Self-resetting assembled bridge pier with replaceable energy-dissipation shear parts and construction method of self-resetting assembled bridge pier
By designing a self-reset and assembled bridge pier structure with replaceable energy-consuming shear parts and prestressed ribs in the bridge pier, the problems of insufficient seismic resistance and difficulty in post-seismic repair are solved, and the rapid recovery of replacing shear parts after strong earthquakes is achieved Function.
Patent Information
- Application Number
- CN202411141120.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-20
- Publication Date
- 2024-11-01
AI Technical Summary
The existing prefabricated assembled bridge piers generally have problems such as insufficient energy consumption capacity and difficulty in repairing after earthquakes, especially other seismic problems other than lateral earthquake response have not been effectively solved.
A self-reset assembly piers with replaceable energy-consuming shear parts are designed, using a structure that combines the support and prefabricated RC piers. Through the design of prestressed ribs and steel bases, it is equipped with right-angle trapezoid shear parts and asphalt henknife to ensure that The bridge pier has sufficient strength, stiffness and energy consumption capabilities, and can be replaced and recovered quickly after suffering from strong shocks.
The pier structure has a clear stress mechanism and a reliable force transmission path. It can replace damaged shear parts after a strong earthquake, quickly restore seismic resistance, and solve the problems of insufficient energy consumption capacity and post-seismic repair of traditional bridge piers.
Smart Images

Figure CN118880726A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of bridge engineering, and in particular to a self-resetting assembled bridge pier with replaceable energy-absorbing shearing members and a construction method thereof. Background Art
[0002] In order to reduce the impact of bridge construction on the surrounding environment and traffic, improve the construction efficiency of cross-river bridges, and realize the concept of rapid, green, and industrialized construction, in recent years, the factory prefabrication and assembly rapid bridge construction technology has received widespread attention. The factory prefabricated pier sections can not only provide high-quality construction speed for modern pier structures, but also achieve efficient connection on the basis of ensuring construction quality and mechanical properties. Therefore, the construction quality and mechanical performance guarantee of the connection parts are the key control points of the prefabricated bridge construction process. At present, the connection forms of prefabricated concrete piers and caps mainly include grouting sleeve connection, grouting bellows connection, slot connection, socket connection, and prestressed steel connection. However, although these connection structures have been relatively mature in the construction process, there are still problems such as construction difficulties, difficulty in detecting grouting quality, poor energy dissipation capacity under earthquake action, and difficulty in repair after earthquake damage. These problems have led to the general shortcomings of prefabricated piers in seismic performance.
[0003] At present, bridge seismic research is gradually developing from the direction of improving the recoverability of structural functions, and the seismic design concept is also shifting from traditional ductile design or seismic isolation design to toughness-based seismic design. A tough seismic bridge refers to a bridge structure that can maintain or quickly restore its use function without repair or with only a little repair after being affected by an earthquake. A tough seismic bridge can adopt concepts such as rocking structures, self-resetting structures, and replaceable components, and combine new materials, new structures, new structures, and new systems to reduce permanent damage and residual deformation of bridge structures after an earthquake, thereby shortening the repair and recovery time and quickly restoring the bridge function.
[0004] The replaceable component system installs replaceable shock-absorbing devices at appropriate component locations, and reduces the post-seismic damage of the main structure by sacrificing replaceable components during strong earthquakes. Nevertheless, from domestic and foreign research, the existing replaceable component systems, such as BRB-double column piers, energy-absorbing connecting beams-double column piers, etc., can effectively reduce the transverse seismic response of the bridge, but cannot solve other seismic problems except the transverse bridge. Summary of the invention
[0005] In view of the shortcomings of the prior art, the technical problem to be solved by the present invention is to provide a self-resetting assembled bridge pier with replaceable energy-absorbing shearing parts and a construction method thereof. The bridge pier is equipped with replaceable energy-absorbing shearing parts and prestressed tendons for self-resetting of the bridge pier. The bridge pier has a simple design and a clear force mechanism, which ensures that the pier column has sufficient strength, rigidity and energy-absorbing capacity. In addition, the bridge pier also has the characteristics of being replaceable and quickly recovering its function after being damaged by a strong earthquake.
[0006] In order to solve the above technical problems, the technical solution of the present invention is: a self-resetting assembled pier with replaceable energy-absorbing shearing members, comprising a cap, a foundation groove for inserting the bottom of a prefabricated RC pier is recessed on the top of the cap, a pier bottom steel sleeve is coaxially sleeved on the outside of the bottom of the prefabricated RC pier, a steel base for abutting the pier bottom steel sleeve is fixedly arranged on the top of the foundation groove, the steel base and the center of the prefabricated RC pier are vertically penetrated by prestressed tendons and both ends are anchored and fixed, an annular anchor bottom steel plate is embedded in the surface of the cap outside the foundation groove, a plurality of shearing members are fixedly arranged along the outer periphery of the pier bottom steel sleeve, and the lower ends of the shearing members are welded to the anchor bottom steel plate; the anchor bottom steel plate is padded with rubber pads along its inner circumferential wall, and an annular asphalt hemp knife is arranged between the rubber pads and the pier bottom steel sleeve located in the foundation groove.
[0007] Furthermore, the shear members are all in the shape of right-angled trapezoids, and their vertical right-angled sides are all welded and fixed to the outer wall of the pier bottom steel sleeve near the top through welded end plates, and their horizontal right-angled sides are all welded to the anchor bottom steel plate.
[0008] Furthermore, the asphalt hemp knife is located below the welding end plate, and arc grooves for making way for the asphalt hemp knife are provided at right angles at the lower ends of the shear members.
[0009] Furthermore, the anchoring bottom steel plate is embedded in the pedestal by anchor bolts, and the top surface of the anchoring bottom steel plate is at the same level as the top surface of the pedestal.
[0010] Furthermore, a plurality of annular stiffening ribs are fixedly arranged at intervals along the vertical height direction on the inner wall of the pier bottom steel sleeve, and the annular stiffening ribs are cast as one body with the prefabricated RC bridge pier.
[0011] Furthermore, the upper and lower ends of the prestressed tendons pass through the prefabricated RC bridge pier and the steel base respectively and are anchored at the ends through anchors.
[0012] Furthermore, the bottom of the pier bottom steel sleeve is in a concave arc shape, and the top of the steel base is also in a concave arc shape to cooperate and abut the pier bottom steel sleeve.
[0013] Furthermore, a tetrafluoroethylene plate is fixedly provided on the arc surface at the top of the steel base.
[0014] Furthermore, a gap is left between the cap and the prefabricated RC bridge pier.
[0015] A working method for a self-resetting assembled bridge pier with replaceable energy-absorbing shearing members is carried out in the following steps: S1: Casting the cap: On-site cap construction, tying the cap reinforcement, accurately arranging the steel base and anchor bolts, installing the cap formwork, pouring concrete, and removing the formwork after the concrete reaches the designed strength; S2: Prefabrication of RC bridge piers in prefabrication plants, tying of bridge pier steel bars, installation of pier bottom steel sleeves at the bottom of the piers, welding of annular stiffening ribs on the inner side of the steel sleeves according to the required reinforcement range, installation of bridge pier formwork, pouring of concrete, and removal of the formwork after curing to reach the concrete design strength; S3: Install the anchor bottom steel plate and anchor it on the cap with anchor bolts; hoist the prefabricated RC bridge pier into place, install the rubber pad inside the anchor bottom steel plate, and bury asphalt hemp knife in the gap between the rubber pad and the steel sleeve at the bottom of the pier; set up temporary support and temporarily fix the prefabricated RC bridge pier to ensure that it does not overturn during the installation process; S4: Install the welded end plate on the side of the pier bottom steel sleeve by welding; then install the shear member and fix it on the anchor bottom steel plate and the welded end plate by welding; S5: Install the bridge superstructure and construct the bridge deck system and its ancillary facilities.
[0016] Furthermore, for the post-earthquake damage that needs to be repaired and replaced, the main construction methods are as follows: (1) Temporary inclined supports are set up around the prefabricated RC pier to ensure that the pier does not overturn during the replacement process.
[0017] (2) Cut the shear parts that need to be replaced and grind the cut parts smooth.
[0018] (3) Re-weld new shear members; after welding is completed, remove the temporary supports around the pier body and complete the repair and replacement of the shear members.
[0019] Compared with the prior art, the present invention has the following beneficial effects: the bridge pier structure has a clear force mechanism and a reliable force transmission path, and has the characteristics of being able to replace damaged shear members and quickly recover after encountering a strong earthquake. This design solves the problem of insufficient energy dissipation capacity of traditional prefabricated bridge piers and difficulty in repair after an earthquake.
[0020] The present invention is further described in detail below with reference to the accompanying drawings and specific embodiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 A schematic diagram of the structure of an embodiment of the present invention; Figure 2 for Figure 1 Sectional view of AA in the middle; Figure 3 for Figure 1 A magnified schematic diagram of B.
[0022] In the figure: 1-prefabricated RC bridge pier; 2-shear member; 3-asphalt hemp knife; 4-pier bottom steel sleeve; 5-steel base; 6-tetrafluoroethylene plate; 7-cap; 8-anchor bolt; 9-anchor bottom steel plate; 10-rubber pad; 11-welded end plate; 12-annular stiffening rib; 13-prestressed tendon; 14-anchor ingot; 15-foundation groove, 16-arc groove. DETAILED DESCRIPTION
[0023] In order to make the above features and advantages of the present invention more clearly understood, embodiments are given below with reference to the accompanying drawings for detailed description.
[0024] like Figures 1 to 3 As shown, a self-resetting assembled pier with replaceable energy-absorbing shearing members comprises a cap 7, a foundation groove 15 is recessed on the top of the cap for inserting the bottom of a prefabricated RC pier 1, a pier bottom steel sleeve 4 is coaxially sleeved on the outer side of the bottom of the prefabricated RC pier, a steel base 5 for abutting the pier bottom steel sleeve is fixedly arranged on the top of the foundation groove, the steel base and the center of the prefabricated RC pier are vertically penetrated by prestressed tendons 13 and both ends are anchored and fixed, a hole is reserved in the steel base and the center of the prefabricated RC pier for passing the prestressed tendons, an annular anchor bottom steel plate 9 is embedded on the surface of the cap outside the foundation groove, a plurality of shearing members 2 are fixedly arranged along the outer periphery of the pier bottom steel sleeve, and the lower ends of the shearing members are welded to the anchor bottom steel plate; the anchor bottom steel plate is padded with rubber pads 10 along its inner circumferential wall, and an annular asphalt hemp knife 3 is arranged between the rubber pads and the pier bottom steel sleeve located in the foundation groove.
[0025] In the embodiment of the present invention, the shear members are all in the shape of a right-angled trapezoid, and their vertical right-angled sides are welded and fixed to the outer wall of the pier bottom steel sleeve near the top through the welded end plate 11, and their horizontal right-angled sides are welded to the anchor bottom steel plate. The shear members are made of low-yield point steel, which can further improve the actual energy consumption effect while meeting the lateral stiffness.
[0026] In the embodiment of the present invention, the asphalt hemp knife is located below the welding end plate, and arc grooves 16 for making way for the asphalt hemp knife are provided at right angles at the lower ends of the shear members.
[0027] In the embodiment of the present invention, the anchor bottom steel plate is embedded in the pedestal by anchor bolts 8, and the top surface of the anchor bottom steel plate is at the same level as the top surface of the pedestal. After the earthquake, the damaged shear members can be cut, removed and replaced, so as to quickly restore the seismic performance of the prefabricated RC pier.
[0028] In the embodiment of the present invention, a plurality of annular stiffening ribs 12 are fixedly arranged at intervals along the vertical height direction on the inner wall of the pier bottom steel sleeve, which can provide effective support and transfer load. The annular stiffening ribs are cast as one with the prefabricated RC bridge pier.
[0029] In the embodiment of the present invention, the upper and lower ends of the prestressed tendons pass through the prefabricated RC bridge pier and the steel base respectively and are anchored at the ends through anchors 14 .
[0030] In an embodiment of the present invention, the bottom of the pier bottom steel sleeve is a concave arc shape, and the top of the steel base is also a concave arc shape to cooperate with the pier bottom steel sleeve to abut against the pier bottom steel sleeve, so that it can have better rotation ability, so as to more fully guide the seismic energy to the shear member.
[0031] In the embodiment of the present invention, a tetrafluoroethylene plate 6 is fixedly provided on the arc surface at the top of the steel base, which can further reduce the friction between the pier bottom steel sleeve and the steel base.
[0032] In the embodiment of the present invention, a gap is left between the cap and the prefabricated RC bridge pier, the function of which is to enable the top of the prefabricated RC bridge pier to swing within a certain range.
[0033] A working method for self-resetting assembled bridge piers with replaceable energy-absorbing shear members is carried out in the following steps: S1: Casting the cap: On-site cap construction, tying the cap reinforcement, accurately arranging the steel base and anchor bolts, installing the cap formwork, pouring concrete, and removing the formwork after the concrete reaches the designed strength; S2: Prefabrication of RC bridge piers in prefabrication plants, tying of bridge pier steel bars, installation of pier bottom steel sleeves at the bottom of the piers, welding of annular stiffening ribs on the inner side of the steel sleeves according to the required reinforcement range, installation of bridge pier formwork, pouring of concrete, and removal of the formwork after curing to reach the concrete design strength; S3: Install the anchor bottom steel plate and anchor it on the cap with anchor bolts; hoist the prefabricated RC bridge pier into place, pass the prestressed tendons 13 through the reserved holes, and after they are in place, tension the prestressed tendons on the top of the pier and seal the anchors; install the rubber pads on the inner side of the anchor bottom steel plate, and bury asphalt hemp knives in the gap between the rubber pads and the steel sleeves at the bottom of the pier; set up temporary supports and temporarily fix the prefabricated RC bridge pier to ensure that it does not overturn during the installation process; S4: Install the welded end plate on the side of the pier bottom steel sleeve by welding; then install the shear member and fix it on the anchor bottom steel plate and the welded end plate by welding; S5: Install the bridge superstructure and construct the bridge deck system and its ancillary facilities.
[0034] In the embodiment of the present invention, the main construction methods for post-earthquake damage that needs to be repaired and replaced are as follows: (1) Temporary inclined supports are set up around the prefabricated RC pier to ensure that the pier does not overturn during the replacement process.
[0035] (2) Cut the shear parts that need to be replaced and grind the cut parts smooth.
[0036] (3) Re-weld new shear members; after welding is completed, remove the temporary supports around the pier body and complete the repair and replacement of the shear members.
[0037] The present invention is not limited to the above-mentioned best implementation mode. Anyone can derive other forms of self-resetting assembled bridge piers with replaceable energy-absorbing shear members and construction methods thereof under the enlightenment of the present invention. All equivalent changes and modifications made according to the scope of the patent application of the present invention shall fall within the scope of the present invention.
Claims
1. A self-resetting assembled bridge pier with replaceable energy-absorbing shearing members, characterized in that: The invention comprises a cap, wherein a foundation groove is recessed on the top of the cap for inserting the bottom of the prefabricated RC pier, a pier bottom steel sleeve is coaxially sleeved on the outer side of the bottom of the prefabricated RC pier, a steel base for abutting the pier bottom steel sleeve is fixedly arranged on the top of the foundation groove, the steel base and the center of the prefabricated RC pier are vertically penetrated by prestressed tendons and both ends are anchored and fixed, an annular anchor bottom steel plate is embedded on the surface of the cap outside the foundation groove, a plurality of shear members are fixedly arranged along the outer periphery of the pier bottom steel sleeve, and the lower ends of the shear members are welded to the anchor bottom steel plate; the anchor bottom steel plate is padded with rubber pads along its inner circumferential wall, and an annular asphalt hemp knife is arranged between the rubber pads and the pier bottom steel sleeve located in the foundation groove.
2. The self-resetting assembled bridge pier with replaceable energy-absorbing shearing members according to claim 1 is characterized in that: The shear members are all in the shape of right-angle trapezoids, and their vertical right-angle sides are all welded and fixed to the outer wall of the pier bottom steel sleeve near the top through welded end plates, and their horizontal right-angle sides are all welded to the anchor bottom steel plate.
3. The self-resetting assembled bridge pier with replaceable energy-absorbing shearing members according to claim 2 is characterized in that: The asphalt hemp knife is located below the welding end plate, and arc grooves for giving way to the asphalt hemp knife are provided at right angles at the lower ends of the shear members.
4. The self-resetting assembled bridge pier with replaceable energy-absorbing shearing members according to claim 1 is characterized in that: The anchor bottom steel plate is embedded on the cap by anchor bolts, and the top surface of the anchor bottom steel plate is at the same level as the top surface of the cap.
5. The self-resetting assembled bridge pier with replaceable energy-absorbing shearing members according to claim 1 is characterized in that: A plurality of annular stiffening ribs are fixedly arranged at intervals on the inner wall of the pier bottom steel sleeve along its vertical height direction, and the annular stiffening ribs are cast as a whole with the prefabricated RC bridge pier.
6. The self-resetting assembled bridge pier with replaceable energy-absorbing shearing members according to claim 1 is characterized in that: The upper and lower ends of the prestressed tendons pass through the prefabricated RC bridge pier and the steel base respectively and are anchored at the ends through anchors.
7. The self-resetting assembled bridge pier with replaceable energy-absorbing shearing members according to claim 1 is characterized in that: The bottom of the pier bottom steel sleeve is in a concave arc shape, and the top of the steel base is also in a concave arc shape to cooperate and abut against the pier bottom steel sleeve.
8. The self-resetting assembled bridge pier with replaceable energy-absorbing shearing members according to claim 7 is characterized in that: A tetrafluoroethylene plate is fixedly arranged on the arc surface at the top of the steel base.
9. The self-resetting assembled bridge pier with replaceable energy-absorbing shearing members according to claim 1 is characterized in that: A gap is left between the cap and the prefabricated RC bridge pier.
10. A working method for self-resetting bridge pier assembly with replaceable energy-absorbing shearing members, characterized in that: A self-resetting assembled bridge pier with replaceable energy-absorbing shearing members as described in any one of claims 1 to 9 is used, and the following steps are performed: S1: Casting the cap: On-site cap construction, tying the cap reinforcement, accurately arranging the steel base and anchor bolts, installing the cap formwork, pouring concrete, and removing the formwork after the concrete reaches the designed strength; S2: Prefabrication of RC bridge piers in prefabrication plants, tying of bridge pier steel bars, installation of pier bottom steel sleeves at the bottom of the piers, welding of annular stiffening ribs on the inner side of the steel sleeves according to the required reinforcement range, installation of bridge pier formwork, pouring of concrete, and removal of the formwork after curing to reach the concrete design strength; S3: Install the anchor bottom steel plate and anchor it on the cap with anchor bolts; hoist the prefabricated RC bridge pier into place, install the rubber pad inside the anchor bottom steel plate, and bury asphalt hemp knife in the gap between the rubber pad and the steel sleeve at the bottom of the pier; set up temporary support and temporarily fix the prefabricated RC bridge pier to ensure that it does not overturn during the installation process; S4: Install the welded end plate on the side of the pier bottom steel sleeve by welding; then install the shear member and fix it on the anchor bottom steel plate and the welded end plate by welding; S5: Install the bridge superstructure and construct the bridge deck system and its ancillary facilities.