Double-circumference jacking device and method for steel box girder incremental launching construction

Through the bi-weekly jacking device and intelligent synchronous jacking technology, the problems of synchronization precision control and local force optimization in the steel box girder jacking construction are solved, achieving an efficient and safe construction process and multi-parameter dynamic control adapted to complex environments. , reducing the risk of construction errors and structural damage.

CN118835531APending Publication Date: 2024-10-25THE THIRD ENG CO LTD OF CHINA RAILWAY SEVENTH GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411188650.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-28
Publication Date
2024-10-25

AI Technical Summary

Technical Problem

Existing steel box girder ejection construction equipment has deficiencies in synchronization precision control, local force optimization and multi-parameter dynamic control, resulting in low construction efficiency and increased risk of structural damage, and lacks comprehensive control capabilities in complex environments.

Method used

It adopts bi-weekly jacking device and intelligent synchronous jacking technology, through real-time monitoring and alternate pushing of three arc-shaped support plates, combined with high-strength base, hydraulic cylinder and advanced computer control system, to achieve real-time monitoring and automatic adjustment to ensure construction accuracy and Safety.

Benefits of technology

It improves construction efficiency and safety, achieves smooth jacking of steel box girders, reduces construction errors and structural damage risks, and adapts to multi-parameter dynamic control of complex construction environments.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118835531A_ABST
    Figure CN118835531A_ABST
Patent Text Reader

Abstract

The invention discloses a double-circumference jacking device and method for steel box girder incremental launching construction, and particularly relates to the technical field of bridge construction equipment.The device is an integrated frame and comprises double-circumference jacking equipment and supporting equipment; the integrated frame comprises a base module, four corners of the base module are connected with a plurality of adjustable supporting devices, and a double-periphery jacking device is arranged in the center of the base module. According to the double-circumference jacking equipment, the monitoring module and the control system are arranged, the horizontal deviation correction system is controlled through a control command to conduct angle and displacement adjustment on the steel box girder on a horizontal coordinate system, and the vertical jacking device is controlled to drive the steel box girder to be pushed forwards in the front-back reciprocating motion process. According to the invention, real-time intelligent monitoring of the steel box girder is realized, so that the steel box girder is kept in a predetermined track, and the safety, efficiency and precision of construction are improved. The device is compact in structural design, easy and convenient to operate and good in environmental adaptability.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of bridge construction equipment, and in particular to a double-circle jacking device and a construction method for jacking construction of steel box girders. Background Art

[0002] Bridge construction is an important part of infrastructure construction, and the construction technology of steel box girders, as a common bridge structure, has always been the focus of attention in the engineering community. Although traditional jacking construction machinery and equipment have met the construction needs to a certain extent, they still have shortcomings. In particular, the existing technology shows obvious limitations in terms of synchronization accuracy control, local force problems, and construction control. For example, the walking jacking construction equipment system has insufficient synchronization accuracy, many auxiliary equipment, and complex construction control, which often leads to low construction efficiency; the local force problem of steel box girders has not been effectively solved, increasing the risk of structural damage; in addition, in actual construction, the existing technology focuses on the control of a single parameter in terms of construction control, lacks comprehensive control of multiple parameters, and still has shortcomings in meeting the complexity of construction monitoring.

[0003] Therefore, it is necessary to provide a new method of jacking steel box girders to achieve synchronous precision control of jacking construction, local force optimization, multi-parameter dynamic control, and meet the economy and efficiency in complex environments. Summary of the invention

[0004] The present invention overcomes the shortcomings of the prior art and aims to solve the following technical problems: to provide a device for jacking construction of steel box girders, using a device with two jacking cycles, through real-time monitoring and alternating jacking of three support plates, to improve the efficiency and safety of jacking construction.

[0005] The specific technical solutions include the following aspects:

[0006] In a first aspect, a double-circle jacking method for jacking construction of a steel box girder is provided, the method comprising the following steps: first, after obtaining a construction order, installing equipment and fixing the equipment base to a bridge pier;

[0007] Next, initialize the sensor and adjust the control system, set the displacement threshold K1, set the stress threshold K2, and set the steel box girder status assessment process.

[0008] Next, lower the surrounding supports, and lift, rotate, and lower the lifting cylinder in the direction of the bridge in succession, running a cycle.

[0009] In the next step, the surrounding supporting fixed steel box beams are raised and the jacking cylinders return to their initial state.

[0010] Next, compare the measured data with the thresholds K1 and K2 to determine the state of the steel box girder. If abnormal, obtain the adjustment target based on data analysis, start the deviation correction system, and adjust the angle and displacement of the steel box girder; if normal, as shown in the attached figure, Figure 1 As shown, the next cycle of movement is performed until the steel box girder is determined to have reached the end point.

[0011] The next step is to inspect the construction quality of the steel box girder and accept it after it passes the inspection.

[0012] Next, the device is disassembled and maintained to prepare for next use.

[0013] In a second aspect, a double-circle jacking device for jacking construction of a steel box girder described in the present invention includes a base module, a slide module, a cylinder module, a monitoring module, a control system module, and a hydraulic pump station module.

[0014] Furthermore, the base module includes a high-strength base, a vertical telescopic support rod, and a circular support plate; the vertical telescopic support rod is connected to the high-strength base and is symmetrically arranged on all sides, and the circular support plate is located at the top of the telescopic support rod.

[0015] Furthermore, the slide module includes a fixed cylinder, a transversely retractable support rod, a cross-shaped slide groove, a horizontal annular track, and a sleeve; the fixed cylinder is connected to the center of the high-strength base, the cross-shaped slide groove is fixed to the center of the high-strength base, the horizontal annular track is connected to the middle of the inner ring of the fixed cylinder, one end of the transversely retractable support rod is fixed to the middle two sides of the outer ring of the sleeve, and the other end is connected to the horizontal annular track through a spherical ball. Further, the cylinder module includes a hydraulic cylinder body, a turntable bearing, a vertical lifting cylinder, and a control valve; the turntable bearing is connected to the cross-shaped slide groove and the hydraulic cylinder body, the hydraulic cylinder body is located above the turntable bearing and connected to the sleeve, and the piston rod and the control valve are located in the hydraulic cylinder body groove.

[0016] Furthermore, the monitoring module includes a displacement sensor and a pressure sensor installed on the base module, which are used to monitor the displacement state and pressure state of the cylinder in real time.

[0017] Furthermore, the control system module integrates advanced computer control technology, collects working status data of each module through sensors, and realizes real-time monitoring and intelligent control. The control system can automatically adjust the jacking force and jacking speed according to the preset construction parameters and real-time feedback.

[0018] Furthermore, the hydraulic pump station module provides power for the entire jacking device and is connected to each cylinder module through a high-pressure oil pipe. The pump station is equipped with an electromagnetic reversing valve, which is controlled by the control system module to achieve precise hydraulic oil flow control.

[0019] Compared with the prior art, the present invention has the following beneficial effects: the present invention provides a double-circle jacking device and method for jacking construction of steel box girders, which uses intelligent synchronous jacking and multi-parameter dynamic control technology to replace traditional construction methods, effectively improving construction efficiency; the double-circle jacking device can achieve precise control during the jacking process, is not constrained by complex construction environments, and can efficiently complete jacking tasks; the device and method have real-time monitoring and early warning functions during the construction process, providing preliminary preparations for construction safety and construction accuracy; the device is connected to an intelligent construction control system, and by precisely adjusting jacking parameters, it achieves smooth jacking of the steel box girder, effectively reducing construction errors and structural damage. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 An operation logic diagram provided for the implementation of the present invention;

[0021] Figure 2 A double-circle jacking device system for jacking construction of a steel box girder provided for the implementation of the present invention;

[0022] Figure 3 for Figure 2 Horizontal correction system;

[0023] Figure 4 for Figure 3 Schematic diagram of the disassembly of the internal structure;

[0024] Figure 5 for Figure 2 Cross-sectional view of the bridge.

[0025] In the figure: 1 is a high-strength base, 2 is a vertical telescopic support rod, 3 is a round support plate, 4 is a fixed cylinder, 5 is a transverse telescopic support rod, 6 is a M-shaped slide, 7 is a horizontal ring track, 8 is a sleeve, 9 is a hydraulic cylinder body, 10 is a vertical lifting cylinder, 11 is a three-fan arc support plate, 12 is a displacement sensor, 13 is a pressure sensor, 14 is a silicone veneer, 15 is a fixing bolt, 16 is a bridge pier, 17 is a steel box girder, 18 is a turntable bearing, and 19 is a control valve. DETAILED DESCRIPTION

[0026] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below. Obviously, the described embodiments are part of the embodiments of the present invention, rather than all the embodiments; based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

[0027] like Figure 1As shown, the present invention provides a double-circle jacking method for steel box girder jacking construction, the method comprising the following steps: first, after obtaining the construction order, the equipment is installed, as shown in the attached Figure 5 As shown, fix the base of the equipment to the bridge pier; the next step is to initialize the sensor and adjust the control system, set the displacement threshold K1, set the stress threshold K2, and set the steel box girder status assessment process; the next step is to lower the surrounding supports, and the jacking cylinder will successively lift, rotate, and lower along the bridge direction for one cycle; the next step is to raise the surrounding supports to fix the steel box girder, and the jacking cylinder will return to the initial state; the next step is to compare the measured data with the thresholds K1 and K2 to determine the state of the steel box girder. If abnormal, obtain the adjustment target based on data analysis, start the correction system, and adjust the angle and displacement of the steel box girder. If normal, as shown in the attached Figure 1 As shown, the next cycle of movement is carried out until the steel box girder is determined to have reached the end point; the next step is to inspect the construction quality of the steel box girder and accept it after it is qualified; finally, the invented equipment is disassembled and maintained for backup for next use.

[0028] like Figure 1-5 As shown, the present invention provides a double-circle jacking device with optimized structure and simple operation, which is suitable for the jacking construction of steel box girders, comprising a high-strength base 1 and a vertically retractable support rod 2 arranged on the high-strength base 1; the vertically retractable support rod 2 is used to connect the high-strength base 1 and a circular support plate 3, and is arranged at the four corners of the high-strength base 1; a silicone veneer 14 is provided on the circular support plate 3 and can contact with the steel box girder 17, so as to suspend the movement of the steel box girder; the silicone veneer 14 is divided into arc and circle according to the upper surface of the support plate shape, and is the only material in contact with the moving target, which is beneficial to alleviate and absorb the vibration and impact force during the movement of the steel box girder.

[0029] Further, such as Figure 2 and Figure 4 As shown, the vertical jacking device includes a hydraulic cylinder body 9, a vertical jacking cylinder 10, a control valve 19, a three-sector arc-shaped support plate 11, and a silicone veneer 14; the hydraulic cylinder body 9 is located above the turntable bearing 18 and is connected to the sleeve 8, and the vertical jacking cylinder 10 and the control valve 19 are located in the groove of the hydraulic cylinder body 9; the silicone veneer 14 is attached to the three-sector arc-shaped support plate 11; the sector arc-shaped support plate 11 is supported by the vertical jacking cylinder 10.

[0030] Further, such as Figure 3-4As shown, the internal structure of the horizontal correction system includes a fixed cylinder 4, a transversely retractable support rod 5, a M-shaped slide groove 6, a horizontal annular track 7, a sleeve 8, a displacement sensor 12, a pressure sensor 13, and a turntable bearing 18; the fixed cylinder 4 is fixed at the center of the high-strength base 1, and is used to carry the horizontal annular track 7; the M-shaped slide groove 6 is fixed on the upper surface of the center of the high-strength base 1, and is used to assist the horizontal sliding of the cylinder pier 9; the horizontal annular track 7 is welded to the middle part of the inner ring surface of the fixed cylinder; the large diameter end of the transversely retractable support rod 5 is fixed to the outer ring of the sleeve, and the small diameter end is connected to the horizontal annular track 7 through a spherical ball. The number of retractable support rods 5 is at least two, and they are distributed in a circular array, which can quickly and effectively push and pull the cylinder pier 9; the turntable bearing 18 connects the M-shaped slide groove 6 and the hydraulic cylinder body 9, and can drive the hydraulic cylinder body 9 to rotate horizontally.

[0031] The working principle and working process of the present invention are as follows: after the equipment and materials are prepared, the high-strength base 1 is connected to the bridge pier 16 by fixing bolts 15, and according to the control system command, the vertical retractable support rod 2 slowly descends, and the first leaf of the arc-shaped support plate 11 slowly extends until the silicone veneer 14 fits with the steel box girder 17. After the seal, the first leaf of the arc-shaped support plate 11 begins to slowly rotate along the bridge direction, thereby driving the steel box girder 17 to move forward. After reaching the threshold, according to the control system command, the second leaf of the arc-shaped support plate 11 rises until the silicone veneer 14 fits with the steel box girder 17. After the seal, the first leaf of the arc-shaped support plate 11 slowly shrinks to the initial value and stops rotating. At the same time, the second leaf of the arc-shaped support plate 11 begins to move along the bridge direction. The steel box girder 17 is slowly rotated to move forward again. After reaching the threshold, according to the control system command, the third leaf of the arc support plate 11 rises to the silicone veneer 14 and fits the steel box girder 17. After the seal, the second leaf of the arc support plate 11 slowly shrinks to the initial value and stops rotating. At the same time, the third leaf of the arc support plate 11 begins to slowly rotate along the bridge direction, thereby driving the steel box girder 17 to move forward again to the final value. The telescopic support rod 2 slowly rises to support the steel box girder 17. According to the data obtained by the monitoring module, after the control system determines that the steel box girder 17 is stable, the third leaf of the arc support plate 11 slowly shrinks to the initial value, and the last three leaves of the arc support plate 11 rotate in the opposite direction to the initial position, ready for the next cycle of work. The data obtained by the monitoring module is used to determine the state of the steel box girder after analysis by the control system. If it is abnormal, the adjustment target is obtained according to the data analysis, and the correction system is started to adjust the angle and displacement of the steel box girder; if it is normal, the next cycle of the steel box girder jacking construction is carried out until the steel box girder is determined to have reached the end point.

[0032] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.

Claims

1. A double-circle jacking device for jacking construction of steel box beams, characterized in that: The device is an integrated frame, including a double-circumference jacking device and a supporting device. The integrated frame includes a plurality of adjustable supporting devices connected with the four corners of a base module, and the center of the base module is provided with a double-circumference jacking device. The adjustable support device comprises a high-strength base (1) and a vertically retractable support rod (2) arranged on the high-strength base (1); the vertically retractable support rod (2) is used to connect the high-strength base (1) and a circular support plate (3) and is evenly arranged around the base; a silicone veneer (14) is provided on the circular support plate (3) and contacts the steel box girder (17) to support the steel box girder to stop.

2. A double-circle jacking device for jacking construction of a steel box girder according to claim 1, characterized in that: The internal structure includes a horizontal deviation correction system including: a fixed cylinder (4) fixed at the center of a high-strength base (1), a transversely retractable support rod (5), one end of which fixes the outer ring of a sleeve (8) and the other end is connected to a horizontal annular track (7) through a spherical ball, a cross-shaped slide groove (6) and a horizontal annular track (7) for assisting a hydraulic cylinder (9) to slide horizontally, and a turntable bearing (18) for assisting a hydraulic cylinder (9) to rotate horizontally. The horizontal deviation correction system obtains an adjustment target according to data analysis and intelligently adjusts the angle and distance of the steel box girder on a horizontal coordinate system.

3. A double-circle jacking device for jacking construction of a steel box girder according to claim 1, characterized in that: The internal structure includes a vertical jacking device, including: the hydraulic cylinder body (9) is located above the turntable bearing (18) and connected to the sleeve (8), the vertical jacking oil cylinder (10) and the control valve (19) are located in the groove of the hydraulic cylinder body (9), the silicone veneer (14) is attached to the three-sector arc-shaped support plate (11), and the sector arc-shaped support plate (11) is supported by the vertical jacking oil cylinder (10). The vertical jacking device drives the steel box girder forward in the process of controlling the vertical jacking oil cylinder (10) to move back and forth under the control command, until the steel box girder is determined to have reached the end point.

4. A double-circle jacking device for jacking construction of a steel box girder according to claim 1 and claim 3, characterized in that: The silicone veneer (14) is the only material that comes into contact with the moving object.

5. A double-circle jacking method for jacking construction of a steel box girder, characterized in that: The method comprises a control system and a monitoring module; the monitoring module collects data on the construction status of the steel box girder from a displacement sensor and a pressure sensor, and transmits the data to the control system for processing via wireless.

6. The control system according to claim 5, characterized in that: The control system connects the surrounding supports, jacking cylinders and correction system through cables. Based on the data processing and analysis of the monitoring module, it controls the pause, advance and adjustment of the steel box girder jacking construction process until the steel box girder is judged to have reached the end point and the construction quality inspection is qualified.