Multistage feed pump maintenance platform and use method thereof
By designing a multi-stage water supply pump maintenance platform, the pump shaft is stably lifted and disassembled by using jacks and adjustment knobs, the problems of wedge-shaped fitting precision and measurement data deviation in the middle section of the high-pressure multi-stage water supply pump are solved, and maintenance accuracy and efficiency are improved .
Patent Information
- Application Number
- CN202411001450.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-25
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2044-07-25
AI Technical Summary
During the maintenance process of high-pressure multi-stage water supply pump, the precision of the wedge-shaped fit in the middle section becomes worse, the roundness of the middle section is easily damaged, and the measurement data is deviated, affecting the reliability of the pump shaft and impeller.
A multi-stage water supply pump maintenance platform is designed, including base, front-end assembly and rear-end assembly. The jack and adjustment knob are used to achieve stable lifting and disassembly of the pump shaft. The adjustment and measurement of the pump shaft are optimized through the flower basket adjustment assembly to ensure the middle section of the pump shaft. Level of precision coordination and data accuracy.
It effectively solves the problems of deterioration in the precision of the middle-section wedge-shaped fit and the measurement data deviation, and improves the accuracy and efficiency of multi-stage water supply pump maintenance.
Smart Images

Figure CN118877792A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of water pump maintenance, and in particular relates to a multi-stage water supply pump maintenance platform and a use method thereof. Background Art
[0002] At present, most of the boilers used in industrial and mining enterprises adopt high-pressure multi-stage water supply pumps for water supply. For a high-pressure, high-speed, multi-stage boiler water supply pump, the maintenance and assembly requirements are very high, which will directly affect whether the water supply pump can operate normally and its operating efficiency.
[0003] At present, in the maintenance of high-pressure multi-stage water supply pumps, their disassembly, splitting and assembly are mostly carried out with the help of ordinary pump stands, whose function is only to play the role of a bracket. Therefore, the following problems will inevitably arise during the maintenance process: First, due to the wedge-shaped fit between the various stages of the middle section of the pump, since the ordinary pump stand only supports the two ends of the pump shaft, under the action of its own gravity, the precision of the wedge-shaped fit will be affected, resulting in poor sealing between the various stages of the middle section; second, the stoppers of the middle section are easily squeezed and stuck to each other during disassembly, resulting in the need to apply a large external force to the gap of the stoppers to forcibly separate them, which will cause damage to the roundness of the middle section; third, it is inconvenient to measure the data of key components (such as: pump shaft curvature, end face runout data, etc.) after the multi-stage water supply pump is disassembled, which will lead to deviations in the measurement data and reduce the reliability of the pump shaft and impeller.
[0004] The Chinese patent specification discloses a multi-stage centrifugal pump maintenance device and maintenance method (publication number CN105987026A), and specifically discloses the following contents: including a flange connected to the inlet section of the multi-stage centrifugal pump, the middle bracket mainly plays a load-bearing and supporting role, an adjustment plate is installed on the bracket, and an adjustment bolt is installed in the middle of the adjustment plate to adjust its position according to the length of the pump shaft. The uppermost part of the adjustment bolt is equipped with a support plate to support pump shafts of different sizes, and the lowermost part is a fixed bottom plate. The technical solution adopted by the invention is to place the entire pump body vertically, and its lifting process is relatively inconvenient and has poor stability, which also affects the accuracy of detection and calibration. Summary of the invention
[0005] 1. Technical issues to be solved
[0006] The present invention provides a multi-stage water supply pump maintenance platform and a method for using the same, the purpose of which is to solve the problems of poor precision of the middle wedge fit, easy damage to the middle section roundness and deviation of the measurement data during the existing maintenance process of the multi-stage water supply pump.
[0007] 2. Technical Solution
[0008] In order to achieve the above object, the present invention adopts the following technical solutions.
[0009] The multi-stage water supply pump maintenance platform of the present invention comprises:
[0010] The base has a middle component on its upper part, a front end component on its front end, and a rear end component on its rear end, and the front end component is mirror-symmetrical to the rear end component; the middle component includes two middle jacks, and the two middle jacks are installed in two rectangular grooves of the base one by one, and the tops of the two middle jacks are connected to the groove-shaped brackets, and the two sides of the base are respectively connected to the retaining walls, and the lifting and lowering adjustment knobs of the two middle jacks extend out from the two rectangular holes of the front retaining wall one by one.
[0011] Furthermore, the front end component includes a front end jack, the lower part of the front end jack is rotatably connected to the front pitch adjusting screw, the other end of the front pitch adjusting screw is threadedly connected to the front end surface of the base, the front end jack is slidably connected to the dovetail groove on the front end box, the top of the front end jack is connected to the V-shaped front end support block, the front side of the front end support block is provided with a front end vertical plate, the upper part of the front end vertical plate is threadedly connected to the front end pump shaft ejector pin, the lower part of the front end vertical plate is slidably connected to the strip groove on the front end box, the upper part of the front end surface of the front end box is threadedly connected to the front fastening screw, and the lower part of the front end surface of the front end box is connected to the U-shaped front clamp.
[0012] Furthermore, the rear end component includes a rear end jack, the lower part of the rear end jack is rotatably connected to the rear pitch adjusting screw, the other end of the rear pitch adjusting screw is threadedly connected to the rear end face of the base, the rear end jack is slidably connected to the dovetail groove on the rear end box body, the top of the rear end jack is connected to the V-shaped rear end support block, the rear side of the rear end support block is provided with a rear end vertical plate, the upper part of the rear end vertical plate is threadedly connected to the rear end pump shaft ejector pin, the lower part of the rear end vertical plate is slidably connected to the strip groove on the rear end box body, the upper part of the rear end face of the rear end box body is threadedly connected to the rear fastening screw, and the lower part of the rear end face of the rear end box body is connected to the U-shaped rear clamp.
[0013] Preferably, the middle jack, the front jack and the rear jack are all scissor-type jacks, which include a left upper arm, a left lower arm, a right upper arm, a right lower arm, and a threaded rod. The upper end of the left upper arm is rotatably connected to the support plate via the upper pin shaft on the left side, the lower end of the left upper arm is rotatably connected to the upper end of the left lower arm via the middle pin shaft on the left side, and the lower end of the left lower arm is rotatably connected to the support plate via the lower pin shaft on the left side; the upper end of the right upper arm is rotatably connected to the support plate via the upper pin shaft on the right side, the lower end of the right upper arm is rotatably connected to the upper end of the right lower arm via the middle pin shaft on the right side, and the lower end of the right lower arm is rotatably connected to the support plate via the lower pin shaft on the right side; the middle pin shaft on the right side is rotatably connected to the threaded sleeve, the threaded rod is threadedly connected to the threaded sleeve, the left end of the threaded rod is rotatably connected to the connecting head, the other end of the connecting head is rotatably connected to the middle pin shaft on the left side, and the right end of the threaded rod is connected to the lifting adjustment knob.
[0014] Furthermore, it also includes a basket adjustment component, which includes a basket adjustment rod, the upper part of the basket adjustment rod is connected to the shaft sleeve through a screw rod, the lower part of the basket adjustment rod is threadedly connected to a bolt, and the end of the bolt is connected to a rotating handle.
[0015] The method for using the multi-stage water supply pump maintenance platform of the present invention comprises the following specific steps:
[0016] 1) Remove the front vertical plate, the front support block on the front jack and the rear support block on the rear jack are both at the lowest height, and the multi-stage water supply pump to be repaired is hoisted onto the grooved support of the multi-stage water supply pump maintenance platform;
[0017] 2) Turn the two middle jacks at the same time to make the trough-shaped support rise slowly and support the multi-stage water supply pump horizontally;
[0018] 3) Remove the coupling, mechanical seal assembly, bearing bush, balance plate, bearing seat and other accessories of the multi-stage water supply pump;
[0019] 4) Slightly lift the shaft head on the water inlet side of the multi-stage water supply pump shaft, and place a protective copper sheet under the shaft hole on the water inlet side;
[0020] 5) Insert the shaft sleeve of the basket adjustment assembly into the shaft head on the water inlet side of the pump shaft, place the bolt in the U-shaped notch of the clamp, turn the handle to the bottom of the clamp, turn the basket adjustment rod, pull down the shaft head on the water inlet side, and slightly lift the shaft head on the water outlet side;
[0021] 6) Use the diagonal disassembly method to remove the cylinder bolts of the multi-stage water supply pump and mark each component;
[0022] 7) Use a copper rod to hit the inner side of the foot of the outlet section to separate the outlet section from the middle section and lift it out;
[0023] 8) Remove the outlet ring, impeller and other parts;
[0024] 9) Starting from the last level in the middle section, use a copper rod to hit each level in the middle section in turn and remove each level in the middle section;
[0025] 10) Turn the rear pitch adjusting screw rod to make the V-shaped rear end support block located at the lower part of the shaft head on the water outlet side, and rotate the crank of the rear end jack, so that the V-shaped rear end support block rises and contacts the shaft head on the water outlet side;
[0026] 11) Remove the sleeve on the shaft head on the water inlet side, turn the front pitch screw to make the V-shaped front end support block located at the lower part of the shaft head on the water inlet side, rotate the crank of the front end jack, and the V-shaped front end support block rises and contacts with the shaft head on the water inlet side;
[0027] 12) Install the front end plate on the front end box, adjust the front end pump shaft ejector pin on the front end plate and the rear end pump shaft ejector pin on the rear end plate respectively, and adjust the front end jack and the rear end jack to rise or fall at the same time, push the front end pump shaft ejector pin into the correction blind hole of the shaft head end face on the water inlet section side, push the rear end pump shaft ejector pin on the rear end plate into the correction blind hole of the shaft head end face on the water outlet section side, and then tighten the front fastening screws and the rear fastening screws respectively;
[0028] 13) Place a dial indicator on the multi-stage water supply pump maintenance platform to measure the pump shaft bending of the multi-stage water supply pump and record it;
[0029] 14) After the impeller, mouth ring and other components are repaired, the data of the relevant components of the multi-stage water supply pump and the assembly of the multi-stage water supply pump are carried out in sequence.
[0030] The data measurement of the multi-stage water supply pump related components specifically includes the following steps:
[0031] 1) Remove the front and rear vertical plates at both ends of the multi-stage water supply pump shaft;
[0032] 2) Insert the shaft sleeve of the basket adjustment assembly into the shaft head on the water inlet side of the pump shaft, place the bolt in the U-shaped notch of the clamp, turn the handle to the bottom of the clamp, turn the basket adjustment rod, and tighten the shaft head on the water inlet side of the pump shaft downward;
[0033] 3) Turn the crank of the rear jack, and the V-shaped rear support block will drop to the lowest position;
[0034] 4) Assemble the impeller, mouth ring, machine seal and other components in sequence, and set a dial indicator on the grooved support to measure the runout and deflection of the above components one by one;
[0035] 5) Repair or replace parts that do not meet the standards again until all parts meet the standards.
[0036] The assembly of the multi-stage water supply pump specifically comprises the following steps:
[0037] 1) Insert the impeller, mouth ring, middle section, sealing ring and water inlet section into the shaft head on the water outlet side of the pump shaft in sequence;
[0038] 2) Insert the cylinder bolts and pre-tighten them;
[0039] 3) Remove the shaft sleeve on the shaft head on the water inlet section side, take out the protective copper sheet at the bottom of the shaft hole of the water inlet section, and turn the two middle jacks at the same time to make the grooved support descend and detach from the middle section of the multi-stage water supply pump;
[0040] 4) Select four measuring points at equal distances along the circumference of the middle section, measure the axial length of the middle section starting from each measuring point, and adjust the tightness of the cylinder bolts according to the measured data;
[0041] 5) Install mechanical seal components, bearings, balance plates, couplings, etc. to complete the assembly of the multi-stage water supply pump.
[0042] 3. Beneficial Effects
[0043] The present invention discloses a multi-stage water supply pump maintenance platform and a method for using the same, which effectively solves the problems of poor precision of the wedge-shaped fit of the middle section, easy damage to the roundness of the middle section and deviation in the measurement data during the existing maintenance process of the multi-stage water supply pump, optimizes the assembly accuracy of the multi-stage water supply pump after maintenance, and improves the efficiency of maintenance and assembly. BRIEF DESCRIPTION OF THE DRAWINGS
[0044] Figure 1 It is a three-dimensional structural schematic diagram of the multi-stage water supply pump maintenance platform of the present invention.
[0045] Figure 2 It is a three-dimensional structural schematic diagram of the front-end component and the rear-end component of the multi-stage water supply pump maintenance platform of the present invention.
[0046] Figure 3 The utility model is a schematic diagram of the main structure of the scissor jack of the multi-stage water supply pump maintenance platform of the present invention.
[0047] Figure 4 It is a three-dimensional structural schematic diagram of the basket adjustment component of the multi-stage water supply pump maintenance platform of the present invention.
[0048] Figure 5 The method of using the multi-stage water supply pump maintenance platform of the present invention is shown in FIG. Figure Ⅰ .
[0049] Figure 6 The method of using the multi-stage water supply pump maintenance platform of the present invention is shown in FIG. Figure II . DETAILED DESCRIPTION
[0050] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments, so that those skilled in the art can have a clearer understanding.
[0051] Embodiment 1
[0052] As a multi-stage water supply pump maintenance platform of the present invention, Figure 1 As shown, it includes a base 1, a middle component 2 is provided on the upper part of the base, a front end component 3 is provided at the front end of the base, and a rear end component 4 is provided at the rear end of the base, and the front end component 3 is mirror-symmetrical with the rear end component 4; the middle component 2 includes two middle jacks 21, and the two middle jacks 21 are installed in two rectangular grooves of the base one by one, and the tops of the two middle jacks 21 are connected to the groove-shaped bracket 22, and the two sides of the base are respectively connected to the retaining wall 23, and the lifting adjustment knobs 210 of the two middle jacks 21 extend out from the two rectangular holes of the front retaining wall one by one.
[0053] like Figure 2 As shown, the front end component 3 includes a front end jack 31, the lower part of the front end jack is rotatably connected to the front pitch adjusting screw 311, the other end of the front pitch adjusting screw is threadedly connected to the front end surface of the base 1, the front end jack is slidably connected to the dovetail groove on the front end box 32, and the front end jack can be moved back and forth on the front end box 32 by rotating the front pitch adjusting screw, the top of the front end jack is connected to the V-shaped front end support block 33, the front side of the front end support block 33 is provided with a front end vertical plate 34, the upper part of the front end vertical plate is threadedly connected to the front end pump shaft ejector pin 35, the lower part of the front end vertical plate 34 is slidably connected to the strip groove on the front end box 32, the upper part of the front end surface of the front end box is threadedly connected to the front fastening screw 36 for fastening the front end vertical plate 34, and the lower part of the front end surface of the front end box 32 is connected to the U-shaped front clamp 310.
[0054] like Figure 2 As shown, the rear end component 4 includes a rear end jack 41, the lower part of the rear end jack is rotatably connected to the rear pitch adjusting screw 411, the other end of the rear pitch adjusting screw is threadedly connected to the rear end surface of the base 1, the rear end jack is slidably connected to the dovetail groove on the rear end box 42, and the rear end jack can be moved back and forth on the rear end box 42 by rotating the rear pitch adjusting screw, the top of the rear end jack is connected to a V-shaped rear end support block 43, the rear side of the rear end support block 43 is provided with a rear end vertical plate 44, the upper part of the rear end vertical plate is threadedly connected to the rear end pump shaft ejector pin 45, the lower part of the rear end vertical plate 44 is slidably connected to the strip groove on the rear end box 42, the upper part of the rear end surface of the rear end box is threadedly connected to the rear fastening screw 46 for fastening the rear end vertical plate 44, and the lower part of the rear end surface of the rear end box 42 is connected to a U-shaped rear clamp 410.
[0055] like Figure 3 As shown, in this embodiment, the middle jack 21, the front jack 31, and the rear jack 41 are all scissor jacks, which include a left upper arm 211, a left lower arm 212, a right upper arm 213, a right lower arm 214, and a threaded rod 221. The upper end of the left upper arm is rotatably connected to the supporting plate 216 through the upper pin shaft 215 on the left side, the lower end of the left upper arm is rotatably connected to the upper end of the left lower arm 212 through the middle pin shaft 217 on the left side, and the lower end of the left lower arm 212 is rotatably connected to the supporting plate 219 through the lower pin shaft 218 on the left side. The upper end of the right upper arm 213 is rotatably connected to the support plate via the upper pin shaft on the right side, the lower end of the right upper arm 213 is rotatably connected to the upper end of the right lower arm 214 via the middle pin shaft on the right side, and the lower end of the right lower arm 214 is rotatably connected to the support plate via the lower pin shaft on the right side; the middle pin shaft on the right side is rotatably connected to the threaded sleeve 220, the threaded rod 221 is threadedly connected to the threaded sleeve, the left end of the threaded rod is rotatably connected to the connecting head 222, the other end of the connecting head is rotatably connected to the middle pin shaft on the left side, and the right end of the threaded rod is connected to the lifting adjustment knob (210).
[0056] like Figure 4As shown, the multi-stage water pump maintenance platform of the present invention also includes a basket adjustment component 5, which includes a basket adjustment rod 51, the upper part of the basket adjustment rod is connected to the sleeve 52 through a screw rod, the lower part of the basket adjustment rod is threadedly connected to the bolt 53, and the end of the bolt is connected to the rotating handle 54.
[0057] The method for using the multi-stage water supply pump maintenance platform of the present invention comprises the following specific steps:
[0058] 1) Remove the front vertical plate 34, the front support block 33 on the front jack 31 and the rear support block 43 on the rear jack 41 are both at the lowest height, and the multi-stage water supply pump to be repaired is hoisted onto the grooved support 22 of the multi-stage water supply pump repair platform;
[0059] 2) Rotate the two middle jacks 21 at the same time, so that the groove-shaped support 22 slowly rises and horizontally supports the multi-stage water supply pump;
[0060] 3) Remove the coupling, mechanical seal assembly, bearing bush, balance plate, bearing seat and other accessories of the multi-stage water supply pump;
[0061] 4) If Figure 5 As shown, the shaft head of the multi-stage water supply pump shaft 63 on the water inlet section 61 side is slightly lifted, and a protective copper sheet is placed on the lower part of the shaft hole on the water inlet section side;
[0062] 5) If Figure 5 As shown, the shaft sleeve 52 of the basket adjustment assembly 5 is inserted into the shaft head of the water inlet section side of the pump shaft 63, so that the bolt 53 is placed in the U-shaped notch of the clamp 310, the handle 54 is turned to be placed at the bottom of the clamp, and the basket adjustment rod 51 is turned to pull the shaft head on the water inlet section side downward, so that the shaft head on the water outlet section side is slightly lifted;
[0063] 6) Use the diagonal disassembly method to remove the cylinder bolts of the multi-stage water supply pump and mark each component;
[0064] 7) Use a copper rod to hit the inner side of the foot of the water outlet section to separate the water outlet section from the middle section 62 and lift it out;
[0065] 8) Remove the outlet ring, impeller and other parts;
[0066] 9) Starting from the last stage of the middle section 62, use a copper rod to hit each stage of the middle section 62 in turn and remove each stage of the middle section;
[0067] 10) As Figure 6 As shown, the rear pitch adjusting screw 411 is rotated to make the V-shaped rear end support block 43 located at the lower part of the shaft head on the water outlet section side, and the crank of the rear end jack 41 is rotated, so that the V-shaped rear end support block 43 rises and contacts the shaft head on the water outlet section side;
[0068] 11) If Figure 6As shown, the shaft sleeve 52 on the shaft head on the water inlet section side is removed, and the front pitch adjusting screw 311 is rotated to make the V-shaped front end support block 33 located at the lower part of the shaft head on the water inlet section side, and the crank of the front end jack 31 is rotated, so that the V-shaped front end support block 33 rises and contacts with the shaft head on the water inlet section side;
[0069] 12) If Figure 6 As shown, the front end vertical plate 34 is installed on the front end box body 42, and the front end pump shaft ejector pin 35 on the front end vertical plate 34 and the rear end pump shaft ejector pin 45 on the rear end vertical plate 44 are adjusted respectively, and the front end jack 31 and the rear end jack 41 are adjusted to rise or fall at the same time, and the front end pump shaft ejector pin 35 is pushed into the correction blind hole of the shaft head end face on the water inlet section side, and the rear end pump shaft ejector pin 45 on the rear end vertical plate 44 is pushed into the correction blind hole of the shaft head end face on the water outlet section side, and then the front fastening screw 36 and the rear fastening screw 46 are tightened respectively;
[0070] 13) If Figure 6 As shown, a dial gauge 7 is placed on the multi-stage water supply pump maintenance platform to measure the pump shaft bending of the multi-stage water supply pump and record it;
[0071] 14) After the impeller, mouth ring and other components are repaired, the data of the relevant components of the multi-stage water supply pump and the assembly of the multi-stage water supply pump are carried out in sequence.
[0072] The data measurement of the multi-stage water supply pump related components specifically includes the following steps:
[0073] 1) Remove the front end plate 34 and the rear end plate 44 at both ends of the pump shaft of the multi-stage water supply pump;
[0074] 2) Insert the shaft sleeve 52 of the basket adjustment assembly 5 into the shaft head on the water inlet side of the pump shaft, place the bolt 53 in the U-shaped notch of the clamp 310, turn the handle 54 to the bottom of the clamp, turn the basket adjustment rod 51, and tighten the shaft head on the water inlet side of the pump shaft downward;
[0075] 3) Turn the crank of the rear jack 41, and the V-shaped rear support block 43 drops to the lowest position;
[0076] 4) Assemble the impeller, mouth ring, machine seal and other components in sequence, and set a dial gauge 7 on the grooved support 22 to measure the runout and deflection of the above components one by one;
[0077] 5) Repair or replace parts that do not meet the standards again until all parts meet the standards.
[0078] The assembly of the multi-stage water supply pump specifically comprises the following steps:
[0079] 1) Insert the impeller, mouth ring, middle section, sealing ring and water inlet section into the shaft head on the water outlet side of the pump shaft in sequence;
[0080] 2) Insert the cylinder bolts and pre-tighten them;
[0081] 3) Remove the shaft sleeve 52 on the shaft head on the water inlet section side, take out the protective copper sheet at the bottom of the shaft hole of the water inlet section, and rotate the two middle jacks 21 at the same time to make the grooved support 22 drop and detach from the middle section of the multi-stage water supply pump;
[0082] 4) Select four measuring points at equal distances along the circumference of the middle section, measure the axial length of the middle section starting from each measuring point, and adjust the tightness of the cylinder bolts according to the measured data;
[0083] 5) Install mechanical seal components, bearings, balance plates, couplings, etc. to complete the assembly of the multi-stage water supply pump.
[0084] The present invention discloses a multi-stage water supply pump maintenance platform and a method for using the same, which effectively solves the problems of poor precision of the wedge-shaped fit of the middle section, easy damage to the roundness of the middle section and deviation in the measurement data during the existing maintenance process of the multi-stage water supply pump, optimizes the assembly accuracy of the multi-stage water supply pump after maintenance, and improves the efficiency of maintenance and assembly.
[0085] The present invention is not limited to the above-mentioned specific implementation modes, and various improvements made by those skilled in the art to the technical solutions according to the concept of the present invention shall all fall within the scope of protection claimed by the present invention.
Claims
1. A multi-stage water supply pump maintenance platform, comprising a base (1), characterized in that: A middle component (2) is provided at the upper part of the base, a front component (3) is provided at the front end of the base, and a rear component (4) is provided at the rear end of the base, wherein the front component (3) and the rear component (4) are mirror-symmetrical; the middle component (2) comprises two middle jacks (21), the two middle jacks (21) are mounted in two rectangular grooves of the base in a one-to-one correspondence, the tops of the two middle jacks (21) are connected to a groove-shaped bracket (22), the two sides of the base are respectively connected to a retaining wall (23), and the lifting and lowering adjustment knobs (210) of the two middle jacks (21) extend out of two rectangular holes of the front retaining wall in a one-to-one correspondence.
2. The multi-stage water pump maintenance platform according to claim 1 is characterized in that: The front end assembly (3) comprises a front end jack (31), the lower part of the front end jack is rotatably connected to the front pitch adjusting screw (311), the other end of the front pitch adjusting screw is threadedly connected to the front end surface of the base (1), the front end jack is slidably connected to the dovetail groove on the front end box (32), the top of the front end jack is connected to the V-shaped front end support block (33), the front side of the front end support block (33) is provided with a front end vertical plate (34), the upper part of the front end vertical plate is threadedly connected to the front end pump shaft ejector pin (35), the lower part of the front end vertical plate (34) is slidably connected to the strip groove on the front end box (32), the upper part of the front end surface of the front end box is threadedly connected to the front fastening screw (36), and the lower part of the front end surface of the front end box (32) is connected to the U-shaped front clamp (310).
3. The multi-stage water supply pump maintenance platform according to claim 2 is characterized in that: The rear end assembly (4) comprises a rear end jack (41), the lower part of the rear end jack is rotatably connected to a rear pitch adjusting screw (411), the other end of the rear pitch adjusting screw is threadedly connected to the rear end surface of the base (1), the rear end jack is slidably connected to a dovetail groove on a rear end box (42), the top of the rear end jack is connected to a V-shaped rear end support block (43), the rear side of the rear end support block (43) is provided with a rear end vertical plate (44), the upper part of the rear end vertical plate is threadedly connected to a rear end pump shaft ejector pin (45), the lower part of the rear end vertical plate (44) is slidably connected to a strip groove on the rear end box (42), the upper part of the rear end surface of the rear end box is threadedly connected to a rear fastening screw (46), and the lower part of the rear end surface of the rear end box (42) is connected to a U-shaped rear clamp (410).
4. The multi-stage water pump maintenance platform according to claim 3 is characterized in that: The middle jack (21), the front jack (31), and the rear jack (41) are all scissor-type jacks, which include a left upper arm (211), a left lower arm (212), a right upper arm (213), a right lower arm (214), and a threaded rod (221). The upper end of the left upper arm is rotatably connected to a support plate (216) via an upper pin shaft (215) on the left side, the lower end of the left upper arm is rotatably connected to the upper end of the left lower arm (212) via a middle pin shaft (217) on the left side, and the lower end of the left lower arm (212) is rotatably connected to a support plate (219) via a lower pin shaft (218) on the left side. ); the upper end of the right upper arm (213) is rotatably connected to the support plate via the upper pin shaft on the right side, the lower end of the right upper arm (213) is rotatably connected to the upper end of the right lower arm (214) via the middle pin shaft on the right side, and the lower end of the right lower arm (214) is rotatably connected to the support plate via the lower pin shaft on the right side; the middle pin shaft on the right side is rotatably connected to the threaded sleeve (220), the threaded rod (221) is threadedly connected to the threaded sleeve, the left end of the threaded rod is rotatably connected to the connecting head (222), the other end of the connecting head is rotatably connected to the middle pin shaft on the left side, and the right end of the threaded rod is connected to the lifting adjustment knob (210).
5. The multi-stage water supply pump maintenance platform according to claim 1 is characterized in that: It also includes a basket adjustment assembly (5), which includes a basket adjustment rod (51), the upper part of which is connected to a shaft sleeve (52) via a screw rod, the lower part of which is threadedly connected to a bolt (53), and the end of which is connected to a rotating handle (54).
6. A method for using the multi-stage water pump maintenance platform according to the above multiple claims, characterized in that: The specific steps include: 1) Remove the front vertical plate (34), the front support block (33) on the front jack (31) and the rear support block (43) on the rear jack (41) are both at the lowest height, and the multi-stage water supply pump to be repaired is hoisted onto the grooved support (22) of the multi-stage water supply pump repair platform; 2) rotating the two middle jacks (21) at the same time, so that the groove-shaped support (22) slowly rises and horizontally supports the multi-stage water supply pump; 3) Remove the coupling, mechanical seal assembly, bearing bush, balance plate, bearing seat and other accessories of the multi-stage water supply pump; 4) Slightly lift the shaft head on the water inlet section (61) side of the multi-stage water supply pump shaft (63), and place a protective copper sheet under the shaft hole on the water inlet section side; 5) Insert the shaft sleeve (52) of the basket adjustment assembly (5) into the shaft head on the water inlet side of the pump shaft (63), place the bolt (53) in the U-shaped notch of the clamp (310), turn the handle (54) to the bottom of the clamp, turn the basket adjustment rod (51), pull the shaft head on the water inlet side downward, and slightly lift the shaft head on the water outlet side; 6) Use the diagonal disassembly method to remove the cylinder bolts of the multi-stage water supply pump and mark each component; 7) Use a copper rod to hit the inner side of the foot of the water outlet section, so that the water outlet section is separated from the middle section (62) and lifted out; 8) Remove the outlet ring, impeller and other parts; 9) Starting from the last stage of the middle section (62), hammer each stage of the middle section with a copper rod in turn and remove each stage of the middle section; 10) Rotate the rear pitch adjusting screw (411) so that the V-shaped rear end support block (43) is located below the shaft head on the water outlet side, and rotate the crank of the rear end jack (41) so that the V-shaped rear end support block (43) rises and contacts the shaft head on the water outlet side; 11) Remove the shaft sleeve (52) sleeved on the shaft head on the water inlet section side, rotate the front pitch adjusting screw (311) so that the V-shaped front end support block (33) is located at the lower part of the shaft head on the water inlet section side, rotate the crank of the front end jack (31), and the V-shaped front end support block (33) rises and contacts the shaft head on the water inlet section side; 12) Install the front end vertical plate (34) on the front end box (42), adjust the front end pump shaft ejector pin (35) on the front end vertical plate (34) and the rear end pump shaft ejector pin (45) on the rear end vertical plate (44) respectively, and adjust the front end jack (31) and the rear end jack (41) to rise or fall, push the front end pump shaft ejector pin (35) into the correction blind hole of the shaft head end face on the water inlet section side, push the rear end pump shaft ejector pin (45) on the rear end vertical plate (44) into the correction blind hole of the shaft head end face on the water outlet section side, and then tighten the front fastening screw (36) and the rear fastening screw (46) respectively; 13) Install a dial indicator (7) on the multi-stage water supply pump maintenance platform to measure the pump shaft bending of the multi-stage water supply pump and record it; 14) After the impeller, mouth ring and other components are repaired, the data of the relevant components of the multi-stage water supply pump and the assembly of the multi-stage water supply pump are carried out in sequence.
7. The method for using the multi-stage water pump maintenance platform according to claim 6 is characterized in that: The data measurement of the multi-stage water supply pump related components specifically includes the following steps: 1) Remove the front end plate (34) and the rear end plate (44) at both ends of the pump shaft of the multi-stage water supply pump; 2) Insert the shaft sleeve (52) of the basket adjustment assembly (5) into the shaft head on the water inlet side of the pump shaft, place the bolt (53) in the U-shaped notch of the clamp (310), turn the handle (54) to the bottom of the clamp, turn the basket adjustment rod (51), and tighten the shaft head on the water inlet side of the pump shaft downward; 3) Turn the crank of the rear jack (41), and the V-shaped rear support block (43) descends to the lowest position; 4) assembling the impeller, the mouth ring, the machine seal and other components in sequence, and setting a dial indicator on the grooved support (22) to measure the runout and deflection of the above components one by one; 5) Repair or replace parts that do not meet the standards again until all parts meet the standards.
8. The method for using the multi-stage water supply pump maintenance platform according to claim 7 is characterized in that: The assembly of the multi-stage water supply pump specifically comprises the following steps: 1) Insert the impeller, mouth ring, middle section, sealing ring and water inlet section into the shaft head on the water outlet side of the pump shaft in sequence; 2) Insert the cylinder bolts and pre-tighten them; 3) Remove the shaft sleeve (52) on the shaft head on the water inlet section side, take out the protective copper sheet at the lower part of the shaft hole of the water inlet section, and simultaneously rotate the two middle jacks (21) to make the grooved support (22) descend and detach from the middle section of the multi-stage water supply pump; 4) Select four measuring points at equal distances along the circumference of the middle section, measure the axial length of the middle section starting from each measuring point, and adjust the tightness of the cylinder bolts according to the measured data; 5) Install mechanical seal components, bearings, balance plates, couplings, etc. to complete the assembly of the multi-stage water supply pump.
Citation Information
Patent Citations
Horizontal dual-shell multi-stage centrifugal pump disassembling tool
CN107803645A
High-precision and high-efficiency assembling and debugging system for high-power high-lift low-temperature pump
CN117399985A
Disassembly and assembly device for column pipe and shaft holder of vertical pump
KR102430720B1
wrench FOR ASSEMBLY AND DISASSEMBLY OF HYDRAULIC DOWNHOLE MOTORS
RU2007110112A
System and method for rotating a turbine shell
US20130199009A1