Charging pile system output parallel DAB converter open-circuit fault detection method

By establishing a dynamic mathematical model and inductor current estimator, combined with an average power state estimator, the problems of low reliability and long diagnosis time in the fault diagnosis of output parallel DAB converter are solved, and fast and accurate fault detection and positioning are achieved, improving the problem of high-quality fault detection and positioning. The reliability of the charging pile system.

CN118884154AInactive Publication Date: 2024-11-01ANGBO INTELLIGENT TECHNOLOGY (SHANGHAI) CO LTD
View PDF 0 Cites 4 Cited by

Patent Information

Application Number
CN202410909388.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-08
Publication Date
2024-11-01
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The prior art has problems of low reliability and long diagnosis time in the fault diagnosis of output parallel DAB converters, especially in signal processing methods, which are susceptible to load, and have a knowledge-based method that is computationally expensive and has a long diagnosis time.

Method used

By establishing a dynamic mathematical model, the current residual is obtained by using the inductor current estimator and normalizing it, combining the average power state estimator to determine the fault side, and realizing the fault tube positioning in the DAB converter.

Benefits of technology

It realizes rapid detection of open circuit faults of output parallel DAB converter, improves system reliability, reduces load dependence and calculation load, and improves diagnostic speed.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118884154A_ABST
    Figure CN118884154A_ABST
Patent Text Reader

Abstract

The invention aims to provide a charging pile system output parallel DAB converter open-circuit fault detection method. The method comprises the following steps: acquiring a current residual error of a DAB converter through an inductive current estimator; carrying out normalization on the current residual error to obtain a first normalization result; based on the first normalization result, judging whether the DAB converter has a fault or not; if the fault of the DAB converter is judged, an average power residual error is obtained based on an average power state estimator; normalizing the average power residual error to obtain a second normalization result; performing fault side judgment based on the second normalization result; based on the result of the fault side judgment, the positioning information of the fault tube in the DAB converter is further obtained, the open-circuit fault of the power device can be rapidly detected, the reliability of the system is improved, and the safe operation of the charging pile is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of charging pile systems, and in particular to a method for detecting an open circuit fault of a parallel DAB converter outputted by a charging pile system. Background Art

[0002] The circuit topology of the dual active bridge DC / DC converter with parallel output (Dual ADAB) has the characteristics of strong integration, simple transformer manufacturing, and high voltage output, so it is widely used in automotive power electronic transformers, charging pile systems, etc. At present, there are many studies on the control method of the parallel DAB converter with charging pile output, but few studies on its faults.

[0003] Existing fault diagnosis technologies for output parallel DAB converters include signal processing-based and knowledge-based methods.

[0004] The signal processing-based method is a method that analyzes the average value, frequency, harmonic content, amplitude and other information of the voltage or current signal measured by the system sensor and extracts fault characteristics to achieve the purpose of fault diagnosis. The fault diagnosis algorithm based on current signal processing does not require additional sensors, but is easily affected by the load, and its reliability will be affected in a closed-loop control system. The fault diagnosis algorithm based on voltage signal processing is independent of the load and control algorithm, with fast diagnosis and relatively high reliability, but it also requires the installation of voltage sensors or the design of hardware detection circuits.

[0005] Knowledge-based fault diagnosis algorithms do not require the establishment of a dynamic mathematical model of the system, nor do they require voltage sensors or other hardware circuits. Common methods include neural networks, expert systems, support vector machines, etc. Knowledge-based fault diagnosis algorithms do not require an accurate model of the system and have certain advantages in the application of complex systems, but they require large data samples and calculations, and the diagnosis time is long. Summary of the invention

[0006] An object of the present invention is to provide a method for detecting an open circuit fault of a parallel DAB converter outputted by a charging pile system.

[0007] According to one aspect of the present invention, a method for detecting an open circuit fault of a parallel DAB converter outputted by a charging pile system is provided, the method comprising:

[0008] Obtaining the current residual of the DAB converter through the inductor current estimator;

[0009] Normalizing the current residual to obtain a first normalized result;

[0010] Based on the first normalization result, determining whether the DAB converter is faulty;

[0011] If it is determined that the DAB converter is faulty, the average power residual is obtained based on the average power state estimator;

[0012] Normalizing the average power residual to obtain a second normalized result;

[0013] Based on the second normalization result, determining the fault side;

[0014] Based on the result of the fault side judgment, the location information of the faulty tube in the DAB converter is further obtained.

[0015] Furthermore, in the above method, the nth DAB converter comprises:

[0016] Input voltage U inn ; Switching tube in the nth DAB converter; Diode VD n1 ~VD n8 ;Module energy storage inductor L n , including transformer leakage inductance; output filter capacitor C on ; Equivalent load Load, including traction inverter and motor, the load nature is inductive; input current i inn ; Inductor current Module output current i n ; The load current i provided by the module on ; The high-frequency voltage U output by the original secondary side H bridge abn and U cdn ; U o is the output voltage; k is the transformer ratio; where,

[0017] Switching tube VT n1 and diode VD n1 Reverse parallel connection forms a power switch device, the switch tube VT n1 , VT n2 , VD n2 To VT n8 , VT n8 All are connected in reverse parallel to form a power switching device;

[0018] Switching tube VT n1 And switch tube VT n2 The series connection forms one of the bridge arms of the primary H bridge, and the switch tube VT n3 And switch tube VT n4 The two bridge arms are connected in parallel to form the other bridge arm of the primary H bridge. inn Connected to the H bridge to provide DC voltage input; the transformer passes through the midpoint a of the H bridge arm n ,b n Two points are connected to the H bridge; inductor L n Located at the connection point a between the transformer and the H bridge nMiddle, r n is the equivalent internal resistance of the inductor and transformer winding, and the inductor L n Series connection; inductance L n Connected to the H bridge and the primary side of the transformer; the circuit of each DAB converter is a symmetrical structure of the transformer secondary side connection and the primary side connection; the transformer passes through the secondary side H bridge midpoint c n ,d n With the switch tube VT n5 ,VT n6 ,VT n7 ,VT n8 The H bridge formed is connected; C on is the output filter capacitor, which is connected in parallel with the secondary side H bridge; Load is the load, which is connected in parallel with multiple DAB converters.

[0019] Furthermore, in the above method, the current residual of the DAB converter is obtained by the inductor current estimator.

[0020] According to the dynamic mathematical model of any DAB converter x in the output parallel DAB, the dynamic mathematical model of the inductor current can be obtained as follows:

[0021]

[0022] In the formula, is the inductor current of module x, r x is the inductance of DAB converter x and the equivalent internal resistance of transformer winding, U inx is the input voltage of DAB converter x, U o is the output voltage of DAB converter x, L x is the inductance value of DAB converter x, k is the transformer ratio of DAB converter x; δ 1x , δ 2x is an auxiliary variable, which represents the switch signal sent by the controller and a logical variable describing the direction of the inductor current;

[0023] The inductor current state estimator is constructed as:

[0024]

[0025] In the formula, is the current estimation value obtained by the inductor current estimator.

[0026] Furthermore, in the above method, the current residual of the DAB converter is obtained by the inductor current estimator.

[0027] Inductor current residual The expression is:

[0028]

[0029] Among them, define the variable It consists of the effective switching signal of the primary H-bridge of the high-frequency transformer in any module x during the actual operation of the system and the logical variable describing the direction of the inductor current. It consists of the effective switching signal of the secondary side H-bridge of the high frequency transformer of any DAB converter x during the actual operation of the system and the logical variable describing the direction of the inductor current;

[0030] When no fault occurs, for any DAB module x, there exists The estimated value of the inductor current output by the state estimator can reproduce the actual value. At this time, the current residual When an open-circuit fault occurs in the IGBT in module x, if the fault occurs in the primary H-bridge, then If the fault occurs in the secondary side H bridge, then Therefore, the residual expression is written as:

[0031]

[0032] Furthermore, in the above method, the current residual is normalized to obtain a first normalized result, including:

[0033] Normalized inductor current residual Described as:

[0034]

[0035] Furthermore, in the above method, judging whether the DAB converter is faulty based on the first normalization result includes:

[0036] If the absolute value of the normalized inductor current residual is continuously greater than the threshold d i If the DAB converter fails for one switching cycle, it is considered that a DAB converter fault is detected.

[0037] Furthermore, in the above method, based on the average power state estimator, the average power estimator of the secondary side H-bridge output in the average power residual is obtained as follows:

[0038]

[0039] Where, t D is the initial moment of the switching cycle, is the estimated value of the average power output of the secondary H-bridge in any module x; the actual average output power is:

[0040]

[0041] Where, is the average power actually output by the secondary H-bridge; and then the average power residual output by the secondary H-bridge in any module x is derived: for:

[0042]

[0043] Furthermore, in the above method, the average power residual is normalized to obtain a second normalized result,

[0044] right Normalization is performed, and the normalized output average power residual It is expressed as:

[0045]

[0046] Furthermore, in the above method, based on the second normalization result, the fault side judgment is performed, including:

[0047] like It is considered that the fault occurs in the secondary side H bridge of the DAB converter, otherwise it is considered that the fault occurs in the primary side H bridge of the DAB converter, where d p To set the threshold.

[0048] Furthermore, in the above method, based on the result of the fault side judgment, the location information of the faulty tube in the DAB converter is further obtained, including:

[0049] After a DAB module fault is detected and located at the primary H bridge,

[0050] If at this time The controller sends a drive signal (1 0 1 0 0 1 1 0) to the DAB module. X1 When the VT fails, the switch signal input by the controller to the state estimator is (1 0 1 0 0 1 1 0), while the equivalent switch signal of the DAB module during actual operation is (0 0 1 0 0 1 1 0). Therefore, the estimated value of the inductor current cannot track the actual value, and the normalized residual amplitude will increase. X4 When the tube fails, the switch signal input by the controller to the state estimator and the equivalent switch signal of the DAB module during actual operation are both (1 0 1 0 0 1 1 0). Therefore, the estimated value of the inductor current will converge to the actual value, and the normalized residual amplitude will gradually decrease.

[0051] If at this time The controller sends a drive signal (1 0 1 0 1 0 0 1) to the DAB module. X2When the VT fails, the switch signal input by the controller to the state estimator and the equivalent switch signal during the actual operation of the DAB module are both (1 0 1 0 1 0 0 1). Therefore, the estimated value of the inductor current will converge to the actual value, and the normalized residual amplitude will gradually decrease. X3 When the inductor fails, the switching signal input by the controller to the state estimator is (1 0 1 0 1 0 0 1), while the equivalent switching signal when the DAB module is actually running is (1 0 0 0 1 0 0 1). Therefore, the estimated value of the inductor current cannot track the actual value, and the normalized residual amplitude will increase.

[0052] Compared with the prior art, the present invention aims to study the open-circuit fault diagnosis method of the power device in the output parallel DAB converter, realize the rapid detection of the open-circuit fault of the power device, improve the reliability of the system, and ensure the safe operation of the charging pile.

[0053] The model-based fault diagnosis method adopted by the present invention establishes a dynamic mathematical model of the system, compares the model output value with the measurable signal during the actual operation, and evaluates the residual to achieve fault diagnosis. Compared with the knowledge-based fault diagnosis method, it does not require a large number of data samples and the calculation load is small; compared with the signal-based fault diagnosis method, it does not require additional hardware. The model-based output parallel DAB converter open-circuit fault diagnosis algorithm proposed in the present invention has the advantages of fast diagnosis speed, easy implementation, and independence from the load, and can achieve rapid diagnosis of DAB converter open-circuit faults in the charging pile system. BRIEF DESCRIPTION OF THE DRAWINGS

[0054] Other features, objects and advantages of the present invention will become more apparent from the detailed description of non-limiting embodiments made with reference to the following drawings:

[0055] Figure 1 A topological structure diagram of a charging pile system outputting a parallel dual active bridge DAB converter according to an example of the present invention is shown;

[0056] Figure 2 A schematic diagram showing voltage and current waveforms of module x under single phase shift control according to an embodiment of the present invention;

[0057] Figure 3 A schematic diagram showing a current flow path of any module x in different working modes according to an embodiment of the present invention;

[0058] Figure 4 A flow chart showing a method for detecting an open circuit fault of a parallel DAB converter output by a charging pile system according to an embodiment of the present invention;

[0059] Figure 5A schematic diagram showing the simulation results of an IGBT open circuit fault diagnosis in a primary H-bridge of a DAB under rated load according to an embodiment of the present invention;

[0060] Figure 6 A schematic diagram showing a simulation result of a secondary side H-bridge IGBT open circuit fault diagnosis according to an embodiment of the present invention.

[0061] The same or similar reference numerals in the drawings represent the same or similar components. DETAILED DESCRIPTION

[0062] The present invention is further described in detail below in conjunction with the accompanying drawings.

[0063] In a typical configuration of the present application, the terminal, the device of the service network and the trusted party all include one or more processors (CPU), input / output interfaces, network interfaces and memories.

[0064] The memory may include non-permanent storage in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM. The memory is an example of a computer-readable medium.

[0065] Computer readable media include permanent and non-permanent, removable and non-removable media that can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic tape disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include non-transitory media such as modulated data signals and carrier waves.

[0066] like Figure 4 As shown, the method for detecting an open circuit fault of a parallel DAB converter outputted by a charging pile system includes:

[0067] Step S1, obtaining a current residual of a DAB converter by an inductor current estimator;

[0068] Step S2, normalizing the current residual to obtain a first normalized result;

[0069] Step S3, judging whether the DAB converter is faulty based on the first normalization result;

[0070] Step S4, if it is determined that the DAB converter is faulty, an average power residual is obtained based on an average power state estimator;

[0071] Step S5, normalizing the average power residual to obtain a second normalized result;

[0072] Step S6, judging the fault side based on the second normalization result;

[0073] Step S7: Based on the result of the fault side judgment, further obtain the location information of the faulty tube in the DAB converter.

[0074] like Figure 1 As shown, the topology of the output parallel dual active bridge DC / DC converter is as follows Figure 1 As shown in the figure, it is composed of n DABs with independent inputs and parallel outputs. in1 , U in2 …U inn is the input voltage of each module of the converter; i in1 、i in2 …i inn is the input current of each module; VT n1 ~VT n8 is the switch tube in the nth module, VD n1 ~VD n8 are the corresponding anti-parallel diodes; L1, L2…L n Energy storage inductance for each module, including transformer leakage inductance; r1, r2…r n The equivalent internal resistance of each module inductance and transformer winding; is the inductor current of each module; U ab1 , U ab2 …U abn and U cd1 , U cd2 …U cdn are the high-frequency voltages output by the primary and secondary H-bridges of each module; i1, i2…i n Output current for each module; C o1 , C o2 …C on is the output filter capacitor of each module; i o1 、i o2 …i on The load current provided to each module; U o is the output voltage; Load is the equivalent load, including the traction inverter and the motor, and the load nature is inductive; k is the transformer ratio.

[0075] like Figure 1 As shown, U inn is the input voltage of the nth DAB converter module; VT n1 ~VT n8 is the switch tube in the nth DAB converter, VD n1 ~VD n8 is the corresponding anti-parallel diode; L n is the module energy storage inductance, including transformer leakage inductance; r n is the module inductance and the equivalent internal resistance of the transformer winding; C on is the output filter capacitor of the module; Load is the equivalent load, including the traction inverter and the motor, and the load nature is inductive;

[0076] i inn is the input current of each module; is the inductor current of each module; i n is the module output current; i on The load current provided to the module; U abn and U cdn are the high-frequency voltages output by the primary and secondary H-bridges of each module; U o is the output voltage; k is the transformer ratio.

[0077] Taking the nth DAB converter as an example, the connection relationship of a single DAB converter is as follows:

[0078] Switching tube VT n1 and diode VD n1 The reverse parallel connection forms a power switch device, which will be described below as a switch tube VT n1 , VT n2 , VD n2 To VT n8 , VD n8 This is true for all; switch tube VT n1 And switch tube VT n2 The series connection forms one of the bridge arms of the primary H bridge, and the switch tube VT n3 And switch tube VT n4 The two bridge arms are connected in parallel to form the other bridge arm of the primary H bridge. inn Connected to the H bridge to provide DC voltage input; the transformer passes through the midpoint a of the H bridge arm n ,b n Two points are connected to the H bridge; inductor L n Located at the connection point a between the transformer and the H bridge n Middle, r n is the equivalent internal resistance of the inductor and transformer winding, and the inductor L n Series connection; inductance L nIt is connected to the H-bridge and the primary side of the transformer to play a role in power transmission; the circuit is a highly symmetrical structure, so the secondary side connection of the transformer is similar to the primary side connection. The transformer passes through the secondary side H-bridge midpoint c n ,d n With the switch tube VT n5 ,VT n6 ,VT n7 ,VT n8 The H bridge formed is connected; C on is the output filter capacitor, which is connected in parallel with the secondary side H bridge; Load is the load, which is connected in parallel with multiple DAB converters in the proposed structure.

[0079] Open circuit and short circuit faults of power devices are the two most common faults. The short circuit fault mechanism of power devices is that the collector overcurrent causes the device to desaturate, and at the same time causes the device to withstand high voltage and high current. The power loss will rise sharply, causing the junction temperature to increase rapidly in a short period of time, causing the device to fail due to thermal breakdown. Driving signal errors, overvoltage and overcurrent breakdown, etc. will cause short circuit faults of power devices. Short circuit faults last for a short time, but the impact is serious and may cause the system to crash directly. Therefore, short circuit monitoring and overvoltage and overcurrent protection circuits are generally integrated in the driving circuit of power devices to protect the rest of the system when a short circuit fault occurs. The impact of the open circuit fault of the power device on the system is smaller than that of the short circuit fault, and it is easy to be ignored. The breakage of the bonding wire of the power device, the shedding of the welding layer and the loss of the driving signal may all cause the occurrence of open circuit faults. For the output parallel DAB converter of the charging pile system, the open circuit failure of the power device will cause the current waveform to be distorted, the power factor to drop, the stress on the switch tube to increase, the output DC voltage amplitude to decrease, the pulsation to increase, and the transmission efficiency to decrease. This kind of failure will reduce the system performance. Although it will not cause the system to crash directly, it is latent in a short period of time and is likely to cause secondary failures in other parts of the system, which will have a more serious impact on the system.

[0080] The present invention aims to study the open circuit fault diagnosis method of the power device in the output parallel DAB converter, realize the rapid detection of the open circuit fault of the power device, improve the reliability of the system, and ensure the safe operation of the charging pile.

[0081] The model-based fault diagnosis method adopted by the present invention establishes a dynamic mathematical model of the system, compares the model output value with the measurable signal during the actual operation, and evaluates the residual to achieve fault diagnosis. Compared with the knowledge-based fault diagnosis method, it does not require a large number of data samples and the calculation load is small; compared with the signal-based fault diagnosis method, it does not require additional hardware. The model-based output parallel DAB converter open-circuit fault diagnosis algorithm proposed in the present invention has the advantages of fast diagnosis speed, easy implementation, and independence from the load, and can achieve rapid diagnosis of DAB converter open-circuit faults in the charging pile system.

[0082] 1. Analysis of the working mode of the output parallel dual active bridge DC / DC converter:

[0083] The output parallel dual active bridge DC / DC converter plays the role of isolation transformation and bidirectional power transmission in the automotive power electronic transformer. By adopting a certain control method, the output DC voltage is kept unchanged when the load changes, providing good working conditions for the traction inverter and motor; at the same time, the dual active bridge DC / DC converter can realize soft switching during operation, reduce switching losses, and improve system efficiency.

[0084] The controller collects the inductor current, output load voltage and load current, and uses a certain control algorithm to generate the switching signal of each module IGBT, and controls the H-bridge output voltage and inductor current of the DAB to achieve the purpose of controlling the output DC voltage and the load current output by each module. For the output parallel DAB, in order to balance the output power of each module, current sharing control is required. For each DAB module, the general control method is pulse width modulation control and phase shift control. Phase shift control is simpler and easier to implement than pulse width modulation control. Therefore, most DABs work under phase shift control, and single phase shift control is the most widely used.

[0085] For any module x (x = 1, 2 ... n), when single phase shift control is adopted, when DAB is working normally, the switching frequency of the H bridges on both sides of the high-frequency transformer is the same, and the IGBTs on each bridge arm are complementary turned on, and the IGBTs in the diagonal position will be turned on or off at the same time, and the H bridges on both sides will output square wave voltage U respectively. abx and U cdx By adjusting U abx and U cdx The size of the phase shift duty ratio Dx between can change the transmission power size and direction. When the phase shift duty ratio is greater than 0, that is, the phase is ahead of, the power will be transmitted in the forward direction; otherwise, the power will be transmitted in the reverse direction. In order to analyze the working mode of DAB, it is assumed that the input and output voltage relationship is U inx ≥ kU o; Assume that IGBT and anti-parallel diode are ideal components and ignore internal resistance. Figure 2 That is the voltage and current waveform of DAB under single phase shift control.

[0086] Figure 2 In, T DAB is the switching period of the converter; SD x1 ~SD x8 is the driving signal of the switch tube of module x. When the switch signal is "1", it represents an on signal, and when it is "0", it represents an off signal. In order to avoid the situation where the two switch tubes in the same bridge arm are directly short-circuited when the switch state is switched, a dead time is set.

[0087] For any module x in the output parallel DAB, its operating state is related to the switch signal and the inductor current, and it is assumed that the direction of the inductor current flowing into the high-frequency transformer is positive. Figure 2 The detailed description of the working mode is as follows.

[0088] When the switch signal is (1 0 0 1 0 1 1 0), When the current flows in the direction of Figure 3 As shown in (a), the flow through VD X1 、VD X4 、VD X6 、VD X7 , then the H-bridge output voltage on both sides of the transformer is: U abx =U inx , U cdx =-U o , the inductor current will be (U inx +U o ) / L x The slope of the inductor rises, at this time the inductor releases energy to the power supply and supplies power to the load; when i Lx >0, the current flows in the direction of Figure 3 As shown in (b), the current flowing through VT X1 VT X4 VT X6 VT X7 , the H-bridge output voltage on both sides of the transformer is: U abx =U inx , U cdx =-U o , the inductor current continues to flow at (U inx +U o ) / L x The slope rises, and at this time the inductor is charged by the input power supply and the output capacitor at the same time.

[0089] When the switch signal is switched to (1 0 0 1 0 0 0 0), the secondary side H-bridge switch enters the dead zone state. At this stage, the inductor current maintains i Lx >0, the current flow direction is Figure 3 As shown in (c), the current flowing through VT X1 VT X4 、VD X5 、VD X8 , then the H-bridge output voltage on both sides of the transformer is: U abx =U inx , U cdx =U o , the inductor current will be (U inx -U o ) / L x The slope of the voltage rises, and the power supply charges the inductor and supplies power to the load. When the dead zone state ends and the switch signal switches to (1 0 0 1 1 0 01), the converter will continue the previous working mode.

[0090] When the switch signal is switched to (0 0 0 0 1 0 0 1), the primary H-bridge switch signal switches and enters the dead zone state, and the inductor current remains i Lx >0, the current flow direction is Figure 3 As shown in (d), the flow through VD X2 、VD X3 、VD X5 、VD X8 , the H-bridge output voltage on both sides of the transformer is: U abx =-U inx , U cdx =Uo, the inductor current will be (-U inx -U o ) / L x The slope decreases, at which point the inductor releases energy to the power supply and supplies power to the load.

[0091] When the dead zone state ends and the switch signal switches to (0 1 1 0 1 0 0 1), when i Lx >0, the converter will continue the previous working mode. Lx When <0, the current flows in the direction of Figure 3 As shown in (e), the current flowing through VT X2 VT X3 VT X5 VT X8 , then the H-bridge output voltage on both sides of the transformer is: U abx =-U inx , U cdx =U o , the inductor current will be (-U inx -Uo ) / L x The slope decreases, and the power supply and output capacitor charge the inductor at the same time.

[0092] When the switch signal is switched to (0 1 1 0 0 0 0 0), the secondary side H bridge enters the dead zone state, and the inductor current remains i Lx <0, the current flow direction is as follows Figure 3 As shown in (f), the current flowing through VT X2 VT X3 、VD X6 、XD X7 The output voltage of the H bridge on both sides of the transformer is: U abx =-U inx , U cdx =-U o , the inductor current will be (-U inx +U o ) / L x The slope of the voltage drops, and the power supply charges the inductor and supplies power to the load. After the dead zone state ends, the switch state switches to (0 1 1 0 0 1 1 0), and the converter will continue the previous working mode.

[0093] When the switch signal is switched to (0 0 0 0 0 1 1 0), the primary H-bridge enters the dead zone state and the inductor current remains i Lx <0, the working mode is the same as when the switching signal is (1 0 0 1 0 1 1 0).

[0094] Through analysis, it can be seen that the working mode of the module depends on the switching signal and the direction of the inductor current. Considering all the switching states and current directions, the working mode of module x in one cycle is shown in Table 1.

[0095] Table 1 Working mode of module x in one cycle

[0096]

[0097] 2. In terms of open circuit fault diagnosis of output parallel dual active bridge DC / DC converter:

[0098] The basic idea of ​​the model-based open-circuit fault diagnosis method for IGBT of automotive power electronic transformer is to construct a state estimator of current and power based on the dynamic mathematical model of the system, and use the electrical quantities measured during operation to subtract the estimated value output by the state estimator to generate a residual signal. According to the set fault judgment criteria, the information on the system operating status contained in the residual is analyzed and evaluated, thereby realizing fault diagnosis.

[0099] Each DAB module in the output parallel dual active bridge DC / DC converter is relatively independent, so the IGBT open circuit fault diagnosis algorithm of any DAB module is the same. The implementation of the IGBT open circuit fault diagnosis method of any module x mainly includes: fault detection, module fault side location and fault tube location after fault side location. The specific flow chart is as follows Figure 4 shown.

[0100] (1) IGBT open circuit fault detection based on inductor current residual

[0101] To realize the IGBT open-circuit fault detection of any DAB module x in the output parallel DAB, it is necessary to first establish an inductor current state estimator. According to the dynamic mathematical model of any DAB module x in the output parallel DAB, the dynamic mathematical model of the inductor current can be obtained as:

[0102]

[0103] In the formula, is the inductor current of module x, r x is the inductance of module x and the equivalent internal resistance of transformer winding, U inx is the input voltage of module x, U o is the output voltage of module x, L x is the inductance value of module x, and k is the transformer ratio of module x. 1x , δ 2x It is an auxiliary variable, which represents the switching signal sent by the controller and the logical variable describing the direction of the inductor current.

[0104] The inductor current state estimator is constructed as:

[0105]

[0106] In the formula, is the current estimation value obtained by the inductor current estimator.

[0107] When module x is in normal operation and no fault occurs, the inductor current described by the dynamic mathematical model is the actual measured value of module x in the actual operation process; when an open-circuit fault occurs in the IGBT of module x, although the controller still sends a switch signal to the fault tube, since the fault tube is in an open-circuit state at this time, for the DAB module in actual operation, the fault tube is equivalent to being always in the off state, that is, its switch signal is always equivalent to "0". Therefore, define the variable It consists of the effective switching signal of the primary H-bridge of the high-frequency transformer in any module x during the actual operation of the system and the logical variable describing the direction of the inductor current. It is composed of the effective switching signal of the secondary side H bridge of the high frequency transformer in any module x during the actual operation of the system and the logical variable describing the direction of the inductor current. The inductor current residual can be obtained The expression is:

[0108]

[0109] When no fault occurs, for any DAB module x, there exists The estimated value of the inductor current output by the state estimator can reproduce the actual value. At this time, the current residual When an open-circuit fault occurs in the IGBT in module x, if the fault occurs in the primary H-bridge, then If the fault occurs in the secondary side H bridge, then Therefore, the residual expression can be written as:

[0110]

[0111] In the actual operation process, due to the influence of errors and interference, the residual inductor current will not be zero when the DAB module is working normally, but will fluctuate within a small value range. Therefore, in order to eliminate the influence of errors, when using the residual inductor current for fault detection, the threshold d should be set first. i ,At the same time, according to the analysis of the residual ,amplitude of the residual will change with the load change. When ,fault detection is performed for different load conditions, different ,thresholds need to be set, which is difficult to achieve in actual ,operation.

[0112] In order to eliminate the influence of load on the fault detection method, the absolute value of the maximum value of the inductor current measured in each switching cycle is taken. As a reference value, the inductor current residual is normalized. The normalized inductor current residual Described as:

[0113]

[0114] When the absolute value of the normalized inductor current residual in a module is greater than the threshold d i When , it is considered that a fault has occurred in the module. To prevent misdiagnosis caused by noise and interference, if the absolute value of the normalized inductor current residual continues to be greater than the threshold d i A fault is detected if the PWM output voltage exceeds one switching cycle.

[0115] In order to detect faults quickly and accurately, the threshold d is set i is 0.05, which is applicable to the open-circuit fault detection of the primary H-bridge or the secondary H-bridge IGBT. At the same time, since the inductor current residual is normalized, d i Suitable for all load situations.

[0116] (2) Fault side location based on power balance

[0117] Since the characteristics of an open-circuit fault in the IGBTs on both sides of the H-bridge of any module in the output parallel dual active bridge DC / DC converter are the same, when a fault in a module is detected through the inductor current residual of the module, it is necessary to determine whether the fault occurs in the primary H-bridge or the secondary H-bridge.

[0118] Select U o i x As the actual power value, based on the instantaneous power balance equation of the secondary H-bridge, the state estimator of the instantaneous work power output of the secondary H-bridge is constructed as follows:

[0119]

[0120] In the formula, is the estimated value of the instantaneous power output of the secondary H-bridge in any module x. By subtracting the estimated value from the actual power value, the residual instantaneous power output of the secondary H-bridge of any module x can be obtained as:

[0121]

[0122] Among them, δ′ 2x It is a logical expression composed of the effective switching signal of the H-bridge on the secondary side of module x and the logical variables describing the direction of the inductor current.

[0123] When performing fault detection, in order to make the detection method independent of the load, the inductor current residual is normalized, where the reference value is the absolute value of the maximum value of the measured inductor current in each switching cycle, and this value can only be obtained after the end of the cycle. Therefore, the normalized inductor current residual will be delayed for one switching cycle to output. The method based on the average power residual is used to identify the fault side. The main idea of ​​this method is to use the residual between the actual value of the output average power calculated by the measured voltage and current of the secondary side H bridge in each switching cycle and the estimated value of the output average power obtained by the estimator of the secondary side H bridge in each switching cycle to judge the fault side. The output average power residual of the secondary side H bridge will be delayed for one switching cycle to output, and the duration of existence is one switching cycle. Therefore, after the fault is detected, the fault side can be effectively located.

[0124] First, the average power estimator of the secondary H-bridge output in each switching cycle is constructed as:

[0125]

[0126] Where, t D is the initial moment of the switching cycle, is the estimated value of the average power output of the secondary H-bridge in any module x. Similarly, the actual average output power can be obtained as:

[0127]

[0128] In the formula, is the average power actually output by the secondary H-bridge. Then, the average power residual output by the secondary H-bridge in any module x is derived: for:

[0129]

[0130] Considering that the IGBT tube in the actual system is a non-ideal device, and due to factors such as measurement error and electromagnetic interference, the secondary side H bridge in the DAB module may be It is not 0, but fluctuates around the zero position. Therefore, in order to eliminate the influence of the error, when locating the fault side of the module, the threshold d should be set first. p At the same time, it changes with the inductor current, that is, the load change will affect Therefore, in order to eliminate the impact of the load on the fault location of the DAB module, the absolute value of the average power actually output by the secondary side H bridge is used as the reference value. Normalization is performed, and the normalized output average power residual It is expressed as:

[0131]

[0132] When a module fault is detected and the normalized output average power residual is used to locate the faulty side of the module, if The fault is considered to occur in the secondary H bridge, otherwise the fault is considered to occur in the primary H bridge. In order to quickly locate the faulty side of the module and reduce the wrong location caused by errors, the threshold d is set. p is 0.001.

[0133] (3) Faulty tube location based on specific switch signals

[0134] For any DAB module x, when an open-circuit fault occurs in the IGBT tube in the primary H bridge, VT X1 Tube and VT X4 The fault characteristics of the tube are consistent with the normalized current residual value. VT X2 Tube and VT X3 The fault characteristics of the tube are consistent with the normalized current residual value. When an open circuit fault occurs in the IGBT tube in the secondary side H bridge, VT X5 Tube and VT X8The fault characteristics of the tube are consistent with the normalized current residual value. VT X6 Tube and VT X7 The fault characteristics of the tube are consistent with the normalized current residual value. Therefore, when an open-circuit fault is detected in an IGBT in a DAB module and the faulty side is located, it is not possible to directly locate the IGBT tube with an open-circuit fault in the primary H-bridge or the secondary H-bridge through the normalized current residual value.

[0135] In order to distinguish the faulty tubes with the same fault characteristics, after a DAB module is detected to have a fault and located at the primary side H bridge, if The controller sends a drive signal (1 0 1 0 0 1 1 0) to the DAB module. X1 When the VT fails, the switch signal input by the controller to the state estimator is (1 0 1 0 0 1 1 0), while the equivalent switch signal of the DAB module during actual operation is (0 0 1 0 0 1 1 0). Therefore, the estimated value of the inductor current cannot track the actual value, and the normalized residual amplitude will increase. X4 When the inductor fails, the switch signal input by the controller to the state estimator and the equivalent switch signal during the actual operation of the DAB module are both (1 0 1 0 0 1 1 0). Therefore, the estimated value of the inductor current will converge to the actual value, and the normalized residual amplitude will gradually decrease. The controller sends a drive signal (1 0 1 0 1 0 0 1) to the DAB module. X2 When the VT fails, the switch signal input by the controller to the state estimator and the equivalent switch signal during the actual operation of the DAB module are both (1 0 1 0 1 0 0 1). Therefore, the estimated value of the inductor current will converge to the actual value, and the normalized residual amplitude will gradually decrease. X3 When the inductor fails, the switching signal input by the controller to the state estimator is (1 0 1 0 1 0 0 1), while the equivalent switching signal when the DAB module is actually running is (1 0 0 0 1 0 0 1). Therefore, the estimated value of the inductor current cannot track the actual value, and the normalized residual amplitude will increase.

[0136] When the fault occurs in the secondary side H bridge, if The controller sends a driving signal (0 1 10 1 0 1 0) to the DAB module; if Then a driving signal (1 0 0 1 1 0 1 0) is issued. The analysis of the change of normalized residuals of different faulty tubes in the secondary side H bridge is similar to that of the primary side H bridge.

[0137] In order to more accurately determine the change trend of the normalized residual, the normalized residual will be continuously observed for 5 sampling cycles after the controller sends a specific drive signal for a switching cycle. By combining the normalized residual sign and the change trend of the normalized residual after the controller sends a specific switching signal to the DAB module, the position of the IGBT tube with an open circuit fault in the DAB module can be accurately located. After that, the controller will send a shutdown signal to the IGBT to prevent the fault from spreading further.

[0138] 3. In terms of simulation experiment analysis:

[0139] The simulation results of the primary side H-bridge IGBT open circuit fault diagnosis in module 1 are as follows: Figure 5 As shown. Set the IGBT tube to have an open circuit fault at 1s, such as Figure 5 As shown, before 1s, the normalized inductor current residual is basically zero and less than the threshold d i At the same time, the normalized value of the average power residual output by the secondary H-bridge is also close to zero. Therefore, the fault diagnosis signal F DAB , L DAB The outputs are all zero. VT 11 and VT 14 After an open circuit fault occurs, Figure 5 As shown in (a) and (d), due to the change in the current flow path, the actual waveform of the inductor current is distorted, causing the residual to increase in the opposite direction. After entering the steady state, the residual will fluctuate within a certain range. When the normalized residual continues to be greater than the set threshold for 20 sampling cycles, it is determined that a fault has occurred. At the same time, the normalized value of the average power residual output of the secondary H-bridge is compared with the set threshold, and the result is It is determined that the fault occurs in the primary side H bridge, F DAB A jump occurs, F DAB =1. After that, the controller sends a drive signal (1 0 1 0 0 1 1 0) to module 1. In the next 5 sampling cycles, VT 11 The estimated value of the inductor current under fault conditions cannot track the actual value, and the normalized residual amplitude will increase. DAB Jump to 1; VT 14 The estimated value of the inductor current under fault conditions will converge to the actual value, and the normalized residual amplitude will gradually decrease. DAB Jump to 4, thus completing the accurate location of the faulty tube. 12 and VT 13 The simulation results after an open circuit fault occurs are as follows: Figure 5 As shown in (b) and (c), after the jump occurs, the switch signal sent by the controller to module 1 is (1 0 1 0 1 0 01). The specific fault diagnosis process is similar to the above analysis, and the fault can be correctly detected and located.

[0140] The simulation results of the secondary side H-bridge IGBT open circuit fault diagnosis in module 1 are as follows: Figure 6 As shown. Figure 6 It can be obtained that after detecting the existence of a fault, It is determined that the fault occurs in the secondary side H bridge, F DAB A jump occurs, F DAB =2, and then the faulty tube is accurately diagnosed based on the sign of the normalized residual and the changing trend of the normalized residual after the controller sends a specific switching signal.

[0141] Figure 5 and 6 The simulation results in show that under rated load conditions, when any DAB module in the output parallel dual active bridge DC / DC converter fails, the fault diagnosis method adopted can accurately locate the fault side and the position of the faulty tube after detecting the fault.

[0142] Obviously, those skilled in the art can make various changes and modifications to the present application without departing from the spirit and scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the claims of the present application and their equivalents, the present application is also intended to include these modifications and variations.

[0143] It should be noted that the present invention can be implemented in software and / or a combination of software and hardware, for example, can be implemented using an application specific integrated circuit (ASIC), a general purpose computer or any other similar hardware device. In one embodiment, the software program of the present invention can be executed by a processor to implement the steps or functions described above. Similarly, the software program of the present invention (including related data structures) can be stored in a computer readable recording medium, for example, a RAM memory, a magnetic or optical drive or a floppy disk and the like. In addition, some steps or functions of the present invention can be implemented using hardware, for example, as a circuit that cooperates with a processor to perform each step or function.

[0144] In addition, a part of the present invention may be applied as a computer program product, such as a computer program instruction, which, when executed by a computer, can call or provide the method and / or technical solution according to the present invention through the operation of the computer. The program instruction for calling the method of the present invention may be stored in a fixed or removable recording medium, and / or transmitted through a data stream in a broadcast or other signal-bearing medium, and / or stored in a working memory of a computer device that runs according to the program instruction. Here, according to an embodiment of the present invention, a device is included, the device including a memory for storing computer program instructions and a processor for executing program instructions, wherein, when the computer program instruction is executed by the processor, the device is triggered to run the method and / or technical solution based on the aforementioned multiple embodiments of the present invention.

[0145] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, from any point of view, the embodiments should be regarded as exemplary and non-restrictive, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims are included in the present invention. Any figure mark in the claims should not be regarded as limiting the claims involved. In addition, it is obvious that the word "comprising" does not exclude other units or steps, and the singular does not exclude the plural. Multiple units or devices stated in the device claim can also be implemented by one unit or device through software or hardware. The words first, second, etc. are used to indicate names, and do not indicate any particular order.

Claims

1. A method for detecting open circuit faults of parallel DAB converters outputted by a charging pile system, wherein: The method includes: Obtaining the current residual of the DAB converter through the inductor current estimator; Normalizing the current residual to obtain a first normalized result; Based on the first normalization result, determining whether the DAB converter is faulty; If it is determined that the DAB converter is faulty, the average power residual is obtained based on the average power state estimator; Normalizing the average power residual to obtain a second normalized result; Based on the second normalization result, determining the fault side; Based on the result of the fault side judgment, the location information of the faulty tube in the DAB converter is further obtained.

2. The method for detecting open circuit fault of a parallel DAB converter output of a charging pile system according to claim 1, wherein: The nth DAB converter comprises: Input voltage U inn ; Switching tube in the nth DAB converter; Diode VD n1 ~VD n8 ;Module energy storage inductor L n , including transformer leakage inductance; output filter capacitor C on ; Equivalent load Load, including traction inverter and motor, the load nature is inductive; input current i inn ; Inductor current Module output current i n ; The load current i provided by the module on ; The high-frequency voltage U output by the original secondary side H bridge abn and U cdn ; U o is the output voltage; k is the transformer ratio; where, Switching tube VT n1 and diode VD n1 Reverse parallel connection forms a power switch device, the switch tube VT n1 , VT n2 , VD n2 To VT n8 , VD n8 All are connected in reverse parallel to form a power switching device; Switching tube VT n1 And switch tube VT n2 The series connection forms one of the bridge arms of the primary H bridge, and the switch tube VT n3 And switch tube VT n4 The two bridge arms are connected in parallel to form the other bridge arm of the primary H bridge. inn Connected to the H bridge to provide DC voltage input; the transformer passes through the midpoint a of the H bridge arm n , b n Two points are connected to the H bridge; inductor L n Located at the connection point a between the transformer and the H bridge n Middle, r n is the equivalent internal resistance of the inductor and transformer winding, and the inductor L n Series connection; inductance L n Connected to the H bridge and the primary side of the transformer; the circuit of each DAB converter is a symmetrical structure of the transformer secondary side connection and the primary side connection; the transformer passes through the secondary side H bridge midpoint c n , d n With the switch tube VT n5 , VT n6 , VT n7 , VT n8 The H bridge formed is connected; C on is the output filter capacitor, which is connected in parallel with the secondary side H bridge; Load is the load, which is connected in parallel with multiple DAB converters.

3. The method for detecting open circuit fault of a parallel DAB converter output of a charging pile system according to claim 2, wherein: The current residual of the DAB converter is obtained by the inductor current estimator. According to the dynamic mathematical model of any DAB converter x in the output parallel DAB, the dynamic mathematical model of the inductor current can be obtained as follows: In the formula, is the inductor current of module x, r x is the inductance of DAB converter x and the equivalent internal resistance of transformer winding, U inx is the input voltage of DAB converter x, U o is the output voltage of DAB converter x, L x is the inductance value of DAB converter x, k is the transformer ratio of DAB converter x; δ 1x , δ 2x is an auxiliary variable, which represents the switch signal sent by the controller and a logical variable describing the direction of the inductor current; The inductor current state estimator is constructed as: In the formula, is the current estimation value obtained by the inductor current estimator.

4. The method for detecting open circuit fault of a parallel DAB converter output of a charging pile system according to claim 1, wherein: The current residual of the DAB converter is obtained by the inductor current estimator. Inductor current residual The expression is: Among them, define the variable It consists of the effective switching signal of the primary H-bridge of the high-frequency transformer in any module x during the actual operation of the system and the logical variable describing the direction of the inductor current. It consists of the effective switching signal of the secondary side H-bridge of the high frequency transformer of any DAB converter x during the actual operation of the system and the logical variable describing the direction of the inductor current; When no fault occurs, for any DAB module x, there exists The estimated value of the inductor current output by the state estimator can reproduce the actual value. At this time, the current residual When an open-circuit fault occurs in the IGBT in module x, if the fault occurs in the primary H-bridge, then If the fault occurs in the secondary side H bridge, then The residual expression is written as:

5. The method for detecting open circuit fault of a parallel DAB converter output of a charging pile system according to claim 1, wherein: The current residual is normalized to obtain a first normalized result, including: Normalized inductor current residual Described as:

6. The method for detecting open circuit fault of a parallel DAB converter output of a charging pile system according to claim 1, wherein: Based on the first normalization result, determining whether the DAB converter is faulty includes: If the absolute value of the normalized inductor current residual is continuously greater than the threshold d i If the DAB converter fails for one switching cycle, it is considered that a DAB converter fault is detected.

7. The method for detecting open circuit fault of a parallel DAB converter output of a charging pile system according to claim 1, wherein: Based on the average power state estimator, the average power residual is obtained. The average power estimator of the secondary H-bridge output is: Where, t D is the initial moment of the switching cycle, is the estimated value of the average power output of the secondary H-bridge in any module x; the actual average output power is: Where, is the average power actually output by the secondary H-bridge; and then the average power residual output by the secondary H-bridge in any module x is derived: for:

8. The method for detecting open circuit fault of a parallel DAB converter output of a charging pile system according to claim 1, wherein: The average power residual is normalized to obtain a second normalized result: right Normalization is performed, and the normalized output average power residual It is expressed as:

9. The method for detecting open circuit fault of a parallel DAB converter output of a charging pile system according to claim 1, wherein: Based on the second normalization result, a fault side judgment is performed, including: like It is considered that the fault occurs in the secondary side H bridge of the DAB converter, otherwise it is considered that the fault occurs in the primary side H bridge of the DAB converter, where d p To set the threshold.

10. The method for detecting open circuit fault of a parallel DAB converter output of a charging pile system according to claim 1, wherein: Based on the result of the fault side judgment, the location information of the faulty tube in the DAB converter is further obtained, including: After a DAB module fault is detected and located at the primary H bridge, If at this time The controller sends a drive signal (1 0 1 0 0 1 1 0) to the DAB module. X1 When the VT fails, the switch signal input by the controller to the state estimator is (1 0 1 0 0 1 1 0), while the equivalent switch signal of the DAB module during actual operation is (0 0 1 0 0 1 1 0). Therefore, the estimated value of the inductor current cannot track the actual value, and the normalized residual amplitude will increase. X4 When the tube fails, the switch signal input by the controller to the state estimator and the equivalent switch signal when the DAB module is actually running are both (10100110). Therefore, the estimated value of the inductor current will converge to the actual value, and the normalized residual amplitude will gradually decrease. If at this time The controller sends a drive signal (10101001) to the DAB module. x When the 2-tube fails, the switch signal input by the controller to the state estimator and the equivalent switch signal when the DAB module is actually running are both (10101001). Therefore, the estimated value of the inductor current will converge to the actual value, and the normalized residual amplitude will gradually decrease. x3 When the inductor fails, the switch signal input by the controller to the state estimator is (101 01001), while the equivalent switch signal of the DAB module during actual operation is (10001001). Therefore, the estimated value of the inductor current cannot track the actual value, and the normalized residual amplitude will increase.

Citation Information

Cited By

  • Open-circuit fault diagnosis method for three-phase interleaving three-level DC-DC converter

    CN119780785A

  • Converter power device open circuit fault diagnosis method based on fundamental frequency current characteristics

    CN120103222A

  • Microgrid fault detection method, system and device and storage medium

    CN121164806A

  • Fault detection method, system, device and storage medium of micro-grid

    CN121164806B