New energy-flexible direct current combined fault ride-through control method and system coordinated with energy consumption device
By coordinating the energy-consuming device in the new energy-flexible system and dynamically adjusting the AC voltage reference value and active power, the problem of DC voltage rise caused by failures in the new energy-flexible system is solved, reducing the configuration requirements and control of the energy-consuming device Cost, more efficient troubleshooting is achieved.
Patent Information
- Application Number
- CN202411082404.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-08
- Publication Date
- 2024-11-01
AI Technical Summary
In the new energy-flexible straight system, if the receiving converter station or AC power grid fails, the DC voltage will rise rapidly and lead to system imbalance, causing system impact, and the existing technology will be difficult to effectively control the fault crossing, and the configuration requirements of energy-consuming devices are relatively high. Large, high cost.
Adopt the new energy-flexible direct joint fault crossing control method coordinated with the energy-consuming device. By detecting the DC voltage, starting and exiting the fault crossing strategy, dynamically adjusting the AC voltage reference value, using the energy-consuming device to alleviate the overvoltage problem, and in the fault 恢复阶段恢复有功功率。
It effectively reduces the degree of DC overvoltage during failure, reduces the configuration requirements of energy-consuming devices, and achieves smaller control costs and more efficient fault handling.
Smart Images

Figure CN118889408A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a fault ride-through control method for an electric power system, and in particular to a new energy-flexible direct current combined fault ride-through control method and system coordinated with an energy consumption device. Background Art
[0002] With the construction of new power systems with new energy as the main body, the new energy field will usher in huge development opportunities. Flexible DC transmission is considered to be an important form of future new energy grid connection due to its advantages of relatively low long-distance transmission cost, independent control of active and reactive power, and island and multi-terminal access. As a new form of power grid, the new energy collection and transmission system through the flexible direct current has its own special dynamic characteristics and control: if the receiving end converter station or AC power grid fails, the flexible direct current power transmission is blocked. Since the new energy at the sending end cannot sense the fault, the flexible direct current keeps receiving power, causing power imbalance in the flexible direct current system. The unbalanced power will charge the flexible direct current MMC submodule capacitor, causing the DC voltage to rise rapidly to the DC voltage protection set value in a few milliseconds to tens of milliseconds, thereby causing the converter station to lock, causing a large impact on the system. Summary of the invention
[0003] Purpose of the invention: In view of the above problems, the present invention proposes a new energy-flexible DC joint fault ride-through control method and system coordinated with energy-consuming devices, which can tap the regulation ability of the new energy-flexible DC itself, improve the degree of DC overvoltage under faults in the receiving converter station or AC power grid, reduce the configuration requirements of energy-consuming devices, and reduce the control cost.
[0004] Technical solution: The technical solution adopted by the present invention is a new energy-flexible direct current combined fault ride-through control method coordinated with energy consumption devices, comprising the following steps:
[0005] (1) When the control system of the flexible direct current sending end converter station detects the DC voltage U dc_rz Higher than the threshold U for starting the new energy-flexible direct current combined fault ride-through strategy dc_start_un When the fault is detected, the new energy-flexible direct current combined fault ride-through strategy is started;
[0006] (2) The control system of the flexible direct current sending end converter station adopts a constant AC voltage control mode. The AC voltage reference value of the constant AC voltage control mode is set to the AC voltage reference value U during the fault ride-through period. ac_ref_lvrt_rz ; When the new energy station control system detects the AC voltage U ac_ng Less than or equal to the low voltage ride-through strategy start threshold U of the new energy station ac_th_ng When the new energy station enters the low voltage ride-through state, the new energy station control system switches to the fixed active power control mode and sets the active power reference value P of the new energy system during the low voltage ride-through period. lvrt_ref_ng ;
[0007] (3) When the control system of the flexible DC sending end converter station detects the DC voltage U dc_rz Higher than the energy consumption device start threshold U dc_start_chp When the flexible direct current sending end converter station control system sends a start signal to the energy consuming device and the number of energy consuming devices put into operation N chp The energy consumption device is a device that consumes active power when supporting flexible direct current. The energy consumption device is configured to solve the problem of overvoltage of flexible direct current. The energy consumption device supporting flexible direct current is usually centralized, such as connected between flexible direct current poles or at the grid-connected busbar at the flexible direct current sending end. The number of energy consumption devices put into use is a unified fixed value, which is related to the severity of the fault, etc.
[0008] (4) When the control system of the flexible direct current sending end converter station detects the DC voltage U dc_rz Below the energy consumption device exit threshold U dc_end_chp When the flexible direct current sending end converter station control system sends an exit signal to the energy consuming device, all the energy consuming devices put into operation are shut down;
[0009] (5) When the control system of the flexible DC sending end converter station detects the DC voltage U dc_rz Lower than the exit threshold U of the new energy-flexible direct current joint fault ride-through strategy dc_end_un When the fault is detected, the new energy-flexible direct current combined fault ride-through strategy is exited;
[0010] (6) The control system of the flexible direct current sending end converter station adopts the constant AC voltage control mode. The AC voltage reference value of the constant AC voltage control is based on the AC voltage recovery rate k Uacrec_ref_rz The AC voltage reference value during the fault ride-through period is restored to the AC voltage reference value before the fault U ac_ref_rz ; When the new energy station control system detects that the AC voltage at the new energy station grid connection point is greater than or equal to the new energy station low voltage ride-through strategy exit threshold U ac_end_ng When the new energy system enters the low voltage ride-through recovery state, the new energy station control system switches to the fixed slope recovery active power control mode, and the active power recovery rate k Prec_ref_ng Restore active power. Adopt constant AC voltage control, which means that the control signal received by the control system is AC voltage reference value instead of DC voltage reference value or power reference value. In this strategy, AC voltage reference value is restored according to a constant slope.
[0011] The threshold U for starting the new energy-flexible direct current combined fault ride-through strategy in step (1) dc_start_un It is dynamically adjusted according to the severity of the fault and the different initial steady-state operating power of the new energy transmission system through flexible direct current; the starting threshold U of the new energy-flexible direct current joint fault ride-through strategy dc_start_un Methods for determining include:
[0012] (1) The control system of the flexible DC sending end converter station calculates the output power of the flexible DC receiving end converter station during the fault period according to the flexible DC voltage increase rate:
[0013]
[0014] Where: P out _ lvrt _ rz is the output power of the flexible DC receiving converter station during the fault period, C eq_rz is the flexible equivalent capacitance; U dc_up_rz U is the upper limit of the steady-state operation of the flexible DC voltage; dc_0_rz is the steady-state operation value of the flexible DC voltage; t0 is the moment when the flexible DC voltage reaches the steady-state operation value; t1 is the moment when the flexible DC voltage reaches the upper limit of the steady-state operation; P in_rz Input power to the flexible direct current sending end converter station before the new energy-flexible direct current combined fault ride-through strategy is started;
[0015] (2) The activation threshold of the new energy-flexible DC joint fault ride-through strategy is determined according to the output power of the flexible DC receiving-end converter station during the fault period, the active power reference value during the new energy low-voltage ride-through period, and the maximum tolerable value of the flexible DC voltage. The calculation formula for the activation threshold of the new energy-flexible DC joint fault ride-through strategy is:
[0016]
[0017] Where: W max_rz The maximum unbalanced energy that can be tolerated by the flexible DC voltage is U dc_max_rz is the maximum tolerable value of the flexible DC voltage; t start_un is the startup time of the new energy-flexible direct current combined fault ride-through strategy; t cut P is the time when the relay protection operates after a short-circuit fault occurs; lvrt_ref_ng U is the reference value of active power during the period of low power consumption of new energy; dc_start_un It is the starting threshold of the new energy-flexible direct current combined fault ride-through strategy.
[0018] (3) If the threshold U of the new energy-flexible direct current combined fault ride-through strategy is dc_start_un Less than the upper limit of the steady-state operation of the flexible DC voltage U dc_up_rz , then the threshold U of the new energy-flexible direct current joint fault ride-through strategy is set dc_start_un Set to the upper limit value of the steady-state operation of the flexible DC voltage U dc_up_rz .
[0019] The AC voltage reference value U during the fault ride-through period of the converter station at the flexible direct current sending end in step (2) ac_ref_lvrt_rz The setting method is:
[0020] (1) The metallic grounding short circuit fault of the output line of the receiving converter station lasts for tcut After clearing, the fault is checked. The maximum value of the flexible DC voltage after the fault is equal to the maximum DC voltage tolerance value. By fully opening all renewable energy stations and only reducing the renewable energy simultaneous rate, the renewable energy-flexible DC joint fault ride-through strategy is used to determine the renewable energy operating active power P when it is not started. safe_ng ;
[0021] (2) The operating power of renewable energy is equal to the operating active power P of renewable energy when the renewable energy-flexible direct current combined fault ride-through strategy is not started. safe_ng As the operation mode, determine the AC voltage reference value U during the fault ride-through period of the flexible direct current sending end converter station ac_ref_lvrt_rz ; The calculation formula of AC voltage reference value during fault ride-through of flexible DC sending end converter station is:
[0022]
[0023] Where: U ac_ref_lvrt_rz is the AC voltage reference value during the fault ride-through period of the flexible DC sending end converter station, U ac_ref_rz is the AC voltage reference value of the flexible direct current sending end converter station before the fault; |Z rz_ng_i | is the mutual impedance modulus between the i-th new energy station and the flexible direct current sending end converter station; |Z ng_ng_i | is the self-impedance modulus value of the i-th new energy station; U ac_0_ng_i is the steady-state AC voltage of the i-th renewable energy station; U ac_th_ng_i is the low voltage ride through control start threshold of the i-th renewable energy station, and N is the number of renewable energy stations.
[0024] The active power reference value P during the low penetration period of new energy in step (2) lvrt_ref_ng The setting method is:
[0025] (1) When setting the active power reference value during the low-voltage ride-through period of renewable energy, the threshold for starting the renewable energy-flexible DC combined fault ride-through strategy is the upper limit of the flexible DC voltage steady-state operation plus the set fluctuation threshold;
[0026] (2) The operation mode is based on the rated power of the flexible DC, and the metallic grounding short circuit fault of the output line of the receiving converter station lasts for t cut After clearing, it is to check the fault and set the active power reference value P during the low penetration period of new energy lvrt_ref_ng The calculation formula is:
[0027]
[0028] Where: W max_rz The maximum unbalanced energy that can be tolerated by the flexible DC voltage is C eq_rz is the flexible equivalent capacitance; U dc_max_rz U is the maximum tolerable value of the flexible DC voltage; dc_0_rzis the steady-state operating value of the flexible DC voltage; t start_un is the startup time of the new energy-flexible direct current combined fault ride-through strategy; P in_rz P is the input power of the flexible DC sending-end converter station before the new energy-flexible DC combined fault ride-through strategy is started; out _ lvrt _ rz P is the output power of the flexible DC receiving converter station during the fault period; lvrt_ref_ng is the reference value of active power during the period of low power consumption of new energy; t0 is the moment when the flexible DC voltage reaches the steady-state operating value; t cut is the time when the relay protection is activated after the short-circuit fault occurs; t1 is the time when the flexible DC voltage reaches the upper limit of steady-state operation; U dc_up_rz U is the upper limit of the steady-state operation of the flexible DC voltage; dc_start_un It is the starting threshold of the new energy-flexible direct current combined fault ride-through strategy.
[0029] The method for setting the number of energy-consuming devices in step (3) is as follows:
[0030]
[0031] Where: N chp is the number of energy-consuming devices put into operation, P chp_one is the capacity of a single group of energy-consuming devices; [] is the rounding of values, P out _ lvrt _ rz P is the output power of the flexible DC receiving converter station during the fault period; lvrt_ref_ng It is the reference value of active power during the period of new energy low penetration.
[0032] In step (5), the method for setting the exit threshold of the new energy-flexible direct current combined fault ride-through strategy is:
[0033] U dc_end_un =U dc_up_rz
[0034] Where U dc_end_un is the exit threshold of the new energy-flexible direct current joint fault ride-through strategy, U dc_up_rz It is the upper limit of the steady-state operation of the flexible DC voltage.
[0035] The reference value k of the active power recovery rate in the new energy fault ride-through recovery phase in step (6) Uacrec_ref_rz The setting method is:
[0036] (1) Determine the maximum tolerable AC voltage value U of new energy ac_max_ng ;
[0037] (2) The operating power of renewable energy is equal to the operating active power P of renewable energy when the renewable energy-flexible direct current combined fault ride-through strategy is not started. safe_ngAs the operation mode, the AC voltage U ac_ng Not exceeding the maximum withstand AC voltage value U ac_max_ng As a constraint, determine the reference value k of active power recovery rate in the new energy fault ride-through recovery stage Uacrec_ref_rz .
[0038] Step (6) Active power recovery rate reference value k in the new energy fault ride-through recovery phase Prec_ref_ng The setting method is:
[0039] (1) Determine the minimum DC voltage value U for flexible DC operation dc_min_rz ;
[0040] (2) The operation mode is the rated power of the flexible DC. The active power output of the flexible DC receiving station is immediately restored to the active power before the fault after the short-circuit fault is cleared. The flexible DC voltage U dc_rz Not less than the minimum DC voltage value U for flexible DC operation dc_min_rz As a constraint, determine the reference value k of active power recovery rate in the new energy fault ride-through recovery stage Prec_ref_ng .
[0041] The present invention proposes a new energy-flexible direct current combined fault ride-through control system coordinated with energy consuming devices, comprising a memory, a processor and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, the new energy-flexible direct current combined fault ride-through control method coordinated with energy consuming devices is implemented.
[0042] The present invention proposes a computer program product, including a computer program and / or instructions, which, when executed by a processor, implements the new energy-flexible direct current combined fault ride-through control method coordinated with energy consumption devices.
[0043] Beneficial effects: Compared with the prior art, the present invention has the following advantages: After a short-circuit fault occurs in the receiving-end converter station or AC power grid of the new energy transmission system via flexible direct current, the present invention uses AC voltage as a medium between the new energy and the flexible direct current, and changes the AC voltage reference value through the converter station at the sending end of the flexible direct current, so that the new energy can actively reduce the power in the fault stage, bear part of the surplus power, and realize the new energy transmission system via flexible direct current. The new energy and the flexible direct current are jointly fault-crossed, and the starting threshold of the new energy-flexible direct current joint fault-crossing strategy is dynamically adjusted to realize adaptive operation of different fault severity or different initial steady-state operating powers of new energy through the flexible direct current transmission system. At the same time, considering the scenarios where the voltage recovers slowly or the new energy is constrained by the main body and the power is reduced and the fault-crossing cannot be realized, the new energy-flexible direct current joint fault-crossing strategy and the coordinated control method of the energy-consuming device are used to realize the fault-crossing, and at the same time, the configuration requirements of the energy-consuming device are minimized. It provides a reference for the planning, design and application of the engineering of the new energy island collection via flexible direct current transmission system. BRIEF DESCRIPTION OF THE DRAWINGS
[0044] Figure 1 It is a flow chart of the new energy-flexible direct current combined fault ride-through control method coordinated with energy consumption devices described in the present invention. DETAILED DESCRIPTION
[0045] The technical solution of the present invention is further described below in conjunction with the accompanying drawings and embodiments.
[0046] The new energy-flexible direct current combined fault ride-through control method coordinated with energy consumption devices described in the present invention is as follows: Figure 1 As shown, the following steps are included:
[0047] (1) Step 1: The new energy-flexible direct current combined fault ride-through strategy is started. The control mode of the flexible direct current sending end converter station is constant AC voltage and constant frequency control. When the flexible direct current sending end converter station detects the DC voltage U dc_rz Higher than the threshold U for starting the new energy-flexible direct current combined fault ride-through strategy dc_start_un At this time, the new energy-flexible direct current combined fault ride-through strategy is activated.
[0048] When setting the active power reference value during the new energy low-through period, the threshold for starting the new energy-flexible DC combined fault ride-through strategy is 0.05pu higher than the upper limit of the flexible DC voltage steady-state operation;
[0049] The operation mode is based on the rated power of the flexible DC, and the duration of the metallic grounding short circuit fault of the output line of the receiving converter station is t cut After clearing, the active power reference value P during the low penetration period of new energy is set using formula (2). lvrt_ref_ng .
[0050] New energy-flexible direct current combined fault ride-through strategy start threshold U dc_start_un The determination method is:
[0051] The flexible DC sending end converter station calculates the output power P of the flexible DC receiving end converter station during the fault period according to the flexible DC voltage increase rate. out _ lvrt _ rz ;
[0052]
[0053] Where: C eq_rz is the flexible equivalent capacitance; U dc_up_rz U is the upper limit of the steady-state operation of the flexible DC voltage; dc_0_rz is the steady-state operation value of the flexible DC voltage; t0 is the moment when the flexible DC voltage reaches the steady-state operation value; t1 is the moment when the flexible DC voltage reaches the upper limit of the steady-state operation; P in_rz The input power to the flexible DC sending-end converter station before the new energy-flexible DC combined fault ride-through strategy is started.
[0054] The starting threshold U of the new energy-flexible DC joint fault ride-through strategy is determined according to the output power of the flexible DC receiving station during the fault period, the active power reference value during the new energy low-through period, and the maximum tolerable value of the flexible DC voltage. dc_start_un ;
[0055]
[0056] Where: t cut It is the time when the relay protection operates after a short-circuit fault occurs; U dc_max_rz W is the maximum tolerable value of the flexible DC voltage; max_rz The maximum unbalanced energy that can be tolerated by the flexible DC voltage is t start_un is the startup time of the new energy-flexible direct current combined fault ride-through strategy; C eq_rz is the flexible equivalent capacitance; U dc_up_rz U is the upper limit of the steady-state operation of the flexible DC voltage; dc_0_rz is the steady-state operation value of the flexible DC voltage; t0 is the moment when the flexible DC voltage reaches the steady-state operation value; t1 is the moment when the flexible DC voltage reaches the upper limit of the steady-state operation; P in_rz P is the input power of the flexible DC sending-end converter station before the new energy-flexible DC combined fault ride-through strategy is started; out _ lvrt _ rz P is the output power of the flexible DC receiving converter station during the fault period; lvrt_ref_ng It is the reference value of active power during the period of new energy low penetration.
[0057] If the threshold U of the new energy-flexible direct current joint fault ride-through strategy is activated dc_start_un Less than the upper limit of the steady-state operation of the flexible DC voltage U dc_up_rz , then the threshold U of the new energy-flexible direct current joint fault ride-through strategy is set dc_start_un Set to the upper limit value of the steady-state operation of the flexible DC voltage U dc_up_rz .
[0058] (2) Step 2: Control strategy for the period of fault ride-through of new energy-flexible direct current combined. Set the AC voltage of the flexible direct current sending end converter station to control the AC voltage reference value to the AC voltage reference value U during the period of fault ride-through. ac_ref_lvrt_rz ; The new energy station senses the change in AC voltage. When the AC voltage U ac_ng Less than or equal to the low voltage ride-through strategy start threshold U of the new energy station ac_th_ng , the new energy enters the low voltage ride-through state and switches to the fixed active power control mode. The active power reference value of the new energy during the low voltage ride-through period is P lvrt_ref_ng ;
[0059] (2-1) The metallic grounding short circuit fault of the output line of the receiving converter station lasts for tcut After clearing, the fault is checked. The maximum value of the flexible DC voltage after the fault is equal to the maximum DC voltage tolerance value. By fully opening all renewable energy stations and only reducing the renewable energy simultaneous rate, the renewable energy-flexible DC joint fault ride-through strategy is used to determine the renewable energy operating active power P when it is not started. safe_ng ;
[0060] (2-2) The operating power of renewable energy is equal to the operating active power P of renewable energy when the renewable energy-flexible direct current combined fault ride-through strategy is not started. safe_ng As the operation mode, determine the AC voltage reference value U during the fault ride-through period of the flexible direct current sending end converter station ac_ref_lvrt_rz ;
[0061]
[0062] Where: U ac_ref_rz is the AC voltage reference value of the flexible direct current sending end converter station before the fault; |Z rz_ng_i | is the mutual impedance modulus between the i-th new energy station and the flexible direct current sending end converter station; |Z ng_ng_i | is the self-impedance modulus value of the i-th new energy station; U ac_0_ng_i is the steady-state AC voltage of the i-th renewable energy station; U ac_th_ng_i is the low voltage ride through control start threshold of the i-th renewable energy station, and N is the total number of renewable energy stations.
[0063] Active power reference value P during new energy low penetration lvrt_ref_ng The setting method is:
[0064] (3-1) When setting the active power reference value during the low-power ride-through period of the new energy, the threshold for starting the new energy-flexible DC combined fault ride-through strategy is set to be 0.05pu higher than the upper limit of the steady-state operation of the flexible DC voltage;
[0065] (3-2) The operation mode is based on the rated power of the flexible DC, and the metallic grounding short circuit fault of the output line of the receiving converter station lasts for t cut After clearing, the active power reference value P during the low penetration period of new energy is set using formula (2). lvrt_ref_ng .
[0066] (3) Step 3: Energy consumption device starts. When the flexible DC sending end converter station detects the DC voltage U dc_rz Higher than the energy consumption device start threshold U dc_start_chp When the flexible direct current sending end converter station sends a start signal to the energy consumption device, the number of energy consumption input groups N is determined. chp .
[0067] U dc_start_chp =U dc_max_rz -ΔU dc_start_chp (4)
[0068] Where: ΔU dc_start_chp The value is 0.1 pu
[0069] Number of energy-consuming devices put into use N chp The setting method is:
[0070]
[0071] Where: P chp_one is the capacity of a single group of energy-consuming devices; [] indicates the rounded value.
[0072] (4) Step 4: Exit the energy-consuming device. When the flexible DC sending end converter station detects the DC voltage U dc_rz Below the energy consumption device exit threshold U dc_end_chp When , the converter station at the sending end of the flexible direct current sends an exit signal to the energy consuming device to exit all the energy consuming groups.
[0073] U dc_end_chp =U dc_end_un +ΔU dc_end_chp (6)
[0074] Where: ΔU dc_end_chp Usually the value is 0.1pu
[0075] (5) Step 5: Exit the new energy-flexible DC combined fault ride-through strategy. When the flexible DC sending-end converter station detects the DC voltage U dc_rz Lower than the exit threshold U of the new energy-flexible direct current joint fault ride-through strategy dc_end_un When , the new energy-flexible direct current combined fault ride-through strategy is exited;
[0076] U dc_end_un =U dc_up_rz (7)
[0077] (6) Step 6: Control strategy for the fault ride-through recovery phase of new energy-flexible DC joint fault. The AC voltage control reference value of the flexible DC sending end converter station is based on the AC voltage recovery rate k Uacrec_ref_rz Restore to the AC voltage reference value U before the fault ac_ref_rz ; The new energy station senses the change in AC voltage. When the AC voltage at the grid connection point of the new energy station is greater than or equal to the exit threshold U of the low voltage ride-through strategy of the new energy station ac_end_ng , the new energy enters the low voltage ride-through recovery state and switches to the fixed slope recovery active power control mode. According to the active power recovery rate k Prec_ref_ng Restore active power;
[0078] (4-1) Determine the maximum tolerable AC voltage value U of new energy ac_max_ng ;
[0079] (4-2) The operating power of renewable energy is equal to the operating active power P of renewable energy when the renewable energy-flexible direct current combined fault ride-through strategy is not started. safe_ng As the operation mode, the AC voltage U ac_ng Not exceeding the maximum withstand AC voltage value U ac_max_ng As a constraint, determine the reference value k of active power recovery rate in the new energy fault ride-through recovery stage Uacrec_ref_rz ;
[0080] (4-3) Determine the minimum DC voltage value U for flexible DC operation dc_min_rz ;
[0081] (4-4) The operation mode is the rated power of the flexible DC, the active power output of the flexible DC receiving station is immediately restored to the active power before the fault after the short-circuit fault is cleared, and the flexible DC voltage U dc_rz Not less than the minimum DC voltage value U for flexible DC operation dc_min_rz As a constraint, determine the reference value k of active power recovery rate in the new energy fault ride-through recovery stage Prec_ref_ng .
[0082] In one embodiment, a new energy-flexible direct current combined fault ride-through control system coordinated with an energy consuming device is provided, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the above-mentioned new energy-flexible direct current combined fault ride-through control method coordinated with the energy consuming device when executing the computer program.
[0083] In one embodiment, a computer program product is provided, including a computer program / instruction, which, when executed by a processor, implements the new energy-flexible direct current combined fault ride-through control method coordinated with energy consumption devices.
[0084] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.
[0085] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0086] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0087] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
Claims
1. A new energy-flexible direct current combined fault ride-through control method coordinated with energy consumption devices, It is characterized in that The following steps are involved: (1) When the control system of the flexible direct current sending end converter station detects the DC voltage U dc_rz Higher than the threshold U for starting the new energy-flexible direct current combined fault ride-through strategy dc_start_un When the fault is detected, the new energy-flexible direct current combined fault ride-through strategy is started; (2) The control system of the flexible direct current sending end converter station adopts a constant AC voltage control mode. The AC voltage reference value of the constant AC voltage control mode is set to the AC voltage reference value U during the fault ride-through period. ac_ref_lvrt_rz ; When the new energy station control system detects the AC voltage U ac_ng Less than or equal to the low voltage ride-through strategy start threshold U of the new energy station ac_th_ng When the new energy station enters the low voltage ride-through state, the new energy station control system switches to the fixed active power control mode and sets the active power reference value P of the new energy system during the low voltage ride-through period. lvrt_ref_ng ; (3) When the control system of the flexible DC sending end converter station detects the DC voltage U dc_rz Higher than the energy consumption device start threshold U dc_start_chp When the flexible direct current sending end converter station control system sends a start signal to the energy consuming device and the number of energy consuming devices put into operation N chp ; The energy consumption device is a device that consumes active power when supporting the flexible direct current; (4) When the control system of the flexible direct current sending end converter station detects the DC voltage U dc_rz Lower than the energy consumption device exit threshold U dc_end_chp When the flexible direct current sending end converter station control system sends an exit signal to the energy consuming device, all the energy consuming devices put into operation are shut down; (5) When the control system of the flexible DC sending end converter station detects the DC voltage U dc_rz Lower than the exit threshold U of the new energy-flexible direct current joint fault ride-through strategy dc_end_un When the fault is detected, the new energy-flexible direct current combined fault ride-through strategy is exited; (6) The control system of the flexible direct current sending end converter station adopts the constant AC voltage control mode. The AC voltage reference value of the constant AC voltage control is based on the AC voltage recovery rate k Uacrec_ref_rz The AC voltage reference value during the fault ride-through period is restored to the AC voltage reference value before the fault U ac_ref_rz ; When the new energy station control system detects that the AC voltage at the new energy station grid connection point is greater than or equal to the new energy station low voltage ride-through strategy exit threshold U ac_end_ng When the new energy system enters the low voltage ride-through recovery state, the new energy station control system switches to the fixed slope recovery active power control mode, and the active power recovery rate k Prec_ref_ng Restore active power.
2. The new energy-flexible direct current combined fault ride-through control method coordinated with energy consumption devices according to claim 1, Features: The threshold U for starting the new energy-flexible direct current combined fault ride-through strategy in step (1) dc_start_un It is a dynamic adjustment based on the severity of the fault and the different initial steady-state operating powers of the new energy transmission system through flexible direct current. New energy-flexible direct current combined fault ride-through strategy start threshold U dc_start_un Methods for determining include: (1) The control system of the flexible DC sending end converter station calculates the output power of the flexible DC receiving end converter station during the fault period according to the flexible DC voltage increase rate: Where: P out _ lvrt _ rz is the output power of the flexible DC receiving converter station during the fault period, C eq_rz is the flexible equivalent capacitance; U dc_up_rz U is the upper limit of the steady-state operation of the flexible DC voltage; dc_0_rz is the steady-state operating value of the flexible DC voltage; t 0 is the moment when the flexible DC voltage reaches the steady-state operating value; t 1 P is the moment when the flexible DC voltage reaches the upper limit of steady-state operation; in_rz Input power to the flexible direct current sending end converter station before the new energy-flexible direct current combined fault ride-through strategy is started; (2) The activation threshold of the new energy-flexible DC joint fault ride-through strategy is determined according to the output power of the flexible DC receiving-end converter station during the fault period, the active power reference value during the new energy low-voltage ride-through period, and the maximum tolerable value of the flexible DC voltage. The calculation formula for the activation threshold of the new energy-flexible DC joint fault ride-through strategy is: Where: W max_rz The maximum unbalanced energy that can be tolerated by the flexible DC voltage is U dc_max_rz is the maximum tolerable value of the flexible DC voltage; t start_un is the startup time of the new energy-flexible direct current combined fault ride-through strategy; t cut P is the time when the relay protection operates after a short-circuit fault occurs; lvrt_ref_ng U is the reference value of active power during the period of low power consumption of new energy; dc_start_un It is the starting threshold of the new energy-flexible direct current combined fault ride-through strategy. (3) If the threshold U of the new energy-flexible direct current combined fault ride-through strategy is dc_start_un Less than the upper limit of the steady-state operation of the flexible DC voltage U dc_up_rz , then the threshold U of the new energy-flexible direct current joint fault ride-through strategy is set dc_start_un Set to the upper limit value U of the flexible DC voltage steady-state operation dc_up_rz .
3. The new energy-flexible direct current combined fault ride-through control method coordinated with energy consumption devices according to claim 1, Features: The AC voltage reference value U during the fault ride-through period of the converter station at the flexible direct current sending end in step (2) ac_ref_lvrt_rz The setting method is: (1) The metallic grounding short circuit fault of the output line of the receiving converter station lasts for t cut After clearing, the fault is checked. The maximum value of the flexible DC voltage after the fault is equal to the maximum DC voltage tolerance value. By fully opening all renewable energy stations and only reducing the renewable energy simultaneous rate, the renewable energy-flexible DC joint fault ride-through strategy is used to determine the renewable energy operating active power P when it is not started. safe_ng ; (2) The operating power of renewable energy is equal to the operating active power P of renewable energy when the renewable energy-flexible direct current combined fault ride-through strategy is not started. safe_ng As the operation mode, determine the AC voltage reference value U during the fault ride-through period of the flexible direct current sending end converter station ac_ref_lvrt_rz ; The calculation formula of AC voltage reference value during fault ride-through of flexible DC sending end converter station is: Where: U ac_ref_lvrt_rz is the AC voltage reference value during the fault ride-through period of the flexible DC sending end converter station, U ac_ref_rz is the AC voltage reference value of the flexible direct current sending end converter station before the fault; |Z rz_ng_i | is the mutual impedance modulus between the i-th new energy station and the flexible direct current sending end converter station; |Z ng_ng_i | is the self-impedance modulus value of the i-th new energy station; U ac_0_ng_i is the steady-state AC voltage of the i-th renewable energy station; U ac_th_ng_i is the low voltage ride through control start threshold of the i-th renewable energy station, and N is the number of renewable energy stations.
4. The new energy-flexible direct current combined fault ride-through control method coordinated with energy consumption devices according to claim 1, Features: The active power reference value P during the low penetration period of new energy in step (2) lvrt_ref_ng The setting method is: (1) When setting the active power reference value during the renewable energy low-voltage ride-through period, the starting threshold of the renewable energy-flexible DC combined fault ride-through strategy is the upper limit of the flexible DC voltage steady-state operation plus the set fluctuation threshold; (2) The operation mode is based on the rated power of the flexible DC, and the metallic grounding short circuit fault of the output line of the receiving converter station lasts for t cut After clearing, it is to check the fault and set the active power reference value P during the low penetration period of new energy lvrt_ref_ng The calculation formula is: Where: W max_rz The maximum unbalanced energy that can be tolerated by the flexible DC voltage is C eq_rz is the flexible equivalent capacitance; U dc_max_rz U is the maximum tolerable value of the flexible DC voltage; dc_0_rz is the steady-state operating value of the flexible DC voltage; t start_un is the startup time of the new energy-flexible direct current combined fault ride-through strategy; P in_rz P is the input power of the flexible DC sending-end converter station before the new energy-flexible DC combined fault ride-through strategy is started; out _ lvrt _ rz P is the output power of the flexible DC receiving converter station during the fault period; lvrt_ref_ng is the reference value of active power during the period of low power consumption of new energy; t 0 is the moment when the flexible DC voltage reaches the steady-state operating value; t cut is the time when the relay protection operates after a short-circuit fault occurs; t 1 is the moment when the flexible DC voltage reaches the upper limit of steady-state operation; U dc_up_rz U is the upper limit of the steady-state operation of the flexible DC voltage; dc_start_un It is the starting threshold of the new energy-flexible direct current combined fault ride-through strategy.
5. The new energy-flexible direct current combined fault ride-through control method coordinated with energy consumption devices according to claim 1, Features: The method for setting the number of energy-consuming devices in step (3) is as follows: Where: N chp is the number of energy-consuming devices put into operation, P chp_one is the capacity of a single group of energy-consuming devices; [] is the rounding of values, P out _ lvrt _ rz P is the output power of the flexible DC receiving converter station during the fault period; lvrt_ref_ng It is the reference value of active power during the period of new energy low penetration.
6. The new energy-flexible direct current combined fault ride-through control method coordinated with energy consumption devices according to claim 1, Features: In step (5), the method for setting the exit threshold of the new energy-flexible direct current combined fault ride-through strategy is: IN dc_end_un =U dc_up_rz Where U dc_end_un is the exit threshold of the new energy-flexible direct current joint fault ride-through strategy, U dc_up_rz It is the upper limit of the steady-state operation of the flexible DC voltage.
7. The new energy-flexible direct current combined fault ride-through control method coordinated with energy consumption devices according to claim 1, Features: The reference value k of the active power recovery rate in the new energy fault ride-through recovery phase in step (6) Uacrec_ref_rz The setting method is: (1) Determine the maximum tolerable AC voltage value U of new energy ac_max_ng ; (2) The operating power of renewable energy is equal to the operating active power P of renewable energy when the renewable energy-flexible direct current combined fault ride-through strategy is not started. safe_ng As the operation mode, the AC voltage U ac_ng Not exceeding the maximum withstand AC voltage value U ac_max_ng As a constraint, determine the reference value k of active power recovery rate in the new energy fault ride-through recovery stage Uacrec_ref_rz .
8. The new energy-flexible direct current combined fault ride-through control method coordinated with energy consumption devices according to claim 1, Features: Step (6) Active power recovery rate reference value k in the new energy fault ride-through recovery phase Prec_ref_ng The setting method is: (1) Determine the minimum DC voltage value U for flexible DC operation dc_min_rz ; (2) The operation mode is the rated power of the flexible DC. The active power output of the flexible DC receiving station is immediately restored to the active power before the fault after the short-circuit fault is cleared. The flexible DC voltage U dc_rz Not less than the minimum DC voltage value U for flexible DC operation dc_min_rz As a constraint, determine the reference value k of active power recovery rate in the new energy fault ride-through recovery stage Prec_ref_ng .
9. A new energy-flexible direct current combined fault ride-through control system coordinated with energy consumption devices, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, Features: When the processor executes the computer program, the new energy-flexible direct current combined fault ride-through control method coordinated with energy consuming devices according to any one of claims 1 to 8 is implemented.
10. A computer program product comprising a computer program and / or instructions, It is characterized in that When the computer program and / or the instruction is executed by the processor, the new energy-flexible direct current combined fault ride-through control method coordinated with the energy consuming device according to any one of claims 1 to 8 is implemented.
Citation Information
Cited By
Sending end three-phase fault ride-through control method for new energy through hybrid direct current sending-out system
CN121055430A
Offshore wind power flexible direct current power transmission cooperative fault ride-through strategy parameter design method
CN121123965A
Low voltage ride through protection threshold value setting method and device
CN121863291A
Fault ride-through and active power adaptive recovery control method and system for flexible layered access system
CN122890526A