New energy grid-connected short-circuit ratio control margin evaluation method and terminal

By calculating the short-circuit ratio margin of new energy grid connection, the problem that traditional methods cannot evaluate the stability of new energy grid connection is solved, and the stability of new energy grid connection system is accurately evaluated and controlled, ensuring the safe operation of the power grid.

CN118886591APending Publication Date: 2024-11-01STATE GRID FUJIAN POWER ELECTRIC CO ECONOMIC RESEARCH INSTITUTE +1

Patent Information

Application Number
CN202410818760.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-24
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

The traditional calculation short-circuit ratio fails to accurately characterize the critical value of the new energy grid-connected system and the margin of the system intensity from the critical value, making it difficult to evaluate the stability of the new energy grid-connected, especially when a high proportion of new energy is connected to the power grid, it may lead to the power grid. Decreased strength and safety stability are difficult to control.

Method used

A method of controlling margin evaluation for the grid-connected short-circuit ratio of new energy is used to calculate the short-circuit ratio of a single or multiple stations by judging the grid-connected form of new energy, and calculate the critical short-circuit ratio based on the maximum transmission power in a static stable environment, thereby Evaluate the short-circuit ratio margin and judge the stability of new energy grid connection.

Benefits of technology

This method can accurately evaluate the stability of new energy grid connection, identify the problems of insufficient short-circuit capacity and insufficient reactive voltage support capacity, and provide a reference for the safety and stability evaluation and operation control of new energy connected to the power grid.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118886591A_ABST
    Figure CN118886591A_ABST
Patent Text Reader

Abstract

The invention discloses a new energy grid-connected short-circuit ratio control margin evaluation method and a terminal, when a new energy grid-connected form is a single-feed-in system, a new energy single-station short-circuit ratio is calculated based on a new energy single-station short-circuit capacity and a new energy rated capacity, and when the new energy grid-connected form is a multi-feed-in system, the new energy single-station short-circuit ratio is calculated based on a new energy rated capacity. If yes, calculating a new energy multi-station short-circuit ratio based on a new energy grid-connected bus node voltage and a new energy station grid-connected bus short-circuit capacity, then calculating a critical short-circuit ratio based on new energy grid-connected maximum transmission power in a static stable environment, and obtaining a short-circuit ratio margin based on the short-circuit ratio and the critical short-circuit ratio; finally, the stability of new energy grid connection is judged based on the short-circuit ratio margin, the short-circuit ratio is an important index for measuring the voltage supporting strength of the system, the critical short-circuit ratio is the short-circuit ratio corresponding to the critical stable state of the system, and the stability of new energy grid connection can be accurately evaluated based on the short-circuit ratio margin calculated through the short-circuit ratio margin and the critical short-circuit ratio.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of new energy grid-connected technology, and in particular to a new energy grid-connected short-circuit ratio control margin evaluation method and terminal. Background Art

[0002] Under the background of new power system construction, the characteristics of "high proportion of renewable energy and high proportion of power electronic equipment" are gradually highlighted. Power electronic equipment such as wind power and photovoltaic power will gradually replace traditional synchronous power supply, which will increase the difficulty of controlling the safe and stable operation of the power system, especially the concentrated access area of ​​high proportion of new energy, which may lead to the problem of reduced regional power grid strength. At present, the short-circuit ratio is usually used to characterize the strength of the power grid, but the traditional calculation of the short-circuit ratio usually only calculates its value, and does not characterize the critical value of the power grid strength and the margin of the current system strength from the critical value.

[0003] The critical short-circuit ratio is the key to calculating the short-circuit ratio control margin and is affected by the maximum transmittable power of the system. The traditional maximum transmittable power calculation generally does not take into account the impact of reactive compensation devices. Taking offshore wind power as an example, in actual operation, reactive compensation devices are usually installed in the centralized control station. It is necessary to further analyze the impact of reactive compensation devices on the maximum transmittable power of the system, and then accurately characterize the critical short-circuit ratio of the system.

[0004] Therefore, it is necessary to accurately evaluate the short-circuit ratio control margin to assist in evaluating the safety and stability of renewable energy grid connection and provide a reference for the planning and operation control of renewable energy grid access. Summary of the invention

[0005] The technical problem to be solved by the present invention is to provide a new energy grid-connected short-circuit ratio control margin evaluation method and terminal, which can accurately evaluate the stability of new energy grid-connected.

[0006] In order to solve the above technical problems, the technical solution adopted by the present invention is:

[0007] A method for evaluating a short-circuit ratio control margin of a new energy grid-connected system comprises the following steps:

[0008] Determine the form of new energy grid connection. If it is a single-feedback system, the short-circuit ratio of the new energy single station is calculated based on the short-circuit capacity of the new energy single station and the rated capacity of the new energy. If it is a multi-feedback system, the short-circuit ratio of the new energy multiple stations is calculated based on the node voltage of the new energy grid-connected bus and the short-circuit capacity of the new energy grid-connected bus.

[0009] Obtaining the maximum transmission power of the new energy grid-connected under a static stable environment, and calculating the critical short-circuit ratio based on the maximum transmission power of the new energy grid-connected under the static stable environment;

[0010] Obtaining a short circuit ratio margin based on the short circuit ratio and the critical short circuit ratio;

[0011] The stability of the new energy grid connection is judged based on the short-circuit ratio margin.

[0012] In order to solve the above technical problems, another technical solution adopted by the present invention is:

[0013] A new energy grid-connected short-circuit ratio control margin assessment terminal includes a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, the following steps are implemented:

[0014] Determine the form of new energy grid connection. If it is a single-feedback system, the short-circuit ratio of the new energy single station is calculated based on the short-circuit capacity of the new energy single station and the rated capacity of the new energy. If it is a multi-feedback system, the short-circuit ratio of the new energy multiple stations is calculated based on the node voltage of the new energy grid-connected bus and the short-circuit capacity of the new energy grid-connected bus.

[0015] Obtaining the maximum transmission power of the new energy grid-connected under a static stable environment, and calculating the critical short-circuit ratio based on the maximum transmission power of the new energy grid-connected under the static stable environment;

[0016] Obtaining a short circuit ratio margin based on the short circuit ratio and the critical short circuit ratio;

[0017] The stability of the new energy grid connection is judged based on the short-circuit ratio margin.

[0018] The beneficial effects of the present invention are as follows: when the grid-connected form of the new energy is a single-feedback system, the short-circuit ratio of the new energy single station is calculated based on the short-circuit capacity of the new energy single station and the rated capacity of the new energy; when the grid-connected form is a multi-feedback system, the short-circuit ratio of the new energy multiple stations is calculated based on the node voltage of the new energy grid-connected bus and the short-circuit capacity of the new energy grid-connected bus; then the critical short-circuit ratio is calculated based on the maximum transmission power of the new energy grid-connected under a static stable environment; the short-circuit ratio margin is obtained based on the short-circuit ratio and the critical short-circuit ratio; finally, the stability of the new energy grid-connected is judged based on the short-circuit ratio margin; since there are problems of insufficient short-circuit capacity and insufficient reactive voltage support capacity caused by a large number of new energy accesses in some weak areas of the power grid, the short-circuit ratio is an important indicator for measuring the voltage support strength of the system; the critical short-circuit ratio is the short-circuit ratio corresponding to the critical stable state of the system; the short-circuit ratio margin calculated based on the two can accurately evaluate the stability of the new energy grid-connected. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 A flowchart of a method for evaluating a short-circuit ratio control margin of a new energy grid-connected power system according to an embodiment of the present invention;

[0020] Figure 2 A schematic diagram of the structure of a new energy grid-connected short-circuit ratio control margin assessment terminal according to an embodiment of the present invention;

[0021] Figure 3 A schematic diagram of a new energy grid-connected system for a multi-feedback system in a new energy grid-connected short-circuit ratio control margin assessment method according to an embodiment of the present invention;

[0022] Figure 4 It is a topology diagram of a new energy grid-connected system in a new energy grid-connected short-circuit ratio control margin evaluation method according to an embodiment of the present invention. DETAILED DESCRIPTION

[0023] In order to explain the technical content, achieved objectives and effects of the present invention in detail, the following is an explanation in combination with the implementation modes and the accompanying drawings.

[0024] Please refer to Figure 1 , a new energy grid-connected short-circuit ratio control margin evaluation method, comprising the steps of:

[0025] Determine the form of new energy grid connection. If it is a single-feedback system, the short-circuit ratio of the new energy single station is calculated based on the short-circuit capacity of the new energy single station and the rated capacity of the new energy. If it is a multi-feedback system, the short-circuit ratio of the new energy multiple stations is calculated based on the node voltage of the new energy grid-connected bus and the short-circuit capacity of the new energy grid-connected bus.

[0026] Obtaining the maximum transmission power of the new energy grid-connected under a static stable environment, and calculating the critical short-circuit ratio based on the maximum transmission power of the new energy grid-connected under the static stable environment;

[0027] Obtaining a short circuit ratio margin based on the short circuit ratio and the critical short circuit ratio;

[0028] The stability of the new energy grid connection is judged based on the short-circuit ratio margin.

[0029] From the above description, it can be seen that the beneficial effects of the present invention are: when the new energy grid-connected form is a single-feedback system, the short-circuit ratio of the new energy single station is calculated based on the short-circuit capacity of the new energy single station and the rated capacity of the new energy; when the grid-connected form is a multi-feedback system, the short-circuit ratio of the new energy multiple stations is calculated based on the new energy grid-connected bus node voltage and the short-circuit capacity of the new energy station grid-connected bus; then the critical short-circuit ratio is calculated based on the maximum transmission power of the new energy grid-connected under a static stable environment; the short-circuit ratio margin is obtained based on the short-circuit ratio and the critical short-circuit ratio; finally, the stability of the new energy grid-connected is judged based on the short-circuit ratio and the critical short-circuit ratio; since there are problems of insufficient short-circuit capacity and insufficient reactive voltage support capacity due to the large-scale access of new energy in some weak areas of the power grid, the short-circuit ratio is an important indicator for measuring the voltage support strength of the system; the critical short-circuit ratio is the short-circuit ratio corresponding to the critical stable state of the system; the short-circuit ratio margin calculated based on the two can accurately evaluate the stability of the new energy grid-connected.

[0030] Further, the calculation of the short-circuit ratio of a new energy single station based on the short-circuit capacity of the new energy single station and the rated capacity of the new energy includes:

[0031] Calculate the short-circuit capacity of a single new energy station based on the nominal voltage of the grid connection point of the new energy grid, the equivalent potential of the grid connection point, and the self-impedance of the grid-connected busbar of the new energy station;

[0032] The short-circuit ratio of the new energy single station is calculated according to the short-circuit capacity of the new energy single station and the rated capacity of the new energy.

[0033] Furthermore, the calculation of the short-circuit capacity of a single new energy station according to the nominal voltage of the grid connection point of the new energy grid connection, the equivalent potential of the grid connection point and the self-impedance of the grid-connected busbar of the new energy station includes:

[0034]

[0035] In the formula, S ac,i Represents the short-circuit capacity of a single renewable energy station, U N Indicates the nominal voltage of the grid connection point, E eq,i represents the equivalent potential of the grid connection point i, Z ii Indicates the self-impedance of the grid-connected busbar of the new energy station;

[0036] Calculating the short-circuit ratio of a new energy single station according to the short-circuit capacity of the new energy single station and the rated capacity of the new energy includes:

[0037]

[0038] In the formula, SCR i Represents the short-circuit ratio of a single renewable energy station, P N,i represents the rated capacity of new energy at the grid connection point i, Z pu Indicates the per unit value of system impedance.

[0039] From the above description, it can be seen that the short-circuit capacity of a single new energy station is calculated according to the nominal voltage of the grid connection point of the new energy grid, the equivalent potential of the grid connection point and the self-impedance of the grid-connected busbar of the new energy station. The short-circuit ratio of a single new energy station is calculated according to the short-circuit capacity of the single new energy station and the rated capacity of the new energy. This can accurately reflect the safety and reliability of the system and ensure the stable operation of the system.

[0040] Further, the calculation of the short-circuit ratio of multiple new energy stations based on the node voltage of the new energy grid-connected bus and the short-circuit capacity of the new energy station grid-connected bus includes:

[0041] Determine the node voltage of the new energy grid-connected busbar based on the Thevenin equivalent impedance;

[0042] Calculate the short-circuit capacity of the new energy station grid-connected bus according to the node voltage of the new energy grid-connected bus;

[0043] The short-circuit ratio of multiple new energy stations is calculated based on the short-circuit capacity of the grid-connected busbar of the new energy station.

[0044] Further, the determining of the node voltage of the new energy grid-connected busbar based on the Thevenin equivalent impedance includes:

[0045]

[0046] In the formula, Indicates the grid-connected bus node voltage of the new energy station i, represents the grid-connected bus node voltage of the new energy station n, Z ii represents the self-impedance of the grid-connected busbar of the new energy station i, Z in It represents the element in the ith row and nth column of the AC grid equivalent impedance matrix at the renewable energy grid-connected busbar. ni It represents the nth row and ith column element of the AC grid equivalent impedance matrix at the renewable energy grid-connected busbar, Z nn It represents the self-impedance of the grid-connected busbar of the new energy station n, It represents the current injected into the AC system by the new energy station i, It represents the current injected into the AC system by the new energy station n;

[0047] Calculating the short-circuit capacity of the new energy station grid-connected bus according to the new energy grid-connected bus node voltage includes:

[0048]

[0049] In the formula, S ac,i represents the short-circuit capacity of the grid-connected busbar of a new energy station, * represents the conjugate operation, Indicates the short-circuit current at the grid-connected busbar of the new energy station i, Indicates the rated voltage of the grid-connected busbar of the new energy station i;

[0050] The calculation of the short-circuit ratio of multiple new energy stations based on the short-circuit capacity of the grid-connected busbar of the new energy station comprises:

[0051]

[0052] Where, MRSCR i Represents the short-circuit ratio of multiple renewable energy stations, S R,i represents the actual apparent power of the renewable energy injected into the i-th renewable energy grid-connected bus node, ε ij represents the complex power conversion factor between the renewable energy grid-connected buses i and j, S R,j It represents the actual apparent power of the renewable energy injected into the jth renewable energy grid-connected bus node.

[0053] From the above description, it can be seen that the short-circuit ratio of renewable energy multiple stations is obtained by first determining the node voltage of the renewable energy grid-connected bus and then calculating the short-circuit capacity of the renewable energy station grid-connected bus. This fully considers the mutual influence of each renewable energy feed-in branch so as to accurately evaluate the stability of the system in the future.

[0054] Further, obtaining the maximum transmission power of new energy grid connection under a static stable environment includes:

[0055] Determine the active power P transmitted to the system through the collection station e and reactive power Q e The expression is:

[0056]

[0057]

[0058] β=1-X l B;

[0059] Where U e Indicates the voltage at the machine outlet, U q Indicates the voltage at the common connection point, X r represents the total reactance between the collection station and the submarine cable, θ e represents the first intermediate variable, θ q represents the second intermediate variable, U s Indicates the voltage of the AC main system, X l represents the reactance value of the transmission line, β represents the third intermediate variable, and B represents the reactive power compensation of the centralized control station.

[0060] By combining the active power and reactive power expressions and eliminating the second intermediate variable, the operation equation for new energy grid connection is obtained as follows:

[0061]

[0062] Based on the operation equation of the new energy grid connection, the active power and reactive power flowing through the grid connection collection station are determined as follows:

[0063]

[0064] The operating conditions are determined as follows: under the premise of certain AC system voltage and transmitted active power, the reactive power flowing through the collection station is minimized, then the partial derivative of the transmitted reactive power with respect to the voltage at the common connection point is equal to zero, specifically:

[0065]

[0066] The minimum reactive power Q transmitted through the collection station under the operating conditions is obtained by solving emin The voltage effective value of the corresponding common connection point is:

[0067]

[0068] Introduce the equivalent compensation coefficient in the above formula, and the voltage at the common connection point does not exceed the maximum value U that the point can tolerate. qmax , specifically:

[0069]

[0070]

[0071] Where U smax Indicates the maximum value of the voltage amplitude of the AC system;

[0072] After mathematical transformation of the above formula, the maximum transmission power P of renewable energy grid-connected in a static stable environment is obtained. emax for:

[0073]

[0074] The calculation of the critical short-circuit ratio based on the maximum transmission power of the new energy grid-connected under the static stable environment includes:

[0075]

[0076] In the formula, CSCR i represents the critical short-circuit ratio, j represents an imaginary number, Q i It represents the equivalent reactive power transmitted by renewable energy to the AC system.

[0077] From the above description, it can be seen that when determining the maximum transmission power of renewable energy grid-connected under a static stable environment, the influence of the reactive compensation device is taken into account, which can more accurately characterize the critical short-circuit ratio of the system. The critical short-circuit ratio is calculated based on the maximum transmission power of renewable energy grid-connected under a static stable environment, that is, the short-circuit ratio corresponding to the critical stable state of the system, so that it can be used as a benchmark for calculating the short-circuit ratio margin in the future.

[0078] Further, obtaining the short circuit ratio margin based on the short circuit ratio and the critical short circuit ratio includes:

[0079] If the new energy grid-connected form is the single feed-in system, the short-circuit ratio margin of the new energy single station is obtained according to the short-circuit ratio of the new energy single station and the critical short-circuit ratio;

[0080] If the new energy grid-connected form is the multi-feedback system, the new energy multi-station short-circuit ratio margin is obtained according to the new energy multi-station short-circuit ratio and the critical short-circuit ratio.

[0081] Further, obtaining the short circuit ratio margin of the new energy single station according to the new energy single station short circuit ratio and the critical short circuit ratio includes:

[0082]

[0083] Where ηSCR Indicates the short-circuit ratio margin of a single new energy station, SCR i Represents the short-circuit ratio of a single renewable energy station, CSCR i represents the critical short-circuit ratio;

[0084] The obtaining of the short circuit ratio margin of the new energy multi-station according to the short circuit ratio of the new energy multi-station and the critical short circuit ratio comprises:

[0085]

[0086] Where η MRSCR Represents the short-circuit ratio margin of multiple renewable energy stations, MRSCR i Indicates the short-circuit ratio of multiple renewable energy stations.

[0087] From the above description, it can be seen that the use of the short-circuit ratio margin of single / multiple new energy stations can accurately and intuitively determine the stability of new energy grid connection, which is of great significance to ensuring the safe and stable operation of new energy grid connection.

[0088] Further, judging the stability of the new energy grid connection based on the short-circuit ratio margin includes:

[0089] Determine whether the short circuit ratio is less than the critical short circuit ratio or whether the short circuit ratio margin is less than a preset value. If so, determine that the new energy grid connection is in an unstable state; if not, determine that the new energy grid connection is in a stable state.

[0090] From the above description, it can be seen that when the short-circuit ratio margin is less than the critical short-circuit ratio, it means that the new energy grid connection is in an unstable state, otherwise it means that it is in a stable state, so as to accurately evaluate the stability of the system.

[0091] Please refer to Figure 2 Another embodiment of the present invention provides a new energy grid-connected short-circuit ratio control margin assessment terminal, including a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, each step in the above-mentioned new energy grid-connected short-circuit ratio control margin assessment method is implemented.

[0092] The above-mentioned new energy grid-connected short-circuit ratio control margin evaluation method and terminal of the present invention can be applied to the new energy grid-connected system, and the following is explained through specific implementation methods:

[0093] Please refer to Figure 1 , Figure 3 and Figure 4 , Embodiment 1 of the present invention is:

[0094] A method for evaluating a short-circuit ratio control margin of a new energy grid-connected system comprises the following steps:

[0095] S1. Determine the grid-connected form of new energy. If it is a single-feedback system, execute S11; if it is a multi-feedback system, execute S12.

[0096] like Figure 3 As shown, Figure 3 Demonstrated the new energy grid-connected form for multi-feed systems, Figure 3 In is the equivalent impedance between the grid connection point i and the grid connection point n, i = 1, 2, ..., The system side converted equivalent impedance between the main grid equivalent power source and the corresponding grid connection point n.

[0097] S11. Calculate the short-circuit ratio of a new energy single station based on the short-circuit capacity of the new energy single station and the rated capacity of the new energy, specifically including S111-S112:

[0098] S111. Calculate the short-circuit capacity of a single new energy station according to the nominal voltage of the grid connection point of the new energy grid connection, the equivalent potential of the grid connection point, and the self-impedance of the grid-connected busbar of the new energy station, specifically:

[0099]

[0100] In the formula, S ac,i Represents the short-circuit capacity of a single renewable energy station, U N Indicates the nominal voltage of the grid connection point, E eq,i represents the equivalent potential of the grid connection point i, Z ii It represents the self-impedance of the grid-connected busbar of the new energy station.

[0101] S112. Calculate the short-circuit ratio of the new energy single station according to the short-circuit capacity of the new energy single station and the rated capacity of the new energy, specifically:

[0102]

[0103] In the formula, SCR i Represents the short-circuit ratio of a single renewable energy station, P N,i represents the rated capacity of new energy at the grid connection point i, Z pu Indicates the per unit value of system impedance.

[0104] S12. Calculate the short-circuit ratio of multiple new energy stations based on the node voltage of the new energy grid-connected bus and the short-circuit capacity of the new energy station grid-connected bus, specifically including S121-S123:

[0105] S121. Determine the node voltage of the new energy grid-connected busbar based on the Thevenin equivalent impedance, specifically:

[0106]

[0107] In the formula, Indicates the grid-connected bus node voltage of the new energy station i, represents the grid-connected bus node voltage of the new energy station n, Z ii represents the self-impedance of the grid-connected busbar of the new energy station i, Z in It represents the element in the ith row and nth column of the AC grid equivalent impedance matrix at the renewable energy grid-connected busbar. ni It represents the nth row and ith column element of the AC grid equivalent impedance matrix at the renewable energy grid-connected busbar, Z nn It represents the self-impedance of the grid-connected busbar of the new energy station n, It represents the current injected into the AC system by the new energy station i, It represents the current injected into the AC system by the new energy station n.

[0108] S122, calculating the short-circuit capacity of the new energy station grid-connected bus according to the node voltage of the new energy grid-connected bus, specifically including:

[0109]

[0110] In the formula, S ac,i represents the short-circuit capacity of the grid-connected busbar of a new energy station, * represents the conjugate operation, Indicates the short-circuit current at the grid-connected busbar of the new energy station i, Indicates the rated voltage of the grid-connected busbar of the new energy station i.

[0111] S123. Calculate the short-circuit ratio of multiple new energy stations based on the short-circuit capacity of the grid-connected busbar of the new energy station, specifically:

[0112]

[0113] Where, MRSCR i Represents the short-circuit ratio of multiple renewable energy stations, S R,i represents the actual apparent power of the renewable energy injected into the i-th renewable energy grid-connected bus node, ε ij represents the complex power conversion factor between the renewable energy grid-connected buses i and j, S R,j It represents the actual apparent power of the renewable energy injected into the jth renewable energy grid-connected bus node.

[0114] in,

[0115] ε ij =Z ij U * i / Z ii U * j ;

[0116] In the formula, Z ijIt represents the equivalent impedance between the grid-connected busbars of renewable energy station i and renewable energy station j, U * i represents the conjugate of the grid connection point voltage of the new energy station i, U * j Represents the conjugate of the grid connection point voltage of renewable energy station j.

[0117] S2, obtaining the maximum transmission power of the new energy grid-connected under a static stable environment, and calculating the critical short-circuit ratio based on the maximum transmission power of the new energy grid-connected under the static stable environment, specifically including S21-S22:

[0118] S21. Obtain the maximum transmission power of new energy grid-connected under static stable environment.

[0119] Specifically, Figure 4 As shown, determine the active power P transmitted to the system through the collection station e and reactive power Q e The expression is:

[0120]

[0121]

[0122] Where U e Indicates the voltage at the machine outlet, U q Indicates the voltage at the common connection point, X r represents the total reactance between the collection station and the submarine cable, θ e represents the first intermediate variable, θ q represents the second intermediate variable, U s Indicates the voltage of the AC main system, X l represents the reactance value of the transmission line, β represents the third intermediate variable, β=1-X l B, B represents reactive power compensation of centralized control station.

[0123] Combine the above equations and eliminate the second intermediate variable θ q , the operation equation of new energy grid connection is obtained as follows:

[0124]

[0125] Based on the operation equation of new energy grid connection, the active power and reactive power flowing through the grid connection collection station are determined as follows:

[0126]

[0127] Determine the operating conditions: Under the premise of certain AC system voltage and transmitted active power, the reactive power flowing through the collection station is minimized, then the partial derivative of the transmitted reactive power with respect to the voltage at the common connection point is equal to zero, which is:

[0128]

[0129] It can be solved that under this operating condition, the minimum reactive power Q transmitted through the collection station is emin The voltage effective value of the corresponding common connection point is:

[0130]

[0131] When the grid-connected collection station operates normally and the transmitted active power remains constant, considering the existence of reactive power compensation device, the equivalent compensation coefficient is introduced. U smax Indicates the maximum value of the AC system voltage amplitude. The voltage at the common connection point cannot exceed the maximum value that the point can tolerate, U qmax ,Right now:

[0132]

[0133] After mathematical transformation of the above formula, the maximum transmission power of renewable energy grid connection under static stable environment is obtained as follows:

[0134]

[0135] In an optional implementation, the voltage variation range of the AC system is 0.95-1.05 times the system reference voltage, and the maximum voltage of the common connection point can be set to 1.05 times the reference voltage.

[0136] S22. Calculate the critical short-circuit ratio based on the maximum transmission power of the new energy grid-connected under the static stable environment, specifically:

[0137]

[0138] In the formula, CSCR i Represents the critical short circuit ratio, P emax represents the maximum transmission power of renewable energy grid-connected in a static stable environment, j represents an imaginary number, Q i It represents the equivalent reactive power transmitted by renewable energy to the AC system.

[0139] S3, obtaining a short circuit ratio margin based on the short circuit ratio and the critical short circuit ratio, specifically including S31-S32:

[0140] S31. If the new energy grid-connected form is the single-feedback system, the short-circuit ratio margin of the new energy single station is obtained according to the short-circuit ratio of the new energy single station and the critical short-circuit ratio, specifically including:

[0141]

[0142] Where η SCRIndicates the short-circuit ratio margin of a single new energy station, SCR i Represents the short-circuit ratio of a single renewable energy station, CSCR i Indicates the critical short-circuit ratio.

[0143] S32. If the new energy grid-connected form is the multi-feedback system, the new energy multi-station short-circuit ratio margin is obtained according to the new energy multi-station short-circuit ratio and the critical short-circuit ratio, specifically including:

[0144]

[0145] Where η MRSCR Represents the short-circuit ratio margin of multiple renewable energy stations, MRSCR i Indicates the short-circuit ratio of multiple renewable energy stations.

[0146] S4. Determine the stability of the new energy grid connection based on the short-circuit ratio margin.

[0147] Specifically, it is determined whether the short circuit ratio is less than the critical short circuit ratio or whether the short circuit ratio margin is less than a preset value. If so, it is determined that the new energy grid connection is in an unstable state; if not, it is determined that the new energy grid connection is in a stable state.

[0148] The preset value is 0. When the new energy grid is in an unstable state, the larger the short-circuit ratio margin is, the more unstable the system is; when the new energy grid is in a stable state, the larger the short-circuit ratio margin is, the more stable the system is.

[0149] The following simulation is carried out using a certain area in Fujian as an example. When the wind turbine obtains the maximum output in the BPA (power system simulation software) simulation, the corresponding MRSCR is the critical short-circuit ratio obtained by the simulation. The specific results are shown in Table 1:

[0150] Table 1 Calculation results of short-circuit ratio of three stations in a certain area of ​​Fujian Province

[0151]

[0152]

[0153] SD, DY, and HZ in Table 1 are node codes used to identify different stations and have no special meaning. Based on the above calculation results, the stability of new energy grid connection can be evaluated more clearly.

[0154] The present invention obtains the critical short-circuit ratio of new energy sites by analyzing in detail the impact of reactive compensation devices and node voltage constraints on the maximum transmittable power of the system in the scenario of new energy access. Based on this, a short-circuit ratio control margin is proposed to assist in evaluating the safety and stability of new energy grid connection, providing an effective reference for the planning and operation control of new energy grid access.

[0155] Please refer to Figure 2 , Embodiment 2 of the present invention is:

[0156] A new energy grid-connected short-circuit ratio control margin assessment terminal comprises a memory, a processor and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, each step of the new energy grid-connected short-circuit ratio control margin assessment method in Embodiment 1 is implemented.

[0157] In summary, the present invention provides a new energy grid-connected short-circuit ratio control margin evaluation method and terminal. When the new energy grid-connected form is a single-feedback system, the new energy single-station short-circuit ratio is calculated based on the new energy single-station short-circuit capacity and the new energy rated capacity. When it is a multi-feedback system, the new energy multi-station short-circuit ratio is calculated based on the new energy grid-connected bus node voltage and the new energy station grid-connected bus short-circuit capacity. Then, the critical short-circuit ratio is calculated based on the maximum transmission power of the new energy grid under a static stable environment. The short-circuit ratio margin is obtained based on the short-circuit ratio and the critical short-circuit ratio. Finally, the stability of the new energy grid-connected is judged based on the short-circuit ratio margin. Since there are problems of insufficient short-circuit capacity and insufficient reactive voltage support capacity due to the large-scale access of new energy in some weak areas of the power grid, the short-circuit ratio is an important indicator for measuring the voltage support strength of the system. The critical short-circuit ratio is the short-circuit ratio corresponding to the critical stable state of the system. The short-circuit ratio margin calculated based on the two can accurately evaluate the stability of the new energy grid-connected; and the short-circuit ratio margin of the new energy single / multi-station can be used to accurately and intuitively determine the stability of the new energy grid-connected, which is of great significance to ensuring the safe and stable operation of the new energy grid-connected.

[0158] The above descriptions are merely embodiments of the present invention and are not intended to limit the patent scope of the present invention. Any equivalent transformations made using the contents of the present invention's specification and drawings, or directly or indirectly applied in related technical fields, are also included in the patent protection scope of the present invention.

Claims

1. A new energy grid-connected short-circuit ratio control margin evaluation method, characterized in that: Includes steps: Determine the form of new energy grid connection. If it is a single-feedback system, the short-circuit ratio of the new energy single station is calculated based on the short-circuit capacity of the new energy single station and the rated capacity of the new energy. If it is a multi-feedback system, the short-circuit ratio of the new energy multiple stations is calculated based on the node voltage of the new energy grid-connected bus and the short-circuit capacity of the new energy grid-connected bus. Obtaining the maximum transmission power of the new energy grid-connected under a static stable environment, and calculating the critical short-circuit ratio based on the maximum transmission power of the new energy grid-connected under the static stable environment; Obtaining a short circuit ratio margin based on the short circuit ratio and the critical short circuit ratio; The stability of the new energy grid connection is judged based on the short-circuit ratio margin.

2. A new energy grid-connected short-circuit ratio control margin evaluation method according to claim 1, characterized in that: The calculation of the short-circuit ratio of a new energy single station based on the short-circuit capacity of the new energy single station and the rated capacity of the new energy includes: Calculate the short-circuit capacity of a single new energy station based on the nominal voltage of the grid connection point of the new energy grid, the equivalent potential of the grid connection point, and the self-impedance of the grid-connected busbar of the new energy station; The short-circuit ratio of the new energy single station is calculated according to the short-circuit capacity of the new energy single station and the rated capacity of the new energy.

3. A new energy grid-connected short-circuit ratio control margin evaluation method according to claim 2, characterized in that: The calculation of the short-circuit capacity of a single new energy station according to the nominal voltage of the grid connection point of the new energy grid connection, the equivalent potential of the grid connection point and the self-impedance of the grid-connected busbar of the new energy station includes: In the formula, S ac,i Represents the short-circuit capacity of a single renewable energy station, U N Indicates the nominal voltage of the grid connection point, E eq,i represents the equivalent potential of the grid connection point i, Z ii Indicates the self-impedance of the grid-connected busbar of the new energy station; Calculating the short-circuit ratio of a new energy single station according to the short-circuit capacity of the new energy single station and the rated capacity of the new energy includes: In the formula, SCR i Represents the short-circuit ratio of a single renewable energy station, P N,i represents the rated capacity of new energy at the grid connection point i, Z pu Indicates the per unit value of system impedance.

4. A new energy grid-connected short-circuit ratio control margin evaluation method according to claim 1, characterized in that: The calculation of the short-circuit ratio of multiple new energy stations based on the node voltage of the new energy grid-connected bus and the short-circuit capacity of the new energy station grid-connected bus includes: Determine the node voltage of the new energy grid-connected busbar based on the Thevenin equivalent impedance; Calculate the short-circuit capacity of the new energy station grid-connected bus according to the node voltage of the new energy grid-connected bus; The short-circuit ratio of multiple new energy stations is calculated based on the short-circuit capacity of the grid-connected busbar of the new energy station.

5. A new energy grid-connected short-circuit ratio control margin evaluation method according to claim 4, characterized in that: Determining the node voltage of the new energy grid-connected busbar based on the Thevenin equivalent impedance includes: In the formula, Indicates the grid-connected bus node voltage of the new energy station i, represents the grid-connected bus node voltage of the new energy station n, Z ii represents the self-impedance of the grid-connected busbar of the new energy station i, Z in It represents the element in the ith row and nth column of the AC grid equivalent impedance matrix at the renewable energy grid-connected busbar. ni It represents the nth row and ith column element of the AC grid equivalent impedance matrix at the renewable energy grid-connected busbar, Z nn It represents the self-impedance of the grid-connected busbar of the new energy station n, It represents the current injected into the AC system by the new energy station i, It represents the current injected into the AC system by the new energy station n; Calculating the short-circuit capacity of the new energy station grid-connected bus according to the new energy grid-connected bus node voltage includes: In the formula, S ac,i represents the short-circuit capacity of the grid-connected busbar of a new energy station, * represents the conjugate operation, Indicates the short-circuit current at the grid-connected busbar of the new energy station i, Indicates the rated voltage of the grid-connected busbar of the new energy station i; The calculation of the short-circuit ratio of multiple new energy stations based on the short-circuit capacity of the grid-connected busbar of the new energy station comprises: Where, MRSCR i Represents the short-circuit ratio of multiple renewable energy stations, S R,i represents the actual apparent power of the renewable energy injected into the i-th renewable energy grid-connected bus node, ε ij represents the complex power conversion factor between the renewable energy grid-connected buses i and j, S R,j It represents the actual apparent power of the renewable energy injected into the jth renewable energy grid-connected bus node.

6. A new energy grid-connected short-circuit ratio control margin evaluation method according to claim 3 or 5, characterized in that: The acquisition of the maximum transmission power of new energy grid connection under a static stable environment includes: Determine the active power P transmitted to the system through the collection station e and reactive power Q e The expression is: β=1-X l B; Where U e Indicates the voltage at the machine outlet, U q Indicates the voltage at the common connection point, X r represents the total reactance between the collection station and the submarine cable, θ e represents the first intermediate variable, θ q represents the second intermediate variable, U s Indicates the voltage of the AC main system, X l represents the reactance value of the transmission line, β represents the third intermediate variable, and B represents the reactive power compensation of the centralized control station; By combining the active power and reactive power expressions and eliminating the second intermediate variable, the operation equation for new energy grid connection is obtained as follows: Based on the operation equation of the new energy grid connection, the active power and reactive power flowing through the grid connection collection station are determined as follows: The operating conditions are determined as follows: under the premise of certain AC system voltage and transmitted active power, the reactive power flowing through the collection station is minimized, then the partial derivative of the transmitted reactive power with respect to the voltage at the common connection point is equal to zero, specifically: The minimum reactive power Q transmitted through the collection station under the operating conditions is obtained by solving emin The voltage effective value of the corresponding common connection point is: Introduce the equivalent compensation coefficient in the above formula, and the voltage at the common connection point does not exceed the maximum value U that the point can tolerate. qmax , specifically: Where U smax Indicates the maximum value of the voltage amplitude of the AC system; After mathematical transformation of the above formula, the maximum transmission power P of renewable energy grid-connected in a static stable environment is obtained. emax for: The calculation of the critical short-circuit ratio based on the maximum transmission power of the new energy grid-connected under the static stable environment includes: In the formula, CSCR i represents the critical short-circuit ratio, j represents an imaginary number, Q i It represents the equivalent reactive power transmitted by renewable energy to the AC system.

7. A new energy grid-connected short-circuit ratio control margin evaluation method according to claim 1, characterized in that: The obtaining of the short circuit ratio margin based on the short circuit ratio and the critical short circuit ratio comprises: If the new energy grid-connected form is the single feed-in system, the short-circuit ratio margin of the new energy single station is obtained according to the short-circuit ratio of the new energy single station and the critical short-circuit ratio; If the new energy grid-connected form is the multi-feedback system, the new energy multi-station short-circuit ratio margin is obtained according to the new energy multi-station short-circuit ratio and the critical short-circuit ratio.

8. A new energy grid-connected short-circuit ratio control margin evaluation method according to claim 7, characterized in that: The short circuit ratio margin of a new energy single station is obtained according to the short circuit ratio of the new energy single station and the critical short circuit ratio, comprising: Where η SCR Indicates the short-circuit ratio margin of a single new energy station, SCR i Represents the short-circuit ratio of a single renewable energy station, CSCR i represents the critical short-circuit ratio; The obtaining of the short circuit ratio margin of the new energy multi-station according to the short circuit ratio of the new energy multi-station and the critical short circuit ratio comprises: Where η MRSCR Represents the short-circuit ratio margin of multiple renewable energy stations, MRSCR i Indicates the short-circuit ratio of multiple renewable energy stations.

9. A new energy grid-connected short-circuit ratio control margin evaluation method according to claim 1, characterized in that: The determining the stability of the new energy grid connection based on the short-circuit ratio margin includes: Determine whether the short circuit ratio is less than the critical short circuit ratio or whether the short circuit ratio margin is less than a preset value. If so, determine that the new energy grid connection is in an unstable state; if not, determine that the new energy grid connection is in a stable state.

10. A new energy grid-connected short-circuit ratio control margin assessment terminal, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, each step of a new energy grid-connected short-circuit ratio control margin evaluation method according to any one of claims 1 to 9 is implemented.

Citation Information

Patent Citations

  • New energy grid-connected system voltage support strength evaluation method and system

    CN113904375A

  • New energy transient voltage supporting capability evaluation method based on short circuit ratio and impedance ratio

    CN115936478A

  • Method for evaluating voltage support strength of new energy via flexible direct current island sending-out system

    CN116780617A

  • New energy multi-infeed power distribution system stability quantitative evaluation method, equipment and medium

    CN117277420A

  • Method and system for estimating voltage support strength of new energy grid-connected system, and storage medium and electronic device

    WO2023103935A1

Cited By

  • New energy output control optimization method and system for high-proportion new energy power system

    CN119496205A

  • Short-circuit ratio margin-based capacity configuration method and system for network construction type converter

    CN119561154A

  • A method and system for configuring grid-type converter capacity based on short-circuit ratio margin

    CN119561154B

  • Evaluation method, system and equipment for improving transient voltage stability of receiving-end power grid by synchronous generator and medium

    CN119674924A

  • Voltage source type energy storage and new energy collaborative active grid-connected operation method and system

    CN119787521A