Underground tunnel heading machine
By designing an adjustable conveyor belt length and a structure equipped with a dust filter in the downhole tunnel boring machine, the inconvenience of gravel transport and air quality problems are solved, and the applicability and environmental safety of the equipment are improved.
Patent Information
- Application Number
- CN202411126441.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-16
- Publication Date
- 2024-11-01
AI Technical Summary
The existing downhole tunnel boring machine cannot adjust the length of the conveyor belt, resulting in inconvenient conveying of gravel, affecting the scope of application of the equipment and the uniformity of gravel collection.
A boring machine structure including a shovel plate, a rotating plate, a feed plate, a fixing plate and a hydraulic cylinder is designed. The limit plate and a push plate are driven by the hydraulic cylinder to adjust the length of the conveyor belt, and is equipped with a stone crusher and dust removal. Filters to improve gravel delivery and air quality.
It realizes the flexibility of conveying gravel to different locations, ensures that the conveyor belts are suitable for different lengths, improves the scope of application of equipment and the uniformity of gravel collection, and improves the visibility and air quality of the underground environment.
Smart Images

Figure CN118881391A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of tunnel boring machines, in particular to an underground tunnel boring machine. Background Art
[0002] Underground tunnels refer to passages dug in underground mines for the purposes of mining, transportation, ventilation, drainage, and the passage of personnel and equipment for coal or other mineral resources. These tunnels are usually located at a certain depth underground. According to their functions and uses, they can be divided into transport tunnels, ventilation tunnels, drainage tunnels, pedestrian tunnels, etc. The shape, size and support method of the tunnels will be designed and constructed according to factors such as geological conditions, mining methods and use requirements. Good underground tunnel design and maintenance are of great significance to ensuring the safe production and efficient mining of mines.
[0003] In the process of underground tunnel mining, a roadheader is a commonly used equipment. A roadheader is a large-scale mechanical equipment used for excavating underground tunnels, tunnels and other projects. A roadheader can perform rock breaking, loading, transportation and other operations underground, crushing rocks or soil and transporting them out, while continuously advancing forward to form the required passage. A roadheader has the advantages of high degree of mechanization, fast excavation speed, good construction quality and high safety. It is widely used in mining, tunnel construction, water conservancy projects and other fields.
[0004] However, when the existing tunnel boring machine is in use, it can only transport gravel to a specified position, which is not conducive to adjusting the length of the conveyor belt on the tunnel boring machine for transporting gravel. When the tunnel boring machine transports gravel to the external equipment for collecting and transporting gravel, it is not conducive to the gravel falling to different positions on the external equipment for collecting and transporting gravel, which will affect the external gravel collection and transportation equipment to uniformly collect and accommodate the gravel, and it is not convenient for the conveyor belt of the tunnel boring machine to meet the needs of transporting gravel of different lengths, which will affect the applicable scope of the tunnel boring machine and is not conducive to the use of the tunnel boring machine.
[0005] To this end, we propose an underground tunnel boring machine. Summary of the invention
[0006] In view of the above problems and / or the problems existing in an existing underground tunnel boring machine, the present invention is proposed.
[0007] Therefore, the object of the present invention is to provide an underground tunnel boring machine. By improving the existing tunnel boring machine, it can solve the above-mentioned problems that the prior art can only transport crushed stone to a specified position, which is not conducive to adjusting the length of the conveyor belt on the tunnel boring machine for transporting crushed stone. When the tunnel boring machine transports crushed stone to the external equipment for collecting and transporting crushed stone, it is not conducive to the crushed stone falling to different positions on the external equipment for collecting and transporting crushed stone, which will affect the external crushed stone collection and transportation equipment to uniformly collect and accommodate the crushed stone, and it is not convenient for the conveyor belt of the tunnel boring machine to meet the requirements of transporting crushed stone of different lengths, which will affect the applicable scope of the tunnel boring machine and be not conducive to the use of the tunnel boring machine.
[0008] To solve the above technical problems, according to one aspect of the present invention, the present invention provides the following technical solutions: The cam is provided with a plurality of movable parts, and a movable part is provided on the movable part, and a movable part is provided on the movable part.
[0009] As a preferred solution of an underground tunnel boring machine described in the present invention, the shovel plate is rotatably connected to the boring machine body through a rotating shaft and an oil cylinder, the boring machine body includes a walking crawler and a cutting mechanism, the walking crawler is located on both sides of the bottom of the boring machine body, the walking crawler is installed with the boring machine body through a rotating wheel and a driving motor, the cutting mechanism is located at the top of the boring machine body close to one end of the shovel plate, the cutting mechanism is installed with the boring machine body through an oil cylinder and a driving motor, the inside of both sides of the shovel plate are corresponding to the rotating disk installed with a driving motor, the output shaft of the driving motor in the shovel plate is facing upward, the upper end of the output shaft of the driving motor in the shovel plate is installed between the corresponding position of the lower surface of the corresponding rotating disk, the shovel plate helps to collect gravel, and the output shaft of the driving motor in the shovel plate rotates in relative directions.
[0010] As a preferred solution of an underground tunnel boring machine described in the present invention, a stone crusher is installed between the shovel plate and the conveyor belt at one end of the middle part of the tunnel boring machine body close to the shovel plate, a fixed block is fixed to the upper surface of the stone crusher close to the conveyor belt, a fixed cylinder is fixed in the middle of the fixed block, the fixed cylinder passes through the two side surfaces of the middle part of the fixed block, a dust removal filter is installed in the fixed cylinder at one end close to the conveyor belt, an induced draft fan is installed in the middle of the fixed cylinder, fixed rods are fixed in the middle around the induced draft fan, the ends of the fixed rods away from the induced draft fan are fixedly connected to the corresponding positions of the inner annular surface of the fixed cylinder, and a porous mesh plate is fixed at one end of the fixed cylinder away from the dust removal filter, and the porous mesh plate can shield and protect the inside of the fixed cylinder.
[0011] As a preferred solution of an underground tunnel boring machine described in the present invention, wherein: a first rotating rod is fixed in the middle of the first rotating roller, the first rotating rod passes through the two end surfaces of the middle of the first rotating roller, and the two ends of the first rotating rod are rotatably connected with the corresponding positions on the corresponding first fixed plate through bearings, and a rotating motor is installed on the surface of one side of the first fixed plate close to the first rotating roller and close to the first rotating roller, a retaining groove is opened in the middle of the outer ring surface of the first rotating roller, and a first pulley is fixed on the first rotating roller in the retaining groove, the output shaft of the rotating motor faces the side close to the first pulley, and a second pulley is installed on the output shaft of the rotating motor corresponding to the first pulley, and a transmission belt is jointly sleeved and installed on the first pulley and the second pulley, and the transmission belt helps to transmit the power between the first pulley and the second pulley.
[0012] As a preferred solution of an underground tunnel boring machine described in the present invention, a second rotating rod is fixed to the middle part of the second rotating roller, the second rotating rod passes through the two end surfaces of the middle part of the second rotating roller, both ends of the second rotating rod are rotatably connected with the middle part of the corresponding first limiting plate through bearings, the first limiting plate helps to rotate and limit the second rotating rod, and a matching first limiting hole is opened at the end of the first fixed plate away from the first rotating roller corresponding to the first limiting plate, the first limiting plates are all located in the first limiting holes on the corresponding first fixed plates, and the first limiting plates are slidably connected with the first limiting holes on the corresponding first fixed plates.
[0013] As a preferred solution of an underground tunnel boring machine described in the present invention, there are clamping blocks fixed in the middle of the upper surface and the middle of the lower surface of the first limit plate, and matching clamping grooves are opened on the corresponding clamping blocks on the first fixed plate. The clamping blocks are all located in the corresponding clamping grooves on the corresponding first fixed plates, and the clamping blocks are slidably connected with the corresponding clamping grooves on the corresponding first fixed plates. The clamping grooves and the clamping blocks help to limit the first fixed plate and the first limit plate.
[0014] As a preferred solution of an underground tunnel boring machine described in the present invention, a first push plate is commonly fixed between the surface of one end of the first limiting plate close to the first rotating roller, a first connecting plate is commonly fixed between the middle parts of the opposite surfaces of the first fixing plate, a first hydraulic cylinder is installed in the middle part of the surface of one side of the first connecting plate close to the first rotating roller, the first connecting plate can fix and limit the first hydraulic cylinder, the output rod of the first hydraulic cylinder faces the first connecting plate and passes through the two side surfaces of the middle part of the first connecting plate, and the end of the output rod of the first hydraulic cylinder close to the first push plate is fixedly connected to the middle part of the opposite surface of the first push plate.
[0015] As a preferred solution of an underground tunnel boring machine described in the present invention, wherein: the bottom end of the second fixed plate close to the first rotating roller is provided with a matching second limiting hole corresponding to the second limiting plate, the second limiting plates are located in the second limiting holes corresponding to the second fixed plates and are slidably connected with the corresponding second limiting holes, and the second limiting holes on the second fixed plate help to limit the second limiting plate.
[0016] As a preferred solution of an underground tunnel boring machine described in the present invention, a third rotating rod is fixed to the middle part of the third rotating roller, both ends of the third rotating rod pass through the two end surfaces of the middle part of the third rotating roller, both ends of the third rotating rod are rotatably connected with the middle part of the corresponding second limiting plate through bearings, the third rotating rod helps to rotate and limit the third rotating roller, and a second push plate is commonly fixed between the end surface of the second limiting plate away from the fourth rotating rod.
[0017] As a preferred solution of an underground tunnel boring machine described in the present invention, a second connecting plate is commonly fixed between the middle parts of the bottom of the opposite surfaces of the second fixed plate, a second hydraulic cylinder is installed on the middle part of the surface of the second connecting plate away from the second push plate, the second connecting plate can fix and limit the second hydraulic cylinder, the output rod of the second hydraulic cylinder faces the second connecting plate and passes through the two side surfaces of the middle part of the second connecting plate, and the end of the second hydraulic cylinder output rod close to the second push plate is fixedly connected to the middle part of the opposite surface of the second push plate.
[0018] Compared with the prior art, the beneficial effects achieved by the present invention are: In the present invention, crushed stone can be transported to different positions when in use, which is convenient for adjusting the length of the conveying belt on the tunnel boring machine for conveying crushed stone. When the tunnel boring machine conveys crushed stone to the external equipment for collecting and conveying crushed stone, it is beneficial for the crushed stone to fall to different positions on the external equipment for collecting and conveying crushed stone, which is convenient for ensuring that the external crushed stone collecting and conveying equipment collects and accommodates the crushed stone evenly, which helps the conveying belt of the tunnel boring machine to meet the requirements of conveying crushed stone of different lengths, which is convenient for ensuring the applicable scope of the tunnel boring machine when in use, and is helpful for the use of the tunnel boring machine.
[0019] In the present invention, the output rod of the first hydraulic cylinder can drive the first limit plate to move through the first push plate, and the first fixed plate can limit the first limit plate through the slot, the block and the first limit hole, which is helpful to stably move the first limit plate, and the first limit plate can drive the second rotating roller to move through the second rotating rod, and the output rod of the second hydraulic cylinder can drive the second limit plate to move through the second push plate, and the second limit plate can drive the third rotating roller to move through the third rotating rod.
[0020] In the present invention, the induced draft fan can extract the air carrying powder on the upper side of the conveyor belt through the dust removal filter, so that the extracted air is discharged through the dust removal filter, the fixed cylinder and the porous mesh plate. The dust removal filter can filter the powder carried in the passing air. The filtration of the dust removal filter can reduce the discharge of powder, which is beneficial to ensure the visibility and air quality in the underground tunnel, and helps to ensure the safety of the staff to work. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 It is a structural schematic diagram of the present invention; Figure 2 It is a schematic diagram of the structure of the feeding plate of the present invention; Figure 3 It is a schematic diagram of the structure of the fixing block of the present invention; Figure 4 It is a schematic structural diagram of the first fixing plate of the present invention; Figure 5 It is a schematic structural diagram of the first connecting plate of the present invention; Figure 6 It is a schematic diagram of the structure of the second fixing plate of the present invention; Figure 7 It is a schematic diagram of the first push plate structure of the present invention; Figure 8 It is a schematic diagram of the second push plate structure of the present invention; Fig. 9 It is a schematic diagram of the fixed tube structure of the present invention.
[0022] In the figure: 1, the main body of the tunnel boring machine; 2, the crawler; 3, the cutting mechanism; 4, the shovel plate; 5, the rotating disk; 6, the feeding plate; 7, the stone crusher; 8, the fixed block; 9, the fixed cylinder; 10, the dust filter; 11, the fixed rod; 12, the induced draft fan; 13, the porous mesh plate; 14, the first fixed plate; 15, the second fixed plate; 16, the first rotating rod; 17, the second rotating rod; 18, the third rotating rod; 19, the fourth rotating rod; 20, the first rotating roller; 21, the second Rotating roller; 22, third rotating roller; 23, rotating motor; 24, retaining groove; 25, first pulley; 26, second pulley; 27, transmission belt; 28, conveying belt; 29, first connecting plate; 30, second connecting plate; 31, first hydraulic cylinder; 32, second hydraulic cylinder; 33, first push plate; 34, second push plate; 35, first limiting hole; 36, second limiting hole; 37, first limiting plate; 38, second limiting plate; 39, card slot; 40, card block. DETAILED DESCRIPTION
[0023] In order to make the objectives, technical solutions and advantages of the present invention more clear, the embodiments of the present invention will be further described in detail below with reference to the accompanying drawings.
[0024] The present invention provides an underground tunnel boring machine, which can transport crushed stones to different positions, and is convenient for adjusting the length of the conveying belt on the boring machine for conveying crushed stones. When the boring machine transports crushed stones to an external device for collecting and conveying crushed stones, the crushed stones are facilitated to fall to different positions on the external device for collecting and conveying crushed stones, which is convenient for ensuring that the external crushed stone collecting and conveying device uniformly collects and accommodates the crushed stones, and is helpful for the conveying belt of the boring machine to meet the requirements of conveying crushed stones of different lengths, and is convenient for ensuring the applicable scope of the boring machine when in use, which is helpful for the use of the boring machine; See also Figure 1-9A tunnel boring machine for underground mines comprises a tunnel boring machine body 1, a shovel plate 4 is rotatably installed at the bottom of one end of the tunnel boring machine body 1, rotating disks 5 are rotatably installed on both sides of the upper surface of the shovel plate 4, and feeding plates 6 are fixed around the outer ring surface of the rotating disk 5, first fixed plates 14 are fixed on both sides of the middle of the tunnel boring machine body 1, a second fixed plate 15 is fixed in the middle of the lower surface of the first fixed plate 14, a first rotating roller 20 is rotatably installed between the opposite surfaces of the first fixed plate 14 close to the end of the shovel plate 4, a first limiting plate 37 is slidably installed in the middle of the end of the first fixed plate 14 away from the first rotating roller 20, a second rotating roller 21 is rotatably installed between the opposite surfaces of the first limiting plate 37, a fourth rotating rod 19 is rotatably installed on the top of the opposite surface of the second fixed plate 15 close to one end of the first rotating roller 20, and the second fixed plate 15 is close to the first rotating roller 20. A second limit plate 38 is slidably installed on the lower side of one end of the roller 20, and a third rotating roller 22 is rotatably installed between the opposite surfaces of the second limit plate 38. A conveying belt 28 is jointly sleeved and installed between the outer sides of the first rotating roller 20 and the second rotating roller 21. The middle part of the lower side of the conveying belt 28 is sequentially sleeved and wound around the side away from the fourth rotating rod 19 and the third rotating roller 22. The conveying length of the conveying belt 28 can be adjusted by moving the second rotating roller 21 and the third rotating roller 22. When in use, it is helpful to adjust the length of the conveying belt 28 used for conveying gravel in the tunneling machine. When the tunneling machine needs to convey gravel of different lengths, it is convenient for the conveying belt 28 of the tunneling machine to adapt to the conveying requirements of gravel of different lengths, which helps to ensure the applicable scope of the tunneling machine when in use, so as to facilitate the use of the tunneling machine.
[0025] Among them, the shovel plate 4 is rotatably connected to the tunnel boring machine body 1 through a rotating shaft and an oil cylinder. The tunnel boring machine body 1 includes a walking crawler 2 and a cutting mechanism 3. The walking crawler 2 is located on both sides of the bottom of the tunnel boring machine body 1. The walking crawler 2 is installed with the tunnel boring machine body 1 through a rotating wheel and a driving motor. The cutting mechanism 3 is located at the top of the tunnel boring machine body 1 near one end of the shovel plate 4. The cutting mechanism 3 is installed with the tunnel boring machine body 1 through an oil cylinder and a driving motor. The insides of both sides of the shovel plate 4 are corresponding to the rotating disk 5. The output shafts of the driving motors in the shovel plate 4 are all facing upwards, and the upper ends of the output shafts of the driving motors in the shovel plate 4 are installed between the corresponding positions on the lower surfaces of the corresponding rotating disks 5. The shovel plate 4 helps to collect gravel, and the output shafts of the driving motors in the shovel plate 4 face in opposite directions. Rotate; a stone crusher 7 is installed at one end of the middle part of the tunnel boring machine body 1 close to the shovel plate 4, between the shovel plate 4 and the conveyor belt 28, a fixed block 8 is fixed to one end of the upper surface of the stone crusher 7 close to the conveyor belt 28, a fixed cylinder 9 is fixed in the middle of the fixed block 8, the fixed cylinder 9 passes through the two side surfaces of the middle part of the fixed block 8, a dust filter 10 is installed at one end of the fixed cylinder 9 close to the conveyor belt 28, an induced draft fan 12 is installed in the middle of the fixed cylinder 9, and fixed rods 11 are fixed in the middle of the four sides of the induced draft fan 12, and the ends of the fixed rods 11 away from the induced draft fan 12 are fixedly connected to the corresponding positions of the inner annular surface of the fixed cylinder 9, and a porous mesh plate 13 is fixed at one end of the fixed cylinder 9 away from the dust filter 10, and the porous mesh plate 13 can shield and protect the inside of the fixed cylinder 9.
[0026] A first rotating rod 16 is fixed to the middle of the first rotating roller 20. The first rotating rod 16 passes through the two end surfaces of the middle of the first rotating roller 20. Both ends of the first rotating rod 16 are rotatably connected to the corresponding positions on the corresponding first fixed plate 14 through bearings. A rotating motor 23 is installed on the surface of one side of the first fixed plate 14 close to the first rotating roller 20 and close to the first rotating roller 20. A retaining groove 24 is opened in the middle of the outer ring surface of the first rotating roller 20. A first pulley 25 is fixed on the first rotating roller 20 in the retaining groove 24. The output shaft of the rotating motor 23 faces the side close to the first pulley 25. A second pulley 26 is installed on the output shaft of the rotating motor 23 corresponding to the first pulley 25. The first pulley 25 and the second pulley 26 are sleeved together. A transmission belt 27 is installed, and the transmission belt 27 helps to transmit the power between the first pulley 25 and the second pulley 26; a second rotating rod 17 is fixed to the middle part of the second rotating roller 21, and the second rotating rod 17 passes through the two end surfaces of the middle part of the second rotating roller 21, and both ends of the second rotating rod 17 are rotatably connected with the middle part of the corresponding first limiting plate 37 through bearings, and the first limiting plate 37 helps to rotate and limit the second rotating rod 17, and a matching first limiting hole 35 is opened at the end of the first fixed plate 14 away from the first rotating roller 20 corresponding to the first limiting plate 37, and the first limiting plates 37 are all located in the first limiting holes 35 on the corresponding first fixed plates 14, and the first limiting plates 37 are slidably connected with the first limiting holes 35 on the corresponding first fixed plates 14.
[0027] A block 40 is fixed in the middle of the upper surface and the middle of the lower surface of the first limiting plate 37. A matching slot 39 is provided on the first fixed plate 14 corresponding to the block 40. The block 40 is located in the corresponding slot 39 on the first fixed plate 14. The block 40 is slidably connected with the corresponding slot 39 on the first fixed plate 14. The slot 39 and the block 40 help to limit the first fixed plate 14 and the first limiting plate 37. The first limiting plate 37 is fixed together with one end surface close to the first rotating roller 20. A first push plate 33 is fixed, and a first connecting plate 29 is fixed between the middle parts of the opposite surfaces of the first fixed plate 14. A first hydraulic cylinder 31 is installed in the middle part of the surface of the first connecting plate 29 close to the first rotating roller 20. The first connecting plate 29 can fix and limit the first hydraulic cylinder 31. The output rod of the first hydraulic cylinder 31 faces the first connecting plate 29 and passes through the two side surfaces of the middle part of the first connecting plate 29. The end of the output rod of the first hydraulic cylinder 31 close to the first push plate 33 is fixedly connected to the middle part of the opposite surface of the first push plate 33.
[0028] A matching second limiting hole 36 is provided at one end of the bottom of the second fixed plate 15 close to the first rotating roller 20, corresponding to the second limiting plate 38. The second limiting plates 38 are located in the second limiting holes 36 on the corresponding second fixed plate 15 and are slidably connected with the corresponding second limiting holes 36. The second limiting holes 36 on the second fixed plate 15 help to limit the second limiting plate 38. A third rotating rod 18 is fixed to the middle of the third rotating roller 22. Both ends of the third rotating rod 18 penetrate the two end surfaces of the middle of the third rotating roller 22. Both ends of the third rotating rod 18 are rotatably connected with the middle of the corresponding second limiting plate 38 through bearings. The third rotating rod 18 has In order to help rotate and limit the third rotating roller 22, a second push plate 34 is commonly fixed between the surfaces of the second limiting plate 38 at one end away from the fourth rotating rod 19; a second connecting plate 30 is commonly fixed between the middle parts of the bottoms of the opposite surfaces of the second fixed plate 15, and a second hydraulic cylinder 32 is installed in the middle part of the surface of the side of the second connecting plate 30 away from the second push plate 34. The second connecting plate 30 can fix and limit the second hydraulic cylinder 32, and the output rod of the second hydraulic cylinder 32 faces the second connecting plate 30 and passes through the two side surfaces of the middle part of the second connecting plate 30, and the output rod of the second hydraulic cylinder 32 is fixedly connected between one end of the output rod of the second hydraulic cylinder 32 close to the second push plate 34 and the middle part of the opposite surface of the second push plate 34.
[0029] The working principle of the present invention is as follows: during use, the main body 1 of the tunnel boring machine is moved to the corresponding position where underground tunnel mining is required. When the main body 1 of the tunnel boring machine needs to be moved, the main body 1 of the tunnel boring machine can be moved along the ground at the corresponding position through the walking crawler 2. When the walking crawler 2 moves, it can drive the main body 1 of the tunnel boring machine to move, so as to move the main body 1 of the tunnel boring machine to the position where it needs to be used. The main body 1 of the tunnel boring machine can cut and mine the corresponding position where underground tunnel mining is required through the cutting mechanism 3. After the cutting mechanism 3 cuts the stone at the position where mining is required in the underground tunnel, the main body 1 of the tunnel boring machine is moved by the walking crawler 2. When the main body 1 of the tunnel boring machine moves, it can drive the shovel plate 4 to move, so that the stone cut by the cutting mechanism 3 is shoveled to the upper side of the shovel plate 4.
[0030] The driving motor in the shovel plate 4 is turned on, and the driving motor in the shovel plate 4 can drive the rotating disk 5 to rotate. When the rotating disk 5 rotates, it can drive the feeding plate 6 to rotate. When the feeding plate 6 rotates, it can push the stones on the shovel plate 4 into the stone crusher 7. The stone crusher 7 is further turned on. When the stone crusher 7 is turned on, the stone crusher 7 can crush the large stones so that the stones are crushed into gravel, which can avoid blockage when the tunnel boring machine body 1 transports large stones, which is helpful for the use of the tunnel boring machine body 1. The gravel crushed by the stone crusher 7 will be transported by the stone crusher 7 to the upper side of the conveyor belt 28, and the gravel transported to the conveyor belt 28 will carry a large amount of powder.
[0031] The induced draft fan 12 in the fixed cylinder 9 is further opened, the fixed block 8 can fix and limit the fixed cylinder 9, and the fixed cylinder 9 can fix and limit the induced draft fan 12 through the fixed rod 11, so as to facilitate the stable use of the induced draft fan 12. When the induced draft fan 12 is opened, the induced draft fan 12 can extract the air carrying powder on the upper side of the conveyor belt 28 through the dust filter 10, so that the extracted air is discharged through the dust filter 10, the fixed cylinder 9 and the porous mesh plate 13. The dust filter 10 can filter the powder carried in the passing air, and the filtration of the dust filter 10 can reduce the discharge of powder, which is beneficial to ensure the visibility and air quality in the underground tunnel, and helps to ensure the safety of the staff to work.
[0032] When it is necessary to transport the gravel on the conveyor belt 28, the rotating motor 23 is turned on. When the rotating motor 23 is turned on, the output shaft of the rotating motor 23 can drive the second pulley 26 to rotate. When the second pulley 26 rotates, it can drive the first pulley 25 to rotate through the transmission belt 27. When the first pulley 25 rotates, it can drive the first rotating roller 20 to rotate through the retention groove 24. When the first rotating roller 20 rotates, it can drive the first rotating rod 16 to rotate along the first fixed plate 14. The first fixed plate 14 can limit the first rotating roller 20 through the first rotating rod 16, so as to stably rotate the first rotating roller 20. When the first rotating roller 20 rotates, it can drive the conveyor belt 28 to move. When the conveyor belt 28 moves, it can transport the gravel on the upper side. When the conveyor belt 28 moves, it will drive the second rotating roller 21, the fourth rotating rod 19 and the third rotating roller 22 to rotate, which is helpful for the use of the conveyor belt 28.
[0033] When the conveying length of the conveying belt 28 needs to be lengthened, the first hydraulic cylinder 31 and the second hydraulic cylinder 32 are opened. When the output rods of the first hydraulic cylinder 31 and the second hydraulic cylinder 32 are extended at the same time, the output rod of the first hydraulic cylinder 31 will push the first push plate 33 to move in the direction away from the first rotating roller 20. When the first push plate 33 moves in the direction away from the first rotating roller 20, it can drive the first limit plate 37 to move in the direction away from the first rotating roller 20. When the first limit plate 37 moves, it can drive the block 40 moves along the slot 39 on the first fixed plate 14, and the first fixed plate 14 can limit the first limiting plate 37 through the slot 39, the block 40 and the first limiting hole 35, which is helpful to stably move the first limiting plate 37. When the first limiting plate 37 moves, it can drive the second rotating roller 21 to move in the direction away from the first rotating roller 20 through the second rotating rod 17, so as to adjust the distance between the second rotating roller 21 and the first rotating roller 20, so as to adjust the conveying length of the conveying belt 28.
[0034] When the output rod of the first hydraulic cylinder 31 is extended, the output rod of the second hydraulic cylinder 32 is extended as well. The output rod of the second hydraulic cylinder 32 will push the second push plate 34 to move toward the fourth rotating rod 19. When the second push plate 34 moves toward the fourth rotating rod 19, it can drive the second limiting plate 38 to move toward the fourth rotating rod 19 along the second limiting hole 36 on the second fixed plate 15. When the second limiting plate 38 moves toward the fourth rotating rod 19, it can drive the third rotating roller 22 toward the fourth rotating rod 19 through the third rotating rod 18, so as to reduce the distance between the fourth rotating rod 19 and the third rotating roller 22, so that the fourth rotating rod 19 and the third rotating roller 22 are close to each other. After the fourth rotating rod 19 and the third rotating roller 22 are close to each other, it helps the conveying belt 28 to follow the movement of the second rotating roller 21, so as to adjust the conveying length of the conveying belt 28.
[0035] When it is necessary to shorten the conveying length of the conveyor belt 28, the output rods of the first hydraulic cylinder 31 and the second hydraulic cylinder 32 are contracted at the same time. When the output rod of the first hydraulic cylinder 31 contracts, the second rotating roller 21 is moved toward the first rotating roller 20. When the output rod of the second hydraulic cylinder 32 contracts, the third rotating rod 18 is moved in a direction away from the fourth rotating rod 19, so that the distance between the second rotating roller 21 and the first rotating roller 20 is shortened, and the distance between the fourth rotating rod 19 and the third rotating roller 22 is lengthened, so as to shorten the conveying length of the conveyor belt 28, which helps to adjust the conveying length of the conveyor belt 28.
[0036] During use, the crushed stone can be transported to different positions, which is convenient for adjusting the length of the conveyor belt 28 on the tunnel boring machine for conveying the crushed stone. When the tunnel boring machine transports the crushed stone to the external equipment for collecting and conveying the crushed stone, it is beneficial for the crushed stone to fall to different positions on the external equipment for collecting and conveying the crushed stone, which is convenient for ensuring that the external crushed stone collection and conveying equipment evenly collects and accommodates the crushed stone, and helps the conveyor belt 28 of the tunnel boring machine to meet the requirements of conveying crushed stones of different lengths, which is convenient for ensuring the applicable scope of the tunnel boring machine when in use, and is helpful for the use of the tunnel boring machine.
[0037] Although the present invention has been described above with reference to the embodiments, various modifications may be made thereto and parts thereof may be replaced by equivalents without departing from the scope of the present invention. In particular, as long as there is no structural conflict, the various features in the embodiments disclosed in the present invention may be used in combination with each other in any manner, and the fact that these combinations are not exhaustively described in this specification is only for the sake of omitting space and saving resources. Therefore, the present invention is not limited to the specific embodiments disclosed herein, but includes all technical solutions falling within the scope of the claims.
Claims
1. An underground tunnel boring machine, comprising a tunnel boring machine body (1), It is characterized in that A shovel plate (4) is rotatably mounted at the bottom of one end of the tunnel boring machine body (1), rotating disks (5) are rotatably mounted on both sides of the upper surface of the shovel plate (4), and feeding plates (6) are fixed around the outer ring surface of the rotating disk (5). First fixed plates (14) are fixed on both sides of the middle of the tunnel boring machine body (1), and a second fixed plate (15) is fixed in the middle of the lower surface of the first fixed plate (14). A first rotating roller (20) is rotatably mounted between the opposite surfaces of the first fixed plate (14) close to the shovel plate (4), and a first limiting plate (37) is slidably mounted in the middle of the end of the first fixed plate (14) away from the first rotating roller (20). The first limiting plate (37) is relatively A second rotating roller (21) is rotatably mounted between the surfaces; a fourth rotating rod (19) is rotatably mounted on the top of the opposite surface of the second fixed plate (15) near one end of the first rotating roller (20); a second limiting plate (38) is slidably mounted on the lower side of the second fixed plate (15) near one end of the first rotating roller (20); a third rotating roller (22) is rotatably mounted between the opposite surfaces of the second limiting plate (38); a conveying belt (28) is sleeved and mounted between the outer sides of the first rotating roller (20) and the second rotating roller (21); and the middle part of the lower side of the conveying belt (28) is sleeved and wound on the side away from the fourth rotating rod (19) and the third rotating roller (22).
2. An underground tunnel boring machine according to claim 1, It is characterized in that The shovel plate (4) is rotatably connected to the tunnel boring machine body (1) via a rotating shaft and an oil cylinder. The tunnel boring machine body (1) comprises a walking crawler (2) and a cutting mechanism (3). The walking crawler (2) is located on both sides of the bottom of the tunnel boring machine body (1). The walking crawler (2) is installed with the tunnel boring machine body (1) via a rotating wheel and a driving motor. The cutting mechanism (3) is located at the top of the tunnel boring machine body (1) near one end of the shovel plate (4). The cutting mechanism (3) is installed with the tunnel boring machine body (1) via an oil cylinder and a driving motor. Drive motors are installed inside the two sides of the shovel plate (4) corresponding to the rotating disk (5). The output shafts of the drive motors in the shovel plate (4) are all facing upwards. The upper ends of the output shafts of the drive motors in the shovel plate (4) are installed between corresponding positions on the lower surfaces of the corresponding rotating disks (5). The output shafts of the drive motors in the shovel plate (4) rotate in opposite directions.
3. An underground tunnel boring machine according to claim 2, It is characterized in that A stone crusher (7) is installed at one end of the middle of the tunnel boring machine body (1) near the shovel plate (4) and between the shovel plate (4) and the conveyor belt (28). A fixed block (8) is fixed to one end of the upper surface of the stone crusher (7) near the conveyor belt (28). A fixed cylinder (9) is fixed to the middle of the fixed block (8). The fixed cylinder (9) passes through the two side surfaces of the middle of the fixed block (8). A dust filter (10) is installed at one end of the fixed cylinder (9) near the conveyor belt (28). An induced draft fan (12) is installed in the middle of the fixed cylinder (9). Fixed rods (11) are fixed in the middle of the four sides of the induced draft fan (12). The ends of the fixed rods (11) away from the induced draft fan (12) are fixedly connected to corresponding positions of the inner annular surface of the fixed cylinder (9). A porous mesh plate (13) is fixed to one end of the fixed cylinder (9) away from the dust filter (10).
4. An underground tunnel boring machine according to claim 3, It is characterized in that A first rotating rod (16) is fixed in the middle of the first rotating roller (20), and the first rotating rod (16) passes through the two end surfaces of the middle of the first rotating roller (20). Both ends of the first rotating rod (16) are rotatably connected to corresponding positions on the corresponding first fixed plate (14) through bearings. A rotating motor (23) is installed at one end of the surface of the first fixed plate (14) on one side close to the first rotating roller (20), and a retaining groove (24) is opened in the middle of the outer ring surface of the first rotating roller (20). A first pulley (25) is fixed in the retaining groove (24) on the first rotating roller (20), and the output shaft of the rotating motor (23) faces the side close to the first pulley (25). A second pulley (26) is installed on the output shaft of the rotating motor (23) corresponding to the first pulley (25), and a transmission belt (27) is installed on the first pulley (25) and the second pulley (26).
5. An underground tunnel boring machine according to claim 4, It is characterized in that A second rotating rod (17) is fixed to the middle of the second rotating roller (21), the second rotating rod (17) passes through the two end surfaces of the middle of the second rotating roller (21), both ends of the second rotating rod (17) are rotatably connected to the middle of the corresponding first limiting plate (37) through bearings, and a matching first limiting hole (35) is opened at one end of the first fixed plate (14) away from the first rotating roller (20) corresponding to the first limiting plate (37), the first limiting plates (37) are located in the first limiting holes (35) on the corresponding first fixed plates (14), and the first limiting plates (37) are slidably connected to the first limiting holes (35) on the corresponding first fixed plates (14).
6. An underground tunnel boring machine according to claim 5, It is characterized in that A clamping block (40) is fixed to the middle of the upper surface and the middle of the lower surface of the first limiting plate (37); a matching clamping slot (39) is provided on the first fixing plate (14) corresponding to the clamping block (40); the clamping block (40) is located in the corresponding clamping slot (39) on the corresponding first fixing plate (14); and the clamping block (40) is slidably connected to the corresponding clamping slot (39) on the corresponding first fixing plate (14).
7. An underground tunnel boring machine according to claim 6, It is characterized in that A first push plate (33) is fixed between the surface of one end of the first limiting plate (37) close to the first rotating roller (20), a first connecting plate (29) is fixed between the middle parts of the opposite surfaces of the first fixing plate (14), a first hydraulic cylinder (31) is installed in the middle part of the surface of one side of the first connecting plate (29) close to the first rotating roller (20), an output rod of the first hydraulic cylinder (31) faces the first connecting plate (29) and passes through the two side surfaces of the middle part of the first connecting plate (29), and an end of the output rod of the first hydraulic cylinder (31) close to the first push plate (33) is fixedly connected to the middle part of the opposite surface of the first push plate (33).
8. An underground tunnel boring machine according to claim 7, It is characterized in that A second limiting hole (36) matching the second limiting plate (38) is provided at one end of the bottom of the second fixing plate (15) close to the first rotating roller (20), and the second limiting plate (38) is located in the second limiting hole (36) on the corresponding second fixing plate (15) and is slidably connected to the corresponding second limiting hole (36).
9. An underground tunnel boring machine according to claim 8, It is characterized in that A third rotating rod (18) is fixed to the middle of the third rotating roller (22), both ends of the third rotating rod (18) penetrate the two end surfaces of the middle of the third rotating roller (22), both ends of the third rotating rod (18) are rotatably connected to the middle of the corresponding second limiting plate (38) through bearings, and a second push plate (34) is commonly fixed between the end surfaces of the second limiting plate (38) away from the fourth rotating rod (19).
10. An underground tunnel boring machine according to claim 9, It is characterized in that A second connecting plate (30) is fixed between the middle parts of the bottoms of the opposite surfaces of the second fixing plate (15), and a second hydraulic cylinder (32) is installed in the middle part of the surface of the second connecting plate (30) away from the second push plate (34). The output rod of the second hydraulic cylinder (32) faces the second connecting plate (30) and passes through the two side surfaces of the middle part of the second connecting plate (30), and one end of the output rod of the second hydraulic cylinder (32) close to the second push plate (34) is fixedly connected to the middle part of the opposite surface of the second push plate (34).
