Reconfigurable production line change design aided decision-making method based on semi-tensor product

Through the combination of semi-tensor product operation and intelligent engine, it solves the problems of high computing resource consumption and low timeliness in the existing technology when assisting decision-making in production line change design, and realizes efficient production line change design assist decision-making, which is suitable for complex production line environments. field engineer.

CN118839501APending Publication Date: 2024-10-25GUANGDONG UNIV OF TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410882578.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-03
Publication Date
2024-10-25

AI Technical Summary

Technical Problem

Existing production line change design auxiliary decision-making methods rely on graph calculations, resulting in high consumption of computing resources and low timeliness. It is difficult to meet the real-time needs of field engineers, especially in complex production line environments, where it is difficult to achieve efficient decision-making.

Method used

Semi-tensor product operation is used to replace the traditional graph calculation method. By establishing a multivariate semantic model and a production line processing parameter matrix, the semi-tensor product operation is performed to generate a production line change probability triplet model, and combined with an intelligent engine to provide an undirected graph form Design plan and assist engineers in designing.

Benefits of technology

It significantly reduces computing resource consumption and computing time, improves the efficiency and timeliness of design changes, and can effectively support high-frequency design changes in the context of large-scale personalized customization production.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118839501A_ABST
    Figure CN118839501A_ABST
Patent Text Reader

Abstract

The invention discloses a reconfigurable production line change design aided decision-making method based on a semi-tensor product. The method comprises the following steps: establishing a multivariate semantic model; performing semi-tensor product operation on the multivariate semantic model and the product feature-processing parameter propagation matrix to obtain a production line processing parameter matrix; performing semi-tensor product operation on the production line processing parameter matrix and the production line processing parameter-change probability propagation matrix group to obtain a production line change probability triple model; and inputting the production line change probability triple model into an intelligent engine to obtain a production line change probability design scheme converted into an undirected graph form consistent with the current production line structure, and assisting an engineer in design. According to the method, the semi-tensor product operation is adopted, so that the system calculation time is shortened while the operation resource consumption is reduced, and the effectiveness of the auxiliary decision-making system in the change design and the efficiency of the overall process of the change design are improved; and design assistance can be provided for field engineers for high-frequency change of the reconfigurable manufacturing system under the background of large-scale personalized customization production.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of production line changes, and in particular to a reconfigurable production line change design auxiliary decision-making method based on semi-tensor product. Background Art

[0002] Currently, the design of reconfigurable production line change plans is often achieved through the experience and coordination of on-site engineers. Since production line changes often involve the coupling of engineering experience in multiple fields (such as light, heat, electricity, hydraulics, etc.), production line changes not only put a great test on the control capabilities of on-site engineers, but also require companies to pay high production line debugging costs and labor costs.

[0003] At present, existing decision-making assistance methods for production line changes often rely on graph computing. The logic of this method is to characterize the production line into a multi-level model through multi-dimensional modeling, and solve the change plan solution under constraints through node calculation. The disadvantage of this technology is that the complexity of the production line requires a large amount of computing resources and time cost to be consumed in the calculation process based on node solution, resulting in reduced timeliness of decision-making assistance and difficulty for field engineers to use. Summary of the invention

[0004] The purpose of the present invention is to overcome the shortcomings of the prior art and provide a reconfigurable production line change design auxiliary decision-making method based on semi-tensor product, which adopts semi-tensor product operation to replace the graph calculation method used in traditional change design, thereby reducing the consumption of computing resources and improving the efficiency of the overall change design process.

[0005] To achieve the above purpose, the technical solution provided by the present invention is:

[0006] A method for assisting decision-making in design change of a reconfigurable production line based on semi-tensor product, comprising:

[0007] S1. Establish a multi-semantic model P that describes the product;

[0008] S2, perform a semi-tensor product operation on the multivariate semantic model P and the product feature-processing parameter propagation matrix Pr to obtain the production line processing parameter matrix MP = {MP1, MP2, MP3, ..., MP s}, where MP k Represents the manufacturing parameters under n functional items of the kth manufacturing unit in the production line;

[0009] S3. Perform a semi-tensor product operation on the production line processing parameter matrix MP and the production line processing parameter-change probability propagation matrix group C to obtain the production line change probability triple model O p ;

[0010] S4, the production line change probability triple model O pThe input is input into the intelligent engine to obtain a production line change probability design plan converted into an undirected graph form consistent with the current production line structure, assisting engineers in design.

[0011] Furthermore, the multi-semantic model is:

[0012] P={P str ,P size ,P loc ,P mat ,P prec ,P cap}

[0013] Among them, P str Indicates the appearance structure of the product; size Indicates the production size of the product; P loc Indicates the positioning dimension of the product processing feature; P mat Indicates the constituent materials of each module of the product; prec Indicates the processing accuracy requirements of the product; P cap Indicates the production requirements of the product;

[0014] P str , P size , P loc There is a progressive relationship between them, that is, the appearance structure of the product affects the production size of the product, and at the same time, the appearance structure and production size affect the positioning size of the product processing features.

[0015] Furthermore, the product feature-processing parameter propagation matrix Pr is obtained as follows:

[0016] The product multivariate semantic model P and the current structure S of the production line in matrix form are input into the product feature-processing parameter propagation matrix generation model to generate the product feature-processing parameter propagation matrix Pr under the corresponding product cluster;

[0017] The product feature-processing parameter propagation matrix generation model is obtained as follows:

[0018] Based on the digital twin technology, an orthogonal experiment of production line changes is carried out on products within a set quantity range within the same product cluster in a simulation environment. The semi-tensor product P of different products and the corresponding production line processing parameter matrix MP are inversely calculated to obtain the corresponding probability propagation matrix group data. Based on the data obtained from the orthogonal experiment, diffusion model training is carried out using diffusion iteration to obtain the product feature-processing parameter propagation matrix generation model.

[0019] Furthermore, the production line processing parameter-change probability propagation matrix group C is obtained as follows:

[0020] The production line processing parameter matrix MP and the current production line structure S in matrix form are input into the production line processing-change probability propagation matrix group generation model to generate the production line processing parameter-change probability propagation matrix group C of the corresponding product cluster production line = {C add ,C del ,C conf}, where C add represents the propagation matrix of production line processing parameters and manufacturing unit additional operations; C del represents the propagation matrix of production line processing parameters and manufacturing unit deletion operations; C conf The propagation matrix representing the production line processing parameters and the manufacturing unit modification operations;

[0021] The production line processing-change probability propagation matrix group generation model is obtained as follows:

[0022] Based on digital twin technology, an orthogonal experiment of production line change is carried out on products within a set quantity range within the same product cluster in a simulation environment. The semi-tensor product is inversely calculated for the processing parameters under different product characteristics and the final production line change plan to obtain the corresponding probability propagation matrix group data. Based on the data obtained from the orthogonal experiment, diffusion model training is performed using diffusion iteration to obtain the production line processing-change probability propagation matrix group generation model.

[0023] Furthermore, the production line change probability triplet model in The matrices are s×s, (s-1)×(s-1), (s-1)×(s-1) respectively; The probability of adding operations at each position of the production line is stored in The probability of executing the deletion operation at each position of the production line is stored in it; The probability of a manufacturing unit change is saved; s is the number of manufacturing units included in the production line.

[0024] Furthermore, when a new design change is generated, relevant data including product parameters, product processing parameters, and production line change nodes of the new design will be integrated with previous change cases and input into the system's intelligent engine as the data set for the next round of iterations; after a new round of iterations, the intelligent engine generates a new product feature-processing parameter propagation matrix Pr and a production line processing parameter-change probability propagation matrix group C.

[0025] Compared with the prior art, the principles and advantages of this technical solution are as follows:

[0026] This technical solution adopts semi-tensor product operation to replace the graph calculation method used in traditional change design, which reduces the consumption of computing resources while speeding up the system calculation time, so as to improve the effectiveness of the auxiliary decision-making system in change design and the efficiency of the overall change design process. It can provide design assistance for on-site engineers who make high-frequency changes to reconfigurable manufacturing systems in the context of large-scale personalized customized production. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the services required for use in the embodiments or the prior art descriptions are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0028] Figure 1 The present invention is a principle flow chart of a reconfigurable production line change design auxiliary decision-making method based on semi-tensor product. DETAILED DESCRIPTION

[0029] The present invention will be further described below in conjunction with specific embodiments:

[0030] like Figure 1 As shown, the method for assisting decision-making in design change of a reconfigurable production line based on a semi-tensor product in this embodiment includes:

[0031] S1. Establish a multi-semantic model P that describes the product. str ,P size ,P loc ,P mat ,P prec ,P cap};

[0032] Among them, P str Indicates the appearance structure of the product; size Indicates the production size of the product; P loc Indicates the positioning dimension of the product processing feature; P mat Indicates the constituent materials of each module of the product; prec Indicates the processing accuracy requirements of the product; P cap Indicates the production requirements of the product;

[0033] P str , P size , P loc There is a progressive relationship between them, that is, the appearance structure of the product affects the production size of the product, and at the same time, the appearance structure and production size affect the positioning size of the product processing features.

[0034] S2, perform a semi-tensor product operation on the multivariate semantic model P and the product feature-processing parameter propagation matrix Pr to obtain the production line processing parameter matrix MP = {MP1, MP2, MP3, ..., MP s}, where MP k Represents the manufacturing parameters under n functional items of the kth manufacturing unit in the production line;

[0035] In this step, the product feature-processing parameter propagation matrix Pr is obtained as follows:

[0036] The product multivariate semantic model P and the current structure S of the production line in matrix form are input into the product feature-processing parameter propagation matrix generation model to generate the product feature-processing parameter propagation matrix Pr under the corresponding product cluster;

[0037] The product feature-processing parameter propagation matrix generation model is obtained as follows:

[0038] Based on the digital twin technology, an orthogonal experiment of production line changes is carried out on products within a set quantity range within the same product cluster in a simulation environment. The semi-tensor product P of different products and the corresponding production line processing parameter matrix MP are inversely calculated to obtain the corresponding probability propagation matrix group data. Based on the data obtained from the orthogonal experiment, diffusion model training is carried out using diffusion iteration to obtain the product feature-processing parameter propagation matrix generation model.

[0039] S3. Perform a semi-tensor product operation on the production line processing parameter matrix MP and the production line processing parameter-change probability propagation matrix group C to obtain the production line change probability triple model O p ;

[0040] In this step, the production line processing parameter-change probability propagation matrix group C is obtained as follows:

[0041] The production line processing parameter matrix MP and the current production line structure S in matrix form are input into the production line processing-change probability propagation matrix group generation model to generate the production line processing parameter-change probability propagation matrix group C of the corresponding product cluster production line = {C add ,C del ,C conf}, where C add represents the propagation matrix of production line processing parameters and manufacturing unit additional operations; C del represents the propagation matrix of production line processing parameters and manufacturing unit deletion operations; C conf The propagation matrix representing the production line processing parameters and the manufacturing unit modification operations;

[0042] The production line processing-change probability propagation matrix group generation model is obtained as follows:

[0043] Based on digital twin technology, an orthogonal experiment of production line change is carried out on products within a set quantity range within the same product cluster in a simulation environment. The semi-tensor product is inversely calculated for the processing parameters under different product characteristics and the final production line change plan to obtain the corresponding probability propagation matrix group data. Based on the data obtained from the orthogonal experiment, diffusion model training is performed using diffusion iteration to obtain the production line processing-change probability propagation matrix group generation model.

[0044] Production line change probability triplet model in The matrices are s×s, (s-1)×(s-1), (s-1)×(s-1) respectively; The probability of adding operations at each position of the production line is stored in The probability of executing the deletion operation at each position of the production line is stored in it; The probability of a manufacturing unit change is saved; s is the number of manufacturing units included in the production line.

[0045] S4, the production line change probability triple model O p The input is input into the intelligent engine to obtain a production line change probability design plan converted into an undirected graph form consistent with the current production line structure, assisting engineers in design.

[0046] In the above,

[0047] When a new design change is generated, the relevant data including the product parameters, product processing parameters, and production line change nodes of the new design will be integrated with the previous change cases and input into the system's intelligent engine as the data set for the next round of iteration; the intelligent engine generates a new product feature-processing parameter propagation matrix Pr and a production line processing parameter-change probability propagation matrix group C after a new round of iteration. The above-mentioned implementation examples are only preferred embodiments of the present invention, and are not intended to limit the scope of implementation of the present invention. Therefore, all changes made according to the shape and principle of the present invention should be covered within the protection scope of the present invention.

Claims

1. A method for assisting decision-making in reconfigurable production line design change based on semi-tensor product. It is characterized in that include: S1. Establish a multi-semantic model P that describes the product; S2, perform a semi-tensor product operation on the multivariate semantic model P and the product feature-processing parameter propagation matrix Pr to obtain the production line processing parameter matrix MP = {MP 1 ,MP 2 ,MP 3 ,…,MP s }, where MP k Represents the manufacturing parameters under n functional items of the kth manufacturing unit in the production line; S3. Perform a semi-tensor product operation on the production line processing parameter matrix MP and the production line processing parameter-change probability propagation matrix group C to obtain the production line change probability triple model O p ; S4, the production line change probability triple model O p The input is input into the intelligent engine to obtain a production line change probability design plan converted into an undirected graph form consistent with the current production line structure, assisting engineers in design.

2. According to claim 1, a reconfigurable production line change design auxiliary decision-making method based on semi-tensor product, It is characterized in that The multi-semantic model is: P={P str ,P size ,P loc ,P mat ,P prec ,P cap } Among them, P str Indicates the appearance structure of the product; size Indicates the production size of the product; P loc Indicates the positioning dimension of the product processing feature; P mat Indicates the constituent materials of each module of the product; prec Indicates the processing accuracy requirements of the product; P cap Indicates the production requirements of the product; P str , P size , P loc There is a progressive relationship between them, that is, the appearance structure of the product affects the production size of the product, and at the same time, the appearance structure and production size affect the positioning size of the product processing features.

3. According to claim 1, a reconfigurable production line change design auxiliary decision-making method based on semi-tensor product, It is characterized in that The product feature-processing parameter propagation matrix Pr is obtained as follows: The product multivariate semantic model P and the current structure S of the production line in matrix form are input into the product feature-processing parameter propagation matrix generation model to generate the product feature-processing parameter propagation matrix Pr under the corresponding product cluster; The product feature-processing parameter propagation matrix generation model is obtained as follows: Based on the digital twin technology, an orthogonal experiment of production line changes is carried out on products within a set quantity range within the same product cluster in a simulation environment. The semi-tensor product P of different products and the corresponding production line processing parameter matrix MP are inversely calculated to obtain the corresponding probability propagation matrix group data. Based on the data obtained from the orthogonal experiment, diffusion model training is carried out using diffusion iteration to obtain the product feature-processing parameter propagation matrix generation model.

4. According to claim 1, a reconfigurable production line change design auxiliary decision-making method based on semi-tensor product, It is characterized in that The production line processing parameter-change probability propagation matrix group C is obtained as follows: The production line processing parameter matrix MP and the current production line structure S in matrix form are input into the production line processing-change probability propagation matrix group generation model to generate the production line processing parameter-change probability propagation matrix group C of the corresponding product cluster production line = {C add ,C del ,C conf }, where C add represents the propagation matrix of production line processing parameters and manufacturing unit additional operations; C del represents the propagation matrix of production line processing parameters and manufacturing unit deletion operations; C conf The propagation matrix representing the production line processing parameters and the manufacturing unit modification operations; The production line processing-change probability propagation matrix group generation model is obtained as follows: Based on digital twin technology, an orthogonal experiment of production line change is carried out on products within a set quantity range within the same product cluster in a simulation environment. The semi-tensor product is inversely calculated for the processing parameters under different product characteristics and the final production line change plan to obtain the corresponding probability propagation matrix group data. Based on the data obtained from the orthogonal experiment, diffusion model training is performed using diffusion iteration to obtain the production line processing-change probability propagation matrix group generation model.

5. According to claim 1, a reconfigurable production line change design auxiliary decision-making method based on semi-tensor product, It is characterized in that The production line change probability triple model in The matrices are s×s, (s-1)×(s-1), (s-1)×(s-1) respectively; The probability of adding operations at each position of the production line is stored in The probability of executing the deletion operation at each position of the production line is stored in it; The probability of a manufacturing unit change is saved; s is the number of manufacturing units included in the production line.

6. A method for assisting decision-making in design change of a reconfigurable production line based on semi-tensor product according to any one of claims 1 to 5, It is characterized in that When a new design change is generated, relevant data including the product parameters, product processing parameters, and production line change nodes of the new design will be integrated with previous change cases and input into the system's intelligent engine as the data set for the next round of iterations; after a new round of iterations, the intelligent engine generates a new product feature-processing parameter propagation matrix Pr and a production line processing parameter-change probability propagation matrix group C.