Base station deployment method and device, electronic equipment, storage medium and program product

Through the hierarchical multi-agent reinforcement learning algorithm based on neural networks, the base station deployment plan is optimized, which solves the problem of inaccurate base station deployment in the existing technology, improves the accuracy and practicality of base station deployment, and realizes the optimization of large-scale base stations. Signal coverage and throughput.

CN118803845APending Publication Date: 2024-10-18CHINA MOBILE GROUP DESIGN INST +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202410798635.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-20
Publication Date
2024-10-18

AI Technical Summary

Technical Problem

Existing base station deployment methods have low computational efficiency when dealing with large-scale problems, resulting in inaccurate base station deployment plans and poor practicality, and cannot effectively optimize the coverage and throughput of base stations.

Method used

A hierarchical multi-agent reinforcement learning algorithm based on a preset neural network model is adopted. By obtaining the input environmental state of the base station to be deployed, the initial execution-evaluation module and the representation learning module are used to update the sample action, and the sample action is determined based on the sample signal prediction value and the environmental state. The reward value is calculated until the preset reward value is reached, and the base station deployment plan is obtained, including the opening status and work parameter information of the base station to be deployed, thereby improving the accuracy of the base station deployment plan.

Benefits of technology

It has improved the accuracy and practicality of the base station deployment solution. Through the UNET network and representation learning mechanism, it has optimized the signal coverage of the base station and the overall network throughput, avoiding local optimal solutions and obtaining global optimal solutions, which is suitable for large-scale applications. Base station deployment scenario.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118803845A_ABST
    Figure CN118803845A_ABST
Patent Text Reader

Abstract

The invention provides a base station deployment method and device, electronic equipment, a storage medium and a program product, and belongs to the technical field of communication. The input environment state is input into a base station deployment scheme determination model, a base station deployment scheme output by the base station deployment scheme determination model is obtained, and the base station deployment scheme comprises the starting condition of the base station to be deployed and the work parameter information of the base station to be deployed. The hierarchical multi-agent reinforcement learning algorithm is used for networking optimization, the base station deployment position and the work parameter information of the base station are obtained, and the optimal base station deployment method is obtained. According to the invention, the UNET network realizes information sharing and interaction among the to-be-deployed base stations by connecting all the to-be-deployed base stations, so that each to-be-deployed base station can obtain the global signal coverage condition and the input environment states of other to-be-deployed base stations, and the accuracy of a base station deployment scheme is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of communication technology, and in particular to a base station deployment method, device, electronic device, storage medium and program product. Background Art

[0002] In the optimization of mobile communication network coverage, there are heuristic learning model solutions for base station deployment methods. Heuristic learning methods usually adopt static segmentation, but as the problem scale increases, the computational efficiency becomes very low.

[0003] Existing base station deployment methods have certain limitations in dealing with comprehensive optimization of large-scale problems and are more suitable for small-scale problems.

[0004] In summary, the existing base station deployment scheme is inaccurate, resulting in poor practicality of the base station deployment scheme. Summary of the invention

[0005] The present application provides a base station deployment method, transposition, electronic device, storage medium and program product to solve the defect that the base station deployment scheme in the prior art is inaccurate, resulting in poor practicality of the base station deployment scheme, and to improve the practicality of the base station deployment scheme.

[0006] In a first aspect, the present application provides a base station deployment method, comprising: obtaining the input environment status of multiple base stations to be deployed; inputting the input environment status into a base station deployment plan determination model, obtaining the base station deployment plan output by the base station deployment plan determination model, and the base station deployment plan includes the startup status of the base station to be deployed and the working parameter information of the base station to be deployed; wherein the base station deployment plan determination model is obtained by training based on a preset neural network model based on sample input environment status and a preset reward value, and the preset neural network model includes an initial execution-evaluation module and a representation learning module, the initial execution-evaluation module is used to update the sample action of the sample input environment status, and the representation learning module is used to determine the sample signal prediction value corresponding to the sample action. In the update process of each sample action, the reward value is determined based on the sample signal prediction value, the sample action and the sample input environment status until the accumulated value of the reward value reaches the preset reward value, and the base station deployment plan determination model is obtained, and the preset reward value is used to characterize the optimal coverage rate and the optimal overall network throughput of the base station. The base station deployment plan determination model includes an execution-evaluation module, and the execution-evaluation module extracts features from the input environment status based on the UNET network, the feature extraction network and the decision network to obtain the base station deployment plan.

[0007] In one embodiment, the sample input environment state includes sample base station information, sample grid information of the deployment area of ​​the sample base station, and sample industrial parameter information. The base station deployment plan determination model is determined based on the following steps: inputting the sample input environment state into a preset neural network model, selecting the current sample action of the sample input environment state based on the initial execution-evaluation module, the current sample action including whether the sample base station is turned on in the grid of the sample deployment area and the change value of the sample industrial parameter information; updating the sample industrial parameter information based on the change value of the sample industrial parameter information, and obtaining the sample signal prediction value based on the feature operation result of the updated sample industrial parameter information and the sample grid information by the representation learning module; determining the current reward value corresponding to the updated sample input environment state based on the sample signal prediction value, the updated sample input environment state is obtained after the sample input environment state is updated based on the current sample action; determining the next sample action based on the initial execution-evaluation module to determine the next reward value, until the accumulated value of the reward value reaches the preset reward value, determining that the preset neural network model training is completed, and obtaining the base station deployment plan determination model.

[0008] In one embodiment, the representation learning module includes a UNET network, a feature extraction network and a prediction network, the prediction network includes a convolutional layer and a fully connected neural network, and the representation learning module is used to obtain a sample signal prediction value: based on the feature processing result of the sample grid information of the UNET network, the sample grid state information output is obtained; the updated sample working parameter information and the sample grid state information output are input into the feature extraction network for feature extraction to obtain a sample feature vector; the sample feature vector is input into the prediction network, the sample feature vector is feature extracted based on the convolutional layer, and the features extracted by the convolutional layer are converted based on the fully connected neural network to obtain a sample signal prediction value.

[0009] In one embodiment, the input environment status includes base station information, grid information and engineering parameter information of the deployment area of ​​the base station to be deployed, and the input environment status of multiple base stations to be deployed is obtained, including: determining the base station information based on the latitude and longitude coordinates of each base station to be deployed and the maximum transmission power of each base station to be deployed; determining the grid information based on whether each grid in the deployment area is covered, whether each grid is indoors, whether there is a base station to be deployed in each grid, the average number of users of each grid in the previous time step, the average number of users of each grid in the previous two time steps, and the average number of users of each grid in the previous three time steps; determining the engineering parameter information based on the engineering parameter information of each base station to be deployed in the previous time step, the engineering parameter information including azimuth, downtilt, horizontal beam width, vertical beam width, base station hanging height and transmission power information.

[0010] In one embodiment, the execution-evaluation module is used to obtain a base station deployment plan: the grid information status is input into the UNET network to obtain the grid information status output; the grid information status output, the industrial parameter information and the base station information are input into the feature extraction network to obtain a fixed-length action feature vector corresponding to the intelligent action of the execution-evaluation module, and the intelligent action includes whether the base station to be deployed is turned on and the change value of the industrial parameter information; the fixed-length action feature vector is input into the decision network to obtain the startup status of the base station to be deployed and the industrial parameter information of the base station to be deployed.

[0011] In one embodiment, the decision network is used to obtain the startup status of the base station to be deployed and the working parameter information of the base station to be deployed: obtain a scalar and a final feature vector based on the feature extraction result of the action feature vector of a fixed length by the decision network; determine the startup status of the base station to be deployed based on the scalar; determine the working parameter mean of the base station to be deployed and the working parameter variance of the base station to be deployed based on the final feature vector, and determine the working parameter values ​​of the base station to be deployed based on the working parameter mean and the working parameter variance, so as to obtain the working parameter information of the base station to be deployed.

[0012] In a second aspect, the present application provides a base station deployment device, including: an input environment state acquisition module, used to obtain the input environment state of multiple base stations to be deployed; a base station deployment plan determination module, used to input the input environment state into a base station deployment plan determination model, and obtain the base station deployment plan output by the base station deployment plan determination model, the base station deployment plan includes the startup status of the base station to be deployed and the working parameter information of the base station to be deployed; wherein, the base station deployment plan determination model is based on a preset neural network model, and is trained based on the sample input environment state and a preset reward value. The preset neural network model includes an initial execution-evaluation module and a representation learning module. The initial execution-evaluation module is used to update the sample action of the sample input environment state. The representation learning module is used to determine the sample signal prediction value corresponding to the sample action. In the update process of each sample action, the reward value is determined based on the sample signal prediction value, the sample action and the sample input environment state until the accumulated value of the reward value reaches the preset reward value, and the base station deployment plan determination model is obtained. The preset reward value is used to characterize the optimal coverage rate and the optimal overall network throughput of the base station. The base station deployment plan determination model includes an execution-evaluation module, and the execution-evaluation module extracts features from the input environment state based on the UNET network, the feature extraction network and the decision network to obtain the base station deployment plan.

[0013] In a third aspect, the present application also provides an electronic device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, any of the above-mentioned base station deployment methods is implemented.

[0014] In a fourth aspect, the present application also provides a non-transitory computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements any of the above-mentioned base station deployment methods.

[0015] In a fifth aspect, the present application also provides a computer program product, including a computer program, which, when executed by a processor, implements any of the above-mentioned base station deployment methods.

[0016] The base station deployment method, device, electronic device, storage medium and program product provided by the present application obtain the input environment status of multiple base stations to be deployed; input the input environment status into the base station deployment plan determination model, obtain the base station deployment plan output by the base station deployment plan determination model, and the base station deployment plan includes the activation status of the base station to be deployed and the working parameter information of the base station to be deployed; wherein the base station deployment plan determination model is obtained by training based on the sample input environment status and the preset reward value on the basis of the preset neural network model, and the preset neural network model includes an initial execution-evaluation module and a representation learning module, the initial execution-evaluation module is used to update the sample action of the sample input environment status, and the representation learning module is used to determine the sample signal prediction value corresponding to the sample action. In the updating process of each sample action, the reward value is determined based on the sample signal prediction value, the sample action and the sample input environment status, until the accumulated value of the reward value reaches the preset reward value, and the base station deployment plan determination model is obtained, and the preset reward value is used to characterize the optimal coverage rate and the optimal overall network throughput of the base station. The base station deployment plan determination model includes an execution-evaluation module, and the execution-evaluation module extracts features of the input environment status based on the UNET network, the feature extraction network and the decision network to obtain the base station deployment plan. This application uses a hierarchical multi-agent reinforcement learning algorithm for network optimization, obtains the base station deployment location and the base station's engineering parameter information, and realizes the optimal base station deployment method. The UNET network of this application connects all base stations to be deployed, realizes information sharing and interaction between base stations to be deployed, so that each base station to be deployed can obtain the global signal coverage and the input environment status of other base stations to be deployed, thereby improving the accuracy of the base station deployment plan. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the technical solutions in the present application or the prior art, a brief introduction will be given below to the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0018] Figure 1 This is one of the flow charts of the base station deployment method provided in this application.

[0019] Figure 2 It is a schematic diagram of the data processing flow of the execution-evaluation module provided in this application.

[0020] Figure 3 It is a schematic diagram of the data processing flow of the UNET network provided by this application.

[0021] Figure 4 This is one of the training process diagrams of the base station deployment solution determination model provided in this application.

[0022] Figure 5 It is a schematic diagram of the data processing flow of the representation learning module provided in this application.

[0023] Figure 6 This is the second training process diagram of the base station deployment solution determination model provided in this application.

[0024] Figure 7 This is the second flow chart of the base station deployment method provided in this application.

[0025] Figure 8 It is a structural diagram of the base station deployment device provided in this application.

[0026] Fig. 9 It is a structural schematic diagram of the electronic device provided by this application. DETAILED DESCRIPTION

[0027] In order to make the purpose, technical solutions and advantages of this application clearer, the technical solutions in this application will be clearly and completely described below in conjunction with the drawings in this application. Obviously, the described embodiments are part of the embodiments of this application, not all of them. Based on the embodiments in this application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0028] Combine the following Figure 1-Figure 9 The present invention describes the base station deployment method, device, electronic device, storage medium and program product.

[0029] Figure 1 This is one of the flow charts of the base station deployment method provided in this application, such as Figure 1 As shown, the method includes the following steps.

[0030] S100: Obtain input environment states of multiple base stations to be deployed.

[0031] The input environment status includes base station information, grid information and engineering parameter information of the deployment area of ​​the base station to be deployed, and the input environment status of multiple base stations to be deployed is obtained, including: determining the base station information based on the latitude and longitude coordinates of each base station to be deployed and the maximum transmission power of each base station to be deployed; determining the grid information based on whether each grid in the deployment area is covered, whether each grid is indoors, whether there is a base station to be deployed in each grid, the average number of users of each grid in the previous time step, the average number of users of each grid in the previous two time steps, and the average number of users of each grid in the previous three time steps; determining the engineering parameter information based on the engineering parameter information of each base station to be deployed in the previous time step, and the engineering parameter information includes azimuth, downtilt, horizontal beam width, vertical beam width, base station hanging height and transmission power information.

[0032] Input base station information, grid information and engineering parameter information. The base station information includes the latitude and longitude coordinates of the base station candidate point to be deployed, whether the base station is turned on, and the transmission power. A grid is a small area block divided according to the geographical location. The grid information includes: whether each grid is covered, whether each grid is indoors, whether there is a base station in each grid, the average number of users in the previous time step of each grid, the average number of users in the previous two time steps of each grid, and the average number of users in the previous three time steps of each grid; the engineering parameter information includes the azimuth, downtilt, horizontal beam width, vertical beam width, base station hanging height and transmission power information of the base station.

[0033] like Figure 2 As shown, the input environment state is matrixed to form a state S, including base station information (S1), grid information (S2) and engineering parameter information (S3). S1 includes the latitude and longitude coordinates and maximum transmit power of the base station candidate point. If there are U base stations to be deployed, S1 is a two-dimensional matrix of size 3×U. S2 includes the azimuth, downtilt, horizontal beam width, vertical beam width, base station hanging height and transmit power information of the base station to be deployed in the previous time step. If there are U base stations to be deployed, S2 is a two-dimensional matrix of size 6×U. Assume that the deployment area of ​​the base station to be deployed can be divided into m×n grids, that is, the divided grids have m rows and n columns. Define S3 as a k×m×n three-dimensional matrix, where the k dimensions include but are not limited to whether each grid is covered, whether each grid is indoors, whether there is a base station in each grid, the average number of users in each grid in the previous time step, the average number of users in each grid in the first two time steps, and the average number of users in each grid in the first three time steps.

[0034] S200: Inputting the input environment state into the base station deployment plan determination model, obtaining the base station deployment plan output by the base station deployment plan determination model, where the base station deployment plan includes the startup status of the base station to be deployed and the working parameter information of the base station to be deployed.

[0035] Among them, the base station deployment plan determination model is obtained by training based on the preset neural network model, based on the sample input environment state and the preset reward value. The preset neural network model includes an initial execution-evaluation module and a representation learning module. The initial execution-evaluation module is used to update the sample action of the sample input environment state. The representation learning module is used to determine the sample signal prediction value corresponding to the sample action. In the update process of each sample action, the reward value is determined based on the sample signal prediction value, the sample action and the sample input environment state until the accumulated value of the reward value reaches the preset reward value, and the base station deployment plan determination model is obtained. The preset reward value is used to characterize the optimal coverage rate and the optimal overall network throughput of the base station. The base station deployment plan determination model includes an execution-evaluation module. The execution-evaluation module extracts features of the input environment state based on the UNET network, the feature extraction network and the decision network to obtain the base station deployment plan.

[0036] The execution-evaluation module is used to obtain the base station deployment plan: the grid information status is input into the UNET network to obtain the grid information status output; the grid information status output, the industrial parameter information and the base station information are input into the feature extraction network to obtain the fixed-length action feature vector corresponding to the intelligent action of the execution-evaluation module. The intelligent action includes whether the base station to be deployed is turned on and the change value of the industrial parameter information; the fixed-length action feature vector is input into the decision network to obtain the startup status of the base station to be deployed and the industrial parameter information of the base station to be deployed.

[0037] The decision network is used to obtain the startup status of the base station to be deployed and the working parameter information of the base station to be deployed: obtain a scalar and a final feature vector based on the feature extraction result of the action feature vector of fixed length by the decision network; determine the startup status of the base station to be deployed based on the scalar; determine the working parameter mean value and the working parameter variance of the base station to be deployed based on the final feature vector, and determine the working parameter values ​​of the base station to be deployed based on the working parameter mean value and the working parameter variance, so as to obtain the working parameter information of the base station to be deployed.

[0038] The input environment state (including S1, S2 and S3) is input into the base station deployment plan determination model. The actor-critic module of the base station deployment plan determination model extracts features of the input environment state according to the UNET network, feature extraction network and fully connected neural network to obtain the base station deployment plan.

[0039] like Figure 2 As shown in Figure 1, the S3 in the input environment state is input into the UNET network of the execution-criticism module to obtain a grid information state output of a 64×m×n dimensional matrix. Figure 3As shown in the figure, the convolutional layer and deconvolutional layer of the UNET network use 3×3 convolution kernels, such as 3×3 convolution ReLU activation function and 3×3 deconvolution ReLU activation function. The maximum pooling and upsampling use 2×2 convolution kernels, such as 2×2 maximum pooling and 2×2 upsampling.

[0040] The grid information state output of the 64×m×n dimensional matrix output by S1, S2 and UNET network is input into the feature extraction layer together. The features corresponding to the agent actions of the actor-critic module are extracted through the feature extraction layer and the convolutional neural network to obtain a fixed-length action feature vector, for example, an action feature vector with a length of 73. For the base station deployment location problem (high-level problem), the azimuth, downtilt angle, horizontal beam width, vertical beam width, base station hanging height and transmission power (six-dimensional vector) of the base station to be deployed are set to fixed values, and the action space of each agent action is to turn on or off the base station, which is a scalar. For the base station engineering parameter information problem (low-level problem), according to the determined base station deployment location, the parameters of each turned-on base station are optimized, and the action space of each agent action is a six-dimensional vector.

[0041] For the base station deployment location problem, the vector of length 73 is input into the decision network composed of a three-layer fully connected neural network (including hidden layer 1, hidden layer 2 and hidden layer 3) to obtain a scalar of fixed length, representing whether the base station is turned on and the base station deployment location. For the industrial parameter information problem, the vector of length 73 is input into the decision network to obtain the final feature vector, for example, a vector of length 12, and the 12 values ​​represent the industrial parameter mean and industrial parameter variance of the six actions in the action space (azimuth, downtilt, horizontal beam width, vertical beam width, base station hanging height and transmission power). The Gaussian probability distribution N(μ, σ) is constructed with the industrial parameter mean and industrial parameter variance. n 2 ). According to the agent action (p n ) and Gaussian probability distribution, and obtain the decision result of the decision network, p n ~N(μ,σ n 2 ). According to the decision result, the specific value of each working parameter (including azimuth angle, downtilt angle, horizontal beam width, vertical beam width, base station hanging height and transmission power) is obtained.

[0042] The base station deployment plan determination model is trained based on the preset neural network model, based on the sample input environment state and the preset reward value. The preset neural network model includes an initial execution-evaluation module and a representation learning module. The initial execution-evaluation module is used to update the sample action of the sample input environment state. The representation learning module is used to determine the sample signal prediction value corresponding to the sample action. During each update of the sample action, the reward value is determined based on the sample signal prediction value, the sample action and the sample input environment state until the accumulated value of the reward value reaches the preset reward value, thereby obtaining the base station deployment plan determination model.

[0043] The base station deployment method provided in the embodiment of the present application obtains the input environment status of multiple base stations to be deployed; inputs the input environment status into the base station deployment plan determination model, obtains the base station deployment plan output by the base station deployment plan determination model, and the base station deployment plan includes the startup status of the base station to be deployed and the working parameter information of the base station to be deployed; wherein the base station deployment plan determination model is obtained by training based on the sample input environment status and the preset reward value on the basis of the preset neural network model, and the preset neural network model includes an initial execution-evaluation module and a representation learning module, the initial execution-evaluation module is used to update the sample action of the sample input environment status, and the representation learning module is used to determine the sample signal prediction value corresponding to the sample action. In the updating process of each sample action, the reward value is determined based on the sample signal prediction value, the sample action and the sample input environment status, until the accumulated value of the reward value reaches the preset reward value, and the base station deployment plan determination model is obtained, and the preset reward value is used to characterize the optimal coverage rate and the optimal overall network throughput of the base station. The base station deployment plan determination model includes an execution-evaluation module, and the execution-evaluation module extracts features of the input environment status based on the UNET network, the feature extraction network and the decision network to obtain the base station deployment plan. This application uses a hierarchical multi-agent reinforcement learning algorithm for network optimization, obtains the base station deployment location and the base station's engineering parameter information, and realizes the optimal base station deployment method. The UNET network of this application connects all base stations to be deployed, realizes information sharing and interaction between base stations to be deployed, so that each base station to be deployed can obtain the global signal coverage and the input environment status of other base stations to be deployed, thereby improving the accuracy of the base station deployment plan.

[0044] The base station deployment method proposed in this application adopts centralized training and distributed mode. All candidate base stations can share the perspective, and each candidate base station can observe the signal coverage of the entire area, thereby avoiding falling into the local optimal solution and obtaining the global optimal solution. This application introduces the UNET neural network and the representation learning mechanism. By connecting all base stations to be deployed to the UNET neural network, the interaction between base stations is realized. The representation learning mechanism can be used to extract valuable information from large-scale information networks, which is convenient for network training and convergence. This application fully considers the actual deployment of base stations in the real world. The construction of the base station to be deployed, the azimuth, downtilt angle, horizontal beam width, vertical beam width, base station hanging height and power are optimized synchronously. At the same time, taking into account the scenario of multi-base station collaboration in the real world, a multi-agent reinforcement learning model with centralized training and distributed execution based on a hierarchical framework is proposed, which can optimize the scenario including hundreds of base stations to be deployed and tens of thousands of users.

[0045] Based on the above embodiment, the sample input environment state includes sample base station information, sample grid information of the deployment area of ​​the sample base station and sample engineering parameter information, and the base station deployment solution determination model is determined based on the following steps.

[0046] S210: Input the sample input environment state into the preset neural network model, and select the current sample action of the sample input environment state based on the initial execution-evaluation module. The current sample action includes whether the sample base station is turned on in the grid of the sample deployment area and the change value of the sample working parameter information.

[0047] S220: The sample work parameter information is updated based on the change value of the sample work parameter information, and the sample signal prediction value is obtained based on the feature operation result of the representation learning module on the updated sample work parameter information and the sample grid information.

[0048] S230: Determine a current reward value corresponding to an updated sample input environment state based on the sample signal prediction value, where the updated sample input environment state is obtained by updating the sample input environment state based on the current sample action.

[0049] S240: Determine the next sample action based on the initial execution-evaluation module to determine the next reward value, until the accumulated value of the reward value reaches the preset reward value, determine that the preset neural network model training is completed, and obtain the base station deployment plan determination model.

[0050] The representation learning module includes a UNET network, a feature extraction network and a prediction network. The prediction network includes a convolutional layer and a fully connected neural network. The representation learning module is used to obtain the sample signal prediction value: based on the feature processing result of the sample grid information by the initial UNET network, the sample grid state information output is obtained; the updated sample working parameter information and the sample grid state information output are input into the feature extraction network for feature extraction to obtain a sample feature vector; the sample feature vector is input into the prediction network, the sample feature vector is feature extracted based on the convolutional layer, and the features extracted by the convolutional layer are converted based on the fully connected neural network to obtain the sample signal prediction value.

[0051] like Figure 4 As shown, the initial execution-evaluation module includes an initial Actor module and an initial Critic module. The initial Actor module or the initial Critic module or the representation learning module includes a UNET network, a feature extraction layer, a convolution layer, and a prediction network (including a fully connected layer).

[0052] The sample input environment state (sample S), including sample S1, sample S2 and sample S3, is input into the preset neural network model. The current sample action of the sample input environment state is selected according to the initial execution-evaluation (Actor-Critic) module of the preset neural network model. The current sample action includes whether the sample base station is turned on in the grid of the sample deployment area and the change value of the sample work parameter information.

[0053] The sample work parameter information is updated according to the changed value of the sample work parameter information, and the sample signal prediction value is obtained based on the feature operation result of the updated sample work parameter information and the sample grid information by the representation learning module.

[0054] like Figure 5 As shown in the figure, the representation learning module can discover the potential structure and features in the data. Traditional machine learning methods usually require manual selection and design of features, which requires the support of domain knowledge and professional experience. In contrast, representation learning has the ability to automatically learn the most informative feature representations from raw data without human intervention, greatly reducing the burden of feature engineering and better adapting to different data domains and tasks. This method can autonomously learn useful feature representations in data, reduce the complexity of feature engineering, improve model performance and generalization ability, and is particularly powerful when processing large-scale and complex data. The input of the representation learning module includes the current sample action of each agent (updated sample parameter information) and the sample parameter information in the state space (S3), while the output of the representation learning module is the sample signal prediction value of each grid signal strength. The loss function of the entire network is calculated based on the mean square error between the true signal value of each grid and the sample signal prediction value. After obtaining the loss function, back propagation is used to update the representation learning network.

[0055] The sample grid information (sample S3) is input into the UNET network of the representation learning module to obtain the sample gateway state information output, for example, the sample gateway state information output of the 64×m×n dimensional matrix is ​​obtained. The sample working parameter information (Action) updated by the base station and the sample gateway state information output of the 64×m×n dimensional matrix are input into the feature extraction network (feature extraction layer) of the representation learning module together to extract the features corresponding to the sample action and obtain the sample feature vector. The sample feature vector is input into the prediction network (including the convolution layer and the 3-layer fully connected neural network), and the sample feature vector is extracted according to the convolution layer (CNN) of the representation learning module. The features extracted by the convolution layer are converted based on the fully connected neural network (such as hidden layer 1, hidden layer 2 and hidden layer 3) to obtain the sample signal prediction value.

[0056] The current reward value corresponding to the updated sample input environment state is determined according to the sample signal prediction value. The signal coverage rate of the grid where the sample base station is located can be determined according to the sample signal prediction value. The overall network throughput of the sample base station can be determined according to the updated sample engineering parameter information. The calculation formula of the current reward value is as follows.

[0057] Re ward=λ1Cov+λ2Cap-λ3BS cost -λ4PoWer total ; Among them, Reward is the current reward value, λ1, λ2, λ3 and λ4 are all real numbers (0 to 1), Cov is the signal coverage rate, Cap is the overall network throughput, BS cost Base station construction cost, Power total is the total energy cost.

[0058] According to the above formula, each additional base station will be penalized for the construction cost. As the total power of the base station increases, the total energy consumption cost will also increase accordingly. For the engineering parameter information of the base station to be deployed, the reward function is defined as the weighted sum of signal coverage, overall network throughput, base station construction cost and total energy consumption cost. For the activation of the base station to be deployed, the reward function is defined as the cumulative value of the reward value of each training cycle (episode).

[0059] To calculate the overall reward, you first need to calculate the received signal strength. The calculation formula for received signal strength is as follows.

[0060] S(dBm)=P trans (dBm)-log 10 (45)-L(dB); Among them, S (dBm) is the predicted value of the sample signal, P trans(dBm) is the transmission power of the antenna of the sample base station, in dBm, L(dB) is the path loss from the sample base station to the grid, in dB, and the path loss is calculated according to the 3GPP TR38.901 standard and is related to the specific value of the sample engineering parameter information of the sample base station.

[0061] Since the user in the sample grid will receive sample signal prediction values ​​from multiple sample base stations, the signal strength of the sample grid is considered to be the sample signal prediction value with the largest strength among the sample signal prediction values ​​received from all sample base stations. If the grid signal is greater than the set threshold, the grid is considered to be effectively covered. The calculation formula for signal coverage is as follows.

[0062] Where, Gov is the signal coverage, Grid cover The number of grids whose grid signals are greater than the set threshold. all is the total number of grids.

[0063] In addition, the number of users in each sample grid is randomly distributed. After obtaining the grid signal of the sample grid, the data throughput of the users in the sample grid can be calculated, and then the total network throughput can be obtained. The calculation formula of the total network throughput is as follows.

[0064] Among them, Cap is the overall network throughput, N is the number of users in the sample grid, U is the number of sample base stations, ρ u.n For user e n Received sample base station b u signal-to-interference ratio.

[0065] This application divides the problem into two layers through the algorithm of hierarchical reinforcement learning. The first layer is the activation status of the base station to be deployed, and the second layer is the working parameter information of the base station to be deployed. Each layer of the problem contains two parts. One is the design of the wireless network coverage optimization algorithm based on multi-agent reinforcement learning (updating the current sample action to update the sample input environment state), and the other is the design of the evaluation network for the current sample action (calculating the current reward value based on the updated sample input environment state).

[0066] like Figure 6As shown, the base station deployment scheme determination model is determined based on the following steps, including initialization, sampling data and training process. Obtain the sample input environment state of multiple sample base stations. Determine the initial execution-evaluation module and the representation learning module. Initialize the coverage and user throughput. Input the sample input environment state into the preset neural network model. The agent of the initial execution-evaluation module reads the sample input environment state and selects the sample action A. Calculate the current reward value corresponding to the sample action A and the corresponding next state (next sample input environment state). Write (sample S, sample action A, Next_S) in each operation process into the cache of the preset neural network. If the cache is not full, save (sample s, sample action A, Next_S), assign Next_S to sample S to update sample S, further update the current sample action, and repeat the above steps for iterative training. If the cache is full, update the network parameters in the initial execution-evaluation module and clear the cache at the same time. Add the current reward value corresponding to each sample S to obtain the cumulative value of the reward value. When the cumulative value of the reward value reaches the preset reward value, terminate the iterative training and obtain the base station deployment scheme determination model.

[0067] like Figure 7 As shown, the base station deployment solution determination model determines the sample body action of the sample input environment state. The sample work parameter information of the sample base station is determined based on the sample input environment state and the sample action, and the low-level reward (reward value) of the sample work parameter information is further determined. The work parameter information of the base station to be deployed is observed at a low level based on the low-level reward. The high-level reward is determined based on the accumulated value of the reward value, and the startup status of the sample base station is observed at a high level based on the high-level reward.

[0068] This application calculates the reward function based on signal coverage and overall network throughput to achieve the optimal base station deployment plan. By training the initial execution-evaluation module to optimize sample actions, it is beneficial to improve the accuracy of action selection of the intelligent agent in the base station deployment plan determination model. By indirectly evaluating sample actions through the representation learning module, the accuracy of sample actions is further improved.

[0069] The base station deployment device provided in the present application is described below. The base station deployment device described below and the base station deployment method described above can be referenced to each other.

[0070] like Figure 8 As shown, a base station deployment device is characterized by comprising: an input environment status acquisition module 801, which is used to obtain the input environment status of multiple base stations to be deployed.

[0071] The base station deployment plan determination module 802 is used to input the input environment state into the base station deployment plan determination model, and obtain the base station deployment plan output by the base station deployment plan determination model. The base station deployment plan includes the activation status of the base station to be deployed and the working parameter information of the base station to be deployed; wherein, the base station deployment plan determination model is obtained by training based on the sample input environment state and the preset reward value on the basis of the preset neural network model. The preset neural network model includes an initial execution-evaluation module and a representation learning module. The initial execution-evaluation module is used to update the sample action of the sample input environment state. The representation learning module is used to determine the sample signal prediction value corresponding to the sample action. In the updating process of each sample action, the reward value is determined based on the sample signal prediction value, the sample action and the sample input environment state until the accumulated value of the reward value reaches the preset reward value, and the base station deployment plan determination model is obtained. The preset reward value is used to characterize the optimal coverage rate and the optimal overall network throughput of the base station. The base station deployment plan determination model includes an execution-evaluation module. The execution-evaluation module extracts features of the input environment state based on the UNET network, the feature extraction network and the decision network to obtain the base station deployment plan.

[0072] The base station deployment device provided by the embodiment of the present invention obtains the input environment status of multiple base stations to be deployed; inputs the input environment status into the base station deployment plan determination model, obtains the base station deployment plan output by the base station deployment plan determination model, and the base station deployment plan includes the startup status of the base station to be deployed and the working parameter information of the base station to be deployed; wherein the base station deployment plan determination model is obtained by training based on the sample input environment status and the preset reward value on the basis of the preset neural network model, and the preset neural network model includes an initial execution-evaluation module and a representation learning module, the initial execution-evaluation module is used to update the sample action of the sample input environment status, and the representation learning module is used to determine the sample signal prediction value corresponding to the sample action. In the updating process of each sample action, the reward value is determined based on the sample signal prediction value, the sample action and the sample input environment status, until the accumulated value of the reward value reaches the preset reward value, and the base station deployment plan determination model is obtained, and the preset reward value is used to characterize the optimal coverage rate and the optimal overall network throughput of the base station. The base station deployment plan determination model includes an execution-evaluation module, and the execution-evaluation module extracts features of the input environment status based on the UNET network, the feature extraction network and the decision network to obtain the base station deployment plan. This application uses a hierarchical multi-agent reinforcement learning algorithm for network optimization, obtains the base station deployment location and the base station's engineering parameter information, and realizes the optimal base station deployment method. The UNET network of this application connects all base stations to be deployed, realizes information sharing and interaction between base stations to be deployed, so that each base station to be deployed can obtain the global signal coverage and the input environment status of other base stations to be deployed, thereby improving the accuracy of the base station deployment plan.

[0073] In one embodiment, the sample input environment state includes sample base station information, sample grid information of the deployment area of ​​the sample base station, and sample industrial parameter information. The base station deployment plan determination module 802 is used to: input the sample input environment state into a preset neural network model, select the current sample action of the sample input environment state based on the initial execution-evaluation module, and the current sample action includes whether the sample base station is turned on in the grid of the sample deployment area and the change value of the sample industrial parameter information; update the sample industrial parameter information based on the change value of the sample industrial parameter information, and obtain the sample signal prediction value based on the feature operation result of the updated sample industrial parameter information and the sample grid information by the representation learning module; determine the current reward value corresponding to the updated sample input environment state based on the sample signal prediction value, and the updated sample input environment state is obtained after the sample input environment state is updated based on the current sample action; determine the next sample action based on the initial execution-evaluation module to determine the next reward value, until the accumulated value of the reward value reaches the preset reward value, determine that the preset neural network model training is completed, and obtain the base station deployment plan determination model.

[0074] In one embodiment, the representation learning module includes a UNET network, a feature extraction network and a prediction network, the prediction network includes a convolutional layer and a fully connected neural network, and the base station deployment plan determination module 802 is used to: obtain the sample grid state information output based on the feature processing result of the sample grid information of the UNET network; input the updated sample working parameter information and the sample grid state information output into the feature extraction network for feature extraction to obtain a sample feature vector; input the sample feature vector into the prediction network, extract the sample feature vector based on the convolutional layer, and convert the features extracted by the convolutional layer based on the fully connected neural network to obtain a sample signal prediction value.

[0075] In one embodiment, the input environment status includes base station information, grid information of the deployment area of ​​the base station to be deployed, and engineering parameter information. The input environment status acquisition module 801 is used to: determine the base station information based on the latitude and longitude coordinates of each base station to be deployed and the maximum transmission power of each base station to be deployed; determine the grid information based on whether each grid in the deployment area is covered, whether each grid is indoors, whether there is a base station to be deployed in each grid, the average number of users of each grid in the previous time step, the average number of users of each grid in the previous two time steps, and the average number of users of each grid in the previous three time steps; determine the engineering parameter information based on the engineering parameter information of each base station to be deployed in the previous time step, and the engineering parameter information includes azimuth, downtilt, horizontal beam width, vertical beam width, base station hanging height and transmission power information.

[0076] In one embodiment, the base station deployment plan determination module 802 is used to: input the grid information status into the UNET network to obtain the grid information status output; input the grid information status output, the industrial parameter information and the base station information into the feature extraction network to obtain the fixed-length action feature vector corresponding to the intelligent agent action of the execution-evaluation module, and the intelligent agent action includes whether the base station to be deployed is turned on and the change value of the industrial parameter information; input the fixed-length action feature vector into the decision network to obtain the startup status of the base station to be deployed and the industrial parameter information of the base station to be deployed.

[0077] In one embodiment, the base station deployment plan determination module 802 is used to: obtain a scalar and a final feature vector based on the feature extraction result of the fixed-length action feature vector of the decision network; determine the activation status of the base station to be deployed based on the scalar; determine the mean value of the working parameters of the base station to be deployed and the variance of the working parameters of the base station to be deployed based on the final feature vector, and determine the working parameter values ​​of the base station to be deployed based on the mean value and the variance of the working parameters to obtain the working parameter information of the base station to be deployed.

[0078] Fig. 9 An example of a physical structure diagram of an electronic device is shown in FIG. Fig. 9 As shown, the electronic device may include: a processor (processor) 910, a communication interface (Communications Interface) 920, a memory (memory) 930 and a communication bus 940, wherein the processor 910, the communication interface 920, and the memory 930 communicate with each other through the communication bus 940. The processor 910 can call the logic instructions in the memory 930 to execute the base station deployment method, which includes: obtaining the input environment status of multiple base stations to be deployed; inputting the input environment status into the base station deployment plan determination model, and obtaining the base station deployment plan output by the base station deployment plan determination model, wherein the base station deployment plan includes the startup status of the base station to be deployed and the working parameter information of the base station to be deployed; wherein the base station deployment plan determination model is obtained by training based on the sample input environment status and the preset reward value on the basis of the preset neural network model, and the preset neural network model includes an initial execution-evaluation module and a representation learning module, the initial execution-evaluation module is used to update the sample action of the sample input environment status, and the representation learning module is used to determine the sample signal prediction value corresponding to the sample action. In the updating process of each sample action, the reward value is determined based on the sample signal prediction value, the sample action and the sample input environment status until the accumulated value of the reward value reaches the preset reward value, and the base station deployment plan determination model is obtained, and the preset reward value is used to characterize the optimal coverage rate and the optimal overall network throughput of the base station. The base station deployment plan determination model includes an execution-evaluation module, and the execution-evaluation module extracts features of the input environment status based on the UNET network, the feature extraction network and the decision network to obtain the base station deployment plan.

[0079] In addition, the logic instructions in the above-mentioned memory 930 can be implemented in the form of a software functional unit and can be stored in a computer-readable storage medium when it is sold or used as an independent product. Based on this understanding, the technical solution of the present application can be essentially or partly embodied in the form of a software product that contributes to the prior art, and the computer software product is stored in a storage medium, including several instructions to enable a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present application. The aforementioned storage medium includes: various media that can store program codes, such as a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a disk or an optical disk.

[0080] On the other hand, the present application also provides a computer program product, which includes a computer program, and the computer program can be stored on a non-transitory computer-readable storage medium. When the computer program is executed by a processor, the computer can execute the base station deployment method provided by the above methods, and the method includes: obtaining the input environmental status of multiple base stations to be deployed; inputting the input environmental status into a base station deployment plan determination model, and obtaining the base station deployment plan output by the base station deployment plan determination model, wherein the base station deployment plan includes the startup status of the base station to be deployed and the working parameter information of the base station to be deployed; wherein the base station deployment plan determination model is based on a preset neural network model, and is trained based on sample input environmental status and a preset reward value, and the preset neural network The network model includes an initial execution-evaluation module and a characterization learning module. The initial execution-evaluation module is used to update the sample action of the sample input environment state. The characterization learning module is used to determine the sample signal prediction value corresponding to the sample action. In the updating process of each sample action, the reward value is determined based on the sample signal prediction value, the sample action and the sample input environment state until the accumulated value of the reward value reaches a preset reward value, and a base station deployment plan determination model is obtained. The preset reward value is used to characterize the optimal coverage rate and the optimal overall network throughput of the base station. The base station deployment plan determination model includes an execution-evaluation module. The execution-evaluation module extracts features of the input environment state based on the UNET network, the feature extraction network and the decision network to obtain the base station deployment plan.

[0081] On the other hand, the present application also provides a non-transitory computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, is implemented to execute the base station deployment method provided by the above-mentioned methods, the method comprising: obtaining the input environmental status of multiple base stations to be deployed; inputting the input environmental status into a base station deployment plan determination model, obtaining a base station deployment plan output by the base station deployment plan determination model, the base station deployment plan including the startup status of the base station to be deployed and the working parameter information of the base station to be deployed; wherein the base station deployment plan determination model is obtained by training based on a preset neural network model, based on sample input environmental status and a preset reward value, and the preset neural network model includes an initial execution-evaluation module and a characterization learning module, the initial execution-evaluation module is used to update the sample action of the sample input environment state, the characterization learning module is used to determine the sample signal prediction value corresponding to the sample action, in each update process of the sample action, the reward value is determined based on the sample signal prediction value, the sample action and the sample input environment state, until the accumulated value of the reward value reaches the preset reward value, and the base station deployment plan determination model is obtained, the preset reward value is used to characterize the optimal coverage rate and the optimal overall network throughput of the base station, the base station deployment plan determination model includes an execution-evaluation module, the execution-evaluation module extracts features of the input environment state based on the UNET network, the feature extraction network and the decision network to obtain the base station deployment plan.

[0082] The device embodiments described above are merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Ordinary technicians in this field can understand and implement it without paying creative labor.

[0083] Through the description of the above implementation methods, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a necessary general hardware platform, and of course, it can also be implemented by hardware. Based on this understanding, the above technical solution is essentially or the part that contributes to the prior art can be embodied in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a disk, an optical disk, etc., including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each embodiment or some parts of the embodiments.

[0084] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit it. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application.

Claims

1. A base station deployment method, characterized in that: include: Obtaining input environment states of multiple base stations to be deployed; Inputting the input environment state into a base station deployment plan determination model, obtaining a base station deployment plan output by the base station deployment plan determination model, wherein the base station deployment plan includes a startup status of a base station to be deployed and working parameter information of the base station to be deployed; Among them, the base station deployment plan determination model is obtained by training based on a preset neural network model, based on sample input environment status and preset reward values. The preset neural network model includes an initial execution-evaluation module and a representation learning module. The initial execution-evaluation module is used to update the sample action of the sample input environment status. The representation learning module is used to determine the sample signal prediction value corresponding to the sample action. During each update of the sample action, the reward value is determined based on the sample signal prediction value, the sample action and the sample input environment status until the accumulated value of the reward value reaches the preset reward value, thereby obtaining the base station deployment plan determination model. The preset reward value is used to characterize the optimal coverage rate and the optimal overall network throughput of the base station. The base station deployment plan determination model includes an execution-evaluation module. The execution-evaluation module extracts features of the input environment status based on the UNET network, the feature extraction network and the decision network to obtain the base station deployment plan.

2. The base station deployment method according to claim 1, characterized in that: The sample input environment state includes sample base station information, sample grid information of the deployment area of ​​the sample base station, and sample engineering parameter information. The base station deployment solution determination model is determined based on the following steps: Input the sample input environment state into the preset neural network model, and select a current sample action of the sample input environment state based on the initial execution-evaluation module, wherein the current sample action includes whether the sample base station is turned on in the grid of the sample deployment area and the change value of the sample working parameter information; The sample work parameter information is updated based on the change value of the sample work parameter information, and the sample signal prediction value is obtained based on the feature calculation result of the representation learning module on the updated sample work parameter information and the sample grid information; Determine, based on the sample signal prediction value, a current reward value corresponding to an updated sample input environment state, wherein the updated sample input environment state is obtained by updating the sample input environment state based on the current sample action; Based on the initial execution-evaluation module, the next sample action is determined to determine the next reward value, until the accumulated value of the reward value reaches the preset reward value, and the preset neural network model training is determined to be completed, and the base station deployment plan determination model is obtained.

3. The base station deployment method according to claim 2, characterized in that: The representation learning module includes the UNET network, the feature extraction network and the prediction network, the prediction network includes a convolutional layer and a fully connected neural network, and the representation learning module is used to obtain the sample signal prediction value: Based on the feature processing result of the sample grid information by the UNET network, the sample grid state information output is obtained; Outputting the updated sample work parameter information and the sample grid state information into the feature extraction network for feature extraction to obtain a sample feature vector; The sample feature vector is input into the prediction network, features are extracted from the sample feature vector based on the convolution layer, and features extracted from the convolution layer are converted based on the fully connected neural network to obtain the sample signal prediction value.

4. The base station deployment method according to claim 1, characterized in that: The input environment state includes base station information, grid information of a deployment area of ​​the base station to be deployed, and engineering parameter information. The acquiring of the input environment states of the plurality of base stations to be deployed includes: Determine the base station information based on the latitude and longitude coordinates of each base station to be deployed and the maximum transmission power of each base station to be deployed; determine the grid information based on whether each grid in the deployment area is covered, whether each grid is indoors, whether there is a base station to be deployed in each grid, the average number of users of each grid in the previous time step, the average number of users of each grid in the previous two time steps, and the average number of users of each grid in the previous three time steps; The engineering parameter information is determined based on the engineering parameter information of each base station to be deployed in the previous time step, and the engineering parameter information includes azimuth angle, downtilt angle, horizontal beam width, vertical beam width, base station hanging height and transmission power information.

5. The base station deployment method according to claim 4, characterized in that: The execution-evaluation module is used to obtain the base station deployment plan: Input the grid information state into the UNET network to obtain a grid information state output; Input the grid information state output, the industrial parameter information and the base station information into the feature extraction network to obtain a fixed-length action feature vector corresponding to the agent action of the execution-evaluation module, wherein the agent action includes whether the base station to be deployed is turned on and the change value of the industrial parameter information; The fixed-length action feature vector is input into the decision network to obtain the activation status of the base station to be deployed and the working parameter information of the base station to be deployed.

6. The base station deployment method according to claim 5, characterized in that: The decision network is used to obtain the startup status of the base station to be deployed and the working parameter information of the base station to be deployed: Obtaining a scalar and a final feature vector based on a feature extraction result of the fixed-length action feature vector by the decision network; determining a startup status of the base station to be deployed based on the scalar; Based on the final feature vector, the working parameter mean and the working parameter variance of the base station to be deployed are determined, and based on the working parameter mean and the working parameter variance, the working parameter values ​​of the base station to be deployed are determined to obtain the working parameter information of the base station to be deployed.

7. A base station deployment device, characterized in that: include: An input environment status acquisition module, used to acquire the input environment status of multiple base stations to be deployed; A base station deployment scheme determination module is used to input the input environment state into a base station deployment scheme determination model, and obtain the base station deployment scheme output by the base station deployment scheme determination model, wherein the base station deployment scheme includes the activation status of the base station to be deployed and the working parameter information of the base station to be deployed; wherein the base station deployment scheme determination model is obtained by training based on a preset neural network model, based on a sample input environment state and a preset reward value, and the preset neural network model includes an initial execution-evaluation module and a representation learning module, the initial execution-evaluation module is used to update the sample action of the sample input environment state, and the representation learning module is used to determine the sample signal prediction value corresponding to the sample action, and in each sample action update process, the reward value is determined based on the sample signal prediction value, the sample action and the sample input environment state, until the accumulated value of the reward value reaches the preset reward value, and the base station deployment scheme determination model is obtained, and the preset reward value is used to characterize the optimal coverage rate and the optimal overall network throughput of the base station, and the base station deployment scheme determination model includes an execution-evaluation module, and the execution-evaluation module extracts features of the input environment state based on a UNET network, a feature extraction network and a decision network to obtain the base station deployment scheme.

8. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein: When the processor executes the program, the base station deployment method as described in any one of claims 1 to 6 is implemented.

9. A non-transitory computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the base station deployment method according to any one of claims 1 to 6 is implemented.

10. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the base station deployment method according to any one of claims 1 to 6 is implemented.

Citation Information

Patent Citations

  • Wireless network coverage optimization method and device

    CN118139085A