Soil-rock junction roadbed treatment structure and method

By setting up a roadbed treatment layer, a transition layer and a graded gravel leveling layer at the soil-rock junction, and using lime-improved soil layers and rough slag fillers for layered backfilling, combined with the design of the geogrid layer, the differences at the soil-rock junction are solved. Settlement problems are improved, construction quality and pavement service life are improved, and soil stability is enhanced.

CN118814545APending Publication Date: 2024-10-22WUHAN SURVEYING GEOTECHN RES INST OF MCC
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411047898.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-01
Publication Date
2024-10-22

AI Technical Summary

Technical Problem

Existing technology is difficult to effectively deal with the problem of differential settlement at the junction of soil and rock, leading to cracking, subsidence, mud-sucking and other diseases of the road subgrade, affecting the functionality and safety of the road. Moreover, conventional treatment methods have long construction periods and difficult to control quality. Problems of poor environmental protection and high project cost.

Method used

Adopt a roadbed treatment structure at the junction of soil and rock, including a roadbed treatment layer, a transition layer and a graded gravel leveling layer. The undisturbed soil is excavated and mixed with lime to form a choking soil layer. Inverse slope steps and geogrids are set up, combined with rough slag or Graded sand and gravel fill is backfilled and compacted in layers to form a continuous geogrid layer to reduce differential settlement.

Benefits of technology

It improves the construction quality of roadbed treatment at the junction of soil and rock, reduces differential settlement, extends the service life of the pavement, enhances the soil bearing capacity and stability, and solves the problem of shortening the service life of the pavement caused by differential settlement.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118814545A_ABST
    Figure CN118814545A_ABST
Patent Text Reader

Abstract

The invention discloses an earth-rock junction roadbed treatment structure and method. The soil-rock junction roadbed treatment structure comprises a roadbed treatment layer located on the top face of a soil roadbed, a transition layer located on the top face of the junction of the soil roadbed and a rock roadbed and a graded broken stone leveling layer located on the top face of the rock roadbed, and the roadbed treatment layer is a backfill compaction layer formed by mixing dug undisturbed soil with lime. The transition layer is located between the roadbed treatment layer and the graded broken stone leveling layer, and a first geogrid layer is laid in the transition layer and the roadbed treatment layer; and a reverse slope step is excavated at the earth-rock boundary line, a backfill layer is arranged below the roadbed treatment layer, and a second geogrid layer is horizontally arranged in the backfill layer. The method can be used for solving the problem that in the prior art, a soil-stone mixed filling roadbed structure cannot be completely applied, roadbed treatment is carried out at the soil-stone junction, and the problem that the service life of a road surface is shortened due to differential settlement at the stone roadbed junction is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of soil-rock junction roadbed treatment in municipal road engineering, in particular to a soil-rock junction roadbed treatment structure and method. Background Art

[0002] Road subgrade construction in municipal engineering is the most important and critical content in municipal engineering, and it is also the core content. The quality of the road subgrade directly affects the use and safety of the entire road project. With the improvement of my country's economic level and the pursuit of the highest quality of engineering, the requirements for the flatness and safety of roads are getting higher and higher. At the same time, a good driving experience also reflects the quality of the road. Due to the differences in the strata at the junction of soil and rock, there will inevitably be differences in the settlement of the area. If it is not handled, it will inevitably lead to cracking, sinking, mud pumping and other diseases of the road subgrade, affecting the functionality and safety of the road. For this reason, it is very necessary to study the treatment of the soil-rock junction of municipal road projects.

[0003] Soil-rock foundation is common in mountainous areas. At present, domestic research mainly focuses on projects such as buildings and foundation pit support tunnels. There are two main treatment methods. One is to treat the soil foundation with high compressibility to adapt it to the rock foundation with low compressibility. It can be treated by pile foundation, local deep excavation, soil replacement and beam arch spanning. The other is to treat the rock foundation to adapt it to the soil foundation with high compressibility. Generally, the cushion method is used. Since the material used as the cushion should be selected according to the different soil and rock properties, settlement amount, foundation stress and natural conditions, it is difficult to solve the problem of differential settlement.

[0004] In order to improve the construction quality of roadbed treatment at the junction of soil and rock, reduce the problem of differential settlement at the junction of soil and rock, and extend the service life of the road surface, roadbed treatment will be carried out at the junction of soil and rock to solve the problem of shortened road surface service life due to differential settlement.

[0005] Existing roadbed treatment only involves the structure of mixed filling of soil and stone, and most of them are for the treatment of the roadbed at the junction of fill and excavation of newly built roads and the junction of new and old roads in the reconstruction and expansion of roads. Commonly used measures for the connection of roadbed at the junction of fill and excavation and the junction of new and old include digging steps, laying geotextiles layer by layer, loading or natural settlement, etc. The main problems are: (1) The backfill of steps is generally backfilled to the top layer, which has high requirements for the quality of the backfill. The utilization rate of the original soil in the existing site is low, and it is difficult to dig steps layer by layer for the rock layer; (2) The laying of geotextiles layer by layer is relatively cumbersome, and the geotextiles are not suitable for large-scale machinery rolling. The construction period is long and the quality is difficult to control. In addition, the method of laying geotextiles at the junction of soil and stone cannot meet the bearing capacity and stability of the soil layer; (3) The construction period of roadbed loading preloading and natural settlement is long.

[0006] In summary, conventional foundation treatment methods involve a large amount of earthwork, make less use of original soil, are not environmentally friendly, have many construction processes, have high project costs, and are difficult to ensure quality. Moreover, the above treatment methods are all for the treatment of the junction between the new and old foundations. The only difference between the new and old foundations is the consolidation time, and the difference is much smaller than that between soil-rock foundations. Therefore, the above methods are not applicable to the treatment of the junction between soil-rock foundations.

[0007] Therefore, it is necessary to design a roadbed connection technology for foundation treatment at the soil-rock interface to solve the above problems. Summary of the invention

[0008] The purpose of the present invention is to provide a roadbed treatment structure and method at the soil-rock interface, which can reduce the problem of differential settlement at the soil-rock interface and extend the service life of the road surface.

[0009] In order to achieve the above technical purpose, the present invention provides a roadbed treatment structure at the junction of soil and rock, which is used to treat the junction of soil and rock, where a soil-rock junction line is formed between the soil and rock, the soil includes a soil layer, and the rock includes a rock layer. The treatment structure includes a roadbed treatment layer located on the top surface of the soil roadbed, a transition layer located on the top surface of the junction of the soil and rock roadbed, and a graded crushed stone leveling layer located on the top surface of the rock roadbed, wherein the roadbed treatment layer is made of the original soil excavated and mixed with lime. A backfill compaction layer is formed, the transition layer is located between the roadbed treatment layer and the graded crushed stone leveling layer, and the thickness of the transition layer matches the thickness of the roadbed treatment layer; a first geogrid layer is laid in the transition layer and the roadbed treatment layer, and the transition layer and the first geogrid layer in the roadbed treatment layer are connected as a whole; a reverse slope step is excavated toward the rock layer at the soil-rock boundary line, a backfill layer is provided under the roadbed treatment layer, the backfill layer is a backfill compaction layer formed by layered backfilling and rolling treatment at the reverse slope step, and a second geogrid layer is horizontally arranged in the backfill layer.

[0010] A preferred technical solution of the present invention is as follows: the transition layer horizontally extends 10 to 15 meters from the soil-rock boundary line toward the soil layer, and the transition layer is filled with slag filler or graded sand and gravel filler.

[0011] The preferred technical solution of the present invention is as follows: the roadbed treatment layer is formed by digging up the soil layer of the earth roadbed, choking with 6% to 10% lime, and then backfilling and compacting to form a lime soil layer with a thickness of 80cm to 100cm; when choking with lime, the specific amount of lime can be dynamically adjusted according to the actual water content of the soil on site.

[0012] The preferred technical solution of the present invention is that the graded crushed stone leveling layer is a pavement structure that is leveled and paved with graded crushed stone after the rock layer of the rock roadbed is excavated according to the designed elevation and pavement structure thickness. The thickness of the graded crushed stone leveling layer is 5cm to 10cm.

[0013] A preferred technical solution of the present invention is as follows: the width of the reverse slope step is 2 to 2.5 m, and a reverse slope with a downward inclination of 4% to 5% toward the rock layer side is excavated at the bottom of the step.

[0014] The preferred technical solution of the present invention is as follows: the backfill layer is formed by digging up the soft soil layer on the upper part of the soil layer of the earth roadbed, backfilling it in layers to the bottom surface of the roadbed treatment layer and compacting it; the soft soil layer includes a cultivated soil layer, a miscellaneous fill soil layer or a plain fill soil layer; the qualified soil includes clay, gravel soil, sand or blasting slag whose water content meets the compaction requirements, wherein the maximum particle size of the blasting slag is not greater than 2 / 3 of the thickness of each layer of paving, and when vibrating and rolling it, it does not exceed 3 / 4 of the thickness of each layer of paving.

[0015] The preferred technical solution of the present invention is as follows: a first geogrid is provided in the transition section and the roadbed treatment layer; three layers of the second geogrid are provided in the backfill layer, and both the first geogrid and the second geogrid are made of polypropylene three-dimensional geogrid, and the quality-controlled tensile modulus thereof is not less than 185kN / m / 2%.

[0016] The present invention also provides a method for treating a roadbed at a soil-rock interface. The method uses the above-mentioned roadbed treatment structure at a soil-rock interface to treat the interface between a soil roadbed and a rock roadbed. The specific treatment steps are as follows:

[0017] S1. Remove the rocks above the top of the roadbed of the rock roadbed, and then use evenly mixed graded crushed stones to level and compact;

[0018] S2. Remove the soft soil layer from the earth roadbed area, excavate the reverse slope steps in layers at the junction of the soil layer and the rock layer within the depth range below the roadbed, and excavate a reverse slope of 4% to 5% towards the rock layer at the bottom of the steps, then backfill the roadbed in layers to the bottom of the roadbed treatment layer and compact it, and during the backfilling process, lay multiple layers of geogrids in the backfill layer;

[0019] S3. A transition section is set at the junction of longitudinal filling and excavation of soil and rock. The length of the transition section is 10 to 15 meters. Raw slag filler or graded sand and gravel filler is used for layered filling and compaction. Geogrids are laid in the transition section, and the geogrids are laid from the transition section to the soil roadbed treatment layer;

[0020] S4. For the soil layer of the earth roadbed, the improved original soil is used for backfilling and compaction in layers, and its thickness is the same as that of the transition section; the improved original soil is obtained by mixing 6% to 10% of lime into the soil layer excavated from the earth roadbed for improvement.

[0021] A better technical solution of the present invention: in the S2 step, the soft soil layer to be excavated includes a cultivated soil layer, a miscellaneous fill soil layer or a plain fill soil layer; the qualified backfill soil includes clay, gravel soil, sand or blasting slag whose water content meets the compaction requirements, wherein the maximum particle size of the blasting slag is not greater than 2 / 3 of the thickness of each layer of paving, and when vibrating and rolling is used, it does not exceed 3 / 4 of the thickness of each layer of paving.

[0022] The preferred technical solution of the present invention is as follows: in the step S2, three layers of geogrids are laid when backfilling the roadbed; in the step S3, the thickness of the transition section is 80 cm to 100 cm, and a layer of geogrid is laid in the transition section; the geogrids in the steps S2 and S3 are both polypropylene three-dimensional geogrids, and their quality-controlled tensile modulus is not less than 185 kN / m / 2%.

[0023] The beneficial effects of the present invention are:

[0024] (1) The transition section of the present invention is backfilled in layers by replacing qualified fillers such as slag during construction, and compacted in layers. A geogrid is laid in the transition section. The geogrid is laid along the transition section to the soil layer roadbed treatment section, and the laying height is kept consistent, thereby improving the construction quality of the roadbed treatment at the soil-rock junction, while reducing the problem of differential settlement at the soil-rock junction, extending the service life of the road surface, and solving the problem of shortening the service life of the road surface due to differential settlement;

[0025] (2) The present invention excavates a reverse slope step toward the rock at the soil-rock boundary, and excavates a reverse slope inclined toward the inner rock layer at the bottom of the step, which can maintain and reduce uneven settlement of the roadbed;

[0026] (3) The excavated soil is mixed with a certain proportion of lime and then treated on the roadbed, which enhances the soil bearing capacity and stability, improves the soil moisture content, and makes it reach the optimal moisture content for roadbed compaction to ensure its anti-leakage effect and construction quality; and it can also make good use of the original soil. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a schematic diagram of the roadbed treatment structure at the soil-rock interface of the present invention;

[0028] Figure 2 It is a plane schematic diagram of the soil-rock interface of the present invention.

[0029] Reference numerals in the figure: 1—soil layer; 2—rock layer; 3—transition section; 4—roadbed treatment layer; 5—graded crushed stone leveling layer; 6—soil-rock boundary line; 7—reverse slope step; 8—fill layer, 9—first geogrid, 10—second geogrid. DETAILED DESCRIPTION

[0030] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0031] The embodiment of the present invention provides a soil-rock junction roadbed treatment structure, which treats the junction between the soil roadbed and the rock roadbed, such as Figure 1 As shown, a soil-rock boundary line 6 is formed between the soil roadbed and the rock roadbed, the soil roadbed includes a soil layer 1, the rock roadbed includes a rock layer 2, the treatment structure includes a roadbed treatment layer 4 located on the top surface of the soil roadbed, a transition layer 3 located on the top surface of the boundary between the soil roadbed and the rock roadbed, and a graded crushed stone leveling layer 5 located on the top surface of the rock roadbed, the transition layer 3 is located between the roadbed treatment layer 4 and the graded crushed stone leveling layer 5, and the thickness of the transition layer 3 matches the thickness of the roadbed treatment layer 4; a first geogrid layer 8 is laid in the transition layer 3 and the roadbed treatment layer 4, and the transition layer 3 and the first geogrid layer 9 in the roadbed treatment layer 4 are connected as a whole; a reverse slope step 7 is excavated toward the rock layer 2 at the soil-rock boundary line 6, and a backfill layer 8 is provided below the roadbed treatment layer 4, the backfill layer 8 is a backfill compaction layer formed by layered backfilling and rolling treatment at the reverse slope step 7, and three layers of second geogrid layers 10 are horizontally arranged in the backfill layer 8. The first geogrid 9 and the second geogrid 10 are both made of polypropylene three-dimensional geogrids, and the quality-controlled tensile modulus thereof is not less than 185 kN / m / 2%.

[0032] In the embodiment, the transition layer 3 extends horizontally from the soil-rock boundary line 6 toward the soil layer for 10 to 15 m, and the transition layer 3 is filled with slag filler or graded sand and gravel filler. The roadbed treatment layer 4 is a lime soil layer formed by digging up the soil layer 1 of the soil roadbed, choking in 6% to 10% lime, and then backfilling and compacting. The thickness of the lime soil layer is 80 cm to 100 cm. The graded gravel leveling layer 5 is a pavement structure that is leveled and paved with graded gravel after the rock layer 2 of the rock roadbed is excavated according to the designed elevation and the thickness of the pavement structure. The thickness of the graded gravel leveling layer 5 is 5 cm to 10 cm. The width of the reverse slope step 7 is 2 to 2.5 m, and a reverse slope of 4% to 5% downwardly inclined toward the rock layer 2 is excavated at the bottom of the step. The backfill layer 8 is formed by digging up the soft soil layer on the upper part of the soil layer 1 of the earth roadbed, backfilling qualified soil in layers to the bottom surface of the roadbed treatment layer 4 and compacting it; the soft soil layer includes a cultivated soil layer, a miscellaneous fill soil layer or a plain fill soil layer; the qualified soil includes clay, gravel soil, sand or blasting slag whose water content meets the compaction requirements, wherein the maximum particle size of the blasting slag is not greater than 2 / 3 of the thickness of each layer of paving, and when vibrating and rolling is used, it does not exceed 3 / 4 of the thickness of each layer of paving.

[0033] In the embodiment, the northern section of Guanggu Eighth Road (Forest Avenue ~ Jiufeng Second Road) project is taken as an example. This project involves earthwork sections and hard rock sections. In order to avoid settlement at the soil-rock interface, a soil-rock interface roadbed treatment method described in the present invention is used for treatment. During the treatment process, the roadbed treatment layer 4 under the top of the earth roadbed is backfilled with 80 cm thick choking ash soil, and the choking ash ratio is 8%. The length of the transition section 3 is 10m, and its replacement thickness is consistent with the depth of the roadbed treatment layer 4, that is, 80cm, and rough slag is used for filling. The graded gravel leveling layer 5 is on the top surface of the rock roadbed with a thickness of 10cm. The width of the reverse slope step 7 is 2m, and a reverse slope of 4% inclined toward the inner rock layer 2 is excavated at the bottom of the step. The geogrid adopts a polypropylene three-way geogrid, and its quality control tensile modulus is not less than 185kN / m / 2%; the specific construction steps are as follows:

[0034] S1. Remove the rock above the top of the roadbed in the rock layer section, and then use evenly mixed graded crushed stone to level and compact it. The compacted thickness of the graded crushed stone is 10cm;

[0035] S2. Remove the unqualified soft soil layers (such as cultivated soil, miscellaneous fill soil, plain fill soil, etc.) in the soil layer section area, and excavate the reverse slope steps in layers at the junction of the soil layer and the rock layer within the depth range below the roadbed. The width is 2m, and a reverse slope with a slope of 4% inclined to the inner rock layer is excavated at the bottom of the steps. Then, the roadbed is backfilled in layers to the bottom of the roadbed treatment layer and compacted. Three layers of geogrids are used for backfilling the roadbed. The geogrid uses polypropylene three-dimensional geogrids, and its quality control tensile modulus is not less than 185kN / m / 2% to improve the stability of the fill embankment;

[0036] S3. A transition section is set up on the roadbed at the junction of longitudinal fill and excavation soil and rock. The transition section is a section of moderate hardness from rock to soil. It is mainly paved from the soil-rock boundary line to 10m in the direction of the soil layer. Qualified filling materials such as slag are used for layered filling and compaction. The replacement thickness is the same as the depth of the soil roadbed treatment layer, that is, 80cm. A layer of geogrid is laid within the replacement depth range, and it is laid from the transition section to the soil roadbed treatment layer. The geogrid uses polypropylene three-way geogrid, and its quality controlled tensile modulus is not less than 185kN / m / 2% to reduce uneven settlement of the roadbed.

[0037] S4. The roadbed of the soil layer section is improved by excavating earth and backfilling with 80cm thick choking soil with an 8% choking ratio. After the original soil and choking soil are excavated, they are backfilled and compacted in layers.

[0038] After the soil-rock interface is treated with the method of the present invention, a good treatment effect is obtained, and after long-term use, no quality phenomena such as differential settlement occur.

[0039] What has been described above are only preferred specific implementations of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field, within the technical scope disclosed by the present invention, can make equivalent replacements or changes based on the technical solutions and inventive concepts of the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A soil-rock junction roadbed treatment structure, which treats the junction of a soil roadbed and a rock roadbed, wherein a soil-rock junction line (6) is formed between the soil roadbed and the rock roadbed, the soil roadbed comprises a soil layer (1), and the rock roadbed comprises a rock layer (2), and is characterized in that: The treatment structure comprises a roadbed treatment layer (4) located on the top surface of the soil roadbed, a transition layer (3) located on the top surface of the junction of the soil roadbed and the rock roadbed, and a graded crushed stone leveling layer (5) located on the top surface of the rock roadbed. The roadbed treatment layer (4) is a backfill compaction layer formed by mixing lime with the excavated original soil. The transition layer (3) is located between the roadbed treatment layer (4) and the graded crushed stone leveling layer (5), and the thickness of the transition layer (3) matches the thickness of the roadbed treatment layer (4). A first geogrid layer (8) is laid in the roadbed treatment layer (4), and the transition layer (3) and the first geogrid layer (9) in the roadbed treatment layer (4) are connected as a whole; a reverse slope step (7) is excavated toward the rock layer (2) at the soil-rock boundary line (6), and a backfill layer (8) is provided below the roadbed treatment layer (4), wherein the backfill layer (8) is a backfill compaction layer formed by backfilling and rolling in layers from the reverse slope step (7), and a second geogrid layer (10) is horizontally arranged in the backfill layer (8).

2. The soil-rock junction roadbed treatment structure according to claim 1 is characterized by: The transition layer (3) horizontally extends 10 to 15 m from the soil-rock boundary line (6) toward the soil layer, and the transition layer (3) is filled with slag filler or graded sand and gravel filler.

3. A soil-rock junction roadbed treatment structure according to claim 1 or 2, characterized in that: The roadbed treatment layer (4) is a lime soil layer formed by digging up the soil layer (1) of the soil roadbed, injecting 6% to 10% lime into it, and then backfilling and compacting it. The thickness of the lime soil layer is 80 cm to 100 cm.

4. A soil-rock junction roadbed treatment structure according to claim 1 or 2, characterized in that: The graded crushed stone leveling layer (5) is a road surface structure that is leveled and paved with graded crushed stone after the rock layer (2) of the rock roadbed is excavated according to the designed elevation and road surface structure thickness. The thickness of the graded crushed stone leveling layer (5) is 5 cm to 10 cm.

5. A soil-rock junction roadbed treatment structure according to claim 1 or 2, characterized in that: The width of the reverse slope step (7) is 2 to 2.5 m, and a reverse slope with a downward inclination of 4% to 5% toward the rock layer (2) is excavated at the bottom of the step.

6. A soil-rock junction roadbed treatment structure according to claim 1 or 2, characterized in that: The backfill layer (8) is formed by digging up the soft soil layer on the upper part of the soil layer (1) of the earth roadbed, backfilling qualified soil in layers to the bottom surface of the roadbed treatment layer (4) and compacting it; the soft soil layer includes a cultivated soil layer, a miscellaneous fill soil layer or a plain fill soil layer; the qualified soil includes clay soil, crushed stone soil, sandy soil or blasting slag whose water content meets the compaction requirements, wherein the maximum particle size of the blasting slag is not more than 2 / 3 of the thickness of each layer, and when vibrating and rolling, it does not exceed 3 / 4 of the thickness of each layer.

7. A soil-rock junction roadbed treatment structure according to claim 1 or 2, characterized in that: A first geogrid (9) is provided in the transition section (3) and the roadbed treatment layer (4); a second geogrid (10) in the backfill layer (8) is provided with three layers, and both the first geogrid (9) and the second geogrid (10) are polypropylene three-dimensional geogrids, and their quality-controlled tensile modulus is not less than 185 kN / m / 2%.

8. A method for treating roadbed at the soil-rock interface, characterized in that: The treatment method adopts the soil-rock junction roadbed treatment structure in claims 1 to 7 to treat the junction of the soil roadbed and the rock roadbed, and the specific treatment steps are as follows: S1. Remove the rocks above the top of the roadbed of the rock roadbed, and then use evenly mixed graded crushed stones to level and compact; S2. Remove the soft soil layer from the earth roadbed area, excavate the reverse slope steps in layers at the junction of the soil layer and the rock layer within the depth range below the roadbed, and excavate a reverse slope of 4% to 5% towards the rock layer at the bottom of the steps, then backfill the roadbed with qualified soil in layers to the bottom of the roadbed treatment layer and compact it, and during the backfilling process, lay multiple layers of geogrids in the backfill layer; S3. A transition section is set at the junction of longitudinal filling and excavation of soil and rock. The length of the transition section is 10 to 15 meters. Raw slag filler or graded sand and gravel filler is used for layered filling and compaction. Geogrids are laid in the transition section, and the geogrids are laid from the transition section to the soil roadbed treatment layer; S4. For the soil layer of the earth roadbed, the improved original soil is used for backfilling and compaction in layers, and its thickness is the same as that of the transition section; the improved original soil is obtained by mixing 6% to 10% of lime into the soil layer excavated from the earth roadbed for improvement.

9. A method for treating roadbed at the soil-rock interface according to claim 8, characterized in that: In the step S2, the soft soil layer to be excavated includes a cultivated soil layer, a miscellaneous fill soil layer or a plain fill soil layer; the qualified backfill soil includes clay, gravel soil, sand or blasting slag whose moisture content meets the compaction requirements, wherein the maximum particle size of the blasting slag is not greater than 2 / 3 of the thickness of each layer of paving, and when vibrating and rolling is used, it does not exceed 3 / 4 of the thickness of each layer of paving.

10. The method for treating the roadbed at the soil-rock interface according to claim 8, characterized in that: In step S2, three layers of geogrids are laid when backfilling the roadbed; in step S3, the thickness of the transition section is 80cm to 100cm, and a layer of geogrid is laid in the transition section; the geogrids in steps S2 and S3 are both polypropylene three-dimensional geogrids, and their quality-controlled tensile modulus is not less than 185kN / m / 2%.

Citation Information

Patent Citations

  • Treatment process for poor soil roadbed

    CN113005839A

  • Bidirectional pulling construction method for filling and excavation junction area of inclined excavation step type roadbed

    CN115573214A

  • Road high embankment self-adaptive deformation coordination layer design method

    CN117421806A

  • Mountain road fills out and digs boundary highway section and prevent differential settlement structure

    CN208777093U

  • Potable multipurpose massaging device

    KR102092409B1