount of electricity purchased by IES1 from the power grid under the dynamic electricity price mechanism is 2081.5k less than that under the time-of-day electricity price. A two-layer optimization method based on the dynamic electricity price of carbon level to guide EV to participate in IES scheduling. As the EV charging period is reduced, the amount of electricity exchanged between IES increases, and the excess electricity of IES1 can be sold to IES2.
[0233] Depend on Figure 5-6 It can be seen that due to the reduction of EV discharge time under the dynamic electricity price mechanism, a part of the electric power supply is reduced, so the interaction between IES2 and shared energy storage increases, and the amount of electricity sold by IES2 to the grid decreases.
[0234] Depend on Figure 7-8It can be seen that the power load of IES3 is relatively large from 10:00 to 12:00. At this time, the units need to output more to meet the power balance. The dynamic electricity price mechanism meets the balance through large-scale discharge of EVs, and the time-of-use mechanism meets the demand through electricity purchase behavior. Although it increases the system cost to a certain extent, it helps to reduce carbon emissions.
[0235] The supply and demand of heat load in IES are shown in the figure Figure 6-7 and Figure 7-8 As shown. The upper part of the horizontal axis is the energy supply power, and the lower part is the demand power. As shown in the figure, the heat recovery of the waste heat boiler and the heat supply of the gas boiler are consistent under the dynamic and time-of-use electricity prices.
[0236] 4.2.2 Electric load dispatch results
[0237] Fig. 9 ,Table 1 (peak-to-valley difference of electric load) shows the electric load dispatching results of IES under dynamic and time-of-use electricity prices.
[0238] Table 1
[0239]
[0240] Depend on Fig. 9 It can be seen from Table 1 that the peak-to-valley difference of IES electric load will increase after connecting to the electric vehicle load. However, the added value of the peak-to-valley difference after the dynamic electricity price of the present invention guides the charging and discharging of electric vehicles is smaller than the time-sharing electricity price. The peak-to-valley difference of IES1-3 in the dynamic situation is reduced by 15.7%, 7.9% and 15.1% respectively compared with the time-sharing electricity price mechanism. Compared with the time-sharing electricity price mechanism, the dynamic electricity price mechanism plays a good role in reducing peaks and filling valleys, which is beneficial to improving the utilization efficiency of other units, indicating that the dynamic electricity price mechanism is reasonable.
[0241] Table 5
[0242]
[0243] 4.2.3 Carbon Level and Electricity Price
[0244] After dynamic and time-of-use electricity prices guide the charging and discharging of electric vehicles, the carbon content level and electricity price of each IES are as follows: Figure 24-26 , Figure 27-29As shown. As can be seen from the figure, the carbon level of IES1 in most time periods after adding EV is higher than that without EV, resulting in the charging and discharging prices under the dynamic electricity price being higher than the time-of-use electricity price in most time periods, which is conducive to promoting EV discharge in IES1. In IES2, during the periods of 1:00-9:00 and 19-21:00, the carbon level of the system is low, and the charging and discharging prices of EV are lower than the time-of-use electricity price, which is conducive to EV charging. The carbon level and electricity price change rules of IES3 are similar to those mentioned above and will not be repeated. The sum of the carbon levels of the three IES under the dynamic electricity price mechanism is 0.14 lower than the sum of the carbon levels of the time-of-use electricity price mechanism, indicating that the use of a dynamic pricing mechanism can reduce the carbon emissions of IES and achieve the goal of carbon reduction for the entire system, while also tapping the carbon reduction potential of EV.
[0245] 4.2.4 EV charging and discharging analysis
[0246] The charging and discharging conditions of EVs under different electricity prices are as follows: Figure 10-11 shown.
[0247] Depend on Figure 10-11 It can be seen that under the time-of-use electricity price mechanism, the charging time period of EV is mainly during the flat and valley periods with lower electricity prices, and the discharging time is mainly concentrated in the peak period, such as 10:00-11:00, 14:00-16:00 and 20:00-22:00, so that EV can obtain lower charging costs through the difference between peak and valley electricity prices. Under the dynamic electricity price mechanism, the charging time of EV is during the period with low carbon content, that is, the period when the charging price is lower than the time-of-use electricity purchase price, and the discharging time is concentrated in the period with high carbon content, when the discharge price is higher than the time-of-use electricity sales price, thus expanding the difference between EV charging and discharging prices. The above operations are not only conducive to reducing the carbon emissions of IES, but also conducive to reducing the charging cost of EV.
[0248] 4.2.5 Analysis of operating costs of IES and EV
[0249] The sum of the costs of the three IES and the charging and discharging costs of EVs is as follows: Fig.12 As shown. Fig.12 It can be seen that the present invention uses time-of-use electricity prices to guide EV charging, and its optimization cost changes less with the number of iterations. Using dynamic electricity prices to guide EV charging, its cost distribution range is wide, which reflects from the side that dynamic electricity prices can effectively adjust the output of units in IES and the charging and discharging process of EVs to obtain different scheduling schemes. The costs of each IES and EV are shown in Table 2 (costs of each part of IES and EV).
[0250] Table 2
[0251]
[0252] As shown in Table 2, under different electricity price mechanisms, the overall energy purchase cost in the dynamic electricity price mechanism is 67.54 yuan less than that under the time-of-use electricity price, and the carbon trading cost is 676.83 yuan less than that under the time-of-use electricity price. Among them, IES1-2 with higher load levels are more affected by the dynamic electricity price mechanism, and the degree of reduction in carbon trading costs is more obvious. The operating costs of wind power and photovoltaic power, gas boiler gas consumption costs and demand response costs remain unchanged. The transaction cost of IES and shared energy storage under the dynamic electricity price mechanism is 735.87 yuan higher than that under the time-of-use electricity price, among which IES2 with less wind and solar power output has the largest increase in costs. The interaction cost between IES has no significant change and is less affected by the electricity price mechanism. The charging cost of EV in IES is lower than the cost of time-of-use electricity price, and the discharge income is higher than that under time-of-use electricity price, which is conducive to EV participation in IES scheduling and reducing the carbon emissions of the system.
[0253] 4.3 Impact of carbon emission range and carbon price on cost and carbon emissions
[0254] In order to verify the impact of the parameters that affect carbon trading costs on the dynamic pricing mechanism, the present invention modifies the length of the carbon trading interval in each period to 10-60kg, increasing by 10kg each time, and the carbon price in each interval is also increased by 120%-20% on the original basis, decreasing by 20% each time, and α increases by 0.1 from 0.18 to 0.58 each time, and then drops sharply from 0.58 to 0.08. Combining the above parameter settings, there are a total of 6 scenarios. Fig.13 The total cost of IES, total carbon trading cost and EV charging cost of the system under the above 6 parameter setting scenarios.
[0255] Depend on Fig.13 It can be seen that under the time-of-use electricity price mechanism, the total cost of EV charging and discharging does not change with the changes in the length of the carbon trading interval, the carbon trading price, and α. The EV charging and discharging cost under the dynamic electricity price mechanism varies greatly with the parameter settings, indicating that EV can be flexibly dispatched under different parameters of the dynamic electricity price mechanism. Under the six parameter settings, the carbon trading cost under the dynamic electricity price mechanism is lower than the cost under the time-of-use electricity price, indicating that the former is conducive to reducing system carbon emissions. Under the parameter settings of scenarios 2 and 3, the cost of EV charging and discharging under the dynamic electricity price is higher than the time-of-use electricity price, and the corresponding IES cost is lower than the time-of-use electricity price. The results of the remaining parameter setting scenarios are the opposite of the above.
[0256] 4.4 Impact of the number of EV charging piles on the economy and carbon emissions
[0257] Because the number of charging piles will affect the overall power of EV charging and discharging, in order to study the impact of this factor on the system, the present invention configures 15, 20, 25, 30, 35 and 40 charging piles in each IES. Figure 14-16 Partial costs of IES and EV with different numbers of charging piles.
[0258] Depend on Figure 14-16 It can be seen that the carbon trading costs of IES under both trading mechanisms have increased. The maximum and minimum differences of the carbon trading costs under the dynamic and time-sharing mechanisms are 1305.6k and 2148.1k respectively. This shows that with the increase in the number of charging piles, the carbon trading change rate under the dynamic electricity price mechanism is slower than that under the time-sharing electricity price mechanism. The former is more effective for the carbon reduction target. In addition, the cost of the former is significantly lower than that of the latter under the same parameter settings. The total cost of IES increases less under the time-sharing electricity price mechanism than under the dynamic electricity price mechanism. The cost increase of IES under the dynamic mechanism mainly comes from the charging cost of EV. Therefore, combined with the parameter settings 2 and 3 in the previous section, it can be inferred that under the parameters of scenarios 2 and 3, increasing the number of charging piles can coordinate the costs of EV and IES. Table 3 (costs of IES and EV) shows the costs of the two electricity price mechanisms under different numbers of charging piles when the parameters of scenario 3 are set.
[0259] Table 3
[0260]
[0261] As shown in Table 3, under the parameter settings of scenario 3, as the number of charging piles increases, the total cost growth rate of IES under the dynamic electricity price mechanism is lower than that of the time-of-use electricity price, and the former is lower than the latter. From the perspective of EV charging cost, it can be found that the EV charging cost decreases with the increase in the number of charging piles, among which the charging cost under the dynamic electricity price mechanism is lower than that of the time-of-use electricity price mechanism, indicating that the dynamic electricity price mechanism can reduce both the total operating cost of IES and the charging cost of EV. In addition, the dynamic electricity price mechanism also plays a significant role in reducing carbon emissions. The economic efficiency and environmental friendliness of the dynamic electricity price mechanism are better than the time-of-use electricity price mechanism.
[0262] 4.5 Cost and carbon emissions at different confidence levels
[0263] The uncertainty of wind power, photovoltaic power and load of IES will affect the operating cost of the system. This section analyzes the total cost of the system under uncertainty. The parameters are set to scenario 3, and the number of charging piles is 20 for each IES. The triangle fuzzy membership parameters are shown in Appendix Table 6 (membership parameters). Table 4 (costs at different confidence levels) shows the operating costs of the two electricity price mechanisms at different confidence levels.
[0264] Table 6
[0265] Fuzzy parameters <![CDATA[ω1]]> <![CDATA[ω2]]> <![CDATA[ω3]]> Wind power output 0.6 1 1.4 Photovoltaic output 0.5 1 1.5 load 0.9 1 1.1
[0266] Table 4
[0267]
[0268] As shown in Table 4, with the increase of confidence level, the total cost of IES continues to increase in both electricity price mechanisms, which shows that the high reliability of the system relies on high-cost investment. The EV charging cost does not change under the time-sharing motor mechanism, but shows a downward trend under the dynamic electricity price mechanism, indicating that with the increase of confidence level, the EV charging cost decreases and the discharge income increases. When the confidence level is higher than 90%, the charging cost of EV does not change much. The carbon trading cost under both electricity price mechanisms is positively correlated with the confidence level, that is, high reliability will cause higher carbon emissions. When the confidence level is less than 80%, the carbon trading difference under the two electricity price mechanisms gradually increases. When it is greater than 80%, the difference between the two gradually decreases. When the confidence level is between 85% and 90%, the difference between the EV charging cost and the total cost of IES under the two electricity price mechanisms is large, and the advantage of the dynamic electricity price mechanism is more obvious at this time.
[0269] From the above, it can be seen that in the context of electric vehicles participating in the integrated energy optimization operation and tapping the potential of electric vehicle scheduling, the present invention considers the uncertainty of wind power, photovoltaic output and load, establishes a multi-integrated energy system model with fuzzy opportunity programming constraints, and proposes a carbon-guided electric vehicle charging and discharging method to realize the interaction between IES and EV. Combined with relevant example analysis, the conclusions are as follows.
[0270] (1) The confidence level is related to the cost and carbon emissions of the system. When the system is highly reliable, the IES operating cost and carbon emissions will increase. The charging and discharging cost of EV is negatively correlated with the system reliability.
[0271] (2) Compared with time-of-use electricity prices, using the system's carbon level to adjust the EV charging and discharging prices and guiding EVs to participate in IES charging and discharging behavior can reduce the carbon emissions of the entire system and increase the charging and discharging benefits of EVs. Under appropriate parameter configuration, the dynamic electricity price mechanism based on carbon level is more economical and environmentally friendly than the time-of-use electricity price mechanism.
[0272] (3) Compared with the time-of-use electricity price mechanism, the dynamic electricity price mechanism can effectively improve the load curve, reduce the peak-to-valley difference of the system, and improve the reliability of system operation.
[0273] The series of detailed descriptions listed above are only specific descriptions of feasible implementation methods of the present invention. They are not intended to limit the scope of protection of the present invention. Any equivalent implementation methods or changes that do not deviate from the technical spirit of the present invention should be included in the scope of protection of the present invention.
[0274] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.
Claims
1. A two-layer optimization method based on dynamic electricity prices at carbon levels to guide EVs to participate in IES scheduling, characterized in that: The steps include: Modeling steps: building a multi-integrated energy system and electric vehicle system model, wherein the multi-integrated energy system and electric vehicle system model includes: a multi-region interconnected integrated energy system including a shared energy storage power station, a plurality of charging piles and a plurality of electric vehicles; the multi-region interconnected integrated energy system including a shared energy storage power station is used as an upper optimization system; a plurality of charging piles and a plurality of electric vehicles are used as a lower optimization system; Model optimization steps: Taking electric vehicles into consideration and taking economic optimization as the goal, an upper-level optimization scheduling model based on fuzzy opportunity constraints is established. The dynamic charging and discharging prices of electric vehicles are determined according to the carbon level of the integrated energy system, and electric vehicles are guided to be connected to the integrated energy system in an orderly manner. The lower-level electric vehicle charging and discharging model is established with the goal of minimizing the charging cost of electric vehicles.
2. The two-layer optimization method for guiding EVs to participate in IES scheduling based on dynamic electricity prices based on carbon levels according to claim 1 is characterized in that: The multi-regional interconnected integrated energy system containing a shared energy storage power station includes a first integrated energy system, a second integrated energy system and a third integrated energy system that can interact through a power grid. The first integrated energy system, the second integrated energy system and the third integrated energy system transmit electric energy to each other through the shared energy storage power station.
3. The two-layer optimization method for guiding EVs to participate in IES scheduling based on dynamic electricity prices based on carbon levels according to claim 2 is characterized in that: The first integrated energy system includes wind turbines and photovoltaic modules, and the load in the first integrated energy system is only electrical load; The second comprehensive energy system includes: photovoltaic modules, diesel generators, cogeneration units and gas boilers. The load of the second comprehensive energy system is electric load and thermal load. In the second comprehensive energy system: the gas boiler and the cogeneration unit use natural gas to supply heat to the thermal load, and the photovoltaic modules and diesel generators both supply energy to the electric load; the third comprehensive energy system includes: fans, photovoltaic modules, diesel generators, cogeneration units and gas boilers. The load of the third comprehensive energy system is electric load and thermal load. In the third comprehensive energy system: the gas boiler and the cogeneration unit use natural gas to supply heat to the thermal load, and the fans, photovoltaic modules and diesel generators both supply energy to the electric load; the first comprehensive energy system, the second comprehensive energy system, the third comprehensive energy system, the shared energy storage power station and the power grid consider the cost when performing electric energy interaction operations, and the cost is also considered when performing electric energy interaction operations between the first comprehensive energy system, the second comprehensive energy system and the third comprehensive energy system.
4. The two-layer optimization method for guiding EVs to participate in IES scheduling based on dynamic electricity prices based on carbon levels according to claim 3 is characterized in that: The cogeneration unit includes a gas turbine and a waste heat boiler, and its mathematical model is as follows: In the formula, is the output power of GT in the i-th integrated energy system at time t; η GT is the power generation efficiency of GT; R is the lower calorific value of natural gas; is the thermal power of the waste heat boiler in the i-th integrated energy system at time t; η WH is the waste heat recovery efficiency of the boiler; V GT,i,t It represents the amount of natural gas consumed by GT in the i-th integrated energy system at time t.
5. The two-layer optimization method for guiding EVs to participate in IES scheduling based on dynamic electricity prices based on carbon levels according to claim 4 is characterized in that: When calculating the operating cost of the upper-level optimization system, the transaction form between the integrated energy system and the shared energy storage power station is represented by the purchase and sale of electricity.
6. The two-layer optimization method for guiding EVs to participate in IES scheduling based on dynamic electricity prices based on carbon levels according to claim 5 is characterized in that: The implementation method of the model optimization step includes constructing a two-layer scheduling model of a multi-integrated energy system including electric vehicles. The method of constructing a two-layer scheduling model of a multi-integrated energy system including electric vehicles is as follows: S21, constructing the upper-level multi-integrated energy system objective function considering shared energy storage power stations: the multi-integrated energy system considering shared energy storage power stations takes the optimal daily operating cost as the objective function, and the upper-level multi-integrated energy system objective function considering shared energy storage power stations is composed of nine parts: diesel generator cost, electricity purchase and sales cost, wind and solar operation cost, cogeneration unit operation cost, gas boiler operation cost, demand response cost, carbon trading cost, service fee paid to shared energy storage power stations and interaction cost between integrated energy systems. The sum of the nine parts minus the electric vehicle charging and discharging cost is the total cost of the multi-integrated energy system objective function considering shared energy storage power stations; S22, constructing upper-level multi-integrated energy system constraints, wherein the upper-level multi-integrated energy system constraints include: cogeneration unit constraints, diesel generator constraints, power balance constraints, interaction constraints between integrated energy systems, and shared energy storage power station constraints; wherein: The constraint formula of the combined heat and power unit is: Where U GT With D GT They represent the upper and lower limits of the GT ramping power in the combined heat and power unit, respectively; Respectively represent the minimum and maximum values of GT output; The constraint formula of diesel generator is: In the formula, represents the 0-1 behavior variable of the i-th diesel generator at time t; Respectively represent the minimum and maximum output; U DIG , D DIG Respectively represent the upper and lower limits of the diesel generator climbing power; The power balance constraint formula is: In the formula, Indicates the thermal power of the gas boiler; Represents the heat load in the integrated energy system; Indicates fixed electrical load; They represent the charging and discharging power of the electric vehicle in the i-th integrated energy system at time t; The interaction constraints between the integrated energy systems are: In the formula, They represent the maximum power purchased and sold between integrated energy systems; They represent the 0-1 status of electricity purchase and sale between the i-th and j-th integrated energy systems respectively; The constraints that need to be met between shared energy storage power stations are as follows: In the formula, is the capacity of the shared energy storage power station at time t; They are the charging and discharging efficiency of the shared energy storage power station; are the charging and discharging power of the shared energy storage power station at time t respectively; They are the maximum charging and discharging power of the shared energy storage power station respectively; They are the charging and discharging 0-1 status bits of the shared energy storage power station; The power interaction and existence constraints between the shared energy storage power station and multiple integrated energy systems. The sum of the charging and discharging power of each integrated energy system is equal to the total charging and discharging power of the shared energy storage. S23, determining the objective function of the lower-level electric vehicle; the operating cost of the lower-level electric vehicle is mainly composed of the following two parts, which are the charging cost and the discharging benefit of the electric vehicle; In the formula, F1 and F2 represent the charging cost and discharging benefit of electric vehicles respectively; They represent the charging and discharging prices of electric vehicles at time t respectively; S24, determining the lower-level electric vehicle constraint conditions; S241, determining the overall power balance constraint of the electric vehicle according to a formula; In the formula, Respectively represent the total charging and discharging power of the electric vehicle at time t; Indicates the total charging power of the electric vehicle; Indicates the maximum charging power of electric vehicles; S242, determine the capacity and charging and discharging power constraints of the electric vehicle according to the following formula: In the formula, and Respectively represent the charging and discharging efficiency of electric vehicles; and They are the upper and lower limits of the battery capacity of the electric vehicle at time t; Respectively represent the total capacity of electric vehicles at 1 o'clock and 24 o'clock; is the maximum charging and discharging power of the electric vehicle during period t; S25, determining a dynamic pricing mechanism as follows; S251, according to the following formula, the carbon level of the system at each moment is used to guide the charging and discharging behavior of electric vehicles, and the output of other units in the system is changed through the charging and discharging of electric vehicles to achieve the purpose of carbon reduction; In the formula, They represent the free carbon quota and actual carbon emissions of the i-th integrated energy system at time t respectively; represents the carbon level at time t; S252, determine the dynamic charging and discharging price of the electric vehicle according to the following formula: In the formula, is the relative carbon content coefficient. When it is greater than 1, it means that the carbon content level of the system is increased after considering electric vehicles. When it is less than 1, it means that the carbon content level of the system is reduced after considering electric vehicles. To consider the carbon level after electric vehicles; are the dynamic electricity prices for electric vehicles to sell and purchase electricity, which are used to replace the charging and discharging prices; s,i,t,max 、p s,i,t,min are the maximum and minimum values of the time-of-use electricity price; p g,i,t,max 、p g,i,t,min They are the maximum and minimum values of the time-of-use electricity price.
7. The two-layer optimization method for guiding EVs to participate in IES scheduling based on dynamic electricity prices based on carbon levels according to claim 6 is characterized in that: The cost is calculated according to the following formula: Diesel Generator Cost In the formula, p DIG Indicates the price per unit output of a diesel generator; represents the output of the diesel generator in the i-th integrated energy system at time t; 0-1 variables representing the start and stop of the diesel generator at time t; They represent the single start and stop costs of the diesel generator respectively; Electricity purchase and sales costs In the formula, p g,t 、p s,t They represent the purchase and sale prices of electricity between the integrated energy system and the power grid; They represent the purchased and sold power of the i-th integrated energy system and the power grid respectively; Wind and solar operating costs In the formula, p WT 、p PV Represent the unit operating costs of wind power and photovoltaic power respectively; They represent the output of wind power and photovoltaic power in the i-th integrated energy system at time t respectively; Cogeneration unit operating costs In the formula, p CHP Indicates the unit price of natural gas; Gas boiler operating costs In the formula, represents the thermal power of the gas boiler at time t in the i-th integrated energy system; η GB Indicates the heating efficiency of the gas boiler; Demand response costs In the formula, represents the time-of-use electricity price of the power grid in period t; represents the dispatchable electric load at time t; represents the dispatchable load factor; The carbon trading costs are derived from carbon emissions from the power grid, diesel engines, gas boilers and gas turbines in cogeneration units.
8. The two-layer optimization method for guiding EVs to participate in IES scheduling based on dynamic electricity prices based on carbon levels according to claim 6 is characterized in that: The carbon trading cost calculation formulas for the first integrated energy system, the second integrated energy system, and the third integrated energy system are as follows: In the formula, represents free carbon allowances; represents the actual carbon emissions; α represents the base of free carbon quota; β represents the unit carbon emission cost of diesel generators; χ represents the unit carbon emission cost of the power grid; δ represents the unit carbon emission cost of natural gas; c tr,i represents the unit cost corresponding to the i-th carbon emission interval; λ i represents the boundary value of the i-th carbon emission interval; ε represents the unit price of the benefit of free carbon quota; They represent the actual carbon trading cost and the carbon trading cost without considering carbon quotas; Service fees paid to shared energy storage power stations In the formula, They respectively represent the amount of electricity purchased and stored by the integrated energy system from the energy storage power station; Represents the service fee of the energy storage power station; Interaction costs between integrated energy systems In the formula, They represent the purchase and sale prices of electricity between integrated energy systems; They respectively represent the power purchased and sold between the integrated energy systems.
9. The two-layer optimization method for guiding EVs to participate in IES scheduling based on dynamic electricity prices based on carbon levels according to claim 8 is characterized in that: The implementation method of the model optimization step includes constructing a fuzzy chance constrained programming, and the method of constructing a fuzzy chance constrained programming is as follows: S31, construct fuzzy parameter membership function: When fuzzy variables appear in the optimization process, fuzzy chance programming constraints are used to make the possibility of the constraint conditions satisfy a certain confidence level σ; the original problem is converted into the form of chance constraints through the confidence level: Where f(x) represents the objective function; C r {g(x,ζ)≤0}≥σ represents the confidence level of the fuzzy variable constraint satisfaction condition; g() represents the fuzzy variable constraint; x and ζ are the optimization variable and fuzzy variable respectively; The fuzzy parameters of intermittent output and load of wind and solar power in the dispatching period are expressed by triangular or trapezoidal functions: Where M F1 -M F4 Used to determine the shape of the membership function and represent the membership parameter; μ(M F ) represents the membership function; different membership parameters are determined according to the predicted values of wind power and load power: M Fc =ω c P yuc (31) Where M Fc is the cth membership parameter; ω c is the cth proportional coefficient, and its value range is [0,1]; P yuc is the parameter prediction value; in particular, when ω2=ω3, the fuzzy parameter is triangular, that is, M F2 =M F3 =P yuc ; S32, the clear equivalent form is used to solve the fuzzy chance constrained programming problem, and equation (17) is transformed into the corresponding clear equivalent class of equation (32); In the formula, The triangular membership functions of wind power, photovoltaic power and load are represented respectively; Formula (32) is used to replace the electric power balance constraint and combined with other constraints and objectives to establish a fuzzy chance constrained programming model for multi-integrated energy systems; S33, two-layer model solution: using fuzzy multi-decision method to select the best compromise solution of two-layer optimization results, In the formula, represents the satisfaction of the jth objective function in the kth result; γ k represents the standard satisfaction of the kth result; Z fin represents the best compromise solution; Represents the maximum and minimum values of the j-th target; Represents the jth target value in the kth result.