Long-distance pipe jacking construction method for water-rich hard rock stratum

By using the stage-by-stage construction method of concentrated mud ring combined with thixotropic mud silt in the pipe top construction, the problem of sediment and mud over-discharge in the pipe top construction in the water-rich hard rock formation is solved, and construction efficiency and cost control are improved.

CN118881384APending Publication Date: 2024-11-01CCFEB CIVIL ENG
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410749481.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-12
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

When the pipe top construction is carried out in the water-rich hard rock formation, due to the influence of groundwater and rock formations, sediment is prone to appear at the bottom of the pipe joints, and the resistance reduction mud is diluted and washed out, resulting in the reduction of the efficiency of the circulating mud super discharge and the elevation, which will affect it in severe cases. Project cost.

Method used

The construction method of the section-by-section top pipe of the thick mud ring combined with thixotropic mud silt is adopted. By leaving the slag-clearing grouting port and the thick mud injection hole in the pipe section, the thick mud ring and the thixotropic mud silt silt form a closed structure to reduce friction Force and resist water pressure, preventing mud dilution and super discharge.

Benefits of technology

It effectively solves the problem of super-discharge of sediment and circulating mud, improves the ejection efficiency and engineering cost control, has good versatility and promotion and application prospects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118881384A_ABST
    Figure CN118881384A_ABST
Patent Text Reader

Abstract

The invention discloses a long-distance pipe jacking construction method for a water-rich hard rock stratum. The long-distance pipe jacking construction method is characterized by comprising the following steps: S1, pipe joint treatment: prefabricating pipe joints in a factory; the pipe joints comprise a common pipe joint, a deslagging and grouting pipe joint and a mud ring injection pipe joint; a slag removing and grouting opening is reserved in the bottom of the slag discharging and grouting pipe joint; a plurality of thick mud injection holes are reserved in the mud ring injection pipe joint in the annular direction of the pipe joint; s2, pipe jacking starting, wherein pipe jacking starting construction is conducted on the pipe joints according to a conventional method; and S3, performing section-by-section pipe jacking construction of the thick mud ring combined thixotropic mud bin. The problems that in the pipe jacking construction process, due to the influence of underground water and a rock stratum, sediment can appear at the bottom of a pipe joint, drag reduction slurry is prone to being diluted and scoured to lose efficacy, and therefore circulating slurry is discharged excessively, and the jacking efficiency is reduced are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of pipe jacking and shield construction, and specifically discloses a long-distance pipe jacking construction method for water-rich hard rock formations. Background Art

[0002] With the continuous development of social urbanization, the development and utilization of underground space in my country has increased rapidly, and the geology encountered in underground construction has become more and more complex. Among them, in the process of underground pipeline construction, the application scope of pipe jacking technology is relatively wide. When pipe jacking construction is carried out in water-rich hard rock formations, due to the influence of groundwater and rock formations, there will be a series of problems such as sediment at the bottom of the pipe section, dilution and scouring failure of drag reduction mud, and over-discharge of circulating mud. In severe cases, it will affect the jacking distance and greatly increase the project cost. For this reason, seeking a pipe jacking construction method in water-rich formations has become a common topic in the industry. Summary of the invention

[0003] The technical problem solved by the present invention is to provide a long-distance jacking construction method in a water-rich hard rock formation, so as to solve the problem that due to the influence of groundwater and rock formations during the jacking construction process, sediment will appear at the bottom of the pipe section, the drag reducing mud will be easily diluted and flushed out, thereby causing over-discharge of circulating mud and reduced jacking efficiency.

[0004] To achieve the above object, the present invention provides the following technical solutions:

[0005] A long-distance pipe jacking construction method for water-rich hard rock formations, characterized by comprising the following steps:

[0006] S1. Pipe segment processing: The pipe segments are prefabricated in the factory; the pipe segments include ordinary pipe segments, slag removal grouting pipe segments and mud ring injection pipe segments; the bottom of the slag removal grouting pipe segments is reserved with a slag removal grouting port; the mud ring injection pipe segments are reserved with a number of thick mud injection holes along the pipe segment annular direction;

[0007] S2. Pipe jacking: Pipe jacking construction is carried out on the pipe section according to conventional methods;

[0008] S3, Sectional pipe jacking construction of thick mud ring combined with thixotropic mud bin:

[0009] During the construction of the first jacking section, the first pipe section uses the mud ring injection pipe section L1, the middle pipe section uses the slag grouting pipe section P1, and the other pipe sections use ordinary pipe sections; after all pipe sections are jacked into place, the first jacking section will be in the No. 1 thixotropic mud bin position, and the jacking operation will be stopped. After the mud ring is injected into the wall of the pipe section L1, thick mud will be injected along the annular direction to form a thick mud ring N1 with a fixed position, so that a thixotropic mud bin C1 is formed between the thick mud ring N1 and the hole plug, and then thixotropic mud is pumped into the thixotropic mud bin C1 through the slag grouting port of the slag grouting pipe section P1, and then the jacking operation is resumed, and the subsequent jacking sections are constructed section by section in the following manner;

[0010] During the construction of the i-th jacking section, the mud ring is used to inject the pipe segment L into the first pipe segment during the jacking process. i , the middle position pipe segment uses slag grouting pipe segment P i , while the pipe sections at other positions use ordinary pipe sections; after all the pipe sections of the i-th jacking section are jacked into place, the first jacking section will move forward to the next newly formed thixotropic mud position, i.e., the i-thixotropic mud position, and stop the jacking operation. After the mud ring is injected into the wall of the pipe section L1, thick mud is injected along the annular direction to form a fixed thick mud ring N i , so that the thick mud ring N i The thick mud ring N constructed in the previous jacking construction section i-1 Thixotropic mud chamber C is formed between i Then, the slag is discharged through the slag discharge grouting port of the slag discharge grouting pipe section P1 into the thixotropic slurry bin C i Thixotropic slurry is pumped in;

[0011] Follow the above steps until all jacking sections are constructed, with the number of pipe segments in each jacking section being the same.

[0012] Preferably, in step S1, when all pipe segments are prefabricated, the annular steel bars at the socket positions of the pipe segments are densely reinforced to avoid stress concentration during the jacking process and causing damage to the pipe segments.

[0013] Preferably, in step S1, the slag cleaning grouting port is a circular hole with a diameter of 12 to 18 cm, and the slag cleaning grouting port is connected to a relay pipe, and a valve is provided on the relay pipe.

[0014] Preferably, in step S1, 3 to 6 concentrated mud injection holes are evenly opened in the mud ring injection pipe segment along the pipe segment annular direction; and a detachable concentrated mud plug is provided in the mud injection hole.

[0015] Preferably, in step S3, the thixotropic slurry is prepared by mixing water, bentonite and gypsum powder in a mass ratio of (4-5):1:(0.03-0.05).

[0016] Preferably, in step S3, the concentrated mud is prepared by mixing water, bentonite and gypsum powder in a mass ratio of 1:0.8 to 1:1.

[0017] Preferably, in step S3, the number of pipe sections in each jacking section is 20 to 35.

[0018] Preferably, in the step S3, when all the pipe sections of the jacking section of the i-th section are jacked into place and the jacking operation is stopped, the step further includes:

[0019] Supplement the thick mud ring formed in the previous jacking section construction with thick mud;

[0020] And / or, the thixotropic mud bin formed during the construction of the preceding jacking section is supplemented with thixotropic mud, or the mud residue in the thixotropic mud bin formed during the construction of the preceding jacking section is first pumped out, and then the thixotropic mud is supplemented.

[0021] Preferably, in step S3, the width of the thick mud ring is controlled to be 1 to 3 m along the jacking direction.

[0022] Preferably, during the jacking process of the jacking section, slag-carrying mud is pumped into the mud and water bin to entrain the slag generated at the tunnel face and then pump it out; the slag-carrying mud is made by mixing water, bentonite and gypsum powder.

[0023] Compared with the prior art, the beneficial effects of the present invention are: the present invention is ingenious in concept, convenient and efficient, and solves a series of problems when implemented in water-rich hard rock formations, such as sediment at the bottom of the pipe section, failure of drag reduction mud, over-discharge of circulating mud, etc. due to the influence of groundwater and rock formations, which in serious cases affect the jacking distance and increase the project cost. The present invention has strong versatility, good social benefits and good prospects for promotion and application. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a construction schematic diagram of the present invention;

[0025] Figure 2 yes Figure 1 A partial enlarged schematic diagram of the structure;

[0026] Figure 3 It is a cross-sectional view of the slag grouting pipe section;

[0027] Figure 4 It is a cross-sectional view of the mud ring injection pipe segment;

[0028] Figure 5 yes Figure 2 Cross-section at AA in the middle;

[0029] Figure 6 It is a flow chart of the section-by-section pipe jacking construction of the thick mud ring combined with the thixotropic mud bin in the present invention;

[0030] The meanings of the marks in the above figure are as follows: 1-ordinary pipe section; 2-slag discharge grouting pipe section; 201-slag clearing grouting port; 3-mud ring injection pipe section; 301-thick mud injection hole; 3011-thick mud plug; 4-mud pipeline; 5-hole plug; 6-relay pipe; 601-valve; 602-pressure gauge; 7-mud and water bin; 8-thick mud ring; 9-pipe jacking machine; 10-slag carrying mud pump; 11-working well; 12-thixotropic mud bin; 13-thick mud pump; 14-thixotropic mud pump; 15-shield machine; 16-rock and soil. DETAILED DESCRIPTION

[0031] The present invention is further described in the form of specific embodiments in conjunction with the accompanying drawings. It should be pointed out that the following implementation modes are only illustrative descriptions of the present invention in the form of examples, but the protection scope of the present invention is not limited thereto. The described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0032] It will be apparent to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, nor to what is suggested by the present invention. Moreover, the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive in all respects, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention.

[0033] Example 1

[0034] A long distance pipe jacking construction method for water-rich hard rock formations, please refer to Figures 1 to 6 , which comprises the following steps:

[0035] S1. Pipe segment processing: The pipe segments are prefabricated in the factory; the pipe segments include ordinary pipe segments 1, slag grouting pipe segments 2 and mud ring injection pipe segments 3; when all the pipe segments are prefabricated, the annular steel bars at the socket positions of the pipe segments are densely reinforced to avoid stress concentration during the jacking process and causing damage to the pipe segments;

[0036] See also Figure 3 A slag grouting port 201 is reserved at the bottom of the slag grouting pipe section 2. The slag grouting port 201 is a circular hole with a diameter of 12 to 18 cm. The slag grouting port 201 is connected to a relay pipe 6, and a valve 601 is arranged on the relay pipe 6. When the jacking operation is stopped, the slag grouting port 201 can be connected to the thixotropic mud pump 14 in sequence through the relay pipe 6 and the mud pipeline 4 to pump thixotropic mud into the thixotropic mud bin 12 at the position of the slag grouting pipe section 2, or the mud residue in the thixotropic mud bin at the position of the slag grouting pipe section 2 is pumped out, and then thixotropic mud is pumped in. After the thixotropic mud is pumped into the thixotropic mud bin, before resuming the jacking operation, the valves 601 on all jacking sections should be closed to maintain the pressure in the thixotropic mud bin.

[0037] See also Figure 4 and Figure 5The mud ring injection pipe segment 3 is provided with 3 to 6 thick mud injection holes 301 along the pipe segment annular direction, and the thick mud injection holes 301 are connected to the thick mud pump 13 through the mud pipeline 4, so as to inject thick mud into the wall of the mud ring injection pipe segment 3 to form a thick mud ring 8; a detachable thick mud plug 3011 is provided in the thick mud injection hole 301; after the thick mud is injected and before the jacking operation is resumed, the thick mud plug 3011 should be installed in all the thick mud injection holes 301 to prevent the thixotropic mud from leaking out through the thick mud injection hole 301 when the mud ring injection pipe segment 3 passes through the thixotropic mud bin during the jacking process;

[0038] S2. Pipe jacking: Pipe jacking construction is carried out on the pipe section according to conventional methods;

[0039] S3, Sectional pipe jacking construction of thick mud ring combined with thixotropic mud bin:

[0040] See also Figure 6 , the first section of the jacking section is constructed. During the jacking process, the first pipe section uses the mud ring injection pipe section L1, the pipe section in the middle position uses the slag grouting pipe section P1, and the pipe sections in the remaining positions use the ordinary pipe section 1; after all the pipe sections are jacked into place, the first section of the jacking section will be in the No. 1 thixotropic mud position, the jacking operation is stopped, and the thick mud injection hole 301 of the mud ring injection pipe section L1 is connected to the thick mud pump 13 through the mud pipeline 4. After the mud ring is injected into the wall of the pipe section L1, the thick mud is injected along the annular direction to form a fixed position with support The closed ring for supporting and blocking water is the thick mud ring N1, so that a thixotropic mud bin C1 is formed between the thick mud ring N1 and the hole plug 5, and then the slag removal grouting port 201 of the slag removal grouting pipe section P1 is connected to the thixotropic mud pump 14 through the relay pipe 6 and the mud pipeline 4 in sequence to pump thixotropic mud into the thixotropic mud bin C1, and then the valves 601 on all the jacking sections are closed, and the thick mud plugs 3011 are installed in all the thick mud injection holes 301, and the jacking operation is resumed, and the subsequent jacking sections are constructed section by section in the following manner;

[0041] See also Figure 6 , the i-th jacking section is constructed, i represents the jacking section number of the current construction, i≥2, i is an integer; during the jacking process, the first pipe section uses a mud ring to inject the pipe section L i The first pipe section in the middle position uses the slag grouting pipe section P i , while the pipe segments at other positions use ordinary pipe segments 1; after all the pipe segments of the i-th jacking section are jacked into place, the first jacking section will move forward to the next newly formed thixotropic mud position, i.e., the i-thixotropic mud position, and the jacking operation will be stopped. The mud ring will be injected into the thick mud injection hole 301 of the pipe segment L1, which is connected to the thick mud pump 13 through the mud pipeline 4. After the mud ring is injected into the wall of the pipe segment L1, the thick mud will be injected along the annular direction to form a closed ring with a fixed position, support and water blocking, i.e., the thick mud ring N i , thick mud ring N i The thick mud ring N constructed in the previous jacking construction sectioni-1 Thixotropic mud chamber C is formed between i Then, the slag removal grouting port 201 of the slag removal grouting pipe section P1 is connected to the thixotropic mud pump 14 through the relay pipe 6 and the mud pipeline 4 in sequence to inject the thixotropic mud into the thixotropic mud bin C i Pump thixotropic mud into the jacking section, then close the valves 601 on all jacking sections, install thick mud plugs 3011 in all thick mud injection holes 301, resume jacking operation, and proceed to the construction of the next jacking section;

[0042] Follow the above steps until all jacking sections are constructed; wherein the number of pipe segments in each jacking section is the same, and the number of pipe segments in each jacking section is 20 to 35;

[0043] See also Figure 6 In the process of step-by-step pipe jacking construction of the thick mud ring and the thixotropic mud bin, the i-th jacking section is jacked step by step at the working well end, and the first jacking section moves forward (toward the tunnel face) to the next thixotropic mud bin, so that the first thixotropic mud bin, the second thixotropic mud bin, the third thixotropic mud bin, ..., the i-thixotropic mud bin are formed in sequence along the jacking direction of the pipe segment, and because the thick mud ring 8 adheres to the rock and soil 16 after formation, the thick mud ring and the thixotropic mud bin will not move forward with the jacking of the pipe segment, so when all the pipe segments of the i-th jacking section are jacked in place and the jacking operation is stopped, the first jacking section will always be in the newly formed i-thixotropic mud bin, that is, along the tunnel face to the working well, the jacking section and the thixotropic mud bin, the slag grouting pipe segment and the thixotropic mud bin, the mud ring injection pipe segment and the thick mud ring have the following corresponding relationship:

[0044] Section 1 jacking section - thixotropic mud bin No. i, slag discharge grouting pipe section P1 - thixotropic mud bin C i , mud ring injection pipe section L1-thick mud ring N i ;

[0045] Section 2 jacking section - thixotropic mud bin No. i-1, slag discharge grouting pipe section P2 - thixotropic mud bin C i-1 , mud ring injection pipe section L2-thick mud ring N i-1 ;

[0046] Section 2 jacking section - No. i-1 thixotropic mud bin, slag grouting pipe section P3 thixotropic mud bin C i-2 , mud ring injection pipe section L3-thick mud ring N i-2 ;

[0047] …;

[0048] Section i: jacking section - No. 1 thixotropic mud position, slag discharge grouting pipe section P i Thixotropic mud tank C1, mud ring injection pipe section L i -Thick mud ring N1;

[0049] Based on the above, it can be known that when all the pipe sections of any jacking section are jacked into place and the jacking operation is stopped, thick mud can only be injected through the mud ring injection pipe section L1 in the first jacking section to form a fixed-position thick mud ring and thixotropic mud bin, and thixotropic mud can only be pumped into the thixotropic mud bin through the slag grouting pipe section P1.

[0050] Furthermore, in a preferred embodiment, the thixotropic mud is processed by mixing water, bentonite and gypsum powder in a mass ratio of 4 to 5:1:0.03 to 0.05; the concentrated mud is processed by mixing water, bentonite and gypsum powder in a mass ratio of 1:0.8 to 1:1; wherein bentonite is an inorganic non-metallic mineral material with montmorillonite as a water rheological agent and other widely used main constituent minerals, the unit layers of the montmorillonite body structure are connected by intermolecular forces, and water molecules and other organic molecules can easily enter its interlayer domain, so that the bentonite has excellent properties such as water absorption and swelling, high dispersibility and adsorption; adding gypsum powder to bentonite can achieve the effect of fluid thickening; in addition, the thixotropic mud and concentrated mud can be mixed using a mud shear pump system, and the mud shear pump system is composed of a shear pump body, a shear funnel and a mud box, which can provide a high shear shear device for rapid hydration of high molecular polymers to reduce the shear ratio rate of the slurry and improve the mud gel strength.

[0051] Furthermore, in a preferred embodiment, the width of the thick mud ring is controlled to be 1 to 3 m along the jacking direction.

[0052] Furthermore, in a preferred embodiment, when all pipe sections of the jacking section of the i-th section are jacked into place and the jacking operation is stopped, in addition to the thick mud ring N formed during the construction, i and thixotropic mud tank C i , and to the thixotropic mud tank C i In addition to pumping thixotropic mud into the machine, the following measures should be taken according to the actual construction situation:

[0053] The thick mud ring formed in the previous jacking section construction is supplemented with thick mud to ensure the support and water blocking effect of the thick mud ring; for example, when the pressure of the thixotropic mud bin C6 is detected to be insufficient, the thick mud ring N5 and the thick mud ring N6 need to be supplemented with thick mud, and the corresponding mud ring is injected into the pipe segment L. i-5 At the position of thick mud ring N6, mud ring injection pipe section L i-4 Located at the position of the thick mud ring N5, it can be injected into the pipe section L through the mud ring i-5 , Mud ring injection pipe joint L i-4 Pump in thick mud to supplement the thick mud ring N6 and thick mud ring N5;

[0054] And / or, the thixotropic mud bin formed in the previous jacking section construction is supplemented with thixotropic mud to balance the groundwater pressure, or the mud residue in the thixotropic mud bin formed in the previous jacking section construction is first pumped out, and then the thixotropic mud is supplemented to prevent a large amount of sediment from being generated at the bottom of the pipe section, which would render the drag reduction effect of the thixotropic mud ineffective; for example, when it is monitored that the pressure of the thixotropic mud bin C6 is insufficient, the corresponding thixotropic mud bin C6 is in the slag grouting pipe section P. i-5 The position of the slag grouting pipe section P i-5 Implement the above operations, that is, the slag grouting pipe section P i-5 The relay pipe 6 on the top is connected to the slag discharge grouting pipe, and the thixotropic mud is injected into the thixotropic mud bin C6 through the slag discharge grouting pump, or the mud slag in the thixotropic mud bin is first pumped out and then the thixotropic mud is injected.

[0055] Further, in a preferred embodiment, see Figure 3 A pressure gauge 602 is provided at one end of the relay pipe 6 near the slag cleaning grouting port 201, so that the pressure in the corresponding thixotropic mud bin can be observed in real time through the pressure gauge 602 to determine whether the thixotropic mud in the corresponding thixotropic mud bin needs to be supplemented.

[0056] Furthermore, in a preferred embodiment, during the jacking process of the jacking section, slag-carrying mud is pumped into the mud and water bin 7 to entrain the slag generated on the face and then pump it out and maintain the pressure of the mud and water bin 7; the slag-carrying mud is made by mixing water, bentonite and gypsum powder; on the one hand, the slag-carrying mud is required to have a certain viscosity so that it can wrap the slag well to prevent excessive wear, and on the other hand, the consistency is not too large to prevent long-distance transportation from causing a burden on pumping; the slag-carrying mud is pumped into the mud and water bin 7 through the mud pipeline 4 by the slag-carrying mud pump 10 to entrain and carry out the slag on the face, while maintaining the pressure of the mud and water bin 7 equal to or slightly lower than the groundwater head pressure, thereby preventing excessive groundwater from entering the mud and water bin and reaching the ground with the slag-carrying mud, causing mud over-discharge and increasing external transportation costs.

[0057] In summary, it can be seen that by adopting the method of the present invention, in long-distance pipe jacking construction, as the pipe segment at the working well is continuously jacked, the first jacking section will move forward step by step to each thixotropic mud bin, and the mud ring injection pipe segment L1 can be used to inject thick mud into each thixotropic mud bin to form a thick mud ring, so that two adjacent thick mud rings and the pipe segment wall and rock and soil are enclosed to form independent, closed and mutually continuous multiple thixotropic mud bins, and thixotropic mud can be pumped into each thixotropic mud bin through the slag grouting pipe segment P1. In this way, through the joint action of each thixotropic mud bin, firstly, the friction force in the process of pipe segment jacking can be reduced to ensure the smooth jacking of the pipe segment, and secondly, a certain pressure can be formed to resist water pressure, so as to prevent excessive groundwater from infiltrating into the thixotropic mud bin, resulting in mud dilution failure and mud over-discharge. Especially in the construction projects of long-distance, water-rich hard rock pipe jacking construction, the present invention has a good application effect.

[0058] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A long distance pipe jacking construction method for water-rich hard rock formations, characterized in that The steps include: S1. Pipe segment processing: prefabricate the pipe segment in a factory; the pipe segment includes a common pipe segment (1), a slag removal grouting pipe segment (2) and a mud ring injection pipe segment (3); a slag removal grouting port (201) is reserved at the bottom of the slag removal grouting pipe segment (2); and a plurality of thick mud injection holes (301) are reserved along the annular direction of the pipe segment in the mud ring injection pipe segment (3); S2. Pipe jacking: Pipe jacking construction is carried out on the pipe section according to conventional methods; S3, Sectional pipe jacking construction of thick mud ring combined with thixotropic mud bin: During the construction of the first jacking section, the first pipe section uses the mud ring injection pipe section L1, the pipe section in the middle position uses the slag grouting pipe section P1, and the pipe sections in the remaining positions use the ordinary pipe sections (1); after all the pipe sections are jacked into place, the first jacking section will be in the No. 1 thixotropic mud bin position, and the jacking operation will be stopped. After the mud ring is injected into the wall of the pipe section L1, thick mud is injected along the annular direction to form a thick mud ring N1 with a fixed position, so that a thixotropic mud bin C1 is formed between the thick mud ring N1 and the hole plug (5), and then thixotropic mud is pumped into the thixotropic mud bin C1 through the slag removal grouting port (201) of the slag grouting pipe section P1, and then the jacking operation is resumed, and the subsequent jacking sections are constructed section by section in the following manner; During the construction of the i-th jacking section, the first pipe section uses a mud ring to inject pipe section L i The middle pipe segment uses slag grouting pipe segment P i , while the pipe segments at the other positions use ordinary pipe segments (1); after all the pipe segments of the i-th jacking section are jacked into place, the first jacking section will move forward to the next newly formed thixotropic mud position, i.e., the i-thixotropic mud position, and the jacking operation will be stopped. After the mud ring is injected into the wall of the pipe segment L1, thick mud will be injected along the annular direction to form a fixed position thick mud ring N i , so that the thick mud ring N i The thick mud ring N constructed in the previous jacking construction section i-1 Thixotropic mud chamber C is formed between i Then, the slag is discharged into the thixotropic slurry bin C through the slag discharge grouting port (201) of the slag discharge grouting pipe section P1. i Thixotropic slurry is pumped in; Follow the above steps until all jacking sections are constructed, with the number of pipe segments in each jacking section being the same.

2. A long distance pipe jacking construction method for water-rich hard rock formations as claimed in claim 1, characterized in that: In the step S1, when all pipe segments are prefabricated, the annular steel bars at the socket positions of the pipe segments are densely reinforced to prevent stress concentration during the jacking process from causing damage to the pipe segments.

3. A long distance pipe jacking construction method for water-rich hard rock formations as claimed in claim 1, characterized in that: In the step S1, the slag cleaning grouting port (201) is a circular hole with a diameter of 12 to 18 cm, and the slag cleaning grouting port (201) is connected to a relay pipe (6), and a valve (601) is provided on the relay pipe (6).

4. A long-distance water-rich hard rock pipe jacking construction method as claimed in claim 1, characterized in that: In the step S1, 3 to 6 concentrated mud injection holes (301) are evenly opened in the mud ring injection pipe section (3) along the pipe section annular direction; and a detachable concentrated mud plug (3011) is arranged in the mud injection hole (301).

5. A long distance pipe jacking construction method for water-rich hard rock formations as claimed in claim 1, characterized in that: In the step S3, the thixotropic slurry is prepared by mixing water, bentonite and gypsum powder in a mass ratio of (4-5):1:(0.03-0.05).

6. A long distance pipe jacking construction method for water-rich hard rock formations as claimed in claim 1, characterized in that: In the step S3, the thick mud is prepared by mixing water, bentonite and gypsum powder in a mass ratio of 1:0.8 to 1:

1.

7. A long distance pipe jacking construction method for water-rich hard rock formations as claimed in claim 1, characterized in that: In the step S3, the number of pipe sections in each jacking section is 20 to 35.

8. A long distance pipe jacking construction method for water-rich hard rock formations as claimed in claim 1, characterized in that: In the step S3, when all the pipe sections of the jacking section of the i-th section are jacked into place and the jacking operation is stopped, the step further includes: Supplement the thick mud ring formed in the previous jacking section construction with thick mud; And / or, the thixotropic mud bin formed during the construction of the preceding jacking section is supplemented with thixotropic mud, or the mud residue in the thixotropic mud bin formed during the construction of the preceding jacking section is first pumped out, and then the thixotropic mud is supplemented.

9. A long distance pipe jacking construction method for water-rich hard rock formations as claimed in claim 1, characterized in that: In step S3, the width of the thick mud ring is controlled to be 1 to 3 m along the jacking direction.

10. A long distance pipe jacking construction method for water-rich hard rock formations as claimed in claim 1, characterized in that: During the jacking process of the jacking section, slag-carrying mud is pumped into the mud and water bin (7) to entrain the slag generated on the tunnel face and then pump it out; the slag-carrying mud is made by mixing water, bentonite and gypsum powder.

Citation Information

Cited By

  • Miniature pipe jacking machine for underground pipeline laying

    CN121067132A