Highway service area and interchange integrated system
Through the integrated system of expressway service areas and interchanges, the problems of low land use efficiency and high construction costs in expressway construction are solved, joint construction in a limited space is realized, the land occupation and land acquisition pressure are reduced, and the construction cost is improved. improve driving safety and service performance.
Patent Information
- Application Number
- CN202411063959.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-05
- Publication Date
- 2024-10-22
AI Technical Summary
In highway construction, especially in remote mountainous areas, land resources are limited and are restricted by basic farmland, ecological red lines, urban development boundaries, topography and other factors. It is difficult for existing technology to efficiently utilize land and realize highway service areas and interchanges. The joint construction of interchanges results in high construction costs, large floor space, high land acquisition pressure, and difficulty in ensuring driving safety.
Design an integrated system of highway service areas and interchanges, including toll stations, service area areas, upstream and downstream lanes on the highway main line, collector lanes and interchange ramps. Through the interchange ramps and The main line of the expressway is connected to enable local vehicles to get on and off the expressway. , two collecting and distributing lanes are located on both sides of the upgoing and downgoing lanes. The service area is connected to the collecting and distributing lanes through the entry and exit lanes. The toll station office area and the service area are arranged on the same side to reduce the length and occupation of the ramp. Curved linear ramps and The three-dimensional structure reduces the design speed and minimum radius and improves driving safety.
The joint construction of the service area and the interchange within a limited fixed space saves project investment, reduces the pressure of land acquisition, improves the service performance of the service area, ensures driving safety, and adapts to the needs of highway construction under limited land conditions.
Smart Images

Figure CN118814541A_ABST
Abstract
Description
Technical Field
[0001] The invention discloses an integrated system of a highway service area and an interchange, and belongs to the technical field of highway engineering design. Background Art
[0002] With the rapid development of the national economy, highways, as a key component of the modern transportation system, undertake a large amount of cargo transportation and personnel exchanges, and play an indispensable and important role in the development of the national economy. As a key node in the highway network, highway service areas are not only important rest and supply stations for drivers and vehicles, but also important infrastructure to ensure driving safety and improve transportation efficiency.
[0003] In recent years, as the country attaches great importance to the economic development of remote mountainous areas, newly built expressways are increasingly extending to these areas, aiming to break the traffic bottleneck and promote balanced regional economic development. However, the construction of expressways faces many challenges, such as large land demand, and is restricted by multiple factors such as basic farmland, ecological red lines, urban development boundaries, topography and geological conditions.
[0004] Under these restrictions, in order to save land resources and reduce construction costs, the construction of interchanges and service areas on highways has become an effective solution. By integrating the interchanges and service areas, not only can the land be used efficiently, but also the demolition and compensation costs during the construction process can be reduced, thereby maximizing economic and social benefits while ensuring the functionality of the highway. Summary of the invention
[0005] The present invention overcomes the shortcomings of the prior art and proposes an integrated system of a highway service area and an interchange, which is characterized by comprising a toll station, two service area areas, an up lane and a down lane for two-way driving on the main line of the highway, two collector and distributor lanes, an in-and-out lane of the service area area, and an interchange ramp; The toll station is arranged on one side of the main line of the expressway and is connected to the main line of the expressway through the interchange ramp, so as to enable local vehicles to get on and off the main line of the expressway; The two collecting and distributing lanes are respectively arranged on the up lane and the down lane, and are located on both sides of the main line of the expressway; The two service area sites are respectively arranged on opposite sides of the main line of the expressway, and are connected with the two collecting and distributing lanes through the service area site entry and exit lanes, so as to realize the expressway service area function.
[0006] Preferably, the interchange ramp includes one interchange two-way ramp and two interchange one-way ramps; The two-way ramp of the interchange is used to connect the toll station with the collector-distributor lane on the side away from the toll station; The two interchange one-way ramps are used to connect the toll station with a collector-distributor lane close to one side of the toll station.
[0007] Preferably, the two-way ramp of the interchange is a three-dimensional structure that crosses over or passes under the main line of the expressway.
[0008] Preferably, the two interchange one-way ramps are curved.
[0009] Preferably, the two-way ramp of the interchange is connected to the collector-distributor lane on the side away from the toll station through two one-way ramps of the interchange.
[0010] Preferably, it also includes the toll station accommodation area; The toll station accommodation area is arranged on one side close to the toll station and is adjacent to the service area.
[0011] Preferably, the entry and exit lanes of the service area are two one-way lanes.
[0012] Preferably, the entry and exit lane of the service area is a two-way lane.
[0013] Preferably, the lanes entering and exiting the service area are curved.
[0014] Beneficial effects: Compared with the prior art, the present invention can realize the joint construction of the service area and the interchange in a limited fixed space, with a small land area and regular land use, which can save part of the project investment.
[0015] The toll station, the toll station accommodation area and the second service area are arranged on the same side of the present invention, occupying a small area, which can reduce the pressure of land acquisition. The toll station is arranged close to the second service area, and the additional area occupied by the slope, the side ditch, the drainage ditch, etc. caused by the separate setting is minimized as much as possible; The main line and the collector-distributor lane diverging nose of the present invention is far away from the interchange ramp, and the driving safety can be improved by decelerating over a long distance. In the case of limited land use, the technical indicators such as the design speed and minimum radius of the one-way ramp off the highway can be reduced; Vehicles getting off the highway can choose to rest or resupply at the service area before getting off the highway, thus improving the service performance of the service area. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a schematic diagram of the layout of the expressway service area and the interchange in an embodiment of the present invention; In the figure: 1. Main line of expressway; 2. First collector-distributor lane; 3. Second collector-distributor lane; 4. Bidirectional A ramp of interchange; 5. One-way B ramp of interchange; 6. One-way C ramp of interchange; 7. One-way D ramp of interchange; 8. One-way E ramp of interchange; 9. Toll station; 10. Local highway; 11. First service area; 12. Second service area; 13. Toll station dormitory area; 14. One-way lane for entering the first service area; 15. One-way lane for exiting the first service area; 16. One-way lane for entering the second service area; 17. One-way lane for exiting the second service area. DETAILED DESCRIPTION
[0017] In the following description, specific details such as specific system structures and technologies are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present invention. However, it should be clear to those skilled in the art that the present invention may be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems and devices are omitted to prevent unnecessary details from obstructing the description of the present invention.
[0018] The preferred technical solutions of the present invention are further described below in conjunction with the accompanying drawings and embodiments.
[0019] The purpose of the present invention is to provide an integrated system of a highway service area and an interchange, which realizes all the functions of the service area and the interchange in a limited fixed space, and achieves the purpose of high-speed vehicles getting on and off the service area by setting up a collection and distribution lane near the service area section, and uses the interchange to connect the toll station 9 with the collection and distribution lane to achieve the purpose of local vehicles getting on and off the highway. The toll station 9 is arranged on one side of the service area away from the main line of the highway, thereby minimizing the length of the ramp and saving space.
[0020] In order to achieve the above object, the specific technical solution of the present invention is as follows: like Figure 1 As shown, an integrated system of a highway service area and an interchange of the present invention comprises a toll station, two service area areas, an up lane and a down lane for two-way travel on the main line of the highway, two collecting and distributing lanes, an entry and exit lane of the service area area, and an interchange ramp; the toll station is arranged on one side of the main line of the highway, and is connected to the main line of the highway through the interchange ramp, so as to enable local vehicles to get on and off the main line of the highway; the two collecting and distributing lanes are respectively arranged on the up lane and the down lane, and are located on both sides of the main line of the highway; the two service area areas are respectively arranged on opposite sides of the main line of the highway, and are connected to the two collecting and distributing lanes through the entry and exit lanes of the service area area, so as to realize the function of the highway service area.
[0021] Specifically, in this embodiment, Figure 1As shown, the up lane is specifically a lane for driving from left to right, and the down lane is specifically a lane for driving from right to left. A first collecting and distributing lane 2 and a second collecting and distributing lane 3 are respectively arranged on the up lane and the down lane near the outer side of the main line 1 of the expressway; The two service areas are a first service area 11 located near an up lane and a second service area 12 located near a down lane.
[0022] In this embodiment, the toll station 9 is arranged on one side of the second service area 12 and is used as an entrance and exit of the main line 1 of the expressway; The two service areas are respectively arranged on opposite sides of the main line 1 of the expressway, and are connected to the collector and distributor lanes on the side close to them.
[0023] Furthermore, the interchange ramps include one interchange two-way ramp and two interchange one-way ramps; the interchange two-way ramp is used to connect the toll station with the collector and distribution lane on the side away from the toll station; the two interchange one-way ramps are used to connect the toll station with the collector and distribution lane on the side close to the toll station.
[0024] Specifically, in this embodiment, the up lane is connected to the toll station 9 through the first collector-distributor lane 2 and the interchange two-way A ramp 4, and is used for vehicles to get on and off the main line up lane of the expressway; The down lane is connected to the toll station 9 through the second collector-distributor lane 3, the interchange one-way D ramp 7, and the interchange one-way E ramp 8, and is used for vehicles to get on and off the main line down lane of the expressway; In actual application, the toll station 9 is connected to the local highway 10, and the number of entry and exit lanes is determined according to the traffic volume; Furthermore, the two-way A ramp 4 of the interchange is connected to the collector-distributor lane on the side away from the toll station 9 through two one-way ramps.
[0025] Specifically, Figure 1 As shown, in this embodiment, the interchange two-way A ramp 4 is connected to the up-going lane through the interchange one-way B ramp 5 and the interchange one-way C ramp 6. The interchange one-way B ramp 5 is connected to the first collector-distributor lane 2, and is used for vehicles to flow from the first collector-distributor lane 2 into the interchange two-way A ramp 4; the interchange one-way C ramp 6 is connected to the first collector-distributor lane 2, and is used for vehicles to flow from the interchange two-way A ramp 4 into the first collector-distributor lane 2, and finally merge into the up-going lane of the expressway main line 1. In actual applications, the number of lanes of the interchange one-way B ramp 5 and the interchange one-way C ramp 6 is determined according to the traffic volume.
[0026] Specifically, Figure 1As shown, in this embodiment, the down lane is connected to the toll station 9 through the interchange one-way D ramp 7 and the interchange one-way E ramp 8. The interchange one-way D ramp 7 is connected to the second collector-distributor lane 3 for vehicles to flow from the toll station 9 into the second collector-distributor lane 3; the interchange one-way E ramp 8 is connected to the second collector-distributor lane 3 for vehicles to flow from the second collector-distributor lane 3 into the toll station 9. In actual application, the interchange one-way D ramp 7 and the interchange one-way E ramp 8 are specifically curved line shapes, and the number of lanes is determined according to the traffic volume.
[0027] Furthermore, the present invention also includes a toll station accommodation area 13; the toll station accommodation area 13 is arranged on a side close to the toll station 9 and adjacent to the service area.
[0028] Specifically, Figure 1 As shown, in this embodiment, the toll station dorm area 13 is located next to the edge of the second service area 12, and is arranged on the same side of the main line 1 of the highway as the toll station 9. It occupies a small area, can alleviate the pressure of land acquisition, and reduces the additional land occupied by slopes, ditches, drainage ditches, etc. caused by the separate setting of the toll station dorm area 13.
[0029] Furthermore, the entrance and exit lanes of the service area are two one-way lanes.
[0030] like Figure 1 As shown, in actual application, high-speed vehicles on the first distribution lane 2 enter the first service area 11 through the first service area one-way lane 14, and high-speed vehicles in the first service area 11 enter the first distribution lane 2 through the first service area one-way lane 15. That is, the two one-way lanes are respectively used for vehicles on the first distribution lane 2 to get on and off the first service area 11, and the two one-way lanes here are connected lanes.
[0031] The second service area 12 is connected to the second distribution lane 3 located in the downlink lane through the second service area one-way lane 16 and the second service area one-way lane 17. The two one-way lanes are respectively used for vehicles in the second distribution lane 3 to get on and off the second service area 12; the two one-way lanes here are connected lanes.
[0032] Furthermore, the two-way ramps of the interchange are three-dimensional structures that cross over or pass under the main line of the expressway.
[0033] Specifically, in order to ensure that the lane far from the toll station 9 can enter the toll station 9 safely and smoothly, an interchange two-way A ramp 4 is set between the two. Figure 1 As shown, in this embodiment, the interchange bidirectional A ramp 4 is a three-dimensional structure that crosses the main line 1 of the expressway, ensuring that vehicles can enter or leave the up lane from the toll station 9 without hindrance, while not affecting the passage of vehicles on the expressway.
[0034] Furthermore, the one-way ramp and the single-phase lane are in a curved line shape.
[0035] Specifically, the one-way ramp and the one-way lane in the present invention both adopt a curved line shape, which is used to reduce the speed change of the vehicle when merging into or exiting a certain road, thereby improving driving safety, especially when deceleration or acceleration is required. The present invention does not limit the specific radius of curvature, and those skilled in the art can adjust it according to the actual project.
[0036] In the present invention, the ramps for vehicles to exit the highway are all far away from the main line and the diverging nose of the collector-distributor lane, so that vehicles have a longer distance in the collector-distributor lane to decelerate, improving driving safety. In the case of limited land use, the design speed, minimum radius and other technical indicators of the ramp can be reduced. For example, in this embodiment, Figure 1 The interchange one-way B ramp 5 and the interchange one-way E ramp 8 shown in the figure have their outflow positions set on the large-pile sides of the first collector-distributor lane 2 and the second collector-distributor lane 3, so that vehicles have to travel a long distance after exiting the highway through the first collector-distributor lane 2 and the second collector-distributor lane 3 before they can flow out to the interchange one-way B ramp 5 and the interchange one-way E ramp 8, with a long deceleration and braking distance and high safety. If the land use is limited, the technical indicators of the interchange one-way B ramp 5 and the interchange one-way E ramp 8 can be reduced without causing safety problems.
[0037] The combined construction of the service area and the interchange of the present invention enables vehicles leaving the highway to have the opportunity to enter the service area for rest or replenishment before leaving the highway, thereby improving the service performance of the service area and making it more adaptable.
[0038] In this embodiment, the flow lines of vehicles entering and leaving the service area on the expressway are specifically as follows: Vehicles on the highway driving lane flow out through the first collecting and distributing lane 2 to the one-way lane 14 for entering the first service area, and then enter the first service area area 11 from the one-way lane 14 for entering the first service area; after resting or replenishing in the service area, they enter the first collecting and distributing lane 2 from the one-way lane 15 for exiting the first service area, and then enter the highway driving lane from the first collecting and distributing lane 2.
[0039] Vehicles in the down lane of the expressway flow out through the second collecting and distributing lane 3 to the one-way lane 16 for entering the second service area, and then enter the second service area area 12 from the one-way lane 16 for entering the second service area; after resting or replenishing in the service area, they enter the second collecting and distributing lane 3 from the one-way lane 17 for exiting the second service area, and then drive into the down lane of the expressway from the second collecting and distributing lane 3.
[0040] In this embodiment, the flow lines of vehicles entering and leaving the toll station on the expressway are specifically as follows: The high-speed vehicles on the up lane flow out to the interchange one-way B ramp 5 through the first collector-distributor lane 2, and then connect to the interchange two-way A ramp 4 from the interchange one-way B ramp 5, and then exit the highway from the interchange two-way A ramp 4 through the toll booth 9; Downward lane high-speed vehicles flow out through the second collector-distributor lane 3 to the interchange one-way E ramp 8, and then exit the highway through the toll booth 9; Vehicles that need to enter the up lane pass through the toll booth 9 and enter the interchange two-way A ramp 4, then the interchange two-way A ramp 4 connects to the interchange one-way C ramp 6, and then merges into the first collector-distributor lane 2 from the interchange one-way C ramp 6, and enters the highway through the first collector-distributor lane 2; Vehicles that need to enter the down lane pass through the toll station 9 and enter the interchange one-way D ramp 7, then merge into the second collector-distributor lane 3 from the interchange one-way D ramp 7, and get on the highway through the second collector-distributor lane 3.
[0041] High-speed vehicles can also enter the service area to rest or resupply, and then exit the highway through the first distribution lane 2 and the second distribution lane 3.
[0042] The above are only several embodiments of the present invention and are not intended to limit the present invention in any form. Although the present invention is disclosed as above in the form of a preferred embodiment, it is not intended to limit the present invention. Any technician familiar with the profession, without departing from the scope of the technical solution of the present invention, using the above disclosed technical content to make slight changes or modifications are equivalent to equivalent implementation cases and fall within the scope of the technical solution.
Claims
1. An integrated system of expressway service area and interchange, characterized in that: It includes toll booths, two service area areas, up and down lanes for two-way travel on the main line of the expressway, two collector lanes, service area entry and exit lanes, and interchange ramps; The toll station is arranged on one side of the main line of the expressway and is connected to the main line of the expressway through the interchange ramp, so as to enable local vehicles to get on and off the main line of the expressway; The two collecting and distributing lanes are respectively arranged on the up lane and the down lane, and are located on both sides of the main line of the expressway; The two service area sites are respectively arranged on opposite sides of the main line of the expressway, and are connected with the two collecting and distributing lanes through the service area site entry and exit lanes, so as to realize the expressway service area function.
2. The integrated system of expressway service area and interchange according to claim 1, characterized in that: The interchange ramps include one interchange two-way ramp and two interchange one-way ramps; The two-way ramp of the interchange is used to connect the toll station with the collector-distributor lane on the side away from the toll station; The two interchange one-way ramps are used to connect the toll station with a collector-distributor lane close to one side of the toll station.
3. The integrated system of expressway service area and interchange according to claim 2 is characterized in that: The two-way ramp of the interchange is a three-dimensional structure that crosses over or passes under the main line of the expressway.
4. The integrated system of expressway service area and interchange according to claim 2, characterized in that: The two interchange one-way ramps are curved.
5. The integrated system of expressway service area and interchange according to claim 3 is characterized in that: The two-way ramp of the interchange is connected to the collector-distributor lane on the side away from the toll station through two one-way ramps of the interchange.
6. The integrated system of expressway service area and interchange according to claim 1, characterized in that: It also includes the toll station accommodation area; The toll station accommodation area is arranged on one side close to the toll station and is adjacent to the service area.
7. The integrated system of expressway service area and interchange according to claim 1, characterized in that: The entry and exit lanes of the service area are two one-way lanes.
8. The integrated system of expressway service area and interchange according to claim 1, characterized in that: The entry and exit lane of the service area is a two-way lane.
9. The integrated system of expressway service area and interchange according to claim 1, characterized in that: The entry and exit lanes of the service area are curved.