Multi-slope control device and multi-slope control method in zigzag street trench construction

Through the longitudinal and transverse slope adjustment structure of the E-shaped frame device, the complexity and artificial error problems of slope control in zigzag street ditch construction are solved, efficient and precise slope control is achieved, and construction efficiency and road drainage effect are improved.

CN118910972AActive Publication Date: 2024-11-08ZHENGZHOU MUNICIPAL ENG CORP
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202410972605.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-19
Publication Date
2024-11-08
Estimated Expiration
2044-07-19

AI Technical Summary

Technical Problem

In the construction of zigzag street grooves, it is difficult for the prior art to accurately control the slopes of longitudinal and transverse slopes at one time, and there are artificial errors, resulting in low construction efficiency and risk of road area water.

Method used

The E-shaped frame device is adopted to control the longitudinal and transverse slopes of the mortar leveling layer through the longitudinal slope adjustment structure and the transverse slope adjustment structure respectively to achieve the smoothing of the predetermined slope at one time, reduce measurement and calculation steps, and avoid work errors in people.

Benefits of technology

The multi-sided slope control in zigzag street ditch construction is simplified, construction efficiency is improved, manpower demand is reduced, equipment wear is reduced, ensuring precise slope control is avoided, and the occurrence of water phenomenon in road area is avoided.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118910972A_ABST
    Figure CN118910972A_ABST
Patent Text Reader

Abstract

The multi-slope control device comprises a frame, the cross section of the frame in the left-right direction is in an E shape, the E-shaped frame is provided with a top edge, a left vertical edge, a right vertical edge and a middle vertical edge, and the left vertical edge comprises a left front vertical edge and a left rear vertical edge; a longitudinal slope adjusting structure is connected between the left front vertical edge and the left rear vertical edge, is in sliding connection with a cross slope adjusting structure, and is used for restraining the gradient of the cross slope adjusting structure when the cross slope adjusting structure moves back and forth; the cross slope adjusting structure is used for controlling the cross slope gradient of the mortar leveling layer and controlling the longitudinal slope gradient of the mortar leveling layer through the front-back moving gradient borne by the longitudinal slope adjusting structure, and the top face of the mortar leveling layer is flattened to the preset longitudinal slope gradient and the preset cross slope gradient at a time. The invention further discloses a corresponding multi-slope control method, the multi-slope control device is adjusted twice before construction according to the gradients in the two directions, complex measurement and calculation are not needed, and adjustment is convenient.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of municipal road construction, and in particular to a multi-faceted slope control device and method in sawtooth ditch construction. Background Art

[0002] When the longitudinal slope of the road is less than 0.3%, it means that the slope of the road surface is very gentle, resulting in weak water flow and insufficient drainage capacity, which may cause the following problems: Water retention: Rainwater may accumulate on the road surface, forming puddles or areas of standing water, because the slope is not adequate to promote rapid longitudinal flow of water.

[0003] Pavement damage: Long-term accumulation of water will penetrate into the roadbed, causing damage to the pavement structure, such as pavement subsidence and cracking, shortening the service life of the road.

[0004] Driving safety hazards: Water accumulation may deteriorate driving conditions and increase the risk of traffic accidents. The reflection on the water surface will also affect the driver's vision, and the water accumulation area is prone to cause the vehicle to slip.

[0005] Inconvenience for pedestrians: accumulated water will affect the use of sidewalks and crossing facilities. Pedestrians may be splashed with water or need to take detours when passing by, causing inconvenience.

[0006] Environmental and sanitation issues: Stagnant water can also lead to sewage stagnation, which can become a breeding ground for mosquitoes, causing environmental and public health problems.

[0007] Therefore, in order to ensure the drainage efficiency and service life of the road and improve the safety of driving and pedestrians, especially on urban roads with a longitudinal slope of less than 0.3%, effective longitudinal drainage must be achieved through the design of reasonable drainage facilities such as zigzag street gutters.

[0008] When using a zigzag street gutter, while keeping the top surface of the curb stone parallel to the design line of the longitudinal slope of the center line of the road, the height between the top surface line of the curb stone and the flat stone (or road surface) is changed alternately, that is, the height of the curb stone is changed alternately, a rainwater inlet is set at the lowest point, and the cross slope of the road surface at the inlet is enlarged, and the cross slope at the water dividing point between the two inlets is reduced, so that the longitudinal slope of the flat stones on both sides of the carriageway changes with the change of the elevation of the inlet and the water dividing point, thereby making the longitudinal slope line of the street ditch form a zigzag shape.

[0009] In the present invention, the road width direction is the left-right direction, the road length direction is the front-back direction, the road lowering direction is the front direction, and the direction pointing to the center line of the road is the inward direction.

[0010] The serrated street gutter is serrated in the left and right viewing directions. Curb stones and flat stones are designed on both sides of the road. The curb stones are located on the outside of the flat stones and are adjacent to the flat stones. The top surface of the curb stones is horizontal, and the top surface of the flat stones is flush with the road surface and is consistent with the road slope in the left and right directions and the front and back directions. The slope in the road width direction is called the cross slope, and the slope in the road length direction is called the transverse slope.

[0011] The vertical structural layers of the road are: the bottom is the foundation layer, i.e. the road structure layer, on which a concrete cushion layer is laid, which provides a solid and stable surface; a mortar leveling layer is arranged on top of the concrete cushion layer, and a pavement layer is arranged on top of the mortar leveling layer.

[0012] In a zigzag street ditch, although the slope of the pavement layer needs to be controlled in the end, the slope of the mortar leveling layer needs to be controlled first. During construction, the longitudinal and transverse slopes of the mortar leveling layer need to be accurately controlled to provide a basis for the slope of the pavement layer (including the slope of the top surface of the flat stone). After the flat stone is installed on the mortar leveling layer with a controlled slope, the slope of the top surface of the flat stone naturally meets the requirements of the design target.

[0013] The object to be achieved by the present invention is to control the slope of the mortar leveling layer at the flat stone so that the longitudinal slope and the transverse slope of the top surface of the flat stone meet the design target.

[0014] Since it is necessary to control both the longitudinal slope and the transverse slope, the conventional straightedge + feeler gauge is often used in the prior art. It is necessary to calculate the corresponding slope based on the transverse and longitudinal slopes given by the design, the height difference between the low point and the high point, and the distance between the two points. The steps are cumbersome, and it is difficult to complete the slope control in both the longitudinal and transverse directions in one operation. It is necessary to measure and calculate the transverse and longitudinal slopes twice, respectively. The overall construction is difficult and the construction efficiency is low.

[0015] If the line method is used for slope control, since the horizontal and vertical slopes of the flat stone are different, both the inner and outer edges need to be controlled. When placing two control lines, the flat stone will inevitably touch the control lines during the lowering process, affecting the actual construction accuracy.

[0016] In addition, the existing slope control operation has a fluctuation phenomenon that is unique to manual operations, that is, the slope control is usually not completely consistent with the designed slope target (there is human error).

[0017] The construction of zigzag street gutters has relatively high requirements for the transverse and longitudinal slopes. If the slope is not well controlled, water accumulation on the road will easily occur and its main function will fail. Summary of the invention

[0018] The purpose of the present invention is to provide a multi-faceted slope control device in the construction of a sawtooth street ditch, which solves the technical problems of flat stone longitudinal slope control and transverse slope control at one time without the need for a complicated measurement control process, and at the same time avoids the phenomenon of human error in slope control during manual operation.

[0019] To achieve the above-mentioned purpose, the present invention discloses a multi-faceted slope control device in the construction of a sawtooth street ditch, with the road width direction as the left and right direction, the road length direction as the front and back direction, and the road lowering direction as the front direction; The invention comprises a frame, wherein the cross section of the frame in the left-right direction is in an E-shape, the opening of the E-shaped frame is arranged downward, the E-shaped frame comprises a top side, a left vertical side, a right vertical side and a middle vertical side, a translation sliding positioning groove opening downward is formed between the middle vertical side and the right vertical side, the translation sliding positioning groove matches the curb stone of the road and is used to cover the middle and upper part of the curb stone to keep the top side of the frame in a horizontal state; the left vertical side comprises a left front vertical side and a left rear vertical side, A longitudinal slope adjustment structure is connected between the left front vertical edge and the left rear vertical edge, and the longitudinal slope adjustment structure is slidably connected to a transverse slope adjustment structure. The longitudinal slope adjustment structure is used to constrain the slope of the transverse slope adjustment structure when it moves forward and backward, and the transverse slope adjustment structure is used to control the transverse slope of the mortar leveling layer through its own inclination angle and control the longitudinal slope of the mortar leveling layer through the forward and backward movement slope of the longitudinal slope adjustment structure, so as to smooth the top surface of the mortar leveling layer to the predetermined longitudinal slope and transverse slope at one time.

[0020] The longitudinal slope adjustment structure is: The length of the left rear vertical side is shorter than that of the left front vertical side; the left rear vertical side is connected downwardly with a rear telescopic ruler, and the left front vertical side is connected downwardly with a front telescopic ruler; a longitudinal slope adjustment beam is connected between the bottom ends of the rear telescopic ruler and the bottom ends of the front telescopic ruler, and the longitudinal slope adjustment beam is connected to the rear telescopic ruler and the front telescopic ruler by bolts, and the front and rear inclination angles of the longitudinal slope adjustment beam are consistent with the predetermined longitudinal slope gradient.

[0021] The slope adjustment structure is: The transverse slope adjustment structure includes a sliding block, a bottom of which is provided with an inclined sliding positioning groove with an opening facing downward, and the sliding block is slidably connected to the longitudinal slope adjustment beam through the inclined sliding positioning groove; a protractor structure is fixedly connected to the top of the sliding block, and the origin of the protractor structure is connected to an inclined scraper by bolts, and the left and right inclination angles of the scraper are consistent with the predetermined transverse slope.

[0022] An upper roller is installed on the inner surface of the top wall of the translation sliding positioning groove, and the upper roller is in rolling and pressing contact with the top surface of the side stone; a right roller is installed on the right inner wall of the translation sliding positioning groove, and the right roller is in rolling and pressing contact with the right surface of the side stone; a left roller is installed on the left inner wall of the translation sliding positioning groove, and the left roller is in rolling and pressing contact with the left surface of the side stone; The cross section of the scraper is L-shaped.

[0023] The present invention also discloses a multi-faceted slope control method using the multi-faceted slope control device in the construction of a sawtooth ditch, which is performed in the following steps: When the multi-faceted slope control device is stored during the construction of the sawtooth street ditch, the front telescopic ruler, the rear telescopic ruler and the longitudinal slope adjustment beam are removed from the E-shaped frame; The first step is to install the E-shaped frame, which is performed before installing the flat stone. Before this step, the side stone has been installed in place and its top surface is horizontal, the road structure layer and concrete cushion layer under the flat stone have been completed, and the mortar leveling layer is spread on the concrete cushion layer to wait for the longitudinal slope and transverse slope to be controlled. This step is to buckle the translation sliding positioning groove on the curb stone, at this time the curb stone is clamped between the left roller and the right roller, the upper roller is pressed on the top surface of the curb stone, so that the top edge of the E-shaped frame is in a horizontal state and the left vertical edge, the right vertical edge and the middle vertical edge are all in a vertical state; the forward direction during construction is the downhill direction of the road slope; The second step is to install the longitudinal slope adjustment structure so that the slope of the longitudinal slope adjustment beam is the same as the predetermined longitudinal slope; The third step is to install the cross slope adjustment structure so that the angle of the scraper's left and right inclination is consistent with the predetermined cross slope; The fourth step is to push the sliding block forward from the back, so that the sliding block drives the protractor structure and the scraper to move toward the longitudinal slope adjustment beam, and the fourth step is ended when the sliding block contacts the front telescopic ruler; During the forward movement, the scraper scrapes off the redundancy on the top surface of the mortar leveling layer, and controls the longitudinal slope and transverse slope of the top surface of the mortar leveling layer within the predetermined longitudinal slope and transverse slope through one movement; After the fourth step is completed, the slope control work of the mortar leveling layer of a section of the road is completed, the sliding block is pushed backward to the rear end of the longitudinal slope adjustment beam and abuts against the rear telescopic ruler, and then the E-shaped frame is pushed forward along the top surface of the curb stone, and the distance of the E-shaped frame in the front and rear direction is pushed, and then the fourth step is repeated until the stroke of the E-shaped frame covers the entire length of the predetermined road section, completing the slope control work of the mortar leveling layer of this road section.

[0024] The second step is specifically: the predetermined longitudinal slope is 0.N%, N is a positive real number; the length of the E-shaped frame in the front-to-back direction is L millimeters; L is a positive real number; the height difference = L×0.N% millimeters; Connect the front telescopic ruler downward at the left front vertical side, connect the rear telescopic ruler downward at the left rear vertical side, and adjust the front telescopic ruler to be in the maximum downward extension state; adjust the rear telescopic ruler first downward to the maximum extension state, and then retract it upward by L×0.N% mm, use fixing bolts to fix the rear end of the longitudinal slope adjustment beam to the connecting hole at the lower end of the rear telescopic ruler, and use fixing bolts to fix the front end of the longitudinal slope adjustment beam to the connecting hole at the lower end of the front telescopic ruler. At this time, the slope of the longitudinal slope adjustment beam is fixed to the predetermined longitudinal slope.

[0025] The third step is specifically: slide the sliding block from top to bottom through its inclined sliding positioning groove to clamp it on the longitudinal slope adjusting beam, and push the sliding block to the rear end of the longitudinal slope adjusting beam to abut against the rear telescopic ruler; loosen the bolts between the scraper and the protractor structure, and adjust the left and right inclination angles of the scraper to be consistent with the predetermined transverse slope according to the indication of the protractor structure, and then tighten the bolts to fix the inclination angle of the scraper; at this time, the lower surface of the scraper is lower than the top surface of the constructed mortar leveling layer; and is consistent with the top surface height of the mortar leveling layer in the design.

[0026] The present invention has the following advantages: By adopting the structure of the present invention, the front and rear slopes of the mortar leveling layer can be simply controlled by the longitudinal slope adjustment structure, and the transverse slope of the mortar leveling layer can be controlled by the transverse slope adjustment structure itself. The multi-faceted slope control device in the zigzag street ditch construction can be adjusted twice according to the slopes in the two directions before construction, without complicated measurement and calculation, and convenient adjustment. When the transverse slope adjustment structure moves forward and backward along the longitudinal slope adjustment structure, it naturally inherits the front and rear slopes of the longitudinal slope adjustment structure. Therefore, the transverse slope adjustment structure can accurately control the longitudinal and transverse slopes of the mortar leveling layer at the same time during the forward and backward movement.

[0027] The upper roller, the left roller and the right roller are arranged to convert the sliding friction between the translation sliding positioning groove and the top surface of the side stone into rolling friction, which not only saves manpower when moving along the side stone, but also reduces wear during use and prolongs the service life of the invention.

[0028] The cross section of the scraper is L-shaped. When the redundant amount of the upper layer of the mortar leveling layer is scraped off by the bottom plate in the L-shaped scraper, the scraped redundant amount (mortar material) can be blocked by the vertical plate in the L-shaped scraper, so that the scraped mortar material is pushed forward and does not fall on the mortar leveling layer with a controlled slope behind the scraper. The forward direction of the construction direction of the present invention is the downhill direction, which is also conducive to the scraped mortar material falling forward without affecting the mortar leveling layer with a controlled slope behind.

[0029] The multi-faceted slope control method of the present invention is very simple. It only needs to slide the sliding block from the back to the front to the front telescopic ruler to simultaneously control the front and rear slopes (longitudinal slope) and left and right slopes (transverse slope) of the mortar leveling layer, which improves the efficiency of slope control compared with the past. Not only is the actual operation simple, but there is no complicated calculation work before the actual slope control operation (sliding the sliding block forward and backward). The transverse slope control does not require calculation, and only requires measuring the angle once; the longitudinal slope control only requires calculating the product of two numbers multiplied (L×0.N%), which is greatly simplified compared with the past. The present invention reduces the knowledge requirements for construction personnel and greatly reduces the workload of slope control construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 It is a schematic diagram of the structure of the present invention installed on a road curb (the sliding block and the angle measuring structure are omitted).

[0031] Figure 2 It is a side view structural schematic diagram of the connection between the left front vertical side and the left rear vertical side and the longitudinal slope adjustment beam.

[0032] Figure 3 It is a structural diagram of the slope adjustment structure.

[0033] Figure 4 It is the left view of the cross slope scraper. DETAILED DESCRIPTION

[0034] In the present invention, the road width direction is the left-right direction, that is, the lateral direction, the road length direction is the front-back direction, that is, the longitudinal direction, and the road lowering direction is the forward direction.

[0035] like Figures 1 to 4 As shown, the present invention provides a multi-faceted slope control device in the construction of a sawtooth street ditch, comprising a frame, the cross section of the frame in the left and right directions is E-shaped, the opening of the E-shaped frame is arranged downward, the E-shaped frame has a top edge 1, a left vertical edge 2, a right vertical edge 3 and a middle vertical edge 4, a translation sliding positioning groove 5 with an opening downward is formed between the middle vertical edge 4 and the right vertical edge 3 (or the left vertical edge 2), the translation sliding positioning groove 5 matches with a curb 6 of the road and is used to cover the middle and upper part of the curb 6 to keep the top edge 1 of the frame in a horizontal state; the left vertical edge 2 includes a left front vertical edge 21 and a left rear vertical edge 22; A longitudinal slope adjustment structure is connected between the left front vertical edge 21 and the left rear vertical edge 22, and the longitudinal slope adjustment structure is slidably connected to a transverse slope adjustment structure. The longitudinal slope adjustment structure is used to constrain the slope of the transverse slope adjustment structure when it moves forward and backward. The transverse slope adjustment structure is used to control the transverse slope of the mortar leveling layer through its own inclination angle and control the longitudinal slope of the mortar leveling layer through the forward and backward movement slope of the longitudinal slope adjustment structure, so as to smooth the top surface of the mortar leveling layer to the predetermined longitudinal slope and transverse slope at one time.

[0036] By adopting the structure of the present invention, the front and rear slopes of the mortar leveling layer can be simply controlled by the longitudinal slope adjustment structure, and the transverse slope of the mortar leveling layer can be controlled by the transverse slope adjustment structure itself. The multi-faceted slope control device in the zigzag street ditch construction can be adjusted twice according to the slopes in the two directions before construction, without complicated measurement and calculation, and convenient adjustment. When the transverse slope adjustment structure moves forward and backward along the longitudinal slope adjustment structure, it naturally inherits the front and rear slopes of the longitudinal slope adjustment structure. Therefore, the transverse slope adjustment structure can accurately control the longitudinal and transverse slopes of the mortar leveling layer at the same time during the forward and backward movement.

[0037] The longitudinal slope adjustment structure is: The length of the left rear vertical side 22 is shorter than that of the left front vertical side 21; the left rear vertical side 22 is downwardly connected to the rear telescopic ruler 9, and the left front vertical side 21 is downwardly connected to the front telescopic ruler 10; a longitudinal slope adjustment beam 11 is connected between the bottom ends of the rear telescopic ruler 9 and the front telescopic ruler 10, and the longitudinal slope adjustment beam 11 is bolted to the rear telescopic ruler 9 and the front telescopic ruler 10 (for easy disassembly and installation), and the front and rear inclination angles of the longitudinal slope adjustment beam 11 are consistent with the predetermined longitudinal slope gradient.

[0038] The transverse slope adjustment structure is: the transverse slope adjustment structure includes a sliding block 12, and the bottom of the sliding block 12 is provided with an inclined sliding positioning groove 13 with an opening facing downward, and the sliding block 12 is slidably clamped on the longitudinal slope adjustment beam 11 through the inclined sliding positioning groove 13; the top of the sliding block 12 is fixedly connected to (preferably integrally arranged with) a protractor structure 14, and the origin position 19 of the protractor structure 14 (that is, the starting point of all its angle lines, which is the center of the protractor arc) is connected to an inclined scraper 15 through bolts, and the left and right inclination angle of the scraper 15 is consistent with the predetermined transverse slope.

[0039] The origin of the protractor structure 14 is preferably located directly above the inclined sliding positioning slot 13 .

[0040] An upper roller 16 is installed on the inner surface of the top wall of the translation sliding positioning groove 5, and the upper roller 16 is in rolling contact with the top surface of the side stone 6; a right roller 17 is installed on the right inner wall of the translation sliding positioning groove 5, and the right roller 17 is in rolling contact with the right surface of the side stone 6; a left roller 18 is installed on the left inner wall of the translation sliding positioning groove 5, and the left roller 18 is in rolling contact with the left surface of the side stone 6; The arrangement of the upper roller 16, the left roller 18 and the right roller 17 converts the sliding friction between the translation sliding positioning groove 5 and the top surface of the side stone 6 into rolling friction, which not only saves manpower when moving along the side stone 6, but also reduces wear during use and prolongs the service life of the present invention.

[0041] The cross section of the scraper 15 is L-shaped, and the bottom edge of the L-shape and its front end are provided with a pointed blade, which is conducive to scraping off the redundant part of the mortar leveling layer. When the redundant amount of the upper layer of the mortar leveling layer is scraped off by the bottom plate in the L-shape of the scraper 15, the scraped redundant amount (mortar material) can be blocked by the vertical plate in the L-shape of the scraper 15, so that the scraped mortar material is pushed forward and does not fall on the mortar leveling layer with a controlled slope behind the scraper 15. The forward direction of the construction direction of the present invention is the downhill direction, which is also conducive to the scraped mortar material falling forward without affecting the mortar leveling layer with a controlled slope behind.

[0042] The present invention also discloses a multi-faceted slope control method using the multi-faceted slope control device in the construction of a sawtooth ditch, which is performed in the following steps: When storing the multi-faceted slope control device in the construction of the sawtooth street ditch, the front telescopic ruler 10, the rear telescopic ruler 9 and the longitudinal slope adjustment beam 11 are removed from the E-shaped frame to facilitate storage; The first step is to install the E-shaped frame. This step is performed before installing the flat stone. Before this step is performed, the side stone 6 has been installed in place and its top surface is horizontal. The road structure layer and concrete cushion layer under the flat stone have been completed. The mortar leveling layer is spread on the concrete cushion layer to wait for the longitudinal slope (i.e. the front and rear slope) and the transverse slope (i.e. the left and right slope) to be controlled. This step is to buckle the translation sliding positioning groove 5 on the curb 6, at this time the curb 6 is sandwiched between the left roller 18 and the right roller 17, the upper roller 16 is pressed on the top surface of the curb 6, so that the top edge 1 of the E-shaped frame is in a horizontal state and the left vertical edge 2, the right vertical edge 3 and the middle vertical edge 4 are all in a vertical state; the forward direction during construction is the downhill direction of the road slope; The second step is to install the longitudinal slope adjustment structure so that the slope of the longitudinal slope adjustment beam 11 is the same as the predetermined longitudinal slope; The third step is to install the cross slope adjustment structure so that the angle of the scraper 15 is consistent with the predetermined cross slope; The fourth step is to push the sliding block 12 from the back to the front, so that the sliding block 12 drives the protractor structure 14 and the scraper 15 to move toward the front longitudinal slope adjustment beam 11, and the fourth step is ended when the sliding block 12 contacts the front telescopic ruler 10; During the forward movement, the scraper 15 scrapes off the redundancy on the top surface of the mortar leveling layer, and controls the longitudinal slope and transverse slope of the top surface of the mortar leveling layer to a predetermined longitudinal slope and transverse slope through one movement; After the fourth step is completed, the slope control work of the mortar leveling layer of a section of the road is completed, the sliding block 12 is pushed backward until the rear end of the longitudinal slope adjustment beam 11 is in contact with the rear telescopic ruler 9, and then the E-shaped frame is pushed forward along the top surface of the curb 6, and the distance of the E-shaped frame in the front and rear direction is pushed, and then the fourth step is repeated until the stroke of the E-shaped frame covers the entire length of the predetermined road section, completing the slope control work of the mortar leveling layer of this road section.

[0043] The multi-faceted slope control method of the present invention is very simple. It only needs to slide the sliding block 12 from the back to the front to the front telescopic ruler 10 to simultaneously control the front and rear slopes (longitudinal slope) and left and right slopes (transverse slope) of the mortar leveling layer, which improves the efficiency of slope control compared with the past. Not only is the actual operation simple, but there is no complicated calculation work before the actual slope control operation (sliding the sliding block 12 forward and backward). The transverse slope control does not require calculation, and only requires measuring the angle once; the longitudinal slope control only requires calculating the product of two numbers multiplied (L×0.N%), which is greatly simplified compared with the past. The present invention reduces the knowledge requirements for construction personnel and greatly reduces the workload of slope control construction.

[0044] The second step is specifically: the predetermined longitudinal slope is 0.N%, N is a positive real number; the length of the E-shaped frame in the front-to-back direction is L mm; L is a positive real number; the height difference = L×0.N% mm; in this embodiment, L=2000 mm, N=3, and the height difference = 6 mm.

[0045] The front telescopic ruler 10 is connected downwardly at the left front vertical side 21, and the rear telescopic ruler 9 is connected downwardly at the left rear vertical side 22. The front telescopic ruler 10 is adjusted to be in the maximum downward extension state; the rear telescopic ruler 9 is adjusted downward to the maximum extension state first, and then retracted upward by L×0.N% mm, and the rear end of the longitudinal slope adjustment beam 11 is fixed to the connection hole at the lower end of the rear telescopic ruler 9 with fixing bolts, and the front end of the longitudinal slope adjustment beam 11 is fixed to the connection hole at the lower end of the front telescopic ruler 10 with fixing bolts. At this time, the slope of the longitudinal slope adjustment beam 11 is fixed to the predetermined longitudinal slope.

[0046] The third step is specifically: slide the sliding block 12 from top to bottom through its inclined sliding positioning groove 13 to be clamped on the longitudinal slope adjustment beam 11, and push the sliding block 12 to the rear end of the longitudinal slope adjustment beam 11 to abut against the rear telescopic ruler 9; loosen the bolts between the scraper 15 and the protractor structure 14, and according to the indication of the protractor structure 14, the construction personnel adjust the left and right inclination angle of the scraper 15 to be consistent with the predetermined transverse slope, and then tighten the bolts to fix the inclination angle of the scraper 15; at this time, the lower surface of the scraper 15 is lower than the top surface of the constructed mortar leveling layer (slightly lower, the purpose is to ensure that the mortar leveling layer can be scraped to control its surface slope); and is consistent with the top surface height of the mortar leveling layer in the design.

[0047] The above embodiments are only used to illustrate rather than limit the technical solutions of the present invention. Although the present invention is described in detail with reference to the above embodiments, those skilled in the art should understand that the present invention can still be modified or replaced by equivalents. Any modification or partial replacement that does not depart from the spirit and scope of the present invention should be included in the scope of the claims of the present invention.

Claims

1. A multi-faceted slope control device for zigzag street ditch construction, with the road width direction as the left and right direction, the road length direction as the front and back direction, and the road lowering direction as the front direction; the characteristics are: The frame comprises a frame, the cross section of the frame in the left-right direction is in an E-shape, the opening of the E-shaped frame is arranged downward, the E-shaped frame comprises a top side, a left vertical side, a right vertical side and a middle vertical side, a translation sliding positioning groove opening downward is formed between the middle vertical side and the right vertical side, the translation sliding positioning groove matches the curb stone of the road and is used to cover the middle and upper part of the curb stone to keep the top side of the frame in a horizontal state; the left vertical side comprises a left front vertical side and a left rear vertical side; A longitudinal slope adjustment structure is connected between the left front vertical edge and the left rear vertical edge, and the longitudinal slope adjustment structure is slidably connected to a transverse slope adjustment structure. The longitudinal slope adjustment structure is used to constrain the slope of the transverse slope adjustment structure when it moves forward and backward, and the transverse slope adjustment structure is used to control the transverse slope of the mortar leveling layer through its own inclination angle and control the longitudinal slope of the mortar leveling layer through the forward and backward movement slope of the longitudinal slope adjustment structure, so as to smooth the top surface of the mortar leveling layer to the predetermined longitudinal slope and transverse slope at one time.

2. The multi-faceted slope control device in the construction of a sawtooth ditch according to claim 1, characterized in that: The longitudinal slope adjustment structure is: The length of the left rear vertical side is shorter than that of the left front vertical side; the left rear vertical side is connected downwardly with a rear telescopic ruler, and the left front vertical side is connected downwardly with a front telescopic ruler; a longitudinal slope adjustment beam is connected between the bottom ends of the rear telescopic ruler and the bottom ends of the front telescopic ruler, and the longitudinal slope adjustment beam is connected to the rear telescopic ruler and the front telescopic ruler by bolts, and the front and rear inclination angles of the longitudinal slope adjustment beam are consistent with the predetermined longitudinal slope gradient.

3. The multi-faceted slope control device in the construction of a sawtooth ditch according to claim 2, characterized in that: The slope adjustment structure is: The transverse slope adjustment structure includes a sliding block, a bottom of which is provided with an inclined sliding positioning groove with an opening facing downward, and the sliding block is slidably connected to the longitudinal slope adjustment beam through the inclined sliding positioning groove; a protractor structure is fixedly connected to the top of the sliding block, and the origin of the protractor structure is connected to an inclined scraper by bolts, and the left and right inclination angles of the scraper are consistent with the predetermined transverse slope.

4. The multi-faceted slope control device in the construction of a sawtooth ditch according to claim 1, characterized in that: An upper roller is installed on the inner surface of the top wall of the translational sliding positioning groove, and the upper roller is in rolling contact with the top surface of the side stone; a right roller is installed on the right inner wall of the translational sliding positioning groove, and the right roller is in rolling contact with the right surface of the side stone; a left roller is installed on the left inner wall of the translational sliding positioning groove, and the left roller is in rolling contact with the left surface of the side stone.

5. The multi-faceted slope control device in the construction of a sawtooth ditch according to claim 4, characterized in that: The cross section of the scraper is L-shaped.

6. A multi-faceted slope control method using the multi-faceted slope control device in the construction of a sawtooth ditch as claimed in claim 5, characterized in that Follow these steps: When the multi-faceted slope control device is stored during the construction of the sawtooth street ditch, the front telescopic ruler, the rear telescopic ruler and the longitudinal slope adjustment beam are removed from the E-shaped frame; The first step is to install the E-shaped frame, which is performed before installing the flat stone. Before this step, the side stone has been installed in place and its top surface is horizontal, the road structure layer and concrete cushion layer under the flat stone have been completed, and the mortar leveling layer is spread on the concrete cushion layer to wait for the longitudinal slope and transverse slope to be controlled. This step is to buckle the translation sliding positioning groove on the curb stone, at this time the curb stone is clamped between the left roller and the right roller, the upper roller is pressed on the top surface of the curb stone, so that the top edge of the E-shaped frame is in a horizontal state and the left vertical edge, the right vertical edge and the middle vertical edge are all in a vertical state; the forward direction during construction is the downhill direction of the road slope; The second step is to install the longitudinal slope adjustment structure so that the slope of the longitudinal slope adjustment beam is the same as the predetermined longitudinal slope; The third step is to install the cross slope adjustment structure so that the angle of the scraper's left and right inclination is consistent with the predetermined cross slope; The fourth step is to push the sliding block forward from the back, so that the sliding block drives the protractor structure and the scraper to move toward the longitudinal slope adjustment beam, and the fourth step is ended when the sliding block contacts the front telescopic ruler; During the forward movement, the scraper scrapes off the redundancy on the top surface of the mortar leveling layer, and controls the longitudinal slope and transverse slope of the top surface of the mortar leveling layer within the predetermined longitudinal slope and transverse slope through one movement; After the fourth step is completed, the slope control work of the mortar leveling layer of a section of the road is completed, the sliding block is pushed backward to the rear end of the longitudinal slope adjustment beam and abuts against the rear telescopic ruler, and then the E-shaped frame is pushed forward along the top surface of the curb stone, and the distance of the E-shaped frame in the front and rear direction is pushed, and then the fourth step is repeated until the stroke of the E-shaped frame covers the entire length of the predetermined road section, completing the slope control work of the mortar leveling layer of this road section.

7. The multi-faceted slope control method according to claim 6, characterized in that: The second step is specifically: the predetermined longitudinal slope is 0.N%, N is a positive real number; the length of the E-shaped frame in the front-to-back direction is L millimeters; L is a positive real number; the height difference = L×0.N% millimeters; Connect the front telescopic ruler downward at the left front vertical side, connect the rear telescopic ruler downward at the left rear vertical side, and adjust the front telescopic ruler to be in the maximum downward extension state; adjust the rear telescopic ruler first downward to the maximum extension state, and then retract it upward by L×0.N% mm, use fixing bolts to fix the rear end of the longitudinal slope adjustment beam to the connecting hole at the lower end of the rear telescopic ruler, and use fixing bolts to fix the front end of the longitudinal slope adjustment beam to the connecting hole at the lower end of the front telescopic ruler. At this time, the slope of the longitudinal slope adjustment beam is fixed to the predetermined longitudinal slope.

8. The multi-faceted slope control method according to claim 7, characterized in that: The third step is specifically: slide the sliding block from top to bottom through its inclined sliding positioning groove to clamp it on the longitudinal slope adjusting beam, and push the sliding block to the rear end of the longitudinal slope adjusting beam to abut against the rear telescopic ruler; loosen the bolts between the scraper and the protractor structure, and adjust the left and right inclination angles of the scraper to be consistent with the predetermined transverse slope according to the indication of the protractor structure, and then tighten the bolts to fix the inclination angle of the scraper; at this time, the lower surface of the scraper is lower than the top surface of the constructed mortar leveling layer; and is consistent with the top surface height of the mortar leveling layer in the design.

Citation Information

Patent Citations

  • Multifunctional device for gradient control of road construction

    CN114689022A

  • A portable equipment that is arranged in road construction side slope slope quality control

    CN206959839U

  • Concrete surface finishing adjusting device and high-speed rail base plate adjusting device

    CN209686170U

  • Device for quickly controlling longitudinal slope, transverse slope and loose paving thickness of roadbed

    CN213295995U

  • Adjustable device for sidewalk cross slope

    CN221094779U