User load prediction method applied to flow industry power transaction
Through the integration of feature engineering and multi-models, combined with the maximum mutual information coefficient algorithm and dynamic computing power management, the problem of high difficulty in predicting power loads in a single large industrial enterprise is solved, high-precision and efficient load prediction are achieved, and resource utilization and data are optimized. Processing efficiency.
Patent Information
- Application Number
- CN202410909344.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-08
- Publication Date
- 2024-11-01
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing technology is difficult to accurately predict the power load of a single large industrial enterprise. Due to uncertain factors such as production changes and raw material price fluctuations, the prediction is difficult, and as the data volume increases, the model complexity and training time increase exponentially, affecting the data. Processing efficiency.
Feature engineering method is adopted to collect static and dynamic features, historically similar daily features, associated meteorological features and volatility features of different time scales, and predict load data through the fusion of maximum mutual information coefficient algorithm and multi-model. Computing power usage, dynamically expand or reduce resources, and rolling predictions and corrections are made.
It improves the accuracy of power load prediction, reduces error accumulation effect, optimizes resource utilization, reduces costs, and improves data processing efficiency.
Smart Images

Figure CN118889382A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power load forecasting, and in particular to a user load forecasting method applied to process industry power trading. Background Art
[0002] Power load forecasting is an important part of power demand side management. Through load forecasting, we can understand the development and changes of future loads, put forward targeted demand side power improvement measures, improve the load curve, and optimize power dispatching. Relevant staff can use the forecast results to carry out power generation, transportation and power consumption, evaluate distribution and establish effective plans, which will help reduce power generation costs and achieve energy conservation and emission reduction goals. At the same time, the power department can discover potential hidden dangers in the power system through the load forecasting system, eliminate hidden dangers in a timely manner, output stable power to users, and ensure the reliable operation of the power system.
[0003] Mainstream load forecasting technology mainly predicts future electricity load through historical electricity load data, economic development level, meteorological data and other influencing factors, and mainly targets regional, industrial and overall macro load data with obvious periodic patterns. However, the power receiving capacity of a single large industrial enterprise is small, and the load data is affected by uncertain factors such as enterprise production changes, raw material price fluctuations, and macro policies. It lacks periodic patterns, has large volatility, and is difficult to predict. At the same time, with the increase in data volume and data dimensions, while the accuracy of the prediction model is improved, the complexity and training time of the model increase exponentially, and it is even difficult to converge, affecting the overall data processing efficiency. For this reason, the present invention proposes a user load forecasting method for process industry power trading. Summary of the invention
[0004] The present invention aims to solve at least one of the technical problems existing in the prior art; to this end, the present invention proposes a user load forecasting method applied to process industry power trading.
[0005] To achieve the above object, a first aspect of the present invention provides a user load forecasting method applied to process industry power trading, comprising the following steps:
[0006] Step 1: Feature engineering: Collect static periodic features, dynamic features, historical similar day features, associated meteorological features, volatility features, and coding features of different time periods at different time scales, and then convert and combine multiple features;
[0007] Analyze the changing patterns of the new energy output curves of the month, week, day and hour, use similar sequences of different scales and periods, as well as the volatility characteristics of new energy output and the characteristic factors of meteorological elements for comprehensive analysis, and obtain multiple time series feature combination data;
[0008] Step 2: Clean and process the multiple time series feature combination data obtained by analysis;
[0009] Step 3: In the offline stage, based on the maximum mutual information coefficient algorithm, the correlation between the multiple time series feature combination data and the load data to be predicted is analyzed to obtain the test set data;
[0010] Step 4: Model training and iteration: Enhance and fuse single models with different features and parameters, train and optimize them in a multi-model iterative manner, and obtain a comprehensive integrated model;
[0011] Step 5: Rolling forecast and correction: After obtaining the comprehensive integrated model, the forecast terminal uses the combined data of multiple time series features of the time zone to be forecasted as model input and calculates the standardized forecast results;
[0012] Among them, the prediction terminal includes several computing nodes; during the prediction terminal operation process, the computing power usage of the computing nodes is monitored and analyzed, and dynamic computing power expansion or reduction is carried out in an orderly manner;
[0013] Step 6: Probabilistically correct the standardized forecast results based on the adaptive dynamic cycle selection to obtain the final load forecast sequence.
[0014] Furthermore, the computing power usage of the computing nodes is monitored and analyzed, including:
[0015] The computing power utilization rate of each computing node is collected at preset intervals and marked as DZ, and a curve chart of computing power utilization rate DZ changing over time is established;
[0016] When the curve graph is in the rising stage, the curve graph is derived to obtain the occupancy rate change curve graph; the real-time computing power occupancy rate change rate of the computing node is marked as Dt, where Dt is a positive number;
[0017] When the computing power occupancy rate DZ is greater than the preset first occupancy threshold, and within the first preset time T1, the computing power occupancy rate change rate Dt is greater than the preset first change threshold, it is judged that the computing power of the computing node is consumed quickly, and an expansion reminder signal is generated to remind the management personnel to expand the computing power resources of the corresponding computing node;
[0018] When the computing power occupancy rate DZ is less than the preset second occupancy threshold, and within the second preset time T2, the computing power occupancy rate change rate Dt is less than the preset second change threshold, the computing power redundancy of the computing node is judged, and a reduction reminder signal is generated to remind the management personnel to reduce the computing power resources of the corresponding computing node.
[0019] Furthermore, the combined data of multiple time series features are cleaned and processed, including:
[0020] First, consistency check, anomaly identification and missing identification are carried out on the combined data of multiple time series features to identify missing data and abnormal data; then the historical average value of industrial electricity users for the same period is calculated to fill in the missing data and replace the abnormal data.
[0021] Furthermore, the standardized prediction results are probabilistically corrected according to the adaptive dynamic cycle selection, specifically including:
[0022] The [Tn-1:T-1] sequence data before the prediction point is intercepted, and the historical load database is traversed. The top k sequences ranked by correlation are selected as features and added to the model. The next moment sequence and the predicted value of the top k sequences ranked by correlation are used for correction; n is the sequence length, and k is the first few groups of sequences with the highest correlation.
[0023] Furthermore, the maximum mutual information coefficient algorithm refers to: a maximum information-based non-parametric exploration algorithm used to measure the degree of association between two variables X and Y, that is, the strength of linear or nonlinearity, where the mutual information Among them, p(dx,dy) is the joint probability density distribution function, which is approximately replaced in this algorithm by the following method:
[0024]
[0025] Among them, a and b are the number of discretizations in the dX and dY directions respectively.
[0026] Furthermore, the specific steps of model training and iteration include:
[0027] Constructing a fusion model: The fusion model is a model constructed by combining at least two of the support vector machine, deep convolutional neural network and RBF neural network. The fusion methods include linear weighted fusion, cross fusion, waterfall fusion, feature fusion and prediction fusion.
[0028] The fusion model is trained using the test set data, and the model is evaluated using the loss function to obtain the network parameters that minimize the overall error of the training samples and obtain a comprehensive integrated model.
[0029] Furthermore, static cycle characteristics refer to the monthly, weekly, and daily load curve characteristics, peak and valley value size, fluctuation variance, fluctuation amplitude, and climbing times.
[0030] Furthermore, meteorological elements include wind speed, wind direction, total cloud cover, total rainfall, ground pressure, dew point temperature, air temperature at a height of 2m above the ground surface, downward solar shortwave radiation reaching the ground, direct solar radiation at all celestial angles received by the ground, and direct solar radiation.
[0031] Furthermore, the method further comprises:
[0032] By calling the final load forecast sequence and historical load data values, the relevant rules in the expert database are matched to provide managers with relevant management suggestions; the expert database is used to record the relevant experience and measures of managers when different power load values appear in different periods.
[0033] Further, the preset second occupancy threshold is smaller than the preset first occupancy threshold.
[0034] Compared with the prior art, the present invention has the following beneficial effects:
[0035] The present invention collects static periodic features, dynamic features, historical similar day features, related meteorological features, volatility features and coding features of different time periods at different time scales, and then converts and combines multiple features to obtain multiple time series feature combination data; considering meteorological factors and new energy output conditions, the multiple time series feature combination data are jointly modeled, and an integrated learning framework and a multi-model fusion strategy are adopted to output regional dispatch load forecasts; according to the adaptive dynamic period selection and multi-model fusion method, the effect of error accumulation can be reduced, and the prediction results can be further probabilistically corrected to obtain the final load forecast sequence with high prediction accuracy; at the same time, in the prediction terminal operation process, the computing power occupancy of each computing node is monitored and analyzed, and dynamic computing power expansion or reduction is carried out in an orderly manner, thereby reducing costs, achieving the purpose of making the most of resources, and improving data processing efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0037] Figure 1 The present invention is a flow chart of a user load forecasting method applied to process industry power trading.
[0038] Figure 2 The figure is a flow chart of data cleaning and processing in the present invention.
[0039] Figure 3 This is a flow chart for real-time dynamic prediction of special process load in the present invention. DETAILED DESCRIPTION
[0040] The technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0041] See also Figures 1 to 3 The first embodiment of the present invention provides a user load forecasting method applied to process industry power trading, comprising the following steps:
[0042] Step 1: Feature Engineering: Mainly consider multiple features such as historical time series and meteorology, such as static period features of different time scales, dynamic features, historical similar day features, related meteorological features, volatility features, and coding features of different time periods, and then convert and combine multiple features;
[0043] Among them, static cycle characteristics refer to the monthly, weekly, and daily load curve characteristics, peak and valley value size, fluctuation variance, fluctuation amplitude, climbing times, etc.;
[0044] Analyze the changing rules of the new energy output curves of the month, week, day and hour, use similar sequences of different scales and periods, as well as the volatility characteristics of new energy output, meteorological element characteristics and other factors for comprehensive analysis, and obtain multiple time series feature combination data; among them, meteorological elements include wind speed, wind direction, total cloud cover, total rainfall, ground pressure, dew point temperature, air temperature at a height of 2m above the ground surface, downward solar shortwave radiation reaching the surface, full-sky direct solar radiation received by the ground, and direct solar radiation;
[0045] Step 2: Clean and process the multiple time series feature combination data obtained through analysis, including:
[0046] First, consistency check, anomaly identification, and missing identification are carried out on the combined data of multiple time series features to identify missing data and abnormal data; then the historical mean value of industrial electricity users is calculated to fill in the missing data and replace the abnormal data; the data cleaning and processing flow chart is shown in the figure Figure 2 As shown;
[0047] Step 3: In the offline stage, based on the maximum mutual information coefficient algorithm, the correlation between the multiple time series feature combination data and the load data to be predicted is analyzed to obtain the test set data;
[0048] In this embodiment, the maximum mutual information coefficient algorithm refers to: a maximum information-based non-parametric exploration algorithm used to measure the degree of association between two variables X and Y, that is, the strength of linear or nonlinearity, where mutual information Among them, p(dx,dy) is the joint probability density distribution function, which is approximately replaced in this algorithm by the following method:
[0049]
[0050] Among them, a and b are the number of discretizations in the dX and dY directions respectively;
[0051] Step 4: Model training and iteration: Using ensemble learning ideas, enhance and fuse single models with different features and parameters, and use multi-model iteration to train and optimize to obtain a robust comprehensive ensemble model; specifically, it includes:
[0052] Constructing a fusion model: The fusion model is a model constructed by combining at least two of the support vector machine, deep convolutional neural network and RBF neural network. The fusion methods include linear weighted fusion, cross fusion, waterfall fusion, feature fusion and prediction fusion.
[0053] The fusion model is trained using the test set data to adjust the network parameters, and the model is evaluated using the loss function to obtain the network parameters that minimize the overall error of the training samples, thus obtaining a comprehensive integrated model.
[0054] Step 5: Rolling forecast and correction: After obtaining the comprehensive integrated model, the forecast terminal uses the combined data of multiple time series features of the time zone to be forecasted as the model input and calculates the standardized forecast results; wherein the forecast terminal includes several computing nodes;
[0055] Step 6: Due to the long time span of load forecasting, the problem of error accumulation is prone to occur in the rolling forecasting process; according to the adaptive dynamic cycle selection and multi-model fusion method, the effect of error accumulation can be reduced, and the forecast results can be further probabilistically corrected to obtain the final load forecast sequence;
[0056] Among them, the prediction results are probabilistically corrected according to the adaptive dynamic cycle selection, including:
[0057] Intercept the [Tn-1:T-1] sequence data before the prediction point, traverse the historical load database, select the top k sequences in correlation order as features and add them to the model, and use the next moment sequence and predicted value of the top k sequences in correlation order to make corrections; n is the sequence length, k is the first few sequences with the highest correlation; the specific value of k is preset by the administrator;
[0058] In this embodiment, the flowchart of real-time dynamic prediction of special process load is as follows: Figure 3 As shown;
[0059] The method also includes: during the prediction terminal operation process, monitoring and analyzing the computing power usage of each computing node, and carrying out dynamic computing power expansion or reduction in an orderly manner, thereby reducing costs, achieving the purpose of making the most of resources, and improving data processing efficiency; the specific steps include:
[0060] The computing power utilization rate of each computing node is collected at preset intervals and marked as DZ, and a curve chart of computing power utilization rate DZ changing over time is established;
[0061] When the curve graph is in the rising stage, the curve graph is derived to obtain the occupancy rate change curve graph; the real-time computing power occupancy rate change rate of the computing node is marked as Dt, where Dt is a positive number;
[0062] When the computing power occupancy rate DZ of the computing node is greater than the preset first occupancy threshold, and within the first preset time T1, the computing power occupancy rate change rate Dt is greater than the preset first change threshold, it is judged that the computing power of the computing node is consumed quickly, and an expansion reminder signal is generated to the server to remind the management personnel to expand the computing power resources of the corresponding computing node to improve data processing efficiency;
[0063] When the computing power occupancy rate DZ of the computing node is less than the preset second occupancy threshold, and within the second preset time T2, the computing power occupancy rate change rate Dt is less than the preset second change threshold, the computing power of the computing node is judged to be redundant, and a reduction reminder signal is generated to the server to remind the management personnel to reduce the computing power resources of the corresponding computing node to avoid idle computing power resources, thereby reducing costs and achieving the purpose of full utilization of resources;
[0064] In this embodiment, the preset second occupancy threshold is less than the preset first occupancy threshold;
[0065] In a possible implementation, the method also includes: matching relevant rules in an expert database by calling the final load forecast sequence and historical load data values, thereby providing relevant management suggestions to managers; wherein the expert database mainly records the relevant experience and measures of managers when different power load values appear in different periods.
[0066] Part of the data in the above formula is calculated by removing the dimension and taking its numerical value. The formula is a formula closest to the actual situation obtained by software simulation of a large amount of collected data; the preset parameters and preset thresholds in the formula are set by technical personnel in this field according to actual conditions or obtained through simulation of a large amount of data.
[0067] In the description of this specification, the description with reference to the terms "one embodiment", "example", "specific example", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.
[0068] The preferred embodiments of the present invention disclosed above are only used to help explain the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to only specific implementation methods. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well. The present invention is limited only by the claims and their full scope and equivalents.
Claims
1. A user load forecasting method applied to process industry power trading, characterized in that: The steps include: Step 1: Feature engineering: Collect static periodic features, dynamic features, historical similar day features, associated meteorological features, volatility features, and coding features of different time periods at different time scales, and then convert and combine multiple features; Analyze the changing patterns of the new energy output curves of the month, week, day and hour, use similar sequences of different scales and periods, as well as the volatility characteristics of new energy output and the characteristic factors of meteorological elements for comprehensive analysis, and obtain multiple time series feature combination data; Step 2: Clean and process the multiple time series feature combination data obtained by analysis; Step 3: In the offline stage, based on the maximum mutual information coefficient algorithm, the correlation between the multiple time series feature combination data and the load data to be predicted is analyzed to obtain the test set data; Step 4: Model training and iteration: Enhance and fuse single models with different features and parameters, train and optimize them in a multi-model iterative manner, and obtain a comprehensive integrated model; Step 5: Rolling forecast and correction: After obtaining the comprehensive integrated model, the forecast terminal uses the combined data of multiple time series features of the time zone to be forecasted as model input and calculates the standardized forecast results; Among them, the prediction terminal includes several computing nodes; during the prediction terminal operation process, the computing power usage of the computing nodes is monitored and analyzed, and dynamic computing power expansion or reduction is carried out in an orderly manner; Step 6: Probabilistically correct the standardized forecast results based on the adaptive dynamic cycle selection to obtain the final load forecast sequence.
2. A user load forecasting method for process industry power trading according to claim 1, characterized in that: Monitor and analyze the computing power usage of computing nodes, including: The computing power utilization rate of each computing node is collected at preset intervals and marked as DZ, and a curve chart of computing power utilization rate DZ changing over time is established; When the curve graph is in the rising stage, the curve graph is derived to obtain the occupancy rate change curve graph; the real-time computing power occupancy rate change rate of the computing node is marked as Dt, where Dt is a positive number; When the computing power occupancy rate DZ is greater than the preset first occupancy threshold, and within the first preset time T1, the computing power occupancy rate change rate Dt is greater than the preset first change threshold, it is judged that the computing power of the computing node is consumed quickly, and an expansion reminder signal is generated to remind the management personnel to expand the computing power resources of the corresponding computing node; When the computing power occupancy rate DZ is less than the preset second occupancy threshold, and within the second preset time T2, the computing power occupancy rate change rate Dt is less than the preset second change threshold, the computing power redundancy of the computing node is judged, and a reduction reminder signal is generated to remind the management personnel to reduce the computing power resources of the corresponding computing node.
3. A user load forecasting method for process industry power trading according to claim 1, characterized in that: Clean and process the combined data of multiple time series features, including: First, consistency check, anomaly identification and missing identification are carried out on the combined data of multiple time series features to identify missing data and abnormal data; then the historical average value of industrial electricity users for the same period is calculated to fill in the missing data and replace the abnormal data.
4. A user load forecasting method for process industry power trading according to claim 1, characterized in that: The standardized prediction results are probabilistically corrected according to the adaptive dynamic cycle selection, including: The [Tn-1:T-1] sequence data before the prediction point is intercepted, and the historical load database is traversed. The top k sequences ranked by correlation are selected as features and added to the model. The next moment sequence and the predicted value of the top k sequences ranked by correlation are used for correction; n is the sequence length, and k is the first few groups of sequences with the highest correlation.
5. A user load forecasting method for process industry power trading according to claim 1, characterized in that: The maximum mutual information coefficient algorithm refers to: a non-parametric exploration algorithm based on maximum information, which is used to measure the degree of association between two variables X and Y, that is, the strength of linear or nonlinearity, where mutual information Among them, p(dx,dy) is the joint probability density distribution function, which is approximately replaced in this algorithm by the following method: Among them, a and b are the number of discretizations in the dX and dY directions respectively.
6. A user load forecasting method for process industry power trading according to claim 1, characterized in that: The specific steps of model training and iteration include: Constructing a fusion model: The fusion model is a model constructed by combining at least two of the support vector machine, deep convolutional neural network and RBF neural network. The fusion methods include linear weighted fusion, cross fusion, waterfall fusion, feature fusion and prediction fusion. The fusion model is trained using the test set data, and the model is evaluated using the loss function to obtain the network parameters that minimize the overall error of the training samples and obtain a comprehensive integrated model.
7. A user load forecasting method for process industry power trading according to claim 1, characterized in that: Static cycle characteristics refer to the monthly, weekly and daily load curve characteristics, peak and valley value size, fluctuation variance, fluctuation amplitude and climbing times.
8. A user load forecasting method for process industry power trading according to claim 1, characterized in that: Meteorological elements include wind speed, wind direction, total cloud cover, total rainfall, ground pressure, dew point temperature, air temperature at a height of 2m above the ground surface, downward solar shortwave radiation reaching the ground, direct solar radiation at all celestial angles received by the ground, and direct solar radiation.
9. A user load forecasting method for process industry power trading according to claim 1, characterized in that: The method further includes: By calling the final load forecast sequence and historical load data values, the relevant rules in the expert database are matched to provide managers with relevant management suggestions; the expert database is used to record the relevant experience and measures of managers when different power load values appear in different periods.
10. A user load forecasting method for process industry power trading according to claim 2, characterized in that: The preset second occupancy threshold is smaller than the preset first occupancy threshold.
Citation Information
Cited By
Internet of Things data interaction method and system based on data collection
CN119537034A
A data interaction method and system for Internet of Things based on data collection
CN119537034B
Charging load data analysis method and system based on actual scheduling service
CN120744563A
Industrial electrical load prediction method and system based on multi-scale feature fusion
CN121840562A
