Method for acquiring electric quantity required by vehicle driving, method for acquiring navigation route, electronic equipment and computer readable storage medium

By obtaining navigation data, predicting the vehicle's electricity demand within the remaining distance of the new energy vehicle, the problem of insufficient power during navigation of new energy vehicles is solved, and more accurate power prediction and driving safety is achieved.

CN118893985APending Publication Date: 2024-11-05CHONGQING JINKANG NEW ENERGY VEHICLE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411094673.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-10
Publication Date
2024-11-05

AI Technical Summary

Technical Problem

New energy vehicles are prone to insufficient power during navigation and driving, and cannot accurately predict which specific section of road is insufficient power, resulting in no nearby refueling or charging stations, resulting in vehicle stagnation.

Method used

By acquiring navigation data, predict vehicle speed, driving time and acceleration, and based on these parameters, determine the power required for the vehicle to drive over the remaining distance, including obtaining road slope, torque and rotational speed, and then calculate the driving power and required power.

Benefits of technology

Improve the accuracy of the vehicle's power forecast within the remaining distance, helping the vehicle avoid stagnation, and ensuring driving safety and efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118893985A_ABST
    Figure CN118893985A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of vehicles, and discloses a method for acquiring electric quantity required by vehicle driving, a method for acquiring a navigation route, electronic equipment and a computer readable storage medium. Based on the navigation data, a predicted vehicle speed, predicted driving time and predicted acceleration of the vehicle in the remaining distance and a road gradient of the remaining distance are obtained; based on the road gradient, the predicted vehicle speed and the predicted acceleration, the torque of a driving motor of the vehicle in the remaining distance is obtained, and the rotating speed of the driving motor in the remaining distance is obtained based on the predicted vehicle speed; and the driving power of the driving motor is obtained based on the torque and the rotating speed, and the electric quantity needed for driving of the vehicle in the remaining journey is determined based on the driving power and the predicted running time. Therefore, the road gradient, the predicted vehicle speed and the predicted acceleration can be obtained through the navigation data, the electric quantity required for driving the vehicle in the remaining journey can be determined based on the parameters, application is easy, and accuracy is higher.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of vehicle technology, and in particular to a method for obtaining the amount of electricity required for driving a vehicle, a method for obtaining a navigation route, an electronic device, and a computer-readable storage medium. Background Art

[0002] New energy vehicles are prone to low battery during navigation, and it is generally impossible to accurately predict where the low battery will occur. In this case, there may be no nearby refueling or charging stations near the location where the low battery occurs, which directly causes the vehicle to break down.

[0003] The root cause of the above problems is that the vehicle navigation function cannot predict the amount of electricity required for the vehicle to travel the remaining distance, or cannot accurately predict the amount of electricity required for the vehicle to travel the remaining distance. Summary of the invention

[0004] In view of the above problems, the present application provides a method for obtaining the power required for vehicle driving, a method for obtaining a navigation route, an electronic device and a computer-readable storage medium, which can obtain the road slope, predicted vehicle speed and predicted acceleration through navigation data, and determine the power required for the vehicle to drive the remaining distance based on these parameters. It is easy to use and has higher accuracy.

[0005] A first aspect of the present application provides a method for obtaining the amount of electricity required to drive a vehicle, comprising: obtaining navigation data of the vehicle, and obtaining a predicted vehicle speed, predicted driving time, predicted acceleration, and a road slope for the remaining distance based on the navigation data; obtaining the torque of a driving motor of the vehicle for the remaining distance based on the road slope, the predicted vehicle speed, and the predicted acceleration, and obtaining the rotational speed of the driving motor for the remaining distance based on the predicted vehicle speed; obtaining the driving power of the driving motor based on the torque and the rotational speed, and determining the amount of electricity required to drive the vehicle for the remaining distance based on the driving power and the predicted driving time.

[0006] In some specific embodiments, the step of obtaining the torque of the vehicle's drive motor in the remaining distance based on the road slope, the predicted vehicle speed and the predicted acceleration includes: determining a first product between a first preset parameter and the road slope, a second product between a second preset parameter and the square of the predicted vehicle speed, and a third product between a third preset parameter and the predicted acceleration; based on the sum of the first product, the second product and the third product, determining the torque of the vehicle's drive motor in the remaining distance.

[0007] In some specific embodiments, the first preset parameter is obtained based on the vehicle's reducer speed ratio, drive shaft efficiency, tire rolling radius and weight; the second preset parameter is obtained based on the vehicle's reducer speed ratio, drive shaft efficiency, tire rolling radius air resistance coefficient and frontal area; and the third preset parameter is obtained based on the vehicle's reducer speed ratio, drive shaft efficiency, tire rolling radius and rotational mass.

[0008] In some specific embodiments, the step of obtaining the predicted speed, predicted driving time and predicted acceleration of the vehicle in the remaining distance based on the navigation data includes: obtaining the predicted speed and predicted driving time corresponding to all driving sections of the vehicle in the remaining distance based on the navigation data; wherein the remaining distance is divided into a plurality of driving sections connected in sequence; based on the predicted speed and predicted driving time corresponding to the driving sections, obtaining the predicted acceleration corresponding to all combined driving sections; wherein the remaining distance is divided into a plurality of non-overlapping combined driving sections, and the combined driving section is composed of two adjacent driving sections.

[0009] In some specific embodiments, based on the predicted vehicle speed and predicted driving time corresponding to the driving sections, the step of obtaining the predicted acceleration corresponding to all combined driving sections includes: obtaining the speed difference between the predicted vehicle speeds corresponding to two driving sections in the combined driving sections, and obtaining the time difference between the predicted driving times corresponding to the two driving sections in the combined driving sections; and using the ratio of the speed difference to the time difference as the predicted acceleration corresponding to the combined driving section.

[0010] In some specific embodiments, the steps of obtaining the torque of the vehicle's drive motor in the remaining distance based on the road slope, predicted vehicle speed and predicted acceleration, and obtaining the rotational speed of the drive motor in the remaining distance based on the predicted vehicle speed include: obtaining the torque of the vehicle's drive motor in the combined driving section based on the road slope corresponding to the combined driving section, predicted vehicle speed and predicted acceleration, and obtaining the rotational speed of the drive motor in the combined driving section based on the predicted vehicle speed; obtaining the driving power of the drive motor based on the torque and rotational speed, and determining the amount of electricity required for driving the vehicle in the remaining distance based on the driving power and driving time, including: obtaining the driving power of the drive motor in the combined driving section based on the torque and rotational speed, and obtaining the amount of electricity required for driving the drive motor in the combined driving section based on the driving power and predicted driving time, and taking the sum of the amount of electricity required for driving in all combined driving sections as the amount of electricity required for driving for the remaining distance.

[0011] In some specific embodiments, after the steps of obtaining the driving power of the driving motor based on the torque and the rotational speed, and determining the amount of electricity required to drive the vehicle for the remaining distance based on the driving power and the predicted driving time, the method includes: obtaining the current ambient temperature of the vehicle's environment; determining a corresponding preset power correction amount based on the current ambient temperature, correcting the driving power based on the power correction amount, and determining the corrected amount of electricity required to drive the vehicle for the remaining distance based on the corrected driving power and the predicted driving time.

[0012] A second aspect of the present application provides a vehicle navigation route recommendation method, comprising: obtaining multiple navigation routes with the same starting and ending points based on a vehicle's starting and ending points; obtaining the driving power required for the vehicle corresponding to each of the multiple navigation routes; wherein the driving power is obtained according to any of the above-mentioned methods for obtaining the vehicle's driving power required; and recommending multiple navigation routes to a user; wherein each navigation route carries information on the driving power required.

[0013] The third aspect of the present application provides an electronic device, comprising: a processor; a memory for storing a computer program, wherein when the computer program is executed by the processor, it implements a method for obtaining the amount of electricity required for driving a vehicle as described in any of the above items, or implements the above-mentioned vehicle navigation route recommendation method.

[0014] A fourth aspect of the present application provides a computer-readable storage medium, in which a computer program is stored. When the computer program is executed by a processor, it implements any of the above-mentioned methods for obtaining the amount of electricity required to drive a vehicle, or implements the above-mentioned method for recommending a vehicle navigation route.

[0015] The present application has at least the following beneficial technical effects: Based on the method for obtaining the amount of electricity required for driving a vehicle, the method for obtaining a navigation route, the electronic device and the computer-readable storage medium provided by the present application, the method for obtaining the amount of electricity required for driving includes: obtaining the navigation data of the vehicle, and obtaining the predicted speed, predicted driving time, predicted acceleration and road slope of the remaining distance of the vehicle based on the navigation data; obtaining the torque of the driving motor of the vehicle in the remaining distance based on the road slope, predicted speed and predicted acceleration, and obtaining the speed of the driving motor in the remaining distance based on the predicted speed; obtaining the driving power of the driving motor based on the torque and speed, and determining the amount of electricity required for driving the vehicle in the remaining distance based on the driving power and predicted driving time. Therefore, the road slope, predicted speed and predicted acceleration can be obtained through navigation data, and the amount of electricity required for driving the vehicle in the remaining distance can be determined based on these parameters, which is easy to apply and has higher accuracy.

[0016] The above description is only an overview of the technical solution of the embodiment of the present application. In order to more clearly understand the technical means of the embodiment of the present application, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the embodiment of the present application more obvious and easy to understand, the specific implementation methods of the present application are listed below. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] The accompanying drawings are only used to illustrate the embodiments and are not to be considered as limiting the present application. In addition, the same reference symbols are used to represent the same components throughout the accompanying drawings. In the accompanying drawings:

[0018] Figure 1 It is a flow chart of an embodiment of a method for obtaining the amount of electricity required for vehicle driving provided by the present application;

[0019] Figure 2 is a flow chart of another embodiment of a method for obtaining the amount of electricity required for vehicle driving provided by the present application;

[0020] Figure 3 is a flow chart of another embodiment of a method for obtaining the amount of electricity required for vehicle driving provided by the present application;

[0021] Figure 4 is a flow chart of another embodiment of a method for obtaining the amount of electricity required for vehicle driving provided by the present application;

[0022] Figure 5 is a flow chart of another embodiment of a method for obtaining the amount of electricity required for vehicle driving provided by the present application;

[0023] Figure 6 is a flow chart of another embodiment of a method for obtaining the amount of electricity required for vehicle driving provided by the present application;

[0024] Figure 7 It is a flowchart of an embodiment of a vehicle navigation route recommendation method provided by the present application;

[0025] Figure 8 It is a schematic diagram of the structural framework of an embodiment of the electronic device provided by the present application;

[0026] Fig. 9 It is a schematic diagram of the structural framework of an embodiment of the computer-readable storage medium provided by the present application. DETAILED DESCRIPTION

[0027] The exemplary embodiments of the present application will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present application are shown in the accompanying drawings, it should be understood that the present application can be implemented in various forms and should not be limited by the embodiments described herein. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present application.

[0028] If there are descriptions involving "first", "second", etc. in the embodiments of the present application, the descriptions of "first", "second", etc. are only for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of technical features indicated. Therefore, the features limited to "first" and "second" may explicitly or implicitly include at least one of the features. In addition, if the meaning of "and / or" appearing in the full text is to include three parallel schemes, taking "A and / or B" as an example, it includes scheme A, or scheme B, or a scheme that satisfies both A and B. In addition, the technical solutions between the various embodiments can be combined with each other, but it must be based on the ability of ordinary technicians in this field to implement. When the combination of technical solutions is contradictory or cannot be implemented, it should be considered that such a combination of technical solutions does not exist and is not within the scope of protection required by this application.

[0029] A first aspect of the present application provides a method for obtaining the amount of electricity required to drive a vehicle, which method is applied to new energy vehicles. Figure 1 is a flow chart of an embodiment of a method for obtaining the amount of electricity required for vehicle driving provided by the present application, combined with Figure 1 , the method comprises the following steps:

[0030] S11: Obtain navigation data of the vehicle, and obtain the predicted vehicle speed, predicted travel time, predicted acceleration, and road slope of the remaining distance of the vehicle based on the navigation data.

[0031] The vehicle controller can obtain navigation data from the cloud and then process the navigation data to obtain the vehicle's predicted speed, predicted driving time, predicted acceleration and road slope for the remaining distance based on the navigation data.

[0032] It should be understood that the remaining mileage of the vehicle can be the mileage from the current location of the vehicle to the destination location. The predicted vehicle speed, predicted driving time and predicted acceleration are predicted through navigation data, and may be different from the specific parameters when the vehicle is actually driving, but are generally roughly the same. Among them, the predicted vehicle speed can include the average speed of each section, and can also include the instantaneous speed of a specific driving position, without specific limitation here. The predicted driving time can include the driving time of the entire remaining distance, and can also include the driving time of some specific sections. The predicted acceleration can include the acceleration of a specific position, and can also include the average acceleration of certain sections.

[0033] S12: Based on the road slope, the predicted vehicle speed and the predicted acceleration, the torque of the vehicle's drive motor in the remaining distance is obtained, and based on the predicted vehicle speed, the rotation speed of the drive motor in the remaining distance is obtained.

[0034] The torque of the vehicle's driving motor in the remaining distance can be obtained by obtaining the instantaneous torque at a certain position or the average torque in a certain distance. If the instantaneous torque is obtained, the predicted vehicle speed at this time can be the instantaneous vehicle speed to obtain the instantaneous speed at a certain position. If the average torque is obtained, the predicted vehicle speed at this time can be the average vehicle speed to obtain the average speed in a certain distance.

[0035] There is a fixed relationship between the vehicle speed and the rotation speed of the drive motor, which is determined by the nature of the vehicle. Therefore, after obtaining the predicted vehicle speed, the rotation speed of the drive motor can be obtained.

[0036] S13: Acquire the driving power of the driving motor based on the torque and the rotation speed, and determine the amount of electricity required to drive the vehicle for the remaining distance based on the driving power and the predicted driving time.

[0037] It should be understood that the product of the speed and torque of the range extender is the driving power of the driving motor. In combination with the above content, if the instantaneous torque and instantaneous speed are obtained, then the driving power at this time is also the instantaneous driving power. If the average speed and average torque are obtained, then the driving power at this time is also the average driving power.

[0038] Combined with the above content, if the instantaneous driving power is obtained, the power required for the remaining distance can be determined by predicting the instantaneous power at each moment during the driving time. If the average driving power is obtained, the power required for driving in each time period can be calculated based on the average power in each time period (corresponding to each road section) during the predicted driving time to obtain the power required for driving in the remaining distance.

[0039] In summary, the present embodiment obtains the predicted driving time, road slope, predicted vehicle speed and predicted acceleration through navigation data, and obtains the torque and speed of the drive motor based on these parameters, and then obtains the power of the drive motor to obtain the amount of electricity required for driving in the remaining distance. Therefore, it is possible to obtain relevant parameters based on the navigation data and ultimately obtain the amount of electricity required for driving the vehicle in the remaining distance, and the acquisition of the amount of electricity required for driving is simple and easy to apply. In addition, since the driving power of the vehicle is greatly affected by the road slope and the acceleration of the vehicle. When the slope is large, the driving power required by the vehicle is large, the driving power required during the acceleration of the vehicle is large, and the driving power required during the deceleration of the vehicle is small. Therefore, based on the road slope and the predicted acceleration, the vehicle driving power can be obtained more accurately to accurately determine the amount of electricity required for driving the vehicle.

[0040] Figure 2 FIG. 1 is a flow chart of another embodiment of the method for obtaining the amount of electricity required for vehicle driving provided by the present application. Figure 2 In some specific embodiments, the step of obtaining the torque of the driving motor of the vehicle in the remaining distance based on the road slope, the predicted vehicle speed and the predicted acceleration, i.e., the above-mentioned step S12, includes:

[0041] S21: Determine a first product between a first preset parameter and a road slope, a second product between a second preset parameter and a square of a predicted vehicle speed, and a third product between a third preset parameter and a predicted acceleration.

[0042] Among them, the first preset parameter, the second preset parameter and the third preset parameter are all pre-set parameters related to the vehicle's own parameters, and the first preset parameter, the second preset parameter and the third preset parameter are different from each other.

[0043] S22: Determine the torque of the driving motor of the vehicle in the remaining distance based on the sum of the first product, the second product and the third product.

[0044] Here, assuming that the first product, the second product and the third product are A, B and C respectively, then the torque of the drive motor = A + B + C. In some application scenarios, a correction factor D may be added, and the torque of the drive motor = A + B + C + D.

[0045] Regarding the specific setting methods of the first preset parameter, the second preset parameter and the third preset parameter, in some specific embodiments:

[0046] The first preset parameter is obtained based on the vehicle's reducer speed ratio, drive shaft efficiency, tire rolling radius and weight, the second preset parameter is obtained based on the vehicle's reducer speed ratio, drive shaft efficiency, tire rolling radius, air resistance coefficient and frontal area, and the third preset parameter is obtained based on the vehicle's reducer speed ratio, drive shaft efficiency, tire rolling radius and rotational mass.

[0047] Specifically, let the speed ratio of the reducer, the efficiency of the transmission shaft, and the rolling radius of the tire be ig and n respectively. t and r, the vehicle weight, air resistance coefficient, frontal area and rotational mass are G, Cd, A and δm respectively. At this time, the first preset parameter can be The second preset parameter can be The third preset parameter may be In combination with the above, the correction coefficient D can be determined by the vehicle's own parameters, such as transmission system resistance, reducer ratio, transmission shaft efficiency, tire rolling radius and other parameters, without specific limitation.

[0048] Figure 3 FIG. 1 is a flow chart of another embodiment of the method for obtaining the amount of electricity required for vehicle driving provided by the present application. Figure 3 In some specific embodiments, the step of obtaining the predicted speed, predicted travel time and predicted acceleration of the vehicle in the remaining distance based on the navigation data, i.e., the above-mentioned step S11, includes:

[0049] S31: Obtaining predicted vehicle speeds and predicted driving times corresponding to all driving sections of the remaining distance of the vehicle based on the navigation data; wherein the remaining distance is divided into a plurality of driving sections connected in sequence.

[0050] It should be understood that the remaining distance is composed of multiple driving sections, and the number of driving sections can be large, thereby realizing a fine division of the remaining distance. At this time, each driving section corresponds to navigation data, and the predicted vehicle speed and predicted driving time corresponding to each driving section can be obtained based on the navigation data. At this time, the predicted vehicle speed can be the instantaneous vehicle speed or the average vehicle speed.

[0051] S32: Based on the predicted vehicle speed and predicted driving time corresponding to the driving section, the predicted acceleration corresponding to all the combined driving sections is obtained; wherein the remaining distance is divided into a plurality of non-overlapping combined driving sections, and the combined driving section is composed of two adjacent driving sections.

[0052] The combined driving section is composed of two adjacent driving sections. In this case, the remaining distance can be regarded as composed of multiple combined driving sections. This step obtains the predicted acceleration of the combined driving section, rather than the acceleration of a single driving section. In this case, the driving sections can be divided into smaller ones, so that the combined driving sections are also smaller, and the predicted acceleration of the entire remaining distance can be obtained more accurately.

[0053] Figure 4 FIG. 1 is a flow chart of another embodiment of the method for obtaining the amount of electricity required for vehicle driving provided by the present application. Figure 4 In some specific embodiments, based on the predicted vehicle speed and predicted driving time corresponding to the driving section, the step of obtaining the predicted acceleration corresponding to all the combined driving sections includes:

[0054] S41: Obtain a speed difference between predicted vehicle speeds corresponding to two driving sections in a combined driving section, and obtain a time difference between predicted driving times corresponding to two driving sections in a combined driving section.

[0055] It should be understood that in a combined driving section, if there is a difference in the average vehicle speeds of two driving sections, it means that the vehicle will accelerate or decelerate in the combined driving section. At this time, the vehicle has an acceleration in the combined driving section.

[0056] At this time, the predicted vehicle speed corresponding to the driving section is the average vehicle speed, so as to obtain the speed difference between the two driving sections. At this time, the predicted driving time corresponding to the two driving sections includes the driving time of the two sections respectively, thereby obtaining the time difference of the driving time of the two driving sections.

[0057] S42: Taking the ratio of the speed difference to the time difference as the predicted acceleration corresponding to the combined driving section.

[0058] Based on the ratio of the speed difference to the time difference, the predicted acceleration corresponding to the combined driving section can be determined. At this time, the predicted acceleration of each combined driving section can be calculated to obtain all the predicted acceleration data for the remaining distance.

[0059] Figure 5 FIG. 1 is a flow chart of another embodiment of the method for obtaining the amount of electricity required for vehicle driving provided by the present application. Figure 5 In some specific embodiments, the step of obtaining the torque of the driving motor of the vehicle in the remaining distance based on the road slope, the predicted vehicle speed and the predicted acceleration, and obtaining the speed of the driving motor in the remaining distance based on the predicted vehicle speed, i.e., the above step S12, includes:

[0060] S51: Based on the road slope, predicted vehicle speed and predicted acceleration corresponding to the combined driving section, the torque of the vehicle's driving motor in the combined driving section is obtained, and based on the predicted vehicle speed, the rotational speed of the driving motor in the combined driving section is obtained.

[0061] In combination with the contents of the above embodiments, the predicted acceleration of the combined driving section has been obtained. At this time, the obtained road slope and predicted vehicle speed are the slope and vehicle speed of the combined driving section. At this time, the predicted vehicle speed of the combined driving section can be the average vehicle speed.

[0062] Then, at this time, the torque of the vehicle's drive motor in the combined driving section and the speed of the vehicle in the combined driving section can be obtained based on the road slope, predicted vehicle speed and predicted acceleration corresponding to the combined driving section.

[0063] The step of obtaining the driving power of the driving motor based on the torque and the speed, and determining the amount of electricity required for driving the vehicle for the remaining distance based on the driving power and the driving time, i.e., the above-mentioned step S13, includes:

[0064] S52: The driving power of the driving motor in the combined driving section is obtained based on the torque and the rotational speed, and the driving power required for the driving motor in the combined driving section is obtained based on the driving power and the predicted driving time, and the sum of the driving power required for all the combined driving sections is used as the driving power required for the remaining distance.

[0065] After obtaining the torque and speed of the combined driving sections, the driving power corresponding to the combined driving sections can be obtained, so the driving power of the driving motor in all the combined driving sections can be obtained. The predicted driving time corresponding to each combined driving section can be further obtained, and the driving power required for each combined driving section can be obtained based on the driving power corresponding to each combined driving section. The total driving power required for the remaining distance can be obtained by adding up the driving power of all combined driving sections.

[0066] Figure 6 FIG. 1 is a flow chart of another embodiment of the method for obtaining the amount of electricity required for vehicle driving provided by the present application. Figure 6 In some specific embodiments, after the step of obtaining the driving power of the driving motor based on the torque and the speed, and determining the amount of electricity required for driving the vehicle for the remaining distance based on the driving power and the predicted driving time, that is, after the above step S13, the method includes:

[0067] S61: Acquire the current ambient temperature of the environment in which the vehicle is located.

[0068] The current ambient temperature may be obtained through weather information, sensor information, etc., without specific restrictions.

[0069] S62: determining a corresponding preset power correction amount based on the current ambient temperature, correcting the driving power based on the preset power correction amount, and determining a corrected amount of power required for driving the vehicle for the remaining distance based on the corrected driving power and the predicted driving time.

[0070] It should be understood that, under the condition that other conditions remain unchanged, the ambient temperature of the environment in which the vehicle is located will affect the driving power of the vehicle. Generally speaking, at a certain temperature, the driving power of the vehicle is less affected by the ambient temperature. When the temperature is greater than or less than the certain temperature, as the temperature decreases or increases, the driving power of the vehicle is gradually affected by the ambient temperature.

[0071] There is a certain preset relationship between the ambient temperature and the preset power correction amount. After obtaining the current ambient temperature, the preset power correction amount corresponding to the current ambient temperature can be determined according to the preset relationship. Among them, the corrected driving power is equal to the sum of the driving power before correction plus the power correction amount. If the preset power correction amount is a positive value, the corrected driving power will increase. If the preset power correction amount is a negative value, the corrected driving power will decrease.

[0072] Through this embodiment, the amount of electricity required for driving is corrected according to the ambient temperature, thereby making the amount of electricity required for driving the vehicle for the remaining distance obtained more realistic and more accurate.

[0073] A second aspect of the present application provides a vehicle navigation route recommendation method, Figure 7 This is a flow chart of an embodiment of the vehicle navigation route recommendation method provided by the present application, combined with Figure 7 , the method comprises the following steps:

[0074] S101: Acquire multiple navigation routes with the same starting and ending points based on a vehicle travel starting point and an ending point.

[0075] The vehicle controller can obtain multiple navigation routes with the same starting and ending points from the cloud. The starting points of the multiple navigation sections are the driving starting points set by the user, and the end points of the multiple navigation routes are the driving destinations set by the user.

[0076] S102: Obtaining the required power for driving the vehicle corresponding to each of the plurality of navigation routes; wherein the driving power is obtained according to any of the above methods for obtaining the required power for driving the vehicle.

[0077] It should be understood that the corresponding driving distances, predicted driving times, etc. of multiple navigation routes may be different. In this case, it is necessary to calculate the required power for driving the vehicle corresponding to each navigation route. The method for obtaining the driving power is the method for obtaining the required power for driving the vehicle in any of the above embodiments, and the obtaining method is relatively simple and accurate.

[0078] S103: recommending a plurality of navigation routes to the user; wherein each navigation route carries information on the amount of power required for driving.

[0079] After obtaining the information on the amount of power required for driving each navigation route, the information on multiple navigation routes is displayed to the user, including the amount of power required for driving, so that the user can understand the amount of power required for driving corresponding to each route, which is convenient for the user to select a navigation route. The navigation route can be recommended to the user through the vehicle screen, or the navigation route can be sent to the user's mobile terminal for the user to select, without specific limitation.

[0080] The third aspect of the present application provides an electronic device, comprising: a processor; a memory for storing a computer program, which, when executed by the processor, implements a method for obtaining the amount of electricity required for driving a vehicle as in any of the above embodiments, or implements a method for recommending a vehicle navigation route in the above embodiments.

[0081] Figure 8 It is a schematic diagram of the structural framework of an embodiment of the electronic device 500 provided in the present application.

[0082] In some specific embodiments, the electronic device 500 includes a central processing unit (CPU) 501 and a read-only memory (ROM) 502, wherein the CPU 501 is a processor and the ROM 502 is a memory. The CPU 501 can perform various appropriate actions and processes according to the program stored in the ROM 502 or the program loaded from the storage part 508 to the random access memory (RAM) 503, such as executing the method in the above embodiment. In the RAM 503, various programs and data required for system operation are also stored. The CPU 501, the ROM 502 and the RAM 503 are connected to each other via a bus 504. The input / output (I / O) interface 505 is also connected to the bus 504.

[0083] The following components are connected to the I / O interface 505: an input section 506 including a keyboard, a mouse, etc.; an output section 507 including a cathode ray tube (CRT), a liquid crystal display (LCD), etc., and a speaker, etc.; a storage section 508 including a hard disk, etc.; and a communication section 509 including a network interface card such as a LAN (Local Area Network) card, a modem, etc. The communication section 509 performs communication processing via a network such as the Internet. A drive 510 is also connected to the I / O interface 505 as needed. A removable medium 511, such as a magnetic disk, an optical disk, a magneto-optical disk, a semiconductor memory, etc., is installed on the drive 510 as needed so that a computer program read therefrom is installed into the storage section 508 as needed.

[0084] In particular, according to an embodiment of the present application, the process described above with reference to the flowchart can be implemented as a computer software program. For example, an embodiment of the present application includes a computer program product, which includes a computer program carried on a computer-readable medium, and the computer program includes a computer program for executing the method shown in the flowchart. In such an embodiment, the computer program can be downloaded and installed from a network through a communication section 509, and / or installed from a removable medium 511. When the computer program is executed by a central processing unit (CPU) 501, various functions defined in the system of the present application are executed.

[0085] A fourth aspect of the present application provides a computer-readable storage medium 40, Fig. 9 It is a schematic diagram of the structural framework of an embodiment of the computer-readable storage medium 40 provided in the present application.

[0086] The computer-readable storage medium 40 stores a computer program 41. When the computer program 41 is executed by the processor, it implements the method for obtaining the amount of electricity required for driving a vehicle as in any of the above embodiments, or implements the method for recommending a vehicle navigation route in the above embodiments.

[0087] It should be noted that the computer-readable medium 40 shown in the embodiment of the present application can be a computer-readable signal medium or a computer-readable storage medium or any combination of the above two. The computer-readable storage medium can be, for example, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or device, or any combination of the above. More specific examples of computer-readable storage media can include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM), a flash memory, an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In the present application, a computer-readable storage medium can be any tangible medium containing or storing a program, which can be used by an instruction execution system, device or device or used in combination with it. In the present application, a computer-readable signal medium can include a data signal propagated in a baseband or as a part of a carrier wave, wherein a computer-readable computer program is carried. Such propagated data signals may take a variety of forms, including but not limited to electromagnetic signals, optical signals, or any suitable combination of the above. Computer-readable signal media may also be any computer-readable medium other than computer-readable storage media, which may send, propagate, or transmit programs for use by or in conjunction with an instruction execution system, apparatus, or device. The computer program contained on the computer-readable medium may be transmitted using any appropriate medium, including but not limited to: wireless, wired, etc., or any suitable combination of the above.

[0088] In summary, based on the method for obtaining the amount of electricity required for driving a vehicle, the method for obtaining a navigation route, the electronic device, and the computer-readable storage medium provided in the present application, the method for obtaining the amount of electricity required for driving includes: obtaining the navigation data of the vehicle, and obtaining the predicted speed, predicted driving time, predicted acceleration, and road slope of the remaining distance of the vehicle based on the navigation data; obtaining the torque of the vehicle's driving motor in the remaining distance based on the road slope, predicted speed, and predicted acceleration, and obtaining the speed of the driving motor in the remaining distance based on the predicted speed; obtaining the driving power of the driving motor based on the torque and speed, and determining the amount of electricity required for driving the vehicle in the remaining distance based on the driving power and predicted driving time. Therefore, the road slope, predicted speed, and predicted acceleration can be obtained through navigation data, and the amount of electricity required for driving the vehicle in the remaining distance can be determined based on these parameters, which is easy to apply and has higher accuracy.

[0089] The above content is only a preferred exemplary embodiment of the present application and is not intended to limit the implementation scheme of the present application. A person skilled in the art can easily make corresponding changes or modifications based on the main concept and spirit of the present application. Therefore, the scope of protection of the present application shall be based on the scope of protection required by the claims.

Claims

1. A method for obtaining the amount of electricity required for vehicle driving, characterized in that: include: Obtaining navigation data of the vehicle, and obtaining a predicted speed, a predicted travel time, a predicted acceleration, and a road slope of the remaining distance of the vehicle based on the navigation data; Based on the road slope, the predicted vehicle speed and the predicted acceleration, obtaining the torque of the driving motor of the vehicle in the remaining distance, and based on the predicted vehicle speed, obtaining the rotation speed of the driving motor in the remaining distance; The driving power of the driving motor is acquired based on the torque and the rotational speed, and the amount of electricity required for driving the vehicle for the remaining distance is determined based on the driving power and the predicted driving time.

2. The method for obtaining the amount of electricity required for vehicle driving according to claim 1, characterized in that: The step of obtaining the torque of the driving motor of the vehicle in the remaining distance based on the road slope, the predicted vehicle speed and the predicted acceleration includes: Determining a first product between a first preset parameter and the road slope, a second product between a second preset parameter and the square of the predicted vehicle speed, and a third product between a third preset parameter and the predicted acceleration; Based on the sum of the first product, the second product and the third product, the torque of the driving motor of the vehicle in the remaining distance is determined.

3. The method for obtaining the amount of electricity required for vehicle driving according to claim 2, characterized in that: The first preset parameter is obtained based on the reducer speed ratio, drive shaft efficiency, tire rolling radius and weight of the vehicle; the second preset parameter is obtained based on the reducer speed ratio, drive shaft efficiency, tire rolling radius, air resistance coefficient and frontal area of ​​the vehicle; and the third preset parameter is obtained based on the reducer speed ratio, drive shaft efficiency, tire rolling radius and rotational mass of the vehicle.

4. The method for obtaining the amount of electricity required for vehicle driving according to claim 1, characterized in that: The step of obtaining the predicted speed, predicted travel time and predicted acceleration of the vehicle for the remaining distance based on the navigation data comprises: Based on the navigation data, the predicted vehicle speed and predicted driving time corresponding to all driving sections of the vehicle in the remaining distance are obtained; wherein the remaining distance is divided into a plurality of driving sections connected in sequence; Based on the predicted vehicle speed and the predicted driving time corresponding to the driving section, the predicted acceleration corresponding to all combined driving sections is obtained; wherein the remaining distance is divided into a plurality of non-overlapping combined driving sections, and the combined driving section is composed of two adjacent driving sections.

5. The method for obtaining the amount of electricity required for vehicle driving according to claim 4, characterized in that: The step of acquiring the predicted acceleration corresponding to all combined driving sections based on the predicted vehicle speed and the predicted driving time corresponding to the driving section comprises: Obtaining a speed difference value of the predicted vehicle speeds corresponding to two of the driving sections in the combined driving section, and obtaining a time difference value of the predicted driving times corresponding to two of the driving sections in the combined driving section; The ratio of the speed difference to the time difference is used as the predicted acceleration corresponding to the combined driving section.

6. The method for obtaining the amount of electricity required for vehicle driving according to claim 4, characterized in that: The step of obtaining the torque of the driving motor of the vehicle in the remaining distance based on the road slope, the predicted vehicle speed and the predicted acceleration, and obtaining the rotation speed of the driving motor in the remaining distance based on the predicted vehicle speed comprises: Based on the road slope corresponding to the combined driving section, the predicted vehicle speed and the predicted acceleration, the torque of the driving motor of the vehicle in the combined driving section is obtained, and based on the predicted vehicle speed, the speed of the driving motor in the combined driving section is obtained; The step of acquiring the driving power of the driving motor based on the torque and the rotation speed, and determining the amount of electricity required for driving the vehicle for the remaining distance based on the driving power and the driving time includes: The driving power of the driving motor in the combined driving section is obtained based on the torque and the rotational speed, and the required driving power of the driving motor in the combined driving section is obtained based on the driving power and the predicted driving time, and the sum of the required driving power in all the combined driving sections is used as the required driving power for the remaining distance.

7. The method for obtaining the amount of electricity required for vehicle driving according to claim 1, characterized in that: After the step of acquiring the driving power of the driving motor based on the torque and the rotation speed, and determining the amount of electricity required for driving the vehicle for the remaining distance based on the driving power and the predicted driving time, the method further includes: Obtaining the current ambient temperature of the environment in which the vehicle is located; A corresponding preset power correction amount is determined based on the current ambient temperature, the driving power is corrected based on the preset power correction amount, and a corrected amount of power required to drive the vehicle for the remaining distance is determined based on the corrected driving power and the predicted driving time.

8. A vehicle navigation route recommendation method, characterized in that: include: Acquire multiple navigation routes with the same starting and ending points based on the vehicle's travel starting point and ending point; Acquire the required power for driving the vehicles corresponding to the plurality of navigation routes respectively; wherein the required power for driving the vehicles is acquired according to the method for acquiring the required power for driving the vehicles according to any one of claims 1 to 7; The plurality of navigation routes are recommended to the user; wherein each of the navigation routes carries information on the amount of power required for driving.

9. An electronic device, characterized in that: include: processor; A memory for storing a computer program, wherein when the computer program is executed by the processor, the method for obtaining the amount of electricity required for driving a vehicle as described in any one of claims 1 to 7 is implemented, or the method for recommending a vehicle navigation route as described in claim 8 is implemented.

10. A computer-readable storage medium, characterized in that: The storage medium stores a computer program, which, when executed by a processor, implements the method for obtaining the amount of electricity required for driving a vehicle as described in any one of claims 1 to 7, or implements the method for recommending a vehicle navigation route as described in claim 8.