Cable-stayed bridge teaching and training integrated model and use method
By designing an integrated model of cable-stayed bridge development and lessons, using rotatable bridge plates and tension sensors to simulate different forms of cable-stayed bridge structures, the problem that the existing model cannot display the stress of the cables is solved, and the teaching is vivid and Quality improvement.
Patent Information
- Application Number
- CN202411254087.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-09
- Publication Date
- 2024-10-25
AI Technical Summary
The existing cable-stayed bridge model cannot effectively display the stress of the cables at different positions of the bridge plate, which limits the vividness of teaching and the improvement of teaching quality, and students cannot verify the calculation results on the model.
An integrated model of cable-stayed bridge development and lessons is designed, including a rotatable bridge plate, counterweight blocks, sliders, cables, tension sensors and locking mechanisms. By adjusting the tension and connection position of the cables, different forms of bridges can be simulated. Cable-stayed bridge structure provides intuitive stress data.
The vividness and quality of teaching are improved, allowing students to intuitively understand the stress of the cable and verify the calculation results on the model, which enhances the learning effect.
Smart Images

Figure CN118840932A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of teaching models, and in particular relates to a cable-stayed bridge development and teaching integrated model and a use method thereof. Background Art
[0002] A cable-stayed bridge is a common bridge structure, including a horizontal bridge deck and a vertical bridge tower. The middle area of the bridge deck is fixed to the bridge tower, and the bridge deck is connected to the bridge tower through multiple cables. In order to help students understand the structure of a cable-stayed bridge more intuitively, a model of a cable-stayed bridge is currently used in the teaching process. In addition to being used in teaching, the model can also be used for external exhibitions.
[0003] The existing model is basically a scaled-down structure of a cable-stayed bridge. Although it allows students to intuitively understand the structure of the cable-stayed bridge, it cannot further demonstrate the mechanical performance. That is, students cannot intuitively understand the stress generated by the cables on the cable-stayed bridge after being connected to different positions on the bridge deck. This is not conducive to more vivid teaching and improving teaching quality. At the same time, after students have initially mastered the force calculation method of the cable-stayed bridge cables, they cannot verify whether the calculation results are correct on the model, which is also not conducive to improving teaching quality. Summary of the invention
[0004] The purpose of the present invention is to provide a cable-stayed bridge display and teaching integrated model and a method for using the same. The present invention has the advantage of improving the teaching quality.
[0005] The technical solution of the present invention is an integrated model of cable-stayed bridge development and teaching, including a base plate, a vertical bridge tower is provided on the base plate, an elastic bridge plate is provided on the bridge tower, the bridge plate is rotatably connected to the bridge tower, a plurality of counterweights evenly distributed along the length of the bridge plate are provided at the bottom of the bridge plate, a sliding bar is provided on the top surface of the bridge plate, a plurality of first sliding blocks are provided on the sliding bar, a first locking mechanism is provided between the first sliding block and the sliding bar, and the first sliding block is connected to the bridge tower through a cable.
[0006] In the aforementioned integrated development and teaching model of the cable-stayed bridge, the bridge tower is provided with a hole passed through by the bridge deck, both sides of the bridge deck are provided with a slide groove, a second slider is provided in the slide groove, a second locking mechanism is provided between the second slider and the bridge deck, a rotating shaft is provided in the middle of the second slider, one end of the rotating shaft extends outward and is fixed to the bridge tower, and the inner end of the rotating shaft is rotatably connected to the second slider.
[0007] In the aforementioned integrated model of cable-stayed bridge development and learning, the cable includes a first rope connected to a first slider, the first rope is connected to a second rope via a basket bolt, the second rope is connected to a third rope via a tension sensor, and the third rope is connected to a bridge tower.
[0008] In the aforementioned integrated development and learning model of the cable-stayed bridge, a first hook is provided at the end of the third rope, and multiple hanging holes arranged from top to bottom are provided on both sides of the bridge tower. The hanging holes are located above the connection between the bridge tower and the bridge deck, and the first hook is connected to the bridge tower through the hanging holes.
[0009] In the aforementioned integrated model of cable-stayed bridge development and teaching, a pressure plate is provided on the top of the first slider, the pressure plate is screwed to the first slider, the first rope passes between the pressure plate and the first slider, and an anti-drop block is provided at the end of the first rope.
[0010] In the aforementioned integrated model of cable-stayed bridge development and learning, a horizontal ruler is provided on the lower side of the bridge deck, and the upper end of the horizontal ruler is rotatably connected to the bridge tower.
[0011] In the aforementioned integrated model of cable-stayed bridge development and learning, a second hook is provided at the bottom of the counterweight block.
[0012] The method of using the above-mentioned model is to first change the connection position of the first slider on the cable, and then change the length of the basket bolt to tighten the cable to provide tension for the bridge deck.
[0013] In the aforementioned method of use, the bridge deck is made level by changing the tension provided by each cable to the bridge deck.
[0014] In the aforementioned method of use, the tensions of the cables are made equal or similar by changing the distribution positions of the first sliders on the slide bar.
[0015] Compared with the prior art, the present invention can not only intuitively display the structure of the cable-stayed bridge, but also enable students to intuitively understand the changes in the number of cables, the different connection positions of the cables on the bridge tower, and the different connection positions of the cables on the bridge deck, and the changes in the tension required on each cable to keep the bridge deck horizontal. The simulation effect is good, making the teaching more vivid and conducive to improving the teaching quality. At the same time, after the students learn the force calculation method of the cable of the cable-stayed bridge, they can also verify it on the model, improve the learning effect through simulation practice, and improve the teaching quality accordingly. Therefore, the present invention has the advantage of improving the teaching quality. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a front view schematic diagram of the present invention.
[0017] Figure 2 It is a left side schematic diagram of the present invention.
[0018] The marks in the attached drawings are: 1-base plate, 2-bridge tower, 3-bridge plate, 4-counterweight, 5-slide bar, 6-first slider, 7-cable, 8-hole, 9-slide groove, 10-second slider, 11-rotating shaft, 12-first rope, 13-basket bolt, 14-second rope, 15-tension sensor, 16-third rope, 17-first hook, 18-hanging hole, 19-pressure plate, 20-anti-slip block, 21-horizontal ruler, 22-second hook. DETAILED DESCRIPTION
[0019] The present invention is further described below in conjunction with the accompanying drawings and embodiments, but they are not intended to limit the present invention.
[0020] Example. Cable-stayed bridge development and lessons integrated model, such as Figure 1 and Figure 2 As shown, it includes a bottom plate 1, a vertical bridge tower 2 is arranged on the bottom plate 1, and an elastic bridge deck 3 is arranged on the bridge tower 2. The bridge deck 3 is 1m long, 8mm thick and 25mm wide. The bottom of the bridge deck 3 is provided with a plurality of counterweight blocks 4 evenly distributed along the length of the bridge deck 3. The counterweight blocks 4 are made of steel blocks, and a gap of about 2mm is formed between adjacent counterweight blocks 4. A second hook 22 is provided at the bottom of the counterweight blocks 4. A slide bar 5 is provided on the top surface of the bridge deck 3. The slide bar 5 and the bridge deck 3 can be integrally formed by extrusion, and the material is reinforced nylon. Since the bridge deck 3 is long and thin, when the bridge deck 3 is only supported in the middle, the two ends will hang down, simulating the state of the bridge deck on the actual cable-stayed bridge. The uniform distribution of the counterweight blocks 4 is mainly to simulate the uniform distribution of mass of the actual bridge deck.
[0021] Eight first steel sliders 6 are provided on the slide bar 5. A first locking mechanism is provided between the first slider 6 and the slide bar 5. The first locking mechanism may be a set screw screwed to the first slider 6. When the set screw presses against the slide bar 6, the position of the first slider 6 is fixed. The first slider 6 is connected to the bridge tower 2 through a cable 7.
[0022] The bridge tower 2 is provided with a hole 8 passed by the bridge plate 3, and slide grooves 9 are provided on both sides of the bridge plate 3. A second steel slider 10 is provided in the slide groove 9, and a second locking mechanism is provided between the second slider 10 and the bridge plate 3. The second locking mechanism can be two set screws screwed with the second slider 10. When the two set screws are tightened against the bridge plate 3, the position of the second slider 10 is fixed. A rotating shaft 11 is provided in the middle of the second slider 10, one end of the rotating shaft 11 extends outward and is fixed to the bridge tower 2, and the inner end of the rotating shaft 11 is rotatably connected to the second slider 10.
[0023] The cable 7 includes a first rope 12 connected to the first slider 6 , the first rope 12 is connected to the second rope 14 through a turnbuckle 13 , the second rope 14 is connected to the third rope 16 through a tension sensor 15 , and the third rope 16 is connected to the bridge tower 2 .
[0024] A first hook 17 is provided at the end of the third rope 16 , and multiple hanging holes 18 arranged from top to bottom are provided on both sides of the bridge tower 2 . The hanging holes 18 are located above the connection between the bridge tower 2 and the bridge deck 3 , and the first hook 17 is connected to the bridge tower 2 through the hanging holes 18 .
[0025] A pressure plate 19 is provided on the top of the first slider 6 , and the pressure plate 19 is screwed to the first slider 6 . The first rope 12 passes between the pressure plate 19 and the first slider 6 , and an anti-dropping block 20 is provided at the end of the first rope 12 .
[0026] A horizontal ruler 21 is provided on the lower side of the bridge deck 3, the horizontal ruler 21 is located in the hole 8, and the upper end of the horizontal ruler 21 is rotatably connected to the bridge tower 2. The horizontal ruler 21 is turned up and contacts the bottom of the bridge deck 3 or the counterweight 4, so as to observe whether the bridge deck 3 is adjusted to be horizontal.
[0027] The first method of use: the tension sensor 15 is connected to the display via the controller so that the value on the tension sensor 15 can be read on the display.
[0028] During the teaching process, when the bridge tower 2 is connected to the middle part of the bridge deck 3 (the most common cable-stayed bridge structure), the distribution position of the first slider 6 on the slide bar 5 is changed, and then the pressure plate 19 is loosened, and the first rope 12 is pulled to make the cable slightly taut. After all the first ropes 12 are adjusted, the length of each basket bolt 13 is adjusted to tighten each cable 7, and the bridge deck 3 is level. The readings of each tension sensor 15 are observed, so that students can understand the influence of the distribution position change of the connection point of the cable 7 on the bridge deck 3 on the stress condition of the cable 7.
[0029] Furthermore, the distribution position of the first slider 6 on the slide bar 5 is continuously changed. After the change, each cable 7 still needs to be tensioned and the bridge plate 3 is kept horizontal. The distribution position of each first slider 6 on the slide bar 5 is found when the tension of each cable 7 is equal or similar (the error with the average tension is not more than 2%). The position distribution should be calculated in combination with the calculation method in the textbook to verify the knowledge in the textbook.
[0030] The second method of use: simulate a cable-stayed bridge structure with different lengths of the bridge decks 3 on both sides of the bridge tower (due to foundation setting problems, the bridge tower may not be able to connect the bridge deck in the middle during actual construction), that is, the bridge tower 2 is connected to one side of the middle of the bridge deck 3. The bridge deck 3 moves a distance along the second slider 10, and then the teaching experiment is carried out according to the first method of use.
[0031] The third method of use is to change the number of cables 7 used. For the unused cables 7, just disconnect them from the bridge tower 2, and then teach according to the first method to make students understand the changes in the stress conditions of the cables 7 under different numbers of cables 7.
[0032] Fourth method of use: After students have mastered the calculation method of the cable-stayed bridge, they can convert it in a proportional manner and verify it with a model. The verification content includes the number and distribution position of the connection points between the cable 7 and the bridge deck 3, the inclination angle of the cable 7, the tension of the cable 7, etc. The simulation of the length and mass ratio of the bridge deck 3 can be achieved by adding or removing the weight on the second hook 22.
[0033] In the above four methods, the adjusted variables include the number and connection positions of the cables and the bridge deck, the number and connection positions of the cables and the bridge towers, and the connection positions of the bridge towers and the bridge deck. On this basis, the tension value of each cable is obtained, which helps students understand the stress state of the cables in different forms of cable-stayed bridges.
[0034] The core innovation of the present invention is that it can simulate the actual conditions of various cable-stayed bridges with good simulation effect, and provide intuitive cable force data, thus facilitating teaching.
[0035] The present invention can be used not only in the teaching process, but also in external exhibitions and student training, thus realizing the function of integrating exhibition and teaching.
[0036] In the description of the embodiments, it should be understood that the terms "up", "down", "front", "back", "left", "right", etc., indicating directions or positional relationships are based on the directions or positional relationships shown in the drawings, and are only for the convenience of describing the embodiments and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as a limitation.
Claims
1. The integrated model of cable-stayed bridge development and learning, characterized by: The invention comprises a bottom plate (1), a vertical bridge tower (2) is arranged on the bottom plate (1), an elastic bridge plate (3) is arranged on the bridge tower (2), the bridge plate (3) is rotatably connected to the bridge tower (2), a plurality of counterweight blocks (4) evenly distributed along the length of the bridge plate (3) are arranged at the bottom of the bridge plate (3), a sliding bar (5) is arranged on the top surface of the bridge plate (3), a plurality of first sliding blocks (6) are arranged on the sliding bar (5), a first locking mechanism is arranged between the first sliding block (6) and the sliding bar (5), and the first sliding block (6) is connected to the bridge tower (2) via a cable (7).
2. The integrated development and learning model of a cable-stayed bridge according to claim 1 is characterized by: The bridge tower (2) is provided with a hole (8) through which the bridge plate (3) passes. Both sides of the bridge plate (3) are provided with a slide groove (9). A second slider (10) is provided in the slide groove (9). A second locking mechanism is provided between the second slider (10) and the bridge plate (3). A rotating shaft (11) is provided in the middle of the second slider (10). One end of the rotating shaft (11) extends outward and is fixed to the bridge tower (2). The inner end of the rotating shaft (11) is rotatably connected to the second slider (10).
3. The integrated development and learning model of a cable-stayed bridge according to claim 1 is characterized by: The cable (7) comprises a first rope (12) connected to a first slider (6), the first rope (12) being connected to a second rope (14) via a turnbuckle (13), the second rope (14) being connected to a third rope (16) via a tension sensor (15), and the third rope (16) being connected to a bridge tower (2).
4. The integrated development and learning model of a cable-stayed bridge according to claim 3 is characterized by: A first hook (17) is provided at the end of the third rope (16), and a plurality of hanging holes (18) arranged from top to bottom are provided on both sides of the bridge tower (2), the hanging holes (18) are located above the connection between the bridge tower (2) and the bridge deck (3), and the first hook (17) is connected to the bridge tower (2) through the hanging holes (18).
5. The integrated development and learning model of a cable-stayed bridge according to claim 3 is characterized by: A pressure plate (19) is provided on the top of the first slider (6), the pressure plate (19) is screwed to the first slider (6), the first rope (12) passes between the pressure plate (19) and the first slider (6), and an anti-drop block (20) is provided at the end of the first rope (12).
6. The integrated development and learning model of a cable-stayed bridge according to claim 1, characterized in that: A horizontal ruler (21) is provided on the lower side of the bridge deck (3), and the upper end of the horizontal ruler (21) is rotatably connected to the bridge tower (2).
7. The integrated development and learning model of a cable-stayed bridge according to claim 6, characterized in that: A second hook (22) is provided at the bottom of the counterweight block (4).
8. The method for using the model according to any one of claims 1 to 7, characterized in that: First, the connection position of the first slider (6) on the cable (7) is changed, and then the length of the basket bolt (13) is changed to tighten the cable (7) and provide tension for the bridge plate (3).
9. The method of use according to claim 8, characterized in that: The bridge deck (3) is made horizontal by changing the pulling force provided by each cable (7) to the bridge deck (3).
10. The method of use according to claim 9, characterized in that: By changing the distribution positions of the first sliding blocks (6) on the slide bar (5), the tensions of the cables (7) are made equal or similar.