Method, device and equipment for evaluating power supply reliability of medium-voltage project and medium
Through problem simulation and solution methods, we can identify and deal with medium-voltage line grid problems, calculate the expected time of power outage, and evaluate the contribution to power supply reliability. This solves the problem of calculating the theoretical reliability of medium-voltage grids in the existing technology and improves the efficiency and accuracy of evaluation. , supporting power grid enterprises in precise investment decisions.
Patent Information
- Application Number
- CN202410890209.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-04
- Publication Date
- 2024-10-29
AI Technical Summary
It is difficult to calculate the theoretical reliability of medium-voltage grids with existing technology, resulting in a heavy workload in drawing planned medium-voltage line topology diagrams and the inability to quantitatively calculate power supply reliability, which affects investment benefits.
Adopt a problem-based simulation solution method to obtain current medium-voltage line grid topology information, identify grid and automation problems, determine medium-voltage projects based on preset problem-solving strategies, handle grid and automation issues, and determine planned medium-voltage Line grid topology information, and calculate the expected time of power outage, and evaluate the contribution to power supply reliability.
It realizes the rapid determination of planned medium-voltage line grid topology information, improves the efficiency and accuracy of power supply reliability assessment, and helps power grid enterprises to rationally arrange investments and maximize investment benefits.
Smart Images

Figure CN118868044A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of power supply reliability of power grids, and in particular to a method, device, equipment and medium for evaluating power supply reliability of a medium voltage project. Background Art
[0002] With the development of social economy, power users have higher and higher requirements for power supply reliability. At the same time, power reform is accelerating and expanding. In the face of the tightening of fixed asset investment in regulated businesses, higher requirements are placed on the precise investment of power grid enterprises. Faced with the dual challenges of high reliability and precise investment, planners need to quantify the contribution of medium-voltage projects to reliability, make overall plans based on investment capacity, rank them according to investment cost-effectiveness, reasonably arrange power grid projects, maximize the benefits of investment, and use limited funds to scientifically, orderly and efficiently improve the reliability of power grid power supply.
[0003] At present, the theoretical reliability of the current medium-voltage grid is usually obtained by parsing the medium-voltage line CIM (Common Information Model) file in the distribution network GIS (Geography Information System), obtaining the topological structure of the medium-voltage line, and calculating it according to the theoretical reliability calculation method. However, the workload of drawing the topological structure diagram of the planned medium-voltage line is large, and it is currently difficult to achieve the drawing of the topological structure diagram of the planned medium-voltage line, resulting in the inability to quantitatively calculate the theoretical reliability of the planned medium-voltage line grid. Summary of the invention
[0004] The present application provides a method, device, equipment and medium for evaluating the power supply reliability of a medium-voltage project. Through a problem-based simulation solution method, the planned medium-voltage line grid topology information can be quickly determined, thereby evaluating the power supply reliability based on the current state and the planned state, thereby improving the work efficiency of the evaluation.
[0005] According to one aspect of the present application, a method for evaluating power supply reliability of a medium voltage project is provided, the method comprising:
[0006] Acquire the current medium-voltage line grid topology information of the target area, and determine the grid and automation problems of the target area according to the current medium-voltage line grid topology information and preset problem identification standards;
[0007] Determine the medium voltage project corresponding to the grid and automation problem based on the preset problem solving strategy, and process the grid and automation problem based on the medium voltage project to determine the planned medium voltage line grid topology structure information of the target area;
[0008] For each remodeled medium-voltage line processed in the medium-voltage project, the expected time of power outage due to a fault in the current state of the remodeled medium-voltage line is determined according to the grid topology structure information of the current medium-voltage line, and the expected time of power outage due to a fault in the planned state of the remodeled medium-voltage line is determined according to the grid topology structure information of the planned medium-voltage line;
[0009] The contribution of the medium-voltage project to the power supply reliability of the target area is determined based on the expected power outage time due to current faults and the expected power outage time due to planned faults of each reconstructed medium-voltage line.
[0010] According to another aspect of the present application, a device for evaluating power supply reliability of a medium voltage project is provided, the device comprising:
[0011] A current state determination module is used to obtain the current state medium voltage line grid topology structure information of the target area, and determine the grid and automation problems of the target area according to the current state medium voltage line grid topology structure information and preset problem identification standards;
[0012] A planning state determination module, used to determine the medium voltage project corresponding to the grid and automation problem based on a preset problem solving strategy, and process the grid and automation problem based on the medium voltage project to determine the planning state medium voltage line grid topology structure information of the target area;
[0013] A fault indicator determination module is used to determine the expected power outage time of the modified medium-voltage line in the current state according to the grid topology structure information of the current state medium-voltage line for each modified medium-voltage line processed in the medium-voltage project, and to determine the expected power outage time of the modified medium-voltage line in the planned state according to the grid topology structure information of the planned state medium-voltage line;
[0014] The reliability evaluation module is used to determine the contribution of the medium-voltage project to the power supply reliability of the target area according to the expected time of power outage due to current faults and the expected time of power outage due to planned faults of each transformed medium-voltage line.
[0015] According to another aspect of the present application, an electronic device is provided, the device comprising:
[0016] At least one processor; and a memory communicatively connected to the at least one processor; wherein the memory stores a computer program executable by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can execute the method for evaluating the power supply reliability of a medium voltage project as described in any embodiment of the present application.
[0017] According to another aspect of the present application, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to implement the method for evaluating power supply reliability of a medium voltage project described in any embodiment of the present application when executed.
[0018] The technical solution provided by the present application is to identify the grid and automation problems in the grid topology structure information of the medium-voltage line in the current state; then determine the medium-voltage project corresponding to the grid and automation problems based on the preset problem solving strategy, and process the grid and automation problems based on the medium-voltage project to determine the planned medium-voltage line grid topology structure information of the target area; then calculate the expected time of power outage for the current state and the planned state respectively; finally, based on the expected time of power outage for the current state and the expected time of power outage for the planned state, evaluate the contribution of the medium-voltage project to the power supply reliability of the target area. The present technical solution is based on the problem simulation solution method to realize the rapid determination of the planned medium-voltage line grid topology structure information, so as to evaluate the power supply reliability based on the current state and the planned state, thereby improving the work efficiency of the reliability evaluation.
[0019] It should be understood that the content described in this section is not intended to identify the key or important features of the embodiments of the present application, nor is it intended to limit the scope of the present application. Other features of the present application will become easily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0021] Figure 1 A flowchart of a method for evaluating power supply reliability of a medium voltage project provided in Example 1 of the present application;
[0022] Figure 2 A flowchart of a method for evaluating power supply reliability of a medium voltage project provided in Example 2 of the present application;
[0023] Figure 3 A schematic diagram of a medium voltage single contact feeder network provided in Example 2 of the present application;
[0024] Figure 4 A flowchart of a method for evaluating power supply reliability of a medium voltage project provided in Example 3 of the present application;
[0025] Figure 5A schematic diagram of the structure of a device for evaluating the reliability of power supply for a medium voltage project provided in Embodiment 4 of the present application;
[0026] Figure 6 It is a structural schematic diagram of a device for implementing a method for evaluating power supply reliability of a medium voltage project in an embodiment of the present application. DETAILED DESCRIPTION
[0027] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.
[0028] It should be noted that the terms "current state", "planned state", "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0029] Embodiment 1
[0030] Figure 1 This is a flowchart of a method for evaluating the reliability of power supply of a medium voltage project provided in the first embodiment of the present application. This embodiment can be applied to the case of evaluating the contribution of a medium voltage project to power supply reliability. The method can be executed by a device for evaluating the reliability of power supply of a medium voltage project. The device for evaluating the reliability of power supply of a medium voltage project can be implemented in the form of hardware and / or software. The device for evaluating the reliability of power supply of a medium voltage project can be configured in a device with data processing capabilities. Figure 1 As shown, the method includes:
[0031] S110, obtaining current medium-voltage line grid topology information of the target area, and determining grid and automation problems of the target area according to the current medium-voltage line grid topology information and preset problem identification standards.
[0032] The target area may be a specific geographical area within which the power supply system provides power services to users.
[0033] The current state may be the state of the power grid in the target area before the medium voltage project is implemented.
[0034] The medium voltage line grid topology information can be the connection mode, layout and relationship between the components of the medium voltage power line, such as the location and capacity of the substation, the direction and path of the line, the location of the tower and equipment, the line connection point and section switch, the grid structure, etc.
[0035] Specifically, it mainly includes the following contents: (1) Topological structure: including the topological connection relationship between the substation 10kV busbar, overhead lines, cable lines, distribution transformers, circuit breakers, load switches, disconnectors and fuses; (2) Basic parameters of distribution lines: including line type, length, model, resistance per unit length, reactance, susceptance and current carrying capacity. Among them, line types are divided into overhead lines and cables; (3) Basic parameters of distribution transformers: including transformer model, rated capacity, no-load loss, load loss, impedance voltage, no-load current; (4) Switchgear data: including switchgear such as circuit breakers, load switches, disconnectors, etc., whose current disconnection status needs to be obtained; (5) Load point data: including the load capacity and number of users at the load point.
[0036] In this application, the current medium-voltage line grid topology information of the target area can be obtained by consulting the power system planning and design documents, or by using the distribution network geographic information system tools, or by conducting on-site surveys.
[0037] Grid and automation issues may include the existence of large branches in feeders, single radiation of feeders, trunk lines not meeting automation configuration requirements, feeders not achieving feeder automation, and medium voltage lines not being able to be transferred.
[0038] The preset problem identification criteria may be evaluation criteria set based on grid and automation issues.
[0039] In the present application, a problem identification model can be constructed according to preset problem identification standards, and grid and automation problems can be output by inputting the current medium-voltage line grid topology information into the problem identification model.
[0040] Optionally, obtaining the current medium-voltage line grid topology information of the target area includes: obtaining the medium-voltage line single-line diagram file of the target area from the distribution network geographic information system; and determining the current medium-voltage line grid topology information of the target area based on the medium-voltage line single-line diagram file.
[0041] The distribution network geographic information system is a system that applies geographic information technology to distribution network management. It can intuitively display the geographical location and distribution of distribution network equipment, lines and other elements in the form of a map, and integrate various data of the distribution network, such as equipment parameters, operating parameters, user information, etc.
[0042] The medium voltage line single-line diagram file may be a graphic file representing the layout and connection relationship of the medium voltage power line.
[0043] Specifically, the medium voltage line range and related equipment can be selected from the distribution network geographic information system and the single-line diagram file thereof can be exported and processed to obtain the medium voltage line single-line diagram file of the target area.
[0044] Furthermore, the medium voltage line single-line diagram file can be parsed to extract the medium voltage line grid topology information.
[0045] S120. Determine a medium voltage project corresponding to the grid and automation problem based on a preset problem solving strategy, and process the grid and automation problem based on the medium voltage project to determine the planned medium voltage line grid topology information of the target area.
[0046] Medium voltage projects can be solutions to grid and automation issues, used to simulate and solve problems in current medium voltage lines, so as to obtain the planned medium voltage line grid topology information. The planned state can be the grid state of the target area after the implementation of the medium voltage project.
[0047] The following are simulation solutions for various grid and automation problems:
[0048] 1) For the problem of large branches in the feeder, the problem branch line is simulated to be disassembled into two branches, that is, the conductors are untied at the point where the number of users on the large branch line is evenly divided, and the rear branch line is connected to the main line by T. For the A and B power supply division branches with more than 5 households after disassembly, an automatic circuit breaker is added at the head end;
[0049] 2) For the problem of single feeder radiation, simulate adding an automated contact switch at the end of the line. The end of the line refers to the end point of the line trunk line diameter, and the point where the subsequent section will not lead to the appearance of a large branch line (that is, the number of medium-voltage users does not exceed 10 households, and the number of low-voltage users does not exceed 1,000 households). If there is a large branch line in the subsequent section of the end point of the trunk line diameter, simulate the extension of the trunk line to the 1-circuit branch line with a large number of users until it is extended to a point where no large branch line appears, which is regarded as the end of the line;
[0050] 3) For the problem that the trunk line does not meet the automation configuration requirements, according to the control requirements of the number of low-voltage users in the automation segment in different power supply zones in the technical guidelines for distribution network planning, the number of switches that need to be configured on the trunk segment that does not meet the automation configuration requirements (assuming it is n) is identified, and then an automated segment switch is added at each point where the number of users in the segment is 1 / (n+1);
[0051] 4) For the problem that feeder automation is not realized, according to the control requirements of different power supply zones on the number of low-voltage users in the automation segment in the technical guidelines for distribution network planning, the number of switches that need to be configured on the trunk segment that does not meet the automation configuration requirements (assuming it is n) is identified, and then an automated segment switch is added at each point 1 / (n+1) of the number of users in the segment, and a tie switch is added at the end of the line;
[0052] 5) For the problem of medium voltage lines not being able to be transferred, the lines are identified as transferable lines in reliability calculations.
[0053] By using the above simulation solution to modify the grid and automation problems existing in the current medium-voltage line grid topology, the planned medium-voltage line grid topology structure information can be quickly obtained.
[0054] S130. For each modified medium-voltage line processed in the medium-voltage project, the expected time of a power outage due to a current fault of the modified medium-voltage line is determined according to the grid topology structure information of the current medium-voltage line, and the expected time of a power outage due to a planned fault of the modified medium-voltage line is determined according to the grid topology structure information of the planned medium-voltage line.
[0055] The transformed medium-voltage line may be a medium-voltage line after its grid and automation issues have been addressed by a medium-voltage project.
[0056] The expected power outage time due to a fault can be the average of various power outage times due to a fault in the current state of the power grid through fault tests. For example, the power outage times due to a fault in the current state of the power grid are 1 hour, 2 hours, and 3 hours, and their corresponding probabilities are 0.3, 0.5, and 0.2, respectively. Then the expected power outage time due to a fault = 1*0.3+2*0.5+3*0.2 = 1.9 hours.
[0057] Specifically, multiple equipment fault simulation tests can be conducted in the current state according to the current medium-voltage line grid topology information, and the power outage time of each fault can be counted, and the expected power outage time of the current state fault can be determined based on the power outage time of each fault. Based on the same method, the expected power outage time of the planned state fault can also be determined.
[0058] S140. Determine the contribution of the medium voltage project to the power supply reliability of the target area according to the expected power outage time due to current faults and the expected power outage time due to planned faults of each of the remodeled medium voltage lines.
[0059] Since the medium-voltage project only renovates one or more medium-voltage lines, this application can evaluate the power supply reliability based on the expected time of current fault outages and the expected time of planned fault outages of each renovated medium-voltage line.
[0060] Specifically, the contribution of each modified medium-voltage line to power supply reliability can be calculated first, and then the contribution of the medium-voltage project to the power supply reliability of the target area can be determined based on each contribution. For example, the expected time of power outage due to current faults and the expected time of power outage due to planned faults of the same modified medium-voltage line can be subtracted, and the difference can be used as the contribution of the modified medium-voltage line to power supply reliability after the implementation of the medium-voltage project. Then, the contribution of each modified medium-voltage line to power supply reliability after the implementation of the medium-voltage project can be added, and the sum can be used as the contribution of the medium-voltage project to the power supply reliability of the target area.
[0061] The embodiment of the present invention provides a method for evaluating the reliability of power supply of medium-voltage projects. The method identifies the grid and automation problems in the grid topology structure information of the medium-voltage line in the current state; then determines the medium-voltage project corresponding to the grid and automation problems based on the preset problem solving strategy, and processes the grid and automation problems based on the medium-voltage project to determine the planned medium-voltage line grid topology structure information of the target area; then calculates the expected time of power outage due to faults in the current state and the planned state respectively; finally, based on the expected time of power outage due to faults in the current state and the expected time of power outage due to faults in the planned state, the contribution of the medium-voltage project to the power supply reliability of the target area is evaluated. This technical solution is based on a problem simulation solution method to achieve rapid determination of the planned medium-voltage line grid topology structure information, thereby evaluating the reliability of power supply based on the current state and the planned state, and improving the work efficiency of reliability evaluation.
[0062] Embodiment 2
[0063] Figure 2 This is a flow chart of a method for evaluating the reliability of power supply of a medium voltage project provided in Example 2 of this application. This embodiment is optimized based on the above embodiment. Figure 2 As shown, the method of this embodiment specifically includes the following steps:
[0064] S210, obtaining current medium-voltage line grid topology information of the target area, and determining grid and automation problems of the target area according to the current medium-voltage line grid topology information and preset problem identification standards.
[0065] S220. Determine a medium voltage project corresponding to the grid and automation problem based on a preset problem solving strategy, and process the grid and automation problem based on the medium voltage project to determine the planned medium voltage line grid topology information of the target area.
[0066] S230. For each modified medium-voltage line processed in the medium-voltage project, determine the expected time of the first fault power outage for each load point in the modified medium-voltage line according to the current medium-voltage line grid topology information; determine the current fault power outage expected time for the modified medium-voltage line according to the number of users at each load point and the first fault power outage expected time.
[0067] A load point is a point in the power system that receives power supply, usually a substation, distribution station or user access point. Users at the load point may include factories, commercial buildings, residential areas, schools, hospitals, etc. It should be noted that the same medium-voltage line includes one or more load points, and one load point provides power to one or more users.
[0068] The number of users may be the number of users accessing the load point. Specifically, it may be determined based on the current medium voltage line grid topology information.
[0069] The first expected power outage time due to a fault may be an average power outage time of various faults occurring at a certain load point under the current state obtained through a fault test.
[0070] In the present application, the first fault power outage expected time of each load point in the same remodeled medium voltage line and the number of users may be multiplied, added and summed to determine the total fault power outage expected time of the remodeled medium voltage line.
[0071] Optionally, based on the current medium-voltage line grid topology information, the expected time of the first fault power outage for each load point in the modified medium-voltage line is determined, including: for each equipment in the modified medium-voltage line, performing a simulated power outage on the equipment to determine the first fault repair time and the first fault power outage rate of each load point in the modified medium-voltage line during the power outage; for each load point, determining the expected time of the first fault power outage for the load point based on the first fault repair time and the first fault power outage rate of the load point during the power outage of each equipment.
[0072] Specifically, the basic parameters and operating statistical parameters for distribution network reliability assessment can be obtained from the asset management system, and data preprocessing can be performed to obtain data such as failure probability, average power restoration time, and average repair time of equipment failures for five major types of equipment (i.e., overhead lines, cable lines, distribution transformers, circuit breakers, and other switches).
[0073] Based on the current medium-voltage line grid topology information, enumerate individual equipment failures, take into account the circuit breaker tripping, fault isolation, and power restoration process after the equipment failure, determine the impact of the failure on each load point, and determine the failure rate and time of each load point. Finally, list the failure rate and time of each load point after all the equipment fails individually, and form a failure mode consequence analysis table for the current state.
[0074] For example, Figure 3 A medium-voltage single-connection feeder network schematic diagram provided for Example 2 of the present application. As shown in the figure, QF represents the outgoing line circuit breaker, L represents the disconnector, LS represents the load switch, T represents the distribution transformer, FU represents the fuse, the number represents the serial number of the equipment, and a, b, and c are the three load points of the medium-voltage line. Perform a simulated power outage process on each device in turn, and record the fault power outage time and fault power outage rate of each load point during the simulated power outage process to form a fault mode consequence analysis table. Finally, based on the fault mode consequence analysis table, determine the expected time of the first fault power outage of the load point.
[0075] Assume that the equipment set that will cause a power outage at a certain load point after a failure is N, and the failure outage rate of the i-th equipment in the equipment set is λ i , the fault repair time of the i-th device is ri. The expected power outage rate of the load point is λ LP-F It can be expressed by the following formula: LP-F =∑ i∈N λ i ; The expected time μ for the first fault outage of the load point LP-F It can be expressed by the following formula: LP-F =∑ i∈N λ i × i .
[0076] S240. For each modified medium-voltage line processed in the medium-voltage project, determine the expected time of a second fault power outage for each load point in the modified medium-voltage line according to the planned medium-voltage line grid topology information; determine the expected time of a planned fault power outage for the modified medium-voltage line according to the number of users at each load point and the expected time of a second fault power outage.
[0077] The second fault outage expected time can be the average value of various fault outage times of a certain load point under the planning state through fault test statistics. Furthermore, the second fault outage expected time of each load point in the same modified medium-voltage line can be added and summed to determine the total fault outage expected time of the modified medium-voltage line.
[0078] Optionally, based on the planned medium-voltage line grid topology information, the expected time of a second fault power outage for each load point in the modified medium-voltage line is determined, including: for each device in the modified medium-voltage line, performing a simulated power outage on the device to determine a second fault repair time and a second fault power outage rate for each load point in the modified medium-voltage line during the power outage; for each load point, determining the expected time of a second fault power outage for the load point based on the second fault repair time and the second fault power outage rate of the load point during the power outage of each device.
[0079] Specifically, based on the planning state medium-voltage line grid topology information, enumerate individual equipment failures, take into account the circuit breaker tripping, fault isolation, and power restoration process after the equipment failure, determine the impact of the failure on each load point, and determine the failure power outage rate and failure power outage time of each load point. Finally, list the failure power outage rate and failure power outage time of each load point after all equipment failures in the planning state to form a planning state failure mode consequence analysis table.
[0080] Assume that the equipment set that will cause a power outage at a certain load point after a failure is N, and the failure outage rate of the i-th equipment in the equipment set is λ' i , the repair time of the fault of the i-th device is r' i The expected outage rate of the load point is λ' LP-F It can be expressed by the following formula: LP-F =∑ i∈N λ' i ; The expected time of the first fault outage of the load point μ' LP-F It can be expressed by the following formula: μ' LP-F =∑ i∈N λ' i ×r' i .
[0081] S250. Determine the contribution of the medium voltage project to the power supply reliability of the target area according to the expected power outage time due to current faults and the expected power outage time due to planned faults of each of the reconstructed medium voltage lines.
[0082] The embodiment of the present invention provides a method for evaluating the power supply reliability of a medium-voltage project. The method obtains the current medium-voltage line grid topology information of the target area, and determines the grid and automation problems of the target area according to the current medium-voltage line grid topology information and preset problem identification standards; determines the medium-voltage project corresponding to the grid and automation problems based on the preset problem solving strategy, and processes the grid and automation problems based on the medium-voltage project to determine the planned medium-voltage line grid topology information of the target area; determines the load of each load in the modified medium-voltage line according to the current medium-voltage line grid topology information. The expected time of the first fault power outage at the load point; according to the number of users at each load point and the expected time of the first fault power outage, determine the expected time of the current fault power outage of the transformed medium-voltage line; according to the planned medium-voltage line grid topology information, determine the expected time of the second fault power outage at each load point in the transformed medium-voltage line; according to the number of users at each load point and the expected time of the second fault power outage, determine the expected time of the planned fault power outage of the transformed medium-voltage line; according to the expected time of the current fault power outage and the expected time of the planned fault power outage of each transformed medium-voltage line, determine the contribution of the medium-voltage project to the power supply reliability of the target area. This technical solution determines the expected time of the fault power outage of each load point in the transformed medium-voltage line in turn to achieve the determination of the expected time of the fault power outage of the transformed medium-voltage line, thereby improving the evaluation accuracy of the medium-voltage project on the power supply reliability of the target area.
[0083] Embodiment 3
[0084] Figure 4 This is a flow chart of a method for evaluating the reliability of power supply of a medium voltage project provided in Example 3 of the present application. This embodiment is optimized based on the above embodiment. Figure 4 As shown, the method of this embodiment specifically includes the following steps:
[0085] S310, obtaining the current medium-voltage line grid topology information of the target area, and determining the grid and automation problems of the target area according to the current medium-voltage line grid topology information and preset problem identification standards.
[0086] S320. Determine the medium voltage project corresponding to the grid and automation problem based on a preset problem solving strategy, and process the grid and automation problem based on the medium voltage project to determine the planned medium voltage line grid topology information of the target area.
[0087] S330. For each modified medium-voltage line processed in the medium-voltage project, the expected time of a power outage due to a current fault of the modified medium-voltage line is determined according to the grid topology structure information of the current medium-voltage line, and the expected time of a power outage due to a planned fault of the modified medium-voltage line is determined according to the grid topology structure information of the planned medium-voltage line.
[0088] S340. For each remodeled medium-voltage line, determine the sub-contribution of the remodeled medium-voltage line to the power supply reliability of the target area according to the expected power outage time due to a current fault of the remodeled medium-voltage line, the expected power outage time due to a planned fault, and the number of users.
[0089] The number of users may be the number of users accessing the load point. Specifically, it may be determined based on the current medium voltage line grid topology information or the planned medium voltage line grid topology information.
[0090] In this application, the sub-contribution of the modified medium-voltage line to the power supply reliability of the target area can be determined based on the expected time of power outage due to the current fault, the expected time of power outage due to the planned fault, and the number of users corresponding to the modified medium-voltage line.
[0091] Optionally, the sub-contribution of the modified medium-voltage line to the power supply reliability of the target area is determined based on the expected time of power outage due to current fault, the expected time of power outage due to planned fault and the number of users of the modified medium-voltage line, including: subtracting the expected time of power outage due to current fault of the modified medium-voltage line from the expected time of power outage due to planned fault to determine a first difference; and determining the sub-contribution of the modified medium-voltage line to the power supply reliability of the target area based on the first difference and the number of users of the modified medium-voltage line.
[0092] The first difference can be determined using the following formula:
[0093] Δ m =|Λ′ m -Λ m |;
[0094] In the formula, Δ m represents the first difference of the mth transformed medium voltage line, Λ' m represents the expected power outage time of the planned fault of the m-th transformed medium-voltage line, Λ m It indicates the expected power outage time due to the current fault of the mth medium-voltage line being rebuilt.
[0095] The contribution of the modified medium voltage line to the power supply reliability of the target area can be determined by the following formula:
[0096] Γ m =Δ m ×ξm;
[0097] In the formula, Γ m represents the sub-contribution of the mth transformed medium-voltage line to the power supply reliability of the target area, ξ m Indicates the number of users whose medium voltage lines have been transformed for the mth time.
[0098] S350. Determine, according to each of the sub-contributions, the contribution of the medium voltage project to the power supply reliability of the target area.
[0099] Specifically, the contribution of each sub-contribution degree can be added together to determine the contribution of the medium voltage project to the power supply reliability of the target area; each sub-contribution degree can also be weighted according to a preset degree of importance, and then the contribution of the medium voltage project to the power supply reliability of the target area can be determined based on each sub-contribution degree and its weight.
[0100] Optionally, the contribution of the medium voltage project to the power supply reliability of the target area is determined based on each of the sub-contribution degrees, including: determining the total number of users in the target area based on the number of users of each modified medium voltage line; determining the contribution of the medium voltage project to the power supply reliability of the target area based on each of the sub-contribution degrees and the total number of users.
[0101] The total number of users can be the sum of the number of users corresponding to each transformed medium voltage line. Specifically, it can be expressed by the following formula:
[0102]
[0103] In the formula, Φ represents the total number of users corresponding to each modified medium-voltage line, M represents the total number of modified medium-voltage lines, ξ m Indicates the number of users whose medium voltage lines have been transformed for the mth time.
[0104] The contribution of medium voltage projects to the power supply reliability of the target area can be expressed by the following formula:
[0105]
[0106] Where G represents the contribution of the medium voltage project to the power supply reliability of the target area, Γ m represents the sub-contribution of the mth reconstructed medium-voltage line to the power supply reliability of the target area, Φ represents the total number of users corresponding to each reconstructed medium-voltage line, and M represents the total number of reconstructed medium-voltage lines.
[0107] The embodiment of the present invention provides a method for evaluating the reliability of power supply of a medium-voltage project. The method identifies the grid and automation problems in the grid topology information of the current medium-voltage line; then determines the medium-voltage project corresponding to the grid and automation problems based on the preset problem solving strategy, and processes the grid and automation problems based on the medium-voltage project to determine the grid topology information of the planned medium-voltage line in the target area; then calculates the expected time of power outage due to faults in the current state and the planned state respectively; finally, for each modified medium-voltage line, according to the expected time of power outage due to faults in the current state, the expected time of power outage due to faults in the planned state and the number of users of the modified medium-voltage line, the sub-contribution of the modified medium-voltage line to the power supply reliability of the target area is determined; according to each sub-contribution, the contribution of the medium-voltage project to the power supply reliability of the target area is determined. This technical solution calculates the sub-contribution of each modified medium-voltage line to the power supply reliability respectively to achieve the determination of the power supply reliability of the target area by the medium-voltage project, thereby improving the evaluation accuracy of the power supply reliability of the target area by the medium-voltage project.
[0108] Embodiment 4
[0109] Figure 5 This is a schematic diagram of a structure of a medium voltage project power supply reliability evaluation device provided in Example 4 of the present application. Figure 5 As shown, the device comprises:
[0110] The current state determination module 410 is used to obtain the current state medium voltage line grid topology structure information of the target area, and determine the grid and automation problems of the target area according to the current state medium voltage line grid topology structure information and the preset problem identification standard;
[0111] A planning state determination module 420 is used to determine the medium voltage project corresponding to the grid and automation problem based on a preset problem solving strategy, and process the grid and automation problem based on the medium voltage project to determine the planning state medium voltage line grid topology structure information of the target area;
[0112] A fault indicator determination module 430 is used to determine, for each modified medium-voltage line processed in the medium-voltage project, the expected time of a power outage due to a fault in the current state of the modified medium-voltage line according to the grid topology structure information of the current state of the medium-voltage line, and to determine the expected time of a power outage due to a fault in the planned state of the modified medium-voltage line according to the grid topology structure information of the planned state of the medium-voltage line;
[0113] The reliability evaluation module 440 is used to determine the contribution of the medium voltage project to the power supply reliability of the target area according to the expected power outage time due to current faults and the expected power outage time due to planned faults of each reconstructed medium voltage line.
[0114] The embodiment of the present invention provides a device for evaluating the reliability of power supply of medium-voltage projects. The device identifies the grid and automation problems in the grid topology structure information of the medium-voltage line in the current state; then determines the medium-voltage project corresponding to the grid and automation problems based on the preset problem solving strategy, and processes the grid and automation problems based on the medium-voltage project to determine the planned medium-voltage line grid topology structure information of the target area; then calculates the expected time of power outage due to faults in the current state and the planned state respectively; finally, based on the expected time of power outage due to faults in the current state and the expected time of power outage due to faults in the planned state, the contribution of the medium-voltage project to the power supply reliability of the target area is evaluated. This technical solution is based on a problem simulation solution method to achieve rapid determination of the planned medium-voltage line grid topology structure information, thereby evaluating the reliability of power supply based on the current state and the planned state, and improving the work efficiency of reliability evaluation.
[0115] Furthermore, the fault indicator determination module 430 includes:
[0116] A current state load point fault index determination unit, used to determine the first fault power outage expected time of each load point in the modified medium voltage line according to the current state medium voltage line grid topology information;
[0117] A current fault indicator determination unit, used to determine the expected power outage time of the current fault of the transformed medium-voltage line according to the number of users at each load point and the expected power outage time of the first fault;
[0118] Accordingly, the fault indicator determination module 430 further includes:
[0119] A planned load point fault index determination unit, used to determine the expected second fault power outage time of each load point in the transformed medium voltage line according to the planned medium voltage line grid topology information;
[0120] The planned fault indicator determination unit is used to determine the expected time of planned fault power outage of the transformed medium-voltage line according to the number of users at each load point and the expected time of second fault power outage.
[0121] Furthermore, the current load point fault index determination unit includes:
[0122] A current load point fault parameter determination subunit is used to simulate a power outage process on each device in the modified medium voltage line, and determine a first fault repair time and a first fault power outage rate of each load point in the modified medium voltage line during the power outage;
[0123] A current state load point fault index determination subunit is used to determine, for each of the load points, the first fault repair time of the load point and the first fault power outage rate during the power outage of each of the equipment to determine the first fault power outage expected time of the load point;
[0124] Accordingly, the planning state load point fault index determination unit includes:
[0125] A planning state load point fault parameter determination subunit is used to simulate a power outage process on each device in the modified medium voltage line, and determine a second fault repair time and a second fault power outage rate of each load point in the modified medium voltage line during the power outage;
[0126] The planned load point fault index determination subunit is used to determine the expected second fault power outage time of the load point according to the second fault repair time and the second fault power outage rate of the load point during the power outage of each device.
[0127] Furthermore, the reliability evaluation module 440 includes:
[0128] A sub-contribution determination unit is used to determine, for each remodeled medium-voltage line, a sub-contribution of the remodeled medium-voltage line to the power supply reliability of the target area according to the expected power outage time of the current fault of the remodeled medium-voltage line, the expected power outage time of the planned fault, and the number of users;
[0129] The reliability evaluation unit is used to determine the contribution of the medium voltage project to the power supply reliability of the target area according to each of the sub-contributions.
[0130] Furthermore, the sub-contribution determination unit includes:
[0131] A first difference determination subunit is used to subtract the expected power outage time of a current fault of the transformed medium-voltage line from the expected power outage time of a planned fault to determine a first difference;
[0132] The sub-contribution determination sub-unit is used to determine the sub-contribution of the modified medium-voltage line to the power supply reliability of the target area according to the first difference and the number of users of the modified medium-voltage line.
[0133] Furthermore, the reliability assessment unit comprises:
[0134] A total user number determination subunit, used to determine the total number of users in the target area according to the number of users of each of the transformed medium voltage lines;
[0135] The reliability evaluation subunit is used to determine the contribution of the medium voltage project to the power supply reliability of the target area according to each of the sub-contributions and the total number of users.
[0136] Furthermore, the current state determination module 410 includes:
[0137] A single-line diagram file acquisition unit is used to acquire a medium-voltage line single-line diagram file of a target area from a distribution network geographic information system;
[0138] The current state determination unit is used to determine the current state medium voltage line grid topology structure information of the target area according to the medium voltage line single line diagram file.
[0139] A medium-voltage project power supply reliability assessment device provided in an embodiment of the present application can execute a medium-voltage project power supply reliability assessment method provided in any embodiment of the present application, and has functional modules and beneficial effects corresponding to the execution method.
[0140] Embodiment 5
[0141] Figure 6 A schematic diagram of a device 10 that can be used to implement an embodiment of the present application is shown. The device is intended to represent various forms of digital computers, such as laptop computers, desktop computers, workbenches, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. The device can also represent various forms of mobile devices, such as personal digital processing, cellular phones, smart phones, wearable devices (such as helmets, glasses, watches, etc.) and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely examples and are not intended to limit the implementation of the present application described and / or required herein.
[0142] like Figure 6 As shown, the device 10 includes at least one processor 11, and a memory connected to the at least one processor 11, such as a read-only memory (ROM) 12, a random access memory (RAM) 13, etc., wherein the memory stores a computer program that can be executed by at least one processor, and the processor 11 can perform various appropriate actions and processes according to the computer program stored in the read-only memory (ROM) 12 or the computer program loaded from the storage unit 18 to the random access memory (RAM) 13. In the RAM 13, various programs and data required for the operation of the device 10 can also be stored. The processor 11, ROM 12 and RAM 13 are connected to each other through a bus 14. An input / output (I / O) interface 15 is also connected to the bus 14.
[0143] A number of components in the device 10 are connected to the I / O interface 15, including: an input unit 16, such as a keyboard, a mouse, etc.; an output unit 17, such as various types of displays, speakers, etc.; a storage unit 18, such as a disk, an optical disk, etc.; and a communication unit 19, such as a network card, a modem, a wireless communication transceiver, etc. The communication unit 19 allows the device 10 to exchange information / data with other devices through a computer network such as the Internet and / or various telecommunication networks.
[0144] The processor 11 may be a variety of general and / or special processing components with processing and computing capabilities. Some examples of the processor 11 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (GPU), various special artificial intelligence (AI) computing chips, various processors running machine learning model algorithms, a digital signal processor (DSP), and any appropriate processor, controller, microcontroller, etc. The processor 11 executes the various methods and processes described above, such as the method for evaluating the reliability of power supply in a medium voltage project.
[0145] In some embodiments, the method for evaluating the reliability of power supply by a medium voltage project may be implemented as a computer program, which is tangibly contained in a computer-readable storage medium, such as a storage unit 18. In some embodiments, part or all of the computer program may be loaded and / or installed on the device 10 via the ROM 12 and / or the communication unit 19. When the computer program is loaded into the RAM 13 and executed by the processor 11, one or more steps of the method for evaluating the reliability of power supply by a medium voltage project described above may be performed. Alternatively, in other embodiments, the processor 11 may be configured to execute the method for evaluating the reliability of power supply by a medium voltage project in any other appropriate manner (e.g., by means of firmware).
[0146] Various implementations of the systems and techniques described above herein can be implemented in digital electronic circuit systems, integrated circuit systems, field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), load programmable logic devices (CPLDs), computer hardware, firmware, software, and / or combinations thereof. These various implementations can include: being implemented in one or more computer programs that can be executed and / or interpreted on a programmable system including at least one programmable processor, which can be a special purpose or general purpose programmable processor that can receive data and instructions from a storage system, at least one input device, and at least one output device, and transmit data and instructions to the storage system, the at least one input device, and the at least one output device.
[0147] The computer programs for implementing the methods of the present application may be written in any combination of one or more programming languages. These computer programs may be provided to a processor of a general-purpose computer, a special-purpose computer, or other programmable data processing device, so that when the computer programs are executed by the processor, the functions / operations specified in the flow charts and / or block diagrams are implemented. The computer programs may be executed entirely on the machine, partially on the machine, partially on the machine and partially on a remote machine as a stand-alone software package, or entirely on a remote machine or server.
[0148] In the context of the present application, a computer readable storage medium may be a tangible medium that may contain or store a computer program for use by or in conjunction with an instruction execution system, device or equipment. A computer readable storage medium may include, but is not limited to, electronic, magnetic, optical, electromagnetic, infrared, or semiconductor systems, devices or equipment, or any suitable combination of the foregoing. Alternatively, a computer readable storage medium may be a machine readable signal medium. A more specific example of a machine readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.
[0149] To provide interaction with a user, the systems and techniques described herein can be implemented on a device having: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user; and a keyboard and a pointing device (e.g., a mouse or trackball) through which the user can provide input to the device. Other types of devices can also be used to provide interaction with the user; for example, the feedback provided to the user can be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user can be received in any form (including acoustic input, voice input, or tactile input).
[0150] The systems and techniques described herein may be implemented in a computing system that includes backend components (e.g., as a data server), or a computing system that includes middleware components (e.g., an application server), or a computing system that includes frontend components (e.g., a user computer with a graphical user interface or a web browser through which a user can interact with implementations of the systems and techniques described herein), or a computing system that includes any combination of such backend components, middleware components, or frontend components. The components of the system may be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include: a local area network (LAN), a wide area network (WAN), a blockchain network, and the Internet.
[0151] A computing system may include a client and a server. The client and the server are generally remote from each other and usually interact through a communication network. The client and server relationship is generated by computer programs running on the corresponding computers and having a client-server relationship with each other. The server may be a cloud server, also known as a cloud computing server or cloud host, which is a host product in the cloud computing service system to solve the defects of difficult management and weak business scalability in traditional physical hosts and VPS services.
[0152] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps recorded in this application can be executed in parallel, sequentially or in different orders, as long as the expected results of the technical solution of this application can be achieved, and this document is not limited here.
[0153] The above specific implementations do not constitute a limitation on the protection scope of this application. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions can be made according to design requirements and other factors. Any modifications, equivalent substitutions and improvements made within the spirit and principles of this application should be included in the protection scope of this application.
Claims
1. A method for evaluating power supply reliability for medium voltage projects. It is characterized in that The method comprises: Acquire the current medium-voltage line grid topology information of the target area, and determine the grid and automation problems of the target area according to the current medium-voltage line grid topology information and preset problem identification standards; Determine the medium voltage project corresponding to the grid and automation problem based on the preset problem solving strategy, and process the grid and automation problem based on the medium voltage project to determine the planned medium voltage line grid topology structure information of the target area; For each remodeled medium-voltage line processed in the medium-voltage project, the expected time of power outage due to a fault in the current state of the remodeled medium-voltage line is determined according to the grid topology structure information of the current medium-voltage line, and the expected time of power outage due to a fault in the planned state of the remodeled medium-voltage line is determined according to the grid topology structure information of the planned medium-voltage line; The contribution of the medium-voltage project to the power supply reliability of the target area is determined based on the expected power outage time due to current faults and the expected power outage time due to planned faults of each reconstructed medium-voltage line.
2. The method according to claim 1, It is characterized in that Determining the expected power outage time of the current fault of the transformed medium-voltage line according to the current medium-voltage line grid topology information includes: Determine the expected time of the first fault power outage of each load point in the transformed medium-voltage line according to the current medium-voltage line grid topology information; Determine the expected power outage time of the current fault of the transformed medium voltage line according to the number of users at each load point and the expected power outage time of the first fault; Accordingly, determining the expected time of power outage due to a planned fault of the transformed medium-voltage line according to the planned medium-voltage line grid topology information includes: Determining the expected second fault power outage time of each load point in the transformed medium-voltage line according to the planned medium-voltage line grid topology information; The planned expected power outage time of the transformed medium-voltage line is determined according to the number of users at each load point and the expected power outage time due to the second fault.
3. The method according to claim 2, It is characterized in that Determining the expected first fault power outage time of each load point in the transformed medium-voltage line according to the current medium-voltage line grid topology information, including: For each device in the modified medium-voltage line, simulate power outage processing is performed on the device to determine the first fault repair time and the first fault power outage rate of each load point in the modified medium-voltage line during the power outage; For each of the load points, determining the expected first fault power outage time of the load point according to the first fault repair time and the first fault power outage rate of the load point during the power outage of each of the devices; Accordingly, according to the planned medium-voltage line grid topology information, determining the expected second fault power outage time of each load point in the transformed medium-voltage line includes: For each device in the modified medium-voltage line, simulate a power outage process on the device to determine the second fault repair time and the second fault power outage rate of each load point in the modified medium-voltage line during the power outage; For each of the load points, the second fault power outage expected time of the load point is determined according to the second fault repair time and the second fault power outage rate of the load point during the power outage of each of the devices.
4. The method according to claim 1, It is characterized in that According to the expected power outage time of the current fault of each transformed medium-voltage line and the expected power outage time of the planned fault, the contribution of the medium-voltage project to the power supply reliability of the target area is determined, including: For each remodeled medium-voltage line, determine the sub-contribution of the remodeled medium-voltage line to the power supply reliability of the target area according to the expected power outage time due to the current fault of the remodeled medium-voltage line, the expected power outage time due to the planned fault, and the number of users; According to each of the sub-contributions, the contribution of the medium voltage project to the power supply reliability of the target area is determined.
5. The method according to claim 4, It is characterized in that According to the expected power outage time of the current fault of the transformed medium-voltage line, the expected power outage time of the planned fault, and the number of users, the sub-contribution of the transformed medium-voltage line to the power supply reliability of the target area is determined, including: Subtracting the expected power outage time of a current fault of the transformed medium-voltage line from the expected power outage time of a planned fault to determine a first difference; The sub-contribution of the modified medium-voltage line to the power supply reliability of the target area is determined according to the first difference and the number of users of the modified medium-voltage line.
6. The method according to claim 4, It is characterized in that Determining the contribution of the medium voltage project to the power supply reliability of the target area according to each of the sub-contributions includes: Determining the total number of users according to the number of users of each of the transformed medium voltage lines; The contribution of the medium voltage project to the power supply reliability of the target area is determined according to each of the sub-contributions and the total number of users.
7. The method according to claim 1, It is characterized in that Obtain the current medium voltage line grid topology information of the target area, including: Obtain the medium voltage line single line diagram file of the target area from the distribution network geographic information system; According to the medium voltage line single line diagram file, the current medium voltage line grid topology information of the target area is determined.
8. A device for evaluating the reliability of power supply for a medium voltage project, It is characterized in that The device comprises: A current state determination module is used to obtain the current state medium voltage line grid topology structure information of the target area, and determine the grid and automation problems of the target area according to the current state medium voltage line grid topology structure information and preset problem identification standards; A planning state determination module, used to determine the medium voltage project corresponding to the grid and automation problem based on a preset problem solving strategy, and process the grid and automation problem based on the medium voltage project to determine the planning state medium voltage line grid topology structure information of the target area; A fault indicator determination module is used to determine the expected power outage time of the modified medium-voltage line in the current state according to the grid topology structure information of the current state medium-voltage line for each modified medium-voltage line processed in the medium-voltage project, and to determine the expected power outage time of the modified medium-voltage line in the planned state according to the grid topology structure information of the planned state medium-voltage line; The reliability evaluation module is used to determine the contribution of the medium-voltage project to the power supply reliability of the target area according to the expected time of power outage due to current faults and the expected time of power outage due to planned faults of each transformed medium-voltage line.
9. An electronic device, It is characterized in that The device comprises: at least one processor; and a memory communicatively connected to the at least one processor; wherein, The memory stores a computer program executable by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can execute the method for evaluating power supply reliability of a medium voltage project according to any one of claims 1 to 7.
10. A computer-readable storage medium, It is characterized in that The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to implement the method for evaluating power supply reliability of a medium voltage project according to any one of claims 1 to 7 when executed.