Anti-scouring suction pile foundation structure
Through the connection of prestressed hollow ring pipe sheet and high-strength bolts, combined with epoxy resin structural glue and underwater jet robot, the problem of transportation and installation of traditional suction pile foundations in large-scale offshore wind power projects is solved, and the structure is high Strength, durability and anti-shrinking ability improve construction efficiency and safety.
Patent Information
- Application Number
- CN202411076692.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-07
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2044-08-07
AI Technical Summary
In offshore wind power projects, traditional thin-walled steel suction pile foundations face transportation and installation difficulties in large-scale projects, and lack structural stability, especially in hard soil layers, which can easily lead to installation failure, affecting the safety and economics of the project.
Prestressed hollow ring pipe sheets and high-strength bolts are connected, combined with epoxy resin structural glue and underwater jet robots to form an anti-shrink-proof suction pile foundation structure. Through factory prefabricated assembly and rapid installation on site, the stability and sealing of the structure are ensured. and automatically level and flush the soil during the sinking process.
It significantly improves the strength and durability of the infrastructure, reduces construction time and cost, ensures the integrity and sealing of the structure, enhances the anti-shock capability, extends the service life, and improves construction efficiency and safety.
Smart Images

Figure CN118880863A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of marine engineering, in particular to an anti-scouring suction pile foundation structure. Background Art
[0002] Offshore wind power, as an emerging field and cutting-edge dynamic in the international wind power industry, occupies an important position in energy science research. Given the lower roughness of the sea surface, the offshore environment exhibits less turbulence and shear force than on land, which gives the offshore wind speed a larger value and higher stability. my country has clearly included offshore wind power in its core strategic planning, and is committed to promoting the optimization and upgrading of the industrial layout, the deepening and expansion of technological innovation, and focusing on implementing a cluster development strategy in deep sea areas.
[0003] Although my country has abundant offshore wind power resources, the construction of offshore wind turbines will encounter constraints from factors such as harsh marine environment and complex geological conditions, which greatly increases the difficulty of offshore wind power project construction. As a unique structural form, the suction pile foundation has an open bottom and closed top design, which enables it to effectively withstand huge horizontal and vertical loads and bending moments. In addition, the suction pile foundation also has many significant advantages, such as saving investment costs, shortening the foundation installation period, and being reusable. Therefore, in the field of offshore wind power projects, the suction pile foundation has gradually received high attention and in-depth research from the industry. The suction pile foundation is usually made of thin-walled steel materials. With the continuous increase in the installed capacity of offshore wind power units, the foundation design size has also increased, which leads to a large foundation volume, thus causing a series of problems during transportation and installation. During the design process, if the wall thickness of the suction pile foundation is too thin, it will increase the risk of buckling during construction and installation, and then cause damage to the overall structure. In addition, during the installation process, when encountering hard soil layers, the sinking and penetration The resistance will increase dramatically, which requires a greater negative pressure to overcome the resistance, which in turn may cause pipe penetration damage to the skirt foundation soil, ultimately leading to overall installation failure. These problems pose a serious threat to the safety and economy of offshore wind power projects, and effective solutions are urgently needed. With the continuous development of construction technology, ultra-high performance concrete (UHPC) has been widely used in the field of civil engineering due to its excellent mechanical properties, corrosion resistance and durability. It can be considered to apply ultra-high performance concrete (UHPC) to the design of suction pile foundations to solve the problems of transportation, installation and structural stability encountered by traditional thin-walled steel suction pile foundations in large-scale offshore wind power projects.
[0004] Therefore, applying ultra-high performance concrete to the design of suction pile foundations can not only solve the problems encountered by traditional suction pile foundations in large-scale offshore wind power projects, but also improve the safety and economy of the foundation, providing strong support for the development of offshore wind power projects. Summary of the invention
[0005] In view of the problems in the prior art, the present invention provides an anti-scouring suction pile foundation structure.
[0006] The technical solution adopted by the present invention to solve the technical problem is: an anti-scour suction pile foundation structure, comprising a prestressed hollow annular pipe segment, wherein the prestressed hollow annular pipe segment is provided with male and female slide grooves on the outer side along the height direction, wherein the male and female slide grooves include a female slide groove and a male slide groove, wherein the female slide groove and the male slide groove are adapted and plugged, wherein the female slide groove is further provided with a water-expandable sealing strip, and the columns, the foundation top plate, and the top plate ribs are welded and arranged by pre-buried steel components;
[0007] The upper end of the prestressed hollow ring segment is evenly embedded with high-strength bolts along the ring line direction for connecting the top plate ribs and the foundation top plate. A pumping hole is provided on the foundation top plate. A foundation blade foot is provided at the lower end of the prestressed hollow ring segment. A segment lifting ring is provided on the prestressed hollow ring segment. Positioning holes are provided on the top plate ribs and the foundation top plate for connecting the prestressed hollow ring segment and the high-strength bolts. A water pump is installed on the pumping hole, and a top plate lifting ring is fixedly connected to the foundation top plate.
[0008] Specifically, the male slide is provided with a segment grouting groove, and when the female slide and the male slide are plugged in, epoxy resin structural adhesive can be injected through the segment grouting groove, and reserved bolt holes are provided on the top plate ribs, and the reserved bolt holes are fixed to the prestressed hollow circular ring segment and the foundation top plate through bolts.
[0009] Specifically, an arc bolt is provided at the bottom of the foundation top plate, and multiple foundation top plates are limitedly connected by the arc bolts, a grouting groove at the top plate connection is provided on the foundation top plate, and a top plate grouting hole is provided at the top of the grouting groove at the top plate connection.
[0010] Specifically, an inflatable buoyancy ring is sleeved on the outer side of the prestressed hollow circular ring segment, and an underwater jet robot is installed between the prestressed hollow circular ring segment and the foundation top plate, which can clean the soil and inject concrete to solidify into fluidized solidified soil, thereby fixing the pile body.
[0011] Beneficial effects of the present invention:
[0012] 1. The present invention achieves the goal of rapid on-site installation through factory prefabricated assembled components. This prefabrication and assembly method greatly reduces on-site construction time and cost and improves work efficiency. At the same time, since all components are standardized in the factory, the quality is effectively guaranteed and the construction quality risk is reduced.
[0013] 2. The present invention utilizes prestressed ultra-high performance concrete materials to manufacture components, which significantly improves the strength and durability of the foundation structure. Prestressed ultra-high performance concrete has excellent mechanical properties and crack resistance, can effectively resist erosion and damage from the marine environment, and ensure the long-term stable operation of the foundation structure.
[0014] 3. The present invention adopts epoxy resin structural adhesive and high-strength bolts to connect components, ensuring the integrity and sealing of the structure. The epoxy resin structural adhesive has excellent bonding strength and weather resistance, which can ensure that the connection between components is firm and reliable, while the high-strength bolts provide a strong fastening force, further enhancing the stability of the structure.
[0015] Fourth, the present invention also realizes automatic leveling and penetration of the foundation through the application of underwater jet robots. This robot technology can accurately flush the soil inside the pipe segment, so that the foundation can be automatically leveled during the sinking and penetration process, avoiding the tilt problem that may occur in traditional methods. At the same time, the underwater jet robot can also flush and hollow out the base soil, so that the foundation can continue to sink and install when encountering hard soil layers, thereby improving construction efficiency.
[0016] 5. The present invention fills the hollow part of the pipe segment with fluidized solidified soil and continues to pour it around the foundation to form a scour protection layer. This innovative design not only enhances the foundation's anti-scour ability, but also improves the overall stability of the structure. The fluidized solidified soil is tightly combined with the inner wall of the pipe segment, effectively preventing the infiltration and scour of seawater and extending the service life of the foundation. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] The present invention is further described below in conjunction with the accompanying drawings and embodiments.
[0018] Figure 1 It is a schematic diagram of the three-dimensional structure of the main body of the present invention from the front perspective;
[0019] Figure 2 It is a top view of the main body in the present invention;
[0020] Figure 3 It is a side view of the main body of the present invention;
[0021] Figure 4 It is a schematic diagram of the connection structure of the prestressed hollow annular tube segment in the present invention;
[0022] Figure 5 It is a structural diagram of the butt joint of the prestressed hollow annular segment in the present invention;
[0023] Figure 6 Schematic diagram of the bottom structure of the prestressed hollow annular segment in the present invention;
[0024] Figure 7 It is a structural schematic diagram of the top plate ribs in the present invention;
[0025] Figure 8 It is a structural schematic diagram of the base top plate in the present invention;
[0026] Fig. 9 is a bottom view of the base top plate in the present invention;
[0027] Fig.10 It is a schematic diagram of the combined structure of the inflatable buoyancy ring and the prestressed hollow circular ring segment in the present invention;
[0028] Fig.11 It is a schematic diagram of the scouring and hollowing of soil by the prestressed hollow annular pipe segment, the foundation blade foot, and the underwater jet robot in the present invention;
[0029] Fig.12 It is a structural diagram of the present invention in a construction completion state.
[0030] In the figure: 1. Prestressed hollow ring segment; 2. High-strength bolts; 3. Pumping holes; 4. Segment lifting rings; 5. Foundation blade feet; 6. Male and female slides; 6-1. Female slide; 6-2. Male slide; 7. Top plate lifting ring; 8. Top plate ribs; 9. Foundation top plate; 10. Columns; 11. Segment grouting grooves; 12. Water-swelling sealing strips; 13. Reserved bolt holes; 14. Arc bolts; 15. Grouting grooves at top plate connections; 16. Top plate grouting holes; 17. Inflatable buoyancy rings; 18. Underwater jet robot; 19. Soil; 20. Pumps; 21. Flow-solidified soil. DETAILED DESCRIPTION
[0031] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.
[0032] The present invention is further described below in conjunction with the accompanying drawings.
[0033] Example
[0034] like Figure 1-9 As shown, an anti-scour suction pile foundation structure of the present invention comprises a prestressed hollow annular tube segment 1, and the prestressed hollow annular tube segment 1 is provided with a male and female chute 6 on the outer side along the height direction, and the male and female chute 6 comprises a female chute 6-1 and a male chute 6-2, and the female chute 6-1 and the male chute 6-2 are adapted and plugged, and the female chute 6-1 is also provided with a water-expandable sealing strip 12, and the column 10, the foundation top plate 9, and the top plate rib plate 8 are welded and arranged by pre-buried steel components;
[0035] The upper end of the prestressed hollow ring segment 1 is evenly embedded with high-strength bolts 2 along the ring line direction for connecting the top plate rib 8 and the foundation top plate 9. A pumping hole 3 is provided on the foundation top plate 9. A foundation blade foot 5 is provided at the lower end of the prestressed hollow ring segment 1. A segment lifting ring 4 is provided on the prestressed hollow ring segment 1. Positioning holes are provided on the top plate rib 8 and the foundation top plate 9 for connecting the prestressed hollow ring segment 1 and the high-strength bolts 2. A pumping pump 20 is installed on the pumping hole 3, and a top plate lifting ring 7 is fixedly connected to the foundation top plate 9.
[0036] A segment grouting groove 11 is provided on the male slide 6-2, and when the female slide 6-1 and the male slide 6-2 are plugged in, epoxy resin structural adhesive can be injected through the segment grouting groove 11, and a reserved bolt hole 13 is provided on the top plate rib 8, and the reserved bolt hole 13 is fixed to the prestressed hollow circular ring segment 1 and the foundation top plate 9 by bolts.
[0037] An arc bolt 14 is provided at the bottom of the foundation top plate 9, and multiple foundation top plates 9 are limitedly connected by the arc bolts 14. A top plate connection grouting groove 15 is provided on the foundation top plate 9, and a top plate grouting hole 16 is provided at the top of the top plate connection grouting groove 15.
[0038] An inflatable buoyancy ring 17 is sleeved on the outer side of the prestressed hollow ring segment 1, and an underwater jet robot 18 is installed between the prestressed hollow ring segment 1 and the foundation top plate 9, which can clean the soil 19 and inject concrete to solidify into fluidized solidified soil 21, thereby fixing the pile body.
[0039] The working principle is as follows: when in use, the prestressed hollow annular segment 1 is made of prestressed ultra-high performance concrete. The prestressed hollow annular segment 1 is composed of four or more pieces to form the skirt portion of the suction pile foundation. The prestressed hollow annular segment 1 is provided with male and female slide grooves 6 on the outside along the height direction for connecting and positioning adjacent segments. A groove is provided in the female slide groove 6-1, while the male slide groove 6-2 presents a T-shaped structural feature. A segment grouting groove 11 is provided between the two to facilitate the injection of epoxy resin structural adhesive. At the same time, a water-swelling sealing strip 12 is provided inside the female slide groove 6-1, which can automatically expand when the suction pile foundation is sunk to enhance the air tightness between the segments. The column 10 is welded to the foundation top plate 9 and the top plate rib 8 through embedded steel components.
[0040] The upper end of the prestressed hollow ring segment 1 is evenly embedded with high-strength bolts 2 along the ring line direction for connecting the foundation top plate 9 and the top plate rib 8. The lower end of the prestressed hollow ring segment 1 is provided with a foundation blade foot 5 with a certain slope. For the convenience of lifting and installation, the prestressed hollow ring segment 1 is provided with a segment lifting ring 4. The male slide groove 6-2 and the female slide groove 6-1 between the prestressed hollow ring segments 1 are nested with each other to form a tight connection structure.
[0041] Positioning holes are provided on the foundation top plate 9 and the top plate ribs 8 for connecting with the high-strength bolts 2 at the upper end of the prestressed hollow circular ring segment 1. The top plate ribs 8 are connected with the inner and outer sides of the prestressed hollow circular ring segment 1, while the foundation top plate 9 is only connected with the inner side of the prestressed hollow circular ring segment 1. The foundation top plate 9 is provided with a pumping hole 3 for connecting a pumping pump 20 during the suction penetration installation process.
[0042] A sealing top plate connection grouting groove 15 is provided between the foundation top plate 9 and the prestressed hollow annular segment 1 , a top plate connection grouting groove 15 is reserved between the foundation top plates 9 for sealing the top plates, and an arc-shaped bolt hole and a placement groove are reserved at the bottom of the foundation top plates 9 .
[0043] The foundation top plates 9 are connected by arc-shaped bolts 14, and the arc-shaped bolt 14 holes are prefabricated.
[0044] The prestressed hollow ring segments 1, foundation top plates 9 and top plate ribs 8 of the prestressed ultra-high performance concrete suction pile foundation are prefabricated in the factory, and then these components are transported to the offshore port for assembly. During the assembly process, the skirt plate is accurately installed between the prestressed hollow ring segments 1 through the male and female slide grooves 6, and epoxy resin structural adhesive is injected into the segment grouting grooves 11 of the male and female slide grooves 6 to ensure the stability and sealing of the connection. After the installation of the prestressed hollow ring segment 1 is completed, a stable inflatable buoyancy ring 17 is installed around the segment so that the skirt plate segment can be stably hoisted into the ocean.
[0045] The suction pile foundation top plate 9 and top plate ribs 8 are hoisted and installed in the port, and the foundation top plate 9 and top plate ribs 8 are tightly connected to the prestressed hollow annular pipe segment 1 by high-strength bolts 2 and arc bolts 14. At the same time, epoxy resin structural adhesive is injected into the grouting groove 15 at the top plate connection to further ensure the stability and sealing of the structure.
[0046] The assembled suction pile foundation is towed by a ship to the installation location, a water pump 20 is installed at the circular opening of the top plate, and the suction pile foundation is sunk to a certain depth by its own weight. Then the water pump 20 is turned on to form a pressure difference between the inside and outside of the foundation, so that the suction pile foundation continues to penetrate into the seabed under the action of negative pressure.
[0047] During the sinking process, if the foundation is tilted, an underwater jet robot 18 can be placed in the hollow part of the prestressed hollow annular segment 1. These robots can flush the soil 19 embedded in the hollow of the high-side segment of the foundation and extract the flushed mud, so that the suction pile foundation can be automatically leveled.
[0048] If the foundation encounters difficult-to-penetrate geological layers such as iron sand or hard soil layers during the penetration process, the water pump 20 can be turned off, and the underwater jet robot 18 in the pipe segment can be used to flush and hollow out the base soil so that the foundation can continue to sink and install. After the foundation blade 5 passes through these difficult strata, the water pump 20 can be turned on to allow the foundation to continue to sink by suction.
[0049] When the suction pile foundation is installed to the specified depth, the underwater jet robot 18 in the segment is used to thoroughly flush the soil in the pipe, and the extracted mud is added to cement and stirred into fluidized solidified soil 21, which is then refilled into the hollow part of the segment and poured again. The fluidized solidified soil will automatically diffuse around the suction pile foundation, and after solidification, it will form an erosion protection layer, further enhancing the stability and durability of the foundation. At the same time, the segment lifting ring 4 and the top plate lifting ring 7 can enhance the bonding strength between the suction pile foundation structure and the fluidized solidified soil 21 to complete the work.
[0050] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. An anti-scour suction pile foundation structure, comprising a prestressed hollow annular segment (1), characterized in that: The prestressed hollow annular pipe segment (1) is provided with male and female slide grooves (6) on the outer side along the height direction, the male and female slide grooves (6) include a female slide groove (6-1) and a male slide groove (6-2), the female slide groove (6-1) and the male slide groove (6-2) are adapted to be plugged in, the female slide groove (6-1) is also provided with a water-expandable sealing strip (12), and the column (10), the foundation top plate (9), and the top plate rib plate (8) are welded by pre-buried steel components.
2. The anti-scour suction pile foundation structure according to claim 1, characterized in that: The upper end of the prestressed hollow annular tube segment (1) is uniformly embedded with high-strength bolts (2) along the ring line direction for connecting the top plate rib plate (8) and the base top plate (9); the base top plate (9) is provided with a water pumping hole (3); the lower end of the prestressed hollow annular tube segment (1) is provided with a base blade foot (5); and the prestressed hollow annular tube segment (1) is provided with a tube segment hanging ring (4).
3. The anti-scour suction pile foundation structure according to claim 2, characterized in that: Positioning holes are provided on the top plate ribs (8) and the base top plate (9) for connecting the prestressed hollow annular pipe segments (1) and the high-strength bolts (2).
4. The anti-scour suction pile foundation structure according to claim 3, characterized in that: A water pump (20) is installed on the water pumping hole (3), and a top plate lifting ring (7) is fixedly connected to the foundation top plate (9).
5. The anti-scour suction pile foundation structure according to claim 4, characterized in that: The male slide groove (6-2) is provided with a pipe segment grouting groove (11), and when the female slide groove (6-1) and the male slide groove (6-2) are plugged in, epoxy resin structural adhesive can be injected through the pipe segment grouting groove (11).
6. The anti-scour suction pile foundation structure according to claim 5, characterized in that: The top plate rib (8) is provided with a reserved bolt hole (13), and the reserved bolt hole (13) is fixed to the prestressed hollow annular pipe segment (1) and the base top plate (9) through bolts.
7. The anti-scour suction pile foundation structure according to claim 6, characterized in that: An arc-shaped bolt (14) is provided at the bottom of the basic top plate (9), and a plurality of basic top plates (9) are position-limitedly connected via the arc-shaped bolt (14).
8. The anti-scour suction pile foundation structure according to claim 7, characterized in that: The foundation top plate (9) is provided with a top plate connection grouting groove (15), and the top of the top plate connection grouting groove (15) is connected to a top plate grouting hole (16).
9. The anti-scour suction pile foundation structure according to claim 8, characterized in that: An inflatable buoyancy ring (17) is sleeved on the outer side of the prestressed hollow annular tube segment (1).
10. The anti-scour suction pile foundation structure according to claim 9, characterized in that: An underwater jet robot (18) is installed between the prestressed hollow annular pipe segment (1) and the foundation top plate (9), which can clean the soil (19) and inject concrete to solidify into fluidized solidified soil (21), thereby fixing the pile body.
Citation Information
Patent Citations
Offshore wind power composite monopile foundation and construction method thereof
CN108222049A
Pile-barrel composite foundation connected with offshore wind turbine in hinged and supported mode
CN213014353U
High-strength sliding insertion type duct piece joint and duct piece
CN218376471U
Offshore single-pile structure foundation
CN220725170U
Cited By
Ultra-high performance concrete suction pile foundation structure of offshore platform
CN121976561A
