A timber formwork early stripping support system and construction method

By setting a lateral support connection structure and a positioning rod lock at the top of the stud adjusting nut, combined with a ball and spring structure, the problem of insufficient stability of the uprights in super high-rise buildings is solved, and the stability of the uprights is improved during the erection and dismantling process.

CN118835791BActive Publication Date: 2026-11-17CHONGQING HENGSHENG DAYE CONSTR TECH GRP CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202411158428.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-22
Publication Date
2026-11-17
Estimated Expiration
2044-08-22

AI Technical Summary

Technical Problem

In existing technologies, the stability of the uprights in super high-rise buildings is problematic, especially when the stud threads are subjected to long-term stress and wear and the uprights are very tall. The stability of the upright support is difficult to guarantee, and it is prone to instability, particularly during the demolding process.

Method used

A lateral support connection structure is set at the top of the stud adjusting nut and locked with a positioning rod. The lower part of the positioning rod locks the lateral support connection structure, and the top of the positioning rod abuts against the flange adjusting nut. A ball and spring structure is combined to reduce friction and improve the stability of the upright.

Benefits of technology

The design of the lateral support connection structure and positioning rod significantly improves the stability of the uprights during the erection and demolding process, reduces thread wear, and ensures the stability of the uprights and studs. In particular, it provides lateral support force after the first demolding, enhancing the stability of the overall support system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118835791B_ABST
    Figure CN118835791B_ABST
Patent Text Reader

Abstract

This invention relates to the field of building engineering technology and discloses an early-stripping formwork support system for wooden formwork, including studs, flange plate adjusting nuts, and a lateral support connection structure mounted on top of the studs and adjusting nuts. The lateral support connection structure includes a first locking block and a second locking block that are snapped together. The first and second locking blocks are symmetrically distributed on both sides of the stud. The first locking block is mounted on the upper surface of the stud and adjusting nut, and has a slot into which the second locking block engages. Both the first and second locking blocks have locking holes into which a positioning rod is inserted, with the top of the positioning rod abutting against the flange plate adjusting nut. This invention significantly improves the stability of the upright support during all stages of formwork erection and dismantling by setting a lateral support connection structure on top of the stud and adjusting nut and locking it with a positioning rod. The lower part of the positioning rod locks the lateral support connection structure, while the top of the positioning rod simultaneously abuts against the flange plate adjusting nut.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of building engineering technology, specifically to a wooden formwork early stripping support system and construction method. Background Technology

[0002] In early-stripping formwork systems, the uprights are generally quite long, and the concrete components poured above them are primarily supported by these uprights. Therefore, the stability of the uprights is crucial during both the erection and dismantling of the support system. To better support concrete slabs of varying heights, existing technologies utilize adjustable studs at the top of the uprights to accommodate different slab height requirements. Other auxiliary support components for the concrete slabs also employ adjustment and support mechanisms on these studs; examples include the Chinese utility model patent CN213837720U, entitled "A Support Top Support and Formwork Support Device for Early-Stripping Back Rigs," and the Chinese invention patent CN113958138A, entitled "Construction Method for Green Formwork Systems." The proposed solutions all involve installing studs at the top of the uprights, with adjusting nuts on the outside of the studs for raising and lowering. Flange plates are fitted onto the studs to support the main and secondary keels, and the raising and lowering are adjusted by the adjusting nuts threaded to the studs. The above solutions are relatively simple and can be applied in most situations. However, because the stud threads are prone to wear due to long-term stress, and the uprights are relatively tall, the uprights or studs are prone to instability during the erection and dismantling process. This is especially true for the very tall uprights of super high-rise buildings, and when only one upright remains after the initial dismantling, forming a single point of support. The stability of the upright support is a problem that needs to be solved. Summary of the Invention

[0003] The purpose of this invention is to overcome the shortcomings of existing technologies and provide a timber formwork early dismantling support system and construction method. By setting a lateral support connection structure at the top of the stud adjusting nut and locking it with a positioning rod; the lower part of the positioning rod locks the lateral support connection structure, and the top of the positioning rod simultaneously abuts against the flange plate adjusting nut, the stability of the upright support is greatly improved in all processes of erection and dismantling.

[0004] To achieve the above objectives, the present invention adopts the following technical solution: a wooden formwork early dismantling support system, comprising a stud fixed to the top of the upright by a stud adjusting nut, a flange adjusting nut threadedly connected to the stud and disposed above the stud adjusting nut, and a lateral support connection structure mounted on top of the stud adjusting nut and capable of supporting the flange adjusting nut; a lifting sleeve is disposed above the flange adjusting nut, the top of the lifting sleeve is fixedly connected to the flange, and the lifting sleeve and the flange are sleeved with the stud; the lateral support connection structure includes a first locking block and a second locking block that are snapped together; the first locking block and the second locking block are symmetrically distributed on both sides of the stud; the first locking block is mounted on the upper surface of the stud adjusting nut, and a slot is horizontally opened on the side of the first locking block facing the second locking block, into which the second locking block is snapped; after the first locking block and the second locking block are snapped together, a locking hole is vertically opened at the overlapping part, a positioning rod is inserted into the locking hole, and the top of the positioning rod abuts against the lower surface of the flange adjusting nut.

[0005] Furthermore, an adjusting thread is provided at the lower part of the positioning rod, and an adjusting nut is connected to the adjusting thread. The lower surface of the adjusting nut abuts against the upper surface of the first locking block. The adjusting thread and adjusting nut are provided for fine adjustment of the positioning rod so that it abuts against the lower surface of the adjusting nut of the flange plate.

[0006] Furthermore, the positioning rod includes a plug rod inserted into the locking hole, at least one extension rod connected to the plug rod, and a top rod connected to the top of the extension rod. The top of the top rod is fixedly mounted with a support plate abutting against the lower surface of the flange adjusting nut. The slot setting rod, extension rod, and top rod facilitate significant adjustment of the height of the positioning rod.

[0007] Furthermore, a first support block is fixedly connected to the side of the first locking block away from the stud, and the first support block has a first limiting groove opened from top to bottom, into which the end of the crossbar is inserted from top to bottom; a second support block is fixedly connected to the side of the second locking block away from the stud, and the second support block has a second limiting groove opened from top to bottom, into which the end of the crossbar is inserted from top to bottom; the support block and the limiting groove are provided to facilitate the erection of the crossbar.

[0008] Furthermore, the upper surface of the flange adjusting nut has a downward-facing annular groove, in which several balls are arranged. A support plate with a width smaller than the width of the annular groove is provided on the top of the balls. A spring is provided on the top of the support plate, and the top of the spring abuts against the lower surface of the lifting sleeve. The balls and spring are arranged to facilitate lifting.

[0009] Furthermore, symmetrical adjustment rods are provided on the outer side of the flange plate adjusting nut; each adjustment rod is provided with a flange plate clamping structure for clamping the flange plate directly above; in order to position the flange plate and prevent it from shaking during the assembly and demolding process, thereby affecting the studs.

[0010] Furthermore, the flange clamping structure includes a fixed seat fixed to the adjusting support rod by positioning bolts; the fixed seat has a fixing groove along the width direction of the flange, and a rotating block is rotatably arranged in the fixing groove. A transmission rod is rotatably connected to each end of the rotating block, and a clamping rod is rotatably connected to the end of the transmission rod away from the fixed seat; the two clamping rods are arranged vertically and clamp the flange symmetrically from both sides; a support column is vertically inserted into the adjusting support rod, and a support rod arranged along the width direction of the flange is connected to the top of the support column. Second connecting shafts are connected to both ends of the support rod at the positions corresponding to the two clamping rods, and the second connecting shafts are rotatably connected to the clamping rods; the adjustment is convenient, and the entire structure can be easily removed from the adjusting support rod.

[0011] A construction method for an early-stripping wooden formwork support system includes the following steps: Step S1, pre-erection treatment: including cleaning the floor and erecting a full-span support frame; Step S2, erecting uprights and early-stripping column heads; Step S3, erecting horizontal bars; Step S4, installing the first-stripping strip and the subsequent-stripping strip; Step S5, installing formwork for pouring concrete components; Step S6, installing beam and slab reinforcement and pouring concrete components; Step S7, starting the first formwork removal after testing the strength of the concrete components to reach 50%; Step S8, starting the second formwork removal after testing the strength of the concrete components to reach the design standard.

[0012] Furthermore, step S2 also includes installing the main keel 4, the secondary keel 5, and the flange clamping structure.

[0013] Furthermore, step S3 includes installing a lateral support connection structure; the design standard for secondary formwork removal in step S8 is at least that the concrete strength reaches 75%.

[0014] The beneficial effects of this invention are:

[0015] 1. This invention improves the stability of the upright support by setting a lateral support connection structure at the top of the stud adjusting nut and locking it with a positioning rod; the lower part of the positioning rod locks the lateral support connection structure, and the top of the positioning rod simultaneously abuts against the flange plate adjusting nut.

[0016] 2. The positioning rod provides support force for the flange plate adjusting nut during the erection process, reducing stud thread wear and thus improving the stability of the upright support. The flange plate lifting structure acts during the lifting process of the flange plate. During this process, the flange plate inevitably sways, which affects the flange plate adjusting nut. However, due to the presence of springs and balls, direct contact between the flange plate adjusting nut and the flange plate is prevented, greatly reducing the impact on the flange plate adjusting nut. This reduces thread wear and stud sway. The swaying or stabilization of the stud is equivalent to the swaying or stabilization of the upright.

[0017] 3. After the lateral support connection structure is installed with the crossbar, it not only plays the role of the crossbar in the existing technology, but also provides lateral support force for the uprights after the first demolding, further ensuring the stability of the uprights after demolding. The flange plate clamping structure is used after the main and secondary keel frames are set up, and the flange plate is fixed, reducing movement and reducing the impact on the stability of the studs. At the same time, it connects the flange plate adjusting nut and the flange plate into one unit, which is equivalent to increasing the center of gravity of this part of the component, thereby reducing the probability of movement under external forces and improving the stability of the uprights and studs after the first demolding. Attached Figure Description

[0018] Figure 1 This is a schematic diagram of the supporting system architecture of the present invention;

[0019] Figure 2 This is a schematic diagram of the early-stripping column head structure of the present invention;

[0020] Figure 3 For the present invention Figure 2 Enlarged structural diagram at point A in the middle;

[0021] Figure 4 This is a schematic diagram of the flange lifting structure of the present invention;

[0022] Figure 5 This is a schematic diagram of the flange clamping structure of the present invention;

[0023] Figure 6 This is a schematic diagram of the lateral support connection structure of the present invention;

[0024] Figure 7 This is a schematic diagram of the positioning rod structure of the present invention;

[0025] Figure 8 This is a flowchart of the construction process of the present invention.

[0026] In the diagram: 1. Template sheet; 2. Upright pole; 3. Horizontal bar; 4. Main keel; 5. Secondary keel; 6. Rear dismantling plate strip; 7. First dismantling plate strip; 8. Concrete component; 9. Stud; 10. Stud adjusting nut; 11. Flange plate adjusting nut; 1101. Ring groove; 1102. Ball bearing; 1103. Support plate; 1104. Spring; 12. Lifting sleeve; 1201. Flange plate; 13. Adjusting support rod; 14. Fixed seat; 15. Rotating block; 16. Adjusting screw; 17. Handle; 18. Positioning bolt; 19. Fixed shaft; 20. Transmission rod; 21. First connecting rod. 21. Connecting shaft; 22. Clamping rod; 23. Second connecting shaft; 24. Support column; 25. Support rod; 26. First locking block; 2601. First support block; 2602. First limiting groove; 2603. Slot; 27. Second locking block; 2701. Second support block; 2702. Second limiting groove; 28. Positioning rod; 2801. Locking hole; 2802. Insert rod; 2803. Adjusting thread; 2804. Slot; 2805. Extension rod; 2806. Plug; 2807. Top rod; 2808. Adjusting nut; 2809. Support plate; 29. ​​Top plate. Detailed Implementation

[0027] The present invention will be further explained and described below with reference to the accompanying drawings and specific embodiments.

[0028] Example:

[0029] like Figures 1-8 As shown, a timber formwork early dismantling support system is characterized by: a stud 9 fixed to the top of the upright 2 by a stud adjusting nut 10; a flange adjusting nut 11 threadedly connected to the stud 9 and disposed above the stud adjusting nut 10; and a lateral support connection structure mounted on top of the stud adjusting nut 10 and capable of supporting the flange adjusting nut 11; a lifting sleeve 12 is disposed above the flange adjusting nut 11, the top of the lifting sleeve 12 is fixedly connected to the flange 1201, and the lifting sleeve 12 and the flange 1201 are sleeved with the stud 9; the lifting sleeve 12 is raised and lowered through the flange adjusting nut 11; the lateral support connection structure includes a snap-fit ​​connection... The first locking block 26 and the second locking block 27 are integrated; the first locking block 26 and the second locking block 27 are symmetrically distributed on both sides of the stud 9; the first locking block 26 is mounted on the upper surface of the stud adjusting nut 10, and a slot 2603 is horizontally opened on the side of the first locking block 26 facing the second locking block 27, and the second locking block 27 is inserted into the slot 2603; after the first locking block 26 and the second locking block 27 are engaged, a locking hole 2801 is vertically opened at the overlapping part, and a positioning rod 28 is inserted into the locking hole 2801. The positioning rod 28 passes through the first locking block 26 and the second locking block 27 at the same time, and the top of the positioning rod 28 abuts against the lower surface of the flange adjusting nut 11.

[0030] The spacing between uprights is generally 800-1200mm; a template plate 1 is set at the bottom of the upright 2, and the template plate 1 is placed on the ground. A horizontal bar 3 is set at the bottom or middle of the upright 2; the top of the stud 9 is fixedly connected to the top plate 29; the main keel 4 is erected on both sides of the flange plate 1201; the secondary keel 5 is erected on the top of the main keel 4; the rear dismantling plate band 6 is erected on the upper surface of the top plate 29; the first dismantling plate band 7 is erected on the top of the secondary keel 5; the first dismantling plate band 7 and the rear dismantling plate band 6 are on the same plane, and concrete components 8 are poured on the top of both.

[0031] The lower part of the positioning rod 28 is provided with an adjusting thread 2803, and the adjusting thread 2803 is connected to an adjusting nut 2808. The lower surface of the adjusting nut 2808 abuts against the upper surface of the first locking block 26. The highest position of the bottom of the positioning rod 28 does not exceed the upper surface of the second locking block 27. The adjusting thread 2803 and the adjusting nut 2808 are provided for fine adjustment of the positioning rod 28 so that it abuts against the lower surface of the flange adjusting nut 11.

[0032] The positioning rod 28 includes a rod 2802 inserted into the locking hole 2801, at least one extension rod 2805 connected to the rod 2802, and a top rod 2807 connected to the top of the extension rod 2805. A support plate 2809 is fixedly installed on the top of the top rod 2807, abutting against the lower surface of the flange adjusting nut 11. Slots 2804 are provided on the top of the rod 2802 and the top of the extension rod 2805. Plugs 2806 are provided on the bottom of the extension rod 2805 and the bottom of the top rod 2807. Adjacent plugs 2806 and slots 2804 are inserted into each other. The slots 2804 provide rod 802, extension rod 2805 and top rod 2807 to facilitate significant adjustment of the height of the positioning rod.

[0033] The first locking block 26 is fixedly connected to the first support block 2601 on the side away from the stud 9. The first support block 2601 has a first limiting groove 2602 opened from top to bottom, and the end of the crossbar 3 is inserted into the first limiting groove 2602 from top to bottom. The second locking block 27 is fixedly connected to the second support block 2701 on the side away from the stud 9. The second support block 2701 has a second limiting groove 2702 opened from top to bottom, and the end of the crossbar 3 is inserted into the second limiting groove 2702 from top to bottom.

[0034] A crossbar 3 is set between two adjacent studs 9 in the same horizontal direction. The two ends of the same crossbar 3 are respectively placed into the corresponding limiting grooves, which can both be the first limiting groove 2602, both can both be the second limiting groove 2702, or they can be different. A first locking block 26 and a second locking block 27 that are snapped together form a group. When the crossbar 3 is set in the longitudinal direction, one group can be erected above the first group of first locking blocks 26. Of course, the distance between the first locking block 26 and the flange plate adjusting nut 11 after erection needs to be considered. The support block and the limiting groove are set to facilitate the erection of the crossbar 3. Since the crossbar 3 is erected from top to bottom, the length of the crossbar 3 can be equal to or slightly greater than the distance between the far ends of the two adjacent limiting grooves, so that the crossbars 3 on both sides symmetrically abut against the studs 9. This is a function that the existing crossbar 3 does not have. The top corner of the far end of the limiting groove can be set as an arc surface to facilitate the insertion of the crossbar 3.

[0035] The upper surface of the flange adjusting nut 11 has a downward-facing annular groove 1101. Several balls 1102 are arranged in the annular groove 1101. A support plate 1103 with a width smaller than the width of the annular groove 1101 is arranged on the top of the balls 1102. A spring 1104 is arranged on the top of the support plate 1103. The top of the spring 1104 abuts against the lower surface of the lifting sleeve 12. When the flange adjusting nut 11 rotates to lift the lifting sleeve 12, the flange 1201 cannot rotate because it has been supported by the main and secondary keels. The friction between the flange adjusting nut 11 and the stud 9 increases when it is lifted. At the same time, there is also friction with the lifting sleeve 12. It is not conducive to the stability of the stud 9 when lifting. Therefore, in order to reduce friction and facilitate lifting, the balls 1102 and the spring 1104 are arranged so that the flange adjusting nut 11 and the lifting sleeve 12 do not directly contact each other.

[0036] Adjusting rods 13 are symmetrically arranged on the outer side of the flange plate adjusting nut 11; each adjusting rod 13 is provided with a flange plate clamping structure for clamping the flange plate 1201 directly above; in order to position the flange plate 1201 and prevent it from shaking during the assembly and demolding process, thereby affecting the stud 9.

[0037] The flange clamping structure includes a fixed seat 14 fixed to the adjusting support rod 13 by positioning bolts 18; the fixed seat 14 has a fixed groove along the width direction of the flange 1201, and a rotating block 15 is rotatably arranged in the fixed groove. A transmission rod 20 is rotatably connected to each end of the rotating block 15. A clamping rod 22 is rotatably connected to the end of the transmission rod 20 away from the fixed seat 14; the two clamping rods 22 are arranged vertically and symmetrically clamp the flange 1201 from both sides; a support column 24 is vertically inserted into the adjusting support rod 13, and a support rod 25 arranged along the width direction of the flange 1201 is connected to the top of the support column 24. A second connecting shaft 23 is connected to each end of the support rod 25 corresponding to the positions of the two clamping rods 22. The second connecting shaft 23 is rotatably connected to the clamping rods 22.

[0038] The fixed base 14 is threaded with an adjusting screw 16 along the length of the flange plate 1201. The adjusting screw 16 is vertically inserted into the rotating block 15 and fixedly connected to it. A handle 17 is connected to the outer end of the adjusting screw 16. Fixed shafts 19 are fixedly connected to both ends of the rotating block 15. The fixed shafts 19 are rotatably connected to one end of the transmission rod 20, and the other end of the transmission rod 20 is rotatably connected to the first connecting shaft 21. The transmission rod 20 can slide back and forth along the length of the first connecting shaft 21. The first connecting shaft 21 passes through the transmission rod 20 and is connected to the bottom of the clamping rod 22. Since the transmission rod 20 can slide back and forth and rotate around the first connecting shaft 21, even if the rotating block 15 moves back and forth along the length of the flange plate 1201 with the adjusting screw 16, it will not be affected, because only a slight rotation of the rotating block 15 is needed to clamp and release the clamping rod 22. The support column 24 is set high so that the second connecting shaft 23 Connected to the upper part of the clamping rod 22, the clamping rod 22, with its slight rotation at the bottom, can achieve a large range of rotation at the top. When the rotating block 15 and both transmission rods 20 are horizontal, the clamping rod 22 remains vertical, and the two clamping rods 22 tightly clamp the flange plate 1201. When it is necessary to release, the adjusting screw 16 is slightly rotated. The adjusting screw 16 drives the rotating block 15, and the rotating block 15 rotates, driving the transmission rods 20 at both ends, so that both transmission rods 20 change from a horizontal state to an inclined state. The ends of both transmission rods 20 near the rotating block 15 move towards the middle of the fixed seat 14, thereby driving the bottom of both clamping rods 22 to move towards the middle position of the flange plate 1201. Then, the tops of both clamping rods 22 swing away from the flange plate 1201. The adjustment is convenient, and the whole thing can be easily removed from the adjusting support rod 13.

[0039] A construction method for an early-stripping timber formwork support system includes the following steps:

[0040] Step S1, Pre-construction preparation: including cleaning the floor and erecting a full-span support frame;

[0041] Step S2: Erect pole 2 and remove the column head as soon as possible;

[0042] Step S3, erect crossbar 3;

[0043] Step S4: Install the first disassembly plate belt 7 and the second disassembly plate belt 6;

[0044] Step S5: Install the formwork for pouring concrete component 8;

[0045] Step S6: Install the beam and slab reinforcement and pour concrete components 8;

[0046] Step S7: After the strength of concrete member 8 reaches 50%, the first formwork removal begins.

[0047] Step S8: After the strength of concrete component 8 reaches the design standard, the second formwork removal begins.

[0048] Step S2 involves setting up the early dismantling column head, which includes installing the lifting sleeve 12, flange plate 1201, and flange plate adjusting nut 11 on the stud 9. Before this, the ball bearing 1102, support plate 1103, and spring 1104 are installed on the flange plate adjusting nut 11. Then, the stud 9 is inserted into the top of the upright 2 and the stud adjusting nut 10 is installed. It also includes installing the main keel 4, the secondary keel 5, and the flange plate clamping structure.

[0049] Step S3 includes installing the lateral support connection structure; the design standard for secondary formwork removal in step S8 is that the concrete strength reaches at least 75%.

[0050] To better stabilize the uprights 2 and studs 9, this scheme first utilizes a lateral support connection structure to set up a crossbar 3. This significantly improves the stability of the upper part when using the ultra-high uprights 2. Simultaneously, the positioning rod in the lateral support connection structure holds the flange plate adjusting nut 11 in place after adjustment, providing support and stability. If the crossbar is not needed initially, a portion of the removed crossbar can be placed in the limiting groove as lateral support after the initial demolding, thus improving the stability of the uprights. The stability of the uprights 2 and studs 9 is ensured during erection by using ball bearings 1102, support plates 1103, and springs 1104, thus improving the stability of the uprights. After erection, the flange plate clamping structure ensures the stability of the flange plates and makes the flange plate adjusting nut 11 and flange plate 1201 a single unit, thus ensuring the stability of the uprights 2 and studs 9 during the pouring process.

[0051] The above description is only used to illustrate the technical solution of the present invention and is not intended to limit it. Any other modifications or equivalent substitutions made by those skilled in the art to the technical solution of the present invention, as long as they do not depart from the spirit and scope of the technical solution of the present invention, should be covered within the scope of the claims of the present invention.

Claims

1. A timber formwork early-stripping support system, characterized in that: The system includes a stud (9) fixed to the top of the upright (2) by a stud adjusting nut (10), a flange adjusting nut (11) threaded to the stud (9) and located above the stud adjusting nut (10), and a lateral support connection structure mounted on top of the stud adjusting nut (10) and capable of supporting the flange adjusting nut (11); a lifting sleeve (12) is provided above the flange adjusting nut (11), the top of the lifting sleeve (12) is fixedly connected to the flange (1201), and the lifting sleeve (12) and the flange (1201) are sleeved with the stud (9); the lateral support connection structure includes a first locking block (26) and a locking block (26) that are snapped together as one piece. The second locking block (27); the first locking block (26) and the second locking block (27) are symmetrically distributed on both sides of the stud (9); the first locking block (26) is mounted on the upper surface of the stud adjusting nut (10), and the first locking block (26) has a horizontal slot (2603) on the side facing the second locking block (27), and the second locking block (27) is inserted into the slot (2603); after the first locking block (26) and the second locking block (27) are engaged, a locking hole (2801) is vertically opened at the overlapping part, and a positioning rod (28) is inserted into the locking hole (2801), and the top of the positioning rod (28) abuts against the lower surface of the flange adjusting nut (11); Wherein: the upper surface of the flange adjusting nut (11) is provided with an annular groove (1101) facing downward, and a number of balls (1102) are provided in the annular groove (1101). The top of the balls (1102) is provided with a support plate (1103) with a width smaller than the width of the annular groove (1101); the top of the support plate (1103) is provided with a spring (1104), and the top of the spring (1104) abuts against the lower surface of the lifting sleeve (12); the flange adjusting nut (11) is symmetrically provided with adjusting rods (13) on the outside; each adjusting rod (13) is provided with a flange clamping structure for clamping the flange (1201) directly above; the flange clamping structure includes a fixing seat (14) fixed to the adjusting rod (13) by a positioning bolt (18); the fixing seat (14) A fixing groove is opened along the width direction of the flange plate (1201). A rotating block (15) is rotatably arranged in the fixing groove. A transmission rod (20) is rotatably connected to both ends of the rotating block (15). A clamping rod (22) is rotatably connected to the end of the transmission rod (20) away from the fixing seat (14). The two clamping rods (22) are arranged vertically and clamp the flange plate (1201) symmetrically from both sides. A support column (24) is vertically inserted into the adjusting support rod (13). A support rod (25) is connected to the top of the support rod (24) along the width direction of the flange plate (1201). A second connecting shaft (23) is connected to both ends of the support rod (25) at the positions corresponding to the two clamping rods (22). The second connecting shaft (23) is rotatably connected to the clamping rod (22).

2. The early-stripping formwork support system for wooden formwork according to claim 1, characterized in that: The lower part of the positioning rod (28) is provided with an adjusting thread (2803), and the adjusting thread (2803) is connected to an adjusting nut (2808). The lower surface of the adjusting nut (2808) abuts against the upper surface of the first locking block (26).

3. The early-stripping formwork support system for wooden formwork according to claim 1, characterized in that: The positioning rod (28) includes a rod (2802) inserted into a locking hole (2801), at least one extension rod (2805) connected to the rod (2802), and a top rod (2807) connected to the top of the extension rod (2805). The top of the top rod (2807) is fixedly mounted with a support plate (2809) abutting against the lower surface of the flange adjusting nut (11).

4. The early-stripping formwork support system for wooden formwork according to claim 1, characterized in that: The first locking block (26) is fixedly connected to the first support block (2601) on the side away from the stud (9). The first support block (2601) has a first limiting groove (2602) from top to bottom. The end of the crossbar (3) is inserted into the first limiting groove (2602) from top to bottom. The second locking block (27) is fixedly connected to the second support block (2701) on the side away from the stud (9). The second support block (2701) has a second limiting groove (2702) from top to bottom. The end of the crossbar (3) is inserted into the second limiting groove (2702) from top to bottom.

Citation Information

Patent Citations

  • Green formwork system construction method

    CN113958138A

  • Supporting jacking and formwork supporting device with back ridges capable of being dismantled early

    CN213837720U

  • Formwork supporting system and construction method

    CN114109041A

  • Early system strutting arrangement that tears open of building engineering template

    CN208473291U