Cast-in-place large-diameter tubular pile die drawing speed control method and device, medium and product
Through real-time monitoring data and dynamic updates of the decision tree model, intelligent control of the draft speed of cast-in-situ large-diameter pipe piles is achieved, which solves the problem of relying on experience control during construction and improves the accuracy of the draft speed and construction efficiency.
Patent Information
- Application Number
- CN202410773953.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-14
- Publication Date
- 2024-10-22
AI Technical Summary
In the construction of cast-in-place large-diameter pipe piles, the control of the vibration pulling speed relies on the experience of the construction personnel and lacks an intelligent control mechanism, resulting in low accuracy in drawing speed control and affecting construction quality, cost and progress.
By obtaining real-time monitoring data of cast-in-place large-diameter pipe piles, the decision tree model is used to determine the optimal draft speed interval, and the decision tree model is dynamically updated with the VFDT algorithm to achieve intelligent control of the draft speed.
The control accuracy of the drafting speed is improved, the risk of pile breakage is reduced, the construction efficiency and quality are improved, and the cost is reduced.
Smart Images

Figure CN118814780A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of pipe pile draft control, and in particular to a method, device, medium and product for controlling the draft speed of cast-in-place large-diameter pipe piles. Background Art
[0002] Cast-in-place large-diameter pipe piles, namely PCC piles, have been widely used in engineering practice. However, in the construction of cast-in-place large-diameter pipe piles, the speed of vibration pipe pulling directly affects the quality, cost and progress of pile foundation construction. If the speed of vibration pipe pulling is too fast, it will induce pile breakage; if the speed is too slow, it will lead to failure to pull out the mold. As one of the key control indicators in the construction process of PCC piles, the speed of vibration pipe pulling is currently still mainly dependent on the experience of construction personnel, and there is a lack of intelligent control mechanism and control system for the speed of vibration pile pulling. Summary of the invention
[0003] The purpose of the present invention is to provide a method, device, medium and product for controlling the drafting speed of cast-in-place large-diameter pipe piles, so as to improve the control accuracy of the drafting speed.
[0004] To achieve the above object, the present invention provides the following solutions:
[0005] A method for controlling the demoulding speed of a cast-in-place large-diameter pipe pile, comprising:
[0006] Obtain current monitoring data, current demoulding speed and pile formation status of cast-in-place large-diameter pipe piles; monitoring data include side friction resistance, end resistance, inner soil squeezing pressure, outer soil squeezing pressure, excess pore water pressure, ambient humidity, ambient temperature, poured concrete filling coefficient and concrete pouring height; pile formation status includes difficult demoulding, normal and broken piles;
[0007] Discretizing the current monitoring data to obtain processed monitoring data;
[0008] According to the processed monitoring data, the current decision tree model is used to determine the first demoulding speed interval, the second demoulding speed interval and the third demoulding speed interval; the decision tree model includes decision trees corresponding to different pile forming situations; the current decision tree model is obtained by updating the decision tree model of the previous moment using the VFDT algorithm according to the current monitoring data and the current demoulding speed; the current decision tree model includes the current decision tree corresponding to the difficult demoulding pile forming situation, the current decision tree corresponding to the normal pile forming situation and the current decision tree corresponding to the broken pile pile forming situation; the decision tree model at the initial moment is established using historical monitoring data and the corresponding demoulding speed and pile forming situation; the decision tree model at the initial moment includes the decision tree corresponding to the difficult demoulding pile forming situation at the initial moment, the decision tree corresponding to the normal pile forming situation at the initial moment and the decision tree corresponding to the broken pile pile forming situation at the initial moment; the first demoulding speed interval is the demoulding speed corresponding to the difficult demoulding pile forming situation; the second demoulding speed interval is the demoulding speed corresponding to the normal pile forming situation; the third demoulding speed interval is the demoulding speed corresponding to the broken pile pile forming situation;
[0009] An optimal draft speed is determined according to the first draft speed interval, the second draft speed interval, and the third draft speed interval to regulate the current draft speed.
[0010] Optionally, the process of establishing the decision tree model at the initial moment specifically includes:
[0011] Obtain historical monitoring data and corresponding demoulding speed and pile formation status;
[0012] Discretization processing is performed on the historical monitoring data and the demoulding speeds corresponding to different pile forming conditions to obtain a processed training sample set corresponding to a difficult-to-demolish pile forming condition, a processed training sample set corresponding to a normal pile forming condition, and a processed training sample set corresponding to a broken pile forming condition;
[0013] Based on the processed training sample set corresponding to the difficult-to-eliminate-pile situation, combined with the impurity index, a decision tree generation algorithm is used to generate a decision tree corresponding to the difficult-to-eliminate-pile situation at the initial moment; the impurity index is information gain, information gain rate or Gini index; the decision tree generation algorithm is ID3 decision tree algorithm, C4.5 algorithm or CART algorithm;
[0014] Based on the processed training sample set corresponding to the normal pile formation situation, combined with the impurity index, a decision tree corresponding to the normal pile formation situation at the initial moment is generated using a decision tree generation algorithm;
[0015] Based on the processed training sample set corresponding to the broken pile formation situation, combined with the impurity index, a decision tree corresponding to the broken pile formation situation at the initial moment is generated using a decision tree generation algorithm.
[0016] Optionally, according to the current monitoring data and the current draft speed, the decision tree model at the last moment is updated using a VFDT algorithm, specifically including:
[0017] Discretize the current monitoring data and the current demoulding speed respectively to obtain a processed updated sample set corresponding to a difficult demoulding pile forming situation, a processed updated sample set corresponding to a normal pile forming situation, and a processed updated sample set corresponding to a broken pile forming situation;
[0018] Based on the processed updated sample set corresponding to the difficult-to-draw-form pile situation, the decision tree corresponding to the difficult-to-draw-form pile situation at the previous moment is updated using the VFDT algorithm to obtain a current decision tree corresponding to the difficult-to-draw-form pile situation;
[0019] Based on the processed updated sample set corresponding to the normal pile formation situation, the decision tree corresponding to the normal pile formation situation at the previous moment is updated using the VFDT algorithm to obtain a current decision tree corresponding to the normal pile formation situation;
[0020] Based on the processed updated sample set corresponding to the broken pile formation situation, the decision tree corresponding to the broken pile formation situation at the previous moment is updated using the VFDT algorithm to obtain a current decision tree corresponding to the broken pile formation situation;
[0021] The current decision tree corresponding to the difficult-to-demold pile forming situation, the current decision tree corresponding to the normal pile forming situation and the current decision tree corresponding to the broken pile pile forming situation constitute a current decision tree model.
[0022] Optionally, based on the processed updated sample set corresponding to the normal piling situation, the decision tree corresponding to the normal piling situation at the previous moment is updated using the VFDT algorithm to obtain a current decision tree corresponding to the normal piling situation, specifically including:
[0023] Input the processed updated sample set corresponding to the normal pile formation situation into the decision tree corresponding to the normal pile formation situation at the previous moment, starting from the root node, entering the respective branches according to the value of the node decision attribute, and traversing from top to bottom until entering the leaf node;
[0024] Update the instance number of leaf nodes;
[0025] If l mod n min = 0 and all instances in the leaf nodes do not belong to the same class, then the information gain of all attributes of the leaf nodes is calculated; nl is the number of instances of leaf nodes; n min is a split indicator;
[0026] Calculate the Hoeffding value;
[0027] If the maximum value of the information gain is not an empty attribute and the difference between the maximum value and the second largest value of the information gain is greater than the Hoeffding value or the Hoeffding value is less than the confidence level, the leaf node corresponding to the information gain is converted into an internal node;
[0028] The number of new leaf nodes is determined by the number of maximum values of the information gain and new leaf nodes are generated. New leaf nodes are generated for all branches, and the relevant information of the split nodes is contained to obtain the current decision tree corresponding to the normal pile formation situation.
[0029] Optionally, determining the optimal draft speed according to the first draft speed interval, the second draft speed interval, and the third draft speed interval specifically includes:
[0030] If the second draft speed interval is greater than or equal to the first draft speed interval and less than or equal to the third draft speed interval, or the second draft speed interval is greater than the third draft speed interval and less than the first draft speed interval, the median of the second draft speed interval is used as the optimal draft speed;
[0031] If the second die-pulling speed interval is smaller than the first die-pulling speed interval and smaller than or equal to the third die-pulling speed interval, the maximum value of the second die-pulling speed interval is used as the optimal die-pulling speed;
[0032] If the second draft speed interval is greater than the third draft speed interval and greater than or equal to the first draft speed interval, the minimum value of the second draft speed interval is used as the optimal draft speed.
[0033] A computer device comprises: a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the computer program to implement the above-mentioned method for controlling the demoulding speed of cast-in-place large-diameter pipe piles.
[0034] A computer-readable storage medium stores a computer program, wherein the computer program, when executed by a processor, implements the above-mentioned method for controlling the demoulding speed of cast-in-place large-diameter pipe piles.
[0035] A computer program product includes a computer program, characterized in that when the computer program is executed by a processor, the above-mentioned method for controlling the demoulding speed of cast-in-place large-diameter pipe piles is implemented.
[0036] According to the specific embodiments provided by the present invention, the present invention discloses the following technical effects:
[0037] The present invention provides a method, device, medium and product for controlling the drafting speed of cast-in-place large-diameter pipe piles. The method comprises the following steps: obtaining current monitoring data, current drafting speed and pile formation status of cast-in-place large-diameter pipe piles; discretizing the current monitoring data to obtain processed monitoring data; determining a first drafting speed interval, a second drafting speed interval and a third drafting speed interval according to the processed monitoring data and using a current decision tree model; the current decision tree model is obtained by updating a decision tree model at a previous moment according to the current monitoring data and the current drafting speed and using a VFDT algorithm; determining an optimal drafting speed according to the first drafting speed interval, the second drafting speed interval and the third drafting speed interval to regulate the current drafting speed, thereby improving the drafting speed control accuracy. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0039] Figure 1 A schematic flow chart of a method for controlling the demoulding speed of cast-in-place large-diameter pipe piles provided in Example 1 of the present invention;
[0040] Figure 2 Flowchart for building and updating decision trees;
[0041] Figure 3 This is a flow chart for speed control using a decision tree;
[0042] Figure 4 This is the structural diagram of the demoulding speed control system for cast-in-place large-diameter pipe piles;
[0043] Figure 5 This is a diagram of the internal structure of a computer device. DETAILED DESCRIPTION
[0044] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0045] The purpose of the present invention is to provide a method, device, medium and product for controlling the drafting speed of cast-in-place large-diameter pipe piles, so as to improve the control accuracy of the drafting speed.
[0046] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.
[0047] Example 1
[0048] like Figure 1 As shown, the method for controlling the demoulding speed of cast-in-place large-diameter pipe piles in this embodiment includes:
[0049] Step 101: Obtain current monitoring data, current demoulding speed, and pile formation status of cast-in-place large-diameter pipe piles; the monitoring data include side friction resistance, end resistance, inner soil squeezing pressure, outer soil squeezing pressure, excess pore water pressure, ambient humidity, ambient temperature, poured concrete filling coefficient, and concrete pouring height.
[0050] In practical applications, a variety of sensors are installed on cast-in-place large-diameter pipe pile equipment to monitor various parameters in real time during the construction process. The parameters include but are not limited to side friction, end resistance, soil squeezing pressure (inside), soil squeezing pressure (outside), excess pore water pressure, ambient humidity, ambient temperature, poured concrete filling coefficient, concrete pouring height, etc.
[0051] When real-time data is collected, the data collection time and vibration pipe pulling speed are recorded at the same time. If the situation of "difficult to pull out" occurs during the demoulding, it will be recorded. After 14 days of pile formation, the pile core soil is excavated, the pile quality is measured, and "normal" or "broken pile" is recorded.
[0052] Step 102: discretize the current monitoring data to obtain processed monitoring data.
[0053] Step 103: According to the processed monitoring data, the first drafting speed interval, the second drafting speed interval and the third drafting speed interval are determined by using the current decision tree model; the decision tree model includes decision trees corresponding to different pile forming conditions; the pile forming conditions include difficult to draft, normal and broken piles; the current decision tree model is obtained by updating the decision tree model of the previous moment by using the VFDT algorithm according to the current monitoring data and the current drafting speed; the current decision tree model includes the current decision tree corresponding to the difficult to draft pile condition, the current decision tree corresponding to the normal pile condition and The current decision tree corresponding to the broken pile piling situation; the decision tree model at the initial moment is established by using historical monitoring data and the corresponding demoulding speeds and pile forming conditions; the decision tree model at the initial moment includes a decision tree corresponding to the difficult demoulding pile forming situation at the initial moment, a decision tree corresponding to the normal pile forming situation at the initial moment, and a decision tree corresponding to the broken pile piling situation at the initial moment; the first demoulding speed interval is the demoulding speed corresponding to the difficult demoulding pile forming situation; the second demoulding speed interval is the demoulding speed corresponding to the normal pile forming situation; the third demoulding speed interval is the demoulding speed corresponding to the broken pile piling situation.
[0054] As an optional implementation method, the process of establishing the decision tree model at the initial moment specifically includes:
[0055] S11: Obtain historical monitoring data and corresponding demoulding speed and pile formation status.
[0056] S12: Discretize the historical monitoring data and demolding speeds corresponding to different pile forming conditions respectively to obtain a processed training sample set corresponding to a difficult-to-demold pile forming condition, a processed training sample set corresponding to a normal pile forming condition, and a processed training sample set corresponding to a broken pile forming condition.
[0057] S13: Based on the processed training sample set corresponding to the difficult-to-eliminate-pile situation, combined with the impurity index, a decision tree generation algorithm is used to generate a decision tree corresponding to the difficult-to-eliminate-pile situation at the initial moment; the impurity index is information gain, information gain rate or Gini index; the decision tree generation algorithm is ID3 decision tree algorithm, C4.5 algorithm or CART algorithm.
[0058] S14: Based on the processed training sample set corresponding to the normal piling situation and in combination with the impurity index, a decision tree corresponding to the normal piling situation at the initial moment is generated using a decision tree generation algorithm.
[0059] S15: Based on the processed training sample set corresponding to the broken pile formation situation, combined with the impurity index, a decision tree corresponding to the broken pile formation situation at the initial moment is generated using a decision tree generation algorithm.
[0060] In practical applications, such as Figure 2 As shown in the figure, using the existing data set (parameter data and corresponding demoulding speed), three decision trees are established according to the pile conditions (normal, broken pile, difficult to demould).
[0061] The steps to build a decision tree are as follows (taking the pile formation situation "normal" as an example):
[0062] (1) Based on the data with “normal” pile formation in the existing data set, a certain amount of data is selected (if the amount of data is small, all data are selected; if the amount of data is large, a certain amount of data is randomly selected).
[0063] (2) Preprocess the selected data.
[0064] Specifically, the preprocessing method in (2) is to discretize the continuous numerical data in the initial data (such as side friction, end resistance, excess pore water pressure, etc.), discretize the demoulding speed, and form a corresponding relationship between the data and the demoulding speed.
[0065] The drafting speed is discretized. Specifically, if the overall drafting speed interval is 0.5m / min to 1.3m / min, it can be divided according to the speed difference of 0.05m / min, that is, 0.5m / min to 0.55m / min, 0.55m / min to 0.6m / min, ..., 1.25m / min to 1.3m / min, which is divided into 16 categories in total. According to the "Industry Standard of the People's Republic of China" JGJ / T 213-2010, the pipe pulling speed in the soft soil layer should be (0.6 to 0.8) m / min; in the loose or slightly dense sand layer, it should be (1.0 to 1.2) m / min. In the present invention, the overall drafting speed interval should not exceed 0.5m / min to 1.3m / min.
[0066] (3) Construct a decision tree based on purity.
[0067] There are three classic "impurity" indicators, namely information gain, information gain rate and Gini index. Any "impurity" indicator can be selected to construct a decision tree. In the present invention, the "impurity" indicator can be any indicator. The following steps take information gain as an example to construct a decision tree.
[0068] Among them, information gain: the statistical information of the training sample set D (the processed training sample set) is stored in the leaf node l, and the information required for the classification of the training sample set D is expected to be Among them, p i Any sample in the training sample set D belongs to class C i The probability, p i =|C i,D| / |D|, m is the number of values of the category attribute. For the possible splitting attribute A of the leaf node, assuming that A has v values, then the expected information of using attribute A to divide the training sample set D is The information gain of attribute A is as follows:
[0069] Gain(A)=Info(D)-Info A (D).
[0070] The ID3 decision tree algorithm is used to generate the initial decision tree (if the information gain rate is used, the C4.5 algorithm is used to generate the initial decision tree; if the Gini index is used, the CART algorithm is used to generate the initial decision tree).
[0071] As an optional implementation mode, according to the current monitoring data and the current draft speed, the decision tree model at the last moment is updated using the VFDT algorithm, specifically including:
[0072] S21: Discretize the current monitoring data and the current demoulding speed respectively to obtain a processed updated sample set corresponding to the difficult-to-eject pile situation, a processed updated sample set corresponding to the normal pile situation, and a processed updated sample set corresponding to the broken pile situation.
[0073] S22: Based on the processed updated sample set corresponding to the difficult-to-draw-out pile situation, the decision tree corresponding to the difficult-to-draw-out pile situation at the previous moment is updated using the VFDT algorithm to obtain a current decision tree corresponding to the difficult-to-draw-out pile situation.
[0074] S23: Based on the processed updated sample set corresponding to the normal piling situation, the decision tree corresponding to the normal piling situation at the previous moment is updated using the VFDT algorithm to obtain a current decision tree corresponding to the normal piling situation.
[0075] S24: Based on the processed updated sample set corresponding to the broken pile formation situation, the decision tree corresponding to the broken pile formation situation at the previous moment is updated using the VFDT algorithm to obtain a current decision tree corresponding to the broken pile formation situation.
[0076] S25: The current decision tree corresponding to the difficult-to-de-mould pile situation, the current decision tree corresponding to the normal pile situation and the current decision tree corresponding to the broken pile pile situation constitute a current decision tree model.
[0077] In practical applications, the decision tree is dynamically updated using real-time monitoring data and subsequent pile detection results.
[0078] Specifically, the decision tree is dynamically updated using the VFDT algorithm.
[0079] The VFDT algorithm uses information gain, information gain rate or Gini index as the standard for selecting split attributes, and uses Hoeffding inequality as the condition for determining node splitting. The purpose of selecting Hoeffding inequality as the node splitting condition is to determine the number of samples required for leaf nodes to become internal nodes, so as to achieve the purpose of using as few samples as possible to establish a decision tree with higher accuracy. In the present invention, the "impurity" index can be any index. The following steps take information gain as an example to update the decision tree.
[0080] Among them, the Hoeffding bound is: for a true random variable r∈R, assume that n independent observations are taken of r, and its Hoeffding constraint guarantees that the true value of the variable r is equal to the observed value with a probability of 1-δ The difference is less than ε, that is:
[0081]
[0082] P(...) is the probability, which here represents the probability that the difference between the true value and the observed value of the variable r is less than ε. δ is the information gain parameter, which is artificially specified, 0<δ<1.
[0083] Active split coefficient: When the information gain values G of several attributes are almost equal, more samples may be needed to determine the decision attribute of the leaf node. The τ value (confidence) is set to actively select attributes and realize leaf node splitting. When ΔG<ε<τ is satisfied, the attribute with the largest or second largest information gain in ΔG is selected as the decision attribute of the leaf node.
[0084] Node splitting condition: One of the valid conditions for judging node splitting is Or ε<τ, Refers to the information gain of attribute X in the leaf node, X a , X b They refer to the attributes with the largest and second largest information gain, respectively.
[0085] Further, the steps for updating the decision tree are as follows (taking the pile formation situation "normal" as an example):
[0086] (1) Preprocessing the data collected by module 1 for real-time monitoring (the pile quality is measured as “normal” 14 days after pile construction).
[0087] (2) The processed updated sample set corresponding to the normal pile formation situation is input into the decision tree corresponding to the normal pile formation situation at the previous moment, starting from the root node, entering the respective branches according to the value of the node decision attribute, and traversing from top to bottom until entering the leaf node (i.e., leaf node l).
[0088] (3) Update the number of instances of leaf nodes (n l ).
[0089] (4) If n l mod n min = 0 and all instances in the leaf nodes do not belong to the same class, then execute (4.1)-(4.6), n l is the number of instances of leaf nodes; n min In order to split the indicators and avoid extreme cases, when a new piece of data is obtained, the decision tree is updated once, resulting in over-calculation of nodes.
[0090] (4.1) Calculate the information gain of all attributes of leaf nodes, that is
[0091] (4.2) Note X a for The attribute with the largest value.
[0092] (4.3) Note X b for The attribute with the second largest value.
[0093] (4.4) Calculate the Hoeffding value
[0094] (4.5) If X a is not an empty property and Or ε<τ, the leaf node corresponding to the information gain is converted into an internal node. a is the decision attribute of the node.
[0095] (4.6) By X a The number of values determines the number of new leaf nodes and generates new leaf nodes. For all branches, new leaf nodes are generated, which also contain relevant information of the split nodes (after a leaf node is split, the instances in the leaf node are assigned to different split nodes, including all information of these instances), and the current decision tree corresponding to the normal pile formation situation is obtained.
[0096] (5) The newly generated decision tree is used as the latest classification decision tree for subsequent mold ejection speed control.
[0097] If the amount of data used to incrementally update the decision tree reaches a certain threshold (the threshold is a preset ratio of the amount of data used to incrementally update the decision tree to the amount of data used to establish the initial decision tree, such as 20%), all data are regarded as training set data and the initial decision tree is regenerated.
[0098] Step 104: determining an optimal draft speed according to the first draft speed interval, the second draft speed interval, and the third draft speed interval to regulate the current draft speed.
[0099] As an optional implementation, step 104 specifically includes:
[0100] If the second draft speed interval is greater than or equal to the first draft speed interval and less than or equal to the third draft speed interval, or the second draft speed interval is greater than the third draft speed interval and less than the first draft speed interval, the median of the second draft speed interval is used as the optimal draft speed.
[0101] If the second die-pulling speed interval is smaller than the first die-pulling speed interval and smaller than or equal to the third die-pulling speed interval, the maximum value of the second die-pulling speed interval is used as the optimal die-pulling speed.
[0102] If the second draft speed interval is greater than the third draft speed interval and greater than or equal to the first draft speed interval, the minimum value of the second draft speed interval is used as the optimal draft speed.
[0103] In practical applications, such as Figure 3 As shown, the latest three decision trees are used to adjust the demolding speed in real time according to the real-time collected data.
[0104] The real-time monitoring data (various parameters) are preprocessed according to the same preprocessing method as above, and classified using three decision trees. That is, starting from the root node of the decision tree, enter the respective branches according to the node decision attributes, traverse from top to bottom until entering the leaf node of the decision tree, and obtain the category attribute value of the node (that is, the corresponding draft speed range) according to the statistical value of the node.
[0105] The speed intervals returned by the three decision trees ("difficult to demold", "normal", and "broken pile") are v1, v2, and v3 respectively.
[0106] If v1≦v2≦v3 is met (e.g. v1 is 0.6m / min~0.65m / min, v2 is 0.7m / min~0.75m / min, v3 is 0.7m / min~0.75m / min), the median of the speed range of v2 is selected as the recommended draft speed, and the draft speed is regulated. A certain amount of corresponding data is randomly selected (it is recommended not to exceed 2% of the total amount of data), and the corresponding parameters, speed, pile quality ("difficult to draft", "normal", "broken pile") are recorded, and the group of data is sent to module 3 for incremental update of the decision tree.
[0107] If v2 < v1 but v2 ≤ v3, select the highest value in the speed range of v2 as the recommended extraction speed, and adjust the extraction speed. Record the corresponding parameters, speed, and pile forming quality ("difficult to extract", "normal", "pile breakage"), and send this set of data to Module 3 for incremental update of the decision tree.
[0108] If v3 < v2 but v1 ≤ v2, select the lowest value in the speed range of v2 as the recommended extraction speed, and adjust the extraction speed. Record the corresponding parameters, speed, and pile forming quality ("difficult to extract", "normal", "pile breakage"), and send this set of data to Module 3 for incremental update of the decision tree.
[0109] If v3 < v2 < v1, select the median value in the speed range of v2 as the recommended extraction speed, and adjust the extraction speed. Record the corresponding parameters, speed, and pile forming quality ("difficult to extract", "normal", "pile breakage"), and send this set of data to Module 3 for incremental update of the decision tree.
[0110] The present invention applies the dynamic decision tree algorithm to the intelligent control of the vibration extraction pile forming speed, solving the problem of relying on the experience of construction personnel for control; at the same time, the present invention has a mechanism for dynamically updating the decision tree, obtaining data in real time through the data acquisition module, and updating the decision tree to ensure the continuous improvement of the decision tree accuracy; as the amount of monitoring data increases, the relevant decision tree can also guide subsequent other constructions.
[0111] Based on the above cast-in-place large-diameter pipe pile extraction speed control method, the present invention also provides a cast-in-place large-diameter pipe pile extraction speed control system, as Figure 4 shown, which consists of the following 4 modules:
[0112] Module 1: Data acquisition module. Install a variety of different sensors on the cast-in-place large-diameter pipe pile equipment so that various parameters can be monitored in real time during construction. The parameters include but are not limited to side friction resistance, end resistance, soil extrusion pressure (inside), soil extrusion pressure (outside), excess pore water pressure, environmental humidity, environmental temperature, concrete filling coefficient of the perfusion, concrete perfusion height, etc.
[0113] Module 2: Decision tree establishment module. Use the existing data set (parameter data and corresponding speed) to establish 3 decision trees according to the pile forming situation (normal, pile breakage, difficult to extract).
[0114] Module 3: Decision tree update module. Use the real-time monitored data and the subsequent detected pile forming situation to dynamically update the decision tree.
[0115] Module 4: Speed adjustment module. Use the latest 3 decision trees to adjust the extraction speed in real time according to the real-time collected data.
[0116] The present invention uses a dynamic decision tree algorithm to solve the problem of relying on the experience of construction personnel. The present invention obtains data in real time through a data acquisition module and updates the decision tree to ensure the continuous improvement of the accuracy of the decision tree.
[0117] Example 2
[0118] A computer device includes: a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the computer program to implement the method for controlling the demoulding speed of cast-in-place large-diameter pipe piles in Example 1.
[0119] Example 3
[0120] A computer-readable storage medium stores a computer program, which, when executed by a processor, implements the method for controlling the demoulding speed of cast-in-place large-diameter pipe piles in Example 1.
[0121] Example 4
[0122] A computer program product includes a computer program, which, when executed by a processor, implements the method for controlling the demoulding speed of cast-in-place large-diameter pipe piles in Example 1.
[0123] Example 5
[0124] A computer device, which may be a database, may have an internal structure as shown in Figure 5 As shown. The computer device includes a processor, a memory, an input / output interface (Input / Output, referred to as I / O) and a communication interface. Among them, the processor, the memory and the input / output interface are connected through a system bus, and the communication interface is connected to the system bus through the input / output interface. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store pending transactions. The input / output interface of the computer device is used to exchange information between the processor and an external device. The communication interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, the method for controlling the drafting speed of cast-in-place large-diameter pipe piles in Example 1 is implemented.
[0125] It should be noted that the object information (including but not limited to object device information, object personal information, etc.) and data (including but not limited to data used for analysis, stored data, displayed data, etc.) involved in the present invention are all information and data authorized by the object or fully authorized by all parties, and the collection, use and processing of relevant data need to comply with relevant laws, regulations and standards of relevant countries and regions.
[0126] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiments can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided by the present invention can include at least one of non-volatile and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetoresistive random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM). The database involved in each embodiment provided by the present invention may include at least one of a relational database and a non-relational database. Non-relational databases may include distributed databases based on blockchains, etc., but are not limited thereto. The processor involved in each embodiment provided by the present invention may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, etc., but are not limited thereto.
[0127] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0128] The principles and implementation methods of the present invention are described in this article using specific examples. The description of the above embodiments is only used to help understand the method and core idea of the present invention. At the same time, for those skilled in the art, according to the idea of the present invention, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as limiting the present invention.
Claims
1. A method for controlling the demoulding speed of cast-in-place large-diameter pipe piles, characterized in that: include: Obtain current monitoring data, current demoulding speed and pile formation status of cast-in-place large-diameter pipe piles; monitoring data include side friction resistance, end resistance, inner soil squeezing pressure, outer soil squeezing pressure, excess pore water pressure, ambient humidity, ambient temperature, poured concrete filling coefficient and concrete pouring height; pile formation status includes difficult demoulding, normal and broken piles; Discretizing the current monitoring data to obtain processed monitoring data; According to the processed monitoring data, the current decision tree model is used to determine the first demoulding speed interval, the second demoulding speed interval and the third demoulding speed interval; the decision tree model includes decision trees corresponding to different pile forming situations; the current decision tree model is obtained by updating the decision tree model of the previous moment using the VFDT algorithm according to the current monitoring data and the current demoulding speed; the current decision tree model includes the current decision tree corresponding to the difficult demoulding pile forming situation, the current decision tree corresponding to the normal pile forming situation and the current decision tree corresponding to the broken pile pile forming situation; the decision tree model at the initial moment is established using historical monitoring data and the corresponding demoulding speed and pile forming situation; the decision tree model at the initial moment includes the decision tree corresponding to the difficult demoulding pile forming situation at the initial moment, the decision tree corresponding to the normal pile forming situation at the initial moment and the decision tree corresponding to the broken pile pile forming situation at the initial moment; the first demoulding speed interval is the demoulding speed corresponding to the difficult demoulding pile forming situation; the second demoulding speed interval is the demoulding speed corresponding to the normal pile forming situation; the third demoulding speed interval is the demoulding speed corresponding to the broken pile pile forming situation; An optimal draft speed is determined according to the first draft speed interval, the second draft speed interval, and the third draft speed interval to regulate the current draft speed.
2. The method for controlling the demoulding speed of cast-in-place large-diameter pipe piles according to claim 1, characterized in that: The process of establishing the decision tree model at the initial moment specifically includes: Obtain historical monitoring data and corresponding demoulding speed and pile formation status; Discretization processing is performed on the historical monitoring data and the demoulding speeds corresponding to different pile forming conditions to obtain a processed training sample set corresponding to a difficult-to-demolish pile forming condition, a processed training sample set corresponding to a normal pile forming condition, and a processed training sample set corresponding to a broken pile forming condition; Based on the processed training sample set corresponding to the difficult-to-eliminate-pile situation, combined with the impurity index, a decision tree generation algorithm is used to generate a decision tree corresponding to the difficult-to-eliminate-pile situation at the initial moment; the impurity index is information gain, information gain rate or Gini index; the decision tree generation algorithm is ID3 decision tree algorithm, C4.5 algorithm or CART algorithm; Based on the processed training sample set corresponding to the normal pile formation situation, combined with the impurity index, a decision tree corresponding to the normal pile formation situation at the initial moment is generated using a decision tree generation algorithm; Based on the processed training sample set corresponding to the broken pile formation situation, combined with the impurity index, a decision tree corresponding to the broken pile formation situation at the initial moment is generated using a decision tree generation algorithm.
3. The method for controlling the demoulding speed of cast-in-place large-diameter pipe piles according to claim 1, characterized in that: According to the current monitoring data and the current draft speed, the decision tree model at the last moment is updated using the VFDT algorithm, specifically including: Discretize the current monitoring data and the current demoulding speed respectively to obtain a processed updated sample set corresponding to a difficult demoulding pile forming situation, a processed updated sample set corresponding to a normal pile forming situation, and a processed updated sample set corresponding to a broken pile forming situation; Based on the processed updated sample set corresponding to the difficult-to-draw-form pile situation, the decision tree corresponding to the difficult-to-draw-form pile situation at the previous moment is updated using the VFDT algorithm to obtain a current decision tree corresponding to the difficult-to-draw-form pile situation; Based on the processed updated sample set corresponding to the normal pile formation situation, the decision tree corresponding to the normal pile formation situation at the previous moment is updated using the VFDT algorithm to obtain a current decision tree corresponding to the normal pile formation situation; Based on the processed updated sample set corresponding to the broken pile formation situation, the decision tree corresponding to the broken pile formation situation at the previous moment is updated using the VFDT algorithm to obtain a current decision tree corresponding to the broken pile formation situation; The current decision tree corresponding to the difficult-to-demold pile forming situation, the current decision tree corresponding to the normal pile forming situation and the current decision tree corresponding to the broken pile pile forming situation constitute a current decision tree model.
4. The method for controlling the demoulding speed of cast-in-place large-diameter pipe piles according to claim 3, characterized in that: Based on the processed updated sample set corresponding to the normal pile formation situation, the decision tree corresponding to the normal pile formation situation at the previous moment is updated using the VFDT algorithm to obtain the current decision tree corresponding to the normal pile formation situation, specifically including: Input the processed updated sample set corresponding to the normal pile formation situation into the decision tree corresponding to the normal pile formation situation at the previous moment, starting from the root node, entering the respective branches according to the value of the node decision attribute, and traversing from top to bottom until entering the leaf node; Update the instance number of leaf nodes; If l mod n min = 0 and all instances in the leaf nodes do not belong to the same class, then the information gain of all attributes of the leaf nodes is calculated; n l is the number of instances of leaf nodes; n min is a split indicator; Calculate the Hoeffding value; If the maximum value of the information gain is not an empty attribute and the difference between the maximum value and the second largest value of the information gain is greater than the Hoeffding value or the Hoeffding value is less than the confidence level, the leaf node corresponding to the information gain is converted into an internal node; The number of new leaf nodes is determined by the number of maximum values of the information gain and new leaf nodes are generated. New leaf nodes are generated for all branches, and the relevant information of the split nodes is contained to obtain the current decision tree corresponding to the normal pile formation situation.
5. The method for controlling the demoulding speed of cast-in-place large-diameter pipe piles according to claim 1, characterized in that: Determining an optimal draft speed according to the first draft speed interval, the second draft speed interval, and the third draft speed interval specifically includes: If the second draft speed interval is greater than or equal to the first draft speed interval and less than or equal to the third draft speed interval, or the second draft speed interval is greater than the third draft speed interval and less than the first draft speed interval, the median of the second draft speed interval is used as the optimal draft speed; If the second die-pulling speed interval is smaller than the first die-pulling speed interval and smaller than or equal to the third die-pulling speed interval, the maximum value of the second die-pulling speed interval is used as the optimal die-pulling speed; If the second draft speed interval is greater than the third draft speed interval and greater than or equal to the first draft speed interval, the minimum value of the second draft speed interval is used as the optimal draft speed.
6. A computer device comprising: A memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the computer program to implement the method for controlling the demolding speed of cast-in-place large-diameter pipe piles according to any one of claims 1 to 5.
7. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the method for controlling the demoulding speed of cast-in-place large-diameter pipe piles according to any one of claims 1 to 5 is implemented.
8. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the method for controlling the demoulding speed of cast-in-place large-diameter pipe piles according to any one of claims 1 to 5 is implemented.