Double-bearing platform for impeller assembly of wind turbine generator in mountain wind power plant and wind resistance method

By designing a double bearing platform and wind resistance method in mountain wind farms, using multiple sets of plug-in brazing and rubber buffer pad structures, the stability problem of wind turbine impellers installed in uneven grounds and complex environments is solved, and the installation safety is improved and efficiency to ensure stable operation under strong wind conditions.

CN118881518APending Publication Date: 2024-11-01HUNAN BRANCH OF HUADIAN FUXIN ENERGY DEV CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411203090.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-29
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

In mountain wind farms, the installation of wind turbine impellers is easily affected by uneven ground support due to uneven ground support, which affects overall stability. In the forest environment, the installation space is limited, resulting in inconvenient installation. , low efficiency and low safety.

Method used

A mountain wind farm wind turbine impeller assembly and lifting platform is designed, adopting a double-bearing platform structure, and provides additional anchoring force and stability through multiple sets of equidistant cylindrical insertion and arcuate rubber buffer pads. Prevent the platform from slipping or tilting, and insert brazing into the soil to enhance support and improve overall load-bearing capacity.

Benefits of technology

Effectively prevent the platform from slipping or tilting during assembly and lifting, ensure stability under strong wind or external force, improve construction safety and overall load-bearing capacity, and ensure stability of impeller assembly and lifting operations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118881518A_ABST
    Figure CN118881518A_ABST
Patent Text Reader

Abstract

The double-bearing platform comprises a second assembly bearing platform, a first assembly bearing platform is installed on one side of the second assembly bearing platform, the second assembly bearing platform comprises a bearing platform, a base is fixedly installed at the bottom of the bearing platform, and meanwhile supporting steel is fixedly arranged in the base; first row drill rods are fixedly arranged on the left side of the bottom of the supporting steel. According to the impeller assembling and hoisting platform for the wind turbine generator of the mountain wind power plant, the six rows of inserting drill rods penetrate into compacted soil, additional anchoring force can be provided, and the surface of the platform is effectively prevented from sliding or inclining in the assembling and hoisting process; when encountering strong wind or other external forces, the platform can be kept stable, and construction safety is guaranteed; the wrapping and supporting effects of the soil on the inserting drill rods are beneficial to dispersing the impeller weight and the hoisting load borne by the platform, and therefore the overall bearing capacity of the platform is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of wind turbine impeller installation auxiliary devices, and in particular to an impeller assembly and hoisting platform for wind turbine units in mountainous wind farms, and a method for stabilizing the platform against wind. Background Art

[0002] Wind power generation is the conversion of wind kinetic energy into electrical energy. As a clean and renewable energy source, wind energy is increasingly valued by countries around the world. Wind power generation equipment is mostly installed in remote areas. Wind power in remote areas can meet the power generation requirements, but the terrain in remote areas is complex, uneven, and even without roads, making the installation of wind power generation equipment difficult and the construction progress slow. At present, the installation locations of most wind turbine impellers are surrounded by forests. For the sake of protecting the ecology, trees cannot be cut down, so the ground installation space is small, resulting in inconvenient installation, low efficiency, and low safety. To solve the above problems, after searching, a Chinese patent with the authorization announcement number CN213572906U discloses a wind turbine impeller assembly and hoisting platform for a mountain wind farm; the article includes that the height of the wind turbine impeller assembly and hoisting platform for a mountain wind farm can be increased or decreased according to the installation needs, and it is easy to use. The climbing ladder is convenient for operators to climb, and the guardrail greatly improves the safety of operators on the top of the platform; when the wind turbine impeller is installed, it can be hoisted onto the wind turbine impeller assembly and hoisting platform for a mountain wind farm, which has good stability and high work efficiency; the present invention overcomes the problem of uneven ground, and the installation is safer, and the height of the hoisting platform is greater than the height of the trees at the installation site, so it can be installed above the tree space, ensuring a larger installation space without affecting the trees; Although the above equipment can assemble the impeller of the wind turbine and then hoist it, in actual operation, the metal frame is easily affected by uneven ground support force under complex terrain and environmental conditions in the field, resulting in local deformation of the frame and affecting the overall stability. Summary of the invention

[0003] The object of the present invention is to provide a double-bearing platform and a wind-resistant method for assembling impellers of wind turbines in mountainous wind farms, so as to solve the defects mentioned in the above-mentioned background technology.

[0004] To achieve the above-mentioned purpose, a wind turbine impeller assembly and hoisting platform for a mountain wind farm is provided, comprising a second assembly support, a first assembly support is installed on one side of the second assembly support, the second assembly support comprises a load-bearing platform, and a base is fixedly installed at the bottom of the load-bearing platform, and a supporting steel is fixedly arranged inside the base, and a first row of chisels is fixedly arranged on the left side of the bottom of the supporting steel, a third row of chisels is fixedly arranged on the right side of the bottom of the supporting steel, and a second row of chisels is fixedly arranged in the middle of the bottom of the supporting steel, and the bottom of the base is covered with a protective sheet, and three groups of equidistantly distributed protective frames are evenly installed on the protective sheet, and the three groups of protective frames are respectively wrapped around the outside of the first row of chisels, the second row of chisels and the third row of chisels, and the first row of chisels, the second row of chisels and the third row of chisels are all composed of a plurality of groups of equidistantly arranged cylindrical plug chisels.

[0005] Preferably, two groups of assembly grooves are respectively opened on the right side surface of the second assembly platform, and two groups of assembly strips are respectively fixedly connected to the left side surface of the first assembly platform, and the second assembly platform and the first assembly platform are positioned and assembled by the assembly strips and the assembly grooves.

[0006] Preferably, the cross-sections of the assembling strip and the assembling groove are both isosceles trapezoidal structures, and the length of the assembling strip is equal to the depth of the assembling groove.

[0007] Preferably, three groups of arc-shaped positioning openings are evenly opened on the surface of the load-bearing platform, and the surface of the load-bearing platform is covered with a rubber buffer pad. At the same time, three groups of equidistantly arranged arc-shaped positioning pieces are evenly fixed on the bottom of the rubber buffer pad, and the positioning pieces are adapted to the size of the positioning openings, and the positioning pieces are inserted into the inside of the positioning openings.

[0008] Preferably, the surface areas of the rubber buffer pad and the load-bearing platform are consistent, and both the rubber buffer pad and the load-bearing platform are semicircular structures. The base section at the bottom of the load-bearing platform is "U"-shaped, and multiple groups of equidistantly arranged support steels are evenly fixed inside the base, and the cross-section of the support steel is I-shaped.

[0009] Preferably, limiting grooves are provided on both sides of the bottom of the base, and limiting strips are fixedly provided on both sides of the surface of the protective sheet, and the limiting strips are inserted into the limiting grooves, and the protective sheet is positioned and installed at the bottom of the base through the limiting grooves and the limiting strips.

[0010] The wind-resistant method of the wind turbine in the mountain wind farm is to assemble the first assembly platform and the second assembly platform through two sets of assembly strips and assembly grooves to form a support platform. The wind turbine can be placed on the platform by hoisting. After the wind turbine is installed on the platform, the installation work is carried out by hoisting equipment. The first row of chisels, the second row of chisels and the third row of chisels are arranged at the bottom of the first assembly cap and the second assembly cap. The sharp bottoms of the first row of chisels, the second row of chisels and the third row of chisels are inserted into the inside of the leveling and compacting soil platform to measure the surface level of the first assembly cap and the second assembly cap. The sharp bottoms of the first, second and third rows of dowels are inserted into the leveled and compacted soil platform. A total of six rows of dowels penetrate deep into the compacted soil, which can provide additional anchoring force and effectively prevent the platform surface from slipping or tilting during assembly and hoisting. When encountering strong winds or other external forces, the platform can remain stable to ensure construction safety. The soil's wrapping and supporting effect on the dowels helps to disperse the impeller weight and hoisting load borne by the platform, thereby improving the platform's overall carrying capacity. It can withstand greater impact and vibration to ensure stability during impeller assembly and hoisting operations.

[0011] Compared with the prior art, the beneficial effects of the present invention are: the bottoms of the first row of dowels, the second row of dowels and the third row of dowels are sharply inserted into the leveling and compacted soil platform, and a total of six rows of dowels penetrate deep into the compacted soil, which can provide additional anchoring force and effectively prevent the platform surface from slipping or tilting during assembly and hoisting; when encountering strong winds or other external forces, the platform can remain stable to ensure construction safety; the soil wrapping and supporting the dowels helps to disperse the impeller weight and hoisting load borne by the platform, thereby improving the overall bearing capacity of the platform; it can withstand greater impact and vibration to ensure stability during impeller assembly and hoisting operations. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 It is a front view schematic diagram of the structure of the present invention; Figure 2 This is a schematic diagram of the second assembly platform of the structure of the present invention; Figure 3 The structure of the present invention Figure 2 Rear view of Figure 4 The structure of the present invention Figure 2 Bottom view of Figure 5 The structure of the present invention Figure 1 Top view after combined installation; Figure 6 The structure of the present invention Figure 5 A front view of Figure 7 This is a schematic diagram of the pre-operation preparation for the assembly and hoisting of the wind turbine impeller on this platform; Figure 8 This is a schematic diagram of the split transportation adopted for this platform.

[0013] Numbers in the figure: 1. First assembly base; 2. Second assembly base; 20. Rubber buffer pad; 21. Positioning piece; 22. Load-bearing platform; 23. Positioning port; 24. Base; 25. Support steel; 26. First row of drill bits; 27. Second row of drill bits; 28. Third row of drill bits; 29. ​​Limiting groove; 30. Protective sheet; 31. Protective frame; 32. Limiting strip; 33. Assembly strip; 34. Assembly groove. DETAILED DESCRIPTION

[0014] See also Figure 1-8 The present invention provides a wind turbine impeller assembly and hoisting platform for a mountain wind farm, comprising a second assembly platform 2, a first assembly platform 1 being installed on one side of the second assembly platform 2, the second assembly platform 2 comprising a bearing platform 22, and a base 24 being fixedly installed at the bottom of the bearing platform 22, and a supporting steel 25 being fixedly arranged inside the base 24, and a first row of drills 26 being fixedly arranged on the left side of the bottom of the supporting steel 25, a third row of drills 28 being fixedly arranged on the right side of the bottom of the supporting steel 25, and a second row of drills 27 being fixedly arranged in the middle of the bottom of the supporting steel 25, and a protective sheet 30 being covered on the bottom of the base 24, and three groups of equidistantly distributed protective frames 31 being evenly installed on the protective sheet 30, and the three groups of protective frames 31 being respectively wrapped around the outer sides of the first row of drills 26, the second row of drills 27 and the third row of drills 28, and the first row of drills 26, the second row of drills 27 and the third row of drills 28 are all composed of a plurality of groups of equidistantly arranged cylindrical insert drills.

[0015] Wind resistance method: After the first assembly platform 1 and the second assembly platform 2 are assembled by two sets of assembly strips 33 and assembly grooves 34, a support platform is formed. The wind turbine set can be placed on the platform by hoisting. After the wind turbine set has completed the installation of the blades on the platform, the installation work can be carried out by hoisting equipment. The first assembly cap 1 and the second assembly cap 2 are both provided with a first row of chisels 26, a second row of chisels 27 and a third row of chisels 28 at the bottom. The sharp bottoms of the first row of chisels 26, the second row of chisels 27 and the third row of chisels 28 are inserted into the interior of the leveling and compacting soil platform to standardize the surface level of the first assembly cap 1 and the second assembly cap 2; The sharp bottoms of the first row of dowels 26, the second row of dowels 27, and the third row of dowels 28 are inserted into the leveling and compacted soil platform. A total of six rows of dowels penetrate deep into the compacted soil, which can provide additional anchoring force and effectively prevent the platform surface from slipping or tilting during assembly and lifting. When encountering strong winds or other external forces, the platform can remain stable to ensure construction safety. The soil wrapping and supporting the dowels helps to disperse the impeller weight and lifting load borne by the platform, thereby improving the overall carrying capacity of the platform; it can withstand greater impact and vibration to ensure stability during impeller assembly and lifting operations.

[0016] As a preferred embodiment, two groups of assembly grooves 34 are respectively opened on the right side surface of the second assembly base 2, and two groups of assembly strips 33 are respectively fixedly connected to the left side surface of the first assembly base 1. At the same time, the second assembly base 2 and the first assembly base 1 are positioned and assembled through the assembly strips 33 and the assembly grooves 34.

[0017] The cross-sections of the assembling strip 33 and the assembling groove 34 are both isosceles trapezoidal structures, and the length of the assembling strip 33 is equal to the depth of the assembling groove 34 .

[0018] The second assembly platform 2 and the first assembly platform 1 are positioned and assembled by means of the assembly strips 33 and the assembly grooves 34. The setting of the assembly strips 33 and the assembly grooves 34 can quickly connect the second assembly platform 2 and the first assembly platform 1, while ensuring the stability of the connection between the second assembly platform 2 and the first assembly platform 1, and reducing the gap between the second assembly platform 2 and the first assembly platform 1.

[0019] As a preferred embodiment, three groups of arc-shaped positioning openings 23 are evenly opened on the surface of the load-bearing platform 22, and the surface of the load-bearing platform 22 is covered with a rubber buffer pad 20. At the same time, three groups of equidistantly arranged arc-shaped positioning pieces 21 are evenly fixed on the bottom of the rubber buffer pad 20, and the positioning pieces 21 are adapted to the size of the positioning openings 23, and the positioning pieces 21 are inserted into the inside of the positioning openings 23.

[0020] The surface areas of the rubber buffer pad 20 and the load-bearing platform 22 are consistent, and both the rubber buffer pad 20 and the load-bearing platform 22 are semicircular structures. The cross-section of the base 24 at the bottom of the load-bearing platform 22 is a "U"-shaped setting, and multiple groups of equidistantly arranged support steels 25 are evenly fixed inside the base 24. At the same time, the cross-section of the support steel 25 is an I-shaped setting.

[0021] Semicircular rubber cushions 20 are provided on the surfaces of the first assembly platform 1 and the second assembly platform 2. The two groups of rubber cushions 20 are combined together to form a circular cushion sheet. The bottom of the wind turbine is covered on the circular cushion sheet, which has the following advantages: 1. The rubber pad has a large friction coefficient, which can effectively prevent the impeller from sliding during assembly and lifting, and improve the safety and stability of operation; 2. During the hoisting process, the rubber pad can absorb some of the impact and vibration, reducing damage to the platform structure and impeller; when the wind turbine falls, the rubber pad can play a buffering role and protect the wind turbine from strong impact; 3. Avoid direct contact between the wind turbine and the metal surface of the platform to reduce wear and scratches and extend the service life of the platform; prevent the sharp parts of the wind turbine from leaving scratches or dents on the platform; 4. The rubber pad can absorb some of the noise generated during operation and improve the working environment; especially when the wind turbine is running and the components are moving, it can significantly reduce the noise level; 5. Rubber has insulating properties, which can reduce the risk of static electricity generation and conductivity, ensuring the safety of construction workers and the normal operation of equipment.

[0022] Limiting grooves 29 are provided on both sides of the bottom of the base 24 , and limiting strips 32 are fixedly provided on both sides of the surface of the protective sheet 30 , and the limiting strips 32 are inserted into the limiting grooves 29 . The protective sheet 30 is positioned and installed at the bottom of the base 24 through the limiting grooves 29 and the limiting strips 32 .

Claims

1. A wind turbine impeller assembly and hoisting platform for a mountain wind farm, comprising a second assembly support (2), characterized in that: The first assembly platform (1) is installed on one side of the second assembly platform (2), the second assembly platform (2) comprises a bearing platform (22), and a base (24) is fixedly installed at the bottom of the bearing platform (22), and a supporting steel (25) is fixedly arranged inside the base (24), and a first row of chisels (26) is fixedly arranged on the left side of the bottom of the supporting steel (25), a third row of chisels (28) is fixedly arranged on the right side of the bottom of the supporting steel (25), and a second row of chisels (27) is fixedly arranged in the middle of the bottom of the supporting steel (25), and the bottom of the base (24) is covered with a protective sheet (30), and three groups of equidistantly distributed protective frames (31) are evenly installed on the protective sheet (30), and the three groups of protective frames (31) are respectively wrapped around the outer sides of the first row of chisels (26), the second row of chisels (27) and the third row of chisels (28), and the first row of chisels (26), the second row of chisels (27) and the third row of chisels (28) are all composed of a plurality of groups of equidistantly arranged cylindrical insert chisels.

2. The wind turbine impeller assembly and hoisting platform for a mountain wind farm according to claim 1, characterized in that: Two groups of assembly grooves (34) are respectively provided on the right side surface of the second assembly support platform (2), and two groups of assembly bars (33) are respectively fixedly connected to the left side surface of the first assembly support platform (1), and the second assembly support platform (2) and the first assembly support platform (1) are positioned and assembled via the assembly bars (33) and the assembly grooves (34).

3. The wind turbine impeller assembly and hoisting platform for a mountain wind farm according to claim 2, characterized in that: The cross-sections of the assembling strip (33) and the assembling groove (34) are both isosceles trapezoidal structures, and the length of the assembling strip (33) is equal to the depth of the assembling groove (34).

4. A wind turbine impeller assembly and hoisting platform for a mountainous wind farm according to claim 1, 2 or 3, characterized in that: The surface of the load-bearing platform (22) is evenly provided with three groups of arc-shaped positioning openings (23), and the surface of the load-bearing platform (22) is covered with a rubber buffer pad (20). Meanwhile, three groups of arc-shaped positioning pieces (21) evenly fixed at equal intervals are arranged at the bottom of the rubber buffer pad (20), and the sizes of the positioning pieces (21) and the positioning openings (23) are matched, and the positioning pieces (21) are inserted into the interior of the positioning openings (23).

5. The wind turbine impeller assembly and hoisting platform for a mountain wind farm according to claim 4, characterized in that: The surface areas of the rubber buffer pad (20) and the load-bearing platform (22) are consistent, and the rubber buffer pad (20) and the load-bearing platform (22) are both semicircular structures. The cross section of the base (24) at the bottom of the load-bearing platform (22) is set in a "U" shape, and multiple groups of equidistantly arranged support steels (25) are evenly fixed inside the base (24), and the cross section of the support steels (25) is set in an I-shape.

6. The wind turbine impeller assembly and hoisting platform for a mountain wind farm according to claim 5, characterized in that: Limiting grooves (29) are provided on both sides of the bottom of the base (24), and limiting strips (32) are fixedly arranged on both sides of the surface of the protective sheet (30), and the limiting strips (32) are inserted into the limiting grooves (29), and the protective sheet (30) is positioned and installed at the bottom of the base (24) through the limiting grooves (29) and the limiting strips (32).

7. A wind resistance method for wind turbines in mountainous wind farms, characterized by: After assembling the first assembly platform and the second assembly platform through two sets of assembly strips and assembly grooves, a support platform is formed. The wind turbine set can be placed on the platform by hoisting. After the wind turbine blades are installed on the platform, the installation work can be carried out by hoisting equipment. The first row of chisels, the second row of chisels and the third row of chisels are arranged at the bottom of the first assembly cap and the second assembly cap. The sharp bottoms of the first row of chisels, the second row of chisels and the third row of chisels are inserted into the inside of the leveling and compacting soil platform to measure the surface level of the first assembly cap and the second assembly cap. The sharp bottoms of the first, second and third rows of dowels are inserted into the leveled and compacted soil platform. A total of six rows of dowels penetrate deep into the compacted soil, which can provide additional anchoring force and effectively prevent the platform surface from slipping or tilting during assembly and hoisting. When encountering strong winds or other external forces, the platform can remain stable to ensure construction safety. The soil's wrapping and supporting effect on the dowels helps to disperse the impeller weight and hoisting load borne by the platform, thereby improving the platform's overall carrying capacity. It can withstand greater impact and vibration to ensure stability during impeller assembly and hoisting operations.