Pipeline grooving and laying integrated construction equipment
By integrating the networking system of sensors and database centers on the pipeline slotting machine, dynamically adjusting the running speed of slotted parts and integrating the support equipment with the slotting machine, the problems of traditional slotting and laying are solved, and the improvement is achieved Efficient construction progress and equipment use.
Patent Information
- Application Number
- CN202410987619.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-23
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2044-07-23
AI Technical Summary
The traditional pipe groove and laying work is carried out in sections, resulting in cumbersome equipment configuration and personnel allocation, delayed progress, and the operation speed of the groove machine needs to be adjusted manually, which cannot adapt to different soil conditions, which affects efficiency.
Design an integrated construction equipment for pipe groove and laying. The groove machine is equipped with sensors to obtain soil parameters. The controller is connected to the database center. The operation speed of the grooved parts is adjusted according to soil and environmental information, and the support equipment is installed in the grooved On the machine, the grooves and laying are synchronized.
Reduce construction steps, improve project progress, adjust the operating speed of the grooved machine in a timely manner, adapt to different soil conditions, improve grooved efficiency and reduce blade damage.
Smart Images

Figure CN118880968A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of pipeline engineering, and in particular relates to an integrated construction device for pipeline grooving and laying. Background Art
[0002] With the acceleration of urbanization, pipeline engineering, as an important part of infrastructure construction, has a direct impact on the progress of the entire project in terms of construction efficiency and quality. Infrastructure construction, especially urban pipeline grooving and laying projects, is becoming increasingly important. Traditional pipeline grooving and laying work is mostly carried out in sections, which means that equipment and personnel need to be reconfigured after each stage is completed. This not only increases the demand for labor, but may also delay the progress of the project due to cumbersome procedures. In addition, when grooving existing pipelines, the operating speed of the grooving machine is manually determined or adjusted. However, in actual excavation, due to the different soil conditions in different areas, if the excavation is always carried out according to the manually adjusted operating speed, it will affect the entire grooving progress. Summary of the invention
[0003] The purpose of the present invention is to provide an integrated construction equipment for pipeline grooving and laying, so as to solve the problems faced by the above-mentioned background technology.
[0004] The purpose of the present invention can be achieved through the following technical solutions:
[0005] A pipeline grooving and laying integrated construction equipment, the equipment comprising a grooving machine, the top of which is detachably mounted with a supporting device for laying;
[0006] The slotting machine includes a slotting machine body, on which a slotting component and a controller for controlling the operation of the slotting component are installed. The controller is connected to a terminal database center and is also provided with a plurality of sensors. The sensors are used to obtain relevant parameter information of the soil at the slotting location and upload the information to the controller. The controller performs a comprehensive analysis based on the obtained relevant parameter information and the environmental information of the database center, and adjusts the operating speed of the slotting component based on the analysis results.
[0007] Furthermore, the slotting component includes an installation cavity, each of the sensors is arranged on the surface of the installation cavity, a driving component is provided on the installation cavity, a chain slotting plate is provided on the outer wall of the installation cavity, and the driving component drives the chain slotting plate to rotate under the control of the controller. Two first hydraulic drive cylinders are provided in the installation cavity, and the output ends of the two first hydraulic drive cylinders are connected to a mounting plate, and a plurality of independently controlled electrically controlled rotating cutter heads are provided on the mounting plate.
[0008] Furthermore, the relevant parameter information includes soil moisture, soil hardness and soil viscosity, and the environmental information includes temperature information, precipitation information and humidity information obtained by the database center from the local meteorological bureau.
[0009] Furthermore, the controller adjusts the running speed of the slotting component according to the analysis result by:
[0010] When it is determined to be a high-increase instruction, the formula Increase the running speed of the slotting part to V + ;
[0011] When it is determined to be a lowering instruction, the formula Reduce the running speed of the slotting part to V - ;
[0012] When it is judged as a hold instruction, the current running speed is maintained;
[0013] Among them, V0 is the current running speed, β is the conversion coefficient, The maximum operating speed allowed in the system. is the maximum operating speed allowed to be reduced in the system, L is the slot depth, K is the slot width, ΔL is the slot depth reference value, and ΔK is the slot width reference value.
[0014] Furthermore, the method for generating the increase instruction, the decrease instruction and the hold instruction is:
[0015] Get the soil moisture value S obtained by each sensor RH , soil hardness value S H And the viscosity value of the soil S CY , so that through the formula Get the soil influence coefficient S g ;
[0016] Get the average precipitation E in the database center within one month of history W , average humidity E RH and the average temperature E T , so that through the formula Obtain the environmental impact coefficient E g ;
[0017] Then through the formula Obtaining an adjustment judgment value G;
[0018] Compare the obtained adjustment judgment value G with the system preset adjustment judgment value interval [G1, G2]:
[0019] When G∈(G2, +∞), a height adjustment instruction is generated;
[0020] When G∈(0, G1), a downgrade instruction is generated;
[0021] When G∈[G1, G2], a hold instruction is generated;
[0022] in, is the standard temperature preset in the system, and τ1 and τ2 are the preset weight coefficients.
[0023] Furthermore, the support equipment includes a connecting plate, a first fixed platform is provided on the connecting plate, a first arc-shaped placement groove is opened on the first fixed platform, a second hydraulic drive cylinder is also provided on both sides of the first arc-shaped placement groove on the first fixed platform, the output ends of the second hydraulic drive cylinder are commonly connected to the second fixed platform, and a second arc-shaped placement groove matching the first arc-shaped placement groove is opened on the second fixed platform.
[0024] Furthermore, a plurality of accommodating grooves are provided in the first arc-shaped placement groove, a telescopic column is provided in the accommodating groove, and an electric rotating wheel is installed on the top of the telescopic column.
[0025] Beneficial effects of the present invention:
[0026] The present invention installs the supporting equipment for laying the pipeline on the grooving machine for grooving. When the pipeline is grooving, the grooving machine will drive the pipeline on the supporting equipment forward when it moves forward, so that the pipeline can be laid immediately after the grooving is completed, which can greatly reduce the construction steps and improve the progress of the entire project.
[0027] The multiple sensors arranged on the slotting machine of the present invention can obtain relevant parameter information such as soil moisture, soil hardness and soil viscosity in the slotting area, and the database center can obtain environmental information such as temperature information, precipitation information and humidity information from the local meteorological bureau, and upload them to the controller in a unified manner. The controller can conduct a comprehensive analysis based on the relevant parameter information and environmental information to determine whether the running speed of the chain slotting piece of the slotting machine meets the slotting efficiency requirements, and generate corresponding adjustment instructions based on the judgment result to adjust the running speed of the chain slotting piece accordingly. In this way, the running speed of the slotting machine can be adjusted accordingly according to the soil conditions in the slotting area in a timely manner, thereby ensuring the slotting efficiency while reducing the damage to the blade.
[0028] Of course, any product implementing the present invention does not necessarily need to achieve all of the advantages described above at the same time. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for describing the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.
[0030] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0031] Figure 2 It is a structural schematic diagram of the slotted component in the present invention;
[0032] Figure 3 It is a schematic diagram of a part of the structure inside the installation cavity in the present invention;
[0033] Figure 4 It is a structural schematic diagram of the support equipment in the present invention;
[0034] Figure 5 For the present invention Figure 4 Schematic diagram of the enlarged structure at point A in the middle.
[0035] Description of the accompanying drawings:
[0036] 1. Slotting machine; 2. Support equipment; 11. Slotting machine body; 13. Slotting parts; 12. Controller; 14. Sensor; 1301. Mounting cavity; 1302. Driving member; 1303. Chain slotting plate; 1304. First hydraulic drive cylinder; 1305. Mounting plate; 1306. Electric rotary cutter head; 21. Connecting plate; 22. First fixed platform; 23. First arc-shaped placement groove; 24. Second hydraulic drive cylinder; 25. Second fixed platform; 26. Second arc-shaped placement groove; 27. Accommodating groove; 28. Telescopic column; 29. Electric turntable. DETAILED DESCRIPTION
[0037] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0038] In one embodiment, a pipeline grooving and laying integrated construction equipment is disclosed, such as Figure 1 as well as Figure 2As shown, the construction equipment mainly includes a slotting machine 1, and a supporting device 2 for paving is detachably installed on the top of the slotting machine 1. The slotting machine 1 includes a slotting machine body 11, and a slotting component 13 and a controller 12 for controlling the operation of the slotting component 13 are installed on the slotting machine body 11. The controller 12 is connected to the terminal database center. The slotting component 13 is also provided with a plurality of sensors 14, and the sensors 14 are used to obtain relevant parameter information of the soil at the slotting location and upload it to the controller 12. The controller 12 performs a comprehensive analysis based on the obtained relevant parameter information and the environmental information of the database center, and adjusts the running speed of the slotting component 13 based on the analysis result. The supporting device 2 includes a connecting plate 21, and a first fixed platform 22 is provided on the connecting plate 21. A first arc-shaped placement groove 23 is opened on the first fixed platform 22, and second hydraulic drive cylinders 24 are also provided on both sides of the first arc-shaped placement groove 23 on the first fixed platform 22. The output end of the cylinder 24 is commonly connected to a second fixed platform 25, and a second arc-shaped placement groove 26 matching the first arc-shaped placement groove 23 is provided on the second fixed platform 25. A plurality of accommodating grooves 27 are also provided in the first arc-shaped placement groove 23, and a telescopic column 28 is provided in the accommodating groove 27. An electric turntable 29 is installed on the top of the telescopic column 28. The slotting component 13 includes a mounting cavity 1301, and each sensor 14 is arranged on the surface of the mounting cavity 1301. A driving member 1302 is provided on the mounting cavity 1301, and a chain slotting piece 1303 is provided on the outer wall of the mounting cavity 1301. The driving member 1302 drives the chain slotting piece 1303 to rotate under the control of the controller 12. Two first hydraulic drive cylinders 1304 are provided in the mounting cavity 1301, and the output ends of the two first hydraulic drive cylinders 1304 are both connected to a mounting plate 1305, and a plurality of independently controlled electrically controlled rotating cutter heads 1306 are provided on the mounting plate 1305.
[0039] Through the above technical solution, the present application installs the support equipment 2 for laying pipes on the slotting machine 1 for slotting, so that when the pipe is slotted, the slotting machine 1 will also drive the pipe on the support equipment 2 to move forward when it moves forward, so that it can be laid immediately after the slotting is completed, which can greatly reduce the construction steps and improve the progress of the entire project. At the same time, the multiple sensors 14 set on the slotting machine can obtain relevant parameter information such as soil moisture, soil hardness and soil viscosity in the slotting area, and the database center can obtain environmental information such as temperature information, precipitation information and humidity information from the local meteorological bureau, and upload them to the controller 12 in a unified manner. The controller 12 can combine the relevant parameter information and environmental information for comprehensive analysis to determine whether the running speed of the chain slotting piece 1303 of the slotting machine 1 is within the predetermined requirements, and generate corresponding adjustment instructions according to the judgment result to adjust the running speed of the chain slotting piece 1303 accordingly, so that the running speed of the chain slotting piece 1303 can be adjusted accordingly according to the soil conditions in the slotting area in a timely manner, thereby ensuring the progress of slotting while reducing the damage to the blade.
[0040] like Figure 2 ,like Figure 3 As shown, the slotting component 13 includes a mounting cavity 1301, each sensor 14 is arranged on the surface of the mounting cavity 1301, a driving member 1302 is arranged on the mounting cavity 1301, a chain slotting plate 1303 is arranged on the outer wall of the mounting cavity 1301, and the driving member 1302 drives the chain slotting plate 1303 to rotate under the control of the controller 12. Two first hydraulic drive cylinders 1304 are arranged in the mounting cavity 1301, and the output ends of the two first hydraulic drive cylinders 1304 are connected to the mounting plate 1305, and a plurality of independently controlled electrically controlled rotating cutter heads 1306 are arranged on the mounting plate 1305. The controller 12 controls the driving member 1302 to move, thereby driving the chain slotting piece 1303 to rotate at a corresponding speed to slot the soil, and the first hydraulic driving cylinder 1304 provided in the installation cavity 1301 can be extended and retracted when necessary, thereby extending the internal electric-controlled rotating cutter head 1306 to widen the two sides, so that when a wider slotting operation is required, normal slotting construction can be carried out. This can greatly improve the use scenario of the slotting machine.
[0041] like Figure 4 , Figure 5As shown, the support equipment 2 includes a connecting plate 21, on which a first fixed platform 22 is provided, on which a first arc-shaped placement groove 23 is provided, and on which a second hydraulic drive cylinder 24 is provided on both sides of the first arc-shaped placement groove 23 on the first fixed platform 22, and on which an output end of the second hydraulic drive cylinder 24 is commonly connected a second fixed platform 25, on which a second arc-shaped placement groove 26 matching the first arc-shaped placement groove 23 is provided, and in which a plurality of accommodating grooves 27 are provided, in which a telescopic column 28 is provided, and on the top of which an electric rotary wheel 29 is installed. The extension and retraction of the second hydraulic drive cylinder 24 can adjust the distance between the first fixed platform 22 and the second fixed platform 25, so that pipes of different sizes can be clamped and fixed. In this way, when the slotting machine 1 moves forward slowly, the clamped pipe will also be driven forward, which can facilitate the construction of the pipe. The telescopic column 28 arranged in the accommodating groove 27 can be extended when unloading the pipe. Through the rotation of the electric turntable 29, a rolling force can be provided to the pipe, which makes it more convenient to unload the pipe, thereby saving human resources.
[0042] The method by which the controller 12 adjusts the running speed of the slotting component 13 according to the analysis result is:
[0043] First, a comprehensive analysis is performed on the acquired relevant parameter information and environmental information. Specifically, the soil moisture value S obtained by each sensor 14 is obtained. RH , soil hardness value S H And the viscosity value of the soil S CY , so that through the formula Get the soil influence coefficient S g Generally speaking, the lower the soil moisture, the higher the soil hardness or the higher the soil viscosity, the greater the impact on the slotting blade, so the formula Get the soil influence coefficient S g , when its value is larger, it means that the impact on slotting efficiency is greater; then the average precipitation E in the database center within one month is obtained W , average humidity E RH and the average temperature E T , so that through the formula Obtain the environmental impact coefficient E g , when the average precipitation in a certain area in a month is less, or the average humidity is lower, it means that the soil is in a relatively hard state, and the influence on the slotting blade speed is greater, and the formula It can represent the change of the difference between the acquired temperature and the preset standard temperature in the system. The smaller the change, the smaller the impact on the blade running speed. On the other hand, the greater the change, the greater the impact on the blade running speed, and the corresponding impact on the slotting efficiency. Therefore, the formula Obtain the environmental impact coefficient E g , the larger the value, the greater the impact on the slotting efficiency; therefore, in order to more accurately judge the soil conditions, the formula is finally used A comprehensive analysis is performed to obtain the adjustment judgment value G, and then the obtained adjustment judgment value G is compared with the system preset adjustment judgment value interval [G1, G2]: when G∈(G2, +∞), it means that the impact value at this time is large. In order to ensure the generated slotting efficiency, it is necessary to increase the running speed of the chain slotting piece 1303 accordingly, and then an increase instruction is generated; on the contrary, when G∈(0, G1), it means that the impact value at this time is small, and the set running speed is sufficient to ensure the normal slotting efficiency. In order to reduce the wear of the tool, the running speed can be appropriately reduced without affecting the slotting efficiency, and then a decrease instruction is generated; and when G∈[G1, G2], no adjustment is required, and the current speed can be maintained, and then a maintain instruction is generated.
[0044] After the adjustment instruction is obtained by the above method, the controller 12 then controls the running speed of the chain slotting piece 1303 on the slotting component 13 accordingly. Specifically, when it is determined to be a height adjustment instruction, the formula Increase the running speed of the slotting part 13 to V + , when it is determined to be a lowering instruction, the formula The running speed of the slotting part 13 is reduced to V - , when it is judged as a hold instruction, the current running speed is maintained; from the formula It can be seen that the more the adjustment judgment value G exceeds the threshold value G2, the more the running speed needs to be increased. However, each tool also has a certain critical speed and cannot be increased infinitely. If it is increased infinitely, the quality of the tool will be seriously damaged. Therefore, a maximum running speed allowed to be increased in the system is set to limit it to protect the tool. The adjustment of the running speed is not only related to the soil conditions, but also to the depth and width of the groove. Generally speaking, the deeper the groove depth and the wider the width, the greater the cutting resistance of the tool, and the greater the impact on the running speed. Therefore, the deeper the groove depth L and the larger the width K, the more the running speed needs to be increased; also from the formula It can be seen that the smaller the adjustment judgment value G is, the smaller its influence on the tool running speed is, and the more the corresponding speed can be lowered, but the speed cannot be reduced infinitely. If it is reduced too much, it will affect the normal slotting efficiency. Therefore, a maximum running speed that can be lowered within the system is set to limit and ensure the slotting efficiency. In this way, the running speed of the slotting machine 1 can be dynamically adjusted based on a comprehensive analysis of the acquired soil information and the historical information of the local area, so as to ensure the slotting efficiency, reduce the damage to the blade, and reasonably save resources.
[0045] It should be noted that the calculation of the above formula is only a mutual calculation in terms of values. The conversion coefficient β, the reference value of the groove depth ΔL, the reference value of the groove width ΔK and the adjustment judgment value interval [G1, G2] can all be determined based on the historical data combined with the results of the test simulation data. The standard temperature preset in the system The preset weight coefficients τ1 and τ2 can be obtained based on empirical data, and the maximum operating speed allowed to be increased in the system The maximum operating speed allowed to be reduced within the system This can be determined based on the historical operating data of the tool of the notified type, which will not be described in detail here.
[0046] The present invention installs the supporting equipment for laying pipes onto the grooving machine for grooving, so that when the pipe is grooving, the grooving machine will drive the pipe on the supporting equipment forward when it moves forward, so that laying can be carried out immediately after the grooving is completed, which can greatly reduce the construction steps and improve the progress of the entire project. At the same time, the laying and grooving integrated equipment provided by the present invention can adapt to grooving of different sizes and the construction of pipes of different sizes, so that the equipment has better economic benefits. The multiple sensors arranged on the slotting machine of the present invention can obtain relevant parameter information such as soil moisture, soil hardness and soil viscosity in the slotting area, and the database center can obtain environmental information such as temperature information, precipitation information and humidity information from the local meteorological bureau, and upload them to the controller in a unified manner. The controller can conduct a comprehensive analysis based on the relevant parameter information and environmental information to determine whether the running speed of the chain slotting piece of the slotting machine meets the slotting efficiency requirements, and generate corresponding adjustment instructions based on the judgment result to adjust the running speed of the chain slotting piece accordingly. In this way, the running speed of the slotting machine can be adjusted accordingly according to the soil conditions in the slotting area in a timely manner, thereby ensuring the slotting efficiency while reducing the damage to the blade.
[0047] The above contents are merely examples and explanations of the concept of the present invention. The technicians in this technical field may make various modifications or additions to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the concept of the invention or exceed the scope defined by the claims, they should all fall within the protection scope of the present invention.
Claims
1. A pipeline grooving and laying integrated construction equipment, characterized in that: The equipment comprises a slotting machine (1), and a paving support device (2) is detachably mounted on the top of the slotting machine (1); The slotting machine (1) comprises a slotting machine body (11), on which a slotting component (13) and a controller (12) for controlling the operation of the slotting component (13) are installed, the controller (12) being networked with a terminal database center, the slotting component (13) being further provided with a plurality of sensors (14), the sensors (14) being used to obtain relevant parameter information of soil at a slotting location and to upload the information to the controller (12), the controller (12) performing a comprehensive analysis based on the obtained relevant parameter information and environmental information from the database center, and adjusting the operating speed of the slotting component (13) based on the analysis result.
2. The pipeline grooving and laying integrated construction equipment according to claim 1, characterized in that: The slotting component (13) comprises a mounting cavity (1301), each of the sensors (14) is arranged on the surface of the mounting cavity (1301), a driving member (1302) is arranged on the mounting cavity (1301), a chain slotting plate (1303) is arranged on the outer wall of the mounting cavity (1301), the driving member (1302) drives the chain slotting plate (1303) to rotate under the control of the controller (12), two first hydraulic drive cylinders (1304) are arranged in the mounting cavity (1301), the output ends of the two first hydraulic drive cylinders (1304) are connected to a mounting plate (1305), and a plurality of independently controlled electrically controlled rotating cutter heads (1306) are arranged on the mounting plate (1305).
3. The pipeline grooving and laying integrated construction equipment according to claim 2, characterized in that: The relevant parameter information includes soil moisture, soil hardness and soil viscosity, and the environmental information includes temperature information, precipitation information and humidity information obtained by the database center from the local meteorological bureau.
4. The pipeline grooving and laying integrated construction equipment according to claim 3, characterized in that: The method in which the controller (12) adjusts the running speed of the slotting component (13) according to the analysis result is: When it is determined to be a high-increase instruction, the formula Increase the running speed of the slotting part (13) to V + ; When it is determined to be a lowering instruction, the formula Reduce the running speed of the slotting part (13) to V - ; When it is judged as a hold instruction, the current running speed is maintained; Among them, V0 is the current running speed, β is the conversion coefficient, V +MAX V is the maximum operating speed allowed in the system. -MAX is the maximum operating speed allowed to be reduced in the system, L is the slot depth, K is the slot width, ΔL is the slot depth reference value, and ΔK is the slot width reference value.
5. The pipeline grooving and laying integrated construction equipment according to claim 4, characterized in that: The method for generating the increase instruction, the decrease instruction and the hold instruction is: Get the soil moisture value S obtained by each sensor (14) RH , soil hardness value S H And the viscosity value of the soil S CY , so that through the formula Get the soil influence coefficient S g ; Get the average precipitation E in the database center within one month of history W , average humidity E RH and the average temperature E T , so that through the formula Obtain the environmental impact coefficient E g ; Then through the formula Obtaining an adjustment judgment value G; Compare the obtained adjustment judgment value G with the system preset adjustment judgment value interval [G1, G2]: When G∈(G2, +∞), a height adjustment instruction is generated; When G∈(0, G1), a downgrade instruction is generated; When G∈[G1, G2], a hold instruction is generated; in, is the standard temperature preset in the system, and τ1 and τ2 are the preset weight coefficients.
6. The pipeline grooving and laying integrated construction equipment according to claim 1, characterized in that: The support device (2) comprises a connecting plate (21), a first fixed platform (22) is provided on the connecting plate (21), a first arc-shaped placement groove (23) is provided on the first fixed platform (22), a second hydraulic drive cylinder (24) is provided on both sides of the first arc-shaped placement groove (23) on the first fixed platform (22), the output end of the second hydraulic drive cylinder (24) is commonly connected to a second fixed platform (25), and a second arc-shaped placement groove (26) matching the first arc-shaped placement groove (23) is provided on the second fixed platform (25).
7. The pipeline grooving and laying integrated construction equipment according to claim 6, characterized in that: A plurality of receiving grooves (27) are also provided in the first arc-shaped placement groove (23), a telescopic column (28) is provided in the receiving groove (27), and an electric rotating wheel (29) is installed on the top end of the telescopic column (28).
Citation Information
Patent Citations
Ploughing and sowing vehicle
CN113330841A
Water conservancy construction grooving machine capable of being flexibly adjusted and grooving method
CN116378141A
Crop seeder adjusting system based on climate prediction information
CN116649045A
Excavation equipment and method to control the rate of advance of an excavation tool
EP0518297A1
Work vehicle
JP2017153382A