Intelligent interconnection electrical test platform based on comprehensive data

Through the intelligent interconnected electrical test platform, the problems of dispersed data management, cumbersome operations and inaccurate temperature monitoring in high-voltage electrical tests are solved, the intelligent management of test data and the accuracy of temperature prediction are realized, and the reliability and reliability of power grid operation are improved. stability.

CN118801560APending Publication Date: 2024-10-18LANGFANG POWER SUPPLY COMPANY STATE GRID JIBEI ELECTRIC POWER COMPANY +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410782021.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-18
Publication Date
2024-10-18

AI Technical Summary

Technical Problem

Existing high-voltage electrical tests suffer from scattered data management, cumbersome operations, and dispersion of test sites and expert resources, which makes collaboration difficult. Moreover, temperature monitoring is not accurate enough, and it is impossible to make accurate predictions based on historical operating condition data and the existing meteorological environment.

Method used

Design an intelligent interconnected electrical test platform based on comprehensive data, including an intelligent acquisition unit, an intelligent analysis unit, an intelligent decision-making unit, an intelligent test unit and a cloud database. It collects data through IoT sensors and uses intelligent analysis algorithms to predict the operating temperature of electrical equipment. , combine historical and meteorological data to make accurate predictions, and achieve automation and intelligent control through cloud databases and remote communications.

Benefits of technology

It realizes the automation and intelligence of test operations, improves test efficiency and the accuracy of data analysis, can accurately predict temperature according to the local meteorological environment, enhances the reliability and stability of power grid operation, reduces power outage time, and improves services quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118801560A_ABST
    Figure CN118801560A_ABST
Patent Text Reader

Abstract

The invention discloses an intelligent interconnection electrical test platform based on comprehensive data, which comprises an intelligent acquisition unit, an intelligent analysis unit, an intelligent decision-making unit, an intelligent test unit and a cloud database, and is characterized in that data acquired by the intelligent acquisition unit in real time is transmitted to the cloud database through a wireless network or a wired network; the invention relates to the technical field of electrical supervision systems. According to the intelligent interconnection electrical test platform based on comprehensive data, more accurate temperature prediction can be carried out according to a local actual meteorological environment, and the purpose of jointly and accurately predicting the working condition temperature data of electrical equipment by combining historical working condition data and existing meteorological environment data is well achieved; therefore, the electrical equipment monitoring system is more accurate in temperature monitoring test management, the situation that prediction analysis is obviously not accurate enough only depending on historical data due to different environments of regions where electrical equipment is located is avoided, and monitoring protection of the electrical equipment is greatly facilitated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of electrical supervision systems, and in particular to an intelligent interconnected electrical test platform based on comprehensive data. Background Art

[0002] With the development of power systems and the improvement of their intelligence, higher requirements are placed on the safety, reliability and stability of high-voltage electrical equipment. As an important means to ensure the normal operation of power systems, high-voltage electrical testing plays a key role in equipment safety assessment, fault diagnosis and equipment maintenance.

[0003] However, traditional high-voltage electrical testing has many problems and challenges. First, data management is decentralized, and a large amount of data generated during the test is stored in different systems or devices. The lack of a unified management platform makes data sharing and analysis difficult, affecting the value of test data. Secondly, the test operation process is cumbersome, with a lot of manual participation, long operation time, and potential safety hazards and risks of misoperation. At the same time, due to the dispersion of expert resources, collaboration and communication with test site personnel are difficult, which reduces the efficiency and quality of decision-making. In this context, there is an urgent need for an innovative test platform that integrates comprehensive data with intelligent and efficient operations to meet the needs of digital transformation of power systems and the development of smart grids.

[0004] Referring to the power monitoring system with Chinese patent publication number CN114243914A, a wireless sensor is set in the first network device, the first network device is communicatively connected with the power terminal device, the wireless sensor is used to collect second data information and send the second data information to the power terminal device, and then the power terminal device transmits the second data information to the second network device, and the second network device transmits the second data information to the background server, forming a wireless sensor network, realizing the management of data information collected by the wireless sensor, and further improving the management efficiency of power system monitoring.

[0005] Referring to the electrical equipment temperature monitoring system with Chinese patent publication number CN117760573A, a temperature prediction model is established based on the historical temperature inside the electrical equipment through the internal temperature prediction module of the equipment, which comprehensively considers the temperature properties of the electrical equipment in the historical operation of the device, and is verified by the actual measured temperature inside the electrical equipment itself, which is more in line with the operating characteristics of the electrical equipment. At the same time, the historical temperature inside the electrical equipment is used to establish the temperature conditions, and the temperature properties of the historical operation of the electrical equipment are also taken into account. The temperature rise prediction model established by the equipment operation status prediction module predicts the time when the abnormal temperature rises to a high temperature dangerous value, thereby providing a time basis for the operator in a timely and effective manner, urging relevant personnel to take timely measures.

[0006] A comprehensive analysis of the above reference patents reveals the following defects:

[0007] 1) The existing electrical equipment data management is decentralized, and a large amount of data generated during the test is stored in different systems or devices, lacking a unified management platform. This leads to the dispersion and isolation of test data, the lack of relevance of data between different departments, and the difficulty in retrieving and accessing historical data, which affects data sharing and analysis, and further affects the utilization value of test data.

[0008] 2) The test operation is cumbersome. The traditional test operation process is cumbersome and complicated, with much manual participation and long operation time. There are safety hazards in the test operation process. Operators are easily harmed by electrical equipment and are prone to misoperation, which affects the accuracy and reliability of the test results. For example, the power monitoring system of reference patent CN114243914A, although remote monitoring is performed through a wireless network, cannot perform automated test operation monitoring during the test operation of electrical equipment, and the accuracy and reliability are poor. At the same time, the dispersion of the test site and expert resources makes it difficult to collaborate with on-site personnel, thereby reducing the efficiency and quality of decision-making. Due to the limitations of information transmission and communication channels, experts often find it difficult to obtain key information in a timely manner, and are unable to make accurate decisions quickly or provide effective guidance.

[0009] 3) The existing electrical equipment monitoring system is not accurate enough for temperature monitoring test management. For example, the electrical equipment temperature monitoring system of reference patent CN117760573A, although an electrical temperature prediction model is established to centrally monitor and predict the temperature of electrical equipment, it only relies on comparative analysis between historical electrical data and existing electrical data. Due to the different environments in each electrical area, relying solely on historical data prediction and analysis is obviously not accurate enough, and cannot achieve more accurate temperature prediction based on the actual local meteorological environment. It is impossible to achieve the purpose of combining historical operating data and existing meteorological environment data to accurately predict the operating temperature data of electrical equipment, which brings great inconvenience to the monitoring and protection of electrical equipment. Summary of the invention

[0010] 1. Technical issues to be solved

[0011] In view of the deficiencies in the prior art, the present invention provides an intelligent interconnected electrical test platform based on comprehensive data, which solves the problems of decentralized data management of existing electrical equipment, cumbersome test operations, and the dispersion of test sites and expert resources, which makes collaboration with on-site personnel difficult. At the same time, the existing electrical equipment monitoring system is not accurate enough in temperature monitoring test management, and cannot achieve more accurate temperature prediction based on the actual local meteorological environment, and cannot achieve the purpose of combining historical operating data with existing meteorological environment data to jointly and accurately predict the operating temperature data of electrical equipment.

[0012] (II) Technical solution

[0013] To achieve the above objectives, the present invention is implemented through the following technical solutions: an intelligent interconnected electrical test platform based on comprehensive data, including an intelligent acquisition unit, an intelligent analysis unit, an intelligent decision unit, an intelligent test unit and a cloud database, the data collected in real time by the intelligent acquisition unit is transmitted to the cloud database through a wireless network or a wired network, and then the cloud database transmits the real-time collected data to the intelligent analysis unit for automatic system analysis or manual analysis and processing, and after the analysis is completed, a control instruction is sent to the intelligent test unit through the intelligent decision unit;

[0014] The intelligent acquisition unit is used to respectively collect electrical parameters of each electrical device and temperature parameters of each electrical device through infrared temperature measurement using IoT sensors, and to respectively detect environmental information data of the environment in which each electrical device is located and user operation behavior information on the electrical device using monitoring equipment;

[0015] The intelligent analysis unit is used to predict the operating temperature of the electrical equipment on the next day through an intelligent analysis algorithm, or to send the predicted temperature to a manual interaction terminal remotely through a wireless network for manual analysis and processing;

[0016] Intelligent test unit, used to control and execute operations on various electrical equipment, and can perform test simulation operations through test simulation algorithms, and can also transmit data information of control and execution operations of various electrical equipment to the cloud database;

[0017] The cloud database is used to store the data collected by the intelligent collection unit in real time, and can send data to the intelligent analysis unit, the intelligent decision-making unit and the intelligent test unit respectively.

[0018] Preferably, the intelligent analysis algorithm specifically includes the following steps:

[0019] S1. Extract the operating data of each electrical device in the historical time period θ from the cloud database, and calculate the average temperature R of the electrical equipment in the historical time period θ k , the specific formula is as follows:

[0020]

[0021] Among them, y i k represents the temperature value of the kth electrical equipment at the i-th hour in the time period corresponding to θ, R k represents the average temperature value of the kth electrical equipment in the time period θ;

[0022] S2, the average temperature R of the kth electrical equipment in the historical time period θ calculated according to step S1 k , calculate the temperature influence factor β k , the specific formula is as follows:

[0023]

[0024] Among them, x i k Indicates that the kth electrical equipment is in contact with y i k The ambient temperature corresponding to the environment in the i-th hour of the corresponding time period θ, H represents the average temperature value of the ambient temperature in the time period θ corresponding to yi, β k is the temperature influence factor of the kth electrical equipment in the time period θ;

[0025] S3, collect temperature data of each time period of the next day from the meteorological network through the weather data collection module, and calculate the temperature influence factor β according to step S2 k To calculate the test prediction temperature of the kth electrical equipment in the i-th hour in the time period θ The specific calculation formula is as follows:

[0026]

[0027] Among them, c i k is the ambient temperature value of the kth electrical equipment collected from the meteorological network in the i-th hour of the corresponding second day time period θ, G k It represents the average temperature value of the environment in the corresponding time period θ of the second day collected by the k-th electrical equipment from the meteorological network, and ∈ is the experimental prediction error.

[0028] Preferably, the weather data collection module divides the 24-hour weather data into different time periods θ, and divides the time period θ within 24 hours into a valley period, an early morning period, a morning peak period, a flat period, an afternoon period, an evening peak period, and a late night period, and the ambient temperature in the weather data of each time period and the internal temperature changes of the electrical equipment are different.

[0029] Preferably, the trough period is from 2 a.m. to 6 a.m., the early morning period is from 6 a.m. to 8 a.m., the morning peak period is from 8 a.m. to 10 a.m., the flat period is from 10 a.m. to 1 p.m., the afternoon period is from 1 p.m. to 4 p.m., the evening peak period is from 5 p.m. to 9 p.m. and the late night period is from 9 p.m. to 2 a.m.

[0030] Preferably, the value range of ∈ in step S3 is -1.8°C to 1.8°C.

[0031] Preferably, the intelligent decision-making unit compares and analyzes the temperature inside the electrical equipment predicted by the intelligent analysis algorithm with the historical temperature data of the same time period stored in the cloud database, and searches for the fault code parameters and response strategy data information corresponding to the failure of the electrical equipment in the same time period, so as to make preparations in advance for the electrical equipment failure that may occur during operation the next day.

[0032] Preferably, the test simulation algorithm specifically includes the following steps:

[0033] E1. Predict temperature based on experiments in intelligent analysis algorithms The calculation formula is used to manually input the test environment temperature value c set by the test into the intelligent interconnected electrical test platform i k , to generate the corresponding test temperature T 测 ;

[0034] E2. The test temperature T calculated in step E1 is 测 The safety protection action execution temperature T of the electrical equipment being tested at this time 标 Conduct comparative analysis;

[0035] E3. When T 测 ≥T 标 When T 测 <T 标 It indicates that the working temperature of the electrical equipment under test is at the normal operating temperature, so as to test whether the safety protection action execution unit of the electrical equipment can work normally.

[0036] Preferably, the cloud database adopts SaaS cloud computing technology and establishes a power equipment data cloud library through MySQL, PostgreSQL or MongoDB database management system, which can complete the collection, integration, storage and retrieval of multi-dimensional information of power grid operation data, environmental data and user behavior data.

[0037] Preferably, the intelligent decision-making unit builds a data diagnosis and analysis model framework by using the Keras algorithm and the Scikit-learn library, applies the support vector machine SVM or the random forest machine learning algorithm to learn the historical data, identifies different types of failure modes and patterns, and uses the recurrent neural network RNN ​​to analyze and predict the time series data of the test data and the operation data, thereby completing the deep mining of hidden dangers, the predictive analysis of failures, and the real-time status assessment and diagnosis.

[0038] (III) Beneficial effects

[0039] The present invention provides an intelligent interconnected electrical test platform based on comprehensive data. Compared with the prior art, it has the following beneficial effects:

[0040] (1) This intelligent interconnected electrical test platform based on comprehensive data realizes the automation and intelligence of test operations through digital management and intelligent control, reduces the workload and operation time of manual participation, and greatly improves the test efficiency. Through the establishment of a cloud data platform and the application of remote communication technology, the platform realizes intelligent analysis of test data and remote expert participation, providing more comprehensive and accurate information support for decision-making and optimizing the decision-making process.

[0041] (2) This intelligent interconnected electrical test platform based on comprehensive data can realize more accurate temperature prediction based on the actual local meteorological environment. It has well achieved the purpose of combining historical operating data and existing meteorological environment data to accurately predict the operating temperature data of electrical equipment, making the electrical equipment monitoring system more accurate in temperature monitoring test management, avoiding the situation where the prediction analysis based solely on historical data is obviously not accurate due to the different environments in each electrical area, thereby greatly facilitating the monitoring and protection of electrical equipment.

[0042] (3) This intelligent interconnected electrical test platform based on comprehensive data can improve the reliability of power grid operation. The platform uses advanced data analysis and fault diagnosis algorithms to achieve real-time monitoring and evaluation of the power grid operation status, improve the reliability and stability of power grid operation, help to promptly discover and solve potential problems, reduce power outage time, and improve the service quality of the power grid. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] Figure 1 It is a system architecture diagram of the intelligent interconnected electrical test platform based on comprehensive data of the present invention;

[0044] Figure 2 It is the logic diagram of the experimental simulation algorithm of the present invention. DETAILED DESCRIPTION

[0045] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0046] See also Figure 1-Figure 2 , the embodiment of the present invention provides two technical solutions: an intelligent interconnected electrical test platform based on comprehensive data, specifically including the following embodiments:

[0047] Embodiment 1: An intelligent interconnected electrical test platform based on comprehensive data, comprising an intelligent acquisition unit, an intelligent analysis unit, an intelligent decision unit, an intelligent test unit and a cloud database. The data collected in real time by the intelligent acquisition unit is transmitted to the cloud database via a wireless network or a wired network, and then the cloud database transmits the real-time collected data to the intelligent analysis unit for automatic system analysis or manual analysis and processing. After the analysis is completed, a control instruction is sent to the intelligent test unit via the intelligent decision unit;

[0048] The intelligent collection unit is used to collect the electrical parameters of each electrical device and the temperature parameters of each electrical device through infrared temperature measurement through IoT sensors, and to detect the environmental information data of the environment in which each electrical device is located and the user's operation behavior information on the electrical device through monitoring equipment;

[0049] Intelligent analysis unit, used to predict the working temperature of electrical equipment on the next day through intelligent analysis algorithm, or to send it remotely to the manual interaction terminal through the wireless network for manual analysis and processing;

[0050] Intelligent test unit, used to control and execute operations on various electrical equipment, and can perform test simulation operations through test simulation algorithms, and can also transmit data information of control and execution operations of various electrical equipment to the cloud database;

[0051] The cloud database is used to store the data collected by the intelligent collection unit in real time, and can send data to the intelligent analysis unit, the intelligent decision-making unit and the intelligent test unit respectively.

[0052] In the embodiment of the present invention, the intelligent analysis algorithm specifically includes the following steps:

[0053] S1. Extract the operating data of each electrical device in the historical time period θ from the cloud database, and calculate the average temperature R of the electrical equipment in the historical time period θ k , the specific formula is as follows:

[0054]

[0055] Among them, y i k represents the temperature value of the kth electrical equipment at the i-th hour in the time period corresponding to θ, R k represents the average temperature value of the kth electrical equipment in the time period θ;

[0056] S2, the average temperature R of the kth electrical equipment in the historical time period θ calculated according to step S1 k , calculate the temperature influence factor β k , the specific formula is as follows:

[0057]

[0058] Among them, x i k Indicates that the kth electrical equipment is in contact with y i k The ambient temperature corresponding to the environment in the i-th hour of the corresponding time period θ, H represents the average temperature value of the ambient temperature in the time period θ corresponding to yi, β k is the temperature influence factor of the kth electrical equipment in the time period θ;

[0059] S3, collect temperature data of each time period of the next day from the meteorological network through the weather data collection module, and calculate the temperature influence factor β according to step S2 k To calculate the test prediction temperature of the kth electrical equipment in the i-th hour in the time period θ The specific calculation formula is as follows:

[0060]

[0061] Among them, c i k is the ambient temperature value of the kth electrical equipment collected from the meteorological network in the i-th hour of the corresponding second day time period θ, G k It represents the average temperature value of the environment in the corresponding time period θ of the second day collected by the k-th electrical equipment from the meteorological network, and ∈ is the experimental prediction error.

[0062] In the embodiment of the present invention, the weather data collection module divides the 24-hour weather data into different time periods θ, and divides the time period θ within the 24-hour into a valley period, an early morning period, a morning peak period, a flat period, an afternoon period, an evening peak period, and a late night period. The ambient temperature in the weather data of each time period and the internal temperature change of the electrical equipment are different. The valley period is from 2 a.m. to 6 a.m., the early morning period is from 6 a.m. to 8 a.m., the morning peak period is from 8 a.m. to 10 a.m., the flat period is from 10 a.m. to 1 p.m., the afternoon period is from 1 p.m. to 4 p.m., the evening peak period is from 5 p.m. to 9 p.m., and the late night period is from 9 p.m. to 2 a.m.

[0063] In the embodiment of the present invention, the value range of ∈ in step S3 is -1.8°C to 1.8°C.

[0064] In an embodiment of the present invention, the intelligent decision-making unit compares and analyzes the temperature inside the electrical equipment predicted by the intelligent analysis algorithm with the historical temperature data of the same time period stored in the cloud database, and searches for the fault code parameters and response strategy data information corresponding to the failure of the electrical equipment in the same time period, so as to make preparations in advance for the electrical equipment failure that may occur during operation the next day.

[0065] Embodiment 2: The difference between the embodiment of the present invention and the embodiment 1 is that the test simulation algorithm specifically includes the following steps:

[0066] E1. Predict temperature based on experiments in intelligent analysis algorithms The calculation formula is used to manually input the test environment temperature value c set by the test into the intelligent interconnected electrical test platform i k , to generate the corresponding test temperature T 测 ;

[0067] E2. The test temperature T calculated in step E1 is 测 The safety protection action execution temperature T of the electrical equipment being tested at this time 标 Conduct comparative analysis;

[0068] E3. When T 测 ≥T 标 When T 测 <T 标 It indicates that the working temperature of the electrical equipment under test is at the normal operating temperature, so as to test whether the safety protection action execution unit of the electrical equipment can work normally.

[0069] In the embodiment of the present invention, the cloud database adopts SaaS cloud computing technology and establishes a power equipment data cloud library through MySQL, PostgreSQL or MongoDB database management system, which can complete the collection, integration, storage and retrieval of multi-dimensional information of power grid operation data, environmental data and user behavior data.

[0070] In the embodiment of the present invention, the intelligent decision-making unit builds a data diagnosis and analysis model framework by using the Keras algorithm and the Scikit-learn library, applies the support vector machine SVM or the random forest machine learning algorithm to learn the historical data, identifies different types of failure modes and laws, and uses the recurrent neural network RNN ​​to analyze and predict the time series data of the test data and the operation data, thereby completing the deep mining of hidden dangers, the predictive analysis of failures, and the real-time status assessment and diagnosis.

[0071] In the embodiment of the present invention, a cloud data platform with centralized storage, intelligent analysis and convenient sharing is constructed. The platform integrates various test data, including multi-dimensional information such as equipment operation data, test process data, and environmental data, and performs data mining and fault diagnosis through advanced big data analysis and artificial intelligence algorithms, thereby improving the accuracy and reliability of power grid status evaluation.

[0072] In the embodiment of the present invention, augmented reality technology is used to realize real-time data recording, equipment status display and operation guidance at the test site. The test personnel can intuitively view information such as electrical parameters, equipment status, internal structure, etc. through the terminal device, and can complete the test operation according to the intelligent operation guidance provided by the platform, reducing the tediousness and safety risks of the test operation.

[0073] In the embodiment of the present invention, a machine learning algorithm is used to realize the automation and intelligence of the test operation. The platform integrates hardware devices such as a mechanical dog, and realizes the seamless integration of various test instruments through hardware integrated design and machine learning capabilities. Users can now enjoy an easy and efficient test process with a simple one-click operation, truly realizing the perfect combination of technology and efficiency.

[0074] In the embodiment of the present invention, satellite Internet technology is used to achieve remote communication and monitoring on a global scale. The test site data can be uploaded to the cloud data platform in real time, and remote experts can participate in test guidance and data analysis in real time through cloud services, adjust operation strategies in time, and ensure the smooth progress of the test.

[0075] In the embodiment of the present invention, an innovative full-dimensional test operation training model for a mechanical dog is constructed. The full-dimensional test operation training model relies on standardized test operations and the accumulated experience of professionals, with the help of a large amount of computing resources and convolutional neural network algorithms. The mechanical dog can be trained to achieve autonomous operation, intelligent recognition, and automatic navigation, thereby improving the reliability and safety of the test and facilitating the realization of an intelligent high-voltage electrical test system.

[0076] In the embodiment of the present invention, the platform uses AR technology such as scene fusion and three-dimensional modeling to generate virtual information overlays in real time at the test site. At the same time, with the help of satellite Internet technology, the platform realizes true global remote communication. In addition, the platform is also highly mobile and comprehensive, taking into account the scene requirements of on-site operations and remote monitoring, and integrating multiple test functions and tools such as Internet of Things integration, data analysis and visualization, intelligent recommendation and decision support, providing a comprehensive, one-stop solution for test personnel.

[0077] Through the implementation of the above technical solutions, the present invention can effectively solve the problems existing in traditional high-voltage electrical tests, realize digital management and intelligent control of the test process, improve test efficiency, reduce safety risks, and provide reliable technical support for the safe and stable operation of the power system.

[0078] The present invention specifically has the following functions:

[0079] 1. Ability to centrally store data: The cloud data platform stores all data in a unified data center or cloud server.

[0080] 2. Intelligent data management: Use advanced big data analysis and artificial intelligence algorithms to manage data intelligently, including data classification, labeling, indexing and archiving. Users can quickly and accurately retrieve the required data through simple keyword searches or filter condition selections.

[0081] 3. Establish a permission control mechanism: set up a strict permission control mechanism, and carry out refined management of data access and operation according to different user roles and permission levels. Only authorized users can access and operate the corresponding data;

[0082] 4. Real-time data update: The data generated during the test is synchronized to the cloud data platform in real time

[0083] 5. Data interface and integration: Provide open data interface and integration functions to interface with various test instruments and data acquisition equipment.

[0084] 1. Data Storage:

[0085] 1. Choose the appropriate storage medium and structure: Select a NoSQL database as the storage medium based on factors such as data type, size, and access frequency, and design an appropriate storage structure, including table structure, index, etc.

[0086] 2. Data backup and recovery: Design an effective data backup strategy, including cloud backup, regular testing and verification, regularly test and verify backup data to ensure the integrity and availability of backup data, verify the reliability of the backup process, and promptly repair any problems that may exist in the backup, thereby ensuring data security and reliability.

[0087] 3. Data cleaning and preprocessing: Before storing the data, data cleaning and preprocessing are performed, including deduplication, denoising, filling missing values, data format conversion, etc., to improve data quality and accuracy.

[0088] 2. Data retrieval:

[0089] 1. Permission control and identity authentication: Design a strict permission control mechanism to ensure that only authorized users can access and operate data, and verify the identity of users through an identity authentication mechanism.

[0090] 2. Data location and retrieval: Provides convenient data location and retrieval functions, allowing users to quickly and accurately find the required data, which can be achieved through keyword search, screening conditions, etc.

[0091] 3. Real-time data update: Ensure timely update of data so that users can obtain the latest data information. This can be achieved through data synchronization, real-time transmission, etc.

[0092] 3. Data Analysis:

[0093] 1. Data mining and model building: Use data mining technology and machine learning algorithms to analyze and model data, explore potential patterns and associations in the data, and establish prediction models and classification models.

[0094] 2. Data processing and calculation: Perform data processing and calculation, including data aggregation, statistical analysis, graphics processing, etc., to extract data features and information.

[0095] 3. Result interpretation and verification: Interpret and verify the analysis results to ensure the reliability and interpretability of the results. This can be done through visualization and experimental verification.

[0096] 4. Data Visualization

[0097] By using AR technology such as scene fusion and three-dimensional modeling, virtual information overlay is generated in real time at the test site, and test data, safety measures, equipment structure and other information are displayed in real time and intuitively, supporting remote experts to participate in test guidance and data analysis in real time, so that the platform can provide users with more comprehensive and efficient services.

[0098] Application results: The intelligent interconnected electrical test platform based on comprehensive data of the present invention makes the test operation more efficient and can significantly shorten the maintenance outage time. Taking Langfang Power Supply Company as an example, the annual maintenance outage time can be shortened by more than 650 hours, and it is expected to increase electricity sales by 10.14 million yuan per year. If it is promoted in national grid companies and other industries, the economic benefits will be more considerable. Through intelligent safety measures and data analysis technology, the safety and accuracy of the test process can be guaranteed, the test quality of electrical equipment can be improved, the equipment failure rate can be reduced, the on-site safety risks can be reduced, and the enthusiasm of front-line employees can be improved. It can reduce the user's power outage time by 30% and reduce customer complaints by 40%. About 5 million people in the power supply area of ​​Langfang Company will benefit from this, which greatly enhances customers' perception of electricity and helps improve the business environment.

[0099] Meanwhile, the contents not described in detail in this specification belong to the prior art known to those skilled in the art.

[0100] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0101] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. An intelligent interconnected electrical test platform based on comprehensive data, including an intelligent acquisition unit, an intelligent analysis unit, an intelligent decision unit, an intelligent test unit and a cloud database, characterized in that: The data collected in real time by the intelligent collection unit is transmitted to the cloud database via a wireless network or a wired network, and then the cloud database transmits the real-time collected data to the intelligent analysis unit for automatic system analysis or manual analysis and processing. After the analysis is completed, the intelligent decision-making unit sends a control instruction to the intelligent test unit; The intelligent acquisition unit is used to respectively collect electrical parameters of each electrical device and temperature parameters of each electrical device through infrared temperature measurement using IoT sensors, and to respectively detect environmental information data of the environment in which each electrical device is located and user operation behavior information on the electrical device using monitoring equipment; The intelligent analysis unit is used to predict the operating temperature of the electrical equipment on the next day through an intelligent analysis algorithm, or to send the predicted temperature to a manual interaction terminal remotely through a wireless network for manual analysis and processing; Intelligent test unit, used to control and execute operations on various electrical equipment, and can perform test simulation operations through test simulation algorithms, and can also transmit data information of control and execution operations of various electrical equipment to the cloud database; The cloud database is used to store the data collected by the intelligent collection unit in real time, and can send data to the intelligent analysis unit, the intelligent decision-making unit and the intelligent test unit respectively.

2. The intelligent interconnected electrical test platform based on comprehensive data according to claim 1, characterized in that: The intelligent analysis algorithm specifically includes the following steps: S1. Extract the operating data of each electrical device in the historical time period θ from the cloud database, and calculate the average temperature R of the electrical equipment in the historical time period θ k , the specific formula is as follows: Among them, y i k represents the temperature value of the kth electrical equipment at the i-th hour in the time period corresponding to θ, R k represents the average temperature value of the kth electrical equipment in the time period θ; S2, the average temperature R of the kth electrical equipment in the historical time period θ calculated according to step S1 k , calculate the temperature influence factor β k , the specific formula is as follows: Among them, x i k Indicates that the kth electrical equipment is in contact with y i k The ambient temperature corresponding to the environment in the i-th hour of the corresponding time period θ, H represents the average temperature value of the ambient temperature in the time period θ corresponding to yi, β k is the temperature influence factor of the kth electrical equipment in the time period θ; S3, collect temperature data of each time period of the next day from the meteorological network through the weather data collection module, and calculate the temperature influence factor β according to step S2 k To calculate the test prediction temperature of the kth electrical equipment in the i-th hour in the time period θ The specific calculation formula is as follows: Among them, c i k is the ambient temperature value of the kth electrical equipment collected from the meteorological network in the i-th hour of the corresponding second day time period θ, G k It represents the average temperature value of the environment in the corresponding time period θ of the second day collected by the k-th electrical equipment from the meteorological network, and ∈ is the experimental prediction error.

3. The intelligent interconnected electrical test platform based on comprehensive data according to claim 2, characterized in that: The weather data collection module divides the 24-hour weather data into different time periods θ, and divides the time period θ within 24 hours into a valley period, an early morning period, a morning peak period, a flat period, an afternoon period, an evening peak period, and a late night period. The ambient temperature in the weather data of each time period and the internal temperature changes of the electrical equipment are different.

4. The intelligent interconnected electrical test platform based on comprehensive data according to claim 3, characterized in that: The trough period is from 2 a.m. to 6 a.m., the early morning period is from 6 a.m. to 8 a.m., the morning peak period is from 8 a.m. to 10 a.m., the flat period is from 10 a.m. to 1 p.m., the afternoon period is from 1 p.m. to 4 p.m., the evening peak period is from 5 p.m. to 9 p.m. and the late night period is from 9 p.m. to 2 a.m.

5. The intelligent interconnected electrical test platform based on comprehensive data according to claim 2, characterized in that: The value range of ∈ in step S3 is -1.8°C to 1.8°C.

6. The intelligent interconnected electrical test platform based on comprehensive data according to claim 1, characterized in that: The intelligent decision-making unit compares and analyzes the temperature inside the electrical equipment predicted by the intelligent analysis algorithm with the historical temperature data of the same time period stored in the cloud database, and searches for the fault code parameters and response strategy data information corresponding to the failure of the electrical equipment in the same time period, so as to prepare in advance for the electrical equipment failure that may occur during operation the next day.

7. The intelligent interconnected electrical test platform based on comprehensive data according to claim 2, characterized in that: The test simulation algorithm specifically includes the following steps: E1. Predict temperature based on experiments in intelligent analysis algorithms The calculation formula is used to manually input the test environment temperature value c set by the test into the intelligent interconnected electrical test platform i k , to generate the corresponding test temperature T 测 ; E2. The test temperature T calculated in step E1 is 测 The safety protection action execution temperature T of the electrical equipment being tested at this time 标 Conduct comparative analysis; E3. When T 测 ≥T 标 When T 测 <T 标 , it means that the operating temperature of the electrical equipment under test is at the normal operating temperature, so as to test whether the safety protection action execution unit of the electrical equipment can work normally.

8. The intelligent interconnected electrical test platform based on comprehensive data according to claim 1, characterized in that: The cloud database adopts SaaS cloud computing technology and establishes a power equipment data cloud library through MySQL, PostgreSQL or MongoDB database management system, which can complete the collection, integration, storage and retrieval of multi-dimensional information of power grid operation data, environmental data and user behavior data.

9. The intelligent interconnected electrical test platform based on comprehensive data according to claim 1, characterized in that: The intelligent decision-making unit uses the Keras algorithm and the Scikit-learn library to build a data diagnosis and analysis model framework, applies the support vector machine SVM or the random forest machine learning algorithm to learn historical data, identifies different types of failure modes and laws, and uses the recurrent neural network RNN ​​to analyze and predict the time series data of test data and operation data, thereby completing in-depth mining of hidden dangers, predictive analysis of failures, and real-time status assessment and diagnosis.