Waste gas harmless treatment device and method for sintered brick production line
By setting the first and second treatment chambers and sprinkler components in the waste gas treatment device of the sintered brick production line, the fan-shaped water mist technology driven by the variable frequency motor is solved, and the waste resource waste caused by large exhaust gas flow space is realized effectively. and water conservation.
Patent Information
- Application Number
- CN202411126961.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-16
- Publication Date
- 2024-11-01
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
When the waste gas is processed in the sintered brick production line, the waste gas flow space is large and dispersed, resulting in a large amount of water spraying operations, resulting in waste of water resources.
A waste gas treatment device including the first and second treatment chambers is designed, and the first and second sprinkler components are arranged respectively, and the rotating plate and the rotating column are driven by a variable frequency motor, and the fan-shaped water mist is formed by using centrifugal force and inertia to achieve multi-range coverage. Sprinkle water to reduce the use of water resources.
It effectively saves water resources, and through centralized treatment of waste gas, the use of water resources is reduced, the demand for large-area nozzles is avoided, and the effective treatment of waste gas is achieved.
Smart Images

Figure CN118874107A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of waste gas treatment in sintered brick production, and in particular to a waste gas harmless treatment device and method for a sintered brick production line. Background Art
[0002] Sintered brick is a kind of brick made of clay, shale, coal gangue or fly ash, which is formed and baked at high temperature. It is also called clay brick. This brick can be made through different production processes. The waste gas generated during production will pollute the air, so it will be treated by waste gas treatment equipment;
[0003] For example, the Chinese authorized patent with announcement number CN214345351U (a waste gas harmless treatment device for a sintered brick production line): includes a separation tank, a sedimentation tank and an alkali liquid tank, the separation tank includes a top plate, a cylinder and a cone with a glass fiber reinforced plastic lining on the inner surface, an air inlet pipe is tangentially arranged at the lower part of the cylinder, a cooling jacket is arranged on the air inlet pipe, a ring plate, a demister and an activated carbon layer are arranged in sequence in the cylinder above the air inlet pipe, a spray pipe with an upper end blocked is vertically arranged inside the cone, the second filter screen in the sedimentation tank divides the internal space of the sedimentation tank into a sedimentation chamber and a clear liquid chamber, a reflux pipe is arranged at the upper part of the clear liquid chamber, the liquid outlet end of the reflux pipe is connected to the lower part of the alkali liquid tank, a stirring mechanism is arranged in the alkali liquid tank, a connecting pipe is arranged at the upper part of the alkali liquid tank, and the liquid outlet end of the connecting pipe passes through the side wall of the cone and is connected to the lower end of the spray pipe. The utility model has a long service life, good dust removal effect, can reduce environmental pollution, and has significant economic and social value.
[0004] In the existing sintered brick production waste gas treatment, the waste gas flow space is large and relatively dispersed, and it is necessary to use more nozzles for water spraying operations, which seriously wastes water resources. For this reason, we provide a waste gas harmless treatment device and method for a sintered brick production line. Summary of the invention
[0005] The purpose of the present invention is to provide a device and method for harmless treatment of waste gas from a sintered brick production line, so as to solve the problem in the above-mentioned background technology that during the treatment of waste gas from existing sintered brick production, the waste gas flow space is large and relatively dispersed, and it is necessary to use more nozzles for water spraying operations, resulting in serious waste of water resources.
[0006] To achieve the above-mentioned objectives, the present invention provides the following technical solutions: a waste gas harmless treatment device for a sintered brick production line, comprising a sedimentation base, a first treatment seat is arranged at the upper end of the sedimentation base, a second treatment seat is arranged above the first treatment seat, a demister seat is arranged at the upper end of the second treatment seat, an exhaust seat is arranged at the upper end of the demister seat, a concentration seat is arranged between the first treatment seat and the second treatment seat, and the two ends of the concentration seat are respectively welded and fixed to the first treatment seat and the second treatment seat, a first treatment chamber and a second treatment chamber are respectively arranged inside the first treatment seat and the second treatment seat, a first sprinkler assembly is arranged inside the first treatment chamber, and a second sprinkler assembly is arranged inside the second treatment chamber.
[0007] Preferably, the first sprinkler assembly and the second sprinkler assembly both include a rotating plate and a rotating column, and the rotating column is welded in the middle of the upper part of the rotating plate, the lower surface of the rotating plate is provided with a water outlet column, the outer surface of the water outlet column is provided with a through-type water mist hole, and a plurality of tax holes are equidistantly distributed in a row, and the upper surface of the rotating plate is provided with a ventilation groove.
[0008] Preferably, a connecting column is inserted and connected to the upper end of the rotating column, and the outer portion of the connecting column is rotatably connected to the rotating column via a ball bearing.
[0009] Preferably, a variable frequency motor is provided at the upper end of the connecting column, a linkage gear is provided at the output end of the variable frequency motor, a rotating gear is welded on the outer wall of the rotating column, a motor mounting frame is welded at the other end of the variable frequency motor, and one end of the motor mounting frame is fixed by a fixing bolt.
[0010] Preferably, a cavity is provided inside the connecting column, a water pipe connecting port is provided on one side surface of the cavity, a water inlet pipe is inserted into the water pipe connecting port, and one end of the water inlet pipe is inserted into the rotating column, and the connection is sealed by a sealing ring.
[0011] Preferably, the other end of the water inlet pipe is connected to a connecting pipe via a tee, and the other end of the connecting pipe is inserted into a water tank.
[0012] Preferably, a concentrating groove is provided on the upper surface of the concentrating seat, a sedimentation chamber is provided inside the sedimentation base, and the concentrating groove is communicated with the sedimentation chamber and the second processing chamber.
[0013] Preferably, a defogger chamber is provided inside the defogger seat, and a defogger is fixed inside the defogger chamber.
[0014] Preferably, an exhaust port is welded on the upper surface of the exhaust seat, and the exhaust port is communicated with the defogger chamber, and an air inlet is welded on one side surface of the first processing seat, and the air inlet is communicated with the first processing chamber.
[0015] Preferably, a method for harmless treatment of waste gas from a sintered brick production line comprises the following steps:
[0016] Step 1: The first sprinkler assembly and the second sprinkler assembly are respectively fixed in the first treatment chamber and the second treatment chamber inside the first treatment seat and the second treatment seat by fixing bolts;
[0017] Step 2: The waste gas generated by the sintered brick production line is transported to the first processing chamber from the air inlet, and a water pump is installed outside the water tank to transport water from the connecting pipe to the water inlet pipe and discharge it from the water mist hole of the water outlet column;
[0018] Step 3: While discharging water, start the variable frequency motor. The output end of the variable frequency motor drives the linkage gear to rotate. The linkage gear meshes with the rotating gear, thereby driving the rotating gear to rotate, and realizing the rotation of the rotating plate. When the rotating plate rotates, the discharged water moves in a fan shape through centrifugal force and inertia, forming a range of water mist.
[0019] Step 4: After the exhaust gas is treated by the first sprinkler assembly from bottom to top, it is discharged from the focusing tank into the second treatment chamber, and then treated by the second sprinkler assembly, and then treated by the demister. The treated gas is discharged from the exhaust port, and the wastewater concentrated in the sedimentation base is discharged from the drain port on the rear surface of the sedimentation base.
[0020] Compared with the prior art, the present invention has the following beneficial effects:
[0021] 1. The present invention arranges a first sprinkler assembly and a second sprinkler assembly in a first treatment chamber and a second treatment chamber respectively, and the first sprinkler assembly and the second sprinkler assembly are fixed in the first treatment chamber and the second treatment chamber inside the first treatment seat and the second treatment seat respectively through fixing bolts, and the waste gas generated by the sintered brick production line is transported to the first treatment chamber from the air inlet, and a water pump is installed outside the water tank to transport water from the connecting pipe to the water inlet pipe, and the water is discharged from the water mist hole of the water outlet column. While discharging the water, the variable frequency motor is started, and the output end of the variable frequency motor drives the linkage gear to rotate. Since the linkage gear is meshed with the rotating gear, the rotating gear is driven to rotate, and the rotation of the rotating column is realized. The rotating column is fixed to the rotating plate to realize the rotation of the rotating plate, and the outer side of the connecting column is rotatably connected to the rotating column through a ball bearing, so that the rotating plate rotates when the connecting column does not rotate. When the rotating plate rotates, the discharged water operates in a fan shape through centrifugal force and inertia to form a range of water mist, thereby realizing a multi-range covering water sprinkling effect with a small amount of water, thereby saving water resources.
[0022] 2. A concentrating seat is arranged between the first treatment seat and the second treatment seat, and a concentrating groove is arranged on the upper surface of the concentrating seat. The concentrating groove is interconnected with the sedimentation chamber and the second treatment chamber. The waste gas generated by the sintered brick production line is transported to the first treatment chamber from the air inlet. The waste gas moving upward is centrally treated by the concentrating groove, and is diverted from the concentrating groove to the second treatment chamber. At this time, when the waste gas moves up and down, it diffuses from the middle to the surroundings, that is, there is more waste gas in the middle and less waste gas around. In the process of diffusion, it will be centrally treated. Compared with the existing diffusion shape, the fallen water resources can be fully utilized within a certain range, without increasing nozzles on a large scale, reducing the use of water resources, thereby saving water resources. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0024] Figure 2 It is a schematic diagram of the overall cross-sectional structure of the present invention;
[0025] Figure 3 It is a schematic structural diagram of the first sprinkler assembly of the present invention;
[0026] Figure 4 It is a schematic diagram of the structure of the centralized seat of the present invention;
[0027] Figure 5 It is a bottom view structural schematic diagram of the first sprinkler assembly of the present invention;
[0028] Figure 6 It is a schematic diagram of the connection structure between the connection column and the water inlet pipe of the present invention;
[0029] In the figure: 1. sedimentation base; 2. first treatment seat; 3. concentration seat; 4. second treatment seat; 5. defogger seat; 6. exhaust seat; 7. air inlet; 8. exhaust port; 9. water tank; 10. water inlet pipe; 11. connecting pipe; 12. sedimentation chamber; 13. first treatment chamber; 14. second treatment chamber; 15. defogger chamber; 16. first sprinkler assembly; 17. second sprinkler assembly; 18. defogger; 19. rotating plate; 20. rotating column; 21. rotating gear; 22. connecting column; 23. ball bearing; 24. variable frequency motor; 25. motor mounting bracket; 26. linkage gear; 27. water pipe connection port; 28. water outlet column; 29. water mist hole; 30. concentration tank; 31. cavity; 32. fixing bolt; 33. ventilation tank. DETAILED DESCRIPTION
[0030] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0031] See also Figure 1-6 , an embodiment of the present invention: a waste gas harmless treatment device for a sintered brick production line, comprising a precipitation base 1, a first treatment seat 2 is arranged at the upper end of the precipitation base 1, a second treatment seat 4 is arranged above the first treatment seat 2, a demister seat 5 is arranged at the upper end of the second treatment seat 4, an exhaust seat 6 is arranged at the upper end of the demister seat 5, a concentration seat 3 is arranged between the first treatment seat 2 and the second treatment seat 4, and the two ends of the concentration seat 3 are respectively welded and fixed to the first treatment seat 2 and the second treatment seat 4, a first treatment chamber 13 and a second treatment chamber 14 are respectively arranged inside the first treatment seat 2 and the second treatment seat 4, and a first sprinkler is arranged inside the first treatment chamber 13 The water assembly 16 and the second treatment chamber 14 are provided with a second water sprinkling assembly 17. The first water sprinkling assembly 16 and the second water sprinkling assembly 17 both include a rotating plate 19 and a rotating column 20, and the rotating column 20 is welded in the middle of the upper part of the rotating plate 19. The lower surface of the rotating plate 19 is provided with a water outlet column 28, and the outer surface of the water outlet column 28 is provided with a through-type water mist hole 29, and a plurality of tax holes are evenly spaced and arranged in a row. When the rotating plate 19 rotates, the discharged water is fan-shaped by centrifugal force and inertia to form a range of water mist, thereby achieving a multi-range coverage water sprinkling effect with a small amount of water, thereby saving water resources. The upper surface of the rotating plate 19 is provided with There is a vent groove 33, through which the gas can move upward. The upper end of the rotating column 20 is inserted and connected with a connecting column 22. The outer part of the connecting column 22 is rotatably connected to the rotating column 20 through a ball bearing 23. A variable frequency motor 24 is provided at the upper end of the connecting column 22. A linkage gear 26 is provided at the output end of the variable frequency motor 24. A rotating gear 21 is welded to the outer wall of the rotating column 20. The variable frequency motor 24 is started, and the output end of the variable frequency motor 24 drives the linkage gear 26 to rotate. Since the linkage gear 26 is meshed with the rotating gear 21, the rotating gear 21 is driven to rotate, thereby realizing the rotation of the rotating column 20. The rotating column 20 is fixed to the rotating plate 19. The rotating plate 19 is rotated, and the outer part of the connecting column 22 is rotatably connected to the rotating column 20 through the ball bearing 23, so that the rotating plate 19 rotates when the connecting column 22 does not rotate. The other end of the variable frequency motor 24 is welded with a motor mounting frame 25, and one end of the motor mounting frame 25 is fixed by a fixing bolt 32. The first sprinkler assembly 16 and the second sprinkler assembly 17 are respectively fixed in the first processing chamber 13 and the second processing chamber 14 inside the first processing seat 2 and the second processing seat 4 by the fixing bolt 32. The defogger seat 5 is provided with a defogger chamber 15, and the defogger chamber 15 is fixed with a defogger 18, and the gas is treated by the defogger 18.
[0032] The waste gas generated by the sintered brick production line is transported to the inside of the first processing chamber 13 from the air inlet 7. The water tank 9 is equipped with an external water pump to transport water from the connecting pipe 11 to the water inlet pipe 10, and the water is discharged from the water mist hole 29 of the water outlet column 28. While discharging the water, the frequency conversion motor 24 is started. The output end of the frequency conversion motor 24 drives the linkage gear 26 to rotate. Since the linkage gear 26 is meshed with the rotating gear 21, the rotating gear 21 is driven to rotate, thereby realizing the rotation of the rotating column 20. The rotating column 20 is fixed to the rotating plate 19 to realize the rotation of the rotating plate 19, and the outer part of the connecting column 22 is rotatably connected to the rotating column 20 through the ball bearing 23, so that the rotating plate 19 rotates when the connecting column 22 does not rotate. When the rotating plate 19 rotates, the discharged water operates in a fan shape through centrifugal force and inertia to form a range of water mist, thereby achieving a multi-range coverage watering effect with a small amount of water, thereby saving water resources.
[0033] It is further introduced that a cavity 31 is provided inside the connecting column 22, and a water pipe connecting port 27 is provided on one side surface of the cavity 31. The water inlet pipe 10 is inserted into the water pipe connecting port 27, and one end of the water inlet pipe 10 is inserted into the rotating column 20. The connection is sealed by a sealing ring, which has a limiting effect on the connection of the water inlet pipe 10, avoids falling, and improves stability.
[0034] To further introduce, the other end of the water inlet pipe 10 is installed with a connecting pipe 11 through a tee, and the other end of the connecting pipe 11 is inserted into the water tank 9. The water tank 9 has an external water pump to transport water from the connecting pipe 11 to the water inlet pipe 10 and discharge it from the water mist hole 29 of the water outlet column 28.
[0035] See also Figure 1 , 2 3. A concentrating groove 30 is arranged on the upper surface of the concentrating seat 3, and a sedimentation chamber 12 is arranged inside the sedimentation base 1. The concentrating groove 30 is communicated with the sedimentation chamber 12 and the second treatment chamber 14. The exhaust gas moving upward is centrally treated by the concentrating groove 30, and is diverted from the concentrating groove 30 to enter the second treatment chamber 14. At this time, when the exhaust gas moves up and down, it diffuses from the middle to the surroundings, that is, there is more exhaust gas in the middle and less exhaust gas around. In the process of diffusion, it will be centrally treated. Compared with the existing diffusion shape, the falling water resources can be fully utilized within a certain range, without increasing the nozzles on a large scale, reducing the use of water resources, thereby playing the effect of saving water resources.
[0036] See also Figure 1 An exhaust port 8 is welded on the upper surface of the exhaust seat 6, and the exhaust port 8 is communicated with the defogger chamber 15. An air inlet 7 is welded on the side surface of the first treatment seat 2, and the air inlet 7 is communicated with the first treatment chamber 13. The waste gas generated by the sintered brick production line is transported to the inside of the first treatment chamber 13 from the air inlet 7, and the treated gas is discharged from the exhaust port 8.
[0037] See also Figure 1-6 , a method for harmless treatment of waste gas from a sintered brick production line, comprising the following steps:
[0038] Step 1: The first sprinkler assembly 16 and the second sprinkler assembly 17 are respectively fixed in the first treatment chamber 13 and the second treatment chamber 14 inside the first treatment seat 2 and the second treatment seat 4 by fixing bolts 32;
[0039] Step 2: The waste gas generated by the sintered brick production line is transported from the air inlet 7 to the first processing chamber 13, and the water tank 9 is equipped with an external water pump to transport water from the connecting pipe 11 to the water inlet pipe 10, and the water is discharged from the water mist hole 29 of the water outlet column 28;
[0040] Step 3: while discharging water, start the variable frequency motor 24, the output end of the variable frequency motor 24 drives the linkage gear 26 to rotate, the linkage gear 26 meshes with the rotating gear 21, thereby driving the rotating gear 21 to rotate, realizing the rotation of the rotating plate 19, when the rotating plate 19 rotates, the discharged water moves in a fan shape through centrifugal force and inertia, forming a range of water mist;
[0041] Step 4: After the exhaust gas is treated by the first sprinkler assembly 16 from bottom to top, it is discharged from the focusing tank 30 into the second treatment chamber 14, and then treated by the second sprinkler assembly 17, and then treated by the demister 18. The treated gas is discharged from the exhaust port 8, and the wastewater concentrated in the sedimentation base 1 is discharged from the drain port on the rear surface of the sedimentation base 1.
[0042] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.
Claims
1. A device for harmless treatment of waste gas of a sintered brick production line, comprising a precipitation base (1), a first treatment base (2) being arranged at the upper end of the precipitation base (1), a second treatment base (4) being arranged above the first treatment base (2), a demister base (5) being arranged at the upper end of the second treatment base (4), an exhaust base (6) being arranged at the upper end of the demister base (5), and characterized in that: A central seat (3) is arranged between the first processing seat (2) and the second processing seat (4), and two ends of the central seat (3) are respectively welded and fixed to the first processing seat (2) and the second processing seat (4); a first processing chamber (13) and a second processing chamber (14) are respectively arranged inside the first processing seat (2) and the second processing seat (4); a first watering assembly (16) is arranged inside the first processing chamber (13), and a second watering assembly (17) is arranged inside the second processing chamber (14).
2. The device for harmless treatment of waste gas from a sintered brick production line according to claim 1 is characterized in that: The first sprinkler assembly (16) and the second sprinkler assembly (17) both comprise a rotating plate (19) and a rotating column (20), wherein the rotating column (20) is welded to the middle of the upper part of the rotating plate (19), a water outlet column (28) is arranged on the lower surface of the rotating plate (19), a through-type water mist hole (29) is arranged on the outer surface of the water outlet column (28), and a plurality of tax holes are evenly spaced and arranged in a row, and a ventilation groove (33) is arranged on the upper surface of the rotating plate (19).
3. The device for harmless treatment of waste gas from a sintered brick production line according to claim 2 is characterized in that: A connecting column (22) is inserted and connected to the upper end of the rotating column (20), and the outside of the connecting column (22) is rotatably connected to the rotating column (20) via a ball bearing (23).
4. The device for harmless treatment of waste gas from a sintered brick production line according to claim 3 is characterized by: A variable frequency motor (24) is disposed at the upper end of the connecting column (22), a linkage gear (26) is disposed at the output end of the variable frequency motor (24), a rotating gear (21) is welded to the outer wall of the rotating column (20), a motor mounting frame (25) is welded to the other end of the variable frequency motor (24), and one end of the motor mounting frame (25) is fixed by a fixing bolt (32).
5. The device for harmless treatment of waste gas from a sintered brick production line according to claim 4 is characterized in that: The connection column (22) is provided with a cavity (31) inside, and a water pipe connection port (27) is provided on one side surface of the cavity (31). A water inlet pipe (10) is inserted into the water pipe connection port (27), and one end of the water inlet pipe (10) is inserted into the inside of the rotating column (20), and the connection is sealed by a sealing ring.
6. The device for harmless treatment of waste gas from a sintered brick production line according to claim 5 is characterized by: The other end of the water inlet pipe (10) is connected to a connecting pipe (11) via a tee, and the other end of the connecting pipe (11) is inserted into the water tank (9).
7. The device for harmless treatment of waste gas from a sintered brick production line according to claim 6 is characterized by: The upper surface of the concentrating seat (3) is provided with a concentrating groove (30), the interior of the precipitation base (1) is provided with a precipitation chamber (12), and the concentrating groove (30) is in communication with the precipitation chamber (12) and the second processing chamber (14).
8. The device for harmless treatment of waste gas from a sintered brick production line according to claim 7 is characterized in that: A demisting chamber (15) is arranged inside the demisting seat (5), and a demisting device (18) is fixed inside the demisting chamber (15).
9. The device for harmless treatment of waste gas from a sintered brick production line according to claim 8, characterized in that: An exhaust port (8) is welded on the upper surface of the exhaust seat (6), and the exhaust port (8) is communicated with the demisting chamber (15); an air inlet (7) is welded on the side surface of the first processing seat (2), and the air inlet (7) is communicated with the first processing chamber (13).
10. A method for harmless treatment of waste gas from a sintered brick production line, based on the harmless treatment of waste gas from a sintered brick production line according to claim 9, characterized in that: The following steps are involved: Step 1: The first sprinkler assembly (16) and the second sprinkler assembly (17) are respectively fixed in the first treatment chamber (13) and the second treatment chamber (14) inside the first treatment seat (2) and the second treatment seat (4) by means of fixing bolts (32); Step 2: The waste gas generated by the sintered brick production line is transported from the air inlet (7) to the inside of the first processing chamber (13); an external water pump is installed in the water tank (9) to transport water from the connecting pipe (11) to the water inlet pipe (10), and the water is discharged from the water mist hole (29) of the water outlet column (28); Step 3: while discharging water, the variable frequency motor (24) is started, the output end of the variable frequency motor (24) drives the linkage gear (26) to rotate, the linkage gear (26) is meshed with the rotating gear (21), thereby driving the rotating gear (21) to rotate, so as to realize the rotation of the rotating plate (19), when the rotating plate (19) rotates, the discharged water moves in a fan shape due to centrifugal force and inertia, forming a range of water mist; Step 4: After the waste gas is treated from bottom to top by the first sprinkler assembly (16), it is discharged from the concentration tank (30) into the second treatment chamber (14), and then treated by the second sprinkler assembly (17), and then treated by the demister (18). The treated gas is discharged from the exhaust port (8), and the waste water collected in the sedimentation base (1) is discharged from the drain port on the rear surface of the sedimentation base (1).
