Power distribution network recovery control method and system with uncertain event adaptive capacity

By obtaining and analyzing the power supply and load information of the distribution network, and dynamically adjusting the recovery plan and sub-area division, the problem of responding to uncertain events in the distribution network restoration control is solved, and the rapid, safe and economical restoration of power supply of the distribution network is achieved.

CN118868002APending Publication Date: 2024-10-29STATE GRID ELECTRIC POWER RES INST +3
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310478903.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-04-28
Publication Date
2024-10-29

AI Technical Summary

Technical Problem

Existing distribution network restoration control methods are difficult to effectively deal with uncertain events, leading to uncertainty and mismatch in the restoration process, affecting the accuracy and efficiency of restoration decision-making and execution.

Method used

By obtaining the power supply and load operation information of the target distribution network, determine the power outage scenario and equipment status, dynamically adjust the recovery plan, optimize the division of global and local recovery sub-areas, judge in real time whether to update the recovery plan, optimize the operation mode of the live area, and conduct online Global recovery sub-area division and concurrent recovery plan optimization.

Benefits of technology

It improves the ability to respond to uncertain events during the restoration process of the distribution network, reduces the impact of uncertain events on the restoration process, ensures fast, safe, and economical power supply restoration, and increases restoration benefits.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118868002A_ABST
    Figure CN118868002A_ABST
Patent Text Reader

Abstract

The invention discloses a power distribution network recovery control method and system with uncertain event adaptability, and the method comprises the steps: determining the operation states of a plant station and equipment in a target power distribution network according to the obtained operation information, and determining the power failure scene information; determining whether the recovery scheme of the global power distribution network or the recovery scheme of the local power distribution network needs to be started, ended or updated and optimized and whether the execution of the recovery scheme of the global power distribution network or the recovery scheme of the local power distribution network needs to be suspended; carrying out operation mode optimization adjustment on the electrified area of which the power supply is restored of the target power distribution network; carrying out online global recovery sub-region division on the target power distribution network; and generating a recovery scheme of each online global recovery sub-region, and optimizing the recovery schemes to obtain a final recovery scheme. The method has the advantages that the recovery sub-region is adaptively adjusted according to the uncertain event, the optimization scheme is updated, the influence of the uncertain event on the recovery process is reduced, rapid, safe and economical power supply recovery of the power distribution network is guaranteed, and the recovery income is effectively improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a distribution network restoration control method and system with uncertain event adaptability, belonging to the technical field of power system restoration control. Background Art

[0002] The purpose of distribution network restoration control is to restore power supply quickly, safely and economically after a power outage, reduce load power outage losses, and avoid new restoration risks introduced by restoration measures. Rapid restoration of large-scale power outages requires comprehensive consideration of the transmission power of the transmission network at each transmission and distribution interface bus, the internal power supply of the distribution network and the microgrid, forming multiple independent restoration sub-areas for parallel restoration and timely parallelization to quickly expand the scope of power supply restoration, and during this period, it is necessary to deal with various uncertain events.

[0003] Matching the available power supply and the target to be restored of the power grid to be restored by global restoration sub-area division will affect the restoration decision space and the global load restoration value. Most existing studies optimize restoration sub-areas and restoration plans based on a single power outage scenario. The time-varying nature of the distribution network load capacity, load unit restoration value, and the transmission network's power delivery plan under each transmission and distribution interface bus, as well as the uncertainty of the restoration process, may lead to a mismatch between the available power supply, distribution network, and load demand in the power outage scenario, and there is room for optimization and adjustment. Based on the real-time power outage scenario, the online optimization of the system operation mode can improve the matching degree of restoration supply and demand, but there are currently few related research methods.

[0004] Regarding various uncertain events in the recovery process, there are currently few studies that consider uncertain events in the distribution network recovery process, but they do not distinguish the characteristics and impacts of various types of uncertain events. Uncertain events in the recovery process may trigger the operation of other safety control assurance systems. This type of control is collectively referred to as external system safety control in the recovery process in this paper. The control imposed by such external systems will obviously affect the recovery control process, but usually only its results are reflected in the initial conditions of the recovery control. The consequences and impacts of protection control are not taken into account in the recovery decision-making and execution process, which seriously affects the accurate evaluation and execution process of the recovery plan. Summary of the invention

[0005] The technical problem to be solved by the present invention is to overcome the defects of the prior art and provide a distribution network recovery control method and system with the ability to adapt to uncertain events.

[0006] In order to solve the above technical problems, the present invention provides a distribution network restoration control method with the ability to adapt to uncertain events, which is characterized by comprising:

[0007] Obtain the operation information of the target distribution network power supply, load and primary equipment, as well as the execution information of the recovery control measures;

[0008] Determine the operating status of the plants and equipment in the target distribution network according to the operating information, and determine the power outage scenario information according to the operating status of the plants and equipment in the target distribution network;

[0009] Determine whether it is necessary to start, end or update the restoration plan of the global distribution network or the restoration plan of the local distribution network and whether it is necessary to suspend the execution of the restoration plan of the global distribution network or the restoration plan of the local distribution network according to the operation information and the execution information;

[0010] According to the operation information, power outage scenario information and judgment information, the operation mode of the energized area of ​​the target distribution network to which power has been restored is optimized and adjusted;

[0011] Dividing the target distribution network into online global recovery sub-areas according to the operation information, execution information, power outage scenario information and operation mode optimization adjustment results;

[0012] A recovery plan for each online global recovery sub-area is generated according to the result of the online global recovery sub-area division, and the recovery plan for each online global recovery sub-area is optimized to obtain a final recovery plan for each online global recovery sub-area.

[0013] Furthermore, the recovery scheme of each online global recovery sub-region is optimized to obtain a final recovery scheme of each online global recovery sub-region, including:

[0014] Determine candidate boundary node pairs for concurrent parallel operation according to the recovery plan of each online global recovery sub-area;

[0015] The concurrent recovery plan of each recovery sub-region is optimized according to the candidate boundary node pairs running in parallel at the same time, the running information and the execution information, so as to obtain the final recovery plan of each online global recovery sub-region.

[0016] Furthermore, the acquisition of execution information of the recovery control measures includes: acquiring switch operation information, state information before / after switch operation, and real-time operation state change information of other primary devices except switches from the energy management system of the target distribution network.

[0017] Furthermore, the determining of the power outage scenario information according to the operating status of the plants and equipment in the target distribution network includes:

[0018] The device fault information and the real-time topological structure of the distribution network are obtained from the energy management system of the target distribution network, the state of the target distribution network is identified according to the device fault situation and the real-time topological structure of the distribution network, and the target distribution network is divided into a live area, a quasi-live area, an isolated power outage area and a non-isolated power outage area according to the result of the state identification.

[0019] Further, the judgment information of determining whether it is necessary to start, end or update the restoration plan of the global distribution network or the restoration plan of the local distribution network and whether it is necessary to suspend the execution of the restoration plan of the global distribution network or the restoration plan of the local distribution network according to the operation information and the execution information includes:

[0020] (1) Determine whether it is the first startup after the power outage based on the operation information and execution information. If it is the first startup, perform online optimization of the global operation mode of the upper-level global optimization. Otherwise, read the most recently generated and executed global recovery plan P c and specific recovery measures c , go to (2);

[0021] (2) judging whether the target distribution network restoration process is completed according to the operation information and the power outage scenario information; if so, performing online optimization of the global operation mode of the upper-layer global optimization; otherwise, proceeding to (3);

[0022] (3) If other monitoring and protection control systems in any restoration sub-area of ​​the target distribution network are performing or planning to perform control, the online optimization of the global operation mode of the upper-level global optimization is suspended; otherwise, the process goes to (4) to enter the restoration process control of each restoration sub-area;

[0023] (4) judging whether the recovery process operation of each recovery sub-area is successfully executed according to the operation information and the execution information; if the operation is successfully executed, proceeding to (5); otherwise, proceeding to (6);

[0024] (5) Determine whether to continue executing plan P based on the operation information, execution information, and execution success information c , if so, then according to P c Continue the recovery process of the recovery sub-area, otherwise go to (6); continue to execute P c The following conditions must be met at the same time:

[0025] P c There are subsequent operations in the process and the target device of the operation is in a recoverable state; no new power-off nodes appear in the powered area; compared with P c At the time of generation, the online operation risk of the current energized area and the recovery risk change value of the power transmission path do not exceed the set threshold; the maximum difference between the current recovery target and the estimated recovery value of other targets to be restored in the divided recovery sub-area does not exceed the set threshold; the difference between the original planned power transmission or receiving power of the transmission network and the actual execution does not exceed the set threshold;

[0026] (6) Obtain the most recently generated set of other feasible recovery solutions P Σ,b , from the set of other feasible recovery solutions P Σ,bIt searches whether there is a feasible alternative solution. If so, it switches to the alternative solution and executes the recovery measures of the recovery sub-area corresponding to the alternative solution. Otherwise, it re-performs the online optimization of the global operation mode of the upper-level global optimization.

[0027] Furthermore, the global operation mode of the upper-level global optimization is optimized online, including:

[0028] The live area of ​​the distribution network is defined as a power supply tree. The available power capacity and its distribution are adjusted by optimizing the live load transfer plan, and a set of anticipated power outage scenarios that take into account the optimization and adjustment of the distribution network operation mode are generated. The set of anticipated power outage scenarios includes real-time power outage scenarios and a set of anticipated initial power outage scenarios generated by deducing each candidate live load transfer plan based on the real-time power outage scenario.

[0029] Furthermore, dividing the target distribution network into online global recovery sub-areas according to the operation information, execution information, power outage scenario information and operation mode optimization adjustment results includes:

[0030] Mark the original recovery sub-area where each device is located and its recovery status, including normal operating devices, recovering devices, planned recovery devices, remaining devices to be recovered, and unrecoverable devices; the planned recovery devices refer to devices that can continue to be recovered according to the original plan, and the remaining devices to be recovered refer to devices whose recovery plans need to be optimized;

[0031] Performing global recovery sub-area division for all scenarios in the expected initial power outage scenario set, including: in any expected initial power outage scenario, considering power balance, voltage level, number of switch operations, and number of voltage conversions, determining the power supply range of each energized node, and determining the recovery sub-area to which each normal operating node, recovering node, and planned recovery node belongs, wherein the node refers to a collection of several busbar devices connected by closing switches in the same distribution network plant;

[0032] The remaining power-off equipment to be restored are divided into restoration sub-areas to which the powered nodes closest to them can be powered, and the result of the global restoration sub-area division of the upper-layer global optimization is obtained.

[0033] Furthermore, the concurrent recovery scheme optimization for each recovery sub-area according to the candidate boundary node pairs running in parallel at the same time and the running information and the execution information includes:

[0034] For any recovery sub-area, first screen and sort the recovery targets in the recovery sub-area, optimize the recovery path of each recovery target, and generate a table of alternative recovery plans with a certain breadth in the recovery sub-area. Generate a new simulated power outage scenario by deducing any recovery plan in the table of alternative recovery plans, repeat the above breadth optimization process, and obtain a table of alternative recovery plans with a certain depth in the recovery sub-area. Then send the table of recovery plans to the global recovery sub-area for parallel decision-making.

[0035] A distribution network restoration control system with the ability to adapt to uncertain events, comprising:

[0036] An acquisition module is used to obtain the operation information of the target distribution network power supply, load and primary equipment, as well as the execution information of the recovery control measures;

[0037] A first determination module is used to determine the operating status of the plant and equipment in the target distribution network according to the operating information, and determine the power outage scenario information according to the operating status of the plant and equipment in the target distribution network;

[0038] A judgment module, used to determine whether it is necessary to start, end or update the restoration plan of the global distribution network or the restoration plan of the local distribution network according to the operation information and the execution information, and whether it is necessary to suspend the execution of the restoration plan of the global distribution network or the restoration plan of the local distribution network;

[0039] An optimization module, configured to optimize and adjust the operation mode of the energized area of ​​the target distribution network where power supply has been restored according to the operation information, power outage scenario information, and judgment information;

[0040] A division module, used for dividing the target distribution network into online global recovery sub-areas according to the operation information, execution information, power outage scenario information and operation mode optimization adjustment results;

[0041] The second determination module is used to generate a recovery plan for each online global recovery sub-area according to the result of the online global recovery sub-area division, optimize the recovery plan for each online global recovery sub-area, and obtain a final recovery plan for each online global recovery sub-area.

[0042] Furthermore, the second determining module is used to

[0043] Determine candidate boundary node pairs for concurrent parallel operation according to the recovery plan of each online global recovery sub-area;

[0044] The concurrent recovery plan of each recovery sub-region is optimized according to the candidate boundary node pairs running in parallel at the same time, the running information and the execution information, so as to obtain the final recovery plan of each online global recovery sub-region.

[0045] Furthermore, the acquisition module is used to

[0046] The switch operation information, the status information before and after the switch operation, and the real-time operation status change information of other primary equipment except the switch are obtained from the energy management system of the target distribution network.

[0047] Furthermore, the first determining module is used to

[0048] The device fault information and the real-time topological structure of the distribution network are obtained from the energy management system of the target distribution network, the state of the target distribution network is identified according to the device fault situation and the real-time topological structure of the distribution network, and the target distribution network is divided into a live area, a quasi-live area, an isolated power outage area and a non-isolated power outage area according to the result of the state identification.

[0049] Furthermore, the judgment module is used to

[0050] (1) Determine whether it is the first startup after the power outage based on the operation information and execution information. If it is the first startup, perform online optimization of the global operation mode of the upper-level global optimization. Otherwise, read the most recently generated and executed global recovery plan P c and specific recovery measures c , go to (2);

[0051] (2) judging whether the target distribution network restoration process is completed according to the operation information and the power outage scenario information; if so, performing online optimization of the global operation mode of the upper-layer global optimization; otherwise, proceeding to (3);

[0052] (3) If other monitoring and protection control systems in any restoration sub-area of ​​the target distribution network are performing or planning to perform control, the online optimization of the global operation mode of the upper-level global optimization is suspended; otherwise, the process goes to (4) to enter the restoration process control of each restoration sub-area;

[0053] (4) judging whether the recovery process operation of each recovery sub-area is successfully executed according to the operation information and the execution information; if the operation is successfully executed, proceeding to (5); otherwise, proceeding to (6);

[0054] (5) Determine whether to continue executing plan P based on the operation information, execution information, and execution success information c , if so, then according to P c Continue the recovery process of the recovery sub-area, otherwise go to (6); continue to execute P c The following conditions must be met at the same time:

[0055] P c There are subsequent operations in the process and the target device of the operation is in a recoverable state; no new power-off nodes appear in the powered area; compared with P cAt the time of generation, the online operation risk of the current energized area and the recovery risk change value of the power transmission path do not exceed the set threshold; the maximum difference between the current recovery target and the estimated recovery value of other targets to be restored in the divided recovery sub-area does not exceed the set threshold; the difference between the original planned power transmission or receiving power of the transmission network and the actual execution does not exceed the set threshold;

[0056] (6) Obtain the most recently generated set of other feasible recovery solutions P Σ,b , from the set of other feasible recovery solutions P Σ,b It searches whether there is a feasible alternative solution. If so, it switches to the alternative solution and executes the recovery measures of the recovery sub-area corresponding to the alternative solution. Otherwise, it re-performs the online optimization of the global operation mode of the upper-level global optimization.

[0057] Furthermore, the judgment module is used to control the online optimization of the global operation mode of the upper-level global optimization, including:

[0058] The live area of ​​the distribution network is defined as a power supply tree. The available power capacity and its distribution are adjusted by optimizing the live load transfer plan, and a set of anticipated power outage scenarios that take into account the optimization and adjustment of the distribution network operation mode are generated. The set of anticipated power outage scenarios includes real-time power outage scenarios and a set of anticipated initial power outage scenarios generated by deducing each candidate live load transfer plan based on the real-time power outage scenario.

[0059] Furthermore, the partitioning module is used to

[0060] Mark the original recovery sub-area where each device is located and its recovery status, including normal operating devices, recovering devices, planned recovery devices, remaining devices to be recovered, and unrecoverable devices; the planned recovery devices refer to devices that can continue to be recovered according to the original plan, and the remaining devices to be recovered refer to devices whose recovery plans need to be optimized;

[0061] Performing global recovery sub-area division for all scenarios in the expected initial power outage scenario set, including: in any expected initial power outage scenario, considering power balance, voltage level, number of switch operations, and number of voltage conversions, determining the power supply range of each energized node, and determining the recovery sub-area to which each normal operating node, recovering node, and planned recovery node belongs, wherein the node refers to a collection of several busbar devices connected by closing switches in the same distribution network plant;

[0062] The remaining power-off equipment to be restored are divided into restoration sub-areas to which the powered nodes closest to them can be powered, and the result of the global restoration sub-area division of the upper-layer global optimization is obtained.

[0063] Furthermore, the second determining module is used to

[0064] For any recovery sub-area, first screen and sort the recovery targets in the recovery sub-area, optimize the recovery path of each recovery target, and generate a table of alternative recovery plans with a certain breadth in the recovery sub-area. Generate a new simulated power outage scenario by deducing any recovery plan in the table of alternative recovery plans, repeat the above breadth optimization process, and obtain a table of alternative recovery plans with a certain depth in the recovery sub-area. Then send the table of recovery plans to the global recovery sub-area for parallel decision-making.

[0065] A computer-readable storage medium storing one or more programs, characterized in that the one or more programs include instructions, which, when executed by a computing device, cause the computing device to perform any of the methods described.

[0066] A computing device comprising:

[0067] One or more processors, a memory, and one or more programs, wherein the one or more programs are stored in the memory and configured to be executed by the one or more processors, and the one or more programs include instructions for executing any of the methods described.

[0068] The beneficial effects achieved by the present invention are:

[0069] In view of the high-dimensional uncertainty of the recovery process, the present invention pre-adjusts the grid operation mode online and dynamically divides the grid into recovery sub-areas based on the grid operation information, power outage scenario information and the results of the execution of recovery measures. Each recovery sub-area optimizes the recovery plan in parallel, comprehensively considers the operation information and the execution information of the recovery measures, and determines online whether the global or local recovery plan needs to be updated. This enables rapid response to uncertain events in the distribution network recovery process, such as equipment failure, closing failure, and other safety and stability controls. According to the uncertain events, the recovery sub-areas are adaptively adjusted and the optimization plan is updated, reducing the impact of uncertain events on the recovery process, ensuring that the distribution network can quickly, safely and economically restore power supply, and effectively improving the recovery benefits. BRIEF DESCRIPTION OF THE DRAWINGS

[0070] Figure 1 It is a schematic diagram of the process of the present invention;

[0071] Figure 2 It is a distribution network online restoration control optimization decision flow chart;

[0072] Figure 3 It is an online control flow chart of the global recovery process. DETAILED DESCRIPTION

[0073] The present invention will be further described below in conjunction with the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solution of the present invention, and cannot be used to limit the protection scope of the present invention.

[0074] like Figure 1 As shown, the present invention aims at various uncertain events in the distribution network restoration process, comprehensively considers the expected restoration value, expected restoration cost and restoration risk of the overall restoration plan to establish a distribution network restoration control optimization model, and introduces the control costs of external control systems such as prevention, emergency and correction, and includes them in the control costs of each link of the restoration decision, thereby providing a distribution network restoration control method with the ability to adapt to uncertain events, including:

[0075] Obtain the operation information of the target distribution network power supply, load and primary equipment, as well as the execution information of the recovery control measures;

[0076] Determine the operating status of the plants and equipment in the target distribution network according to the operating information, and determine the power outage scenario information according to the operating status of the plants and equipment in the target distribution network;

[0077] Determine whether it is necessary to start, end or update the restoration plan of the global distribution network or the restoration plan of the local distribution network and whether it is necessary to suspend the execution of the restoration plan of the global distribution network or the restoration plan of the local distribution network according to the operation information and the execution information;

[0078] According to the operation information, power outage scenario information and judgment information, optimizing and adjusting the operation mode of the energized area of ​​the target distribution network where power supply has been restored;

[0079] Dividing the target distribution network into online global recovery sub-areas according to the operation information, execution information, power outage scenario information and operation mode optimization adjustment results;

[0080] A recovery plan for each online global recovery sub-area is generated according to the result of the online global recovery sub-area division, and the recovery plan for each online global recovery sub-area is optimized to obtain a final recovery plan for each online global recovery sub-area.

[0081] like Figure 2 As shown, the specific steps include:

[0082] Step 1: Conduct real-time information exchange with the distribution management system and other control systems of the target distribution network online to obtain data information on the power supply, load and equipment of the target distribution network, classify and manage various types of data information, and monitor the effectiveness of recovery control measures.

[0083] Analyze the real-time operating status, load status, recovery progress, measurement and control conditions, fault probability and other information of distribution network equipment. In order to coordinate global resources, it is necessary to timely lock the distributed automatic power supply recovery equipment or system based on local information, such as automatic reclosing, standby automatic switching and feeder automation. Classify and collect information on various available power sources of the distribution network, among which the available power sources of the distribution network include power support of adjacent external transmission and distribution networks, black start units of the distribution network, and live areas that operate independently after accidents. The collected power information involves its operating status, available power, start-up conditions, networking capabilities, etc. Available power is the space for available power sources to increase power generation output, including the power transmission plan of the transmission network at each interface bus, the maximum additional power generation space of the power sources that have been restored and are being restored in the distribution network, among which the intermittent power sources of the distribution network need to predict their power generation capacity. Monitor the load recovery progress of each load node online, and collect the distribution network load and adjacent external transmission and distribution network power demand information. The distribution network load information includes the power demand of the restored and to-be-restored loads, the unit recovery value, etc. The distribution network load information is obtained directly from the end user.

[0084] Step 2: The upper-level global distribution network system status identification requires online identification of the recovery status of each device, including normal operation, recovery, planned recovery, remaining to be recovered, and unable to be recovered. The planned recovery device refers to the device that can continue to be recovered according to the original plan, while the remaining equipment to be recovered needs to optimize its recovery plan. Further analyze the power outage scenario based on the real-time information obtained online, identify the operating status of the plant and equipment in the target distribution network, and analyze the distribution network connectivity and connectivity online based on the node-branch association matrix according to the equipment failure and operating status, and identify the energized area, isolated power outage area, and non-isolated power outage area.

[0085] The connectivity status and connectivity of the distribution network are obtained by analyzing the reachability matrix. The reachability matrix can be obtained by summing up the powers of the adjacency matrix. Assume that an undirected graph is denoted by G = (V, E), where V = {v1, v2, …, v n} is a vertex set, E = {e1,e2,…,e g} is the edge set; use b ij Describe the vertex v i With vertex v j Whether there is an edge between them, the value is a logical variable. ij = 0 means it does not exist. ij =1 indicates existence; using matrix B = B(G) = (b ij ) n×n Represents the relationship between all the edges of the vertex set, and the matrix B is defined as the adjacency matrix of the undirected graph. Whether there is a connection path between two nodes is described as whether the two nodes are reachable, and the matrix describing the reachability relationship of all nodes in the graph is called the reachability matrix. That is, suppose the reachability matrix D(di,j ) is an n-order square matrix, if d i,j =1, then from v i You can reach v j , otherwise, if d i,j =0 then v i and v j Unreachable.

[0086] Assume the adjacency matrix B is the mth power: B m =B×B m-1 . B 2 =(b 2 i,j ),in:

[0087]

[0088] In the above formula, the multiplication and addition are logical multiplication and logical AND; b 2 i,j The value of is a logical variable. If b i,k ×b k,j =1, it means that there is at least one connected path between node i and node j through node k. 2 i,j =1, it means there is at least one connecting path between node i and node j.

[0089] The above method first identifies each live zone based on the operating status of the equipment between each live node and the live power supply node, and identifies the quasi-live zone based on the operating status between the power-off node and the power-off node with self-start capability; nodes that have no connectable equipment to any live zone or quasi-live zone are identified as belonging to an isolated power-off zone; nodes that have connectable equipment to at least one live zone or quasi-live zone are identified as belonging to a non-isolated power-off zone.

[0090] Step 3: Online control of the global recovery process of the upper-level global optimization Online judgment of whether it is necessary to start or update the global distribution network recovery plan optimization, and coordinate the control process of the recovery control with other external control systems of the distribution network. The online control logic of the global recovery process is shown in the attached figure. Figure 3 As shown, the explanation is as follows:

[0091] (1) Determine whether the recovery decision is the first start after the power outage. If it is the first start, enter the global operation mode online optimization step of the upper-level global optimization, otherwise go to (2).

[0092] (2) Determine whether the distribution network recovery process is completed. If it is completed, send the recovery completion signal to the global operation mode online optimization of the upper-level global optimization, otherwise go to (3).

[0093] (3) If other monitoring and protection control systems are currently controlling or planning to control a certain recovery sub-area of ​​the distribution network, the recovery plan of the recovery decision system will be suspended, and a signal of "suspending the recovery operation of the relevant sub-area and waiting" will be sent to the online optimization of the global operation mode of the upper-level global optimization; otherwise, go to (4) and enter the recovery process control of each recovery sub-area.

[0094] (4) Determine whether the current recovery operation is executed successfully. If the operation is executed successfully, go to (5), otherwise go to (6).

[0095] (5) Determine whether to continue to execute the original recovery plan. If so, the recovery signal will continue to be sent to the global operation mode online optimization, otherwise go to (6). Continuing to execute the original recovery plan requires the following conditions to be met at the same time: there are subsequent operations in the original plan and the relevant equipment can still be restored; no new power outage nodes appear in the energized area; compared with the time when the plan was generated, the change value of the online operation risk of the current energized area and the recovery risk of the power transmission path does not exceed the set threshold; the maximum difference between the current recovery target and the estimated recovery value of other targets to be restored in the divided recovery sub-area does not exceed the set threshold; the difference between the original planned power transmission or receiving power of the transmission network and the actual implementation situation does not exceed the set threshold.

[0096] (6) Determine whether there is a feasible alternative solution. If so, send the instruction to switch to the alternative solution and execute it to the global operation mode online optimization of the upper-level global optimization; otherwise, send the instruction to re-optimize the recovery solution.

[0097] Step 4: Through the online optimization of the global operation mode of the upper-level global optimization, the operation mode of the energized area of ​​the distribution network where power supply has been restored is optimized and adjusted, providing a more reasonable decision-making space for the subsequent global recovery sub-area division and the optimization of the parallel recovery plan of the recovery sub-area, thereby reducing the global recovery cost.

[0098] Considering that the distribution network usually has a radial operation structure, the time-varying nature of the distribution network load capacity, load unit recovery value, and the transmission network's power transmission plan under each interface bus, as well as the uncertainty of the recovery process, may lead to a mismatch between the available power supply, grid structure, and the load to be restored in the power outage scenario. The live area of ​​the distribution network is defined as a power supply tree. The available power supply capacity and its distribution are adjusted by optimizing the live load transfer scheme to generate a set of expected power outage scenarios that take into account the optimization and adjustment of the distribution network operation mode, including real-time power outage scenarios and a set of expected initial power outage scenarios generated by deducing each candidate live load transfer scheme based on the real-time power outage scenario.

[0099] Step 5: The upper-level optimization continues to divide all scenarios in the expected initial power outage scenario set generated in step 4 into global recovery sub-areas one by one. The method for dividing the global recovery sub-areas in a single power outage scenario is as follows:

[0100] (1) Comprehensively consider the current maximum capacity of all power sources connected to each live area, the number of switch operations on the power transmission path, and other factors to determine the power supply range of each live area, and accordingly determine the initial recovery sub-area division of each live area. The current maximum capacity of the power source is determined by the maximum value of the power transmission plan under the interface bus and the rated capacity of the non-intermittent power source of the distribution network.

[0101] (2) All normally operating nodes are assigned to their original recovery sub-areas. Nodes that are recovering or scheduled to recover will no longer change their assigned recovery sub-areas.

[0102] (3) For other power-off nodes to be restored, they are divided into restoration sub-areas in turn, where the live nodes that can supply power to them and are closest to them are located. The power-off node to be restored is used as the starting point for breadth-first search of the live area or quasi-live area. If the shortest path obtained by the search does not pass through other nodes belonging to other live areas, then the power-off node to be restored belongs to the searched live area or quasi-live area. When the number of searched live areas or quasi-live areas is greater than 1, the distances from the power-off node to be restored to each searched live area or quasi-live area are compared, and the power-off node to be restored is assigned to the live area or quasi-live area with the shortest distance.

[0103] (4) If the number of live areas or quasi-live areas with the shortest distance searched from the power outage node to be restored is greater than 1, compare the remaining available capacities of the two restoration sub-areas where the live areas are located. If the power outage node to be restored is a substation, the substation is assigned to the restoration sub-area where the live area with the larger remaining available capacity is located. If the power outage node to be restored is a power plant, the power plant node is assigned to the restoration sub-area where the live area with the smaller remaining available capacity is located. The remaining available capacity calculation formula of the restoration sub-area is (P GΣ -P LΣ ), where P GΣ It is the sum of the available spinning reserve capacity and the rated capacity of the non-grid-connected units in the recovery sub-area, including the capacity of the units being recovered, the capacity of the units planned to be recovered and the units to be recovered; P LΣ It is the load to be restored in the restoration sub-area.

[0104] Step 6: The upper-level global optimization further makes a global recovery sub-area parallel decision based on the recovery sub-area division results in step 5. Recommend alternative boundary node pairs for paralleling between different recovery sub-areas, and dynamically modify them during the recovery process. After obtaining the table of alternative recovery plans for each recovery sub-area sent by the recovery sub-area optimization layer, check the recovery sub-area parallel conditions, including whether the recovery sub-areas can be paralleled at the same time, and whether the paralleled recovery sub-areas can operate safely and stably. Then optimize the recovery sub-area parallel plan, including the plan of two recovery sub-areas transmitting power to restore their boundary nodes separately and the plan of two boundary nodes being paralleled through branches.

[0105] Step 7: The lower-level concurrent optimization performs parallel recovery plan optimization on each recovery sub-area. The recovery plan optimization process for a recovery sub-area is as follows:

[0106] First, uniformly screen and sort the targets to be restored in the restoration sub-area, where the targets to be restored refer to the units or substation buses that are yet to be restored. The restoration value V of the units to be restored that need to start power is evaluated according to formula (2): G .

[0107]

[0108]

[0109] Where η sys , η part are the recovery demand satisfaction rates of the system and the recovery sub-area, that is, the ratio of the sum of the spinning reserve and recovery unit capacities to the load to be restored; V GP is the estimated value of the load recovery value that can be generated after the unit obtains the starting power and restores the grid, which is obtained by formula (3), where the load recovery value of the conventional power source is obtained according to its rated power, while the value of the intermittent power source is evaluated according to its predicted lower limit of output in the future period; t s is the load recovery time; t e is the preset evaluation end time; α L (t), ΔP L (t) are the unit recovery value and active capacity of the restored load at time t respectively; C GP The cost of restoring the unit.

[0110] The restoration value V of the substation busbar to be restored B Evaluate according to formula (4).

[0111]

[0112] Where V BL is the estimated value of the load restoration value of the bus, that is, assuming that all the power of the restoration sub-area is used to restore the bus itself and the maximum restoration value that can be generated by the load in the restoration sub-area where it is located; C BL is the cost of restoring the load under the bus; V GN It is the estimated load recovery value that can be obtained after the units on the substation busbar that do not need to start power are connected to the grid. For the nodes to be restored that are connected to the distribution network units, when they are included in the restoration sub-area that does not meet the networking conditions, the units cannot be restored, so their estimated restoration value is 0; if they are included in the restoration sub-area that meets the networking conditions, their estimated restoration value is the estimated value of the load restoration value that can be generated after the units obtain the startup power to restore and connect to the grid.

[0113] Secondly, optimize the recovery path of the target to be restored in the recovery sub-area, generate a table of alternative recovery plans of a certain width in the recovery sub-area, and evaluate the risk and value of each plan, where the risk takes into account the control cost of other monitoring and protection control systems. When optimizing the k-th step recovery plan, for a certain recovery path of the recovery target, perform normal operation verification and evaluation according to the following steps:

[0114] (1) Based on the online scenario, the normal operation verification is performed on the recovery operation. For the operation that fails the verification, the optimal preventive control measures and costs that enable the operation to pass the verification are optimized, and the update scenario is further deduced.

[0115] (2) Based on the latest scenario, the results of the recovery operation are sampled: if the operation fails, it is necessary to generate emergency or corrective control measures and costs, deduce the update scenario, and adaptively switch to the backup path to simulate the subsequent recovery control of the recovery target; if the operation is successful, the update scenario is directly deduced.

[0116] (3) Repeat (1)-(2) until the recovery process simulation of the path is completed, and then evaluate the overall recovery value V of the deterministic process i. k,i , recovery cost C k,i and protection control cost E k,i Among them, I k,i Including unit recovery value and load recovery value.

[0117] (4) Repeat (1)-(3) to generate several deterministic recovery processes, and evaluate the expected recovery value V of the path according to equations (5)-(7) respectively. k , expected recovery cost C k and recovery risk R k

[0118]

[0119]

[0120]

[0121] Where N P The total number of deterministic recovery processes generated for the simulated sampling; k = 1, 2, ..., N K It is the step number in the recovery plan. A step plan is a series of operations taken to restore a unit or load.

[0122] Next, a new simulated power outage scenario is generated by deducing any restoration plan in the alternative restoration plan table, and the above breadth optimization process is repeated to obtain an alternative restoration plan table of a certain depth in the restoration sub-area.

[0123] Finally, the overall restoration scheme of each restoration sub-area is optimized with the goal of minimizing the expected restoration cost as shown in formula (8).

[0124]

[0125] Where N K is the total number of steps of the recovery scheme; x k is the system state variable at step k; u k is the control variable of step k; p k is the disturbance variable of the kth step, reflecting the high-dimensional uncertainty in the power outage scenario, external environment, and recovery process.

[0126] Each recovery sub-region concurrently optimizes its own alternative recovery solution table and simultaneously uploads the optimization results to step 6 for parallel decision making.

[0127] Correspondingly, the present invention also provides a distribution network restoration control system with the ability to adapt to uncertain events, comprising:

[0128] An acquisition module is used to obtain the operation information of the target distribution network power supply, load and primary equipment, as well as the execution information of the recovery control measures;

[0129] A first determination module is used to determine the operating status of the plant and equipment in the target distribution network according to the operating information, and determine the power outage scenario information according to the operating status of the plant and equipment in the target distribution network;

[0130] A judgment module, used to determine whether it is necessary to start, end or update the restoration plan of the global distribution network or the restoration plan of the local distribution network according to the operation information and the execution information, and whether it is necessary to suspend the execution of the restoration plan of the global distribution network or the restoration plan of the local distribution network;

[0131] An optimization module, configured to optimize and adjust the operation mode of the energized area of ​​the target distribution network where power supply has been restored according to the operation information, power outage scenario information, and judgment information;

[0132] A division module, used for dividing the target distribution network into online global recovery sub-areas according to the operation information, execution information, power outage scenario information and operation mode optimization adjustment results;

[0133] The second determination module is used to generate a recovery plan for each online global recovery sub-area according to the result of the online global recovery sub-area division, optimize the recovery plan for each online global recovery sub-area, and obtain a final recovery plan for each online global recovery sub-area.

[0134] The second determining module is used to

[0135] Determine candidate boundary node pairs for concurrent parallel operation according to the recovery plan of each online global recovery sub-area;

[0136] The concurrent recovery plan of each recovery sub-region is optimized according to the candidate boundary node pairs running in parallel at the same time, the running information and the execution information, so as to obtain the final recovery plan of each online global recovery sub-region.

[0137] The acquisition module is used to

[0138] The switch operation information, the status information before and after the switch operation, and the real-time operation status change information of other primary equipment except the switch are obtained from the energy management system of the target distribution network.

[0139] The first determining module is used to

[0140] The device fault information and the real-time topological structure of the distribution network are obtained from the energy management system of the target distribution network, the state of the target distribution network is identified according to the device fault situation and the real-time topological structure of the distribution network, and the target distribution network is divided into a live area, a quasi-live area, an isolated power outage area and a non-isolated power outage area according to the result of the state identification.

[0141] The judging module is used to

[0142] (1) Determine whether it is the first startup after the power outage based on the operation information and execution information. If it is the first startup, perform online optimization of the global operation mode of the upper-level global optimization. Otherwise, read the most recently generated and executed global recovery plan P c and specific recovery measures c , go to (2);

[0143] (2) judging whether the target distribution network restoration process is completed according to the operation information and the power outage scenario information; if so, performing online optimization of the global operation mode of the upper-layer global optimization; otherwise, proceeding to (3);

[0144] (3) If other monitoring and protection control systems in any restoration sub-area of ​​the target distribution network are performing or planning to perform control, the online optimization of the global operation mode of the upper-level global optimization is suspended; otherwise, the process goes to (4) to enter the restoration process control of each restoration sub-area;

[0145] (4) judging whether the recovery process operation of each recovery sub-area is successfully executed according to the operation information and the execution information; if the operation is successfully executed, proceeding to (5); otherwise, proceeding to (6);

[0146] (5) Determine whether to continue executing plan P based on the operation information, execution information, and execution success information c , if so, then according to P cContinue the recovery process of the recovery sub-area, otherwise go to (6); continue to execute P c The following conditions must be met at the same time:

[0147] P c There are subsequent operations in the process and the target device of the operation is in a recoverable state; no new power-off nodes appear in the powered area; compared with P c At the time of generation, the online operation risk of the current energized area and the recovery risk change value of the power transmission path do not exceed the set threshold; the maximum difference between the current recovery target and the estimated recovery value of other targets to be restored in the divided recovery sub-area does not exceed the set threshold; the difference between the original planned power transmission or receiving power of the transmission network and the actual execution does not exceed the set threshold;

[0148] (6) Obtain the most recently generated set of other feasible recovery solutions P Σ,b , from the set of other feasible recovery solutions P Σ,b It searches whether there is a feasible alternative solution. If so, it switches to the alternative solution and executes the recovery measures of the recovery sub-area corresponding to the alternative solution. Otherwise, it re-performs the online optimization of the global operation mode of the upper-level global optimization.

[0149] The judgment module is used to control the online optimization of the global operation mode of the upper-level global optimization, including:

[0150] The live area of ​​the distribution network is defined as a power supply tree. The available power capacity and its distribution are adjusted by optimizing the live load transfer plan, and a set of anticipated power outage scenarios that take into account the optimization and adjustment of the distribution network operation mode are generated. The set of anticipated power outage scenarios includes real-time power outage scenarios and a set of anticipated initial power outage scenarios generated by deducing each candidate live load transfer plan based on the real-time power outage scenario.

[0151] The partitioning module is used to

[0152] Mark the original recovery sub-area where each device is located and its recovery status, including normal operating devices, recovering devices, planned recovery devices, remaining devices to be recovered, and unrecoverable devices; the planned recovery devices refer to devices that can continue to be recovered according to the original plan, and the remaining devices to be recovered refer to devices whose recovery plans need to be optimized;

[0153] Performing global recovery sub-area division for all scenarios in the expected initial power outage scenario set, including: in any expected initial power outage scenario, considering power balance, voltage level, number of switch operations, and number of voltage conversions, determining the power supply range of each energized node, and determining the recovery sub-area to which each normal operating node, recovering node, and planned recovery node belongs, wherein the node refers to a collection of several busbar devices connected by closing switches in the same distribution network plant;

[0154] The remaining power-off equipment to be restored are divided into restoration sub-areas to which the powered nodes closest to them can be powered, and the result of the global restoration sub-area division of the upper-layer global optimization is obtained.

[0155] The second determining module is used to

[0156] For any recovery sub-area, first screen and sort the recovery targets in the recovery sub-area, optimize the recovery path of each recovery target, and generate a table of alternative recovery plans with a certain breadth in the recovery sub-area. Generate a new simulated power outage scenario by deducing any recovery plan in the table of alternative recovery plans, repeat the above breadth optimization process, and obtain a table of alternative recovery plans with a certain depth in the recovery sub-area. Then send the table of recovery plans to the global recovery sub-area for parallel decision-making.

[0157] The present invention also provides a computer-readable storage medium storing one or more programs, characterized in that the one or more programs include instructions, which, when executed by a computing device, enable the computing device to perform any of the methods described.

[0158] The present invention also provides a computing device, comprising:

[0159] One or more processors, a memory, and one or more programs, wherein the one or more programs are stored in the memory and configured to be executed by the one or more processors, and the one or more programs include instructions for executing any of the methods described.

[0160] Those skilled in the art will appreciate that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0161] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1A device that provides the functions specified in a block or multiple blocks.

[0162] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0163] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0164] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A distribution network restoration control method with the ability to adapt to uncertain events, characterized in that: include: Obtain the operation information of the target distribution network power supply, load and primary equipment, as well as the execution information of the recovery control measures; Determine the operating status of the plants and equipment in the target distribution network according to the operating information, and determine the power outage scenario information according to the operating status of the plants and equipment in the target distribution network; Determine whether it is necessary to start, end or update the restoration plan of the global distribution network or the restoration plan of the local distribution network and whether it is necessary to suspend the execution of the restoration plan of the global distribution network or the restoration plan of the local distribution network according to the operation information and the execution information; According to the operation information, power outage scenario information and judgment information, optimizing and adjusting the operation mode of the energized area of ​​the target distribution network where power supply has been restored; Dividing the target distribution network into online global recovery sub-areas according to the operation information, execution information, power outage scenario information and operation mode optimization adjustment results; A recovery plan for each online global recovery sub-area is generated according to the result of the online global recovery sub-area division, and the recovery plan for each online global recovery sub-area is optimized to obtain a final recovery plan for each online global recovery sub-area.

2. The distribution network restoration control method with uncertainty event adaptability according to claim 1, characterized in that: The optimizing the recovery scheme of each online global recovery sub-region to obtain the final recovery scheme of each online global recovery sub-region includes: Determine candidate boundary node pairs for concurrent parallel operation according to the recovery plan of each online global recovery sub-area; The concurrent recovery plan of each recovery sub-region is optimized according to the candidate boundary node pairs running in parallel at the same time, the running information and the execution information, so as to obtain the final recovery plan of each online global recovery sub-region.

3. The distribution network restoration control method with uncertainty event adaptability according to claim 1, characterized in that: The acquisition of the execution information of the recovery control measure includes: acquiring switch operation information, state information before / after switch operation, and real-time operation state change information of other primary devices except switches from the energy management system of the target distribution network.

4. The distribution network restoration control method with uncertainty event adaptability according to claim 1, characterized in that: The determining of the power outage scenario information according to the operating status of the plants and equipment in the target distribution network includes: The device fault information and the real-time topological structure of the distribution network are obtained from the energy management system of the target distribution network, the state of the target distribution network is identified according to the device fault situation and the real-time topological structure of the distribution network, and the target distribution network is divided into a live area, a quasi-live area, an isolated power outage area and a non-isolated power outage area according to the result of the state identification.

5. The distribution network restoration control method with uncertainty event adaptability according to claim 2, characterized in that: The judgment information of determining whether it is necessary to start, end or update the restoration plan of the global distribution network or the restoration plan of the local distribution network and whether it is necessary to suspend the execution of the restoration plan of the global distribution network or the restoration plan of the local distribution network according to the operation information and the execution information includes: (1) Determine whether it is the first startup after the power outage based on the operation information and execution information. If it is the first startup, perform online optimization of the global operation mode of the upper-level global optimization. Otherwise, read the most recently generated and executed global recovery plan P c and specific recovery measures c , go to (2); (2) judging whether the target distribution network restoration process is completed according to the operation information and the power outage scenario information; if so, performing online optimization of the global operation mode of the upper-layer global optimization; otherwise, proceeding to (3); (3) If other monitoring and protection control systems in any restoration sub-area of ​​the target distribution network are performing or planning to perform control, the online optimization of the global operation mode of the upper-level global optimization is suspended; otherwise, the process goes to (4) to enter the restoration process control of each restoration sub-area; (4) judging whether the recovery process operation of each recovery sub-area is successfully executed according to the operation information and the execution information; if the operation is successfully executed, proceeding to (5); otherwise, proceeding to (6); (5) Determine whether to continue executing plan P based on the operation information, execution information, and execution success information c , if so, then according to P c Continue the recovery process of the recovery sub-area, otherwise go to (6); continue to execute P c The following conditions must be met at the same time: P c There are subsequent operations in the process and the target device of the operation is in a recoverable state; no new power-off nodes appear in the powered area; compared with P c At the time of generation, the online operation risk of the current energized area and the recovery risk change value of the power transmission path do not exceed the set threshold; the maximum difference between the current recovery target and the estimated recovery value of other targets to be restored in the divided recovery sub-area does not exceed the set threshold; the difference between the original planned power transmission or receiving power of the transmission network and the actual execution does not exceed the set threshold; (6) Obtain the most recently generated set of other feasible recovery solutions P Σ,b , from the set of other feasible recovery solutions P Σ,b It searches whether there is a feasible alternative solution. If so, it switches to the alternative solution and executes the recovery measures of the recovery sub-area corresponding to the alternative solution. Otherwise, it re-performs the online optimization of the global operation mode of the upper-level global optimization.

6. The distribution network restoration control method with uncertainty event adaptability according to claim 5, characterized in that: The global operation mode of the upper-level global optimization is optimized online, including: The live area of ​​the distribution network is defined as a power supply tree. The available power capacity and its distribution are adjusted by optimizing the live load transfer plan, and a set of anticipated power outage scenarios that take into account the optimization and adjustment of the distribution network operation mode are generated. The set of anticipated power outage scenarios includes real-time power outage scenarios and a set of anticipated initial power outage scenarios generated by deducing each candidate live load transfer plan based on the real-time power outage scenario.

7. The distribution network restoration control method with uncertainty event adaptability according to claim 6, characterized in that: The step of dividing the target distribution network into online global recovery sub-areas according to the operation information, execution information, power outage scenario information and operation mode optimization adjustment results includes: Mark the original recovery sub-area where each device is located and its recovery status, including normal operating devices, recovering devices, planned recovery devices, remaining devices to be recovered, and unrecoverable devices; the planned recovery devices refer to devices that can continue to be recovered according to the original plan, and the remaining devices to be recovered refer to devices whose recovery plans need to be optimized; Performing global recovery sub-area division for all scenarios in the expected initial power outage scenario set, including: in any expected initial power outage scenario, considering power balance, voltage level, number of switch operations, and number of voltage conversions, determining the power supply range of each energized node, and determining the recovery sub-area to which each normal operating node, recovering node, and planned recovery node belongs, wherein the node refers to a collection of several busbar devices connected by closing switches in the same distribution network plant; The remaining power-off equipment to be restored are divided into restoration sub-areas to which the powered nodes closest to them can be powered, and the result of the global restoration sub-area division of the upper-layer global optimization is obtained.

8. The distribution network restoration control method with uncertainty event adaptability according to claim 7, characterized in that: The concurrent recovery scheme optimization for each recovery sub-area according to the candidate boundary node pairs running in parallel at the same time and the running information and the execution information includes: For any recovery sub-area, first screen and sort the recovery targets in the recovery sub-area, optimize the recovery path of each recovery target, and generate a table of alternative recovery plans with a certain breadth in the recovery sub-area. Generate a new simulated power outage scenario by deducing any recovery plan in the table of alternative recovery plans, repeat the above breadth optimization process, and obtain a table of alternative recovery plans with a certain depth in the recovery sub-area. Then send the table of recovery plans to the global recovery sub-area for parallel decision-making.

9. A distribution network restoration control system with the ability to adapt to uncertain events, characterized in that: include: An acquisition module is used to obtain the operation information of the target distribution network power supply, load and primary equipment, as well as the execution information of the recovery control measures; A first determination module is used to determine the operating status of the plant and equipment in the target distribution network according to the operating information, and determine the power outage scenario information according to the operating status of the plant and equipment in the target distribution network; A judgment module, used to determine whether it is necessary to start, end or update the restoration plan of the global distribution network or the restoration plan of the local distribution network according to the operation information and the execution information, and whether it is necessary to suspend the execution of the restoration plan of the global distribution network or the restoration plan of the local distribution network; An optimization module, configured to optimize and adjust the operation mode of the energized area of ​​the target distribution network where power supply has been restored according to the operation information, power outage scenario information, and judgment information; A division module, used for dividing the target distribution network into online global recovery sub-areas according to the operation information, execution information, power outage scenario information and operation mode optimization adjustment results; The second determination module is used to generate a recovery plan for each online global recovery sub-area according to the result of the online global recovery sub-area division, optimize the recovery plan for each online global recovery sub-area, and obtain a final recovery plan for each online global recovery sub-area.

10. The distribution network restoration control system with the ability to adapt to uncertain events according to claim 9, characterized in that: The second determining module is used to Determine candidate boundary node pairs for concurrent parallel operation according to the recovery plan of each online global recovery sub-area; The concurrent recovery plan of each recovery sub-region is optimized according to the candidate boundary node pairs running in parallel at the same time, the running information and the execution information, so as to obtain the final recovery plan of each online global recovery sub-region.

11. The distribution network restoration control system with the ability to adapt to uncertain events according to claim 9, characterized in that: The acquisition module is used to The switch operation information, the status information before and after the switch operation, and the real-time operation status change information of other primary equipment except the switch are obtained from the energy management system of the target distribution network.

12. The distribution network restoration control system with uncertain event adaptability according to claim 9, characterized in that: The first determining module is used to The device fault information and the real-time topological structure of the distribution network are obtained from the energy management system of the target distribution network, the state of the target distribution network is identified according to the device fault situation and the real-time topological structure of the distribution network, and the target distribution network is divided into a live area, a quasi-live area, an isolated power outage area and a non-isolated power outage area according to the result of the state identification.

13. The distribution network restoration control system with uncertain event adaptability according to claim 10, characterized in that: The judging module is used to (1) Determine whether it is the first startup after the power outage based on the operation information and execution information. If it is the first startup, perform online optimization of the global operation mode of the upper-level global optimization. Otherwise, read the most recently generated and executed global recovery plan P c and specific recovery measures c , go to (2); (2) judging whether the target distribution network restoration process is completed according to the operation information and the power outage scenario information; if so, performing online optimization of the global operation mode of the upper-layer global optimization; otherwise, proceeding to (3); (3) If other monitoring and protection control systems in any restoration sub-area of ​​the target distribution network are performing or planning to perform control, the online optimization of the global operation mode of the upper-level global optimization is suspended; otherwise, the process goes to (4) to enter the restoration process control of each restoration sub-area; (4) judging whether the recovery process operation of each recovery sub-area is successfully executed according to the operation information and the execution information; if the operation is successfully executed, proceeding to (5); otherwise, proceeding to (6); (5) Determine whether to continue executing plan P based on the operation information, execution information, and execution success information c , if so, then according to P c Continue the recovery process of the recovery sub-area, otherwise go to (6); continue to execute P c The following conditions must be met at the same time: P c There are subsequent operations in the process and the target device of the operation is in a recoverable state; no new power-off nodes appear in the powered area; compared with P c At the time of generation, the online operation risk of the current energized area and the recovery risk change value of the power transmission path do not exceed the set threshold; The maximum difference between the current restoration target and the estimated restoration value of other restoration targets in the divided restoration sub-area does not exceed the set threshold; the difference between the power transmission or receiving power originally planned by the transmission network and the actual implementation does not exceed the set threshold; (6) Obtain the most recently generated set of other feasible recovery solutions P Σ,b , from the set of other feasible recovery solutions P Σ,b It searches whether there is a feasible alternative solution. If so, it switches to the alternative solution and executes the recovery measures of the recovery sub-area corresponding to the alternative solution. Otherwise, it re-performs the online optimization of the global operation mode of the upper-level global optimization.

14. The distribution network restoration control system with the ability to adapt to uncertain events according to claim 13, characterized in that: The judgment module is used to control the online optimization of the global operation mode of the upper-level global optimization, including: The live area of ​​the distribution network is defined as a power supply tree. The available power capacity and its distribution are adjusted by optimizing the live load transfer plan, and a set of anticipated power outage scenarios that take into account the optimization and adjustment of the distribution network operation mode are generated. The set of anticipated power outage scenarios includes real-time power outage scenarios and a set of anticipated initial power outage scenarios generated by deducing each candidate live load transfer plan based on the real-time power outage scenario.

15. The distribution network restoration control system with the ability to adapt to uncertain events according to claim 14, characterized in that: The partitioning module is used to Mark the original recovery sub-area where each device is located and its recovery status, including normal operating devices, recovering devices, planned recovery devices, remaining devices to be recovered, and unrecoverable devices; the planned recovery devices refer to devices that can continue to be recovered according to the original plan, and the remaining devices to be recovered refer to devices whose recovery plans need to be optimized; Performing global recovery sub-area division for all scenarios in the expected initial power outage scenario set, including: in any expected initial power outage scenario, considering power balance, voltage level, number of switch operations, and number of voltage conversions, determining the power supply range of each energized node, and determining the recovery sub-area to which each normal operating node, recovering node, and planned recovery node belongs, wherein the node refers to a collection of several busbar devices connected by closing switches in the same distribution network plant; The remaining power-off equipment to be restored are divided into restoration sub-areas to which the powered nodes closest to them can be powered, and the result of the global restoration sub-area division of the upper-layer global optimization is obtained.

16. The distribution network restoration control system with the ability to adapt to uncertain events according to claim 15, characterized in that: The second determining module is used to For any recovery sub-area, firstly, the recovery targets in the recovery sub-area are screened and sorted, the recovery path of each recovery target is optimized, and a table of alternative recovery plans with a certain width in the recovery sub-area is generated; A new simulated power outage scenario is generated by deducing any restoration plan in the alternative restoration plan table, and the above breadth optimization process is repeated to obtain an alternative restoration plan table of a certain depth in the restoration sub-area, and the restoration plan table is sent to the global restoration sub-area for parallel decision-making.

17. A computer-readable storage medium storing one or more programs, characterized in that: The one or more programs include instructions which, when executed by a computing device, cause the computing device to perform any one of the methods according to claims 1 to 8.

18. A computing device, characterized in that include, One or more processors, a memory, and one or more programs, wherein the one or more programs are stored in the memory and configured to be executed by the one or more processors, and the one or more programs include instructions for executing any one of the methods according to claims 1 to 8.