Method and device for evaluating output characteristics of energy storage power station facing peak regulation and frequency modulation

Through the peak-shaving and frequency-modulation-oriented energy storage power station output characteristics evaluation method, multiple final-level evaluation indicators are used to calculate the first-level evaluation indicators, which solves the problem of difficulty in in-depth analysis of the output characteristics of energy storage power stations in the existing technology, and realizes the evaluation of energy storage power stations. Detailed evaluation of power station output characteristics and provision of improvement directions.

CN118839999APending Publication Date: 2024-10-25STATE GRID NEW ENERGY CLOUD TECH CO LTD +3
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202410797692.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-20
Publication Date
2024-10-25

AI Technical Summary

Technical Problem

The existing energy storage power station evaluation system lacks a separate evaluation method for the output characteristics of energy storage power stations, making it difficult to conduct an in-depth analysis of the output of energy storage power stations under peak load regulation and frequency regulation scenarios.

Method used

An evaluation method for the output characteristics of energy storage power stations for peak regulation and frequency regulation is proposed. By obtaining multiple final-level evaluation indicators, including peak regulation power control index, peak regulation state conversion time efficiency ratio, peak regulation start time efficiency index, etc., a calculation is performed Level evaluation indicators, such as peaking output characteristic index and frequency modulation output characteristic index, conduct detailed output characteristic evaluation.

Benefits of technology

This method can more accurately and comprehensively evaluate the output characteristics of energy storage power stations under peak load regulation and frequency regulation scenarios, identify weak links and potential problems in power station operation, and provide directions for the improvement and upgrading of power stations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118839999A_ABST
    Figure CN118839999A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of energy storage power station management, and discloses an energy storage power station output characteristic evaluation method and device for peak regulation and frequency modulation, and the method comprises the steps: obtaining the values of a plurality of last-stage evaluation indexes of a pre-constructed energy storage power station output characteristic evaluation system, comprise a peak regulation power regulation index, a peak regulation state conversion time efficiency ratio, a peak regulation starting time efficiency index, a peak regulation steady-state precise control rate, a peak regulation scheduling response capability, frequency modulation starting response efficiency, a frequency modulation response time efficiency ratio, a frequency modulation steady-state control capability, a frequency modulation power regulation index and a frequency modulation scheduling response capability; classifying and calculating the plurality of final-stage evaluation indexes to obtain first-stage evaluation indexes including a peak regulation output characteristic index and a frequency modulation output characteristic index; and evaluating the energy storage power station according to the first-level evaluation index. According to the invention, the evaluation system is constructed for peak regulation and frequency modulation scenes of the energy storage power station, and a plurality of evaluation indexes avoid the limitation of evaluation, so that the power station can be evaluated more comprehensively, problems in operation of the power station can be found out, and a direction is provided for improvement.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of energy storage power station management, and in particular to a method and device for evaluating output characteristics of an energy storage power station for peak load regulation and frequency regulation. Background Art

[0002] At present, there are many types of evaluation systems for energy storage power stations, most of which are evaluation systems that take into account operation indicators, reliability indicators and economic indicators at the same time. After determining the indicators, typical weight determination methods such as hierarchical analysis method and entropy weight method are used to assign weights to each indicator as the basis for equipment selection or battery type selection.

[0003] However, most of the evaluation systems for energy storage power stations are comprehensive evaluations, which include operation indicators, reliability indicators, economic indicators and other aspects. They are designed to evaluate the overall performance of energy storage power stations and reflect the comprehensive level of the power stations. There is a lack of evaluation systems for the output of energy storage power stations alone, and it is difficult to conduct in-depth analysis of the output of energy storage power stations alone.

[0004] Some research has been done on output evaluation in the fields of renewable energy power generation and thermal power generation. However, in the field of renewable energy power generation, the output evaluation system is mainly established around the impact of natural conditions such as light and wind speed on renewable energy power generation, as well as the impact of photovoltaic and wind power components and layout factors on output. In the field of thermal power generation, the output of thermal power units is mainly evaluated based on factors such as fuel type, power generation efficiency, and equipment operating conditions. Its output evaluation system is not applicable to energy storage power stations and cannot be evaluated specifically based on the work of energy storage power stations. Summary of the invention

[0005] The purpose of the present invention is to establish a targeted output characteristic evaluation method for the use of energy storage power stations in peak load regulation and frequency regulation scenarios.

[0006] In order to achieve the above-mentioned purpose, the present invention provides an evaluation method for the output characteristics of an energy storage power station for peak load regulation and frequency regulation, comprising: obtaining the index values ​​of multiple final evaluation indicators of a pre-constructed energy storage power station output characteristics evaluation system; the final evaluation indicators include: peak load regulation power regulation index, peak load state conversion time efficiency ratio, peak load start time efficiency index, peak load steady-state precise control rate, peak load dispatching response capability, frequency regulation start response efficiency, frequency regulation response time efficiency ratio, frequency regulation steady-state control capability, frequency regulation power regulation index and frequency regulation dispatching response capability;

[0007] Classifying and calculating the plurality of final evaluation indicators to obtain first-level evaluation indicators; the first-level evaluation indicators include: a peak-shaving output characteristic index and a frequency-shaving output characteristic index;

[0008] The output characteristics of the energy storage power station are evaluated according to the values ​​of the first-level evaluation indicators.

[0009] Furthermore, the calculation formula of the peak power regulation index PRI is:

[0010]

[0011] Among them, α is the coefficient of the equipment aging factor, β is the coefficient of the technology improvement factor, N is the number of times the energy storage power station participated in peak regulation during the statistical period, and P 1i is the actual peak output power P actual ,P 0i is the initial state of the energy storage power station when receiving the command, T 2i -T 1i is the power output stabilization time T stable ;

[0012] The calculation formula of the peak load state conversion time efficiency ratio STER is:

[0013]

[0014] Among them, α is the coefficient of the equipment aging factor, β is the coefficient of the technology improvement factor, N is the number of times the energy storage power station participated in peak regulation during the statistical period, T 3i -T 1i is the charge and discharge conversion time of the energy storage power station T transition , T 3i -T 0i is the response delay time T response ;

[0015] The calculation formula of the peak load start time index STI is:

[0016]

[0017] Among them, α is the coefficient of the equipment aging factor, β is the coefficient of the technology improvement factor, N is the number of times the energy storage power station participated in peak regulation during the statistical period, T 3i -T 0i is the response delay time T response , T 3i -T 1 i is the charge and discharge conversion time of the energy storage power station T transition , T 2i -T 0i T is the active power stabilization time active ;

[0018] The calculation formula of the peak regulation steady-state precise control rate SPR is:

[0019]

[0020] Among them, α is the coefficient of the equipment aging factor, β is the coefficient of the technology improvement factor, N is the number of times the energy storage power station participated in peak regulation during the statistical period, and P 2i is the target power P Target , P 1i is the actual power P Actual ,P E is the rated power, T 4i -T 2i To maintain the current power, the total operation time is T maintain ;

[0021] The peak load dispatch response capability DRC P The calculation formula is:

[0022]

[0023] Among them, SCR P To successfully respond to the peak load instruction times, TCR P is the total number of peak-shaving instructions.

[0024] Furthermore, the peak load characteristic index OCI P The calculation formula is:

[0025] OCI P =a·PRI+b·(1-STER)+c·(1-STI)+d·(1-SPR)+e·DRC P

[0026] Among them, a is the coefficient of the influencing factor of the peak-shaving power regulation index PRI; b is the coefficient of the influencing factor of the peak-shaving state conversion efficiency ratio STER; c is the coefficient of the influencing factor of the peak-shaving start efficiency index STI; d is the coefficient of the influencing factor of the peak-shaving steady-state precision control rate SPR; e is the peak-shaving scheduling response capability DRC P The coefficient of the influencing factor.

[0027] Furthermore, the calculation formula of the frequency modulation start response efficiency SRE is:

[0028]

[0029] Among them, T 2i -T 1i The start-up preparation time T prepare , T 2i -T 0i is the frequency modulation response speed T modulate ;

[0030] The calculation formula of the frequency modulation response time efficiency ratio RER is:

[0031]

[0032] Among them, T 2i -T 0i is the frequency modulation response speed T modulate , T 3i -T 2i is the stabilization time T variation , T 4i -T 3i is the stable operation time T stable ;

[0033] The calculation formula of the frequency modulation steady-state control capability SSC is:

[0034]

[0035] Among them, P actual is the actual output power of frequency modulation, P 0i is the initial state of the energy storage power station when receiving the command, P E is the rated power, T 4i -T 3i is the stable operation time T stable ;

[0036] The calculation formula of the frequency modulation power regulation index PRI is:

[0037]

[0038] Among them, T 3i -T 2i is the stabilization time T during the frequency regulation of the energy storage power station variation ;

[0039] The frequency modulation dispatch response capability DRC F The calculation formula is:

[0040]

[0041] Among them, SCR F TCR is the number of successful responses to frequency modulation commands within a period of time. F It is the total number of peak load instructions within a period of time.

[0042] Furthermore, the frequency modulation output characteristic index OCI F The calculation formula is:

[0043] OCI F =f·(1-SRE)+g·(1-RER)+h·SSC+j·PRI+e·DRC F

[0044] Among them, f is the coefficient of the influencing factor of the frequency modulation start response efficiency SRE, g is the coefficient of the influencing factor of the frequency modulation response time efficiency ratio RER, h is the coefficient of the influencing factor of the frequency modulation steady-state control capability SSC, j is the coefficient of the influencing factor of the frequency modulation power regulation index PRI, k is the coefficient of the frequency modulation scheduling response capability DRC F The coefficient of the influencing factor.

[0045] Furthermore, the peak load characteristic index OCI P The relationship between the coefficients of the multiple influencing factors is: a+b+c+d+e=1;

[0046] The frequency modulation output characteristic index OCI F The relationship between the coefficients of the multiple influencing factors is: f+g+h+j+k=1.

[0047] Furthermore, the coefficient α of the equipment aging factor is [0.9, 1]; the coefficient β of the technology improvement factor is [1, 1.02].

[0048] A second aspect of an embodiment of the present invention provides an evaluation device for output characteristics of an energy storage power station, comprising:

[0049] An acquisition module is used to acquire the index values ​​of multiple final evaluation indicators of a pre-built energy storage power station output characteristic evaluation system; the final evaluation indicators include: peak-shaving power regulation index, peak-shaving state conversion efficiency ratio, peak-shaving start efficiency index, peak-shaving steady-state precision control rate, peak-shaving dispatch response capability, frequency modulation start response efficiency, frequency modulation response efficiency ratio, frequency modulation steady-state control capability, frequency modulation power regulation index and frequency modulation dispatch response capability;

[0050] An index calculation module, used for classifying and calculating the plurality of final evaluation indexes to obtain first-level evaluation indexes; the first-level evaluation indexes include: a peak-shaving output characteristic index and a frequency-shaving output characteristic index;

[0051] The evaluation module is used to evaluate the output characteristics of the energy storage power station according to the value of the first-level evaluation index.

[0052] Furthermore, the calculation formula of the peak power regulation index PRI is:

[0053]

[0054] Among them, α is the coefficient of the equipment aging factor, β is the coefficient of the technology improvement factor, N is the number of times the energy storage power station participated in peak regulation during the statistical period, and P 1i is the actual peak output power P actual ,P 0i is the initial state of the energy storage power station when receiving the command, T2i -T 1i is the power output stabilization time T stable ;

[0055] The calculation formula of the peak load state conversion time efficiency ratio STER is:

[0056]

[0057] Among them, α is the coefficient of the equipment aging factor, β is the coefficient of the technology improvement factor, N is the number of times the energy storage power station participated in peak regulation during the statistical period, T 3i -T 1i is the charge and discharge conversion time of the energy storage power station T transition , T 3i -T 0i is the response delay time T response ;

[0058] The calculation formula of the peak load start time index STI is:

[0059]

[0060] Among them, α is the coefficient of the equipment aging factor, β is the coefficient of the technology improvement factor, N is the number of times the energy storage power station participated in peak regulation during the statistical period, T 3i -T 0i is the response delay time T response , T 3i -T 1 i is the charge and discharge conversion time of the energy storage power station T transition , T 2i -T 0i T is the active power stabilization time active ;

[0061] The calculation formula of the peak regulation steady-state precise control rate SPR is:

[0062]

[0063] Among them, α is the coefficient of the equipment aging factor, β is the coefficient of the technology improvement factor, N is the number of times the energy storage power station participated in peak regulation during the statistical period, and P 2i is the target power P Target , P 1i is the actual power P Actual ,P E is the rated power, T 4i -T 2i To maintain the current power, the total operation time is T maintain ;

[0064] The peak load dispatch response capability DRC P The calculation formula is:

[0065]

[0066] Among them, SCR P To successfully respond to the peak load instruction times, TCR P is the total number of peak-shaving instructions.

[0067] Furthermore, the peak load characteristic index OCI P The calculation formula is:

[0068] OCI P =a·PRI+b·(1-STER)+c·(1-STI)+d·(1-SPR)+e

[0069] DRC P

[0070] Among them, a is the coefficient of the influencing factor of the peak-shaving power regulation index PRI; b is the coefficient of the influencing factor of the peak-shaving state conversion efficiency ratio STER; c is the coefficient of the influencing factor of the peak-shaving start efficiency index STI; d is the coefficient of the influencing factor of the peak-shaving steady-state precision control rate SPR; e is the peak-shaving scheduling response capability DRC P The coefficient of the influencing factor.

[0071] Furthermore, the calculation formula of the frequency modulation start response efficiency SRE is:

[0072]

[0073] Among them, T 2i -T 1i The start-up preparation time T prepare , T 2i -T 0i is the frequency modulation response speed T modulate ;

[0074] The calculation formula of the frequency modulation response time efficiency ratio RER is:

[0075]

[0076] Among them, T 2i -T 0i is the frequency modulation response speed T modulate , T 3i -T 2i is the stabilization time T variation , T 4i -T 3i is the stable operation time T stable ;

[0077] The calculation formula of the frequency modulation steady-state control capability SSC is:

[0078]

[0079] Among them, P actual is the actual output power of frequency modulation, P 0i is the initial state of the energy storage power station when receiving the command, P E is the rated power, T 4i -T 3i is the stable operation time T stable ;

[0080] The calculation formula of the frequency modulation power regulation index PRI is:

[0081]

[0082] Among them, T 3i -T 2i is the stabilization time T during the frequency regulation of the energy storage power station variation ;

[0083] The frequency modulation dispatch response capability DRC F The calculation formula is:

[0084]

[0085] Among them, SCR F TCR is the number of successful responses to frequency modulation commands within a period of time. F It is the total number of peak load instructions in a period of time.

[0086] Furthermore, the frequency modulation output characteristic index OCI F The calculation formula is:

[0087] OCI F =f·(1-SRE)+g·(1-RER)+h·SSC+j·PRI+e·DRC F

[0088] Among them, f is the coefficient of the influencing factor of the frequency modulation start response efficiency SRE, g is the coefficient of the influencing factor of the frequency modulation response time efficiency ratio RER, h is the coefficient of the influencing factor of the frequency modulation steady-state control capability SSC, j is the coefficient of the influencing factor of the frequency modulation power regulation index PRI, k is the coefficient of the frequency modulation scheduling response capability DRC F The coefficient of the influencing factor.

[0089] Furthermore, the peak load characteristic index OCI P The relationship between the coefficients of the multiple influencing factors is: a+b+c+d+e=1;

[0090] The frequency modulation output characteristic index OCI F The relationship between the coefficients of the multiple influencing factors is: f+g+h+j+k=1.

[0091] Furthermore, the coefficient α of the equipment aging factor is [0.9, 1]; the coefficient β of the technology improvement factor is [1, 1.02].

[0092] According to a third aspect of an embodiment of the present invention, a non-transitory computer-readable storage medium is provided, wherein the non-transitory computer-readable storage medium is used to store computer instructions, and when the computer instructions are executed by a processor, the above-mentioned method for evaluating the output characteristics of a peak-shaving and frequency-regulating energy storage power station is implemented.

[0093] According to a fourth aspect of an embodiment of the present invention, an electronic device is provided, comprising: a processor, a memory, and a computer program; wherein the processor is connected to the memory, the computer program is stored in the memory, and when the electronic device is running, the processor executes the computer program stored in the memory, so that the electronic device executes the above-mentioned method for evaluating the output characteristics of energy storage power stations for peak load regulation and frequency regulation.

[0094] Compared with the prior art, the method for evaluating the output characteristics of an energy storage power station for peak shaving and frequency regulation in an embodiment of the present invention has the following beneficial effects: a targeted output evaluation system is constructed for the peak shaving and frequency regulation application scenarios of energy storage power stations, and the evaluation indicators in the evaluation system are all important performance indicators under specific scenarios. Multiple evaluation indicators avoid the limitations of single indicator evaluation, and can more accurately and comprehensively evaluate the output characteristics of the energy storage power station in the peak shaving and frequency regulation scenarios, identify the weak links and potential problems in the operation of the power station, and provide direction for the improvement and upgrading of the power station. BRIEF DESCRIPTION OF THE DRAWINGS

[0095] Figure 1 It is a flow chart of a method for evaluating output characteristics of an energy storage power station for peak load regulation and frequency regulation according to an embodiment of the present invention;

[0096] Figure 2 It is a power-time schematic diagram of the energy storage power station participating in peak load regulation according to an embodiment of the present invention;

[0097] Figure 3 It is a power-time schematic diagram of the energy storage power station participating in frequency modulation according to an embodiment of the present invention;

[0098] Figure 4 It is a schematic diagram of the structure of the collection device and the collection process of an embodiment of the present invention;

[0099] Figure 5 is a schematic structural diagram of an optimization device according to an embodiment of the present invention;

[0100] Figure 6 is a schematic block diagram of an exemplary electronic device according to an embodiment of the present invention.

[0101] Among them, the figure numbers of the drawings in the specification are as follows: 100, evaluation device; 101, acquisition module; 102, indicator calculation module; 103, evaluation module; 200, electronic device; 201, calculation unit; 202, ROM; 203, RAM; 204, bus; 205, I / O interface; 206, input unit; 207, output unit; 208, storage unit; 209, communication unit. DETAILED DESCRIPTION

[0102] The specific implementation of the present invention is further described in detail below in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.

[0103] like Figure 1 As shown, a method for evaluating the output characteristics of an energy storage power station for peak load regulation and frequency regulation according to a preferred embodiment of an embodiment of the present invention comprises: obtaining index values ​​of multiple final evaluation indicators of a pre-constructed energy storage power station output characteristics evaluation system; the final evaluation indicators comprise: peak load regulation power regulation index, peak load state conversion time efficiency ratio, peak load start time efficiency index, peak load steady-state precise control rate, peak load dispatching response capability, frequency regulation start response efficiency, frequency regulation response time efficiency ratio, frequency regulation steady-state control capability, frequency regulation power regulation index and frequency regulation dispatching response capability;

[0104] The multiple final evaluation indicators are classified and calculated to obtain the first-level evaluation indicators; the first-level evaluation indicators include: peak load characteristic index OCI P , Frequency modulation output characteristic index OCI F ;

[0105] The output characteristics of the energy storage power station are evaluated according to the values ​​of the first-level evaluation indicators.

[0106] Specifically, the energy storage power station will be referred to as a "power station" hereinafter. For the power stations participating in peak regulation, parameters such as active power stable regulation time, actual average regulation rate of active power, steady-state control deviation, charge and discharge conversion time, and response lag time are selected to construct peak regulation power regulation index, peak regulation state conversion time efficiency ratio, peak regulation start-up time efficiency index, peak regulation steady-state precision control rate and other indicators to evaluate the command response efficiency, power output capacity, equipment integration level, operation stability and reliability of the power station during the peak regulation process.

[0107] See also Figure 2 As shown in the figure, when the power station participates in peak load regulation, it discharges at peak load and charges at low load. Figure 2 The discharge period when the power station participates in peak load regulation is taken as an example.

[0108] When the power station participates in peak load regulation, the power station is assumed to be 0 The peak load dispatching instruction is received at time T 0 ~T 3 is the response delay time T response , represents the time required for the power plant to receive the command and start executing the command, including the transmission delay of the command, the response delay of the power plant control system, and the analysis and processing time of the command. 0 ~T 2 is the active power regulation stabilization time T active , refers to the time required from the power station receiving the power regulation command to the actual active power reaching and stabilizing at the target value. 1 ~T 3 Represents the charging and discharging conversion time T of the power station transition , which means that after the command is parsed, the charging and discharging equipment of the power station needs to start adjusting its operating state to match the power output time required by the peak load command. 1 ~T 2 is the power output stabilization time T stable , represents the time it takes for the power station's output power to reach the target value after it starts operating, T 2 ~T 4 To maintain the current power, the total operation time is T maintain .

[0109] In a preferred embodiment of the present invention, the calculation formula of the peak power regulation index PRI is:

[0110]

[0111] Among them, α is the coefficient of the equipment aging factor, β is the coefficient of the technology improvement factor, N is the number of times the energy storage power station participated in peak regulation during the statistical period, and P 1i is the actual peak output power P actual ,P 0i is the initial state of the energy storage power station when receiving the command, T 2i -T 1i is the power output stabilization time T stable .

[0112] Specifically, the peak power regulation index PRI refers to the ratio of the difference between the original power during regulation and the actual power during stable operation from the time the power station receives the power regulation command to the time of stable power output. It indicates how fast the power output of the power station changes from the original power to the final actual output power, and reflects the efficiency of being able to stably reach the target power output within a given time. It can be used to measure the speed of power change, intuitively and quickly quantify and evaluate the power regulation capability of the power station, and make the performance comparison between different power stations easier and fairer. While considering the power change amplitude, combined with the time required to reach a stable state, it can more comprehensively evaluate the power regulation capability of the power station and its adaptability to peak-shaving scenarios that require rapid response.

[0113] The higher the power regulation rate, the better the technical performance of the power station, with stronger power regulation capability and faster response speed, and the ability to quickly respond to system requirements; while a low power regulation rate indicates that the power station has limited response capabilities and may be affected by technical limitations, equipment aging, system performance and other poor factors, requiring the power station to improve its performance.

[0114] The calculation formula of the peak load state conversion time efficiency ratio STER is:

[0115]

[0116] Among them, α is the coefficient of the equipment aging factor, β is the coefficient of the technology improvement factor, N is the number of times the energy storage power station participated in peak regulation during the statistical period, and T 3i -T 1i is the charge and discharge conversion time of the energy storage power station T transition , T 3i -T 0i is the response delay time T response .

[0117] Specifically, the peak-shaving state transition time efficiency ratio (STER) refers to the ratio of the charge-discharge conversion time to the total time required from receiving instructions to starting to execute instructions when the energy storage power station participates in peak-shaving. It is an indicator used to evaluate the charge-discharge conversion efficiency of the power station in the peak-shaving scenario. It directly reflects the proportion of time required for the power station to start executing instructions from receiving instructions, and comprehensively considers multiple links such as instruction transmission delay, control system response, and equipment adjustment. It can comprehensively and intuitively demonstrate the efficiency of the power station in the state transition process, quickly understand the power station's overall performance level in quickly parsing instructions and charging and discharging conversion, and the required data is easy to obtain, with high operability and practicality.

[0118] Specifically, the lower the STER value, the faster the power station can complete the conversion of the charging and discharging state after receiving the command, and the power starts to change to the target power; the higher the STER value, the longer the delay in the conversion process of the power station, and there may be room for optimization in the control system, command transmission system, etc. State conversion capability = (1-STER)*100.

[0119] The calculation formula of the peak load start time index STI is:

[0120]

[0121] Among them, α is the coefficient of the equipment aging factor, β is the coefficient of the technology improvement factor, N is the number of times the energy storage power station participated in peak regulation during the statistical period, T 3i -T 0i is the response delay time T response , T 3i -T 1 i is the charge and discharge conversion time of the energy storage power station T transition , T 2i -T 0i T is the active power stabilization time active .

[0122] Specifically, the peak-shaving start-up time index STI is the ratio of the sum of the power station's response lag time and the charge-discharge conversion time to the active power regulation stabilization time. It combines the response lag time and the charge-discharge conversion time, and reflects the efficiency of the entire process from the start of response to the actual execution of the power station after receiving the peak-shaving instruction. It is used to evaluate the efficiency of the energy storage power station in the peak-shaving scenario, from receiving the adjustment instruction to actually starting to execute the power change action.

[0123] Specifically, combined with the response and state transition of the power station, it can comprehensively reflect the response capability of the power station and the flexibility and integration level of the equipment. The higher the STI, the longer the response and startup process of the power station. There may be problems such as response delay, slow equipment conversion speed, and unsmooth overall adjustment link. The power station cannot quickly respond to the peak-shaving needs of the power grid. The lower the STI, the faster the response and startup process of the power station. It can respond to the peak-shaving instruction more quickly and start the peak-shaving process. The stronger the response capability of the power station, the higher the equipment integration, and the better the coordination performance between the equipment. Peak-shaving power adjustment startup capability = (1-STI)*100.

[0124] The calculation formula of the peak regulation steady-state precise control rate SPR is:

[0125]

[0126] Among them, α is the coefficient of the equipment aging factor, β is the coefficient of the technology improvement factor, N is the number of times the energy storage power station participated in peak regulation during the statistical period, and P 2i is the target power P Target , P 1i is the actual power P Actual ,P E is the rated power, T 4i -T 2i To maintain the current power, the total operation time is T maintain .

[0127] Specifically, the peak-shaving steady-state precision control rate SPR refers to the ratio of the integral value of the absolute value of the difference between the actual operating power and the target power to the product of the rated power and the duration of the period after the target power is reached and the target power is stabilized. It represents the proportion of the difference between the actual operating power and the target power to the rated power. It is a quantitative indicator used to evaluate the degree of deviation between the actual operating power and the target power of the energy storage power station in the peak-shaving scenario. It is combined with the duration of the deviation, which can intuitively reflect the size of the deviation and the performance of the power station in a stable operating state. In addition, considering the use of rated power, the influence of power station capacity differences on the results is eliminated, and the power control performance of the power station can be more accurately evaluated.

[0128] Specifically, the higher the SPR, the greater the deviation between the actual stable operating power of the power station and the target power, indicating that the performance of the power station equipment or control system needs to be improved and the control accuracy is insufficient; the lower the SPR, the smaller the deviation between the actual operating power and the target power, the power station can accurately adjust the output power according to the command, the control system operates well, the equipment performance is stable, and it can effectively respond to the peak load instruction. Peak load steady-state control performance = (1-SPR)*100.

[0129] The peak load dispatch response capability DRC P The calculation formula is:

[0130]

[0131] Among them, SCR P To successfully respond to the peak load instruction times, TCR P is the total number of peak-shaving instructions.

[0132] Specifically, the peak load dispatch response capability DRC P Is the number of successful responses to peak load instructions SCR P Total peak load instruction times TCR P The ratio of is used to evaluate the actual response performance of the power station after receiving the peak-shaving instruction, which reflects the rapidity and accuracy of the response. Through this indicator, the response of the power station to the peak-shaving instruction can be intuitively measured.

[0133] Specifically, DRC P A high index indicates that the stability and reliability of the power station are high, and the operation and maintenance management level is efficient, which means that the power station can better meet the peak load demand of the power grid; DRC P Low dispatch response capability may result in the power station being unable to respond to peak-shaving instructions in a timely manner, and it is necessary to optimize the operation and maintenance management level and operation reliability.

[0134] In a preferred embodiment of the present invention, the peak load characteristic index OCI P The calculation formula is:

[0135] OCI P =a·PRI+b·(1-STER)+c·(1-STI)+d·(1-SPR)+e

[0136] DRC P

[0137] Among them, a is the coefficient of the influencing factor of the peak-shaving power regulation index PRI; b is the coefficient of the influencing factor of the peak-shaving state conversion efficiency ratio STER; c is the coefficient of the influencing factor of the peak-shaving start efficiency index STI; d is the coefficient of the influencing factor of the peak-shaving steady-state precision control rate SPR; e is the peak-shaving scheduling response capability DRC P The coefficient of the influencing factor.

[0138] Specifically, after evaluating the peak-shaving power regulation index, peak-shaving state conversion efficiency ratio, peak-shaving startup efficiency index, peak-shaving steady-state precision control rate, and peak-shaving response capability, it is necessary to conduct a comprehensive evaluation of the overall output characteristics of the power station in order to obtain the comprehensive level of the output characteristics of the power station under the peak-shaving scenario.

[0139] The peak load characteristic index OCI P The relationship between the coefficients of the multiple influencing factors is: a+b+c+d+e=1;

[0140] Output Characteristic Index OCI P It is constructed by the above five indicators, and the influence factors a, b, c, d, and e corresponding to the five indicators are introduced. The corresponding indicators of each factor are shown in Table 1. In order to determine the size of the influence factor, no less than 3 industry experts are invited to determine the influence factor based on their own experience and actual data. Among them, when each expert determines the factor assignment, it is required that each expert a+b+c+d+e=1. At the same time, combined with actual experience and the evaluation direction of each indicator, the following value requirements are set for individual influence factors: a∈[0.15,1], b∈(0,0.2], c∈(0,0.2], d∈[0.25,1], e∈(0,0.3].

[0141] The influence factors determined by the experts are averaged to obtain the influence factor assignment corresponding to each indicator.

[0142] Table 1 Correspondence between indicator parameters and influence factors

[0143]

[0144]

[0145] For the frequency modulation scenario, parameters such as response lag time, frequency modulation response speed, stabilization time, stable operation time, and dispatch response success rate are selected to construct indicators such as frequency modulation startup response efficiency, frequency modulation response time efficiency ratio, frequency modulation steady-state control capability, and frequency modulation power regulation index to evaluate the equipment integration, equipment coordination efficiency, unit performance level, power station regulation performance, and contribution to the power grid when the power station participates in frequency modulation.

[0146] See also Figure 3 As shown, when the energy storage power station participates in frequency regulation, when the grid load increases, the system frequency decreases, and the energy storage is discharged; when the load decreases, the system frequency increases, and the energy storage is charged. Figure 3 The whole process of a frequency modulation of an energy storage power station is demonstrated, taking the energy storage discharge scenario as an example.

[0147] P 0 is the initial state of the power station when receiving the command, P 1 The target output P required by the system target , P 2 , P 3 The permissible power fluctuation range (P low , P hiigh ), that is, adjusting the dead zone range.

[0148] Assume that the power station starts from T 0 The frequency modulation instruction issued by the dispatcher is received from the time T 0 ~T 1 Represents the response lag time T during the frequency regulation of the energy storage power station response , including the time it takes for the power station to receive the dispatching instruction, make a decision based on the instruction, and send the instruction to the generator set and related equipment through the communication system. 0 ~T 2 Represents the frequency modulation response speed T during the frequency modulation process modulate , mainly covers the time period from receiving the dispatch instruction to the time when the actual output or power generation of the power station begins to adjust according to the instruction and reaches an observable change. At this time, the power station can be regarded as successfully responding to this frequency regulation instruction. Therefore, T 1 ~T 2 It can be regarded as the preparation time and starting time of the generator set, that is, the starting preparation time T prepare, which can directly reflect the startup speed and performance of the energy storage device, as well as the device's ability to respond immediately to instructions. 2 ~T 3 Represents the stabilization time T during the frequency regulation of the energy storage power station variation , refers to the time required for the output power of the power station to reach the target power range after completing the response operation. T 3 ~T 4 Represents the stable operation time T stable , refers to the time during which the output power of the energy storage power station remains within the target power regulation dead zone during the frequency regulation process of the energy storage power station. |P 1 -P 0 | represents the frequency regulation mileage of this frequency regulation, that is, the absolute value of the difference between the output value of the power generation unit at the end of each response to the AGC frequency regulation control command and the output value when the command is issued.

[0149] Similarly, considering the differences in technology and equipment levels caused by different operation times and the technical upgrades of power stations, the equipment aging factor α and the technology improvement factor β are introduced. And because the output of a single energy storage power station when participating in frequency regulation is not representative and cannot reflect the long-term output capacity of the energy storage power station, the output of the energy storage power station participating in frequency regulation over a period of time is selected for comprehensive evaluation.

[0150] Therefore, the following scoring indicators are determined to evaluate the output characteristics of energy storage power stations in frequency regulation scenarios.

[0151] In a preferred embodiment of the present invention, the calculation formula of the frequency modulation start response efficiency SRE is:

[0152]

[0153] Among them, T 2i -T 1i The start-up preparation time T prepare , T 2i -T 0i is the frequency modulation response speed T modulate .

[0154] Specifically, the frequency regulation start response efficiency (SRE) refers to the ratio of the time from when the generator set receives the control system command to when the unit starts responding to the pre-frequency regulation process to the time of preparation for the entire frequency regulation process. It reflects the speed with which the power station control system responds to commands and the equipment integration capability of the energy storage system. It is highly sensitive to changes in the startup phase. A slight extension of the startup time or a decrease in the response speed may lead to significant changes in this indicator, thereby reflecting changes in power station performance.

[0155] Specifically, the frequency modulation startup response efficiency SRE reflects the overall efficiency of the power station in responding to the frequency modulation command. A lower SRE means that the power station has a higher response efficiency and can respond to the dispatch command and adjust the output faster to meet the frequency modulation demand faster; a higher SRE may mean that the power station has a longer startup time or a slower response speed, and it is necessary to further optimize the equipment performance and improve the system response capability. Startup response capability = (1-SRE)*100.

[0156] The calculation formula of the frequency modulation response time efficiency ratio RER is:

[0157]

[0158] Among them, T 2i -T 0i is the frequency modulation response speed T modulate , T 3i -T 2i is the stabilization time T variation , T 4i -T 3i is the stable operation time T stable .

[0159] Specifically, the frequency response time efficiency ratio (RER) is the ratio of the frequency response speed to the duration of the entire frequency regulation. It is an indicator that can reflect the proportion of response time of the energy storage power station in the frequency regulation process. It directly reflects the response speed of the power station to the dispatching instructions, as well as the integration capability and coordination efficiency among multiple components of the power station, such as the energy storage equipment, control system, and communication network.

[0160] Specifically, the lower the frequency modulation response time efficiency ratio RER, the higher the response efficiency of the power station, the faster the response, the better the integration capability and coordination efficiency, and the faster the power grid frequency modulation needs; the higher the frequency modulation response time efficiency ratio RER, the higher the frequency modulation response time efficiency ratio RER, which indicates that the power station may have a long response time or a slow response speed during the response process, and it is necessary to further optimize the equipment performance and improve the system response capability. Frequency modulation response capability = (1-RER)*100.

[0161] The calculation formula of the frequency modulation steady-state control capability SSC is:

[0162]

[0163] Among them, P actual is the actual output power of frequency modulation, P 0i is the initial state of the energy storage power station when receiving the command, P E is the rated power, T 4i -T 3i is the stable operation time T stable .

[0164] Specifically, the frequency regulation steady-state control capability SSC is the ratio of the integral value of the difference between the power station's operating power and the original power during the stable operation time to the stable operation time multiplied by the difference between the rated power and the original power. It can comprehensively reflect the power station's power operation accuracy, power regulation performance, and energy utilization efficiency during the frequency regulation process. It quantitatively measures the power station's actual operating power's tracking ability, execution ability, and capacity utilization of dispatch instructions during the stable operation time. Compared with the frequency regulation mileage that only considers the actual output power and original power during the frequency regulation process, this indicator comprehensively considers the power station's power changes and stable operation time, and evaluates the power station's output and operation conditions in combination with time, which is more comprehensive and practical.

[0165] Specifically, the stronger the frequency regulation steady-state control capability, the greater the SSC, which means that the actual output power of the energy storage power station is closer to the rated power during the frequency regulation process, the higher the response accuracy and energy utilization rate, and the stronger the regulation performance; the lower the SSC, the more there is a certain response deviation in the frequency regulation process of the power station, and the lower the energy utilization rate. Frequency regulation steady-state control performance = SSC*100.

[0166] The calculation formula of the frequency modulation power regulation index PRI is:

[0167]

[0168] Among them, T 3i -T 2i is the stabilization time T during the frequency regulation of the energy storage power station variation .

[0169] Specifically, the power regulation index (PRI) refers to the ratio of the difference between the original power during regulation and the actual power when the energy storage power station reaches stable operation from the time it receives the power regulation command to the stabilization time. It indicates how fast the power output of the power station changes from the original power to the final actual output power, and reflects the efficiency of being able to stably reach the target power output within a given time. It is used to measure the speed of power change and quickly quantify and evaluate the power regulation capability of the energy storage power station. While considering the power change amplitude, combined with the time required to reach a stable state, it can more comprehensively evaluate the power regulation capability of the power station and its adaptability to frequency regulation scenarios that require rapid response.

[0170] Specifically, the higher the frequency modulation power regulation rate PRI, the superior the technical performance of the power station, the stronger the power regulation capability and the faster the response speed, and the ability to respond quickly to system requirements; while a low power regulation rate PRI indicates that the power station has limited response capabilities and may be affected by technical limitations, equipment aging, system performance and other poor factors, requiring the power station to improve its performance.

[0171] The frequency modulation dispatch response capability DRC FThe calculation formula is:

[0172]

[0173] Among them, SCR F TCR is the number of successful responses to frequency modulation commands within a period of time. F It is the total number of peak load instructions in a period of time.

[0174] Specifically, the scheduling response capability DRC F Is the number of successful responses to frequency modulation commands within the selected time period SCR F Total peak load instruction times TCR F The ratio is used to evaluate the actual response performance of the power station after receiving the command, which reflects the rapidity and accuracy of the response. Through this indicator, the response of the power station to the command can be intuitively measured.

[0175] Specifically, the scheduling response capability DRC F The high index indicates that the stability and reliability of the power station are high, and the operation and maintenance management level is efficient, which means that the power station can better meet the frequency regulation needs of the power grid; the dispatch response capability DRC F If the indicators are too low, the power station may not be able to respond to the frequency regulation command in time, and it is necessary to optimize the operation and maintenance management level and the reliability of operation.

[0176] In a preferred embodiment of the present invention, the frequency modulation output characteristic index OCI F The calculation formula is:

[0177] OCI F =f·(1-SRE)+g·(1-RER)+h·SSC+j·PRI+e·DRC F

[0178] Among them, f is the coefficient of the influencing factor of the frequency modulation start response efficiency SRE, g is the coefficient of the influencing factor of the frequency modulation response time efficiency ratio RER, h is the coefficient of the influencing factor of the frequency modulation steady-state control capability SSC, j is the coefficient of the influencing factor of the frequency modulation power regulation index PRI, k is the coefficient of the frequency modulation scheduling response capability DRC F The coefficient of the influencing factor.

[0179] The frequency modulation output characteristic index OCI F The relationship between the coefficients of the multiple influencing factors is: f+g+h+j+k=1.

[0180] Specifically, after evaluating the frequency regulation startup response efficiency, frequency regulation response time efficiency ratio, frequency regulation steady-state control capability, frequency regulation power regulation index, and frequency regulation response capability, it is necessary to conduct a comprehensive evaluation of the overall output characteristics of the power station in order to derive the comprehensive level of the output characteristics of the energy storage power station under the peak regulation scenario.

[0181] Output Characteristic Index OCI F It is constructed by the above five indicators, and the influence factors f, g, h, j, and k corresponding to the five indicators are determined. The corresponding indicators of each factor are shown in Table 2. Invite no less than 3 industry experts to determine the influence factors based on their own experience and actual data. Among them, when each expert determines the factor assignment, it is required that each expert f+g+h+j+k=1. At the same time, combined with actual experience and the evaluation direction of each indicator, the following value requirements are set for individual influence factors: f∈(0,0.15], g∈(0,0.2], h∈[0.25,1], j∈[0.15,1], k∈(0,0.3].

[0182] The influence factors determined by the experts are averaged to obtain the influence factor assignment corresponding to each indicator.

[0183] Table 2 Correspondence between indicator parameters and influence factors

[0184]

[0185]

[0186] In a preferred embodiment of the present invention,

[0187] In a preferred embodiment of the embodiment of the present invention, the value of the coefficient α of the equipment aging factor is [0.9, 1]; the value of the coefficient β of the technology improvement factor is [1, 1.02].

[0188] Specifically, when evaluating the output characteristics of energy storage power stations, the differences in technology and equipment between power stations with different operating years are taken into account, such as those with an operating time of less than 1 year, 1-3 years, 3-5 years, and more than 5 years, and the equipment aging factor α is introduced. Among them, for newly commissioned power stations (with an operating time of less than 1 year), the equipment is in a relatively new state and the degree of aging is relatively low, and the value of α is 1; for power stations with an operating time of 1-3 years, the value range of α is [0.97, 0.99]; for power stations with an operating time of 3-5 years, the value range of α is [0.94, 0.96]; for power stations with an operating time of more than 5 years, the value of α is [0.9-0.93].

[0189] Specifically, for power stations that have undergone technology upgrades or equipment updates, such as upgrading or replacing control systems, conversion equipment (converters, etc.) and auxiliary equipment (cooling, monitoring systems), a technology improvement factor β is introduced. For power stations that have not undergone technology upgrades or equipment upgrades, β takes a value of 1, indicating that there is no gain from technology upgrades; for facilities that have replaced control systems, conversion equipment, batteries, etc., which can significantly improve the operating efficiency and output characteristics of power stations, β takes a value of 1.2; for facilities that have a relatively mild effect on output characteristics such as replacing auxiliary equipment, β takes a value of 1.05.

[0190] like Figure 4 As shown, the present invention acquires evaluation index data through a data acquisition device for energy storage power stations, supports the acquisition of real-time operation information of battery management systems, PCS, power distribution equipment, and auxiliary systems in energy storage power stations, and regularly collects power consumption of air conditioning, lighting, management, and operation and maintenance in the station. The device collects data for index calculation, and regularly evaluates the output of the power station in combination with the index evaluation system, providing decision support for the scheduling and operation of the energy storage power station.

[0191] The data acquisition device supports the regular and real-time collection of operating information of the battery management system, PCS, power distribution equipment, auxiliary systems, etc. in the energy storage power station through sensor technology and measurement technology, and also supports the regular collection of power consumption for daily operation of the power station such as air conditioning, lighting, operation and maintenance management. In addition, the acquisition device has data calculation, analysis and storage functions to meet the needs of data analysis and evaluation of output conditions in peak load and frequency regulation scenarios, and supports sending the evaluation results to the power station operation and maintenance personnel.

[0192] Data acquisition device development includes data acquisition, data transmission and storage, and data storage and processing.

[0193] ①Data collection

[0194] It has 400 built-in industrial drives to meet the communication protocol requirements of different brands and different devices. It uses PLC and built-in real-time database technology to pre-process and store the collected data locally, and transmit it to the edge computing collection gateway device to realize data collection and pre-processing functions.

[0195] ②Data transmission and storage

[0196] The device reserves different interfaces such as RS232, RS485, Ethernet, etc. to realize wired data transmission. It also supports multiple transmission protocols such as wireless interface acquisition, OPC, Modbus, MQTT, etc. for wireless transmission. It adopts a combination of distributed acquisition and networked acquisition to group connected devices for data acquisition and upload it to the edge node. After further processing by the edge node, it is transmitted to the cloud platform.

[0197] ③Data storage and processing

[0198] Deploy edge gateways and edge servers at edge nodes, and build an edge computing architecture through the combination of the two to achieve efficient data processing, storage, and analysis. The edge gateway collects power station data and identifies and processes abnormal data, such as missing values, outliers, and duplicate data. The edge server receives and stores the pre-processed data from the edge gateway for further calculations. Its advantage is that it can efficiently process, store, and analyze data, realize a distributed edge computing architecture, reduce the data processing pressure of cloud data centers, and provide faster decision-making and response.

[0199] The acquisition device is applied to energy storage power stations, combining distributed data acquisition with networked data acquisition. Distributed acquisition modules are placed at key equipment to collect and transmit data to networked data acquisition modules after local processing, and then to the corresponding edge gateway to share the transmission pressure. The edge gateway and edge server can perform further data processing. Among them, the edge gateway can perform preliminary cleaning, aggregation and conversion of data, and the edge server is used to further process and store data in depth.

[0200] Among them, distributed data collection distributes data collection tasks on different devices or nodes. Combined with networked data collection, it can realize the monitoring and control of the entire energy storage power station, improving the real-time and accuracy of data collection. Edge computing technology can realize rapid data processing and analysis, perform preliminary data processing and analysis at edge nodes and device ends, and only transmit streamlined data to the central server, reducing data transmission delay and data transmission costs; in addition, pushing data processing and storage to edge devices can share the data storage pressure of the central server, reduce the risk of data being tampered with or stolen during transmission, and enhance data privacy and security.

[0201] See also Figure 5 As shown, according to an embodiment of the present invention, there is also provided an evaluation device 100 for output characteristics of an energy storage power station for peak load regulation and frequency regulation, comprising:

[0202] The acquisition module 101 is used to obtain the index values ​​of multiple final evaluation indicators of the pre-built energy storage power station output characteristic evaluation system; the final evaluation indicators include: peak-shaving power regulation index, peak-shaving state conversion efficiency ratio, peak-shaving start efficiency index, peak-shaving steady-state precision control rate, peak-shaving dispatching response capability, frequency modulation start response efficiency, frequency modulation response efficiency ratio, frequency modulation steady-state control capability, frequency modulation power regulation index and frequency modulation dispatching response capability;

[0203] The index calculation module 102 is used to classify and calculate the multiple final evaluation indicators to obtain the first-level evaluation indicators; the first-level evaluation indicators include: peak-shaving output characteristic index and frequency-shaving output characteristic index;

[0204] The evaluation module 103 is used to evaluate the output characteristics of the energy storage power station according to the value of the first-level evaluation index.

[0205] In a preferred embodiment of the present invention, the calculation formula of the peak power regulation index PRI of the evaluation device is:

[0206]

[0207] Among them, α is the coefficient of the equipment aging factor, β is the coefficient of the technology improvement factor, N is the number of times the energy storage power station participated in peak regulation during the statistical period, and P 1i is the actual peak output power P actual , P 0i is the initial state of the energy storage power station when receiving the command, T 2i -T 1i is the power output stabilization time T stable ;

[0208] The calculation formula of the peak load state conversion time efficiency ratio STER is:

[0209]

[0210] Among them, α is the coefficient of the equipment aging factor, β is the coefficient of the technology improvement factor, N is the number of times the energy storage power station participated in peak regulation during the statistical period, and T 3i -T 1i is the charge and discharge conversion time of the energy storage power station T transition , T 3i -T 0i is the response delay time T response ;

[0211] The calculation formula of the peak load start time index STI is:

[0212]

[0213] Among them, α is the coefficient of the equipment aging factor, β is the coefficient of the technology improvement factor, N is the number of times the energy storage power station participated in peak regulation during the statistical period, and T 3i -T 0i is the response delay time T response , T 3i -T 1 i is the charge and discharge conversion time of the energy storage power station T transition , T 2i -T 0iT is the active power stabilization time active ;

[0214] The calculation formula of the peak regulation steady-state precise control rate SPR is:

[0215]

[0216] Among them, α is the coefficient of the equipment aging factor, β is the coefficient of the technology improvement factor, N is the number of times the energy storage power station participated in peak regulation during the statistical period, and P 2i is the target power P Target , P 1i is the actual power P Actual ,P E is the rated power, T 4i -T 2i To maintain the current power, the total operation time is T maintain ;

[0217] The peak load dispatch response capability DRC P The calculation formula is:

[0218]

[0219] Among them, SCR P To successfully respond to the peak load instruction times, TCR P is the total number of peak-shaving instructions.

[0220] In a preferred embodiment of the present invention, the peak load characteristic index OCI of the evaluation device is P The calculation formula is:

[0221] OCI P =a·PRI+b·(1-STER)+c·(1-STI)+d·(1-SPR)+e

[0222] DRC P

[0223] Among them, a is the coefficient of the influencing factor of the peak-shaving power regulation index PRI; b is the coefficient of the influencing factor of the peak-shaving state conversion efficiency ratio STER; c is the coefficient of the influencing factor of the peak-shaving start efficiency index STI; d is the coefficient of the influencing factor of the peak-shaving steady-state precision control rate SPR; e is the peak-shaving scheduling response capability DRC P The coefficient of the influencing factor.

[0224] In a preferred embodiment of the present invention, the calculation formula of the frequency modulation start-up response efficiency SRE of the evaluation device is:

[0225]

[0226] Among them, T 2i -T 1i The start-up preparation time T prepare , T 2i -T 0i is the frequency modulation response speed T modulate ;

[0227] The calculation formula of the frequency modulation response time efficiency ratio RER is:

[0228]

[0229] Among them, T 2i -T 0i is the frequency modulation response speed T modulate , T 3i -T 2i is the stabilization time T variation , T 4i -T 3i is the stable operation time T stable ;

[0230] The calculation formula of the frequency modulation steady-state control capability SSC is:

[0231]

[0232] Among them, P actual is the actual output power of frequency modulation, P 0i is the initial state of the energy storage power station when receiving the command, P E is the rated power, T 4i -T 3i is the stable operation time T stable ;

[0233] The calculation formula of the frequency modulation power regulation index PRI is:

[0234]

[0235] Among them, T 3i -T 2i is the stabilization time T during the frequency regulation of the energy storage power station variation ;

[0236] The frequency modulation dispatch response capability DRC F The calculation formula is:

[0237]

[0238] Among them, SCR F TCR is the number of successful responses to frequency modulation commands within a period of time. F It is the total number of peak load instructions within a period of time.

[0239] Furthermore, the frequency modulation output characteristic index OCI F The calculation formula is:

[0240] OCI F =f·(1-SRE)+g·(1-RER)+h·SSC+j·PRI+e·DRC F

[0241] Among them, f is the coefficient of the influencing factor of the frequency modulation start response efficiency SRE, g is the coefficient of the influencing factor of the frequency modulation response time efficiency ratio RER, h is the coefficient of the influencing factor of the frequency modulation steady-state control capability SSC, j is the coefficient of the influencing factor of the frequency modulation power regulation index PRI, k is the coefficient of the frequency modulation scheduling response capability DRC F The coefficient of the influencing factor.

[0242] In a preferred embodiment of the present invention, the peak load characteristic index OCI of the evaluation device is P The relationship between the coefficients of the multiple influencing factors is: a+b+c+d+e=1;

[0243] The frequency modulation output characteristic index OCI F The relationship between the coefficients of the multiple influencing factors is: f+g+h+j+k=1.

[0244] In a preferred embodiment of the embodiment of the present invention, the value of the coefficient α of the equipment aging factor of the evaluation device is [0.9, 1]; the value of the coefficient β of the technology improvement factor is [1, 1.02].

[0245] According to an embodiment of the present invention, the present invention also provides an electronic device and a readable storage medium.

[0246] Figure 6 A schematic block diagram of an example electronic device 200 that can be used to implement an embodiment of the present invention is shown. The electronic device is intended to represent various forms of digital computers, such as laptop computers, desktop computers, workstations, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. The electronic device can also represent various forms of mobile devices, such as personal digital assistants, cellular phones, smart phones, wearable devices, and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely examples and are not intended to limit the implementation of the present invention described and / or required herein.

[0247] See also Figure 6As shown, the device 200 includes a computing unit 201, which can perform various appropriate actions and processes according to a computer program stored in a read-only memory (ROM) 202 or a computer program loaded from a storage unit 208 into a random access memory (RAM) 203. In the RAM 203, various programs and data required for the operation of the device 200 can also be stored. The computing unit 201, the ROM 202, and the RAM 203 are connected to each other via a bus 204. An input / output (I / O) interface 205 is also connected to the bus 204.

[0248] A number of components in the device 200 are connected to the I / O interface 205, including: an input unit 206, such as a keyboard, a mouse, etc.; an output unit 207, such as various types of displays, speakers, etc.; a storage unit 208, such as a disk, an optical disk, etc.; and a communication unit 209, such as a network card, a modem, a wireless communication transceiver, etc. The communication unit 209 allows the device 200 to exchange information / data with other devices through a computer network such as the Internet and / or various telecommunication networks.

[0249] The computing unit 201 may be a variety of general and / or special processing components with processing and computing capabilities. Some examples of the computing unit 201 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (GPU), various dedicated artificial intelligence (AI) computing chips, various computing units running machine learning model algorithms, digital signal processors (DSPs), and any appropriate processors, controllers, microcontrollers, etc. The computing unit 201 performs the various methods and processes described above, such as a method for evaluating the output characteristics of an energy storage power station for peak shaving and frequency regulation. For example, in some embodiments, a method for evaluating the output characteristics of an energy storage power station for peak shaving and frequency regulation may be implemented as a computer software program, which is tangibly contained in a machine-readable medium, such as a storage unit 208. In some embodiments, part or all of the computer program may be loaded and / or installed on the device 200 via the ROM 202 and / or the communication unit 209. When the computer program is loaded into the RAM 203 and executed by the computing unit 201, one or more steps of the method for evaluating the output characteristics of an energy storage power station for peak shaving and frequency regulation described above may be performed. Alternatively, in other embodiments, the computing unit 201 may be configured in any other appropriate manner (for example, by means of firmware) to execute a method for evaluating the output characteristics of an energy storage power station for peak load regulation and frequency regulation.

[0250] Various implementations of the systems and techniques described above herein can be implemented in digital electronic circuit systems, integrated circuit systems, field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), load programmable logic devices (CPLDs), computer hardware, firmware, software, and / or combinations thereof. These various implementations can include: being implemented in one or more computer programs that can be executed and / or interpreted on a programmable system including at least one programmable processor, which can be a special purpose or general purpose programmable processor that can receive data and instructions from a storage system, at least one input device, and at least one output device, and transmit data and instructions to the storage system, the at least one input device, and the at least one output device.

[0251] The program code for implementing the method of the present invention can be written in any combination of one or more programming languages. These program codes can be provided to a processor or controller of a general-purpose computer, a special-purpose computer or other programmable data processing device, so that the program code, when executed by the processor or controller, enables the functions / operations specified in the flow chart and / or block diagram to be implemented. The program code can be executed entirely on the machine, partially on the machine, partially on the machine as a stand-alone software package and partially on a remote machine, or entirely on a remote machine or server.

[0252] In the context of the present invention, a machine-readable medium may be a tangible medium that may contain or store a program for use by or in conjunction with an instruction execution system, device, or equipment. A machine-readable medium may be a machine-readable signal medium or a machine-readable storage medium. A machine-readable medium may include, but is not limited to, electronic, magnetic, optical, electromagnetic, infrared, or semiconductor systems, devices, or equipment, or any suitable combination of the foregoing. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.

[0253] To provide interaction with a user, the systems and techniques described herein can be implemented on a computer having: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user; and a keyboard and pointing device (e.g., a mouse or trackball) through which the user can provide input to the computer. Other types of devices can also be used to provide interaction with the user; for example, the feedback provided to the user can be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user can be received in any form (including acoustic input, voice input, or tactile input).

[0254] The systems and techniques described herein may be implemented in a computing system that includes back-end components (e.g., as a data server), or a computing system that includes middleware components (e.g., an application server), or a computing system that includes front-end components (e.g., a user computer with a graphical user interface or a web browser through which a user can interact with implementations of the systems and techniques described herein), or a computing system that includes any combination of such back-end components, middleware components, or front-end components. The components of the system may be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include: a local area network (LAN), a wide area network (WAN), and the Internet.

[0255] A computer system may include a client and a server. The client and the server are generally remote from each other and usually interact through a communication network. The relationship of client and server is generated by computer programs running on respective computers and having a client-server relationship with each other. The server may be a cloud server, a server of a distributed system, or a server combined with a blockchain.

[0256] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps described in the present invention can be executed in parallel, sequentially or in different orders, as long as the desired values ​​of the technical solutions disclosed in the present invention can be achieved, and this document does not limit this.

[0257] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and substitutions can be made without departing from the technical principles of the present invention. These improvements and substitutions should also be regarded as the scope of protection of the present invention.

Claims

1. A method for evaluating the output characteristics of energy storage power stations for peak load regulation and frequency regulation. It is characterized in that include: Obtaining the index values ​​of multiple final evaluation indicators of a pre-constructed energy storage power station output characteristic evaluation system; the final evaluation indicators include: peak-shaving power regulation index, peak-shaving state conversion efficiency ratio, peak-shaving start efficiency index, peak-shaving steady-state precision control rate, peak-shaving dispatching response capability, frequency modulation start response efficiency, frequency modulation response efficiency ratio, frequency modulation steady-state control capability, frequency modulation power regulation index and frequency modulation dispatching response capability; Classifying and calculating the plurality of final evaluation indicators to obtain first-level evaluation indicators; the first-level evaluation indicators include: a peak-shaving output characteristic index and a frequency-shaving output characteristic index; The output characteristics of the energy storage power station are evaluated according to the values ​​of the first-level evaluation indicators.

2. The evaluation method according to claim 1, It is characterized in that The calculation formula of the peak power regulation index PRI is: Among them, α is the coefficient of the equipment aging factor, β is the coefficient of the technology improvement factor, N is the number of times the energy storage power station participated in peak regulation during the statistical period, and P 1i is the actual peak output power P actual ,P 0i is the initial state of the energy storage power station when receiving the command, T 2i -T 1i is the power output stabilization time T stable ; The calculation formula of the peak load state conversion time efficiency ratio STER is: Among them, α is the coefficient of the equipment aging factor, β is the coefficient of the technology improvement factor, N is the number of times the energy storage power station participated in peak regulation during the statistical period, T 3i -T 1i is the charge and discharge conversion time of the energy storage power station T transition , T 3i -T 0i is the response delay time T response ; The calculation formula of the peak load start time index STI is: Among them, α is the coefficient of the equipment aging factor, β is the coefficient of the technology improvement factor, N is the number of times the energy storage power station participated in peak regulation during the statistical period, and T 3i -T 0i is the response delay time T response , T 3i -T 1 i is the charge and discharge conversion time of the energy storage power station T transition , T 2i -T 0i T is the active power stabilization time active ; The calculation formula of the peak regulation steady-state precise control rate SPR is: Among them, α is the coefficient of the equipment aging factor, β is the coefficient of the technology improvement factor, N is the number of times the energy storage power station participated in peak regulation during the statistical period, and P 2i is the target power P Target , P 1i is the actual power P Actual ,P E is the rated power, T 4i -T 2i To maintain the current power, the total operation time is T maintain ; The peak load dispatch response capability DRC P The calculation formula is: Among them, SCR P To successfully respond to the peak load instruction times, TCR P is the total number of peak-shaving instructions.

3. The evaluation method according to claim 2, It is characterized in that The peak load characteristic index OCI P The calculation formula is: OCI P =a·PRI+b·(1-STER)+c·(1-STI)+d·(1-SPR)+e·DRC P Among them, a is the coefficient of the influencing factor of the peak-shaving power regulation index PRI; b is the coefficient of the influencing factor of the peak-shaving state conversion efficiency ratio STER; c is the coefficient of the influencing factor of the peak-shaving start efficiency index STI; d is the coefficient of the influencing factor of the peak-shaving steady-state precision control rate SPR; e is the peak-shaving scheduling response capability DRC P The coefficient of the influencing factor.

4. The evaluation method according to claim 3, It is characterized in that The calculation formula of the frequency modulation start response efficiency SRE is: Among them, T 2i -T 1i The start-up preparation time T prepare , T 2i -T 0i is the frequency modulation response speed T modulate ; The calculation formula of the frequency modulation response time efficiency ratio RER is: Among them, T 2i -T 0i is the frequency modulation response speed T modulate , T 3i -T 2i is the stabilization time T variation , T 4i -T 3i is the stable operation time T stable ; The calculation formula of the frequency modulation steady-state control capability SSC is: Among them, P actual is the actual output power of frequency modulation, P 0i is the initial state of the energy storage power station when receiving the command, P E is the rated power, T 4i -T 3i is the stable operation time T stable ; The calculation formula of the frequency modulation power regulation index PRI is: Among them, T 3i -T 2i is the stabilization time T during the frequency regulation of the energy storage power station variation ; The frequency modulation dispatch response capability DRC F The calculation formula is: Among them, SCR F TCR is the number of successful responses to frequency modulation commands within a period of time. F It is the total number of peak load instructions in a period of time.

5. The evaluation method according to claim 4, It is characterized in that The frequency modulation output characteristic index OCI F The calculation formula is: OCI F =f·(1-SRE)+g·(1-RER)+h·SSC+j·PRI+e·DRC F Among them, f is the coefficient of the influencing factor of the frequency modulation start response efficiency SRE, g is the coefficient of the influencing factor of the frequency modulation response time efficiency ratio RER, h is the coefficient of the influencing factor of the frequency modulation steady-state control capability SSC, j is the coefficient of the influencing factor of the frequency modulation power regulation index PRI, k is the coefficient of the frequency modulation scheduling response capability DRC F The coefficient of the influencing factor.

6. The evaluation method according to claim 5, It is characterized in that The peak load characteristic index OCI P The relationship between the coefficients of the multiple influencing factors is: a+b+c+d+e=1; The frequency modulation output characteristic index OCI F The relationship between the coefficients of the multiple influencing factors is: f+g+h+j+k=1.

7. The evaluation method according to claim 5, It is characterized in that The value of the coefficient α of the equipment aging factor is [0.9, 1]; the value of the coefficient β of the technology improvement factor is [1, 1.02].

8. An evaluation device for the output characteristics of energy storage power stations for peak load regulation and frequency regulation, It is characterized in that include: An acquisition module is used to acquire the index values ​​of multiple final evaluation indicators of a pre-built energy storage power station output characteristic evaluation system; the final evaluation indicators include: peak-shaving power regulation index, peak-shaving state conversion efficiency ratio, peak-shaving start efficiency index, peak-shaving steady-state precision control rate, peak-shaving dispatch response capability, frequency modulation start response efficiency, frequency modulation response efficiency ratio, frequency modulation steady-state control capability, frequency modulation power regulation index and frequency modulation dispatch response capability; An index calculation module, used for classifying and calculating the plurality of final evaluation indexes to obtain first-level evaluation indexes; the first-level evaluation indexes include: a peak-shaving output characteristic index and a frequency-shaving output characteristic index; The evaluation module is used to evaluate the output characteristics of the energy storage power station according to the value of the first-level evaluation index.

9. The evaluation device according to claim 8, It is characterized in that The calculation formula of the peak power regulation index PRI is: Among them, α is the coefficient of the equipment aging factor, β is the coefficient of the technology improvement factor, N is the number of times the energy storage power station participated in peak regulation during the statistical period, and P 1i is the actual peak output power P actual ,P 0i is the initial state of the energy storage power station when receiving the command, T 2i -T 1i is the power output stabilization time T stable ; The calculation formula of the peak load state conversion time efficiency ratio STER is: Among them, α is the coefficient of the equipment aging factor, β is the coefficient of the technology improvement factor, N is the number of times the energy storage power station participated in peak regulation during the statistical period, and T 3i -T 1i is the charge and discharge conversion time of the energy storage power station T transition , T 3i -T 0i is the response delay time T response ; The calculation formula of the peak load start time index STI is: Among them, α is the coefficient of the equipment aging factor, β is the coefficient of the technology improvement factor, N is the number of times the energy storage power station participated in peak regulation during the statistical period, and T 3i -T 0i is the response delay time T response , T 3i -T 1 i is the charge and discharge conversion time of the energy storage power station T transition , T 2i -T 0i T is the active power stabilization time active ; The calculation formula of the peak regulation steady-state precise control rate SPR is: Among them, α is the coefficient of the equipment aging factor, β is the coefficient of the technology improvement factor, N is the number of times the energy storage power station participated in peak regulation during the statistical period, and P 2i is the target power P Target , P 1i is the actual power P Actual ,P E is the rated power, T 4i -T 2i To maintain the current power, the total operation time is T maintain ; The peak load dispatch response capability DRC P The calculation formula is: Among them, SCR P To successfully respond to the peak load instruction times, TCR P is the total number of peak-shaving instructions.

10. The evaluation device according to claim 9, It is characterized in that The peak load characteristic index OCI P The calculation formula is: OCI P =a·PRI+b·(1-STER)+c·(1-STI)+d·(1-SPR)+e·DRC P Among them, a is the coefficient of the influencing factor of the peak-shaving power regulation index PRI; b is the coefficient of the influencing factor of the peak-shaving state conversion efficiency ratio STER; c is the coefficient of the influencing factor of the peak-shaving start efficiency index STI; d is the coefficient of the influencing factor of the peak-shaving steady-state precision control rate SPR; e is the peak-shaving scheduling response capability DRC P The coefficient of the influencing factor.

11. The evaluation device according to claim 10, It is characterized in that The calculation formula of the frequency modulation start response efficiency SRE is: Among them, T 2i -T 1i The start-up preparation time T prepare , T 2i -T 0i is the frequency modulation response speed T modulate ; The calculation formula of the frequency modulation response time efficiency ratio RER is: Among them, T 2i -T 0i is the frequency modulation response speed T modulate , T 3i -T 2i is the stabilization time T variation , T 4i -T 3i is the stable operation time T stable ; The calculation formula of the frequency modulation steady-state control capability SSC is: Among them, P actual is the actual output power of frequency modulation, P 0i is the initial state of the energy storage power station when receiving the command, P E is the rated power, T 4i -T 3i is the stable operation time T stable ; The calculation formula of the frequency modulation power regulation index PRI is: Among them, T 3i -T 2i is the stabilization time T during the frequency regulation of the energy storage power station variation ; The frequency modulation dispatch response capability DRC F The calculation formula is: Among them, SCR F TCR is the number of successful responses to frequency modulation commands within a period of time. F It is the total number of peak load instructions within a period of time.

12. The evaluation device according to claim 11, It is characterized in that The frequency modulation output characteristic index OCI F The calculation formula is: OCI F =f·(1-SRE)+g·(1-RER)+h·SSC+j·PRI+e·DRC F Among them, f is the coefficient of the influencing factor of the frequency modulation start response efficiency SRE, g is the coefficient of the influencing factor of the frequency modulation response time efficiency ratio RER, h is the coefficient of the influencing factor of the frequency modulation steady-state control capability SSC, j is the coefficient of the influencing factor of the frequency modulation power regulation index PRI, k is the coefficient of the frequency modulation scheduling response capability DRC F The coefficient of the influencing factor.

13. The evaluation device according to claim 12, It is characterized in that The peak load characteristic index OCI P The relationship between the coefficients of the multiple influencing factors is: a+b+c+d+e=1; The frequency modulation output characteristic index OCI F The relationship between the coefficients of the multiple influencing factors is: f+g+h+j+k=1.

14. The evaluation device according to claim 12, It is characterized in that The value of the coefficient α of the equipment aging factor is [0.9, 1]; the value of the coefficient β of the technology improvement factor is [1, 1.02].

15. A non-transitory computer-readable storage medium, It is characterized in that The non-transitory computer-readable storage medium is used to store computer instructions. When the computer instructions are executed by the processor, the method for evaluating the output characteristics of the energy storage power station for peak load regulation and frequency regulation as described in any one of claims 1 to 7 is implemented.

16. An electronic device, It is characterized in that include: A processor, a memory and a computer program; wherein the processor is connected to the memory, the computer program is stored in the memory, and when the electronic device is running, the processor executes the computer program stored in the memory so that the electronic device executes the method for evaluating the output characteristics of a peak-shaving and frequency-shaving energy storage power station as described in any one of claims 1 to 7.

Citation Information

Cited By

  • Self-adaptive temperature adjusting system for power electronic device

    CN120010599A

  • Multi-source collaborative fused salt heat storage peak regulation system and intelligent regulation and control method

    CN120914837A