Method and system for calculating moving block trafficability of high-speed railway

Through the intelligent simulation calculation and compression timetable method, the deviation problem of high-speed railway mobile occlusion pass capability calculation in the existing technology is solved, and accurate pass capability evaluation and mobile occlusion scheme are achieved, which improves the accuracy and reality of the calculation sex.

CN118898162APending Publication Date: 2024-11-05BEIJING JIAOTONG UNIV +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410944117.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-15
Publication Date
2024-11-05

AI Technical Summary

Technical Problem

The existing high-speed railway train pass capability calculation method fails to fully consider factors such as actual line data, infrastructure layout and train performance, resulting in a large deviation from the actual situation, and lacks effective calculations for the mobile blocked pass capability of China's high-speed railway. Methods and systems.

Method used

Using a method based on the simulation calculation of the agent, train agent tracking simulation is carried out by setting simulation parameters, including fixed parameters and variable factors that affect the ability of the route to pass, recording operation data in real time, drawing the occlusion time model, and using the compressed timetable method Calculate the utilization rate and pass capabilities of high-speed rail lines to verify the feasibility of the new train running schedule.

Benefits of technology

It realizes the simulation of the operation of the mobile occlusion train based on the predetermined timetable, outputs the actual operation data of the train and the occupancy of partition time, accurately calculates the line throughput capabilities, and provides an evaluation method for the existing train control system to improve the accuracy of the calculation results. and reality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118898162A_ABST
    Figure CN118898162A_ABST
Patent Text Reader

Abstract

The invention provides a method and a system for calculating moving block trafficability of a high-speed railway, and belongs to the technical field of trafficability calculation of the high-speed railway. A high-speed rail line infrastructure suitable for moving block is constructed based on existing high-speed rail line data, a train tracking simulation model is constructed based on moving block logic, train operation data is output, and the trafficability of the line is calculated based on the block time theory. The simulation system provided by the invention can be used for evaluating the trafficability income brought by realizing the moving block on the basis of the existing line, and calculating the maximum trafficability of the line under the moving block. The trafficability change of the moving block system under the influence of different factors can be simulated, and the feasibility of a high-speed rail line trafficability improvement scheme is verified.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of high-speed railway throughput capacity calculation, and in particular to a method and system for calculating the moving block throughput capacity of a high-speed railway based on constructing an intelligent agent simulation. Background Art

[0002] As the demand for high-speed rail transportation continues to increase, the train capacity of high-speed rail lines is becoming increasingly tight. In response to this problem, a mobile block system based on the existing high-speed rail train control system is proposed to improve the line capacity. However, there is currently a lack of methods and related systems for calculating the capacity of China's high-speed rail mobile block, and it is impossible to carry out the assessment and evaluation of the capacity of related systems after the application of mobile block. Therefore, there is an urgent need for a method and system that can calculate and verify the capacity of high-speed rail mobile block.

[0003] The existing calculation methods mainly include coefficient deduction method, graphical method and direct calculation method. The above methods are based on theoretical models and are calculated according to published empirical values. They do not fully consider the impact of various influencing factors on the high-speed rail capacity under actual line data, infrastructure layout and train performance, resulting in a large deviation between the calculation results and the actual situation. Summary of the invention

[0004] The purpose of the present invention is to provide a method and system for calculating the mobile block capacity of a high-speed railway, and to provide a scenario that is very close to the actual situation to calculate and verify the improvement in line capacity brought about by mobile block on the basis of existing lines, so as to solve at least one technical problem existing in the above-mentioned background technology.

[0005] In order to achieve the above object, the present invention adopts the following technical solutions:

[0006] In a first aspect, the present invention provides a method for calculating the moving block capacity of a high-speed railway, comprising:

[0007] Simulation parameters are set based on existing solutions; the simulation parameters include fixed parameters and variable factors that affect the line's throughput capacity, the fixed parameters include but are not limited to train static parameters, driver reaction time, equipment action time, and safety protection distance, and the variable factors that affect the line's throughput capacity include train traction and braking performance, throat area speed limit, train speed limit, etc.;

[0008] Perform train agent tracking simulation according to the set simulation parameters, and record train operation data in real time during the simulation;

[0009] Output simulation results; the simulation results include but are not limited to the train running VS curve, TS curve, total running time from the start to the end of the simulation, train running distance, time for trains to enter and clear sections and stations, and train tracking interval time;

[0010] Draw the train operation block time model based on the simulation operation results;

[0011] According to the train operation block time model, the utilization rate and throughput capacity of the high-speed railway line are calculated based on the compressed timetable method;

[0012] Determine whether the throughput capacity meets the expected demand; if so, generate a new train operation schedule based on the compressed schedule;

[0013] Verify the feasibility of the new train schedule, where the new train schedule is input to verify whether the train agents can operate normally under the schedule, and calculate the high-speed rail line utilization.

[0014] Furthermore, a train operation block time model is drawn based on the simulation operation results, including:

[0015] Obtain the running time of train i in each partition, divide the partition into receiving partition, departure partition and interval partition according to the train running path, and calculate the block time of each partition respectively. The block times of different partitions are superimposed to obtain the train block time series.

[0016] Furthermore, since mobile blocking cancels the block section restriction, the block section is no longer used as the unit when calculating the block time model. Combined with the characteristics of mobile blocking, the train operation block time model is based on points.

[0017] Furthermore, the time a train occupies a point on the line The calculation formula is as follows:

[0018]

[0019] Among them, t add The additional time for the signal system before the train approaches the point; t t The time it takes for a train to travel one train length; t s The time it takes for the train to travel a safe distance; t c The time when the train sends the release signal to the following train or the dispatching center and the release signal is confirmed by the following train.

[0020] Furthermore, the utilization rate and throughput capacity of the high-speed rail line are calculated based on the compressed timetable method; the utilization rate and throughput capacity of the high-speed rail line calculated by the compressed timetable method are based on the existing train operation timetable, including:

[0021] Calculate the minimum train tracking interval time; based on the train operation timetable, approach the train blocking time series according to the minimum train tracking interval time without adding buffer time to obtain a compressed timetable; calculate the effective time of the train occupation operation timetable; among which, the effective time of the train occupation operation timetable is the minimum time of the train occupation operation timetable. In order to ensure the stability of train operation, buffer time is added between continuously running trains. Therefore, the total time that the train occupies the line infrastructure is the effective time of the train occupation operation diagram plus the buffer time; calculate the utilization rate of the high-speed rail line; calculate the capacity of the high-speed rail line.

[0022] Furthermore, the minimum train tracking interval time of train i before train i+1 is The calculation formula is:

[0023]

[0024] The effective time t of the train's occupancy schedule 有效 The calculation formula is:

[0025]

[0026] Where: The departure time of the last train; is the arrival time of the last train;

[0027] The calculation formula of high-speed rail line utilization f is as follows:

[0028]

[0029] Where: is the buffer time between trains i and i+1; t s Defines the total time for running the graph.

[0030] The formula for calculating the capacity of a high-speed rail line is as follows:

[0031]

[0032] Where: n is the number of trains in the operation diagram.

[0033] In a second aspect, the present invention provides a system for calculating the moving block passing capacity of a high-speed railway, comprising:

[0034] A setting module is used to set simulation parameters based on existing solutions; the simulation parameters include fixed parameters and variable factors that affect the line's throughput capacity, the fixed parameters include but are not limited to train static parameters, driver reaction time, equipment action time and safety protection distance, and the variable factors that affect the line's throughput capacity include train traction and braking performance, throat area speed limit, train speed limit, etc.;

[0035] The simulation module is used to perform train agent tracking simulation according to the set simulation parameters and record the train operation data in real time during the simulation process;

[0036] An output module is used to output simulation results; the simulation results include but are not limited to the train running VS curve, TS curve, total running time from the start to the end of the simulation, train running distance, time for trains to enter and clear sections and stations, and train tracking interval time;

[0037] A drawing module is used to draw a train operation block time model according to the simulation operation results;

[0038] A calculation module, used to calculate the utilization rate and throughput capacity of the high-speed railway line based on the train operation block time model and the compressed timetable method;

[0039] A judgment module is used to judge whether the throughput capacity meets the expected demand; if so, a new train operation schedule is generated based on the compressed schedule;

[0040] The verification module is used to verify the feasibility of the new train operation schedule; wherein, the new train operation schedule is input to verify whether the train intelligent agents can operate normally under the schedule and calculate the utilization rate of the high-speed rail line.

[0041] In a third aspect, the present invention provides a non-transitory computer-readable storage medium, which is used to store computer instructions. When the computer instructions are executed by a processor, the method for calculating the moving block passing capacity of a high-speed railway as described in the first aspect is implemented.

[0042] In a fourth aspect, the present invention provides a computer device comprising a memory and a processor, wherein the processor and the memory communicate with each other, the memory stores program instructions executable by the processor, and the processor calls the program instructions to execute the method for calculating the moving block passing capacity of a high-speed railway as in the first aspect.

[0043] In a fifth aspect, the present invention provides an electronic device, comprising: a processor, a memory and a computer program; wherein the processor is connected to the memory, the computer program is stored in the memory, and when the electronic device is running, the processor executes the computer program stored in the memory so that the electronic device executes instructions for implementing the method for calculating the moving block passing capacity of a high-speed railway as described in the first aspect.

[0044] The beneficial effects of the present invention are as follows: the train operation under mobile block can be simulated according to a predetermined timetable and the actual train operation data and the train occupancy time of each section can be output, so as to provide data support for the calculation of the throughput capacity under mobile block; the train operation data can be output, the line throughput capacity can be accurately calculated, and an evaluation method can be established for realizing the mobile block scheme based on the existing train control system.

[0045] Additional advantages of the present invention will be more clearly presented in the following description or learned through the practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.

[0047] Figure 1 This is a functional principle block diagram of a system for calculating the moving block capacity of a high-speed railway according to an embodiment of the present invention.

[0048] Figure 2 This is a structural block diagram of a train intelligent agent according to an embodiment of the present invention.

[0049] Figure 3 This is a logic flow chart based on mobile block train intelligent agent tracking according to an embodiment of the present invention.

[0050] Figure 4 This is a flow chart of a method for calculating the moving block passing capacity of a high-speed railway according to an embodiment of the present invention. DETAILED DESCRIPTION

[0051] The embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements with the same or similar functions. The embodiments described below by the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be interpreted as limiting the present invention.

[0052] It should be understood by those skilled in the art that unless otherwise defined, all terms (including technical and scientific terms) used herein have the same meaning as commonly understood by those skilled in the art to which this invention belongs.

[0053] It should also be understood that terms, such as those defined in commonly used dictionaries, should be understood to have a meaning consistent with that in the context of the prior art and will not be interpreted in an idealized or overly formal sense unless as defined herein.

[0054] Those skilled in the art will appreciate that, unless otherwise stated, the singular forms "a", "an", "said" and "the" used herein may also include plural forms. It should be further understood that the term "comprising" used in the specification of the present invention refers to the presence of the features, integers, steps, operations, elements and / or components, but does not exclude the presence or addition of one or more other features, integers, steps, operations, elements and / or groups thereof.

[0055] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. Different embodiments or examples described in this specification and features of different embodiments or examples may be combined and combined by those skilled in the art without contradiction.

[0056] To facilitate understanding of the present invention, the present invention is further explained below with reference to specific embodiments in conjunction with the accompanying drawings, and the specific embodiments do not constitute a limitation on the embodiments of the present invention.

[0057] Those skilled in the art should understand that the drawings are merely schematic diagrams of embodiments, and the components in the drawings are not necessarily necessary for implementing the present invention.

[0058] Example 1

[0059] In this embodiment 1, a system for calculating the moving block passing capacity of a high-speed railway is first provided, comprising:

[0060] A setting module is used to set simulation parameters based on existing solutions; the simulation parameters include fixed parameters and variable factors that affect the line's throughput capacity, the fixed parameters include but are not limited to train static parameters, driver reaction time, equipment action time and safety protection distance, and the variable factors that affect the line's throughput capacity include train traction and braking performance, throat area speed limit, train speed limit, etc.;

[0061] The simulation module is used to perform train agent tracking simulation according to the set simulation parameters and record the train operation data in real time during the simulation process;

[0062] An output module is used to output simulation results; the simulation results include but are not limited to the train running VS curve, TS curve, total running time from the start to the end of the simulation, train running distance, time for trains to enter and clear sections and stations, and train tracking interval time;

[0063] A drawing module is used to draw a train operation block time model according to the simulation operation results;

[0064] A calculation module, used to calculate the utilization rate and throughput capacity of the high-speed railway line based on the train operation block time model and the compressed timetable method;

[0065] A judgment module is used to judge whether the throughput capacity meets the expected demand; if so, a new train operation schedule is generated based on the compressed schedule;

[0066] Verification module, used to verify the feasibility of the new train schedule; the new train schedule is input to verify whether the train agents can operate normally under the schedule, and calculate the high-speed rail line utilization rate

[0067] In this embodiment 1, the above system is used to implement a method for calculating the moving block capacity of a high-speed railway, including:

[0068] Simulation parameters are set based on existing solutions; the simulation parameters include fixed parameters and variable factors that affect the line's throughput capacity, the fixed parameters include but are not limited to train static parameters, driver reaction time, equipment action time, and safety protection distance, and the variable factors that affect the line's throughput capacity include train traction and braking performance, throat area speed limit, train speed limit, etc.;

[0069] Perform train agent tracking simulation according to the set simulation parameters, and record train operation data in real time during the simulation;

[0070] Output simulation results; the simulation results include but are not limited to the train running VS curve, TS curve, total running time from the start to the end of the simulation, train running distance, time for trains to enter and clear sections and stations, and train tracking interval time;

[0071] Draw the train operation block time model based on the simulation operation results;

[0072] According to the train operation block time model, the utilization rate and throughput capacity of the high-speed railway line are calculated based on the compressed timetable method;

[0073] Determine whether the throughput capacity meets the expected demand; if so, generate a new train operation schedule based on the compressed schedule;

[0074] Verify the feasibility of the new train schedule, where the new train schedule is input to verify whether the train agents can operate normally under the schedule, and calculate the high-speed rail line utilization.

[0075] Among them, the train operation block time model is drawn according to the simulation operation results, including:

[0076] Get the running time of train i in each partition, divide the partition into receiving partition, departure partition and interval partition according to the train running path, and calculate the block time of each partition respectively. The block time of different partitions is superimposed to obtain the train block time series. Since mobile block cancels the block partition restriction, the block time model is no longer calculated in units of block partitions. Combined with the characteristics of mobile block, the train operation block time model is based on points.

[0077] The time a train occupies a point on the line The calculation formula is as follows:

[0078]

[0079] Among them, t add The additional time for the signal system before the train approaches the point; t t The time it takes for a train to travel one train length; t s The time it takes for the train to travel a safe distance; t c The time when the train sends the release signal to the following train or the dispatching center and the release signal is confirmed by the following train.

[0080] The utilization rate and capacity of the high-speed rail line are calculated based on the compressed timetable method. The utilization rate and capacity of the high-speed rail line calculated by the compressed timetable method are based on the existing train operation timetable, including:

[0081] Calculate the minimum train tracking interval time; based on the train operation timetable, approach the train blocking time series according to the minimum train tracking interval time without adding buffer time to obtain a compressed timetable; calculate the effective time of the train occupation operation timetable; among which, the effective time of the train occupation operation timetable is the minimum time of the train occupation operation timetable. In order to ensure the stability of train operation, buffer time is added between continuously running trains. Therefore, the total time that the train occupies the line infrastructure is the effective time of the train occupation operation diagram plus the buffer time; calculate the utilization rate of the high-speed rail line; calculate the capacity of the high-speed rail line.

[0082] The minimum train tracking interval time of train i before train i+1 The calculation formula is:

[0083]

[0084] The effective time t of the train's occupancy schedule 有效 The calculation formula is:

[0085]

[0086] Where: The departure time of the last train; is the arrival time of the last train;

[0087] The calculation formula for high-speed rail line utilization f is as follows:

[0088]

[0089] Where: is the buffer time between trains i and i+1; t s Defines the total time for running the graph.

[0090] The formula for calculating the capacity of a high-speed rail line is as follows:

[0091]

[0092] Where: n is the number of trains in the operation diagram.

[0093] Example 2

[0094] like Figures 1 to 4 As shown, in this embodiment 2, a method and system for calculating the moving block capacity of a high-speed railway are provided. Based on intelligent agent simulation modeling, the system includes two parts: a moving block train tracking simulation subsystem and a high-speed railway capacity calculation subsystem.

[0095] The mobile block train tracking simulation subsystem includes three parts: a high-speed rail line network model, a train agent model, and a train tracking logic model based on mobile block. The high-speed rail line network model is based on the existing real line data and the corresponding ground equipment is set according to the mobile block requirements. The train agent model is the main body of the simulation. The train agent completes the train agent behavior solution based on the received data and knowledge base based on the blackboard communication. The train tracking logic model based on mobile block is the key to connecting the train agent model with the high-speed rail line network model, controlling the generation, path selection, action decision and clearing of the train agent. The mobile block train tracking simulation subsystem can be used to simulate the tracking operation process of trains based on mobile block in specific scenarios and verify the feasibility of the high-speed rail train operation plan under the scheduled timetable. The simulation can output data such as the train running time in the section and station and the train tracking interval time.

[0096] Furthermore, the high-speed rail network model realizes mobile blocking based on the existing high-speed rail train control system. At present, it is technically impossible to completely cancel the track circuit while taking into account driving safety and efficiency. At the same time, due to the complexity of the high-speed rail network, the mobile block system is often compatible with non-mobile block train operation. Combined with the actual situation, this embodiment still uses the existing block partition as the smallest unit when modeling the high-speed rail network, and establishes the high-speed rail network model in proportion according to the actual line data and station layout.

[0097] The main functions of the train agent model are to perceive the surrounding environment, communicate with other train agents, and make corresponding decisions based on the train knowledge base in combination with the acquired information. In this embodiment, the train agent's perception of the environment mainly refers to obtaining line data and other train data through the blackboard communication mode. The train agent decision-making mechanism includes train operation curve calculation, train condition selection and action execution.

[0098] The train tracking logic model of mobile block decomposes the train operation process into three processes: train intelligent body leaving the station, train intelligent body running in the section, and train intelligent body entering the station. The train intelligent body continuously executes the above three processes in a cycle, makes operation decisions based on its own speed, position information, and the position information of the train intelligent body in front, and drives the operation of the simulation clock, thereby realizing the complete train operation process.

[0099] The high-speed railway capacity calculation subsystem calculates the line capacity based on the preset departure schedule. According to the data such as the train tracking interval time and the train section running time output by the mobile block train tracking simulation subsystem, the capacity bottleneck is analyzed, and the relevant influencing factors are analyzed to obtain the line capacity improvement plan. The high-speed railway capacity calculation subsystem aims to obtain the line capacity that meets the expected demand, and calculates the line capacity based on the train infrastructure occupation time, train tracking interval time and train running schedule output by the mobile block train tracking simulation subsystem.

[0100] In this embodiment 2, a method for calculating the mobile block passing capacity of China's high-speed railway is implemented based on the above system. The method case in this embodiment 2 is implemented using AnyLogic. On the one hand, a high-precision road network model can be quickly established based on the AnyLogic track library, and the entire train operation process can be visualized; on the other hand, Java language can be used for secondary development to meet personalized modeling needs; based on the modeling of the interaction process between the intelligent agent and the train intelligent agent tracking operation, block zoning control and station operation, this method can well adapt to complex train tracking simulation. Figure 1 A method for calculating the moving block capacity of high-speed railway and a system implementation block diagram are shown. The system includes two subsystems: a moving block train tracking simulation subsystem and a high-speed railway capacity calculation subsystem.

[0101] (1) Moving Block Train Tracking Simulation Subsystem

[0102] The mobile block train tracking simulation subsystem provides the required data for the high-speed railway capacity calculation subsystem to calculate the high-speed railway capacity. On the other hand, it can be used to verify the high-speed railway capacity improvement plan. The implementation of the mobile block train tracking simulation subsystem includes the following steps:

[0103] Step 1: Modeling the high-speed rail network. The high-speed rail network can be regarded as a topological network structure formed by connecting block partitions and nodes. The high-speed rail line topological network model can simplify the line modeling process while ensuring modeling accuracy. At the station, the turnouts can be regarded as nodes, and the tracks between the turnouts can be regarded as arcs. The interval is divided into intervals with the block partition as the smallest unit. The nodes in the interval topological structure are the boundary points of two adjacent block partitions, the arcs are the interval tracks, and the modeling scale is 1 meter = 0.1 pixel. For specific sections of the line, the lengths of ramps, curves, tunnels and block partitions are all determined. In this embodiment, the ramps, line speed limits and block partition information of the line are imported through Excel documents.

[0104] Step 2: Train agent modeling. Compared with the existing train control system, the trains in the mobile block system have higher autonomy and intelligence, which is consistent with the high autonomy of the "agent". Figure 2 As shown, the constructed train agent includes a train communication module, a train traction calculation module, a data storage module, an electronic map, a train action decision module and a train action execution module. The main functions of the train agent include steps 21, 22, 23, 24 and 25:

[0105] Step 21: Initialize the train agent data. When the train is generated, the static information of each train, such as the train length, train number and train formation information, will be initialized.

[0106] Step 22: Line data storage and update. The position of the mobile block train during operation does not rely on the track circuit. In this embodiment 2, the train agent stores the line data in the electronic map before starting. When the train agent is running, it determines its own position information based on the travel distance and the line data in the electronic map.

[0107] Step 23: Train agent communication. The realization of mobile interlocking relies on an efficient and large-capacity information transmission process. In the simulation, all train agents are distributed multi-agent organizations that are completely equal, independent and autonomous. In this structure, point-to-point communication is used between train agents. This communication method will result in high simulation resource consumption and low flexibility. To solve the above problems, the train agent communication module in this embodiment realizes information interaction with ground equipment and other train agents through a blackboard communication mechanism. By setting up a public database area, a faster and more effective data transmission method is provided for train agents to obtain line data and other train agent data.

[0108] Step 24: Train traction calculation. The train traction calculation module is the most important functional module of the train intelligent body and the basis for the operation decision of the train intelligent body. This module can calculate the acceleration and braking deceleration of the train in real time according to the train running mileage, running speed, line data, train braking performance and other information, and draw a continuous braking curve of the train. In this embodiment, all additional resistance is converted into ramp resistance, and the train acceleration calculation method is as follows:

[0109] W0=4.5+0.0146v+0.000543v 2 (1)

[0110] W i =1000tanα=i(N / kN) (2)

[0111]

[0112] Where: W0 is the additional resistance of train operation; W i is the slope resistance; trainAcc is the acceleration of the train in traction condition; trainDec is the deceleration of the train in braking condition; trainCoa is the deceleration of the train in inertia condition; γ is the rotation mass coefficient; f i is the traction force of the train; a is the braking deceleration of the train, which does not include the running resistance.

[0113] Step 25: Train action decision and execution. The train action decision module functions to judge the acceleration, deceleration and constant speed of the train.

[0114] Step 3: Modeling the train tracking logic based on moving block. The train tracking logic model based on moving block is used to control the train tracking operation logic under moving block and output train operation data in real time. Figure 3 As shown, step 3 also includes the following steps:

[0115] Step 31: Generate train agents. Generate train agents at corresponding stations and tracks according to the train departure schedule. The necessary condition for generating train agents is that the scheduled departure track status is displayed as idle. If the scheduled track status is displayed as non-idle, the train agent generation time is postponed by one time step until the scheduled departure track status is displayed as idle to generate the train agent.

[0116] Step 32: Train intelligent body station departure logic. The train intelligent body runs at a time step length. When the speed of the train intelligent body is less than the speed limit of the station, the train intelligent body accelerates; when the speed of the train intelligent body reaches the speed limit, it runs at a constant speed. Only after the current train intelligent body clears the throat area can the following train's departure route be processed, otherwise it needs to stop and wait. After the departure route is processed, the following train intelligent body leaves the station. The minimum departure interval time I under moving block发 The calculation formula is:

[0117]

[0118] From this, we can conclude that the following train departure intervals in moving block should meet the constraints:

[0119] t[i+1]-t[i]≥t 发 (7)

[0120] Where: L d L is the distance from the stop sign to the exit signal; ta L is the length of the throat area; t is the train length; V i is the departure speed of train i. t[i] and t[i+1] represent the time when trains i and i+1 arrive at the same point on the line.

[0121] Step 33: Train intelligent body interval operation logic. When the train is running in intervals under moving block, the tail of the preceding train is used as the tracking target. The train operation condition is dynamically adjusted according to the MA length, the speed limit of the preceding section and its own structure to ensure safe operation. When the train is running in intervals, the interval tracking interval time of each point is calculated, and the maximum value is taken as the interval interval time. The interval tracking interval time t 区 The calculation formula is as follows:

[0122]

[0123] Therefore, the tracking interval time between the following trains in the moving block should meet the constraints:

[0124] t[i+1]-t[i]≥t 区 (9)

[0125] At the same time, the following constraints should also be met for the tracking of train sections under moving blocks:

[0126]

[0127] V i ≤Min(V t , V m ) (12)

[0128] Where: L is the braking distance of train i+1 from the current speed to 0; s is the safety protection distance; L add is the additional distance; S i+1 is the head position of train i+1; S i is the locomotive position of train i; is the braking distance of train i+1 from the current speed to v; v is the speed limit of the speed limit section ahead; V is the starting point of the speed limit in the section ahead; i is the speed of train i; V t is the train construction speed, V m is the fixed speed limit of the line. The train i mentioned above is the nearest train in front of train i+1.

[0129] The train section operation is based on a time step as a cycle. In a cycle, the train determines whether to slow down, run at a constant speed or accelerate according to the operation constraints. The specific judgment method is as follows:

[0130] If constraints (10) and (11) are satisfied and V i <Min(V t , V m ), the train accelerates;

[0131] If constraints (10) and (11) are satisfied and V i =Min(V t , V m ), the train has a constant speed;

[0132] If one of the constraints (10) or (11) is not satisfied, the train slows down.

[0133] After each cycle of the train operation, it is determined whether it has reached the station entry signal. If it has reached the station entry signal, the train section operation ends.

[0134] Step 34: Train intelligent body station receiving logic. The initial position of the train entering the station is actually outside the station entry signal. When the train enters the station, the train immediately applies for the occupation of the station throat area, the train stops at the stop sign, and the train enters the station. After the front train’s receiving route is cleared, the following train can be processed. The train arrival interval is the deceleration time when the train starts to enter the station. Time to pass the exit signal Adding the time for handling the route for receiving the train, the minimum arrival interval time of the following trains in the moving block is t 到 The calculation formula is as follows:

[0135]

[0136] Therefore, the following train arrival tracking interval time of moving block should meet the constraints:

[0137] t[i+1]-t[i]≥t 到 (14)

[0138] Where: is the deceleration time of train i when it starts entering the station; is the time when train i passes the anti-departure signal; t 作业The time for picking up the car and entering the road;

[0139] Step 35: The train agent disappears. The train loops through steps 32, 33, and 34 until the train stops at the terminal station, the train clears out, and the train agent disappears.

[0140] (2) High-speed railway capacity calculation subsystem

[0141] The high-speed railway capacity calculation subsystem mainly provides the capacity calculation method. Figure 4 As shown, the simulation process for calculating the moving block passing capacity of a high-speed railway includes the following steps:

[0142] Step 1: Set experimental parameters based on existing schemes; including but not limited to fixed parameter settings such as train static parameters, driver reaction time, equipment action time, and safety protection distance, and variable factors affecting line capacity such as train traction and braking performance, throat area speed limit, and train speed limit, to calculate and verify the high-speed rail line capacity under different schemes.

[0143] Step 2: Train agent simulation operation and animation display; during the simulation process, the train operation data can be recorded in real time and the entire train operation process can be visualized in two-dimensional or three-dimensional form.

[0144] Step 3: Simulation result output; including but not limited to the train running VS curve, TS curve, total running time from the start to the end of the simulation, train running distance, time for trains to enter and clear sections and stations, and train tracking interval time;

[0145] Step 4: Draw the train operation block time model according to the simulation operation output data;

[0146] The step 4 comprises the following steps:

[0147] Step 41: Obtain the running time of train i in each zone. According to the train running path, the zone is divided into the receiving zone, the departure zone and the interval zone, and the block time is calculated respectively. Mobile block cancels the block zone restriction, so this embodiment no longer uses the block zone as the unit when calculating the block time model. In combination with the characteristics of mobile block, the train running block time model in this embodiment is based on points. The train occupancy time of a point on the line is calculated. The calculation formula is as follows:

[0148]

[0149] Where: t add The additional time for the signal system before the train approaches the point; t t The time it takes for a train to travel one train length; t sThe time it takes for the train to travel a safe distance; t c The time when the train sends the release signal to the following train or the dispatching center and the release signal is confirmed by the following train.

[0150] Step 42: Superimpose the block times of different sections to obtain a train block time sequence;

[0151] Step 5: Calculate the high-speed rail line utilization and capacity based on the compressed timetable method; The high-speed rail line utilization and capacity calculated by the compressed timetable method are based on the existing train operation timetable. The results obtained by this method take into account the existing line transportation characteristics, such as the operating ratio of trains with different operating speeds, and are very applicable to the calculation of the existing line capacity.

[0152] The step 5 further comprises the following steps:

[0153] Step 51: Calculate the minimum train tracking interval time. The minimum train tracking interval time of train i before train i+1 The calculation formula is:

[0154]

[0155] Step 52: Based on the train operation schedule, the train block time sequence is calculated according to the minimum train tracking interval time without adding buffer time. Get close to getting a compressed schedule.

[0156] Step 53: Calculate the effective time of the train occupation operation diagram. The effective time t of the train occupation operation schedule 有效 The calculation formula is:

[0157]

[0158] Where: The departure time of the last train; is the arrival time of the last train.

[0159] Step 54: Calculate the utilization rate of high-speed rail lines. 有效 It is the minimum time that a train can technically occupy the operation schedule. In order to ensure the stability of train operation, buffer time is added between consecutive trains. Therefore, the total time that a train occupies the line infrastructure is the effective time of the train occupation operation diagram plus the buffer time. The calculation formula for the high-speed rail line utilization f is as follows:

[0160]

[0161] Where: is the buffer time between trains i and i+1; t s Defines the total time for running the graph.

[0162] Step 55: Calculate the capacity of the high-speed rail line. The formula for calculating the capacity of the high-speed rail line is as follows:

[0163]

[0164] Where: n is the number of trains in the operation diagram.

[0165] Step 6: Determine whether the throughput capacity meets the expected demand. If so, generate a new train operation schedule based on the compressed schedule and proceed to step 7; if not, analyze the line throughput capacity bottleneck, give a new solution, and return to step 1.

[0166] Step 7: Verify the feasibility of the new train schedule. Input the new train schedule to verify whether all train agents can operate normally under the schedule, and calculate the high-speed rail line utilization. If all train agents operate normally and the high-speed rail line utilization is less than 100%, it means that the solution is feasible.

[0167] Example 3

[0168] This embodiment 3 provides a non-transitory computer-readable storage medium, wherein the non-transitory computer-readable storage medium is used to store computer instructions. When the computer instructions are executed by a processor, the method for calculating the moving block passing capacity of a high-speed railway as described above is implemented. The method includes:

[0169] Simulation parameters are set based on existing solutions; the simulation parameters include fixed parameters and variable factors that affect the line's throughput capacity, the fixed parameters include but are not limited to train static parameters, driver reaction time, equipment action time, and safety protection distance, and the variable factors that affect the line's throughput capacity include train traction and braking performance, throat area speed limit, train speed limit, etc.;

[0170] Perform train agent tracking simulation according to the set simulation parameters, and record train operation data in real time during the simulation;

[0171] Output simulation results; the simulation results include but are not limited to the train running VS curve, TS curve, total running time from the start to the end of the simulation, train running distance, time for trains to enter and clear sections and stations, and train tracking interval time;

[0172] Draw the train operation block time model based on the simulation operation results;

[0173] According to the train operation block time model, the utilization rate and throughput capacity of the high-speed railway line are calculated based on the compressed timetable method;

[0174] Determine whether the throughput capacity meets the expected demand; if so, generate a new train operation schedule based on the compressed schedule;

[0175] Verify the feasibility of the new train schedule, where the new train schedule is input to verify whether the train agents can operate normally under the schedule, and calculate the high-speed rail line utilization.

[0176] Example 4

[0177] This embodiment 4 provides a computer device, including a memory and a processor, the processor and the memory communicate with each other, the memory stores program instructions executable by the processor, the processor calls the program instructions to execute the method for calculating the moving block passing capacity of a high-speed railway as described above, the method comprising:

[0178] Simulation parameters are set based on existing solutions; the simulation parameters include fixed parameters and variable factors that affect the line's throughput capacity, the fixed parameters include but are not limited to train static parameters, driver reaction time, equipment action time, and safety protection distance, and the variable factors that affect the line's throughput capacity include train traction and braking performance, throat area speed limit, train speed limit, etc.;

[0179] Perform train agent tracking simulation according to the set simulation parameters, and record train operation data in real time during the simulation;

[0180] Output simulation results; the simulation results include but are not limited to the train running VS curve, TS curve, total running time from the start to the end of the simulation, train running distance, time for trains to enter and clear sections and stations, and train tracking interval time;

[0181] Draw the train operation block time model based on the simulation operation results;

[0182] According to the train operation block time model, the utilization rate and throughput capacity of the high-speed railway line are calculated based on the compressed timetable method;

[0183] Determine whether the throughput capacity meets the expected demand; if so, generate a new train operation schedule based on the compressed schedule;

[0184] Verify the feasibility of the new train schedule, where the new train schedule is input to verify whether the train agents can operate normally under the schedule, and calculate the high-speed rail line utilization.

[0185] Example 5

[0186] This embodiment 5 provides an electronic device, including: a processor, a memory, and a computer program; wherein the processor is connected to the memory, the computer program is stored in the memory, and when the electronic device is running, the processor executes the computer program stored in the memory, so that the electronic device executes instructions for implementing the method for calculating the moving block passing capacity of a high-speed railway as described above, the method including:

[0187] Simulation parameters are set based on existing solutions; the simulation parameters include fixed parameters and variable factors that affect the line's throughput capacity, the fixed parameters include but are not limited to train static parameters, driver reaction time, equipment action time, and safety protection distance, and the variable factors that affect the line's throughput capacity include train traction and braking performance, throat area speed limit, train speed limit, etc.;

[0188] Perform train agent tracking simulation according to the set simulation parameters, and record train operation data in real time during the simulation;

[0189] Output simulation results; the simulation results include but are not limited to the train running VS curve, TS curve, total running time from the start to the end of the simulation, train running distance, time for trains to enter and clear sections and stations, and train tracking interval time;

[0190] Draw the train operation block time model based on the simulation operation results;

[0191] According to the train operation block time model, the utilization rate and throughput capacity of the high-speed railway line are calculated based on the compressed timetable method;

[0192] Determine whether the throughput capacity meets the expected demand; if so, generate a new train operation schedule based on the compressed schedule;

[0193] Verify the feasibility of the new train schedule, where the new train schedule is input to verify whether the train agents can operate normally under the schedule, and calculate the high-speed rail line utilization.

[0194] In summary, the method and system for calculating the capacity of high-speed railway mobile block according to the embodiment of the present invention constructs a high-speed railway line infrastructure suitable for mobile block based on the existing high-speed railway line data, constructs a train tracking simulation model based on the mobile block logic and outputs the train operation data, and calculates the capacity of the line based on the block time theory. The simulation system described in the present invention can be used to evaluate the capacity benefits brought by the mobile block on the basis of the existing line, and calculate the maximum capacity of the line under the mobile block. The capacity change of the mobile block system under the influence of different factors can be simulated to verify the feasibility of the high-speed railway line capacity improvement plan. The key point of the present invention is that it can simulate the train operation under the mobile block according to the predetermined schedule and can output the actual train operation data and the train occupation time of each section, so as to provide data support for the calculation of the capacity under the mobile block. The present invention is based on the simulation output of the train operation data of the mobile block train tracking subsystem, and the high-speed railway capacity calculation subsystem can accurately calculate the line capacity, so as to establish an evaluation method for realizing the mobile block scheme based on the existing train control system.

[0195] Those skilled in the art will appreciate that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0196] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0197] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1A function specified in one or more boxes.

[0198] These computer program instructions can also be loaded onto a computer or other programmable data processing device, and a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, so that the instructions executed on the computer or other programmable device provide for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 A step that specifies a function in one or more boxes.

[0199] Although the above describes the specific implementation mode of the present invention in conjunction with the accompanying drawings, it is not intended to limit the scope of protection of the present invention. Those skilled in the art should understand that various modifications or variations that can be made by those skilled in the art without creative work on the basis of the technical solution disclosed in the present invention should be included in the scope of protection of the present invention.

Claims

1. A method for calculating the moving block capacity of a high-speed railway, characterized in that: include: Simulation parameters are set based on existing solutions; the simulation parameters include fixed parameters and variable factors that affect the line's throughput capacity, the fixed parameters include but are not limited to train static parameters, driver reaction time, equipment action time, and safety protection distance, and the variable factors that affect the line's throughput capacity include train traction and braking performance, throat area speed limit, and train speed limit; Perform train intelligent tracking simulation according to the set simulation parameters, and record train operation data in real time during the simulation; Output simulation results; the simulation results include but are not limited to the train running VS curve, TS curve, total running time from the start to the end of the simulation, train running distance, time for trains to enter and clear sections and stations, and train tracking interval time; Draw the train operation block time model based on the simulation operation results; According to the train operation block time model, the utilization rate and throughput capacity of the high-speed railway line are calculated based on the compressed timetable method; Determine whether the throughput capacity meets the expected demand; if so, generate a new train operation schedule based on the compressed schedule; Verify the feasibility of the new train schedule, where the new train schedule is input to verify whether the train agents can operate normally under the schedule, and calculate the high-speed rail line utilization.

2. The method for calculating the moving block capacity of a high-speed railway according to claim 1, characterized in that: Draw the train operation block time model based on the simulation operation results, including: Obtain the running time of train i in each partition, divide the partition into receiving partition, departure partition and interval partition according to the train running path, and calculate the block time of each partition respectively. The block times of different partitions are superimposed to obtain the train block time series.

3. The method for calculating the moving block capacity of a high-speed railway according to claim 2, characterized in that: Since mobile blocking cancels the block section restriction, the block section is no longer used as the unit when calculating the block time model. Combined with the characteristics of mobile blocking, the train operation block time model is based on points.

4. The method for calculating the moving block capacity of a high-speed railway according to claim 3, characterized in that: The time a train occupies a point on the line The calculation formula is as follows: Among them, t add The additional time for the signal system before the train approaches the point; t t The time it takes for a train to travel one train length; t s The time it takes for the train to travel a safe distance; t c The time when the train sends the release signal to the following train or the dispatching center and the release signal is confirmed by the following train.

5. The method for calculating the moving block capacity of a high-speed railway according to claim 4, characterized in that: Calculate the utilization rate and capacity of high-speed rail lines based on the compressed timetable method; The high-speed rail line utilization and capacity calculated by the compressed timetable method are based on the existing train operation timetable, including: Calculate the minimum train tracking interval time; based on the train operation timetable, approach the train blocking time series according to the minimum train tracking interval time without adding buffer time to obtain a compressed timetable; calculate the effective time of the train occupation operation timetable; among which, the effective time of the train occupation operation timetable is the minimum time of the train occupation operation timetable. In order to ensure the stability of train operation, buffer time is added between continuously running trains. Therefore, the total time that the train occupies the line infrastructure is the effective time of the train occupation operation diagram plus the buffer time; calculate the utilization rate of the high-speed rail line; calculate the capacity of the high-speed rail line.

6. The method for calculating the moving block capacity of a high-speed railway according to claim 5, characterized in that: The minimum train tracking interval time of train i before train i+1 The calculation formula is: The effective time t of the train's occupancy schedule 有效 The calculation formula is: Where: The departure time of the last train; is the arrival time of the last train; The calculation formula of high-speed rail line utilization f is as follows: Where: is the buffer time between trains i and i+1; t s Defines the total time for running the graph. The formula for calculating the capacity of a high-speed rail line is as follows: Where: n is the number of trains in the operation diagram.

7. A system for calculating the moving block capacity of a high-speed railway, characterized in that: include: A setting module is used to set simulation parameters based on an existing solution; the simulation parameters include fixed parameters and variable factors that affect the line's throughput capacity, the fixed parameters include but are not limited to train static parameters, driver reaction time, equipment action time, and safety protection distance, and the variable factors that affect the line's throughput capacity include train traction and braking performance, throat area speed limit, and train speed limit; The simulation module is used to perform train agent tracking simulation according to the set simulation parameters and record the train operation data in real time during the simulation process; An output module is used to output simulation results; the simulation results include but are not limited to the train running VS curve, TS curve, total running time from the start to the end of the simulation, train running distance, time for trains to enter and clear sections and stations, and train tracking interval time; A drawing module is used to draw a train operation block time model according to the simulation operation results; A calculation module, used to calculate the utilization rate and throughput capacity of the high-speed railway line based on the train operation block time model and the compressed timetable method; A judgment module, used to judge whether the passing capacity meets the expected requirements; If it is reached, a new train operation schedule is generated based on the compressed schedule; The verification module is used to verify the feasibility of the new train operation schedule; wherein, the new train operation schedule is input to verify whether the train intelligent agents can operate normally under the schedule and calculate the utilization rate of the high-speed rail line.

8. A non-transitory computer-readable storage medium, characterized in that: The non-transitory computer-readable storage medium is used to store computer instructions, and when the computer instructions are executed by a processor, the method for calculating the moving block passing capacity of a high-speed railway as described in any one of claims 1-6 is implemented.

9. A computer device, characterized in that: It includes a memory and a processor, the processor and the memory communicate with each other, the memory stores program instructions that can be executed by the processor, and the processor calls the program instructions to execute the method for calculating the moving block passing capacity of a high-speed railway as described in any one of claims 1-6.

10. An electronic device, characterized in that: include: A processor, a memory and a computer program; wherein the processor is connected to the memory, the computer program is stored in the memory, and when the electronic device is running, the processor executes the computer program stored in the memory so that the electronic device executes instructions for implementing the method for calculating the moving block passing capacity of a high-speed railway as described in any one of claims 1 to 6.