Deep foundation pit prestressed profile steel inner support and construction method
By using foundation pit steel column shaped guide brackets, guide grooves, cleaning systems and assembly retaining steel plate technology in deep foundation pit construction, combined with the near-to-distance earth excavation method, the columns in deep foundation pit construction are solved. The problems of positioning deviation, low construction efficiency and safety hazards have achieved efficient and safe internal support construction of prestressed steel.
Patent Information
- Application Number
- CN202411048625.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-01
- Publication Date
- 2024-11-01
AI Technical Summary
In the construction of deep foundation pits, the existing prestressed steel internal support technology has problems such as large deviations in column positioning and insertion, low construction efficiency, large safety hazards and transportation difficulties, especially in complex soft soil geological foundation pits, which affects the difficulty of construction. Overall quality and safety.
The foundation pit steel column shaped guide bracket, inner and outer steel sheet pile, square steel pipe support and H-shaped steel support beam are adopted, combined with the purlin purlin horn, clearance concrete rapid support technology, guide groove precision positioning technology, cleaning system and assembly barrier The rapid construction technology of soil steel plates and the earth excavation technology from near to far form to form an efficient and safe construction system.
Through the precise positioning of the fixed guide brackets and guide grooves, the accurate punching and stability of steel columns is ensured; the design of the cleaning system improves construction efficiency and safety; the assembly retaining steel plate technology ensures the stability and construction of the structure. Safety; Earth excavation technology from near to far avoids car pressure support and ensures the safety of foundation pits and surrounding environment.
Smart Images

Figure CN118880902A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of steel section inner support construction, and in particular relates to a deep foundation pit prestressed steel section inner support and a construction method. Background Art
[0002] In terms of foundation pit retaining technology, for many years, my country's housing construction projects have been mainly based on reinforced concrete materials, with backward technology, high energy consumption, long cycle and high cost. The support of narrow foundation pits in municipal projects such as subways generally adopts steel pipe support, but the width of its support is limited, which is not suitable for the overall support of super-large flat foundation pits. In recent years, my country has established a prestressed assembled H-shaped steel support technology system, which has significant advantages such as energy saving, environmental protection and green construction, and is suitable for the support requirements of the integral all-steel structure of super-large and super-deep foundation pits. However, it was found in actual construction that the steel purlin, as an important part of the system, has a poor quality of concrete pouring between the gap concrete poured between it and the retaining structure (such as steel sheet piles) due to the limited formwork space. Especially for complex soft soil foundation pits, the difficulty of leveling during the construction of steel columns leads to large deviations in column positioning and insertion, which affects the construction quality of the columns and poses a major safety hazard. In addition, since cars cannot pass on the steel supports, it is difficult to excavate and transport the foundation pit.
[0003] Therefore, it is necessary to seek a construction method of prestressed steel internal support for deep foundation pits with high construction efficiency, high construction safety and good economic benefits by optimizing the prestressed steel internal support system. Summary of the invention
[0004] The purpose of the present invention is to overcome the deficiencies in the prior art and provide a deep foundation pit prestressed steel inner support and a construction method.
[0005] This deep foundation pit prestressed steel inner support construction system includes a standardized guide bracket for foundation pit steel columns; inner steel sheet piles are arranged at the edge of the foundation pit, outer steel sheet piles are arranged outside the foundation pit, and square steel pipe supports and steel columns are arranged inside the foundation pit; H-shaped steel support beams are supported on the steel columns; purlin corbels are arranged on the steel sheet piles, and a steel purlin is arranged above the front end of the purlin corbel as an outer formwork for gap concrete, and the gap concrete bottom formwork is fixed between the purlin corbels;
[0006] The standardized guide bracket for foundation pit steel columns includes an operating platform and a bottom plate. The operating platform is supported on the bottom plate by a jack. The bottom plate and the operating platform are provided with corresponding guide grooves for applying steel columns. A cleaning system is provided on the operating platform.
[0007] A capping beam is provided on the top of the inner steel sheet pile and the outer steel sheet pile. Support columns and roadbed boxes are installed above the capping beam and the square steel pipe support for the passage of transport vehicles. A retaining steel plate is provided on the outside of the square steel pipe support.
[0008] Preferably, the purlin corbels are bolted to the inner steel sheet piles at uniform spacing, and the purlin corbels include a pressure plate and a stiffening plate; the front end of the pressure plate is grooved to form a limit groove, and the steel purlin is placed in the limit groove to serve as the outer formwork when pouring gap concrete; arc-shaped positioning plates are symmetrically arranged at both ends of the bottom mold, and an arc-shaped positioning groove is arranged at the rear end of the pressure plate, and the arc-shaped positioning plates at both ends of the bottom mold are respectively placed in the arc-shaped positioning grooves on both sides; arc-shaped connecting plates are welded to the bottom mold and the pressure plate, and are connected by bolts; a sleeve is arranged on the side of the bottom mold, and the top end of the diagonal brace is inserted into the sleeve, and the bottom end of the diagonal brace is fixed in the foundation pit through a fixing plate; the bottom mold is also provided with a handle and an adjustable support rod, the handle is arranged on the side of the bottom mold away from the steel sheet pile, and the adjustable support rod is arranged at the bottom of the four corners of the bottom mold, and a pulley is installed at the bottom of the adjustable support rod.
[0009] Preferably, the base plate serves as a leveling layer, a jack is provided between the base plate and the operating platform, and a pulley is provided at the bottom of the base plate; safety columns are provided around the operating platform, a number of cross bars are evenly distributed between adjacent safety columns, and a door is provided between the two safety columns on one side of the operating platform; a first guide groove is provided on the base plate, and a second guide groove is correspondingly provided on the operating platform; a sliding groove is provided on the operating platform, and the cleaning system includes a cleaning brush, a garbage collection box and a filling steel block for leveling the second guide groove, and then the two ends of the cleaning brush are placed in the sliding groove of the operating platform through a slider, and the garbage collection box is provided on one side of the operating platform; the side panel on one side of the garbage collection box is detachable, and protrusions are provided at both ends of the side panel, and the garbage collection box is provided with corresponding concave blocks, and the protrusions are inserted into the concave blocks when the side panel is installed on the garbage collection box; a garbage collection bag provided with a hanging ring is connected to one side of the garbage collection box with a side panel through a hook; and the interior of the garbage collection box is inclined toward the side panel.
[0010] Preferably, a capping beam is provided on the top of the inner steel sheet pile and the outer steel sheet pile, and a support column and a roadbed box are installed above the capping beam and the square steel pipe support; the support columns are connected by a connecting rod, and plug blocks are welded at both ends of the connecting rod. There are corresponding holes on both sides of the support column, and the plug blocks are inserted into the plug holes; the roadbed box is laid above the support column, and there are plug blocks and plug holes on both sides of the roadbed box, and adjacent roadbed boxes are connected to each other through the plug blocks and the plug holes; a fixing plate is provided on the top of the retaining steel plate, and a fixing plate is provided below one end of the support column corresponding to the retaining steel plate Square column, a fixing groove is reserved at the bottom of the fixed square column, the fixing plate is placed in the fixing groove, arc-shaped connecting plates are provided on both sides of the retaining steel plate, and adjacent retaining steel plates are fixed by bolts passing through the arc-shaped connecting plates thereon; a columnar plug is provided on the top of the square steel tube support, and a reserved hole is provided at the bottom of the support column, and the columnar plug is inserted into the reserved hole at the bottom of the support column; a positioning rod is welded on the back of the retaining steel plate, and a positioning groove with a positioning rail is installed on the side of the square steel tube support, and the positioning rod is inserted in the positioning groove; an H-shaped steel support beam is erected at a certain elevation in the foundation pit.
[0011] The construction method of deep foundation pit prestressed steel inner support by this construction system includes the following steps:
[0012] Step 1: Drive the inner and outer steel sheet piles, fix the perimeter purlin corbels on the inner steel sheet piles, and set the steel perimeter purlins;
[0013] Step 2: Both ends of the bottom formwork are connected to the corbels of the surrounding purlin respectively; the steel surrounding purlin is used as the side formwork to form a rapid formwork system for pouring concrete in the gap between the foundation pit steel supports, and the gap concrete is poured;
[0014] Step 3: The standardized guide bracket uses the guide groove to apply the steel column;
[0015] Step 4: Install the H-shaped steel support beam and fix it on the support beam of the steel column; set a prestressing device at the end of the brace or angle brace of the H-shaped steel support beam to apply prestress;
[0016] Step 5: Set up square steel pipe supports and retaining steel plates, and set up support columns and roadbed boxes to form a horizontal steel support system for setting up the excavation steel platform; use earth excavation technology from near to far, and after the soil is excavated, it will be transported out through the roadbed box by a transport vehicle.
[0017] As a preferred method, after the earthwork is excavated to the support elevation, an H-shaped steel support beam is erected in the foundation pit; when excavating the earthwork under the H-shaped steel support beam, the earthwork is excavated from near to far; when excavating, the earthwork is retained within a certain range at both ends of the support column, and then the earthwork is excavated from far to near to the bottom of the pit.
[0018] The prestressed steel inner support of a deep foundation pit is obtained by any of the methods described above.
[0019] The beneficial effects of the present invention are:
[0020] 1) The present invention adopts standardized purlin corbel rapid formwork technology, and uses the limiting grooves arranged on the corbels to quickly install the steel purlins as the side formwork of the gap concrete. The bottom formwork is provided with an arc-shaped positioning plate placed in the arc-shaped positioning grooves arranged on the pressure plate. At the same time, bolts are passed through the arc-shaped connecting plate. On the one hand, the bottom formwork is quickly moved by using handles and pulleys. On the other hand, the adjustable support rods and diagonal braces together serve as the support system of the bottom formwork, ensuring that the template system is stable in force and the structure is stable and safe.
[0021] 2) The present invention adopts the guide groove precise positioning technology, the base plate is used as the leveling layer, and the relative height of the operating platform is adjusted by a jack. The first guide groove and the second guide groove are respectively arranged on the base plate and the operating platform. The guide groove is used to accurately position and drive the steel column to improve the construction efficiency and quality.
[0022] 3) The present invention provides a guide bracket cleaning system, and the welded slide blocks at both ends of the cleaning brush are placed in the sliding grooves of the operating platform, which is convenient for workers to move the push-pull handles to place the garbage in the garbage collection box. The side panels of the collection box are detachable. When dumping the garbage, the side panels are taken out, and because the inside of the box is tilted at a certain angle, the garbage will automatically move into the hanging garbage collection bag, thereby achieving the purpose of simply and quickly cleaning the bracket.
[0023] 4) The present invention adopts a rapid construction technology for assembled retaining steel plates. A fixed plate is arranged on the top of the retaining steel plate and placed in a fixed groove reserved for a fixed square column. At the same time, the steel plate is reinforced by bolts passing through the arc-shaped connecting plate thereon. A positioning rod is welded behind the steel plate and placed in the positioning groove of the square steel tube support, so that the square steel tube support forms a stable structural connection with the support column and the retaining steel plate, respectively, thereby ensuring the safety of construction and improving the assembly efficiency.
[0024] 5) The present invention adopts the earth excavation technology from near to far, leaving triangular soil on both sides, excavating a channel in the middle, and then moving forward to the far end of the foundation pit and retreating a section of the whole, applying a section of support method, thereby avoiding the situation where the car presses the support, and can also provide support immediately after the elevation is dug, ensuring the safety of the foundation pit and the surrounding environment. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a structural schematic diagram of the rapid formwork system for pouring concrete in the gap of the foundation pit steel support;
[0026] Figure 2 This is a schematic diagram of the structure of the purlin corbel and bottom formwork before assembly;
[0027] Figure 3 This is a structural diagram after the purlin corbels and bottom formwork are assembled and installed;
[0028] Figure 4 It is a structural schematic diagram of the standardized guide bracket of the foundation pit steel column;
[0029] Figure 5 It is a structural diagram of the pit type steel column guide bracket operating platform cleaning system when in use;
[0030] Figure 6 This is a schematic diagram of the structure of the foundation pit steel column guide bracket operating platform cleaning system when it is not in use;
[0031] Figure 7 It is a cross-sectional view of the horizontal steel support system for setting up the excavated steel platform;
[0032] Figure 8 It is a schematic diagram of the unassembled retaining steel plate structure;
[0033] Fig. 9 This is a schematic diagram of the retaining steel plate structure after assembly;
[0034] Fig.10 It is the earthwork excavation flow diagram.
[0035] In the figure: 1-fixed plate, 2-inner steel sheet pile, 3-purlin corbel, 4-gap concrete, 5-steel purlin, 6-diagonal brace, 7-stiffening plate, 8-limiting groove, 9-pressure plate, 10-arc positioning groove, 11-arc positioning plate, 12-arc connecting plate, 13-sleeve, 14-bottom mold, 15-handle, 16-adjustable support rod, 17-steel column, 18-first guide groove, 19-bottom plate, 20-jack, 21-garbage collection box, 22-operating platform, 23-safety column, 24-door, 25-cross bar, 26-sliding groove, 27-second guide groove , 28-slider, 29-push-pull handle, 30-cleaning brush, 31-garbage collection bag, 32-lifting ring, 33-hook, 34-bump, 35-side plate, 36-recess, 37-filling steel block, 38-outer steel sheet pile, 39-top beam, 40-support column, 41-roadbed box, 42-H-shaped steel support, 43-square steel pipe support, 44-fixed square column, 45-retaining steel plate, 46-positioning track, 47-positioning groove, 48-column plug, 49-fixing groove, 50-jack, 51-plug, 52-connecting rod, 53-positioning rod, 54-fixing plate. DETAILED DESCRIPTION
[0036] The present invention is further described below in conjunction with embodiments. The description of the following embodiments is only used to help understand the present invention. It should be noted that for ordinary persons in the art, without departing from the principle of the present invention, the present invention can also be modified in some ways, and these improvements and modifications also fall within the scope of protection of the claims of the present invention.
[0037] Embodiment 1
[0038] As an example, Figures 1 to 10As shown, the deep foundation pit prestressed steel inner support construction system includes a fixed plate 1, an inner steel sheet pile 2, a purlin corbel 3, a gap concrete 4, a steel purlin 5, a diagonal brace 6, a stiffening plate 7, a limit groove 8, a pressure plate 9, an arc positioning groove 10, an arc positioning plate 11, an arc connecting plate 12, a sleeve 13, a bottom mold 14, a handle 15, an adjustable support rod 16, a steel column 17, a first guide groove 18, a bottom plate 19, a jack 20, a garbage collection box 21, an operating platform 22, a safety column 23, a door 24, a cross bar 25, a sliding groove 26, a second guide groove 27, a slider 28, a push-pull handle 29, a cleaning brush 30, a garbage collection bag 31, a lifting ring 32, a lifting hook 33, and a protrusion 34, side plate 35, recessed block 36, filling steel block 37, outer steel sheet pile 38, top beam 39, support column 40, roadbed box 41, H-shaped steel support beam 42, square steel pipe support 43, fixed square column 44, retaining steel plate 45, positioning rail 46, positioning groove 47, columnar plug 48, fixed groove 49, plug hole 50, plug 51, connecting rod 52, positioning rod 53, fixed plate 54; the deep foundation pit prestressed steel inner support adopts the foundation pit steel support gap concrete pouring rapid formwork system; the deep foundation pit prestressed steel inner support adopts the foundation pit steel column standardized guide bracket; the deep foundation pit prestressed steel inner support adopts the horizontal steel support system with an excavation steel platform.
[0039] An inner steel sheet pile 2 is provided at the edge of the foundation pit, an outer steel sheet pile 38 is provided outside the foundation pit, and a square steel pipe support 43 and a steel column 17 are provided inside the foundation pit; an H-shaped steel support beam 42 is supported on the steel column 17; a purlin corbel 3 is provided on the steel sheet pile 2, and a steel purlin 5 is provided above the front end of the purlin corbel 3 as an outer formwork for the gap concrete 4, and the bottom formwork 14 of the gap concrete 4 is fixed between the purlin corbels 3;
[0040] The foundation pit steel column standardization guide bracket includes an operating platform 22 and a bottom plate 19. The operating platform 22 is supported on the bottom plate 19 by a jack 20. The bottom plate 19 and the operating platform 22 are provided with guide grooves for applying the steel column 17. A cleaning system is provided on the operating platform 22.
[0041] A capping beam 39 is provided on the top of the inner steel sheet pile 2 and the outer steel sheet pile 38 . A support column 40 and a roadbed box 41 are installed above the capping beam 39 and the square steel pipe support 43 for the passage of transport vehicles. A retaining steel plate 45 is provided on the outside of the square steel pipe support 43 .
[0042] The purlin corbels 3 are bolted to the inner steel sheet piles 2 at uniform intervals, and the corbels are welded by a pressure plate 9 and a stiffening plate 7; the steel purlin 5 is placed in a limiting groove 8 formed by a groove at the front end of the pressure plate 9, and the steel purlin 5 is placed in the limiting groove 8, serving as an outer template when pouring the gap concrete 4 to ensure that the concrete is poured densely; the arc-shaped positioning plates 11 symmetrically arranged at both ends of the bottom mold 14 are respectively placed in the arc-shaped positioning grooves 10 arranged at the rear end of the pressure plate 9, and the arc-shaped positioning plates 11 at both ends of the bottom mold 14 are respectively placed in the arc-shaped positioning grooves 10 on both sides. 0; at the same time, bolts are used to pass through the arc-shaped connecting plate 12 welded on the bottom mold 14 and the pressure plate 9 to ensure that the surrounding purlin corbel 3 is firmly and reliably connected to the bottom mold 14; the top of the diagonal brace 6 is inserted into the sleeve 13 set on the side of the bottom mold 14, and the bottom end is welded with a fixed plate 1 and fixed in the foundation pit; the bottom mold 14 is also provided with a handle 15 and four adjustable support rods 16 with pulleys installed. The handle 15 is set on the side of the bottom mold 14 away from the steel sheet pile 2, and the adjustable support rod 16 is set at the bottom of the four corners of the bottom mold 14. The bottom of the adjustable support rod 16 is equipped with a pulley. On the one hand, the handle 15 and the pulley are used to facilitate the movement of the bottom mold 14. On the other hand, the adjustable support rod 16 and the diagonal brace 6 serve as the support system of the bottom mold 14 to ensure the stability and safety of the template system.
[0043] Embodiment 2
[0044] As another embodiment, this embodiment 2 proposes a more specific deep foundation pit prestressed steel inner support construction system based on the embodiment 1:
[0045] In the standardized guide bracket of the foundation pit steel column, the base plate 19 is used as a leveling layer, and a jack 20 is arranged between it and the operating platform 22, and the relative height of the operating platform 22 is adjusted by the jack 20; a pulley is arranged at the bottom of the base plate 19 for easy movement; safety columns 23 are arranged around the operating platform 22, and a number of cross bars 25 are evenly arranged between adjacent columns, and a door 24 is arranged on one side of the column to facilitate the construction personnel to enter and exit the operating platform 22.
[0046] A first guide groove 18 is provided on the bottom plate 19, and a second guide groove 27 is correspondingly provided on the operating platform 22. The guide groove is used to accurately position and apply the steel column 17. Before using the cleaning brush 30 on the bracket, the second guide groove 27 is first leveled with a filling steel block 37, and the door 24 is opened. Then, the sliders 28 welded at both ends of the cleaning brush 30 are placed in the sliding groove 26 of the operating platform 22. By manually moving the push-pull handle 29, the garbage is placed in the garbage collection box 21 set on the side of the operating platform 22.
[0047] The side panel 35 on one side of the collection box is detachable, and the protrusions 34 provided at both ends of the side panel 35 are inserted into the concave blocks 36 of the collection box; when dumping garbage, the side panel 35 is taken out, and a hook 33 is installed at the lower part of the garbage collection box 21, so that a garbage collection bag 31 provided with a ring 32 is connected to the hook 33; and the inside of the garbage collection box 21 is tilted at a certain angle, and the garbage in the box will automatically move into the garbage collection bag 31, so as to achieve the purpose of simply and quickly cleaning the bracket.
[0048] The horizontal steel support system of the unearthed steel platform, the deep foundation pit is provided with inner steel sheet piles 2 and outer steel sheet piles 38, and the top of the steel sheet piles on both sides is provided with a capping beam 39, the capping beam 39 and the square steel pipe support 43 are used as the load-bearing, and the support column 40 and the roadbed box 41 are installed.
[0049] Among them, the support columns 40 are evenly arranged, and connecting rods 52 are arranged between adjacent columns to enhance the stability of the structure. Insert blocks 51 are welded at both ends of the connecting rods 52, which can be directly inserted into the corresponding sockets 50 of the support columns 40; the roadbed box 41 is laid above the support columns 40, and adjacent roadbed box 41 modules are also quickly connected through the mode of insert blocks 51 and sockets 50.
[0050] A fixing plate 54 is arranged on the top of the retaining steel plate 45, and a fixing square column 44 is arranged below one end of the support column 40 corresponding to the retaining steel plate 45, and the fixing plate 54 is placed in a fixing groove 49 reserved for the fixing square column 44, and arc-shaped connecting plates 12 are arranged on both sides of the retaining steel plate 45. At the same time, the retaining steel plate 45 is strengthened and fixed by bolts passing through the arc-shaped connecting plates 12 thereon; a columnar plug 48 is arranged on the top of the square steel pipe support 43 and is directly inserted into the reserved hole at the bottom of the support column 40.
[0051] The positioning rod 53 welded behind the retaining steel plate 45 is placed in the positioning groove 47 of the positioning track 46 installed on the side of the square steel tube support 43, so that the square steel tube support 43 forms a stable structural connection with the support column 40 and the retaining steel plate 45 respectively, ensuring the safety of construction.
[0052] The earth excavation technology from near to far is adopted. After the earth is excavated, it is transported out by a transport vehicle through the roadbed box 41. After the earth is excavated to the support elevation, the H-shaped steel support beam 42 is fully and timely erected.
[0053] When digging the earth under the H-shaped steel support beam 42, the excavation method is adopted, and the earth is excavated from near to far; after the transport vehicle goes down the ramp, only the middle channel is excavated at the middle support and the angle support, that is, the earth is retained in the cloud line range at both ends of the support, so that the soil pressure can still be balanced after the channel is excavated, and then the earth is excavated from far to near to the bottom of the pit.
[0054] It should be noted that the parts in this embodiment that are the same or similar to those in the first embodiment can be referenced to each other and will not be described in detail in this application.
[0055] Embodiment 3
[0056] As another embodiment, this embodiment 3 proposes, based on the embodiments 1 and 2, a construction method of the deep foundation pit prestressed steel inner support construction system, comprising the following steps:
[0057] Step 1: Installation of the purlin corbel 3 and the steel purlin 5: After the inner steel sheet pile 2 and the outer steel sheet pile 38 are inserted and driven, the purlin corbel 3 is evenly spaced and fixed on the steel sheet pile with expansion bolts. The corbel is composed of a pressure plate 9 and a stiffening plate 7 welded together; before pouring the gap concrete 4, the position of the steel purlin 5 is positioned using the limit groove 8 provided on the purlin corbel 3, and is fastened with bolts.
[0058] Step 2, support formwork for gap concrete 4: arc-shaped positioning plates 11 symmetrically arranged at both ends of bottom form 14 are respectively placed in arc-shaped positioning grooves 10 arranged at the rear end of pressure plate 9, and bolts are used to pass through bottom form 14 and arc-shaped connecting plates 12 welded on pressure plate 9 to ensure that purlin corbels 3 are firmly and reliably connected to bottom form 14; the top end of diagonal brace 6 is inserted into sleeve 13 arranged on the side of bottom form 14, and the bottom end is welded with fixing plate 1 to be fixed in foundation pit, and bottom form 14 is pushed into construction site by handle 15 and pulley, and then bottom form 14 is installed by adjusting the height of adjustable support rod 16, and purlin corbels 3 are reliably connected to bottom form 14 by bolt connection, and diagonal brace 6 is installed, and steel purlin 5 is used as side form to form a stable and reliable formwork system for gap concrete 4.
[0059] Step 3: Pouring of gap concrete 4: After the formwork is installed and passed the acceptance, the gap concrete 4 can be poured. The concrete is poured and formed in one time, and watered and cured as soon as possible after initial setting.
[0060] Step 4, erection of steel columns 17: use standardized guide brackets to carry out column erection construction, the bottom plate 19 of the guide bracket is used as a leveling layer, and a jack 20 is set between it and the operating platform 22, and the relative height of the operating platform 22 is adjusted by the jack 20; a pulley is set at the bottom of the bottom plate 19 for easy movement; safety columns 23 are set around the operating platform 22, and a number of cross bars 25 are evenly arranged between adjacent columns. A door 24 is set on one side of the column to facilitate construction personnel to enter and exit the operating platform 22; a first guide groove 18 is set on the bottom plate 19, and a second guide groove 27 is correspondingly set on the operating platform 22. The guide grooves are used to accurately position and inject steel columns 17 to improve construction efficiency.
[0061] Embodiment 4
[0062] As another embodiment, this embodiment 4 proposes a more specific construction method of prestressed steel inner support for deep foundation pits on the basis of embodiment 3, wherein after step 4, there are steps 5 to 9:
[0063] Step 5, cleaning of the operating platform 22 of the steel column 17: the operating platform 22 cleaning system provided on the stereotyped guide bracket of the steel column 17 is used for cleaning. Before using the cleaning brush 30, the second guide groove 27 is first filled with a filling steel block 37, and the door 24 is opened. Then, the sliders 28 welded at both ends of the cleaning brush 30 are placed in the sliding groove 26 of the operating platform 22, and the garbage is placed in the garbage collection box 21 provided on the side of the operating platform 22 by manually moving the push-pull handle 29; the side plate 35 on one side of the collection box is detachable, and the protrusions 34 provided at both ends of the side plate 35 are inserted into the concave blocks 36 of the collection box; when dumping garbage, the side plate 35 is taken out, and a hook 33 is installed at the lower part of the garbage collection box 21, so that the garbage collection bag 31 provided with a ring 32 is connected to the hook 33; and the inside of the garbage collection box 21 is tilted at a certain angle, and the garbage in the box will automatically move into the garbage collection bag 31, so as to achieve the purpose of simply and quickly cleaning the bracket.
[0064] Step 6, erection of H-shaped steel support beam 42: After the construction of steel column 17 is completed, the support beam is installed and fixed on the support beam of steel column 17, and the support beam and the steel support beam are connected by bolts.
[0065] Step 7. Apply prestress: The application of prestress should be carried out along with the installation of structural parts. The prestressing device is set at the end of the brace or angle brace of the steel support. After the prestressing is completed, the on-site management personnel and technical personnel should check the application of the prestressing device.
[0066] Step 8, soil excavation: before excavation, an excavation steel platform support system including retaining steel plates 45 is set up, and the construction is quickly carried out by assembling the retaining steel plates 45; the soil excavation technology from near to far is adopted, and after the soil is excavated, it is transported out by the transport vehicle through the roadbed box 41. After the soil is excavated to the support elevation, the H-shaped steel support beam 42 is fully and timely erected; when excavating the soil under the H-shaped steel support beam 42, the soil is excavated from near to far; after the transport vehicle goes down the ramp, the middle angle support is also excavated in the same way, and only the middle channel is excavated, that is, the cloud line range at both ends of the support retains the soil, so that the soil pressure can still be balanced after the channel is excavated, and then the soil is excavated from far to near to the bottom of the pit.
[0067] Step 9: Support removal: After the concrete strength of the underground foundation and the surrounding force transmission belts of the deep foundation pit operation has all been tested and met the standards, the support system can be gradually removed. The prestress should be released in advance before removal, and the removal should be carried out in a bottom-up order according to the stress conditions.
[0068] The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.
Claims
1. A deep foundation pit prestressed steel inner support construction system, characterized in that: It includes a standardized guide bracket for foundation pit steel columns; inner steel sheet piles are provided at the edge of the foundation pit, outer steel sheet piles are provided outside the foundation pit, and square steel pipe supports and steel columns are provided inside the foundation pit; H-shaped steel support beams are supported on the steel columns; purlin corbels are provided on the steel sheet piles, and a steel purlin is provided above the front end of the purlin corbel as the outer formwork of the gap concrete, and the gap concrete bottom formwork is fixed between the purlin corbels; The standardized guide bracket for foundation pit steel columns includes an operating platform and a bottom plate. The operating platform is supported on the bottom plate by a jack. The bottom plate and the operating platform are provided with corresponding guide grooves for applying steel columns. A cleaning system is provided on the operating platform. A capping beam is provided on the top of the inner steel sheet pile and the outer steel sheet pile. Support columns and roadbed boxes are installed above the capping beam and the square steel pipe support for the passage of transport vehicles. A retaining steel plate is provided on the outside of the square steel pipe support.
2. The deep foundation pit prestressed steel inner support construction system according to claim 1 is characterized in that: The described purlin corbels are bolted to the inner steel sheet piles at uniform intervals, and the purlin corbels include a pressure plate and a stiffening plate; a groove is formed at the front end of the pressure plate to form a limit groove, and the steel purlin is placed in the limit groove to serve as an outer formwork when pouring gap concrete; arc-shaped positioning plates are symmetrically arranged at both ends of the bottom mold, and an arc-shaped positioning groove is arranged at the rear end of the pressure plate, and the arc-shaped positioning plates at both ends of the bottom mold are respectively placed in the arc-shaped positioning grooves on both sides; arc-shaped connecting plates are welded to the bottom mold and the pressure plate, and are connected by bolts; a sleeve is arranged on the side of the bottom mold, and the top end of the diagonal brace is inserted into the sleeve, and the bottom end of the diagonal brace is fixed in the foundation pit through a fixing plate; the bottom mold is also provided with a handle and an adjustable support rod, the handle is arranged on the side of the bottom mold away from the steel sheet pile, and the adjustable support rod is arranged at the bottom of the four corners of the bottom mold, and a pulley is installed at the bottom of the adjustable support rod.
3. The deep foundation pit prestressed steel inner support construction system according to claim 1 is characterized in that: The base plate is used as a leveling layer, a jack is arranged between the base plate and the operating platform, and a pulley is arranged at the bottom of the base plate; safety columns are arranged around the operating platform, a number of cross bars are evenly distributed between adjacent safety columns, and a door is arranged between the two safety columns on one side of the operating platform; a first guide groove is arranged on the base plate, and a second guide groove is correspondingly arranged on the operating platform; a sliding groove is arranged on the operating platform, and the cleaning system includes a cleaning brush, a garbage collection box and a filling steel block for leveling the second guide groove, and then the two ends of the cleaning brush are placed in the sliding groove of the operating platform through a slider, and the garbage collection box is arranged on one side of the operating platform; the side panel on one side of the garbage collection box is detachable, and protrusions are arranged at both ends of the side panel, and the garbage collection box is provided with corresponding concave blocks, and the protrusions are inserted into the concave blocks when the side panel is installed on the garbage collection box; a garbage collection bag provided with a hanging ring is connected to one side of the garbage collection box with a side panel through a hook; and the interior of the garbage collection box is inclined toward the side panel.
4. The deep foundation pit prestressed steel inner support construction system according to claim 1 is characterized in that: A capping beam is provided on the top of the inner and outer steel sheet piles, and support columns and roadbed boxes are installed above the capping beam and the square steel pipe support; the support columns are connected by connecting rods, and plug blocks are welded at both ends of the connecting rods. There are corresponding plug holes on both sides of the support columns, and the plug blocks are inserted into the plug holes; the roadbed box is laid above the support columns, and plug blocks and plug holes are respectively provided on both sides of the roadbed box, and adjacent roadbed boxes are connected to each other through the plug blocks and the plug holes; a fixed plate is provided on the top of the retaining steel plate, and a fixed square column is provided below one end of the support column corresponding to the retaining steel plate. A fixing groove is reserved at the bottom of the fixed square column, and the fixing plate is placed in the fixing groove. Arc-shaped connecting plates are provided on both sides of the retaining steel plate, and adjacent retaining steel plates are fixed by bolts passing through the arc-shaped connecting plates thereon; a columnar plug is provided on the top of the square steel tube support, and a reserved hole is provided at the bottom of the support column, and the columnar plug is inserted into the reserved hole at the bottom of the support column; a positioning rod is welded on the back of the retaining steel plate, and a positioning groove with a positioning rail is installed on the side of the square steel tube support, and the positioning rod is inserted in the positioning groove; an H-shaped steel support beam is erected at a certain elevation in the foundation pit.
5. A method for constructing prestressed steel inner supports for deep foundation pits using the construction system described in any one of claims 1 to 4, characterized in that: The following steps are involved: Step 1: Drive the inner and outer steel sheet piles, fix the perimeter purlin corbels on the inner steel sheet piles, and set the steel perimeter purlins; Step 2: Both ends of the bottom formwork are connected to the corbels of the surrounding purlin respectively; the steel surrounding purlin is used as the side formwork to form a rapid formwork system for pouring concrete in the gap between the foundation pit steel supports, and the gap concrete is poured; Step 3: The standardized guide bracket uses the guide groove to apply the steel column; Step 4: Install the H-shaped steel support beam and fix it on the support beam of the steel column; set a prestressing device at the end of the brace or angle brace of the H-shaped steel support beam to apply prestress; Step 5: Set up square steel pipe supports and retaining steel plates, and set up support columns and roadbed boxes to form a horizontal steel support system for setting up the excavation steel platform; use earth excavation technology from near to far, and after the soil is excavated, it will be transported out through the roadbed box by a transport vehicle.
6. The construction method of deep foundation pit prestressed steel inner support according to claim 5 is characterized in that: After the earthwork is excavated to the support elevation, an H-shaped steel support beam is erected in the foundation pit; when excavating the earthwork under the H-shaped steel support beam, the earthwork is excavated from near to far; when excavating, the earthwork is retained within a certain range at both ends of the support column, and then the earthwork is excavated from far to near to the bottom of the pit.
7. Prestressed steel inner support for deep foundation pit, characterized in that: Obtained by the method according to any one of claims 5 to 6.
Citation Information