Method for distinguishing 10kV single-phase earth fault by subtracting inductive current in fault line

By setting up a single-phase grounding judgment system in a 10kV distribution network, collecting PMU data and subtracting the inductance current of the arc-destroying coil, the problem of difficulty in determining single-phase grounding faults in the arc-destroying coil grounding system is solved, and the fault lines and regions are realized accurate positioning and continuous monitoring of segments.

CN118899816APending Publication Date: 2024-11-05SUZHOU YINJU ELECTRIC POWER TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410970830.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-19
Publication Date
2024-11-05

AI Technical Summary

Technical Problem

In a 10kV power distribution network, the arc suppression coil grounding system leads to difficulty in determining single-phase grounding faults, especially within 2 to 10ms after the fault occurs, the zero-sequence power direction calculation cannot be continuously carried out, which can easily lead to misjudgment and malfunctions.

Method used

By setting up a single-phase grounding judgment system at the dispatching main station or substation end, collecting PMU zero-sequence current and zero-sequence voltage data, preliminary judgment of the fault line and section, and subtracting the inductor current of the arc-destroying coil after the fault, obtaining the capacitance current. Continuous zero-sequence power direction calculations are performed to confirm the faulty line and section.

Benefits of technology

Accurate judgment and continuous monitoring of single-phase grounding faults are achieved, the problem of short judgment time after the arc suppression coil device is overcome, and the accuracy and continuity of fault judgment are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118899816A_ABST
    Figure CN118899816A_ABST
Patent Text Reader

Abstract

The invention discloses a method for distinguishing a 10kV single-phase grounding fault by subtracting an inductive current in a fault line, which comprises the following steps of: arranging a single-phase grounding distinguishing system master station at a dispatching master station end or a transformer substation end within the initial 2-10ms time of single-phase grounding of a certain distribution line; the zero-sequence power direction is calculated in real time by collecting the PMU zero-sequence current of each measuring point on each 10kV line and the secondary PMU zero-sequence voltage of a PT on a substation bus or a line, and sorting is carried out to preliminarily judge a fault line section; 2-10 ms after the single-phase earth fault occurs, PMU inductive current of the arc suppression coil of the transformer substation is further collected, then zero-sequence current of each measurement point of the fault section of the 10kV fault line subtracts the inductive current to obtain PMU zero-sequence current of the fault section of the fault line, and zero-sequence power direction calculation is conducted on the PMU zero-sequence current and PMU zero-sequence voltage in real time; when the zero-sequence voltage exists, continuously judging that a single-phase earth fault occurs in the line section; and when the single-phase earth fault time exceeds the specified time limit, the permanent single-phase earth fault occurs in the section line.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to an arc suppression coil grounding system, and in particular to a method for determining a 10kV single-phase grounding fault by subtracting an inductive current in a fault line. The invention belongs to the technical field of protection and control of power distribution networks. Background Art

[0002] In the arc suppression coil grounding system, an over-compensation scheme is generally adopted; when a single-phase grounding fault occurs on a 10kV distribution line, the arc suppression coil is started about 2 to 10ms after the fault occurs, and the inductive current of the arc suppression coil compensates and exceeds the capacitive current of the fault point, so that the fault information of the fault line is submerged by the inductive current, which will make the further identification of the single-phase grounding fault very difficult. In the 10kV distribution network, which is a system of arc suppression coil grounding, for single-phase grounding faults on 10kV distribution lines, a wide-area synchronous (PMU) current measurement device is used to collect the A, B, and C phase currents on the line, and send them to the dispatching master station or substation end to calculate the zero-sequence current 3I0 of each line. At the same time, a wide-area synchronous voltage measurement device is installed on the secondary side of the voltage transformer (PT) on the substation bus or line to collect the PMU zero-sequence voltage 3U0, which is sent to the dispatching master station or substation end, and then the zero-sequence power direction is calculated. However, the above technical solution can only perform zero-sequence power direction calculation and single-phase grounding fault judgment within a short period of 2 to 10ms, and it is impossible to further judge the single-phase grounding fault after this time. Because as long as the zero-sequence power direction is started, it will always maintain the action state when the zero-sequence voltage exists. This method is prone to misjudgment and false operation. The present invention proposes a relay protection technical solution for single-phase grounding faults for a 10kV system that is a grounding system through an arc suppression coil. Based on wide-area synchronization information, the zero-sequence current of each measuring point in the fault section of the 10kV fault line is subtracted from the directly measured arc suppression coil inductance current to obtain the capacitive current of each measuring point in the fault section of the fault line, confirm the fault line and fault section, and realize fault line selection or section positioning. Summary of the invention

[0003] To solve the above technical problems, the purpose of the present invention is to, in a 10kV system grounded by an arc suppression coil, based on wide-area synchronization information, after preliminarily confirming the fault line and the fault section, use the zero-sequence current of each measuring point in the fault section of the 10kV fault line minus the directly measured arc suppression coil inductance current to obtain the capacitive current of each measuring point in the fault section of the fault line, thereby realizing a relay protection method for single-phase grounding faults with fault line selection or section positioning.

[0004] To implement the method, in the arc suppression coil grounding system, within the first 2 to 10 ms of a single-phase grounding of a distribution line, a single-phase grounding identification system master station located at the dispatching master station or the substation end collects the PMU zero-sequence current of each measuring point on each 10kV line and the PMU zero-sequence voltage of the PT secondary on the substation bus or line, calculates the zero-sequence power direction in real time, and sorts the calculation results to preliminarily determine the faulty line section; 2 to 10 ms after the single-phase grounding fault, the PMU inductance current of the arc suppression coil of the substation is further collected, and then the zero-sequence current of each measuring point in the fault section of the 10kV fault line is subtracted from the inductance current to obtain the PMU zero-sequence current (capacitance current) of the faulty section of the faulty line, and the zero-sequence power direction is calculated in real time with the PMU zero-sequence voltage; when the zero-sequence voltage exists, it is continuously determined that a single-phase grounding fault has occurred in the line section; when the single-phase grounding fault time exceeds the specified time limit, it is reported that a permanent single-phase grounding fault has occurred in the line section.

[0005] To achieve the above object, the present invention adopts the following technical solution:

[0006] A method for determining a 10kV single-phase grounding fault by subtracting the inductance current in the fault line is as follows:

[0007] At the dispatching master station or substation end, a single-phase grounding identification system master station is set up to collect fault information, calculate the zero-sequence power direction, and calculate the capacitance current of the fault section of the fault line by subtracting the arc suppression coil inductance current, so as to judge the non-fault line, fault line fault section, and non-fault section of the fault line where the single-phase grounding fault occurs; on the 10kV line, A, B, C three-phase current or zero-sequence current PMU type current measuring devices are installed at every other line as current measurement points, and the A, B, C phase PMU current or zero-sequence current of each measurement point on the line is collected and sent to the single-phase grounding identification master station system for PMU zero-sequence current 3I0 calculation; a PMU type current measuring device is installed on the arc suppression coil of the substation to measure the arc suppression coil PMU inductance current and send it to the single-phase grounding identification master station system; a PMU type voltage measuring device is installed on the secondary side of the PT on the substation bus or line to collect the PMU zero-sequence voltage 3U0 and send it to the single-phase grounding identification master station system.

[0008] The method for determining a 10kV single-phase grounding fault includes the following steps:

[0009] Step 1), the single-phase grounding judgment master station system collects zero-sequence voltage PMU data. When the zero-sequence voltage value is greater than the zero-sequence voltage start setting value, the single-phase grounding fault judgment program is entered; the PMU data of zero-sequence current and zero-sequence voltage at the first measuring point of each line collected are used to calculate the zero-sequence power direction within the first 2 to 10 ms of the fault to exclude the grounding fault that is not in the upstream line section of the first measuring point of each 10kV line or the 10kV busbar of the substation:

[0010] (1) If the angle of the zero-sequence power direction calculation result is not entirely in the reverse direction (i.e., the zero-sequence power direction is in the reverse direction), and the angle of the zero-sequence power direction calculation result of at least one line is in the positive direction (i.e., the zero-sequence power direction is in the positive direction), then the grounding point that excludes the single-phase grounding fault is not in the upstream line section of the first measurement point of all 10kV lines or the 10kV busbar of the substation;

[0011] (2) If the calculation results of the zero-sequence power direction are all in the opposite direction of the zero-sequence power direction, it is judged that the grounding point of the single-phase grounding fault is in the upstream line section of the first measuring point of all 10kV lines or the 10kV busbar of the substation;

[0012] Step 2), based on step 1), screening faulty lines and non-faulty lines according to the zero-sequence power direction;

[0013] The screening method is as follows:

[0014] ⑴ Screen out the faulty lines:

[0015] If the zero-sequence power direction of the first measuring point on a line is positive, the line section downstream of the measuring point is judged to be a fault line;

[0016] ⑵Filter out non-faulty lines:

[0017] If the zero-sequence power direction of the first measuring point on a line is in the reverse direction, the line section downstream of the measuring point of the line is judged to be a non-fault line;

[0018] Through the above screening steps, faulty lines and non-faulty lines are screened out;

[0019] Step 3), after selecting the faulty line according to step (1) of step 2, calculate the zero-sequence power direction of each measuring point of the faulty line, and select the faulty section of the faulty line and the non-faulty section of the faulty line according to the zero-sequence power direction,

[0020] The screening method is as follows:

[0021] ⑴ Calculate the zero-sequence power direction of each measuring point on the fault line, set condition ① if the zero-sequence power direction of one or more consecutive measuring points (may be 1 point, or 1 series of points: from the first measuring point of the line to the measuring point before the fault point) is in the positive direction, condition ② the zero-sequence current is greater than the zero-sequence current setting value; if the above two conditions are met, select the downstream line section of the measuring point as the positive direction of the fault;

[0022] (2) Calculate the zero-sequence power direction of each measuring point on the fault line. If it is in the reverse direction, select the downstream line section of the measuring point as the reverse direction of the fault;

[0023] ⑶ Sort the measurement points selected as the positive direction and the reverse direction of the fault. The sorting method is: the zero-sequence power direction on the line is judged to be the positive direction (from the first measurement point of the line to the measurement point before the fault point) and the reverse direction (all measurement points after the fault point) are sorted respectively. The downstream section of the last measurement point in the positive direction to the upstream section of the first measurement point in the reverse direction is the fault point of the line fault. The downstream section of the first measurement point in the reverse direction is the non-fault section of the line. The line section between the last measurement point in the positive direction of the fault and the first measurement point in the reverse direction of the fault is determined to be the fault section of the fault line.

[0024] (4) If the last measurement point in the positive direction of the fault is already the last measurement point of the line, the line section downstream of the measurement point is judged to be the fault line section;

[0025] Alternatively, another method is used: sort the zero-sequence current of the fault line at this moment, calculate and screen the phase of the zero-sequence current of the upstream measuring point and the downstream measuring point: when the phase of the zero-sequence current of the upstream measuring point and the zero-sequence current of the downstream measuring point is in reverse phase, the coverage section of the upstream measuring point and the downstream measuring point is screened and selected as the fault section.

[0026] Note: When a single-phase grounding occurs in the line: the phase of the zero-sequence current will be opposite at the fault point. The fault location can be determined through this fault phenomenon.

[0027] Through the above screening steps, the faulty section of the faulty line is screened out.

[0028] Step 4: Based on the screening in the above steps, further screen out the fault phase of the faulty line;

[0029] The screening method is as follows:

[0030] (1) Calculate the three-phase current increments of each measuring point before the fault section of the faulty line while screening in step 3;

[0031] ⑵ Sort the three-phase current increments of each measuring point before calculating the fault section of the faulty line, and determine that the phase with the largest current increment among the three-phase currents is the fault phase.

[0032] Or another method is used: the A, B, and C three-phase voltage data of the PT secondary on the bus or line is used to screen the fault phases. When two of the three-phase voltages A, B, and C are greater than the normal operating voltage and one of the phase voltages is less than m times the normal operating voltage or less, the phase with reduced voltage is determined to be the faulty phase of the faulty line.

[0033] It is another method to determine the fault phase: because the most obvious fault feature of single-phase grounding is the decrease in voltage of one phase of the PT, which can be used to determine the phase difference of single-phase grounding.

[0034] Through the above screening steps, the fault phase of the faulty line can be screened out.

[0035] Step 5: 2 to 10 ms after the fault, continue to collect the three-phase currents of A, B, and C at each measuring point of the fault section of the faulty line, continue to calculate the zero-sequence current or collect the zero-sequence current from the zero-sequence CT, and collect the PMU inductance current at the arc suppression coil measuring point at the same time, use the PMU zero-sequence current at each measuring point of the fault section of the faulty line, subtract the PMU inductance current at the arc suppression coil measuring point, and obtain the PMU zero-sequence current at each measuring point of the fault section of the faulty line, that is, the capacitive current, and calculate the zero-sequence power direction with the PMU zero-sequence voltage, and continue to screen the faulty line section;

[0036] The screening method is as follows: 2 to 10 ms after the fault,

[0037] ⑴Continue to collect the three-phase currents of A, B, and C at each measuring point in the fault line section of the fault line to calculate the PMU zero-sequence current or collect the zero-sequence current from the zero-sequence CT, and collect the PMU inductance current at the arc suppression coil measuring point at the same time; use the PMU zero-sequence current at each measuring point in the fault section of the fault line to subtract the PMU inductance current at the arc suppression coil measuring point to obtain the PMU zero-sequence current at each measuring point in the fault section of the fault line;

[0038] ⑵Continue to collect the PMU zero-sequence voltage and the PMU zero-sequence current of each measuring point in the fault section of the fault line obtained in step ⑴ above, continue to calculate the zero-sequence power direction, and continue to confirm the fault section of the fault line;

[0039] ⑶ Collect the zero-sequence voltage of PMU and calculate the starting value when the zero-sequence voltage is continuously greater than the zero-sequence voltage;

[0040] (4) It is determined that the grounding point of the single-phase grounding fault is not on the upstream line section or substation busbar of the first measuring point of the 10kV line;

[0041] The zero-sequence current of the first measuring point on each line is collected, and the zero-sequence power direction is calculated with the PMU zero-sequence voltage. The result of the zero-sequence power direction calculation is: the non-fault lines are all in the reverse direction, while the fault line is in the positive direction, so the grounding point of the single-phase grounding fault is not in the upstream line section of the first measuring point of the 10kV line or the 10kV busbar of the substation; among them, for the fault line, the zero-sequence current (capacitive current) of the fault line obtained by subtracting the PMU inductance current of the arc suppression coil measuring point from the PMU zero-sequence current of each measuring point in the fault section of the fault line is used for the zero-sequence power direction calculation;

[0042] Since the capacitive current is retrieved, the zero-sequence power direction of the fault line can be calculated continuously until the fault disappears, and the fault duration can be obtained;

[0043] Step 6: Determine whether the faulty line is an instantaneous single-phase grounding fault:

[0044] When the duration of the single-phase grounding fault in step 5 is less than time t, the fault line is judged to be an instantaneous single-phase grounding fault;

[0045] Step 7: Determine whether the faulty line is a permanent single-phase grounding fault:

[0046] When the single-phase grounding fault in step 5 lasts longer than time t, the faulty line is judged to be a permanent single-phase grounding fault;

[0047] Step 8: Single-phase ground fault judgment program and system return

[0048] When the measured zero-sequence voltage is less than the return set value of the zero-sequence voltage, it is determined that the single-phase grounding fault disappears, and the single-phase grounding fault determination program and system return.

[0049] The above method for determining a 10kV single-phase grounding fault by subtracting the inductance current in the fault line includes step 1):

[0050] Preferably, the method for collecting zero-sequence current PMU data is: collecting PMU data of three-phase currents A, B, and C collected at each measuring point on each 10kV line, calculating the zero-sequence current at each measuring point of each line, or directly collecting PMU data of zero-sequence current at each measuring point using a zero-sequence current transformer; wherein the zero-sequence current calculated from the three-phase currents A, B, and C is for:

[0051]

[0052] (1) In the formula, is 3 times the zero-sequence current, is the A phase current, is the B phase current, is the C phase current;

[0053] Step 1) requires collecting the zero-sequence current of each measuring point of each line, which is also equal to the sum of the capacitance currents of the three-phase A, B, and C lines to the ground at each measuring point of each line in the event of a single-phase grounding fault, that is, the zero-sequence current is a comprehensive capacitance current.

[0054] The above method for determining a 10kV single-phase grounding fault by subtracting the inductance current in the fault line includes step 1):

[0055] Preferably, the method for collecting zero-sequence voltage PMU data is: collecting the three-phase voltage of the PT secondary on the substation bus or line, calculating the zero-sequence voltage in real time, and calculating the zero-sequence voltage from the A, B, and C three-phase voltages. for:

[0056]

[0057] In formula (2), is 3 times the zero-sequence voltage, is the A phase voltage, is the B phase voltage, is the C phase voltage;

[0058] Alternatively, a zero-sequence voltage transformer (PT) is used to directly collect the zero-sequence voltage PMU data of the PT secondary on the substation bus or line.

[0059] In the above method for determining a 10 kV single-phase ground fault by subtracting the inductance current in the fault line, in step 1 (3): the zero-sequence voltage is continuously greater than the starting setting of the zero-sequence voltage: greater than the maximum unbalanced voltage value when the master station system collects the zero-sequence voltage during normal operation:

[0060] 3U 0zd =K k *3U bph (3)

[0061] In formula (3), 3U 0zd is the zero-sequence voltage starting value; K k is the reliability factor; 3U bph It is the maximum unbalanced voltage value when the master station system collects zero-sequence voltage during normal operation, 3U 0zd Take 5~15V; reliability coefficient K k Take ≥1.5~2.0; the return setting of the zero-sequence voltage is k times the zero-sequence voltage starting setting, and k is 0.5~0.8.

[0062] The above method for determining a 10kV single-phase grounding fault by subtracting the inductance current in the fault line includes step 3):

[0063] Preferably, the zero-sequence current setting value is greater than the maximum unbalanced current when the master station system collects zero-sequence current under normal line operation.

[0064] 3I 0zd =K k 3I 0bph (4)

[0065] In formula (4), 3I 0zd is the zero-sequence current setting value; K k is the reliability coefficient; 3I 0bph It is the maximum unbalanced current when the master station system collects zero-sequence current during normal operation of the line, 3I 0zd Take 2~7A. Reliability coefficient K k Take ≥1.5~2.0.

[0066] The above method for determining a 10kV single-phase grounding fault by subtracting the inductance current in the fault line includes step 1:

[0067] Preferably, if the zero-sequence power direction of the line is positive, it is a faulty line. The method for determining the direction of the zero-sequence power is as follows: the angle range for the positive direction is -180° to 0° or 180° to 360°. The half angle position of the action area is called the maximum sensitivity angle. The sensitivity angle Φ lm The angle is 90°, and there is a clear action boundary, plus or minus 8° respectively, and the action equation is:

[0068]

[0069] If the zero-sequence power direction of the line is judged to be in the reverse direction, it is a non-fault line. The angle range for judging the reverse direction is 0°~180°, and its sensitive angle Φ lm The angle is -90°, and there is a clear action boundary, plus or minus 8° respectively. The action equation is:

[0070]

[0071] The voltage in the zero-sequence power direction calculated in equations (5) to (6) is Calculate the current in the zero-sequence power direction as

[0072] In the above method for determining a 10kV single-phase grounding fault by subtracting the inductance current in the fault line, step 5 is:

[0073] 2 to 10 ms after the fault, the PMU zero-sequence current of each measuring point in the fault section of the fault line is used, minus the PMU inductance current of the arc suppression coil, to obtain the PMU zero-sequence current (capacitance current) of each measuring point in the fault section of the fault line. The calculation formula is

[0074]

[0075] (7) In the formula, It is the inductive current of the arc suppression coil of the substation measured 2 to 10ms after the fault. It is the zero-sequence current at each measuring point in the fault section of the faulty line 2 to 10ms after the fault.

[0076] In the above method for determining a 10 kV single-phase grounding fault by subtracting the inductance current in the fault line, in step 4, m is set to 70% to 80%.

[0077] In the above method for determining a 10kV single-phase grounding fault by subtracting the inductive current in the fault line, the time t of step 6 and step 7 is set to be greater than the disturbance fault time of the distribution line, and is set to 0.1 to 10 minutes.

[0078] The above method for determining a 10kV single-phase grounding fault by subtracting the inductance current in the fault line, wherein the increments of the three-phase currents A, B, and C at each measuring point before the fault section of the fault line in step 4 are for:

[0079]

[0080] (8) In the formula, They are the A, B, and C phase currents collected after the fault section of the fault line fails. They are the A, B, and C phase currents collected before the fault in the fault section of the faulty line, and Φ represents phase A, phase B, and phase C respectively.

[0081] The voltage level of the power distribution line applied by the present invention is 6kV-35kV, and the grounding method used in the 6kV-35kV system is a grounding system via an arc suppression coil.

[0082] Compared with the prior art, the present invention has the following beneficial effects:

[0083] 1. The present invention makes full use of the advantages of wide-area synchronous data. 2 to 10 ms before the occurrence of a fault, the PMU data of the entire 10kV power grid is collected, the zero-sequence power direction of the 10kV lines of the entire network is calculated, and the data is sorted. The fault line can be screened and identified, and the fault identification is accurate, which is conducive to the safe and stable operation of the power grid.

[0084] 2. The present invention further collects PMU zero-sequence current data of each acquisition point in the fault section of the fault line when a single-phase grounding fault occurs 2 to 10 ms after the fault occurs, and subtracts the directly measured arc suppression coil inductance current from the zero-sequence current of each measurement point in the fault section of the 10kV fault line to obtain the capacitive current of each measurement point in the fault section of the fault line, and then calculates the zero-sequence power direction with the PMU zero-sequence voltage, and further confirms the faulty part of the fault line, thereby overcoming the defect of the prior art that the effective time for correctly judging the fault by the zero-sequence power direction of the fault line is only 2 to 10 ms after the arc suppression coil device is started. The present invention gives full play to the advantages of big data, further screens and confirms the faulty line, ensures the accuracy of fault judgment, and is simple and easy to implement.

[0085] 3. The present invention directly measures the inductive current of the arc suppression coil, and then subtracts the inductive current from the zero-sequence current of the 10kV fault line to obtain the capacitive current of the fault section of the fault line, and further calculates the zero-sequence power direction of the fault section. It can be confirmed whether the fault line is a transient single-phase grounding fault or a permanent single-phase grounding fault, which overcomes the problem that the arc suppression coil grounding method cannot accurately determine whether the fault line is a transient single-phase grounding fault or a permanent single-phase grounding fault.

[0086] 4. The present invention directly measures the inductive current of the arc suppression coil, and then subtracts the inductive current from the zero-sequence current of the 10kV fault line to obtain the capacitive current of the fault section of the fault line. The zero-sequence power direction calculation of the fault section is continuous, which solves the technical problem that the prior art can only judge the single-phase grounding fault of the arc suppression coil grounding system for 2 to 10ms and cannot judge continuously. BRIEF DESCRIPTION OF THE DRAWINGS

[0087] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.

[0088] Figure 1 It is a single line diagram of a 10kV power distribution line of the present invention;

[0089] Figure 2 This is a flow chart of single-phase grounding fault determination of a 10kV power distribution line of the present invention;

[0090] Figure 3 It is the action characteristic diagram of the zero-sequence power direction of the fault line of the present invention;

[0091] Figure 4 It is the action characteristic diagram of the zero-sequence power direction of the non-fault line of the present invention. DETAILED DESCRIPTION

[0092] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, rather than all the embodiments. The components of the embodiments of the present application described and shown in the drawings here can be arranged and designed in various different configurations.

[0093] Therefore, the following detailed description of the embodiments of the present application provided in the accompanying drawings is not intended to limit the scope of the present application for which protection is sought, but merely represents selected embodiments of the present application. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present application.

[0094] The purpose of the present invention is to, in a 10kV system that is grounded through an arc suppression coil, based on wide-area synchronization information, after preliminarily confirming the fault line and fault section, use the zero-sequence current of each measuring point in the fault section of the 10kV fault line minus the inductive current of the arc suppression coil measured directly to obtain the capacitive current of each measuring point in the fault section of the fault line, so as to realize fault line selection or section positioning.

[0095] To achieve the purpose of the invention, the overall idea of ​​the technical solution of the present invention is that in the arc suppression coil grounding system, within the first 2 to 10 ms when a single-phase grounding occurs in a distribution line, the single-phase grounding identification system master station located at the dispatching master station or the substation end collects the PMU zero-sequence current of each measuring point on each 10kV line and the PMU zero-sequence voltage of the PT secondary on the substation bus or line, calculates the zero-sequence power direction in real time, and sorts the calculation results to preliminarily determine the faulty line section; 2 to 10 ms after the single-phase grounding fault, the arc suppression coil of the substation is further collected. The PMU inductance current is then subtracted from the zero-sequence current of each measuring point in the fault section of the 10kV fault line to obtain the PMU zero-sequence current (capacitance current) of the fault section of the fault line, and the zero-sequence power direction is calculated in real time with the PMU zero-sequence voltage; when the zero-sequence voltage exists, it is continuously judged that a single-phase grounding fault has occurred in the line section; the technical problem that the existing technical solution can only perform zero-sequence power direction calculation and single-phase grounding fault judgment within a short time of 2 to 10ms, and the single-phase grounding fault judgment cannot be further performed after this time is solved. With the technical solution of the present invention, when the single-phase grounding fault time exceeds the specified time limit, it is reported that a permanent single-phase grounding fault has occurred in the line section.

[0096] The technical solution of the present invention is:

[0097] First, the test equipment is set up and installed: (1) At the dispatching master station or substation end, a single-phase grounding identification system master station is established to collect fault information, calculate the zero-sequence power direction, subtract the arc suppression coil inductance current to obtain the capacitance current of the fault section of the fault line, and other calculations to determine the non-fault line, fault line fault section, and non-fault section of the fault line where the single-phase grounding fault occurs; (2) On the 10kV line, A, B, and C three-phase current or zero-sequence current PMU type current measuring devices are installed on every other line to collect the A, B, and C phase PMU currents or zero-sequence currents of each measuring point on the line, and send them to the master station system to calculate the PMU zero-sequence current 3I0; (3) A PMU type current measuring device is installed on the arc suppression coil of the substation to measure the arc suppression coil PMU inductance current and send it to the master station system; (4) A PMU type voltage measuring device is installed on the PT secondary of the substation bus or line to collect the PMU zero-sequence voltage 3U0 and send it to the master station system. The PMU type current measuring device is an overhead PMU type current measuring device (SGS) or a cable type current measuring device (RCMU).

[0098] The method for determining a 10kV single-phase grounding fault includes the following steps:

[0099] Step 1), the single-phase grounding judgment master station system collects zero-sequence voltage PMU data. When the zero-sequence voltage value is greater than the zero-sequence voltage start setting value, the single-phase grounding fault judgment program is entered; the PMU data of zero-sequence current and zero-sequence voltage at the first measuring point of each line collected are used to calculate the zero-sequence power direction within the first 2 to 10 ms of the fault to exclude the grounding fault that is not in the upstream line section of the first measuring point of each 10kV line or the 10kV busbar of the substation:

[0100] (1) If the angle of the zero-sequence power direction calculation result is not entirely in the reverse direction (i.e., the zero-sequence power direction is in the reverse direction), and the angle of the zero-sequence power direction calculation result of at least one line is in the positive direction (i.e., the zero-sequence power direction is in the positive direction), then the grounding point that excludes the single-phase grounding fault is not in the upstream line section of the first measurement point of all 10kV lines or the 10kV busbar of the substation;

[0101] (2) If the calculation results of the zero-sequence power direction are all in the opposite direction of the zero-sequence power direction, it is judged that the grounding point of the single-phase grounding fault is in the upstream line section of the first measuring point of all 10kV lines or the 10kV busbar of the substation;

[0102] Step 2), based on step 1), screening faulty lines and non-faulty lines according to the zero-sequence power direction;

[0103] The screening method is as follows:

[0104] ⑴ Screen out the faulty lines:

[0105] If the zero-sequence power direction of the first measuring point on a line is positive, the line section downstream of the measuring point is judged to be a fault line;

[0106] ⑵Filter out non-faulty lines:

[0107] If the zero-sequence power direction of the first measuring point on a line is in the reverse direction, the line section downstream of the measuring point of the line is judged to be a non-fault line;

[0108] Through the above screening steps, faulty lines and non-faulty lines are screened out;

[0109] Step 3), after selecting the faulty line according to step (1) of step 2, calculate the zero-sequence power direction of each measuring point of the faulty line, and select the faulty section of the faulty line and the non-faulty section of the faulty line according to the zero-sequence power direction,

[0110] The screening method is as follows:

[0111] ⑴ Calculate the zero-sequence power direction of each measuring point on the fault line, set condition ① if the zero-sequence power direction of one or more consecutive measuring points (may be 1 point, or 1 series of points: from the first measuring point of the line to the measuring point before the fault point) is in the positive direction, condition ② the zero-sequence current is greater than the zero-sequence current setting value; if the above two conditions are met, select the downstream line section of the measuring point as the positive direction of the fault;

[0112] (2) Calculate the zero-sequence power direction of each measuring point on the fault line. If it is in the reverse direction, select the downstream line section of the measuring point as the reverse direction of the fault;

[0113] ⑶ Sort the measurement points selected as the positive direction and the reverse direction of the fault. The sorting method is: the zero-sequence power direction on the line is judged to be the positive direction (from the first measurement point of the line to the measurement point before the fault point) and the reverse direction (all measurement points after the fault point) are sorted respectively. The downstream section of the last measurement point in the positive direction to the upstream section of the first measurement point in the reverse direction is the fault point of the line fault. The downstream section of the first measurement point in the reverse direction is the non-fault section of the line. The line section between the last measurement point in the positive direction of the fault and the first measurement point in the reverse direction of the fault is determined to be the fault section of the fault line.

[0114] (4) If the last measurement point in the positive direction of the fault is already the last measurement point of the line, the line section downstream of the measurement point is judged to be the fault line section;

[0115] Alternatively, another method is used: sort the zero-sequence current of the fault line at this moment, calculate and screen the phase of the zero-sequence current of the upstream measuring point and the downstream measuring point: when the phase of the zero-sequence current of the upstream measuring point and the zero-sequence current of the downstream measuring point is in reverse phase, the coverage section of the upstream measuring point and the downstream measuring point is screened and selected as the fault section.

[0116] Note: When a single-phase grounding occurs in the line: the phase of the zero-sequence current will be opposite at the fault point. The fault location can be determined through this fault phenomenon.

[0117] Through the above screening steps, the faulty section of the faulty line is screened out.

[0118] Step 4: Based on the screening in the above steps, further screen out the fault phase of the faulty line;

[0119] The screening method is as follows:

[0120] (1) Calculate the three-phase current increments of each measuring point before the fault section of the faulty line while screening in step 3;

[0121] ⑵ Sort the three-phase current increments of each measuring point before calculating the fault section of the faulty line, and determine that the phase with the largest current increment among the three-phase currents is the fault phase.

[0122] Or another method is used: the A, B, and C three-phase voltage data of the PT secondary on the bus or line is used to screen the fault phases. When two of the three-phase voltages A, B, and C are greater than the normal operating voltage and one of the phase voltages is less than m times the normal operating voltage or less, the phase with reduced voltage is determined to be the faulty phase of the faulty line.

[0123] It is another method to determine the fault phase: because the most obvious fault feature of single-phase grounding is the decrease in voltage of one phase of the PT, which can be used to determine the phase difference of single-phase grounding.

[0124] Through the above screening steps, the fault phase of the faulty line can be screened out.

[0125] Step 5: 2 to 10 ms after the fault, continue to collect the three-phase currents of A, B, and C at each measuring point of the fault section of the faulty line to continue to calculate the zero-sequence current or collect the zero-sequence current from the zero-sequence CT meter, and collect the PMU inductance current at the arc suppression coil measuring point at the same time, and use the PMU zero-sequence current at each measuring point of the fault section of the faulty line to subtract the PMU inductance current at the arc suppression coil measuring point to obtain the PMU zero-sequence current at each measuring point of the fault section of the faulty line, that is, the capacitive current, and calculate the zero-sequence power direction with the PMU zero-sequence voltage, and continue to screen the faulty line section;

[0126] The screening method is as follows: 2 to 10 ms after the fault,

[0127] ⑴Continue to collect the three-phase currents of A, B, and C at each measuring point in the fault line section of the fault line to calculate the PMU zero-sequence current or collect the zero-sequence current from the zero-sequence CT, and collect the PMU inductance current at the arc suppression coil measuring point at the same time; use the PMU zero-sequence current at each measuring point in the fault section of the fault line to subtract the PMU inductance current at the arc suppression coil measuring point to obtain the PMU zero-sequence current at each measuring point in the fault section of the fault line;

[0128] ⑵Continue to collect the PMU zero-sequence voltage and the PMU zero-sequence current of each measuring point in the fault section of the fault line obtained in step ⑴ above, continue to calculate the zero-sequence power direction, and continue to confirm the fault section of the fault line;

[0129] ⑶ Collect the zero-sequence voltage of PMU and calculate the starting value when the zero-sequence voltage is continuously greater than the zero-sequence voltage;

[0130] (4) It is determined that the grounding point of the single-phase grounding fault is not on the upstream line section or substation busbar of the first measuring point of the 10kV line;

[0131] The zero-sequence current of the first measuring point on each line is collected, and the zero-sequence power direction is calculated with the PMU zero-sequence voltage. The result of the zero-sequence power direction calculation is: the non-fault lines are all in the reverse direction, while the fault line is in the positive direction, so the grounding point of the single-phase grounding fault is not in the upstream line section of the first measuring point of the 10kV line or the 10kV busbar of the substation; among them, for the fault line, the zero-sequence current (capacitive current) of the fault line obtained by subtracting the PMU inductance current of the arc suppression coil measuring point from the PMU zero-sequence current of each measuring point in the fault section of the fault line is used for the zero-sequence power direction calculation;

[0132] Since the capacitive current is retrieved, the zero-sequence power direction of the fault line can be calculated continuously until the fault disappears, and the fault duration can be obtained;

[0133] Step 6: Determine whether the faulty line is an instantaneous single-phase grounding fault:

[0134] When the duration of the single-phase grounding fault in step 5 is less than time t, the fault line is judged to be an instantaneous single-phase grounding fault;

[0135] Step 7: Determine whether the faulty line is a permanent single-phase grounding fault:

[0136] When the single-phase grounding fault in step 5 lasts longer than time t, the faulty line is judged to be a permanent single-phase grounding fault;

[0137] Step 8: Single-phase ground fault judgment program and system return

[0138] When the measured zero-sequence voltage is less than the return set value of the zero-sequence voltage, it is determined that the single-phase grounding fault disappears, and the single-phase grounding fault determination program and system return.

[0139] The above method for determining a 10kV single-phase grounding fault by subtracting the inductance current in the fault line includes step 1):

[0140] Preferably, the method for collecting zero-sequence current PMU data is: collecting PMU data of three-phase currents A, B, and C collected at each measuring point on each 10kV line, calculating the zero-sequence current at each measuring point of each line, or directly collecting PMU data of zero-sequence current at each measuring point using a zero-sequence current transformer; wherein the zero-sequence current calculated from the three-phase currents A, B, and C is for:

[0141]

[0142] (9) In the formula, is 3 times the zero-sequence current, is the A phase current, is the B phase current, is the C phase current;

[0143] Step 1) requires collecting the zero-sequence current of each measuring point of each line, which is also equal to the sum of the capacitance currents of the three-phase A, B, and C lines to the ground at each measuring point of each line in the event of a single-phase grounding fault, that is, the zero-sequence current is a comprehensive capacitance current.

[0144] The above method for determining a 10kV single-phase grounding fault by subtracting the inductance current in the fault line includes step 1):

[0145] Preferably, the method for collecting zero-sequence voltage PMU data is: collecting the three-phase voltage of the PT secondary on the substation bus or line, calculating the zero-sequence voltage in real time, and calculating the zero-sequence voltage from the A, B, and C three-phase voltages. for:

[0146]

[0147] In formula (10), is 3 times the zero-sequence voltage, is the A phase voltage, is the B phase voltage, is the C phase voltage;

[0148] Alternatively, a zero-sequence voltage transformer (PT) is used to directly collect the zero-sequence voltage PMU data of the PT secondary on the substation bus or line.

[0149] The above method for determining a 10kV single-phase grounding fault by subtracting the inductance current in the fault line includes step 1:

[0150] Preferably, the zero-sequence voltage starting setting is greater than the maximum unbalanced voltage value when the master station system collects zero-sequence voltage during normal operation:

[0151] 3U 0zd =K k *3U bph (11)

[0152] In formula (11), 3U 0zd is the zero-sequence voltage starting value; K k is the reliability factor; 3U bph It is the maximum unbalanced voltage value when the master station system collects zero-sequence voltage during normal operation, 3U 0zd Take 5~15V; reliability coefficient K k Take ≥1.5~2.0; the return setting of the zero-sequence voltage is k times the zero-sequence voltage starting setting, and k is 0.5~0.8.

[0153] The above method for determining a 10kV single-phase grounding fault by subtracting the inductance current in the fault line includes step 3):

[0154] Preferably, the zero-sequence current setting value is greater than the maximum unbalanced current when the master station system collects zero-sequence current under normal line operation.

[0155] 3I 0zd =K k 3I 0bph (12)

[0156] In formula (12), 3I 0zd is the zero-sequence current setting value; K k is the reliability coefficient; 3I 0bph It is the maximum unbalanced current when the master station system collects zero-sequence current during normal operation of the line, 3I 0zd Take 2~7A. Reliability coefficient K k Take ≥1.5~2.0.

[0157] The above method for determining a 10kV single-phase grounding fault by subtracting the inductance current in the fault line includes step 1:

[0158] Preferably, if the zero-sequence power direction of the line is positive, it is a faulty line. The method for determining the direction of the zero-sequence power is as follows: the angle range for the positive direction is -180° to 0° or 180° to 360°. The half angle position of the action area is called the maximum sensitivity angle. The sensitivity angle Φ lm The angle is 90°, and there is a clear action boundary, plus or minus 8° respectively, and the action equation is:

[0159]

[0160] If the zero-sequence power direction of the line is judged to be in the reverse direction, it is a non-fault line. The angle range for judging the reverse direction is 0°~180°, and its sensitive angle Φ lm The angle is -90°, and there is a clear action boundary, plus or minus 8° respectively. The action equation is:

[0161]

[0162] The voltage in the zero-sequence power direction calculated in equations (13) to (14) is Calculate the current in the zero-sequence power direction as

[0163] In the above method for determining a 10kV single-phase grounding fault by subtracting the inductance current in the fault line, step 5 is:

[0164] 2 to 10 ms after the fault, the PMU zero-sequence current of each measuring point in the fault section of the fault line is used, minus the PMU inductance current of the arc suppression coil, to obtain the PMU zero-sequence current (capacitance current) of each measuring point in the fault section of the fault line. The calculation formula is

[0165]

[0166] (15) In the formula, It is the inductive current of the arc suppression coil of the substation measured 2 to 10ms after the fault. It is the zero-sequence current at each measuring point in the fault section of the faulty line 2 to 10ms after the fault.

[0167] In the above method for determining a 10 kV single-phase grounding fault by subtracting the inductance current in the fault line, in step 4, m is set to 70% to 80%.

[0168] In the above method for determining a 10kV single-phase grounding fault by subtracting the inductive current in the fault line, the time t of step 6 and step 7 is set to be greater than the disturbance fault time of the distribution line, and is set to 0.1 to 10 minutes.

[0169] The above method for determining a 10kV single-phase grounding fault by subtracting the inductance current in the fault line, wherein the increments of the three-phase currents A, B, and C at each measuring point before the fault section of the fault line in step 4 are for:

[0170]

[0171] (16) In the formula, They are the A, B, and C phase currents collected after the fault section of the fault line fails. They are the A, B, and C phase currents collected before the fault in the fault section of the faulty line, and Φ represents phase A, phase B, and phase C respectively.

[0172] The above-mentioned method of determining a 10kV single-phase ground fault by subtracting the inductance current in the fault line is applied to distribution lines with a voltage level of 6kV to 35kV. The grounding method used in the 6kV to 35kV system is a grounding system through an arc suppression coil.

[0173] In the above method for determining a 10kV single-phase grounding fault by subtracting the inductance current in the fault line, the PMU type current measuring device is an overhead PMU type current measuring device (SGS) or a cable type current measuring device (RCMU).

[0174] In the above method for determining a 10kV single-phase grounding fault by subtracting the inductance current in the fault line, preferably, the main station for determining the single-phase grounding system of the distribution line is established at the dispatching end or at the substation end.

[0175] The following embodiments take 10kV as an example:

[0176] Embodiment 1

[0177] like Figure 1-4 As shown, PMU type current measuring devices of phase A, B, C or zero-sequence current are installed at each measuring point 1~n on each 10kV line and each line branch respectively, and the currents of phase A, B, C or zero-sequence current at each measuring point of the line are collected, and sent to the dispatching main station or substation end, and the zero-sequence current 3I0 is calculated; a PMU type current measuring device is installed on the arc suppression coil of the substation to measure the PMU inductance current of the arc suppression coil and send it to the main station system; at the same time, a PMU type voltage measuring device is installed on the PT secondary of the substation bus or line to collect the zero-sequence voltage 3U0 and send it to the main station system; then the zero-sequence power direction is calculated in the main station system, and the line section of the distribution line single-phase grounding fault is judged and found by calculating the zero-sequence power direction of each measuring point on each outgoing line.

[0178] The specific implementation steps are as follows:

[0179] The voltage and current in the zero-sequence power direction are When the zero-sequence power direction of the line is positive, its sensitivity angle Φ lm is 90°, and its motion equation is:

[0180]

[0181] Further calculations are performed to make the action boundary clear, adding or subtracting 8° respectively, and we get:

[0182]

[0183] Therefore, the angle range for judging the zero-sequence direction of the zero-sequence current protection power as the positive direction is -172° to -8° or 188° to 352°.

[0184] When the line is a non-fault line and the zero-sequence power direction is in the opposite direction, its sensitivity angle Φ lm is -90°, and its motion equation is:

[0185]

[0186] Further calculations are made to make the action boundary clear, and 8° is added or subtracted to obtain:

[0187]

[0188] Therefore, the angle range for judging the zero-sequence direction of the zero-sequence current protection power is 8° to 172°.

[0189] In the arc suppression coil grounding system, the arc suppression coil starts to operate 2 to 10ms after the initial fault, and the inductive current of the arc suppression coil drowns out the fault information of the fault line segment of the fault line, making the zero-sequence power direction of the fault line section of the fault line, which was originally judged to be the positive direction of the fault, now judged to be the reverse direction. 2 to 10ms after the fault, the PMU zero-sequence current of each measuring point in the fault line section of the fault line is subtracted from the PMU inductive current measured directly at the arc suppression coil measuring point to obtain the PMU zero-sequence current (capacitive current) of each measuring point in the fault line section of the fault line. The calculation formula is:

[0190]

[0191] (21) In the formula, It is the inductive current of the arc suppression coil of the substation measured 2 to 10ms after the fault. It is the zero-sequence current at each measuring point in the fault section of the faulty line 2 to 10ms after the fault.

[0192] When zero-sequence voltage still exists in the system, the zero-sequence power direction of the fault line can be further calculated with the collected PMU zero-sequence voltage, and the duration of the single-phase grounding fault of the fault line can be further determined 2 to 10 ms after the fault, and it can be determined whether the fault line is a transient single-phase grounding fault or a permanent single-phase grounding fault.

[0193] Combined with the above-mentioned determination method, when a C-phase grounding fault occurs in the downstream line section of the 5th measuring point of the 2nd line, and the collected or calculated zero-sequence voltage exceeds the zero-sequence voltage setting value, the master station system enters the single-phase grounding fault determination procedure, and immediately collects the zero-sequence current of each line and each measuring point, and calculates the zero-sequence power direction. Within 2 to 10 ms after the initial fault: the zero-sequence power direction of the 1st to 5th measuring points of the 2nd line is judged to be in the positive direction, and the zero-sequence power direction of the measuring points on the 6th to nth lines is judged to be in the reverse direction; the increments of the A, B, and C three-phase currents of the 1st to 5th measuring points of the 2nd line are calculated, among which the C-phase current is the largest, or the three-phase voltage is used to judge that the A and B phase voltages increase, and the C-phase voltage is less than m times the normal operating voltage, then the fault is between the 5th and 6th measuring points of the 1st line, and the fault phase is the C phase.

[0194] 2 to 10 ms after the fault, continue to collect the zero-sequence current of each measuring point in the fault section of the second line, and collect the inductance current of the arc suppression coil of the busbar of the substation at the same time. Subtract the inductance current of the arc suppression coil of the busbar of the substation from the zero-sequence current of each measuring point in the fault section of the second line, and then obtain the zero-sequence current (capacitive current) of each measuring point in the fault section of the fault line. Continue to calculate the zero-sequence power direction of each measuring point in the fault section of the fault line with the zero-sequence voltage, and further judge it as the positive direction. If the fault duration is less than t time, it is reported that a transient C-phase grounding fault has occurred between the 5th and 6th measuring points of the second line; if the fault duration is greater than t time, it is reported that a permanent C-phase grounding fault has occurred between the 5th and 6th measuring points of the second line.

[0195] When the zero-sequence voltage disappears, the master station system single-phase grounding fault judgment program exits.

[0196] In addition to the above embodiments, the present invention may also have other implementation modes. Any technical solutions formed by equivalent replacement or equivalent transformation shall fall within the protection scope required by the present invention.

Claims

1. A method for determining a 10kV single-phase grounding fault by subtracting the inductance current in the fault line, which can be used in arc suppression coil grounding systems of 6-35kV voltage levels; a single-phase grounding determination system master station is set up at the dispatching master station or substation end to collect fault information, calculate the zero-sequence power direction, calculate the capacitance current of the fault section of the fault line by subtracting the inductance current of the arc suppression coil, and determine the non-fault line, fault section of the fault line, and non-fault section of the fault line where the single-phase grounding fault occurs; On the 10kV line, three-phase current or zero-sequence current PMU type current measuring devices of A, B, C are installed at every other section of the line as current measurement points to collect the PMU current or zero-sequence current of A, B, C phases at each measurement point on the line, and send it to the single-phase grounding identification master station system to calculate the PMU zero-sequence current 3I0; a PMU type current measuring device is installed on the arc suppression coil of the substation to measure the arc suppression coil PMU inductance current and send it to the single-phase grounding identification master station system; a PMU type voltage measuring device is installed on the secondary side of the PT on the substation bus or line to collect the PMU zero-sequence voltage 3U0 and send it to the single-phase grounding identification master station system; Features: The method for determining a 10 kV single-phase grounding fault by subtracting the inductance current in the fault line includes the following steps: Step 1), the single-phase grounding judgment master station system collects zero-sequence voltage PMU data. When the zero-sequence voltage value is greater than the zero-sequence voltage start setting value, the single-phase grounding fault judgment program is entered; the PMU data of zero-sequence current and zero-sequence voltage at the first measuring point of each line collected are used to calculate the zero-sequence power direction within the first 2 to 10 ms of the fault to exclude the grounding fault that is not in the upstream line section of the first measuring point of each 10kV line or the 10kV busbar of the substation: (1) If the angle of the calculation result of the zero-sequence power direction is not entirely in the angle range of the reverse direction, that is, the zero-sequence power direction is in the reverse direction, and the angle of the calculation result of the zero-sequence power direction of at least one line is in the angle range of the positive direction, that is, the zero-sequence power direction is in the positive direction, then the grounding point that excludes the single-phase grounding fault is not in the upstream line section of the first measurement point of all 10kV lines or the 10kV busbar of the substation; (2) If the calculation results of the zero-sequence power direction are all in the opposite direction of the zero-sequence power direction, it is judged that the grounding point of the single-phase grounding fault is in the upstream line section of the first measuring point of all 10kV lines or the 10kV busbar of the substation; Step 2), based on step 1), screening faulty lines and non-faulty lines according to the zero-sequence power direction; The screening method is as follows: ⑴ Screen out the faulty lines: If the zero-sequence power direction of the first measuring point on a line is positive, the line section downstream of the measuring point is judged to be a fault line; ⑵Filter out non-faulty lines: If the zero-sequence power direction of the first measuring point on a line is in the reverse direction, the line section downstream of the measuring point of the line is judged to be a non-fault line; Through the above screening steps, faulty lines and non-faulty lines are screened out; Step 3), after selecting the faulty line according to step (1) of step 2), the zero-sequence power direction of each measuring point of the faulty line is calculated, and the faulty section of the faulty line and the non-faulty section of the faulty line are screened according to the zero-sequence power direction. The screening method is as follows: (1) Calculate the zero-sequence power direction of each measuring point on the fault line, and set condition ① if the zero-sequence power direction of one or more consecutive measuring points is in the positive direction, and condition ② the zero-sequence current is greater than the zero-sequence current setting value; if the above two conditions are met, select the downstream line section of the measuring point as the fault positive direction; (2) Calculate the zero-sequence power direction of each measuring point on the fault line. If it is in the reverse direction, select the line section downstream of the measuring point as the reverse direction of the fault; (3) Sorting the measurement points selected as the positive direction and the reverse direction of the fault, the sorting method is: the zero-sequence power directions on the line are judged to be in the positive direction and the reverse direction are sorted respectively, the downstream section of the last measurement point judged to be in the positive direction to the upstream section of the first measurement point judged to be in the reverse direction is the fault point location of the line fault, and the downstream section of the first measurement point judged to be in the reverse direction is the non-fault section of the line, then the line section between the last measurement point in the positive direction of the fault and the first measurement point in the reverse direction of the fault is determined to be screened as the fault section of the fault line; (4) If the last measurement point in the positive direction of the fault is already the last measurement point of the line, the line section downstream of the measurement point is determined to be the faulty line section; Through the above screening steps, the fault section of the faulty line is screened out; Step 4: Based on the screening in the above steps, further screen out the fault phase of the faulty line; The screening method is as follows: (1) while screening in step 3, calculating the three-phase current increments of each measuring point before the fault section of the faulty line; (2) sorting the three-phase current increments of each measuring point before calculating the fault section of the fault line, and determining that the phase with the largest current increment among the three-phase currents is the fault phase; Through the above screening steps, the fault phase of the faulty line can be screened out; Step 5: 2 to 10 ms after the fault, continue to collect the three-phase currents of A, B, and C at each measuring point of the fault section of the faulty line to continue to calculate the zero-sequence current or collect the zero-sequence current from the zero-sequence CT, and collect the PMU inductance current at the arc suppression coil measuring point at the same time, and use the PMU zero-sequence current at each measuring point of the fault section of the faulty line to subtract the PMU inductance current at the arc suppression coil measuring point to obtain the PMU zero-sequence current at each measuring point of the fault section of the faulty line, that is, the capacitive current, and calculate the zero-sequence power direction with the PMU zero-sequence voltage, and continue to screen the faulty line section; The specific screening method is as follows: 2 to 10 ms after the fault, ⑴Continue to collect the three-phase currents of A, B, and C at each measuring point in the fault line section of the fault line to calculate the PMU zero-sequence current or collect the zero-sequence current from the zero-sequence CT, and collect the PMU inductance current at the arc suppression coil measuring point at the same time; use the PMU zero-sequence current at each measuring point in the fault section of the fault line to subtract the PMU inductance current at the arc suppression coil measuring point to obtain the PMU zero-sequence current at each measuring point in the fault section of the fault line; ⑵Continue to collect the PMU zero-sequence voltage and the PMU zero-sequence current of each measuring point in the fault section of the fault line obtained in step ⑴ above, continue to calculate the zero-sequence power direction, and continue to confirm the fault section of the fault line; ⑶ Collect the zero-sequence voltage of PMU and calculate the starting value when the zero-sequence voltage is continuously greater than the zero-sequence voltage; (4) It is determined that the grounding point of the single-phase grounding fault is not on the upstream line section or substation busbar of the first measuring point of the 10kV line; The zero-sequence current of the first measuring point on each line is collected, and the zero-sequence power direction is calculated with the PMU zero-sequence voltage. The result of the zero-sequence power direction calculation is: the non-fault lines are all in the reverse direction, while the fault line is in the positive direction, so the grounding point of the single-phase grounding fault is not in the upstream line section of the first measuring point of the 10kV line or the 10kV busbar of the substation; among them, for the fault line, the zero-sequence current of the fault line is calculated by subtracting the PMU inductance current of the arc suppression coil measuring point from the zero-sequence current of each measuring point in the fault section of the fault line; Since the capacitive current is retrieved, the zero-sequence power direction of the fault line can be calculated continuously until the fault disappears, and the fault duration can be obtained; Step 6: Determine whether the faulty line is an instantaneous single-phase grounding fault: When the duration of the single-phase grounding fault in step 5 is less than time t, the fault line is judged to be an instantaneous single-phase grounding fault; time t: set to be greater than the disturbance fault time of the distribution line, and is set to 0.1 to 10 minutes; Step 7: Determine whether the faulty line is a permanent single-phase grounding fault: When the single-phase grounding fault in step 5 lasts longer than time t, the faulty line is judged to be a permanent single-phase grounding fault; Step 8, single-phase ground fault judgment program and system return: When the measured zero-sequence voltage is less than the return set value of the zero-sequence voltage, it is determined that the single-phase grounding fault disappears, and the single-phase grounding fault determination program and system return.

2. The method for determining a 10 kV single-phase grounding fault by subtracting the inductance current in the fault line as claimed in claim 1, characterized in that: Wherein step 1): The method for collecting zero-sequence current PMU data is: collect the PMU data of the three-phase currents A, B, and C collected at each measuring point on each 10kV line, calculate the zero-sequence current at each measuring point on each line, or use a zero-sequence current transformer to directly collect the PMU data of the zero-sequence current at each measuring point; the zero-sequence current calculated from the three-phase currents A, B, and C for: (1) In the formula, is 3 times the zero-sequence current, A phase current is the B phase current, is the C phase current.

3. The method for determining a 10 kV single-phase grounding fault by subtracting the inductance current in the fault line as claimed in claim 1, characterized in that: Wherein step 1): The method for collecting zero-sequence voltage PMU data is: collect the three-phase voltage of the PT secondary on the substation bus or line, calculate the zero-sequence voltage in real time, and calculate the zero-sequence voltage from the A, B, and C three-phase voltages. for: In formula (2), is 3 times the zero-sequence voltage, is the A phase voltage, is the B phase voltage, is the C phase voltage; Alternatively, use a zero-sequence voltage transformer PT to directly collect the zero-sequence voltage PMU data of the PT secondary on the substation bus or line.

4. The method for determining a 10 kV single-phase grounding fault by subtracting the inductance current in the fault line as claimed in claim 1, characterized in that: In step 1(3), the zero-sequence voltage is continuously greater than the starting value of the zero-sequence voltage: greater than the maximum unbalanced voltage value when the master station system collects the zero-sequence voltage during normal operation: 3U 0zd =K k *3U bph (3) In formula (3), 3U 0zd is the zero-sequence voltage starting value; K k is the reliability factor; 3U bph It is the maximum unbalanced voltage value when the master station system collects zero-sequence voltage during normal operation; 3U 0zd Take 5~15V; reliability coefficient K k Take ≥1.5~2.0; the return setting of the zero-sequence voltage is k times the zero-sequence voltage starting setting, and k is 0.5~0.

8.

5. The method for determining a 10 kV single-phase grounding fault by subtracting the inductance current in the fault line as claimed in claim 1, characterized in that: Step 3): The zero-sequence current setting value is greater than the maximum unbalanced current when the master station system collects zero-sequence current under normal line operation. <h2 style=";text-align:left;direction:ltr">3I<h2 style=";text-align:left;direction:ltr"> 0zd <h2 style=";text-align:left;direction:ltr"> =K<h2 style=";text-align:left;direction:ltr"> k <h2 style=";text-align:left;direction:ltr"> 3I<h2 style=";text-align:left;direction:ltr"> 0bph <h2 style=";text-align:left;direction:ltr"> (4) In formula (4), 3I 0zd is the zero-sequence current setting value; K k is the reliability coefficient; 3I 0bph It is the maximum unbalanced current when the master station system collects zero-sequence current during normal operation of the line, 3I 0zd Take 2~7A, reliability coefficient K k Take ≥1.5~2.

0.

6. The method for determining a 10 kV single-phase grounding fault by subtracting the inductance current in the fault line as claimed in claim 1, characterized in that: Step 1: If the zero-sequence power direction of the line is positive, it is a faulty line. The method for judging the zero-sequence power direction is: the angle range for judging the positive direction is -180°~0° or 180°~360°. The half angle position of the action area is called the maximum sensitivity angle. The sensitivity angle Φ lm The angle is 90°, and there is a clear action boundary, plus or minus 8° respectively, and the action equation is: If the zero-sequence power direction of the line is judged to be in the reverse direction, it is a non-fault line. The angle range for judging the reverse direction is 0°~180°, and its sensitive angle Φ lm The angle is -90°, and there is a clear action boundary, plus or minus 8° respectively. The action equation is: The voltage in the zero-sequence power direction calculated in equations (5)-(6) is Calculate the current in the zero-sequence power direction as 7. The method for determining a 10 kV single-phase grounding fault by subtracting the inductance current in the fault line as claimed in claim 1, characterized in that: The method for screening the fault section of the fault line in step 3) is as follows: sort the zero-sequence current of the fault line at this moment, calculate and screen the phase of the zero-sequence current of the upstream measurement point and the downstream measurement point: when the phase of the zero-sequence current of the upstream measurement point and the zero-sequence current of the downstream measurement point appears in reverse phase, the coverage section of the upstream measurement point and the downstream measurement point is screened and selected as the fault section.

8. The method for determining a 10 kV single-phase grounding fault by subtracting the inductance current in the fault line as claimed in claim 1, characterized in that: The method for screening the fault phase of the faulty line in step 4) is: (3) or using the A, B, C three-phase voltage data of the PT secondary on the bus or line to screen the fault phase. When two of the three-phase voltages A, B, C are greater than the normal operating voltage and one of the phase voltages is less than m times the normal operating voltage or less, the phase with reduced voltage is determined to be the fault phase of the faulty line, and m is 70% to 80%.

9. The method for determining a 10 kV single-phase grounding fault by subtracting the inductance current in the fault line as claimed in claim 1, characterized in that: Step 5: 2 to 10 ms after the fault, the PMU zero-sequence current of each measuring point in the fault section of the fault line is used, minus the PMU inductance current of the arc suppression coil, to obtain the PMU zero-sequence current of each measuring point in the fault section of the fault line The calculation formula is (7) In the formula, It is the inductive current of the arc suppression coil of the substation measured 2 to 10ms after the fault. It is the zero-sequence current at each measuring point in the fault section of the faulty line 2 to 10ms after the fault.

10. The method for determining a 10 kV single-phase grounding fault by subtracting the inductance current in the fault line as claimed in claim 1, characterized in that: The three-phase current increments of A, B and C at each measuring point before the fault section of the fault line in step 4 are for: (8) In the formula, They are the A, B, and C phase currents collected after the fault section of the fault line fails. They are the A, B, and C phase currents collected before the fault in the fault section of the faulty line, and Φ represents phase A, phase B, and phase C respectively.