Engineering project exploration method, equipment, medium and product
Through the interaction between resource management equipment and survey auxiliary equipment, the resource pre-occupation mechanism and data update mechanism are adopted to solve the problem of network differences caused by changes in resource data in communication engineering design, improve the efficiency of engineering project survey and reduce costs.
Patent Information
- Application Number
- CN202410690035.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-30
- Publication Date
- 2024-10-18
AI Technical Summary
During the communication engineering design process, multiple construction projects and maintenance work on the existing network are carried out collaboratively, resulting in rapid changes in resource data, resulting in large differences between the engineering design and the actual network, thereby reducing the efficiency of engineering project exploration.
Through the interaction between resource management equipment and survey auxiliary equipment, the resource pre-occupation mechanism is adopted to achieve efficient resource allocation and optimal utilization, regularly update the stock resource data, correct abnormal resource data, ensure that the survey work is based on the latest resource data, and avoid resource changes. resulting network differences.
It improves the efficiency of engineering project investigation, reduces design costs, ensures the reasonable arrangement of concurrent design and construction resources for multiple projects, enhances resource management capabilities, and can effectively respond to resource changes.
Smart Images

Figure CN118798802A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of engineering exploration, and in particular to an engineering project exploration method, equipment, medium and product. Background Art
[0002] At present, the design work of communication engineering is mainly carried out in accordance with the process of design commissioning - design initiation - demand and related data investigation - on-site investigation and record keeping - program preparation - design review.
[0003] In actual design work, after the design is started, designers need to conduct a survey on project requirements and related data with the client. On the one hand, they need to clarify the project requirements, and on the other hand, they need to obtain static data on the current network status from resource management equipment or paper materials. For communication projects, this mainly includes network structure, equipment configuration, resource usage, working status, geographic location and other information, which will serve as the data basis for the next on-site investigation.
[0004] After completing the demand and related data investigation, it is necessary to carry out on-site engineering investigation, conduct on-site verification of the relevant data obtained previously, and generate investigation records based on project requirements.
[0005] However, existing networks often have multiple construction projects and maintenance work being carried out simultaneously. The resource data obtained during the survey phase is often quickly modified by other projects, such as machine position occupancy, system resource adjustment, etc. This will lead to large differences between the engineering design and the actual network, and the design plan needs to be adjusted, resulting in low efficiency in project surveys. Summary of the invention
[0006] The present invention provides an engineering project exploration method, equipment, medium and product, which are used to solve the problem of low efficiency of engineering project exploration in the prior art.
[0007] In a first aspect, the present invention provides a method for surveying an engineering project, comprising: Receiving resource call requests sent by survey auxiliary equipment for designing target engineering projects; Based on the resource call request, determining stock resource data that can be used to design the target engineering project, and feeding back the stock resource data to the exploration auxiliary equipment; receiving a pre-occupied resource request sent by the survey auxiliary device; the pre-occupied resource request is generated by the survey auxiliary device based on the stock resource data and the survey data; the survey data is obtained by surveyors conducting on-site surveys of the project based on the stock resource data; Verify resource status based on the pre-occupied resource request to obtain target resource information that can be used to design the target engineering project; The target resource information is sent to the survey auxiliary device; the target resource information is used by the survey auxiliary device to generate a survey result of the target engineering project.
[0008] In one embodiment, after feeding back the stock resource data to the survey auxiliary device and before receiving the pre-occupied resource request sent by the survey auxiliary device, the method further includes: Obtaining resource status results of the stock resource data at preset time intervals; According to the resource status result, the stock resource data is updated to obtain updated stock resource data, and the updated stock resource data is synchronized to the exploration auxiliary equipment.
[0009] In one embodiment, before receiving the pre-occupied resource request sent by the survey auxiliary device, it also includes: receiving abnormal resource data sent by the survey auxiliary device; the abnormal resource data refers to data in which the resource data recorded by the survey personnel when conducting the engineering site survey based on the stock resource data is different from the resource data recorded by the resource management device; Performing data verification based on the abnormal resource data to obtain a data verification result; The resource data is corrected according to the data verification result to obtain corrected resource data.
[0010] In one embodiment, the verifying of resource status based on the pre-occupied resource request to obtain target resources that can be used to design the target engineering project includes: Determining the pre-occupied resources in the pre-occupied resource request; Verifying the resource status of the pre-occupied resources to obtain a resource status result; Allocating initial resources that can be used to design the target engineering project according to the resource status result; The initial resources are pre-occupied with resource identification to obtain target resources that can be used to design the target engineering project.
[0011] In a second aspect, the present invention further provides a method for surveying an engineering project, comprising: Sending a resource call request for designing a target engineering project to a resource management device; Receiving stock resource data sent by the resource management device; the stock resource data is determined by the resource management device based on the resource call request; Generate a pre-occupied resource request based on the survey data and the stock resource data, and send the pre-occupied resource request to the resource management device; the survey data is obtained by survey personnel conducting on-site engineering surveys based on the stock resource data; receive and confirm the target resource information sent by the resource management device; the target resource information is generated by the resource management device verifying the resource status based on the pre-occupied resource request; Based on the target resource information and the survey data, a survey result of the target engineering project is generated.
[0012] In one embodiment, before generating a pre-occupied resource request based on the survey data and the stock resource data, the method further includes: Determining whether there is a difference between the resource data in the exploration data and the stock resource data; If there is a difference, the resource data with the difference is determined as abnormal resource data, and the abnormal resource data is fed back to the resource management device; the abnormal resource data is used by the resource management device to correct the resource data.
[0013] In a third aspect, the present invention further provides a resource management device, comprising: A first receiving module is used to receive a resource call request for designing a target engineering project sent by the survey auxiliary equipment; A determination module, configured to determine, based on the resource call request, stock resource data that can be used to design the target engineering project, and feed the stock resource data back to the exploration auxiliary equipment; A second receiving module is used to receive a pre-occupied resource request sent by the survey auxiliary device; the pre-occupied resource request is generated by the survey auxiliary device based on the stock resource data and the survey data; the survey data is obtained by surveyors conducting on-site surveys of the project based on the stock resource data; A resource status verification module, used to verify the resource status based on the pre-occupied resource request, and obtain target resource information that can be used to design the target engineering project; The sending module is used to send the target resource information to the survey auxiliary equipment; the target resource information is used by the survey auxiliary equipment to generate the survey result of the target engineering project.
[0014] In a fourth aspect, the present invention further provides an exploration auxiliary device, comprising: A sending module, used for sending a resource call request for designing a target engineering project to a resource management device; A first receiving module, configured to receive stock resource data sent by the resource management device; the stock resource data is determined by the resource management device based on the resource call request; A first generating module is used to generate a pre-occupied resource request based on the survey data and the stock resource data, and send the pre-occupied resource request to the resource management device; the survey data is obtained by survey personnel conducting on-site surveys based on the stock resource data; A second receiving module is used to receive and confirm the target resource information sent by the resource management device; the target resource information is generated by the resource management device based on the resource status verification of the pre-occupied resource request; The second generating module is used to generate the survey result of the target engineering project based on the target resource information and the survey data.
[0015] In a fifth aspect, the present invention provides a device, comprising an electronic device, wherein the electronic device comprises a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, the steps of any one of the engineering project survey methods described above are implemented.
[0016] In a sixth aspect, the present invention further provides a medium, comprising a non-transitory computer-readable storage medium on which a computer program is stored, and when the computer program is executed by a processor, the steps of any of the above-mentioned engineering project investigation methods are implemented.
[0017] In the seventh aspect, the present invention also provides a product, which includes a computer program product, and the computer program product includes a computer program. The computer program can be stored on a non-transitory computer-readable storage medium, and when the computer program is executed by the processor, it implements the steps of any of the engineering project investigation methods described above.
[0018] The project survey method, equipment, medium and product provided by the present invention realize efficient resource allocation and optimal utilization through the interaction between resource management equipment and survey auxiliary equipment. Taking into account the impact of network differences caused by the coordinated development of multiple engineering projects in the existing network, a resource pre-occupancy mechanism is adopted in the process of project survey to ensure the coordination of the project with other projects, ensure the reasonable arrangement of resources for the parallel design and construction of multiple projects, improve the overall resource management capabilities, and can well cope with changes in resources during the survey process, avoid the problem of large network differences caused by resource changes, greatly improve the efficiency of project survey, and reduce the cost of project design. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] In order to more clearly illustrate the technical solutions in the present invention or the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0020] Figure 1 It is one of the flow diagrams of the engineering project survey method provided by the present invention.
[0021] Figure 2 This is the second flow chart of the engineering project survey method provided by the present invention.
[0022] Figure 3 It is a schematic diagram of the overall process of the engineering project survey method provided by the present invention.
[0023] Figure 4 It is a structural diagram of the resource management device provided by the present invention.
[0024] Figure 5 It is a structural schematic diagram of the exploration auxiliary equipment provided by the present invention.
[0025] Figure 6 It is a structural schematic diagram of the electronic device provided by the present invention. DETAILED DESCRIPTION
[0026] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the drawings of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0027] The terms "first", "second", etc. in the present invention are used to distinguish similar objects, rather than to describe a specific order or sequence. It should be understood that the numbers used in this way can be interchanged where appropriate, so that the embodiments of the present invention can be implemented in an order other than those illustrated or described herein.
[0028] Combine the following Figure 1-Figure 6 Describe the engineering project survey method, equipment, medium and product provided by the present invention.
[0029] Combination Figure 1 , Figure 1 It is one of the flow diagrams of the engineering project survey method provided by the present invention.
[0030] like Figure 1As shown, the engineering project survey method provided by the present invention includes but is not limited to the following steps: Step 101: receiving a resource call request for designing a target engineering project sent by an exploration auxiliary device; Step 102: Based on the resource call request, determine the stock resource data that can be used to design the target engineering project, and feed the stock resource data back to the exploration auxiliary equipment; Step 103: receiving a pre-occupied resource request sent by the survey auxiliary device; Step 104: Verify resource status based on the pre-occupied resource request to obtain target resource information that can be used to design the target engineering project; Step 105: Send the target resource information to the survey auxiliary device.
[0031] It should be noted that the project survey method provided in the embodiment of the present invention is implemented based on the project survey device. Project survey is an important task before the start of a project, involving investigation, measurement and evaluation of the area where the project is located to determine the feasibility, resource distribution and potential environmental impact of the project. The project survey method proposed in the present invention is applicable to various types of projects. The embodiment of the present invention takes a communication project as an example for illustration.
[0032] In the engineering project survey, the resource management equipment and the survey auxiliary equipment are connected, and the engineering project survey is realized through the interaction between the resource management equipment and the survey auxiliary equipment. Among them, the resource management equipment provides monitoring and management of resources, and the survey auxiliary equipment provides field data for on-site survey. The survey auxiliary equipment can be the survey terminal of the online design platform or an independent survey tool platform.
[0033] Specifically, the on-site investigation task of the target engineering project is initiated during the planning stage or project establishment stage before the launch of the target engineering project.
[0034] After the on-site investigation task is launched, the project team will determine the relevant data requirements of the target project based on factors such as the nature, scale, environment and preliminary research data of the target project. For communication projects, the relevant data requirements of the target project mainly include network structure, equipment configuration, resource usage, working status, geographical location and other data, which serve as the data basis for the next on-site investigation.
[0035] Furthermore, the project team will record the data requirements related to the target engineering project on the survey auxiliary equipment. Furthermore, the survey auxiliary equipment will generate a resource call request for designing the target engineering project based on the data requirements related to the target engineering project, and send the resource call request to the resource management device.
[0036] Furthermore, after receiving the resource calling request sent by the exploration auxiliary device, the resource management device parses the resource calling request to obtain a request parsing result.
[0037] Furthermore, the resource management device determines the identity of the resource caller according to the request parsing result, and performs identity authentication according to the identity of the resource caller to ensure that the resource caller has legal authority to access the requested data.
[0038] Furthermore, if the identity authentication fails, the resource management device generates information that the resource data cannot be called, and feeds back the information that the resource data cannot be called to the exploration auxiliary device.
[0039] Furthermore, if the identity authentication is successful, the resource management device determines the stock resource data of the existing network according to the request analysis result, and feeds back the stock resource data of the existing network to the exploration auxiliary device.
[0040] Furthermore, after receiving the stock resource data sent by the resource management device, the survey auxiliary device performs a visual display based on the stock resource data, so that survey personnel can conduct on-site surveys based on the stock resource data displayed by the survey auxiliary device to obtain survey data.
[0041] Furthermore, the survey auxiliary equipment determines the pre-occupied resources based on the survey data and the stock resource data.
[0042] Furthermore, the survey auxiliary device generates a pre-occupied resource request according to the pre-occupied resources, and sends the pre-occupied resource request to the resource management device.
[0043] Furthermore, after receiving the pre-occupied resource request sent by the survey auxiliary device, the resource management device parses the pre-occupied resource request to obtain a request parsing result.
[0044] Furthermore, the resource management device verifies the resource status according to the request parsing result to obtain the target resources that can be used to design the target engineering project. That is to say, the resource management device verifies the status and usage of the pre-occupied resources according to the request parsing result to obtain the target resources that can be used to design the target engineering project.
[0045] Furthermore, the resource management device generates target resource information according to the target resource, and sends the target resource information to the exploration auxiliary device.
[0046] Furthermore, after receiving the target resource information sent by the resource management device, the survey auxiliary equipment confirms the target resource information. Furthermore, the survey auxiliary equipment generates a survey result of the target engineering project based on the target resource information, and stores the finalized survey result to support the later preparation of the target engineering project plan.
[0047] The engineering project survey method provided by the present invention realizes efficient resource allocation and optimal utilization through the interaction between resource management equipment and survey auxiliary equipment. Taking into account the influence of network differences caused by the coordinated development of multiple engineering projects in the existing network, a resource pre-occupancy mechanism is adopted in the process of engineering project survey to ensure the coordination of the engineering project with other engineering projects, ensure the reasonable arrangement of resources for the parallel design and construction of multiple projects, improve the overall resource management ability, can well cope with the changes of resources in the survey process, avoid the problem of large network differences caused by resource changes, greatly improve the efficiency of engineering project survey, and reduce the cost of engineering project design.
[0048] Furthermore, after feeding back the stock resource data to the survey auxiliary device and before receiving the pre-occupied resource request sent by the survey auxiliary device, it also includes: Obtaining resource status results of the stock resource data at preset time intervals; According to the resource status result, the stock resource data is updated to obtain updated stock resource data, and the updated stock resource data is synchronized to the exploration auxiliary equipment.
[0049] It should be noted that the exploration work of engineering projects usually lasts for a long time, which may last for several hours or even several days. During this period of time, the stock resource data will also face the risk of change and adjustment. For example, other engineering projects of the same period have completed the exploration work before the target engineering project. At this time, some resource data in the stock resource data may be pre-occupied by other engineering projects of the same period. Then, the stock resource data will be biased, and the exploration data will be biased due to the change of the stock resource data. Therefore, it is necessary to regularly synchronize the updated stock resource data from the resource management equipment to the exploration auxiliary equipment to ensure that the exploration work is carried out on the basis of the latest resource data, so as to avoid deviations in the exploration data.
[0050] Specifically, the resource management device obtains the resource status results of the existing resource data at a preset time interval, and the resource status results include resource status and usage. The preset time interval is set according to actual conditions, and different levels of time intervals such as minutes and hours can be selected as needed.
[0051] Furthermore, the resource management device updates the stock resource data according to the resource status results, that is, removes the pre-occupied resources from the stock resource data to obtain updated stock resource data, and synchronizes the updated stock resource data to the exploration auxiliary equipment. Further, the exploration auxiliary equipment visualizes the regularly updated stock resource data so that surveyors can conduct on-site engineering surveys based on the regularly updated stock resource data. That is to say, the display page of the exploration auxiliary equipment will be updated at preset time intervals to display the latest resource data so that surveyors can conduct on-site engineering surveys based on the latest resource data.
[0052] It should be noted that after the project team obtains the regularly updated stock resource data, it needs to verify the consistency between the regularly updated stock resource data and the actual site conditions. Therefore, it is necessary to conduct on-site surveys based on the regularly updated stock resource data to ensure the availability and reliability of the data.
[0053] The embodiment of the present invention uses a data synchronization mechanism to regularly update the change status of stock resources on the exploration auxiliary equipment, effectively ensuring the unification of the exploration data and the resource data of the resource management equipment, and improving the accuracy of the engineering project exploration.
[0054] Furthermore, before receiving the pre-occupied resource request sent by the survey auxiliary device, it also includes: receiving abnormal resource data sent by the survey auxiliary device; the abnormal resource data refers to data that is different from the resource data recorded by the survey personnel when conducting on-site engineering survey based on the stock resource data and the resource data recorded by the resource management device; Performing data verification based on the abnormal resource data to obtain a data verification result; The resource data is corrected according to the data verification result to obtain corrected resource data.
[0055] Specifically, after the surveyors conduct an engineering site survey based on the regularly updated stock resource data, the surveyors record the survey data on the survey auxiliary equipment.
[0056] Furthermore, the exploration auxiliary equipment determines abnormal resource data based on the exploration data, wherein the abnormal resource data refers to data that is different from the resource data recorded by the exploration personnel when conducting on-site engineering exploration based on the regularly updated stock resource data and the resource data recorded by the resource management equipment, and the differences may include differences in the location, status, quantity, etc. of the resources.
[0057] Furthermore, the exploration auxiliary device sends the abnormal resource data to the resource management device. The abnormal resource data sent to the resource management device may be in a graphical form or in a variety of forms such as text and charts, which are set according to actual conditions.
[0058] Furthermore, after receiving the abnormal resource data sent by the exploration auxiliary device, the resource management device performs data verification based on the abnormal resource data to obtain a data verification result.
[0059] Furthermore, the resource management device corrects the resource data according to the data verification result to obtain corrected resource data.
[0060] The embodiment of the present invention performs accurate engineering site surveys based on a data synchronization mechanism. After obtaining the survey data, it feeds back resource data that differs between the engineering site and the resource management device, further realizing iterative updating and optimization of the resource management device data, effectively ensuring the unification of the survey data and the resource data of the resource management device, and improving the accuracy of engineering project surveys.
[0061] Further, based on step 104, the resource status verification is performed based on the pre-occupied resource request to obtain target resources that can be used to design the target engineering project, including: Determining the pre-occupied resources in the pre-occupied resource request; Verifying the resource status of the pre-occupied resources to obtain a resource status result; Allocating initial resources that can be used to design the target engineering project according to the resource status result; The initial resources are pre-occupied with resource identification to obtain target resources that can be used to design the target engineering project.
[0062] Specifically, the resource management device parses the pre-occupied resource request to obtain a request parsing result, and determines the pre-occupied resource according to the request parsing result.
[0063] Furthermore, the resource management device verifies the resource status of the pre-occupied resources to obtain a resource status result.
[0064] Furthermore, the resource management device allocates initial resources that can be used to design the target engineering project according to the resource status result and in accordance with preset allocation rules while ensuring that the resources are normal and not occupied, wherein the preset allocation rules are set according to actual conditions.
[0065] Furthermore, the resource management device performs pre-occupied resource identification on the initial resources to obtain target resources that can be used to design the target engineering project.
[0066] The embodiment of the present invention ensures the coordination of the engineering project with other engineering projects through the resource pre-occupancy mechanism, ensures the reasonable arrangement of resources for the parallel design and construction of multiple projects, and improves the overall resource management capabilities. It can well cope with changes in resources during the survey process, such as equipment pre-occupancy, resource cutover, etc., avoids the problem of large network differences caused by resource changes, greatly improves the efficiency of engineering project survey, and reduces the cost of engineering project design.
[0067] Combination Figure 2 , Figure 2 This is the second flow chart of the engineering project survey method provided by the present invention.
[0068] like Figure 2 As shown, the engineering project survey method provided by the present invention includes but is not limited to the following steps: Step 201: Sending a resource call request for designing a target engineering project to a resource management device; Step 202: receiving the stock resource data sent by the resource management device; Step 203: Generate a pre-occupied resource request based on the survey data and the stock resource data, and send the pre-occupied resource request to the resource management device; Step 204: Receive and confirm the target resource information sent by the resource management device; Step 205: Generate a survey result of the target engineering project based on the target resource information and the survey data.
[0069] Specifically, the on-site investigation task of the target engineering project is initiated during the planning stage or project establishment stage before the launch of the target engineering project.
[0070] After the on-site investigation mission is launched, the project team will determine the relevant data requirements for the target project based on factors such as the nature, scale, environment and preliminary research data of the target project.
[0071] Furthermore, the project team will record the data requirements related to the target engineering project on the survey auxiliary equipment. Furthermore, the survey auxiliary equipment will generate a resource call request for designing the target engineering project based on the data requirements related to the target engineering project, and send the resource call request to the resource management device.
[0072] Furthermore, after receiving the resource call request sent by the survey auxiliary device, the resource management device determines the stock resource data that can be used to design the target engineering project based on the resource call request, and feeds the stock resource data back to the survey auxiliary device.
[0073] Furthermore, the resource management device updates the stock resource data at preset time intervals to obtain regularly updated stock resource data, and synchronizes the regularly updated stock resource data to the exploration auxiliary device.
[0074] Furthermore, after receiving the regularly updated stock resource data sent by the resource management device, the exploration auxiliary equipment performs a visual display based on the regularly updated stock resource data, and the display method can be graphical display, text display, icon display and other display forms.
[0075] Furthermore, the survey personnel conduct engineering site surveys based on the regularly updated stock resource data displayed by the survey auxiliary equipment, obtain survey data, and record the survey data in the survey auxiliary equipment.
[0076] It should be noted that the survey personnel go to the communication project site and start resource survey according to the predetermined area or task scope, which may include field observation and measurement of communication facilities, equipment, lines, antennas and other resources. Based on the regularly updated stock resource data in the resource management equipment, the survey personnel will compare the field observations with the system records. The survey personnel will check the location, status, specifications, quantity and other information of the resources, and record any discrepancies in the resource data.
[0077] Furthermore, the auxiliary survey system generates a preliminary design plan for the target engineering project based on the survey data and regularly updated stock resource data, and determines the pre-occupied resources based on the preliminary design plan.
[0078] Furthermore, the survey auxiliary equipment generates a pre-occupied resource request based on the pre-occupied resources, and sends the pre-occupied resource request to the resource management equipment to apply for resource pre-occupancy from the resource management equipment, thereby ensuring the feasibility of the subsequent design plan and coordinating the use of resources for other projects.
[0079] Furthermore, after receiving the pre-occupied resource request sent by the survey auxiliary device, the resource management device verifies the resource status based on the pre-occupied resource request to obtain target resources that can be used to design the target engineering project.
[0080] Furthermore, the resource management device generates target resource information according to the target resource, and sends the target resource information to the exploration auxiliary device.
[0081] Furthermore, after receiving the target resource information sent by the resource management device, the exploration auxiliary device confirms the target resource information.
[0082] Furthermore, the exploration auxiliary equipment generates exploration results of the target engineering project based on the target resource information and exploration data, and stores the exploration results in a final form to support the subsequent preparation of the target engineering project plan.
[0083] The engineering project survey method provided by the present invention realizes efficient resource allocation and optimal utilization through the interaction between resource management equipment and survey auxiliary equipment, adopts a resource pre-occupancy mechanism, ensures the coordination of the engineering project with other engineering projects, ensures the reasonable arrangement of resources for the parallel design and construction of multiple projects, and improves the overall resource management capabilities. It can well cope with changes in resources during the survey process, such as equipment pre-occupancy, resource cutover, etc., avoids the problem of large network differences caused by resource changes, greatly improves the efficiency of engineering project survey, and reduces the cost of engineering project design.
[0084] Furthermore, before generating a pre-occupied resource request based on the survey data and the stock resource data, the method further includes: Determining whether there is a difference between the resource data in the exploration data and the stock resource data; If there is a difference, the resource data with the difference is determined as abnormal resource data, and the abnormal resource data is fed back to the resource management device; the abnormal resource data is used by the resource management device to correct the resource data.
[0085] Specifically, the auxiliary exploration system determines whether there is a difference between the resource data in the exploration data and the regularly updated stock resource data.
[0086] Furthermore, if there is no difference, the auxiliary exploration system does not need to feedback the difference in resource data to the resource management device.
[0087] Furthermore, if there is a difference, the auxiliary exploration system determines the resource data with the difference as abnormal resource data, and feeds back the abnormal resource data to the resource management device.
[0088] Furthermore, after receiving the abnormal resource data sent by the auxiliary exploration system, the resource management device verifies the abnormal resource data to obtain a data verification result.
[0089] Furthermore, the resource management device corrects the resource data according to the data verification result to obtain corrected resource data.
[0090] The embodiment of the present invention performs accurate engineering site surveys based on a data synchronization mechanism. After obtaining the survey data, it feeds back resource data that differs between the engineering site and the resource management device, further realizing iterative updating and optimization of the resource management device data, effectively ensuring the unification of the survey data and the resource data of the resource management device, and improving the accuracy of engineering project surveys.
[0091] Combination Figure 3 , Figure 3 It is a schematic diagram of the overall process of the engineering project investigation method provided by the present invention. Therefore, the overall process of the engineering project investigation method is as follows: During the planning stage or project establishment stage before the launch of the target engineering project, the on-site investigation task of the target engineering project is initiated.
[0092] After the on-site investigation mission is launched, the project team will determine the relevant data requirements for the target project based on factors such as the nature, scale, environment and preliminary research data of the target project.
[0093] Furthermore, the project team will record the data requirements related to the target engineering project on the survey auxiliary equipment. Furthermore, the survey auxiliary equipment will generate a resource call request for designing the target engineering project based on the data requirements related to the target engineering project, and send the resource call request to the resource management device.
[0094] Furthermore, after receiving the resource calling request sent by the exploration auxiliary device, the resource management device parses the resource calling request to obtain a request parsing result.
[0095] Furthermore, the resource management device determines the identity of the resource caller according to the request parsing result, and performs identity authentication according to the identity of the resource caller to ensure that the resource caller has legal authority to access the requested data.
[0096] Furthermore, if the identity authentication fails, the resource management device generates information that the resource data cannot be called, and feeds back the information that the resource data cannot be called to the exploration auxiliary device.
[0097] Furthermore, if the identity authentication is successful, the resource management device determines the stock resource data of the existing network according to the request analysis result, and feeds back the stock resource data of the existing network to the exploration auxiliary device.
[0098] Furthermore, the resource management device updates the stock resource data at a preset time interval to obtain updated stock resource data, and synchronizes the updated stock resource data to the exploration auxiliary device.
[0099] Furthermore, after receiving the regularly updated stock resource data sent by the resource management device, the exploration auxiliary device performs a visual display based on the regularly updated stock resource data.
[0100] Furthermore, the survey personnel conduct engineering site surveys based on the regularly updated stock resource data displayed by the survey auxiliary equipment, obtain survey data, and record the survey data in the survey auxiliary equipment.
[0101] Furthermore, the auxiliary exploration system determines whether there is a difference between the resource data in the exploration data and the regularly updated stock resource data.
[0102] Furthermore, if there is no difference, the auxiliary exploration system does not need to feedback the difference in resource data to the resource management device.
[0103] Furthermore, if there is a difference, the auxiliary exploration system determines the resource data with the difference as abnormal resource data, and feeds back the abnormal resource data to the resource management device.
[0104] Furthermore, after receiving the abnormal resource data sent by the auxiliary exploration system, the resource management device verifies the abnormal resource data to obtain a data verification result.
[0105] Furthermore, the resource management device corrects the resource data according to the data verification result to obtain corrected resource data.
[0106] Furthermore, the auxiliary survey system generates a preliminary design plan for the target engineering project based on the survey data and regularly updated stock resource data, and determines the pre-occupied resources based on the preliminary design plan.
[0107] Furthermore, the survey auxiliary device generates a pre-occupied resource request according to the pre-occupied resources, and sends the pre-occupied resource request to the resource management device.
[0108] Furthermore, the resource management device analyzes the pre-occupied resource request to obtain a request analysis result, and determines the pre-occupied resource according to the request analysis result.
[0109] Furthermore, the resource management device verifies the resource status of the pre-occupied resources to obtain a resource status result.
[0110] Furthermore, the resource management device allocates initial resources that can be used to design the target engineering project according to the resource status result and in accordance with preset allocation rules while ensuring that the resources are normal and not occupied.
[0111] Furthermore, the resource management device performs pre-occupied resource identification on the initial resources to obtain target resources that can be used to design the target engineering project.
[0112] Furthermore, the resource management device generates target resource information according to the target resource, and sends the target resource information to the exploration auxiliary device.
[0113] Furthermore, after receiving the target resource information sent by the resource management device, the exploration auxiliary device confirms the target resource information.
[0114] Furthermore, the exploration auxiliary equipment generates exploration results of the target engineering project based on the target resource information and exploration data, and stores the exploration results in a final form to support the subsequent preparation of the target engineering project plan.
[0115] Furthermore, the present invention also provides an engineering project survey device.
[0116] Reference Figure 4 , Figure 4 It is a structural diagram of the resource management device provided by the present invention.
[0117] The resource management device comprises: The first receiving module 410 is used to receive a resource call request for designing a target engineering project sent by the survey auxiliary device; the determining module 420 is used to determine the stock resource data that can be used to design the target engineering project based on the resource call request, and feed the stock resource data back to the survey auxiliary device; The second receiving module 430 is used to receive the pre-occupied resource request sent by the survey auxiliary device; the pre-occupied resource request is generated by the survey auxiliary device based on the stock resource data and the survey data; the survey data is obtained by the surveyor performing an engineering site survey based on the stock resource data; A resource status verification module 440, configured to verify the resource status based on the pre-occupied resource request, and obtain target resource information that can be used to design the target engineering project; The sending module 450 is used to send the target resource information to the survey auxiliary device; the target resource information is used by the survey auxiliary device to generate the survey result of the target engineering project.
[0118] The resource management device provided by the present invention realizes efficient resource allocation and optimal utilization through the interaction between the resource management device and the exploration auxiliary equipment. Taking into account the influence of network differences caused by the coordinated development of multiple engineering projects in the existing network, a resource pre-occupancy mechanism is adopted in the process of engineering project exploration to ensure the coordination of the engineering project with other engineering projects, ensure the reasonable arrangement of resources for the parallel design and construction of multiple projects, and improve the overall resource management ability. It can well cope with the changes of resources in the exploration process, avoid the problem of large network differences caused by resource changes, greatly improve the efficiency of engineering project exploration, and reduce the cost of engineering project design.
[0119] Furthermore, the engineering project survey device is also used for: Obtaining resource status results of the stock resource data at preset time intervals; According to the resource status result, the stock resource data is updated to obtain updated stock resource data, and the updated stock resource data is synchronized to the exploration auxiliary equipment.
[0120] Furthermore, the engineering project survey device is also used for: Receive abnormal resource data sent by the survey auxiliary equipment; the abnormal resource data refers to data that is different from the resource data recorded by the survey personnel when conducting on-site engineering survey based on the stock resource data and the resource data recorded by the resource management equipment; Performing data verification based on the abnormal resource data to obtain a data verification result; The resource data is corrected according to the data verification result to obtain corrected resource data.
[0121] Furthermore, the resource status verification module 440 is also used to: Determining the pre-occupied resources in the pre-occupied resource request; Verifying the resource status of the pre-occupied resources to obtain a resource status result; Allocating initial resources that can be used to design the target engineering project according to the resource status result; The initial resources are pre-occupied with resource identification to obtain target resources that can be used to design the target engineering project.
[0122] Reference Figure 5 , Figure 5 It is a structural schematic diagram of the exploration auxiliary equipment provided by the present invention.
[0123] The exploration auxiliary equipment includes: A sending module 510 is used to send a resource call request for designing a target engineering project to a resource management device; A first receiving module 520 is configured to receive stock resource data sent by the resource management device; the stock resource data is determined by the resource management device based on the resource call request; The first generating module 530 is used to generate a pre-occupied resource request based on the survey data and the stock resource data, and send the pre-occupied resource request to the resource management device; the survey data is obtained by the survey personnel performing on-site survey on the basis of the stock resource data; The second receiving module 540 is used to receive and confirm the target resource information sent by the resource management device; the target resource information is generated by the resource management device based on the resource status verification of the pre-occupied resource request; The second generating module 550 is used to generate the survey result of the target engineering project based on the target resource information and the survey data.
[0124] The exploration auxiliary equipment provided by the present invention realizes efficient resource allocation and optimal utilization through the interaction between the resource management equipment and the exploration auxiliary equipment, adopts the resource pre-occupancy mechanism, ensures the coordination of the engineering project with other engineering projects, ensures the reasonable arrangement of resources for the parallel design and construction of multiple projects, and improves the overall resource management capabilities. It can well cope with changes in resources during the exploration process, such as equipment pre-occupancy, resource cutover, etc., avoids the problem of large network differences caused by resource changes, greatly improves the efficiency of engineering project exploration, and reduces the cost of engineering project design.
[0125] The survey auxiliary equipment is also used for: Determining whether there is a difference between the resource data in the exploration data and the stock resource data; If there is a difference, the resource data with the difference is determined as abnormal resource data, and the abnormal resource data is fed back to the resource management device; the abnormal resource data is used by the resource management device to correct the resource data.
[0126] It should be noted that the resource management device and exploration auxiliary device provided by the present invention can execute the engineering project exploration method described in any of the above embodiments during specific operation, which will not be elaborated in this embodiment.
[0127] Figure 6 is a schematic diagram of the structure of the electronic device provided by the present invention, such as Figure 6As shown, the electronic device may include: a processor (processor) 610, a communication interface (Communications Interface) 620, a memory (memory) 630 and a communication bus 640, wherein the processor 610, the communication interface 620, and the memory 630 communicate with each other through the communication bus 640. The processor 610 can call the logic instructions in the memory 630 to execute the engineering project survey method, which includes: receiving a resource call request for designing a target engineering project sent by a survey auxiliary device; based on the resource call request, determining the stock resource data that can be used to design the target engineering project, and feeding back the stock resource data to the survey auxiliary device; receiving a pre-occupied resource request sent by the survey auxiliary device; the pre-occupied resource request is generated by the survey auxiliary device based on the stock resource data and the survey data; the survey data is obtained by the survey personnel through an engineering site survey based on the stock resource data; verifying the resource status based on the pre-occupied resource request to obtain the target resources that can be used to design the target engineering project; generating target resource information based on the target resources; sending the target resource information to the survey auxiliary device; the target resource information is used by the survey auxiliary device to generate the survey result of the target engineering project.
[0128] In addition, the logic instructions in the above-mentioned memory 630 can be implemented in the form of a software functional unit and can be stored in a computer-readable storage medium when it is sold or used as an independent product. Based on such an understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk and other media that can store program codes.
[0129] On the other hand, the present invention also provides a computer program product, which includes a computer program stored on a non-transitory computer-readable storage medium, and the computer program includes program instructions. When the program instructions are executed by a computer, the computer can execute the engineering project survey method provided by the above-mentioned embodiments, the method including: receiving a resource call request for designing a target engineering project sent by a survey auxiliary device; based on the resource call request, determining the stock resource data that can be used to design the target engineering project, and feeding back the stock resource data to the survey auxiliary device; receiving a pre-occupied resource request sent by the survey auxiliary device; the pre-occupied resource request is generated by the survey auxiliary device based on the stock resource data and the survey data; the survey data is obtained by the survey personnel conducting an engineering site survey based on the stock resource data; based on the pre-occupied resource request, verifying the resource status to obtain the target resources that can be used to design the target engineering project; generating target resource information based on the target resources; sending the target resource information to the survey auxiliary device; the target resource information is used by the survey auxiliary device to generate a survey result for the target engineering project.
[0130] On the other hand, the present invention also provides a non-transitory computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, is implemented to execute the engineering project survey method provided by the above-mentioned embodiments, the method comprising: receiving a resource call request for designing a target engineering project sent by a survey auxiliary device; based on the resource call request, determining the stock resource data that can be used to design the target engineering project, and feeding back the stock resource data to the survey auxiliary device; receiving a pre-occupied resource request sent by the survey auxiliary device; the pre-occupied resource request is generated by the survey auxiliary device based on the stock resource data and the survey data; the survey data is obtained by surveyors conducting an engineering site survey based on the stock resource data; verifying the resource status based on the pre-occupied resource request to obtain the target resources that can be used to design the target engineering project; generating target resource information based on the target resources; sending the target resource information to the survey auxiliary device; the target resource information is used by the survey auxiliary device to generate a survey result for the target engineering project.
[0131] The device embodiments described above are merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Ordinary technicians in this field can understand and implement it without paying creative labor.
[0132] Through the description of the above implementation methods, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a necessary general hardware platform, and of course, it can also be implemented by hardware. Based on this understanding, the above technical solution is essentially or the part that contributes to the prior art can be embodied in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a disk, an optical disk, etc., including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each embodiment or some parts of the embodiments.
[0133] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A method for surveying an engineering project, characterized in that: Applicable to resource management equipment, including: Receiving resource call requests sent by survey auxiliary equipment for designing target engineering projects; Based on the resource call request, determining stock resource data that can be used to design the target engineering project, and feeding back the stock resource data to the exploration auxiliary equipment; receiving a pre-occupied resource request sent by the survey auxiliary device; the pre-occupied resource request is generated by the survey auxiliary device based on the stock resource data and the survey data; the survey data is obtained by surveyors conducting on-site surveys of the project based on the stock resource data; Verify resource status based on the pre-occupied resource request to obtain target resource information that can be used to design the target engineering project; The target resource information is sent to the survey auxiliary device; the target resource information is used by the survey auxiliary device to generate a survey result of the target engineering project.
2. The engineering project survey method according to claim 1, characterized in that: After feeding back the stock resource data to the survey auxiliary device and before receiving the pre-occupied resource request sent by the survey auxiliary device, the method further includes: obtaining a resource status result of the stock resource data at a preset time interval; According to the resource status result, the stock resource data is updated to obtain updated stock resource data, and the updated stock resource data is synchronized to the exploration auxiliary equipment.
3. The engineering project survey method according to claim 1, characterized in that: Before receiving the pre-occupied resource request sent by the survey auxiliary device, the method further includes: Receive abnormal resource data sent by the survey auxiliary equipment; the abnormal resource data refers to data that is different from the resource data recorded by the survey personnel when conducting on-site engineering survey based on the stock resource data and the resource data recorded by the resource management equipment; Performing data verification based on the abnormal resource data to obtain a data verification result; The resource data is corrected according to the data verification result to obtain corrected resource data.
4. The engineering project survey method according to claim 1, characterized in that: The verifying of resource status based on the pre-occupied resource request to obtain target resources that can be used to design the target engineering project includes: Determining the pre-occupied resources in the pre-occupied resource request; Verifying the resource status of the pre-occupied resources to obtain a resource status result; Allocating initial resources that can be used to design the target engineering project according to the resource status result; The initial resources are pre-occupied with resource identification to obtain target resources that can be used to design the target engineering project.
5. A method for surveying an engineering project, characterized in that: Applied to exploration auxiliary equipment, including: Sending a resource call request for designing a target engineering project to a resource management device; Receiving stock resource data sent by the resource management device; the stock resource data is determined by the resource management device based on the resource call request; Generate a pre-occupied resource request based on the survey data and the stock resource data, and send the pre-occupied resource request to the resource management device; the survey data is obtained by survey personnel conducting on-site engineering surveys based on the stock resource data; receive and confirm the target resource information sent by the resource management device; the target resource information is generated by the resource management device verifying the resource status based on the pre-occupied resource request; Based on the target resource information and the survey data, a survey result of the target engineering project is generated.
6. The engineering project survey method according to claim 5, characterized in that: Before generating a pre-occupied resource request based on the survey data and the stock resource data, the method further includes: Determining whether there is a difference between the resource data in the exploration data and the stock resource data; If there is a difference, the resource data with the difference is determined as abnormal resource data, and the abnormal resource data is fed back to the resource management device; the abnormal resource data is used by the resource management device to correct the resource data.
7. A resource management device, characterized in that: include: A first receiving module is used to receive a resource call request for designing a target engineering project sent by the survey auxiliary equipment; A determination module, configured to determine, based on the resource call request, stock resource data that can be used to design the target engineering project, and feed the stock resource data back to the exploration auxiliary equipment; A second receiving module, configured to receive a pre-occupied resource request sent by the survey auxiliary device; The pre-occupied resource request is generated by the survey auxiliary device based on the stock resource data and the survey data; the survey data is obtained by surveyors conducting on-site surveys of the project based on the stock resource data; A resource status verification module, used to verify the resource status based on the pre-occupied resource request, and obtain target resource information that can be used to design the target engineering project; A sending module, used for sending the target resource information to the exploration auxiliary device; The target resource information is used by the survey auxiliary equipment to generate survey results for the target engineering project.
8. A survey auxiliary device, characterized in that: include: A sending module, used for sending a resource call request for designing a target engineering project to a resource management device; A first receiving module, configured to receive stock resource data sent by the resource management device; the stock resource data is determined by the resource management device based on the resource call request; A first generating module is used to generate a pre-occupied resource request based on the survey data and the stock resource data, and send the pre-occupied resource request to the resource management device; the survey data is obtained by survey personnel conducting on-site surveys based on the stock resource data; A second receiving module, used to receive and confirm the target resource information sent by the resource management device; The target resource information is generated by the resource management device performing resource status verification based on the pre-occupied resource request; The second generating module is used to generate the survey result of the target engineering project based on the target resource information and the survey data.
9. A device, comprising an electronic device, the electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the steps of the engineering project investigation method according to any one of claims 1 to 6 are implemented.
10. A medium, comprising a non-transitory computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the engineering project investigation method as claimed in any one of claims 1 to 6 are implemented.
11. A product, comprising a computer program product, wherein the computer program product comprises a computer program, characterized in that: When the computer program is executed by a processor, the steps of the engineering project investigation method as claimed in any one of claims 1 to 6 are implemented.
Citation Information
Patent Citations
Resource scheduling method and system
CN104731657A
Resource reservation method, device and system and storage medium
CN110874657A
Grid-based survey resource scheduling method, device and equipment and readable medium
CN111476464A
Resource processing method, computer equipment and storage medium
CN117992213A