Method for manufacturing bicycle high-speed bridge steel tower
By dividing the steel tower into multiple structures and processing them independently, and using rotating tire frames and port matching tooling, the problem of low installation efficiency and precision in the manufacturing of bicycle high-speed bridge steel towers is solved, and an efficient and safe installation process is achieved.
Patent Information
- Application Number
- CN202410950267.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-16
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2044-07-16
Smart Images

Figure CN118848436A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of manufacturing and processing of high-speed bridge steel towers, and in particular to a manufacturing method of a high-speed bicycle bridge steel tower. Background Art
[0002] The steel tower of the bicycle high-speed bridge is connected to the embedded flange through the bottom flange, and the main beam section is directly connected to the anchor plate of the steel tower through multiple zipper structures. The anchor plate is the main force-bearing structure, so the installation accuracy of the flange and cable plate is particularly critical. There is no heavy plate in the production process of the anchor lug plate, and the angle position of the lug plate cannot be adjusted by machining the heavy plate. The welding angle of the anchor plate is small, the space is limited, and the construction is difficult. Therefore, it is very important to control the position and angle of the anchor hole.
[0003] During the traditional installation of flanges and anchor plates, after the overall manufacture of the steel tower is completed, the flanges and anchor plates are machined as a whole by measuring and marking. This method has a relatively low installation efficiency; the flange is heavy and has a low safety factor during installation; the anchor plates have different positions and angles, which places high demands on machining equipment. At the same time, when working in the field, there are many restrictions and a large measurement workload. In addition, the processing accuracy of portable equipment is low, the processing posture is difficult to adjust, and the deviation in the process cannot be handled in time. Finally, when performing overall data analysis and deviation processing, error accumulation is likely to occur, which makes it impossible to process through data borrowing, which in turn leads to some rework. Summary of the invention
[0004] Therefore, the present invention provides a method for manufacturing a steel tower for a bicycle high-speed bridge, which aims to solve the technical problems that in the prior art process for manufacturing a steel tower for a bicycle high-speed bridge, after the overall manufacture of the steel tower is completed, the flange and the anchor plate are integrally machined by measuring and marking, and this method has relatively low installation efficiency and limited conditions for field operations. The present invention can improve the manufacturing and installation accuracy and efficiency of the steel tower for a bicycle high-speed bridge, while ensuring safety during the installation process.
[0005] To this end, the present invention provides a method for manufacturing a bicycle high-speed bridge steel tower, comprising:
[0006] The following steps are involved:
[0007] S1: The steel tower is divided into three parts: the lower steel tower, the middle steel tower and the upper anchor structure; the lower steel tower, the middle steel tower and the upper anchor structure are processed independently; the segment division principle, the anchor part is a non-conical structure, and it needs to be turned over, assembled and welded many times, and is divided into a separate structure; the lower steel tower and the middle steel tower are divided into false flanges, which meet the conditions for separation; in addition, the lower steel tower contains flange components for easy processing;
[0008] S2: Assemble the lower steel tower, the middle steel tower and the upper anchor structure to form a steel tower;
[0009] S3: Install the bridge tower joint section on the formed steel tower;
[0010] S4: Install the wire conduit on the steel tower after the installation of the bridge tower joint section is completed.
[0011] Preferably, the processing of the lower steel tower in S1 includes the following steps:
[0012] S101: The lower steel tower consists of a lower cylinder, a stiffener, a lower flange, and a manhole door. Cutting is performed according to the unfolded shape of the lower cylinder. After cutting, sample punching points and marks are made at 0°, 90°, 180°, and 270° positions, and then rolled to form the lower cylinder. The manhole hole is not trimmed during cutting to avoid deformation during rolling. During the rolling process, the sample punching points and marks are left on the outer surface of the lower cylinder. Finally, the manhole door notch is processed on the lower cylinder using a milling machine.
[0013] S102: Cut the lower flange parts, leaving a 5mm margin on one side. After cutting, use a double-sided boring and milling machine to mill the surface, drill holes, and draw the flange 0°, 90°, 180°, 270° reference lines, and knock out the sample punching points;
[0014] S103: Turn over the lower cylinder to a vertical state; place the lower flange on the T-slot platform, control the flatness between 0 and 0.5 mm, evenly arrange L-shaped code plates around the flange, one end of the L-shaped code plate is placed on the upper surface of the lower flange, and the other end is placed in the T-slot of the T-slot platform and welded to the T-slot; an internal stiffening plate is provided in the lower cylinder, and the lower cylinder is hoisted to the upper surface of the lower flange, and the reference line on the lower flange is matched with the sample punching points and marks on the lower cylinder, and then the lower cylinder and the lower flange are welded; the external stiffening plate is connected between the lower cylinder and the lower flange.
[0015] Preferably, in S1, the processing of the middle steel tower includes the following steps:
[0016] Cut the parts and mark the 0°90°180°270° reference lines before rolling them up. Repeat the process of cutting the parts and marking the 0°90°180°270° reference lines before rolling them up. After obtaining multiple middle cylinders, select the corresponding number of middle cylinders for team welding according to the length of the middle steel tower to be processed to complete the processing of the middle steel tower.
[0017] Preferably, the processing of the upper anchor structure in S1 includes the following steps:
[0018] S111: The upper anchoring structure includes round steel, triangular rib plates, main rib plates, anchoring lug plates, shells, supports, upper semicircular cover shells, lower semicircular cover shells and temporary lifting lugs. Multiple main rib plates are evenly and vertically arranged on the side of the round steel. Triangular rib plates are connected between the main rib plates. The shell is arranged on the outside of the triangular rib plates. An anchoring lug plate is arranged on the side of the round steel, which passes through the shell. Upper semicircular cover shells and lower semicircular cover shells are arranged around the main rib plates and the triangular rib plates. Supports are connected between the upper semicircular cover shells and the lower semicircular cover shells. A temporary lifting lug is arranged on the top of the round steel. The round steel is selected and a 3D marking machine is used to mark the reference lines for the installation of various parts on the round steel. The temporary lifting lug includes a lifting lug, a stiffening plate, a screw and a bottom plate. The screw is directly connected to the bottom plate, and the lifting lug and the stiffening plate are installed by bolts, which can be used for later hoisting and turning operations. After arriving at the site, the temporary lifting lug can be removed and the lampshade shell can be installed.
[0019] S112: prefabricate one of the triangular ribs and the main ribs on both sides of it on the tire frame as an integral component; install the integral component with the round steel, and check whether the straightness of the central round steel is ≤3mm, otherwise, straighten it;
[0020] S113: Install anchor lugs; locate and pre-install temporary lifting lugs, and then weld the temporary lifting lugs to the round steel. During the welding process, pay attention to measuring and monitoring the angle of the temporary lifting lugs. If there is an angle deviation, adjust the welding sequence in time; then install the remaining triangular ribs and main ribs;
[0021] S114: according to the length of the round steel, a cylindrical tire frame and a roller frame are respectively arranged at the ends, and a supporting tire frame is evenly arranged between the two roller frames; after the cylindrical tire frame is arranged, the bottom is stuffed, the cylindrical tire frame is fixed, and the space between the cylindrical tire frame and the roller frame is stuffed and welded firmly; the middle supporting tire frame is arranged in advance, and the position is adjusted according to the actual situation, arranged in the gap, and multiple groups are evenly distributed according to the actual situation; the components are hoisted onto the tire frame and prepared for welding;
[0022] S115: First weld the weld on one side of the main reinforcement plate, and weld symmetrically from the middle to both sides; turn over and weld the anchor members in turn; during the welding process, pay attention to measuring and monitoring the angle of the temporary lifting lugs. If there is an angle deviation, adjust the welding sequence and make corrections in time;
[0023] S116: Assemble the shell with the round steel reference end flush; the assembly gap between the long side of the shell and the anchor lug plate is 2mm. First weld the short side of the shell, symmetrically; then weld the welds between the anchor lug plate and the shell, symmetrically; then weld the welds between the shell and the main reinforcement plate, and finally weld the butt welds of the sealing plate;
[0024] S117: boring the mounting holes on the anchor lug plates;
[0025] S118: The support members are prefabricated into components with the upper semicircular cover shell and the lower semicircular cover shell respectively. After the upper semicircular cover shell and the lower semicircular cover shell are bent and processed to be qualified, they are respectively prefabricated into components by bolting with the corresponding support members. First, the upper semicircular cover shell and the corresponding support members are installed, the docking matching degree is adjusted, and preliminary positioning is performed. After the upper semicircular cover shell is removed, the support members are welded, and then the upper semicircular cover shell is installed. Similarly, the lower semicircular cover shell and the corresponding support members are installed.
[0026] Preferably, the overall assembly process in S2 includes the following steps:
[0027] S21: Arrange the roller frame according to the length of the steel tower;
[0028] S22: The middle steel tower and the upper anchor structure are aligned through the angle reference line, and the total length and tower straightness are measured to ensure the straightness;
[0029] S23: Align the 0°, 90°, 180°, and 270° angle reference lines of the upper and lower ports for overall assembly; at the same time, precisely control the alignment of the center line of the cylinder and the center line of the anchor structure by measurement.
[0030] Preferably, the bridge tower combination section in S3 is a box structure, and a gasket is provided at the port.
[0031] Preferably, before the installation of the bridge tower joint section in S3, a port matching tooling is manufactured according to the structural shape of the joint section installation product, and the product size is checked by controlling the error amount between the product outer surface and the tooling outer surface.
[0032] Preferably, the matching tooling is consistent with the product port structure, which is shortened in the length direction and 100% restored on the docking port structure. The guide plate welded at the end of the product is adjusted to be connected with rivets and bolts when making the tooling; a lifting lug is provided on the upper part of the matching tooling for easy lifting.
[0033] Preferably, the dimensional deviation of the length, width and height of the matching tooling and the product port is controlled within ±1mm, the diagonal deviation is controlled within ±2mm, the straightness deviation is controlled within 1mm, the matching surface is flush, the flatness does not exceed 1mm, and the flatness of other positions does not exceed 2mm.
[0034] Preferably, after the overall assembly in S4 is completed, the wire tube is installed, and finally a rope is threaded in reserve, and a corresponding plug is made and placed at the end of the wire tube for fixing the rope, so as to ensure smooth threading of the cable at the bridge site.
[0035] Compared with the prior art, the present invention has the following advantages:
[0036] 1. The bicycle high-speed bridge steel tower manufacturing method provided by the present invention improves the installation accuracy and efficiency by changing the installation state of the bottom flange plate, while ensuring the safety during the installation process. Through the port matching tooling, the precise production of the joint section port is achieved without reserving welds and overall trial assembly.
[0037] 2. The manufacturing method of the bicycle high-speed bridge steel tower provided by the present invention realizes the installation of anchor plates at different angles by rotating the tire frame, does not need to add large-scale equipment for machining after the overall molding of the steel tower, and at the same time ensures the hole margin and the coordinate positioning of the hole, thereby realizing high-precision installation.
[0038] 3. The bicycle high-speed bridge steel tower manufacturing method provided by the present invention divides the steel tower, and each divided section is processed separately and then assembled, thereby reducing the procedures that need to be performed off-site and improving the efficiency of steel tower manufacturing. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0040] Figure 1 The main view of the steel tower divided into sections of the present invention;
[0041] Figure 2 It is a side view of the steel tower divided into sections according to the present invention;
[0042] Figure 3 A three-dimensional view of the upper anchor structure of the present invention;
[0043] Figure 4 It is a cross-sectional view of the upper anchoring structure of the present invention;
[0044] Figure 5 This is a front view of the temporary lifting lug structure of the present invention;
[0045] Figure 6 A top view of the temporary lifting lug structure of the present invention;
[0046] Figure 7 This is an expanded view of the lower cylinder of the present invention;
[0047] Figure 8 It is a schematic diagram of the assembly of the lower cylinder and the flange of the present invention;
[0048] Fig. 9 It is the team diagram of the middle cylinder of the present invention;
[0049] Fig.10It is the team diagram of the middle cylinder of the present invention;
[0050] Fig.11 Pre-drawing of the triangular rib plate and the main rib plate of the present invention;
[0051] Fig.12 This is a cross-sectional view of the installation of the triangular rib plate and the round steel of the present invention;
[0052] Fig.13 This is a cross-sectional view of the installation of the anchor lug plate and the round steel of the present invention;
[0053] Fig.14 It is a cross-sectional view of the installation of the triangular rib plate, the main rib plate, the anchor lug plate and the round steel of the present invention;
[0054] Fig.15 This is a front view of the rotating tire frame of the present invention;
[0055] Fig.16 For the present invention Fig.15 A-direction view;
[0056] Fig.17 For the present invention Fig.15 B-direction view;
[0057] Fig.18 For the present invention Fig.15 of Ⅰ Enlarge the picture;
[0058] Fig.19 It is the layout diagram of the roller frame of the present invention;
[0059] Fig. 20 A three-dimensional diagram of the bridge tower combined section of the present invention;
[0060] Fig.21 This is a schematic diagram of the bridge tower connection of the present invention;
[0061] Fig. 22 This is the front view of the matching tooling of the present invention;
[0062] Fig.23 is a side view of the matching tooling of the present invention;
[0063] Fig.24 This is a schematic diagram of the installation of the matching tooling of the present invention;
[0064] Fig.25 It is a schematic diagram of the tensile test of the eye bolt of the present invention.
[0065] Description of reference numerals:
[0066] 1. Round steel; 2. Triangular rib plate; 3. Main rib plate; 4. Anchor lug plate; 5. Shell; 6. Support; 7. Upper semicircular cover; 8. Lower semicircular cover; 9. Temporary lifting lug; 901. Lifting lug; 902. Stiffening plate; 903. Screw; 904. Bottom plate; 10. Upper anchor structure; 11. Middle steel tower; 101. Middle cylinder; 12. Lower steel tower; 121. Lower cylinder; 122. Internal stiffening plate; 123. External stiffening plate; 124. Lower flange; 125. Manhole door; 13. Bridge tower joint section; 14. Wire tube; 15. T-slot platform; 16. Code plate; 17. Roller frame; 18. Cylinder tire frame; 19. Stretching equipment; 20. Ring pad pad; 21. Base; 22. Matching tooling; 23. Rotating round tube. DETAILED DESCRIPTION
[0067] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0068] In the description of the present invention, it should be noted that the terms "center", "up", "down", "left", "right", "vertical", "horizontal", "inside", "outside", etc. indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction. Therefore, they cannot be understood as limitations on the present invention.
[0069] Example 1
[0070] Figure 1 The steel tower segmentation diagram of the bicycle high-speed bridge steel tower manufacturing method provided in this embodiment is as follows:
[0071] The following steps are involved:
[0072] S1: Divide the steel tower into three parts: a lower steel tower 12, a middle steel tower 11 and an upper anchor structure 10; and process the lower steel tower 12, the middle steel tower 11 and the upper anchor structure 10 independently;
[0073] S2: Assemble the lower steel tower 12, the middle steel tower 11 and the upper anchor structure 10 to form a steel tower;
[0074] S3: installing the bridge tower joint section 13 on the formed steel tower;
[0075] S4: After the bridge tower joint section 13 is installed, the conductor pipe 14 is installed on the steel tower.
[0076] In this embodiment, the processing of the lower steel tower 12 in S1 includes the following steps:
[0077] S101: The lower steel tower 12 is composed of a lower cylinder 121, a stiffening plate, a lower flange 124, and a manhole door 125; cutting is performed according to the unfolded shape of the lower cylinder 121, and after cutting is completed, sample punching points and marks are punched at 0°, 90°, 180°, and 270° positions, and then rolled to form the lower cylinder 121, and the sample punching points and marks are left on the outer surface of the lower cylinder 121 during the rolling process; finally, the manhole door 125 notch is processed on the lower cylinder 121 using a milling machine; Figure 7 ;
[0078] S102: Cut the lower flange 124 part, and reserve a 5mm margin on one side. After cutting, use a double-sided boring and milling machine to mill the surface, drill holes, and draw the flange 0°, 90°, 180°, and 270° reference lines, and knock the sample punch points;
[0079] S103: Turn over the lower cylinder 121 to a vertical state; place the lower flange 124 on the T-slot platform 15, control the flatness between 0 and 0.5 mm, evenly arrange L-shaped code plates 16 around the flange, one end of the L-shaped code plate 16 is placed on the upper surface of the lower flange 124, and the other end is placed in the T-slot of the T-slot platform 15 and welded to the T-slot; an internal stiffener 122 is provided in the lower cylinder 121, and the lower cylinder 121 is hoisted to the lower method The upper surface of the flange 124 is matched with the sample punching points and marks on the lower cylinder 121 according to the reference line on the lower flange 124, and the reference line deviation is controlled within 0.5mm, and then the lower cylinder 121 and the lower flange 124 are welded; the external stiffening plate 123 is connected between the lower cylinder 121 and the lower flange 124; the welds between the flange and the cylinder, and the welds between the stiffening plate and the cylinder and the flange are welded according to the welding assessment process; Figure 8 As shown;
[0080] In this embodiment, it is characterized in that in said S1, the processing of the middle steel tower 11 includes the following steps:
[0081] After cutting the parts and marking the 0°90°180°270° reference lines, they are rolled up. After repeating this step to obtain multiple middle cylinders 101, according to the length of the middle steel tower 11 to be processed, the corresponding number of middle cylinders 101 are selected for team welding to complete the processing of the middle steel tower 11.
[0082] In this embodiment, the processing of the upper anchor structure 10 in S1 includes the following steps:
[0083] S111: Figure 3 , Figure 4 As shown, the upper anchoring structure 10 includes round steel 1, triangular rib plate 2, main rib plate 3, anchoring ear plate 4, shell 5, support member 6, upper semicircular cover shell 7, lower semicircular cover shell 8 and temporary lifting ear 9. The temporary lifting ear 9 includes a lifting ear 901, a stiffening plate 902, a screw 903 and a bottom plate 904. The screw 903 is directly connected to the bottom plate 904, and the lifting ear 901 and the stiffening plate 902 are installed by bolts, which can be used for later lifting and turning operations. After arriving at the site, the temporary lifting ear 9 can be removed and the lampshade shell can be installed; multiple The main rib plate 3 is evenly and vertically arranged on the side of the round steel 1, and a triangular rib plate 2 is connected between the main rib plates 3 and the main rib plates 3. A shell 5 is arranged on the outside of the triangular rib plate 2. An anchor lug plate 4 is arranged on the side of the round steel 1, which passes through the shell 5. An upper semicircular cover shell 7 and a lower semicircular cover shell 8 are arranged around the main rib plate 3 and the triangular rib plate 2. A support member 6 is connected between the upper semicircular cover shell 7 and the lower semicircular cover shell 8. A temporary lifting lug 9 is arranged on the top of the round steel 1. The round steel 1 is selected, and a three-dimensional marking machine is used to mark the reference line for the installation of each component on the round steel 1;
[0084] S112: prefabricate one of the triangular ribs 2 and the main ribs 3 on both sides of it on the tire frame as an integral component; install the integral component with the round steel 1, and check whether the straightness of the center round steel 1 is ≤3mm, otherwise, straighten it;
[0085] S113: Install anchor lug plate 4; Position and pre-install temporary lug 9, and then weld temporary lug 9 to round steel 1. The positioning size increases the welding shrinkage allowance by 0.7‰; the control tolerance of the hole on the lug plate to the center of the round steel 1 axis is 500mm ±2mm; the control tolerance of the distance from the top of the lug to the four angle lines is ±2mm; after the angle and length of the lug plate are correct, weld the lug plate and round steel 1, from the middle to both sides, and weld the lug plates on both sides symmetrically. When welding a single lug plate, first weld 1 / 2 of the large groove, then clean the root on the back and weld 1 / 3. Welding is performed based on whether the angle of the lug plate is correct. When the angle of the lug plate meets the requirements of the drawing, weld the welds on both sides of the lug symmetrically; (If the main rib plate 3 hinders welding during welding, it can be removed first and then installed after the lug plate is welded); during the welding process, pay attention to measuring and monitoring the angle of the temporary lug 9, and adjust the welding sequence in time if the angle deviation occurs; then install the remaining triangular rib plates 2 and main rib plates 3; control the margin from the main rib plate 3 to the lug plate, and control the base end of the main rib plate 3 to be flush; control the opening tolerance of the main rib plate 3 to 0~2mm; diagonal tolerance |L1-L2|≤2; if Fig.14 ;
[0086] S114: according to the length of the round steel 1, a cylindrical tire frame 18 and a roller frame 17 are respectively arranged at the ends, and the support tire frame is evenly arranged between the two roller frames 17; after the cylindrical tire frame 18 is arranged, the bottom is stuffed, the cylindrical tire frame 18 is fixed, and the space between the cylindrical tire frame 18 and the roller frame 17 is stuffed and welded firmly; the middle support tire frame is arranged in advance, and the position is adjusted according to the actual situation, arranged in the gap, and multiple groups are evenly distributed according to the actual situation; the cylindrical tire frame 18 is withdrawn before flipping to prevent interference during flipping, and rotated to the required position according to the welding position and deformation control requirements during hoisting and flipping; after hoisting and flipping , the middle support tire frame position is locked with a code plate 16 before the hook can be released; after each rotation, the overall straightness needs to be measured, and the overall straightness needs to be adjusted by adjusting the welding sequence and the fire calibration method to ensure the overall straightness; before hoisting and turning over, it is necessary to confirm that the support frame is firmly fixed to the ground to prevent the tooling from tipping over during the turning process. After turning over in place, the welds of the tooling should be checked to see if they are firm. Construction can only be carried out after confirmation of firmness; before hoisting the anchor structure, the lower end of the rib plate and the process support are welded firmly as required, and the lower end of the rib plate and the center axis are welded as required by the drawing. The weld length is ≥500mm. After passing the inspection, it is hoisted to the tire frame and prepared for welding; if Figure 15-17 In order to facilitate the turning of the round steel 1, a temporary rotating round tube 23 needs to be added to the end; Fig.18 ;
[0087] S115: First weld the weld on one side of the main reinforcement plate 3, and weld symmetrically from the middle to both sides; turn over and weld the anchor members in turn; pay attention to measuring and monitoring the angle of the temporary lifting lug 9 during welding, and adjust the welding sequence and correction in time if the angle deviation occurs; perform flaw detection as required after welding, and control the diagonal tolerance |L1-L2|≤2; control the opening tolerance of the main reinforcement plate 3 to ±2mm;
[0088] S116: Assemble the shell 5 with the reference end of the round steel 1 flush; the assembly gap between the long side of the shell 5 and the anchor lug plate 4 is 2mm. First weld the short side of the shell 5, symmetrically; then weld the welds between the anchor lug plate 4 and the shell 5, symmetrically; then weld the welds between the shell 5 and the main rib plate 3, and finally weld the butt welds of the sealing plate; weld the welds between the notch of the shell 5 and the internal rib plate, with low heat input, multi-layer and multi-pass welding, and the layer temperature is controlled below 120℃;
[0089] S117: boring the mounting holes on the anchor lug plate 4; welding first and then boring to ensure the boring accuracy;
[0090] S118: The support member 6 is prefabricated with the upper semicircular cover shell 7 and the lower semicircular cover shell 8 as components respectively. After the upper semicircular cover shell 7 and the lower semicircular cover shell 8 are bent and processed to be qualified, they are respectively connected with the corresponding support members 6 by bolts to be prefabricated as a whole component. First, the upper semicircular cover shell 7 and the corresponding support member 6 are installed, and the docking matching degree is adjusted to perform preliminary positioning. After removing the upper semicircular cover shell 7, the support member 6 is welded, and then the upper semicircular cover shell 7 is installed. Similarly, the lower semicircular cover shell 8 and the corresponding support member 6 are installed.
[0091] In this embodiment, the overall assembly process in S2 includes the following steps:
[0092] S21: Arrange the roller frame 17 according to the length of the steel tower;
[0093] S22: The middle steel tower 11 and the upper anchor structure 10 are aligned through the angle reference line, and the total length and tower straightness are measured to ensure the straightness;
[0094] S23: Align the 0°, 90°, 180°, and 270° angle reference lines of the upper and lower ports for overall assembly; at the same time, precisely control the measurement and control of the alignment of the center line of the cylinder and the center line of the anchor structure. It is also necessary to measure the overall straightness of 2mm before welding, the verticality deviation of the flange and the tower is 2mm, the diagonal deviation is controlled within 2mm, the transition section and the anchor angle axis deviation is within 2mm, the relative position deviation of the flange and the anchor plate is controlled within ±10mm, and the height deviation is controlled within ±5mm. After the base of the cylinder and the anchor structure joints and the internal weld filling are completed, the cylinder can be rotated. When the cylinder rotates, the driving needs to hold the transition section to prevent side slipping and collision during rotation to damage the components. After welding is completed, measure the overall straightness of 3mm, the verticality deviation of the flange and the tower is 3mm, the diagonal deviation is controlled within 3mm, the transition section and the anchor angle axis deviation is within 4mm, the relative position deviation of the flange and the anchor plate is controlled within ±15mm, and the height deviation is controlled within ±8mm.
[0095] In this embodiment, if Fig. 20 The bridge tower joint section 13 in S3 is a box structure, and the port is provided with a gasket. Multiple measurements are required to ensure that the deviation between the four points of the box ring and the flange angle axis is controlled within 2mm.
[0096] In this embodiment, before the installation of the bridge tower joint section 13 in S3, a port matching tooling 22 is manufactured according to the structural shape of the joint section installation product, and the product size is checked by controlling the error amount between the product outer surface and the tooling outer surface.
[0097] In this embodiment, the matching tooling 22 is consistent with the product port structure, which is shortened in the length direction and 100% restored on the docking port structure. The guide plate welded at the end of the product is adjusted to be connected with rivets and bolts when making the tooling; a lifting lug is provided on the upper part of the matching tooling 22 for easy lifting.
[0098] In this embodiment, the dimensional deviation between the length, width and height of the matching tooling 22 and the product port is controlled within ±1mm, the diagonal deviation is controlled within ±2mm, the straightness deviation is controlled within 1mm, the matching surface is flush, the flatness does not exceed 1mm, and the flatness of the remaining positions does not exceed 2mm.
[0099] In this embodiment, after the overall assembly in S4 is completed, the wire tube 14 is installed, and finally a rope is threaded in place, and a corresponding plug is made and placed at the end of the wire tube 14 for fixing the rope, thereby ensuring smooth threading of the cable at the bridge site.
[0100] The temporary lifting lug 9 bolts can be subjected to a tensile test, using a 90mm high ring pad 20 on the base 21; the tensile test is performed using the screw 903 tensile device 19, requiring a tensile load of 375KN or a pressure gauge of 307bar (pressure 30.7MPa), and the test time is maintained for 10 minutes; the screw 903 is subjected to 100% VT testing, and the weld is subjected to 100% VT testing and 100% MT testing; Figure 2 fifteen.
[0101] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the invention.
Claims
1. A method for manufacturing a bicycle high-speed bridge steel tower, characterized in that: The following steps are involved: S1: Divide the steel tower into three parts: a lower steel tower (12), a middle steel tower (11) and an upper anchor structure (10); and process the lower steel tower (12), the middle steel tower (11) and the upper anchor structure (10) independently; S2: Assemble the lower steel tower (12), the middle steel tower (11) and the upper anchor structure (10) to form a steel tower; S3: installing the bridge tower joint section (13) on the formed steel tower; S4: After the bridge tower joint section (13) is installed, the conductor pipe (14) is installed on the steel tower.
2. The method for manufacturing a bicycle high-speed bridge steel tower according to claim 1, characterized in that: The processing of the lower steel tower (12) in S1 comprises the following steps: S101: The lower steel tower (12) is composed of a lower cylinder (121), a stiffening plate, a lower flange (124), and a manhole door (125); cutting is performed according to the unfolded shape of the lower cylinder (121); after cutting, sample punching points and marks are made at positions of 0°, 90°, 180°, and 270°, and then the lower cylinder (121) is rolled to form the lower cylinder (121); during the rolling process, the sample punching points and marks are left on the outer surface of the lower cylinder (121); finally, a milling machine is used to process the notch of the manhole door (125) on the lower cylinder (121); S102: Cut the lower flange (124) part, leaving a 5mm margin on one side. After cutting, use a double-sided boring and milling machine to mill the surface, drill holes, and draw the flange 0°, 90°, 180°, 270° reference lines, and punch the sample punch points. S103: Turn the lower cylinder (121) over to a vertical position; place the lower flange (124) on the T-slot platform (15), control the flatness between 0 and 0.5 mm, evenly arrange a number of L-shaped code plates (16) around the flange, one end of the L-shaped code plate (16) is placed on the upper surface of the lower flange (124), and the other end is placed in the T-slot of the T-slot platform (15) and connected to the T-slot; the lower cylinder (124) is placed on the upper surface of the lower flange (124), and the other end is placed in the T-slot of the T-slot platform (15) and connected to the T-slot; 21) is provided with an internal stiffening plate (122), the lower cylinder (121) is hoisted to the upper surface of the lower flange (124), the reference line on the lower flange (124) is matched with the sample punching points and marks on the lower cylinder (121), and then the lower cylinder (121) and the lower flange (124) are connected; the external stiffening plate (123) is connected between the lower cylinder (121) and the lower flange (124).
3. The method for manufacturing a bicycle high-speed bridge steel tower according to claim 1, characterized in that: In S1, the processing of the middle steel tower (11) includes the following steps: After cutting parts and marking 0°90°180°270° reference lines, the parts are rolled up. After repeatedly cutting parts and marking 0°90°180°270° reference lines, the parts are rolled up. After obtaining a plurality of middle cylinders (101), a corresponding number of middle cylinders (101) are selected according to the length of the middle steel tower (11) to be processed for team welding, thereby completing the processing of the middle steel tower (11).
4. The method for manufacturing a bicycle high-speed bridge steel tower according to claim 1, characterized in that: The processing of the upper anchor structure (10) in S1 comprises the following steps: S111: The upper anchor structure (10) comprises round steel (1), triangular rib plates (2), main rib plates (3), anchor lug plates (4), a shell (5), a support member (6), an upper semicircular cover shell (7), a lower semicircular cover shell (8) and a temporary lifting lug (9), wherein a plurality of main rib plates (3) are evenly and vertically arranged on the side of the round steel (1), triangular rib plates (2) are connected between the main rib plates (3), and a shell (5) is arranged on the outside of the triangular rib plates (2). ), an anchor lug plate (4) is arranged on the side of the round steel (1), which passes through the shell (5), an upper semicircular cover shell (7) and a lower semicircular cover shell (8) are arranged around the main rib plate (3) and the triangular rib plate (2), a support member (6) is connected between the upper semicircular cover shell (7) and the lower semicircular cover shell (8), a temporary lifting lug (9) is arranged on the top of the round steel (1), the round steel (1) is selected, and a 3D marking machine is used to mark the reference lines for the installation of various components on the round steel (1); S112: prefabricate one of the triangular ribs (2) and the main ribs (3) on both sides thereof into an integral component on a tire frame; install the integral component with the round steel (1), and check whether the straightness of the central round steel (1) is less than or equal to 3 mm, otherwise, perform straightening treatment; S113: Install the anchor lug plate (4); position and pre-install the temporary lifting lug (9), and then weld the temporary lifting lug (9) to the round steel (1). During the welding process, pay attention to measuring and monitoring the angle of the temporary lifting lug (9). If there is an angle deviation, adjust the welding sequence in time; then install the remaining triangular rib plates (2) and the main rib plates (3); S114: according to the length of the round steel (1), a cylindrical tire frame (18) and a roller frame (17) are respectively arranged at the ends, and a supporting tire frame is evenly arranged between the two roller frames (17); after the cylindrical tire frame (18) is arranged, the bottom is stuffed, the cylindrical tire frame (18) is fixed, and the space between the cylindrical tire frame (18) and the roller frame (17) is stuffed and welded firmly; the middle supporting tire frame is arranged in advance, the position is adjusted according to the actual situation, and it is arranged in the gap, and multiple groups are evenly distributed according to the actual situation; the components are hoisted onto the tire frame and prepared for welding; S115: First weld the weld on one side of the main reinforcement plate (3), and weld symmetrically from the middle to both sides; turn over and weld the anchor members in turn; during the welding process, pay attention to measuring and monitoring the angle of the temporary lifting lug (9), and adjust the welding sequence and correct the angle deviation in time; S116: Assemble the shell (5) with the reference end of the round steel (1) flush; the assembly gap between the long side of the shell (5) and the anchor lug plate (4) is 2 mm, first weld the short side of the shell (5), and weld symmetrically; then weld the welds between the anchor lug plate (4) and the shell (5), and weld symmetrically; then weld the welds between the shell (5) and the main rib plate (3), and finally weld the butt welds of the sealing plate; S117: boring the mounting holes on the anchor lug plate (4); S118: The support member (6) is prefabricated with the upper semicircular cover shell (7) and the lower semicircular cover shell (8) as an assembly. After the upper semicircular cover shell (7) and the lower semicircular cover shell (8) are subjected to qualified bending processing, they are prefabricated with the corresponding support member (6) by bolt connection as an assembly as a whole. The upper semicircular cover shell (7) and the corresponding support member (6) are first installed, the docking matching degree is adjusted, and preliminary positioning is performed. After the upper semicircular cover shell (7) is removed, the support member (6) is welded, and then the upper semicircular cover shell (7) is installed. Similarly, the lower semicircular cover shell (8) and the corresponding support member (6) are installed.
5. The method for manufacturing a bicycle high-speed bridge steel tower according to claim 1, characterized in that: The overall assembly process in S2 includes the following steps: S21: Arrange the roller frame (17) according to the length of the steel tower; S22: The middle steel tower (11) and the upper anchor structure (10) are aligned through the angle reference line, and the total length and tower straightness are measured and ensured; S23: Align the 0°, 90°, 180°, and 270° angle reference lines of the upper and lower ports for overall assembly; at the same time, precisely control the alignment of the center line of the cylinder and the center line of the anchor structure by measurement.
6. The method for manufacturing a bicycle high-speed bridge steel tower according to claim 1, characterized in that: The bridge tower combination section (13) in S3 is a box structure, and a liner is provided at the port.
7. The method for manufacturing a bicycle high-speed bridge steel tower according to claim 1, characterized in that: Before installing the bridge tower joint section (13) in S3, a port matching tooling (22) is manufactured according to the structural shape of the joint section installation product, and the product dimensions are checked by controlling the error amount between the product outer surface and the tooling outer surface.
8. The method for manufacturing a bicycle high-speed bridge steel tower according to claim 7, characterized in that: The matching tooling (22) is consistent with the product port structure, is shortened in the length direction, and is 100% restored on the docking port structure. The guide plate welded at the end of the product is adjusted to be connected with a punch and a bolt when the tooling is manufactured; and a lifting lug is provided on the upper part of the matching tooling (22) for easy lifting.
9. The method for manufacturing a bicycle high-speed bridge steel tower according to claim 8, characterized in that: The dimensional deviation of the length, width and height of the matching tooling (22) and the product port is controlled within ±1mm, the diagonal deviation is controlled within ±2mm, the straightness deviation is controlled within 1mm, the matching surface is flush, the flatness does not exceed 1mm, and the flatness of other positions does not exceed 2mm.
10. The method for manufacturing a bicycle high-speed bridge steel tower according to claim 1, characterized in that: After the overall assembly of S4 is completed, the wire tube (14) is installed, and finally a rope is threaded in reserve, and a corresponding plug is made and placed at the end of the wire tube (14) for fixing the rope, so as to ensure smooth threading of the cable at the bridge site.
Citation Information
Patent Citations
Construction method of curved-surface arc-shaped main towers of cross-river single-cable suspension bridge
CN104695333A
Manufacturing method of multi-direction four-anchor-head integral steel anchor beam
CN107253026A
Steel tower manufacturing process, cable-stayed bridge construction process, steel tower and cable-stayed bridge
CN116575333A
Steel tower for a wind turbine
DE20321855U1
Floating tower body raising equipment and method thereof
KR1020160137126A