By combining hydraulic forming and mechanical expansion processes, the problem of slow forming speed of low-temperature expansion joints is solved, and the rapid forming of multi-rippled expansion joints is achieved, the defects of the traditional method are overcome and the forming efficiency is improved.

CN118905007APending Publication Date: 2024-11-08JIANGSU KUI ZE MACHINERY IND CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202410970701.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-19
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

The molding method of low-temperature expansion joints in the prior art has the problem of difficulty in forming hydraulic forming and slow mechanical expansion speed, and lacks a rapid forming process that can combine hydraulic forming and mechanical expansion.

Method used

Using a preparation process combining hydraulic forming and mechanical expansion, the rapid molding of multi-corrugated expansion joints is achieved by cutting rectangular sheets, welding into cylinders, pressurizing of the expansion mold, injection of low-temperature gas and re-pressurization.

Benefits of technology

The rapid forming of multi-rippled expansion joints is achieved, the shortcomings of the traditional single forming method are overcome, and the forming efficiency is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118905007A_ABST
    Figure CN118905007A_ABST
Patent Text Reader

Abstract

The invention discloses a preparation technology for low-temperature expansion joint production. The preparation technology comprises the following steps that firstly, a plate is cut; 2, cylinder welding airtightness inspection is carried out; 2, the cylindrical pipe is subjected to bulging deformation; 3, multi-section preliminary bulging is carried out; step 4, applying pressure; 5, sealing and gas injection are carried out; sixthly, along with rising of the pressure in the preliminary bulging cylinder and movement promoted by axial pressure, the preliminary bulging cylinder is shrunk, corrugations are expanded till corrugation forming is completed, and the low-temperature expansion joint is obtained; and seventhly, the low-temperature expansion joint is pressurized again, pressure relief and form removal are conducted after pressure maintaining, the low-temperature expansion joint is taken out, and forming is finished. The invention belongs to the technical field of expansion joint production, and particularly relates to a preparation process for low-temperature expansion joint production, through the method, hydraulic forming and mechanical bulging are combined, the problem caused by traditional independent forming of the hydraulic forming and the mechanical bulging is solved, and the technical effect of rapid forming of a multi-bellow expansion joint is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of expansion joint production, and specifically refers to a preparation process for low-temperature expansion joint production. Background Art

[0002] At present, the expansion joint is widely used. It is a spare part that plays an important role in industry, new energy industry, marine scientific research and various sectors of the national economy. The bellows in the bellows expansion joint is a thin-walled part. The service life of the bellows expansion joint mainly depends on the service life of the bellows.

[0003] In the prior art, low-temperature expansion joints are made by one-piece forming and non-one-piece forming methods, and the one-piece forming method includes hydraulic forming, roll forming and mechanical bulging. These three methods have their own advantages and disadvantages. It is difficult to form multi-corrugated expansion joints by hydraulic forming, and the forming speed of mechanical bulging is slow. Therefore, a preparation process for the production of low-temperature expansion joints that can combine the two is further designed. Summary of the invention

[0004] In view of the above situation, in order to overcome the defects of the prior art, the present invention proposes a preparation process for the production of low-temperature expansion joints. Through this method, hydraulic forming and mechanical bulging are combined to overcome the problems caused by the traditional forming of the two separately, and the technical effect of rapid forming of multi-corrugated expansion joints is achieved.

[0005] The technical solution adopted by the present invention is as follows: A preparation process for producing a low-temperature expansion joint proposed by the present invention comprises the following steps:

[0006] Step 1: Select a rectangular sheet and cut it;

[0007] Step 2: Weld the cut rectangular sheet into a cylindrical shape and perform air tightness inspection on the welding position;

[0008] Step 3: The cylindrical tube that has passed the air tightness test is put on the bulging die, and a positioning support is set on the outer wall of the cylindrical tube. The bulging die is pressurized, and the rigid body split die of the bulging die is used to cooperate with the positioning support to expand outward, so that the cylindrical tube is bulged and deformed;

[0009] Step 4: Control the displacement of the rigid split die, stop the deformation when the cylindrical tube begins to deform, and move the tube axially to perform downward corrugation bulging, and so on until all the corrugations on the cylindrical tube are bulged, and obtain a preliminary bulged cylinder;

[0010] Step 5: Remove the positioning support outside the preliminary bulging cylinder, and apply a movable pressure in the lateral axial direction inside the preliminary bulging cylinder;

[0011] Step 6: sealing the preliminary bulging cylinder, and injecting low-temperature gas into the sealed preliminary bulging cylinder;

[0012] Step 7: With the increase of pressure in the initial bulging cylinder and the movement caused by the axial pressure, the initial bulging cylinder shrinks and the corrugation expands until the corrugation is formed and a low-temperature expansion joint is obtained;

[0013] Step 8: Re-pressurize the low-temperature expansion joint, release the pressure after maintaining the pressure, remove the mold, take out the low-temperature expansion joint, and the molding is completed.

[0014] Furthermore, in step one, the material of the plate is one of stainless steel, copper and aluminum.

[0015] Furthermore, in the step 2, the air tightness test is carried out using a soapy water medium, and when the ambient temperature is below 0°C, alcohol needs to be added to the soapy water to ensure the leak test effect.

[0016] Furthermore, in the step three, a pressure test is required before the bulging die is pressurized, and the pressurization pressure is accurately determined by the pressure test.

[0017] Furthermore, in the step 4, the displacement of the rigid-body split die outward is greater than the yield displacement of the material.

[0018] Furthermore, in the step 5, the movable pressure applied in the axial direction of the inner side of the preliminary bulging cylinder is applied in a progressive manner based on the number of expansion joints.

[0019] Furthermore, the pressure of the re-pressurization in step eight is 0.1-0.2Mpa.

[0020] Furthermore, the pressure holding time in step eight is 10-15 minutes.

[0021] The beneficial effects achieved by the present invention using the above structure are as follows: a preparation process for the production of low-temperature expansion joints, through which hydraulic forming and mechanical bulging are combined to overcome the problems caused by the traditional forming of the two separately, and achieve the technical effect of rapid forming of multi-corrugated expansion joints. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 The present invention provides a production process flow chart for a preparation process for producing low-temperature expansion joints. DETAILED DESCRIPTION

[0023] In order to enable those skilled in the art to better understand the technical solution of the present invention, the technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments of the present invention.

[0024] Embodiment 1:

[0025] A preparation process for producing low-temperature expansion joints, comprising the following steps: taking a metal plate selected from stainless steel, copper and aluminum, cutting the plate into rectangular plates;

[0026] Wrap the rectangular metal sheet into a cylinder and weld the joints. The welded position needs to be tested for air tightness. Soak the welded position with soapy water during the test. When the test environment temperature is below 0°C, add 10:1 alcohol into the soapy water.

[0027] The cylinder that passed the leak test is put on the bulging die, and the pressure test is carried out after the positioning support is set on the outer wall of the cylinder. The initial pressure of the stainless steel pressure test is 27.5MPA, and then the pressure is gradually increased until the stainless steel cylinder is deformed. The pressure test is stopped to obtain the pressure of the stainless steel cylinder; similarly, the initial pressures of the copper cylinder and the aluminum cylinder are 230MPA and 40MPA respectively.

[0028] After the pressurization, the cylinder begins to deform as the pressure increases. When the outer wall of the cylinder begins to bulge along the positioning support, the deformation displacement of the material is greater than the yield displacement of the material. Stop pressurization after ensuring that the material will not deform and reset.

[0029] Remove the positioning support erected outside the preliminary bulging cylinder, and introduce a movable pressure in the lateral axial direction into the interior of the preliminary bulging cylinder, with the outlet of the pressure aligned with the deformation position on the preliminary bulging cylinder. Continue to use the pressure according to the material to increase the deformation amount, so that the deformation position continues to deform until the deformation amount is qualified, and at the same time, pressurize each section of the corrugated deformation in a progressive manner to continue the deformation;

[0030] The movable pressure inside the preliminary bulging cylinder is removed, and low-temperature gas is injected into the preliminary bulging cylinder and then sealed;

[0031] As the pressure inside the initial bulging cylinder increases and the movement caused by the axial pressure, the initial bulging cylinder shrinks and the corrugations expand until the corrugations are formed and a low-temperature expansion joint is obtained;

[0032] Finally, the corrugated low-temperature expansion joint is re-pressurized, the pressure is maintained and then released, and then the mold is removed to take out the low-temperature expansion joint. At this time, the re-pressurized pressure is 0.1Mpa, and the pressure maintenance time is 10min.

[0033] The above-mentioned embodiment only expresses one implementation mode of the present invention, and its description is relatively specific and detailed, but it cannot be understood as limiting the scope of the patent of the present invention. It should be pointed out that for ordinary technicians in this field, several modifications and improvements can be made without departing from the concept of the present invention, which all belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention shall be based on the attached claims.

Claims

1. A preparation process for producing low-temperature expansion joints, characterized in that: The following steps are involved: Step 1: Select a rectangular sheet and cut it; Step 2: Weld the cut rectangular sheet into a cylindrical shape and perform air tightness inspection on the welding position; Step 3: The cylindrical tube that has passed the air tightness test is put on the bulging die, and a positioning support is set on the outer wall of the cylindrical tube. The bulging die is pressurized, and the rigid body split die of the bulging die is used to cooperate with the positioning support to expand outward, so that the cylindrical tube is bulged and deformed; Step 4: Control the displacement of the rigid split die, stop the deformation when the cylindrical tube begins to deform, and move the tube axially to perform downward corrugation bulging, and so on until all the corrugations on the cylindrical tube are bulged, and obtain a preliminary bulged cylinder; Step 5: Remove the positioning support outside the preliminary bulging cylinder, and apply a movable pressure in the lateral axial direction inside the preliminary bulging cylinder; Step 6: sealing the preliminary bulging cylinder, and injecting low-temperature gas into the sealed preliminary bulging cylinder; Step 7: With the increase of pressure in the initial bulging cylinder and the movement caused by the axial pressure, the initial bulging cylinder shrinks and the corrugation expands until the corrugation is formed and a low-temperature expansion joint is obtained; Step 8: Re-pressurize the low-temperature expansion joint, release the pressure after maintaining the pressure, remove the mold, take out the low-temperature expansion joint, and the molding is completed.

2. A preparation process for producing low-temperature expansion joints according to claim 1, characterized in that: The material of the plate in step 1 is one of stainless steel, copper and aluminum.

3. A preparation process for producing low-temperature expansion joints according to claim 1, characterized in that: The air tightness test in step 2 is carried out using soapy water as a medium, and when the ambient temperature is below 0°C, alcohol needs to be added to the soapy water to ensure the leak test effect.

4. A preparation process for producing low-temperature expansion joints according to claim 1, characterized in that: In the step 3, the bulging die needs to be pressure tested before pressurizing, and the pressurized pressure is accurately determined by the pressure test.

5. A preparation process for producing low-temperature expansion joints according to claim 1, characterized in that: In the step 4, the displacement of the rigid-body split die outward is greater than the yield displacement of the material.

6. A preparation process for producing low-temperature expansion joints according to claim 1, characterized in that: The movable pressure applied in the axial direction of the inner side of the preliminary bulging cylinder in step 5 is applied in a progressive manner based on the number of expansion joints.

7. A preparation process for producing low-temperature expansion joints according to claim 1, characterized in that: The pressure of the re-pressurization in step eight is 0.1-0.2Mpa.

8. A preparation process for producing low-temperature expansion joints according to claim 1, characterized in that: The pressure holding time in step eight is 10-15 minutes.

Citation Information

Patent Citations

  • Combined plastic forming method of automobile hub and matching forming mold of automobile hub

    CN102179664A

  • Plate shearing machine for expansion joint production

    CN210450463U

  • Formation of metallic bellows for bulging and apparatus for forming metallic bellows

    JP1997001249A

  • Bulging method and bulging device

    JP2009214156A