Improved structure of reduction chamber of external heating type coal-based direct reduction iron shaft furnace
By arranging boss structures on both sides of the walls of the reduction section of the externally heated coal-based direct reduced iron shaft furnace, the problem of material adhesion caused by local high temperatures is solved, the material is remixed and discharged smoothly, and material jamming is avoided. phenomenon, improving the safety and efficiency of production.
Patent Information
- Application Number
- CN202411155925.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-22
- Publication Date
- 2024-10-25
AI Technical Summary
In the externally heated coal-based direct reduced iron shaft furnace, uneven material burning due to vertical fire channel flame combustion and local high temperature cause material adhesion, resulting in uneven material cutting and material jamming, which affects the smoothness and safety of production.
Multiple rows of boss structures are installed along the high direction on both sides of the reduction section to allow the materials to be remixed during the unloading process to avoid bonding caused by local high temperatures. A triangular or arc-shaped boss structure is used, with an outer convex thickness of 20mm. to 1/5 of the inner cavity width, and are staggered to ensure material mixing and productivity.
It effectively prevents materials from sticking, avoids material jamming, ensures smooth production, and improves the production quality and safety of sponge iron.
Smart Images

Figure CN118835019A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of direct reduction ironmaking, and in particular to an improved structure of a reduction chamber of an externally heated coal-based direct iron reduction vertical furnace. Background Art
[0002] Sponge iron has a stable chemical composition and low impurity content. It is a high-quality alternative iron source for scrap steel and a smelting raw material for special steel and high-quality steel. The direct reduction ironmaking process for producing sponge iron is divided into a gas-based direct reduction iron process and a coal-based direct reduction iron process. Among them, the externally heated coal-based vertical furnace process that can be produced continuously has the advantages of strong raw material adaptability, good reducing atmosphere, and high product metallization rate. It has become the main equipment for producing direct reduced iron.
[0003] The Chinese patent application with application publication number CN 107893138 A discloses "a reduction chamber of an externally heated coal-based direct reduction iron vertical furnace". The reduction chamber is divided into a preheating section, a reduction section and a cooling section from top to bottom. The preheating section is provided with a riser pipe that connects the furnace top with a converging gas channel. A sealed feed port is provided at the top of the reduction chamber, and a sealed discharge port is provided at the bottom of the reduction chamber. The cavity of the reduction chamber is evenly divided into n+1 holes along the length by n reduction chamber partition walls. 2 to 4 gas collecting channels are provided at both ends and / or inside of each hole reduction chamber. The gas collecting channels are connected to the corresponding reduction chambers through multiple gas outlet holes provided along the height direction. The top of each gas collecting channel is respectively connected to the converging gas channel, and the bottom is respectively connected to the reduction chamber. The reduction chamber has the advantages of good air permeability, no restrictions on the particle size of raw coal, good heat transfer conditions, high structural strength, and large single-hole production capacity. It can effectively avoid the uneven descent of furnace charge and the phenomenon of jamming during sponge iron production.
[0004] Direct reduction of iron is the process of reducing iron oxide to metallic iron at a temperature below the melting point of iron. The reduction temperature of direct reduction iron is generally 800-1200℃. When the temperature exceeds 1250℃, some solid materials will be in a semi-molten state, so it is easy to stick. In the externally heated direct reduction iron vertical furnace, the wall temperature of the reduction chamber is generally less than 1200℃. However, due to production operations and uneven combustion of the vertical flame, the wall of the reduction chamber may have local high temperature, resulting in the melting and bonding of materials near the walls on both sides of the reduction chamber; in addition, during the material discharge process in the reduction chamber, due to the relatively slow rate of solid material descent, the relative position of the material near the wall of the reduction chamber will basically not change during the descent process, that is, it is always in the high temperature zone near the wall, which accelerates the bonding process of the solid material. When the solid material is severely bonded, it will lead to uneven discharge of the reduction chamber or even jamming of the material, affecting normal production and even causing production accidents. Summary of the invention
[0005] The present invention provides an improved structure of a reduction chamber of an externally heated coal-based direct iron reduction vertical furnace. By arranging multiple rows of boss structures along the height direction of the reduction section, materials close to the two side walls can be remixed during the material unloading process, effectively preventing material adhesion caused by local high temperature, and avoiding material jamming and other phenomena that affect smooth production.
[0006] In order to achieve the above object, the present invention adopts the following technical solutions:
[0007] An improved structure of a reduction chamber of an externally heated coal-based direct iron reduction vertical furnace comprises a reduction chamber, which is divided into a preheating section, a reduction section and a cooling section from top to bottom, the preheating section is provided with a riser pipe connected to the furnace top through a merging gas duct, a sealed feed inlet is provided at the top of the reduction chamber, and a sealed discharge port is provided at the bottom of the reduction chamber; the reduction chamber is divided into multiple holes by a reduction chamber partition wall, and a plurality of gas collecting channels are provided at both ends and / or inside of each hole of the reduction chamber, and the gas collecting channels are connected to the corresponding reduction chambers through a plurality of gas outlet holes arranged along the height direction; the tops of the gas collecting channels are respectively connected to the merging gas ducts, and the bottoms are respectively connected to the reduction chambers; a plurality of rows of boss structures are arranged at intervals along the height direction on the walls on both sides of the reduction section, and the boss structures protrude toward the inside of the reduction section.
[0008] Furthermore, the cross-sectional shape of the boss structure is a triangle, and the angles between the upper bevel and the lower bevel and the horizontal plane are both greater than the stacking angle of the material; a rounded transition is used between the upper bevel and the lower bevel.
[0009] Furthermore, the cross-sectional shape of the boss structure is an arc, and the angle between the tangent line on the arc at a direction of 45° to the horizontal axis and the horizontal plane is greater than the accumulation angle of the material.
[0010] Furthermore, the minimum outer convex thickness of the boss structure is 20 mm, and the maximum outer convex thickness is less than 1 / 5 of the width of the inner cavity of the reduction section.
[0011] Furthermore, the boss structures on the two side walls of the reduction section are staggered along the height direction on the two side walls of the reduction section.
[0012] Furthermore, the spacing distance between the boss structures is greater than the height of the boss structures.
[0013] Furthermore, the boss structure and the side wall of the reduction section are an integrated structure.
[0014] Furthermore, the boss structure is arranged along the length of the inner cavity of the reduction section.
[0015] Compared with the prior art, the present invention has the following beneficial effects:
[0016] By arranging boss structures on the walls on both sides of the reduction section of the reduction chamber, the materials close to the walls on both sides of the reduction chamber can be remixed with the internal materials during the unloading process, avoiding the adhesion of the materials close to the walls due to long-term heating, and effectively preventing the adhesion of materials due to local high temperature, thereby avoiding the phenomenon of material jamming and other phenomena affecting the smooth production during the sponge iron production process. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the improved structure of the reduction chamber of the externally heated coal-based direct iron reduction vertical furnace described in the present invention.
[0018] Figure 2 It is a partial enlargement of the boss structure of the present invention. Figure 1 .
[0019] Figure 3 It is a partial enlargement of the boss structure of the present invention. Figure 2 .
[0020] Figure 4 yes Figure 1 AA view in.
[0021] Figure 5 yes Figure 4 BB view in.
[0022] In the figure: 1. Combustion chamber 2. Reduction chamber 3. Converging air channel 4. Sealed feed port 5. Boss structure 6. Sealed discharge port 7. Rising pipe 11. Upper horizontal air channel 12. Lower horizontal air channel 13. Vertical fire channel 21. Preheating section 22. Reduction section 23. Cooling section 24. Reduction chamber 25. Gas collecting channel 26. Reduction chamber partition wall 27. Gas outlet hole DETAILED DESCRIPTION
[0023] The specific implementation of the present invention will be further described below in conjunction with the accompanying drawings:
[0024] See Figure 1 The reduction chamber 2 of the externally heated coal-based direct iron reduction vertical furnace of the present invention is divided into a preheating section 21, a reduction section 22 and a cooling section 23 from top to bottom. A plurality of gas collecting channels 25 are arranged at both ends or in the middle of the reduction chamber 2. The preheating section 21 is provided with a riser 7 that connects the converging gas channel 3 to the furnace top. The top of the gas collecting channel 25 is connected to the converging gas channel 3, and the bottom is connected to the reduction chamber 2; the gas collecting channel 25 is connected to the reduction chamber 2 by a plurality of gas outlet holes 27 arranged along the height direction.
[0025] The improved structure of the present invention mainly sets multiple rows of boss structures 5 along the height direction on the two side walls of the reduction section 22, so that the materials near the two side walls of the reduction section 22 can be remixed with the internal materials during the descent process, avoiding the adhesion caused by the local high temperature of the vertical fire channel 13 and the long-term heating of the materials near the side walls of the reduction section 22. Since the temperature at the upper horizontal air channel 11 and the lower horizontal air channel 12 is relatively low, the corresponding preheating section 21 and cooling section 23 do not need to be provided with boss structures 5, and only need to be provided in the reduction section 22 corresponding to the vertical fire channel 13.
[0026] Preferably, Figure 1 As shown, the cross-sectional shape of the boss structure 5 of the present invention is a triangle, one side of which is connected to the side wall of the reduction section 22, and the other two oblique sides form a boss structure, and the angle between the two oblique sides and the horizontal plane is greater than the stacking angle of the material, so as to avoid material hanging on the upper part of the boss structure 5 or generating gaps at the lower part of the boss structure; the intersection of the two oblique sides is transitioned by a rounded corner.
[0027] The cross section of the boss structure 5 of the present invention may also be an arc shape (such as Figure 2 As shown), bow-shaped or other smooth curves, it should be noted that the angle between the tangent line on the curve at a direction of 45° to the horizontal axis and the horizontal plane should be greater than the stacking angle of the material, also to avoid hanging materials on the upper part of the boss structure 5 and generating gaps on the lower part.
[0028] Preferably, Figure 2 , Figure 3 As shown, the minimum convex thickness h of the boss structure 5 of the present invention is 20 mm, and the maximum convex thickness is less than 1 / 5 of the width of the inner cavity of the reduction chamber 2; if the convex thickness h of the boss structure 5 is too small, the purpose of remixing the materials cannot be achieved, and if the convex thickness h is too large, the production capacity of the vertical furnace will be affected. The boss structure 5 is arranged along the horizontal length of the inner cavity 24 of the reduction chamber. The temperature in the gas collecting channel 25 is not as high as that in the vertical fire channel 13, so the boss structure is not arranged on the corresponding side wall.
[0029] Preferably, the boss structures 5 described in the present invention are staggered in the height direction on the two side walls of the reduction section 22, and the spacing distance L of the boss structures in the same row is not less than the height H of the boss structures 5; it is ensured that only one side of each horizontal section of the reduction chamber 2 has a boss structure 5, so that the material can descend in an S-shaped route to avoid material jamming due to the necking structure; and while ensuring the mixing of the materials, the production capacity of the reduction chamber 2 is not affected as much as possible.
[0030] Preferably, the boss structure 5 described in the present invention is an integrated structure with the side wall of the reduction section 22, that is, the outermost layer of refractory bricks of the side wall of the reduction section 22 adopts special-shaped refractory bricks, and the boss structure 5 is prefabricated on the side of the outer layer of refractory bricks to avoid affecting the strength of the boss structure 5 due to wear of descending materials.
[0031] In order to make the purpose, technical scheme and technical effect of the present invention clearer, the technical scheme in the embodiment of the present invention is now clearly and completely described. However, the embodiments described below are only part of the embodiments of the present invention, not all of the embodiments. In combination with the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0032] [Example 1]
[0033] like Figure 1 and Figure 3-Figure 5 As shown, it is an improved structure of the reduction chamber of the externally heated coal-based direct reduction iron vertical furnace in this embodiment. The externally heated coal-based direct reduction iron vertical furnace comprises a combustion chamber 1 and a reduction chamber 2. Each reduction chamber 2 is equally divided into two reduction chambers by a reduction chamber partition wall 26. Both ends and the middle of each reduction chamber are provided with gas collecting channels 25. Each reduction chamber is divided into two reduction chambers 24 by the gas collecting channels 25. The top of the gas collecting channel 25 is connected with the confluent gas channel 3, and the bottom is connected with the reduction chamber 2. The reduction chamber 2 and the gas collecting channel 25 are connected through a gas outlet hole 27. The gas collecting channel 25 is used to timely discharge the gas in the reduction chamber 2 to avoid excessive working pressure in the reduction chamber 2 and cause production accidents.
[0034] The upper part of the combustion chamber 1 is the upper horizontal airway 11, the middle part is the vertical fireway 13, and the lower part is the lower horizontal airway 12, which correspond to the preheating section 21, the reduction section 22 and the cooling section 23 of the reduction chamber 2 respectively. Since the side wall temperature of the reduction section 22 is the highest (up to 800-1200°C), a plurality of rows of boss structures 5 are only arranged along the height direction on the two side walls of the reduction section 22, and no boss structures 5 are arranged in the preheating section 21 and the cooling section 23. In addition, since the gas temperature in the gas collecting channel 25 is not high (generally below 800°C), the boss structures 5 are not arranged on the side walls of the corresponding gas collecting channel 25.
[0035] In this embodiment, the cross-section of the boss structure 5 is in the shape of an arc, and the angle between the tangent line on the arc at a direction of 45° to the horizontal axis and the horizontal plane is 55°, while the stacking angle of the loaded material is about 40°.
[0036] In this embodiment, the width of the inner cavity (reduction chamber cavity 24) of the reduction section 22 is 300 mm, the outer protrusion thickness h of the boss structure 5 is 50 mm, and the boss structures 5 on the two side walls of each reduction chamber cavity 24 are arranged along the length of the reduction chamber cavity 24. The height of each layer of refractory bricks on the side wall of the reduction section 22 is 125 mm, and the height H of the boss structure 5 is 110 mm. The boss structure 5 and the refractory bricks on the side wall of the reduction section 22 are an integral structure and are centrally arranged on the side of the refractory bricks to ensure that the boss structure 5 has no mortar joints in the height direction of the reduction chamber 2, thereby preventing the mortar joints from being worn by falling materials and affecting the life of the boss structure 5.
[0037] In this embodiment, the boss structure 5 on the side wall of one side of the reduction section 22 is arranged on an odd-numbered layer of refractory bricks, and the boss structure 5 on the other side wall is arranged on an even-numbered layer of refractory bricks. The distance L between two adjacent layers of the boss structure 5 on the same side wall is 140 mm. There is a boss structure 5 on only one side of each horizontal section of the reduction section 22, which ensures the material mixing effect while reducing the impact on the production capacity of the reduction chamber 2.
[0038] During normal production, the mixed raw materials are loaded into the reduction chamber 2 from the sealed feed port 4, and the combustible gas enters the vertical fire channel 13 of the combustion chamber 1 and burns. The heat generated is transferred to the mixed material in the reduction chamber 2 through the partition wall. As the mixed material descends, the material is first preheated by the high-temperature gas in the upper horizontal gas channel 11 in the preheating section 21, and then enters the reduction section 22 to undergo a reduction reaction under the action of high temperature. The coal or semi-coke is gradually consumed, and the pelletized ore is gradually reduced to sponge iron, and a large amount of reduction tail gas is generated at the same time. The reduction tail gas enters the gas collecting channel 25 through the gas outlet hole 27, and then flows through the converging gas channel 3 and enters the riser 7, and finally is led to the gas collecting pipe outside the furnace and enters the reduction tail gas purification system. After the mixed material is completely reacted in the reduction section 22 to generate sponge iron and residual carbon, it enters the cooling section 23. In the cooling section 23, internal circulating gas cooling or external circulating cooling water cooling can be used. The cooled sponge iron and residual carbon are discharged from the vertical furnace through the sealed discharge port 6.
[0039] In this embodiment, since the boss structures 5 are arranged on the two side walls of the reduction section 22, the material slowly falls in the reduction section 22 in an S-shaped route, and the material near the two side walls of the reduction chamber can be remixed with the internal material during the descent, thereby avoiding the problems of material adhesion and affecting smooth production due to the local high temperature of the vertical fire channel 13 and the long-term heating of the material near the side walls of the reduction section; the boss structures 5 on both sides are staggered to avoid the formation of a necking structure in the reduction section 22 that causes material jamming and other problems, thereby ensuring the mixing of materials while minimizing the impact on the production capacity of the reduction chamber 2.
[0040] The above described embodiments are only some embodiments of the present invention, not all embodiments. The boss structure can also be in other shapes, or be arranged on both sides of the reduction chamber in other ways, but as long as the boss structure is adopted to change the mixing form of the materials and reduce the adhesion of the materials in the reduction chamber, it is within the scope of protection of the present invention.
Claims
1. An improved structure of a reduction chamber of an externally heated coal-based direct iron reduction vertical furnace, comprising a reduction chamber, wherein the reduction chamber is divided into a preheating section, a reduction section and a cooling section from top to bottom, wherein the preheating section is provided with an ascending pipe connected to the furnace top through a merging gas channel, a sealed feed inlet is provided at the top of the reduction chamber, and a sealed discharge port is provided at the bottom of the reduction chamber; the reduction chamber is divided into multiple holes by a reduction chamber partition wall, and a plurality of gas collecting channels are provided at both ends and / or inside of each hole of the reduction chamber, and the gas collecting channels are connected to the corresponding reduction chambers through a plurality of gas outlet holes arranged along the height direction; the tops of the gas collecting channels are respectively connected to the merging gas channels, and the bottoms are respectively connected to the reduction chambers; and the characteristics are that A plurality of rows of boss structures are arranged at intervals along the height direction on the walls on both sides of the reduction section, and the boss structures protrude toward the interior of the reduction section.
2. The improved structure of the reduction chamber of the externally heated coal-based direct iron reduction vertical furnace according to claim 1, characterized in that: The cross-sectional shape of the boss structure is a triangle, and the angles between the upper bevel and the lower bevel and the horizontal plane are both greater than the stacking angle of the material; a rounded transition is used between the upper bevel and the lower bevel.
3. The improved structure of the reduction chamber of the externally heated coal-based direct iron reduction vertical furnace according to claim 1, characterized in that: The cross-sectional shape of the boss structure is an arc shape, and the angle between the tangent line on the arc at a direction of 45° to the horizontal axis and the horizontal plane is greater than the accumulation angle of the material.
4. The improved structure of the reduction chamber of the externally heated coal-based direct iron reduction vertical furnace according to claim 1, characterized in that: The minimum convex thickness of the boss structure is 20 mm, and the maximum convex thickness is less than 1 / 5 of the width of the inner cavity of the reduction section.
5. The improved structure of the reduction chamber of the externally heated coal-based direct iron reduction vertical furnace according to claim 1, characterized in that: The boss structures on the two side walls of the reduction section are staggered along the height direction on the two side walls of the reduction section.
6. The improved structure of the reduction chamber of an externally heated coal-based direct iron reduction vertical furnace according to claim 1, characterized in that: The spacing distance of the boss structures is greater than the height of the boss structures.
7. The improved structure of the reduction chamber of an externally heated coal-based direct iron reduction vertical furnace according to claim 1, characterized in that: The boss structure and the side wall of the reduction section are an integrated structure.
8. The improved structure of the reduction chamber of an externally heated coal-based direct iron reduction shaft furnace according to claim 1, characterized in that: The boss structure is arranged along the length of the inner cavity of the reduction section.