Wind power handover test management system

By setting up test preparation module, handover test module and test data record management terminal in the wind power handover test management system, the problem of inconcentrated management in the wind power handover test is solved, centralized control of test data and reduced error risks, ensuring that Accuracy and completeness of the experimental data.

CN118884070APending Publication Date: 2024-11-01SHAANXI DONGHAO ELECTRIC POWER ENG CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410888189.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-04
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

The lack of centralized management systems in wind power handover tests leads to the dispersed testing process and data control, increasing the workload and the risk of data flow errors.

Method used

A wind power handover test management system is designed, including a test preparation module, a handover test module and a test data record management terminal, which is used to centrally manage the test process and data to ensure the accuracy and completeness of the test data.

Benefits of technology

The centralized management of wind power handover tests and the risk of data flow are achieved, ensuring the accuracy and record integrity of test data.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118884070A_ABST
    Figure CN118884070A_ABST
Patent Text Reader

Abstract

The invention discloses a wind power handover test management system, which comprises a test preparation module, a handover test module, a power supply module, a power supply module, a power supply module, a power supply module, a power supply module, a power supply module, a power supply module and a power supply module, and is characterized in that the test preparation module is used for checking and verifying a wind driven generator body, a transformer body and a frequency converter body in advance before a wind power handover test; and the test data recording management terminal is used for respectively testing the wind driven generator body, the transformer body and the frequency converter body during a wind power handover test. The beneficial effects are that the system is provided with the test preparation module, the handover test module and the test data recording management terminal which are respectively used before, during and after the wind power handover test, so that the centralized management and control of the informatization means can be carried out on the test process and the test data in a centralized manner; concentrated management and overall planning of the wind power handover test process are facilitated, and meanwhile, the error risk rate in the data circulation process is also reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of wind power handover management systems, and in particular to a wind power handover test management system. Background Art

[0002] The wind farm electrical equipment handover test is an important part of the operation and maintenance of power equipment, and is one of the effective means to ensure the safe operation of power equipment. The wind farm handover test is an important process for comprehensive testing after the installation of the building electrical project is completed, in order to determine whether the project meets the specified requirements and whether it can be powered on and put into operation. Only if the handover test is qualified can the building electrical project be powered on for trial operation. At the same time, the results of the handover test must be issued with a written test report.

[0003] At present, in the process of wind power handover test, first of all, the handover test lacks a centralized management system, which makes the control of the test process and data extremely decentralized, making it difficult to conduct effective centralized coordination. At the same time, due to the lack of centralized control of test instruments and data by information technology, the repeated submission of data increases the workload and also increases the risk of errors in the data flow process. Summary of the invention

[0004] The purpose of the present invention is to provide a wind power handover test management system in order to solve the above-mentioned problem. The system is provided with a test preparation module, a handover test module and a test data recording management terminal to respectively correspond to before the wind power handover test, during the wind power handover test and after the wind power handover test, so as to centrally control the test process and test data by means of information technology, as described below for details.

[0005] To achieve the above object, the present invention provides the following technical solutions:

[0006] A wind power handover test management system provided by the present invention comprises a wind turbine body, a transformer body and a frequency converter body. The system comprises a test preparation module for inspecting and calibrating the wind turbine body, the transformer body and the frequency converter body in advance before the wind power handover test.

[0007] A handover test module, used to perform test work on the wind turbine body, the transformer body and the inverter body respectively during the wind power handover test;

[0008] The test data recording management terminal is used to centrally manage the test preparation module and the handover test module and to centrally organize and record the test data during the wind power handover test.

[0009] Preferably, the test preparation module includes an inspection and cleaning unit, an internal inspection unit, a preheating control unit and a verification and calibration unit, for inspecting and cleaning the wind turbine body, the transformer body and the inverter body through the inspection and cleaning unit, inspecting the interior of the wind turbine body and the transformer body through the internal inspection unit, preheating the wind turbine body, the transformer body and the inverter body through the preheating control unit, and verifying and calibrating the wind turbine body, the transformer body and the inverter body through the verification and calibration unit.

[0010] Preferably, the test preparation module further comprises a record transmission unit for centrally managing and transmitting the operation and data of the test preparation module by connecting the record transmission unit to the test data record management terminal.

[0011] Preferably, the handover test module includes a wind turbine parameter measurement unit, a wind turbine cable electrical system inspection unit, and a wind power static and dynamic test unit, which are used to perform parameter value inspection, cable power system inspection and static and dynamic tests on the wind turbine body during the wind power handover test through the wind turbine parameter measurement unit, the wind turbine cable electrical system inspection unit, and the wind power static and dynamic test unit.

[0012] Preferably, the handover test module also includes a transformer parameter measurement unit, a transformer cable electrical system inspection unit, and a transformer static and dynamic test unit, which are used to perform parameter value inspection, cable power system inspection and static and dynamic tests on the transformer body during the wind power handover test through the transformer parameter measurement unit, the transformer cable electrical system inspection unit, and the transformer static and dynamic test unit.

[0013] Preferably, the handover test module also includes a converter parameter measurement unit, a converter cable electrical system inspection unit, and a converter static and dynamic test unit, which are used to perform parameter value inspection, cable power system inspection, and static and dynamic tests on the converter body during the wind power handover test through the converter parameter measurement unit, the converter cable electrical system inspection unit, and the converter static and dynamic test unit.

[0014] Preferably, the handover test module further comprises a data record transmission unit for centrally managing and transmitting the operation and data of the handover test module by connecting the test data record management terminal via the data record transmission unit.

[0015] Preferably, the test data record management terminal includes a data input unit, a data storage and processing unit, and a display unit, which can centrally input, summarize, centrally process, store, and call out for display the test data of the test preparation module and the handover test module through the data input unit, the data storage and processing unit, and the display unit.

[0016] Preferably, the test data record management terminal further includes a control management unit for centrally managing the test preparation module and the handover test module through the control management unit.

[0017] By adopting the above-mentioned wind power handover test management system, during the wind power handover test process, the test preparation module, the handover test module and the test data recording management terminal are provided to correspond to before, during and after the wind power handover test, respectively, so that the test process and test data can be centrally controlled by information means, which is convenient for centralized management and coordination of the wind power handover test process, and also reduces the error risk rate in the data flow process. More specifically, the test preparation module can be used to inspect and calibrate the wind turbine body, the transformer body and the inverter body in advance before the wind power handover test, thereby ensuring the accuracy of the test data. At the same time, the handover test module can be used to test the wind turbine body, the transformer body and the inverter body respectively during the wind power handover test, thereby ensuring the integrity of the test requirements. Moreover, the test data recording management terminal can centrally manage the test preparation module and the handover test module, and centrally organize and record the test data during the wind power handover test, thereby ensuring the centralized management of the test process and the integrity of the record of the test results.

[0018] The beneficial effects are as follows: 1. The present invention is provided with a test preparation module, a handover test module and a test data recording management terminal to correspond to before the wind power handover test, during the wind power handover test and after the wind power handover test, so that the test process and test data can be centrally controlled by information means, which is convenient for centralized management and coordination of the wind power handover test process and also reduces the error risk rate in the data flow process;

[0019] 2. Through the test preparation module, the wind turbine body, transformer body and inverter body can be inspected and verified in advance before the wind power handover test, ensuring the accuracy of the test data. At the same time, through the handover test module, the wind turbine body, transformer body and inverter body can be tested separately during the wind power handover test, ensuring the integrity of the test requirements. Moreover, through the test data record management terminal, the test preparation module and the handover test module can be centrally managed, and the test data can be centrally sorted and recorded during the wind power handover test, ensuring the centralized management of the test process and the integrity of the test results.

[0020] 3. The test preparation module is provided with an inspection and cleaning unit, an internal inspection unit, a preheating control unit, a verification and calibration unit and a recording and transmission unit, so that the wind turbine body, the transformer body and the inverter body can be inspected and cleaned by the inspection and cleaning unit, the internal inspection unit can be used to inspect the inside of the wind turbine body and the transformer body, and the preheating control unit can be used to preheat the wind turbine body, the transformer body and the inverter body to a normal working state, and the verification and calibration unit can be used to perform necessary verification and calibration on the wind turbine body, the transformer body and the inverter body, and the operation and data of the test preparation module can be centrally managed and transmitted by connecting the record transmission unit to the test data record management terminal, so that the test process and test data can be centrally controlled by information means before the wind power handover test;

[0021] 4. The handover test module is equipped with a wind turbine parameter measurement unit, a wind turbine cable electrical system inspection unit, and a wind power static and dynamic test unit. Through the wind turbine parameter measurement unit, the wind turbine cable electrical system inspection unit, and the wind power static and dynamic test unit, the wind turbine body can be respectively checked for parameter values, checked for cable power systems, and tested for static and dynamic conditions during the handover test, thus meeting the test requirements for the wind turbine body in the wind power handover test.

[0022] 5. The handover test module is equipped with a transformer parameter measurement unit, a transformer cable electrical system inspection unit, and a transformer static and dynamic test unit. Through the transformer parameter measurement unit, the transformer cable electrical system inspection unit, and the transformer static and dynamic test unit, the transformer body can be respectively checked for parameter values, cable power system inspection, and static and dynamic tests during the handover test, meeting the test requirements for the transformer body in the wind power handover test;

[0023] 6. The handover test module is equipped with a frequency converter parameter measurement unit, a frequency converter cable electrical system inspection unit, and a frequency converter static and dynamic test unit. The frequency converter parameter measurement unit, the frequency converter cable electrical system inspection unit, and the frequency converter static and dynamic test unit can respectively perform parameter value inspection, cable power system inspection, and static and dynamic tests on the frequency converter body during the handover test, thereby meeting the test requirements for the frequency converter body in the wind power handover test;

[0024] 7. The handover test module is provided with a data recording and transmission unit, so that the operation and data of the handover test module can be centrally managed and transmitted by connecting the data recording and transmission unit to the test data recording management terminal, so that the test process and test data can be centrally controlled by information means in the wind power handover test;

[0025] 8. The test data record management terminal is provided with a data input unit, a data storage and processing unit, a display unit and a control management unit, so that the test data of the test preparation module and the handover test module can be centrally input, summarized, centrally processed, stored and called out for display through the data input unit, the data storage and processing unit and the display unit respectively. At the same time, the test preparation module and the handover test module can be centrally managed through the control management unit respectively, so that the test process and test data can be centrally controlled by information means during the wind power handover test. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0027] Figure 1 is the overall system block diagram of the present invention;

[0028] Figure 2 is a schematic block diagram of a test preparation module of the present invention;

[0029] Figure 3 is a schematic block diagram of a handover test module of the present invention;

[0030] Figure 4 It is a schematic block diagram of the test data recording management terminal of the present invention. DETAILED DESCRIPTION

[0031] To make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be described in detail below. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other implementation methods obtained by ordinary technicians in this field without creative work belong to the scope of protection of the present invention.

[0032] See also Figure 1 , Figure 2 and Figure 4 As shown, the present invention provides a wind power handover test management system, including a wind turbine body, a transformer body and a frequency converter body. The system includes a test preparation module for inspecting and calibrating the wind turbine body, the transformer body and the frequency converter body in advance before the wind power handover test. Specifically, the test preparation module includes an inspection and cleaning unit, an internal inspection unit, a preheating control unit and a verification and calibration unit. The inspection and cleaning unit is used to inspect and clean the wind turbine body, the transformer body and the frequency converter body to ensure that there is no leakage of the equipment, and the internal inspection unit is used to inspect the inside of the wind turbine body and the transformer body to ensure that the inside of the equipment is in a dry state. If the humidity inside the equipment is found to be high, it should be ventilated and dried in time, and the preheating control unit is used to preheat the wind turbine body, the transformer body and the frequency converter body. The inverter body is used to ensure that all equipment is in normal working condition, and then to ensure the accuracy of the test. The wind turbine body, transformer body and inverter body are inspected and calibrated through the inspection and calibration unit to ensure the accuracy of the test data. With this arrangement, the test process and test data can be centrally managed and controlled by information means in the wind power handover test. At the same time, the optional test preparation module also includes a record transmission unit, which is used to centrally manage and transmit the operation and data of the test preparation module by connecting the record transmission unit to the test data record management terminal. Preferably, the record transmission unit is connected to the data input unit of the test data record management terminal to ensure that the test data before the wind power handover test transmitted by the record transmission unit can be entered into the test data record management terminal through the data input unit.

[0033] See also Figure 1 , Figure 3 and Figure 4As shown, the system also includes a handover test module, which is used to test the wind turbine body, transformer body and inverter body respectively during the wind power handover test. Specifically, the handover test module includes a wind turbine parameter measurement unit, a wind turbine cable electrical system inspection unit, and a wind power static and dynamic test unit. Through the wind turbine parameter measurement unit, the wind turbine cable electrical system inspection unit, and the wind power static and dynamic test unit, the wind turbine body is respectively tested for parameter values, cable power system inspection and static and dynamic tests during the wind power handover test. With this arrangement, the test requirements for the wind turbine body in the wind power handover test are first met. At the same time, when performing parameter value inspection, the weight of the wind turbine body, blade length, hub diameter and other parameters should be measured, and the records should be compared with the values ​​specified in the contract to check whether they are consistent. When performing cable power system inspection, the cable and electrical system of the wind turbine body should be checked to confirm that the connection is correct. Then, the wind turbine body is tested statically and dynamically, and the operating status and mechanical properties of the various components of the wind turbine body are checked to see if they are normal.

[0034] The handover test module also includes a transformer parameter measurement unit, a transformer cable electrical system inspection unit, and a transformer static and dynamic test unit, which are used to perform parameter value inspection, cable power system inspection and static and dynamic tests on the transformer body during the wind power handover test through the transformer parameter measurement unit, the transformer cable electrical system inspection unit, and the transformer static and dynamic test unit. With this arrangement, the test requirements for the transformer body in the wind power handover test are first met. At the same time, when performing parameter value inspection, the voltage, current, insulation resistance and other parameters of the transformer body should be measured, and the data should be compared with the set values ​​before the experiment to check whether they are consistent. When performing cable power system inspection, check the cable and electrical system of the transformer body to confirm that the connection is correct, and then perform static and dynamic tests on the transformer body, and check whether the operating status and mechanical properties of each component of the transformer body are normal.

[0035] The handover test module also includes a frequency converter parameter measurement unit, a frequency converter cable electrical system inspection unit, and a frequency converter static and dynamic test unit, which are used to perform parameter value checks, cable power system checks, and static and dynamic tests on the frequency converter body during the wind power handover test through the frequency converter parameter measurement unit, the frequency converter cable electrical system inspection unit, and the frequency converter static and dynamic test unit. With this arrangement, the test requirements for the frequency converter body in the wind power handover test are first met. At the same time, when performing parameter value checks, the output voltage, current, frequency and other parameters of the frequency converter body should be measured, and the data should be compared with the set values ​​before the experiment to check whether they are consistent. When performing cable power system inspections, check the cables and electrical systems of the frequency converter body to confirm that the connection is correct, and then perform static and dynamic tests on the frequency converter body, and check whether the operating status and mechanical properties of each component of the frequency converter body are normal.

[0036] More preferably, the handover test module also includes a data recording and transmission unit, which is used to centrally manage and transmit the operation and data of the handover test module by connecting the test data recording management terminal through the data recording and transmission unit. Specifically, the data recording and transmission unit is connected to the data input unit of the test data recording management terminal to ensure that the test data in the wind power handover test transmitted via the data recording and transmission unit can be entered into the test data recording management terminal through the data input unit.

[0037] See also Figure 1-Figure 4 As shown, the system also includes a test data recording management terminal, which is used to centrally manage the test preparation module and the handover test module and to centrally organize and record the test data during the wind power handover test. Specifically, the test data recording management terminal includes a data input unit, a data storage and processing unit, and a display unit, which can centrally input, summarize, centrally process, store and call out the test data of the test preparation module and the handover test module through the data input unit, the data storage and processing unit, and the display unit. The test data recording management terminal also includes a control management unit, which is used to centrally manage the test preparation module and the handover test module through the control management unit. With this arrangement, centralized control of the test process and test data by information means is achieved during the wind power handover test. Preferably, the control management unit and the test preparation module are connected through a connection path formed by the data input unit and the record transmission unit, and the control management unit is connected through a connection path formed by the data input unit and the data record transmission unit, so that the control management unit can centrally manage the test preparation module and the handover test module during the wind power handover test.

[0038] By adopting the above structure, during the wind power handover test process, a test preparation module, a handover test module and a test data recording management terminal are provided to correspond to before, during and after the wind power handover test, respectively, so that the test process and test data can be centrally controlled by information means, which is convenient for centralized management and coordination of the wind power handover test process, and also reduces the error risk rate in the data flow process. More specifically, through the test preparation module, the wind turbine body, transformer body and inverter body can be inspected and calibrated in advance before the wind power handover test, thereby ensuring the accuracy of the test data. At the same time, through the handover test module, the wind turbine body, transformer body and inverter body can be tested respectively during the wind power handover test, thereby ensuring the integrity of the test requirements. Moreover, through the test data recording management terminal, the test preparation module and the handover test module can be centrally managed, and the test data can be centrally sorted and recorded during the wind power handover test, thereby ensuring the centralized management of the test process and the integrity of the test results.

[0039] The above are only specific embodiments of the present invention, but the protection scope of the present invention is not limited thereto. Any person skilled in the art who is familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.

Claims

1. A wind power handover test management system, comprising a wind turbine body, a transformer body and a frequency converter body, characterized in that: The system includes a test preparation module, which is used to inspect and calibrate the wind turbine body, the transformer body and the inverter body in advance before the wind power handover test; A handover test module, used to perform test work on the wind turbine body, the transformer body and the inverter body respectively during the wind power handover test; The test data recording management terminal is used to centrally manage the test preparation module and the handover test module and to centrally organize and record the test data during the wind power handover test.

2. A wind power handover test management system according to claim 1, characterized in that: The test preparation module includes an inspection and cleaning unit, an internal inspection unit, a preheating control unit and a verification and calibration unit, which are used to inspect and clean the wind turbine body, the transformer body and the inverter body through the inspection and cleaning unit, to inspect the interior of the wind turbine body and the transformer body through the internal inspection unit, to preheat the wind turbine body, the transformer body and the inverter body through the preheating control unit, and to verify and calibrate the wind turbine body, the transformer body and the inverter body through the verification and calibration unit.

3. A wind power handover test management system according to claim 2, characterized in that: The test preparation module also includes a record transmission unit, which is used to centrally manage and transmit the operation and data of the test preparation module by connecting the record transmission unit to the test data record management terminal.

4. A wind power handover test management system according to claim 1, 2 or 3, characterized in that: The handover test module includes a wind turbine parameter measurement unit, a wind turbine cable electrical system inspection unit, and a wind power static and dynamic test unit, which are used to perform parameter value inspection, cable power system inspection and static and dynamic tests on the wind turbine body during the wind power handover test through the wind turbine parameter measurement unit, the wind turbine cable electrical system inspection unit, and the wind power static and dynamic test unit.

5. A wind power handover test management system according to claim 4, characterized in that: The handover test module also includes a transformer parameter measurement unit, a transformer cable electrical system inspection unit, and a transformer static and dynamic test unit, which are used to perform parameter value inspection, cable power system inspection and static and dynamic tests on the transformer body during the wind power handover test through the transformer parameter measurement unit, the transformer cable electrical system inspection unit, and the transformer static and dynamic test unit.

6. A wind power handover test management system according to claim 5, characterized in that: The handover test module also includes a converter parameter measurement unit, a converter cable electrical system inspection unit, and a converter static and dynamic test unit, which are used to perform parameter value inspection, cable power system inspection, and static and dynamic tests on the converter body during the wind power handover test through the converter parameter measurement unit, the converter cable electrical system inspection unit, and the converter static and dynamic test unit.

7. A wind power handover test management system according to claim 6, characterized in that: The handover test module also includes a data record transmission unit, which is used to centrally manage and transmit the operation and data of the handover test module by connecting the test data record management terminal through the data record transmission unit.

8. A wind power handover test management system according to any one of claims 5 to 7, characterized in that: The test data record management terminal includes a data input unit, a data storage and processing unit, and a display unit, which are used to centrally input, summarize, centrally process, store, and call out the test data of the test preparation module and the handover test module through the data input unit, the data storage and processing unit, and the display unit.

9. A wind power handover test management system according to claim 8, characterized in that: The test data record management terminal also includes a control management unit, which is used to centrally manage the test preparation module and the handover test module through the control management unit.

Citation Information

Cited By

  • Power line testing device

    CN120801017A