Hollow fan foundation mass concrete one-time pouring construction method
Through one-time pouring and formwork support methods, the problems of difficulty in the construction of hollow fan foundation and long construction cycle of solid concrete foundation are solved, and efficient molding and strength improvement of hollow fan foundation are achieved, saving costs and time.
Patent Information
- Application Number
- CN202411212727.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-30
- Publication Date
- 2024-11-08
AI Technical Summary
In the prior art, the construction of hollow fan foundation is difficult, the construction period of solid concrete foundation is long and the firm performance is poor, and the effective construction method of hollow fan foundation is lacking.
A one-time pouring construction method for large volume concrete of hollow fan foundation, including supporting foundation pit formwork, binding steel mesh, setting support parts and formwork, and using a new formwork support method combining brick tire formwork and steel formwork to realize One-time casting and molding shortens the construction cycle.
It improves the strength and construction efficiency of the hollow fan foundation, saves material and labor costs, shortens construction period, avoids the complexity and high cost of formwork disassembly, and ensures construction safety and quality.
Smart Images

Figure CN118911147A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of civil engineering of fan foundations, in particular to a one-time pouring construction method of large-volume concrete for a hollow fan foundation. Background Art
[0002] The statements in this section merely provide background information related to the present invention and do not necessarily constitute prior art.
[0003] With the vigorous development of the wind power industry, wind power towers are built higher and higher, and wind turbine foundations are also built larger and larger. Wind turbine foundations usually adopt concrete foundations, mostly solid concrete foundations. Solid concrete foundations have the problem of large concrete consumption. In the prior art, solid concrete foundations are formed by setting up formwork and pouring in layers for many times. The problems of pouring in layers for many times are that the construction period is long and the overall firmness is poor.
[0004] In addition, the prior art does not use a hollow fan foundation, and the corresponding prior art does not have a construction method for a hollow fan foundation. The prior art takes into account the difficulty in constructing a large hollow fan foundation (with a diameter greater than 10m). For example, if a brick formwork is used to support the side wall of the hollow fan foundation, it is easy to tilt and deform because there is no stress point on the outside of the side wall; if a steel formwork is used to support the entire fan foundation, there are problems such as heavy weight, complicated assembly, high construction cost, and increased labor and time costs in the demolding process. Therefore, there is no research and construction on related content. Summary of the invention
[0005] In view of the deficiencies in the prior art, the object of the present invention is to provide a one-time pouring construction method for large-volume concrete of a hollow fan foundation, which can realize the molding of the hollow fan foundation, ensure the strength of the hollow fan foundation, and help shorten the construction period.
[0006] In order to achieve the above object, the present invention is implemented through the following technical solutions:
[0007] A one-time pouring construction method for a large volume of concrete for a hollow fan foundation includes the following contents:
[0008] Support the foundation pit formwork, and pour the foundation pit side wall cushion between the foundation pit formwork and the foundation pit side wall;
[0009] Tie up the bottom plate steel mesh in the fan foundation bottom plate and the internal steel mesh inside the brick formwork, and connect the internal steel mesh with the bottom steel mesh;
[0010] A support member is arranged in the bottom plate of the wind turbine foundation to support the hollow foundation bottom side wall template, and the hollow foundation bottom side wall template is supported, and the hollow foundation bottom side wall template is located on the inner side of the internal steel mesh;
[0011] A hollow foundation middle ring beam template is supported on the top of the hollow foundation bottom side wall template, and the hollow foundation middle ring beam template forms an annular ring;
[0012] A hollow foundation cylindrical side wall formwork is supported on the inner side of the ring beam formwork in the middle of the hollow foundation;
[0013] The foundation top side wall formwork is supported on the outer peripheral side of the hollow foundation cylindrical side wall formwork;
[0014] A foundation bottom outer wall template is supported on the outer peripheral side of the hollow foundation cylindrical side wall template, the foundation bottom outer wall template is set lower than the foundation top side wall template, and the foundation bottom outer wall template is located in the outer peripheral direction of the foundation top side wall template;
[0015] During the process of supporting each formwork, external steel mesh is tied between the hollow foundation cylindrical side wall formwork and the foundation top side wall formwork and the foundation bottom outer side wall formwork;
[0016] Grouting starts through the space between the foundation bottom outer wall formwork and the foundation top side wall formwork. As described above, a large-volume concrete one-time pouring construction method for a hollow fan foundation, the hollow foundation bottom side wall formwork, the hollow foundation middle ring beam formwork, the hollow foundation cylindrical side wall formwork, the foundation top side wall formwork and the foundation bottom outer wall formwork are all made of steel formwork, which is firm, durable and reusable;
[0017] The foundation pit formwork adopts a brick-based formwork and does not need to be removed.
[0018] According to the one-time pouring construction method of large-volume concrete for a hollow wind turbine foundation as described above, the middle ring beam formwork of the hollow foundation is supported by ring beam support uprights and ring beam support cross bars, the ring beam support uprights support the ring beam support cross bars, a plurality of ring beam support cross bars are arranged along the inner side of the bottom side wall formwork of the hollow foundation, a plurality of ring beam support cross bars are arranged along the height direction of the bottom side wall formwork of the hollow foundation, the topmost ring beam support cross bar supports the middle ring beam formwork of the hollow foundation, and one end of the ring beam support cross bar is against the bottom side wall formwork of the hollow foundation.
[0019] A one-time pouring construction method for a large volume of concrete for a hollow fan foundation as described above, wherein the bottom of the ring beam support pole is inserted into the bottom plate of the fan foundation;
[0020] During the binding process of the bottom steel mesh of the fan foundation bottom plate, a first sleeve is arranged on the fan foundation bottom plate, the first sleeve is exposed outside the fan foundation bottom plate, and the bottom of the ring beam support pole is inserted into the first sleeve.
[0021] As described above, a large-volume concrete one-time pouring construction method for a hollow wind turbine foundation, during the process of supporting the hollow foundation cylindrical side wall formwork, it is necessary to set up a scaffolding on the inner side of the hollow foundation cylindrical side wall formwork, the scaffolding includes a scaffolding main body cross bar and a scaffolding main body upright bar, the scaffolding main body upright bar is connected to the scaffolding three-dimensional cross bar, part of the scaffolding main body cross bar is located in the radial direction of the hollow foundation middle ring beam formwork, part of the scaffolding main body cross bar connects the scaffolding main body cross bars in two adjacent radial directions, the end of part of the scaffolding three-dimensional cross bar is against the hollow foundation bottom side wall formwork, and the end of part of the scaffolding three-dimensional cross bar is against the hollow foundation bottom side wall formwork.
[0022] In the one-time pouring construction method of a large volume concrete for a hollow fan foundation as described above, the main cross bars of the scaffolding are arranged in multiple layers, and the main cross bars of two adjacent layers of the scaffolding are arranged in a staggered manner;
[0023] A second sleeve is arranged in the fan foundation bottom plate, the second sleeve is exposed outside the fan foundation bottom plate, and the bottom of the scaffold main body upright pole is inserted into the second sleeve.
[0024] A one-time pouring construction method for a large volume of concrete for a hollow fan foundation as described above, wherein the hollow foundation bottom side wall template comprises a plurality of pieces, and two adjacent hollow foundation bottom side wall templates are welded or bolted together;
[0025] The foundation bottom outer side wall template comprises a plurality of pieces, and two adjacent pieces of the foundation bottom outer side wall template are connected;
[0026] Outer hoops are respectively arranged on the outer sides of the foundation top side wall template and the foundation bottom outer side wall template, and the outer hoops are arranged in multiple layers.
[0027] According to the one-time pouring construction method of a large volume concrete for a hollow fan foundation, the outer hoop outside the outer wall template of the foundation bottom includes a plurality of arc segments, the arc segments are arranged across two adjacent outer wall templates of the foundation bottom, and are respectively connected to the two adjacent outer wall templates of the foundation bottom, and the two adjacent arc segments are fixedly connected;
[0028] An oblique support rod is arranged between the outer hoop outside the outer side wall template of the bottom of the foundation and the ground.
[0029] A one-time pouring construction method for a large volume of concrete for a hollow fan foundation as described above, wherein the cross-section of the side wall template at the bottom of the hollow foundation is circular or square;
[0030] The inner diameter or side length of the hollow foundation bottom side wall template is greater than the inner diameter of the hollow foundation cylindrical side wall template.
[0031] A one-time pouring construction method for a large volume of concrete for a hollow fan foundation as described above, wherein the cross section of the side wall template at the top of the foundation is circular;
[0032] The outer side surface of the foundation top side wall template is flush with the outer side surface of the brick tire template, and the outer side surface of the foundation pit side wall cushion layer is set beyond the outer side surface of the foundation top side wall template;
[0033] The top side of the foundation top side wall template is flush with the top side of the hollow foundation cylindrical side wall template, and the bottom side of the foundation top side wall template is set higher than the bottom side of the hollow foundation cylindrical side wall template.
[0034] A one-time pouring construction method for a large volume of concrete for a hollow fan foundation as described above, wherein the height of the cylindrical side wall template of the hollow foundation is higher than the height of the side wall template of the bottom of the hollow foundation;
[0035] The ring beam template in the middle of the hollow foundation is arranged higher than the ground surface on the side of the foundation pit;
[0036] The top of the foundation bottom outer side wall template is lower than the foundation top side wall template, and the bottom of the foundation bottom outer side wall template is fixed to the ground.
[0037] The beneficial effects of the present invention are as follows:
[0038] 1) The construction method of the present invention specifically first casts the foundation pit side wall cushion layer, ties the bottom plate steel mesh, and then sequentially supports the hollow foundation bottom side wall template, the hollow foundation middle ring beam template, the hollow foundation cylindrical side wall template, the foundation top side wall template and the foundation bottom outer wall template, and supports the template from the inside to the outside to ensure the stability and reliability of each template setting; during the process of supporting each template, the external steel mesh can be tied and constructed at the same time, which is further conducive to shortening the construction period; the entire construction method can realize the one-time casting and molding of hollow large-volume concrete, which not only ensures the structural strength of the fan foundation, but also can effectively shorten the construction period and save materials.
[0039] 2) The present invention adopts a new formwork supporting method that combines brick formwork and steel formwork; a brick formwork is used at the side wall cushion layer of the foundation pit, which does not need to be disassembled, facilitating subsequent construction; the hollow foundation bottom side wall formwork, the hollow foundation middle ring beam formwork, the hollow foundation cylindrical side wall formwork, the foundation top side wall formwork and the foundation bottom outer wall formwork all adopt easy-to-remove steel formwork, maximizing the advantages of the two formwork supporting methods and avoiding their shortcomings, which is beneficial to ensuring the quality of concrete pouring while improving installation efficiency, saving certain material costs and labor costs, and effectively shortening the support period of the fan foundation formwork.
[0040] 3) In the present invention, the middle ring beam template of the hollow foundation is supported by the ring beam support vertical rod and the ring beam support cross rod. One end of the ring beam support cross rod is against the bottom side wall template of the hollow foundation, so the bottom side wall template of the hollow foundation can be reinforced from the inside. The topmost ring beam support cross rod supports the middle ring beam template of the hollow foundation, which is beneficial to ensure the stability of the position of the middle ring beam template of the hollow foundation and avoid slurry leakage.
[0041] 4) In the present invention, during the process of supporting the hollow foundation cylindrical side wall formwork, a scaffolding is set up on the inner side thereof, and the scaffolding includes a scaffolding main body cross bar and a scaffolding main body vertical bar. The ends of some scaffolding three-dimensional cross bars are against the hollow foundation cylindrical side wall formwork, and the ends of some scaffolding three-dimensional cross bars are against the hollow foundation bottom side wall formwork, which effectively enhances the stability of the hollow foundation bottom side wall formwork and the hollow foundation cylindrical side wall formwork.
[0042] 5) In the present invention, during the process of binding the bottom steel mesh of the fan foundation slab, a first sleeve and a second sleeve are arranged in the fan foundation slab, the bottom of the ring beam support upright is inserted into the first sleeve, and the bottom of the scaffolding main body upright is inserted into the second sleeve, thereby ensuring the stability of the ring beam support upright and the scaffolding, and facilitating the removal of the ring beam support upright and the scaffolding after the foundation is formed, avoiding the need to cut the scaffolding pipe from the top of the slab after the slab is poured, saving time and material costs, avoiding dangerous points such as mechanical damage and electric shock damage caused by using a cutting machine, ensuring construction safety, and improving construction speed.
[0043] 6) The brick formwork in the present invention has a fast construction speed, can reduce unnecessary processes, shorten construction time, save labor, reduce the use of personnel, save human resources, and ensure construction quality. The brick membrane can ensure that the height of bricks in each layer is consistent, and it is not easy to tilt or misalign, thereby ensuring the construction quality of the building.
[0044] 7) The steel formwork in the present invention is matched on demand and accurately matched, is sturdy and durable, has a high safety factor, is energy-saving, environmentally friendly and reusable, but is heavy and difficult to assemble, has a high cost and has an additional demolding process compared to brick formwork, which increases material cost, labor cost and time cost, and is not suitable for large-scale use. BRIEF DESCRIPTION OF THE DRAWINGS
[0045] The accompanying drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.
[0046] Figure 1 It is a cross-sectional view of a wind turbine foundation cast by using a large-volume concrete one-time casting construction method for a hollow wind turbine foundation according to one or more embodiments of the present invention.
[0047] Figure 2 It is a top view of a wind turbine foundation cast by using a large-volume concrete one-time casting construction method for a hollow wind turbine foundation according to one or more embodiments of the present invention.
[0048] Figure 3 It is a schematic diagram of scaffolding arrangement in a large-volume concrete one-time pouring construction method for a hollow fan foundation according to one or more embodiments of the present invention.
[0049] Figure 4 It is a schematic diagram of scaffolding main body uprights and ring beam support uprights in a large volume concrete one-time pouring construction method for a hollow wind turbine foundation according to one or more embodiments of the present invention.
[0050] Figure 5 It is a schematic diagram of a section of brick formwork in a one-time pouring construction method of large-volume concrete for a hollow fan foundation according to one or more embodiments of the present invention.
[0051] Figure 6 It is a schematic diagram of a section of steel formwork in a one-time pouring construction method of large-volume concrete for a hollow wind turbine foundation according to one or more embodiments of the present invention.
[0052] In the figure: the distances or sizes between parts are exaggerated to show the positions of various parts, and the schematic diagram is for reference only.
[0053] Among them: 1. Brick formwork, 2. Steel formwork, 3. Scaffolding, 4. First set of pipes, 5. Second set of pipes;
[0054] 2-A. Formwork for the top side wall of foundation, 2-B. Formwork for the bottom side wall of hollow foundation, 2-C. Formwork for the cylindrical side wall of hollow foundation, 2-D. Formwork for the middle ring beam of hollow foundation, 2-E. Formwork for the outer side wall of the bottom of foundation;
[0055] 3-A. Scaffolding main body uprights, 3-B. Scaffolding main body horizontal bars, 3-C. Ring beam supporting uprights, 3-D. Ring beam supporting horizontal bars. DETAILED DESCRIPTION
[0056] It should be noted that the following detailed descriptions are illustrative and intended to provide further explanation of the present invention. Unless otherwise specified, all technical and scientific terms used in the present invention have the same meanings as those commonly understood by those skilled in the art to which the present invention belongs.
[0057] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit the exemplary embodiments according to the present invention. As used herein, unless otherwise explicitly stated in the present invention, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "include" and / or "include" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof;
[0058] As introduced in the background technology, the existing hollow fan foundation has the problem of great construction difficulty. In order to solve the above technical problems, the present invention proposes a one-time pouring construction method of large-volume concrete for hollow fan foundation.
[0059] In a typical embodiment of the present invention, reference is made to Figure 1 and Figure 2 As shown, a one-time pouring construction method for a large volume of concrete for a hollow fan foundation includes the following contents:
[0060] Support the foundation pit formwork, and choose brick formwork 1 (reference Figure 5 As shown), pour the foundation pit side wall cushion between the foundation pit formwork and the foundation pit side wall;
[0061] Tie up the bottom plate steel mesh in the fan foundation bottom plate and the internal steel mesh inside the brick formwork, and connect the internal steel mesh with the bottom steel mesh;
[0062] A support member such as a horse stool steel bar is arranged in the bottom plate of the wind turbine foundation to support the hollow foundation bottom side wall template 2-B, and the hollow foundation bottom side wall template 2-B is supported and arranged, and the hollow foundation bottom side wall template is located on the inner side of the internal steel mesh;
[0063] A hollow foundation middle ring beam template 2-D is supported on the top of the hollow foundation bottom side wall template 2-B, and the hollow foundation middle ring beam template forms an annular ring;
[0064] A hollow foundation cylindrical side wall formwork 2-C is supported on the inner side of the hollow foundation middle ring beam formwork 2-D;
[0065] A foundation top side wall template 2-A is supported on the outer peripheral side of the hollow foundation cylindrical side wall template 2-C;
[0066] A foundation bottom outer side wall template 2-E is supported on the outer peripheral side of the hollow foundation cylindrical side wall template, the foundation bottom outer side wall template 2-E is set lower than the foundation top side wall template 2-A, and the foundation bottom outer side wall template is located on the outer peripheral direction of the foundation top side wall template;
[0067] During the process of supporting each formwork, external steel mesh is tied between the hollow foundation cylindrical side wall formwork and the foundation top side wall formwork and the foundation bottom outer side wall formwork;
[0068] Grouting begins through the space between the outer side wall formwork at the bottom of the foundation and the side wall formwork at the top of the foundation. After the grouting is completed, a hollow fan foundation is formed.
[0069] Among them, the brick-based formwork 1 refers to a formwork supported by brick masonry, which does not need to be removed later and can form an integrated structure with the concrete poured on its side to enhance the stability of the structure.
[0070] It should be noted that the hollow foundation bottom side wall formwork 2-B, the hollow foundation middle ring beam formwork 2-D, the hollow foundation cylindrical side wall formwork 2-C, the foundation top side wall formwork 2-A and the foundation bottom outer wall formwork 2-E all use steel formwork 2, which is firm, durable and reusable.
[0071] It should also be noted that before the construction of the brick formwork 1, before the subsequent setting of the bottom steel mesh, internal steel mesh and external steel mesh in the foundation pit and on the ground, it is necessary to set reinforced concrete piles on the ground and in the foundation pit, and the exposed steel bars on the top of the reinforced concrete piles are tied together with the corresponding steel mesh to enhance the stability of the structure.
[0072] It is easy to understand that the ring beam template in the middle of the hollow foundation has a set width and is arranged horizontally. The ring beam template in the middle of the hollow foundation is supported by the ring beam support uprights 3-C and the ring beam support cross bars 3-D. The ring beam support uprights 3-C support the ring beam support cross bars 3-D. There are multiple ring beam support cross bars along the inner side of the bottom side wall template of the hollow foundation. The ring beam support cross bars have two adjacent radial ring beam support cross bars arranged along the radial direction, which are also connected by the ring beam support cross bars. If there are multiple ring beam support cross bars along the height direction of the bottom side wall template of the hollow foundation, the topmost ring beam support cross bar supports the ring beam template in the middle of the hollow foundation, which is beneficial to ensure the stability of the position of the ring beam template in the middle of the hollow foundation. One end of the ring beam support cross bar is against the bottom side wall template of the hollow foundation, and the bottom side wall template of the hollow foundation can be reinforced from the inside.
[0073] Among them, the ring beam supporting cross bars and the ring beam supporting vertical bars can be round bars, and the ring beam supporting cross bars and the ring beam supporting vertical bars can adopt existing scaffolding bars.
[0074] In this embodiment, the bottom of the ring beam support pole is inserted into the fan foundation bottom plate; during the process of binding the bottom steel mesh of the fan foundation bottom plate, a first sleeve 4 is set on the fan foundation bottom plate. The first sleeve 4 can be a plastic sleeve. The first sleeve is exposed on the fan foundation bottom plate, and the bottom of the ring beam support pole is inserted into the first sleeve.
[0075] In addition, during the installation of the hollow foundation cylindrical side wall formwork, it is necessary to set up scaffolding inside the hollow foundation cylindrical side wall formwork, refer to Figure 3 and Figure 4As shown, the scaffolding 3 includes a scaffolding main body cross bar 3-B and a scaffolding main body upright bar 3-A. The scaffolding main body upright bar 3-A is connected to the scaffolding three-dimensional cross bar 3-B. One scaffolding main body upright bar 3-A is located at the central axis of the bottom plate of the wind turbine foundation. The other scaffolding main body upright bars are arranged at multiple locations around the central axis. The diameter of the scaffolding main body upright bars at the central axis is larger than the diameter of the scaffolding main body upright bars at other positions. Some of the scaffolding main body cross bars are located in the radial direction of the middle ring beam template of the hollow foundation. Some of the scaffolding main body cross bars connect the scaffolding main body cross bars in two adjacent radial directions. The ends of some of the scaffolding three-dimensional cross bars are against the bottom side wall template of the hollow foundation. The ends of some of the scaffolding three-dimensional cross bars are against the bottom side wall template of the hollow foundation, which effectively enhances the stability of the setting of the bottom side wall template of the hollow foundation and the cylindrical side wall template of the hollow foundation.
[0076] Specifically, the scaffolding main body cross bars 3-B are arranged in multiple layers, and the two adjacent layers of scaffolding main body cross bars 3-B are staggered; and the interval between the two adjacent scaffolding main body cross bars of each layer is set at a set angle.
[0077] In addition, during the process of binding the bottom steel mesh of the fan foundation bottom plate, a second sleeve 5 is set on the fan foundation bottom plate. The second sleeve 5 can be a plastic sleeve. The second sleeve is exposed on the fan foundation bottom plate, and the bottom of the scaffolding main body pole is inserted into the second sleeve.
[0078] In this embodiment, after the concrete forming set time, the scaffolding main body cross bar 3-B and the scaffolding main body vertical bar 3-A, the hollow foundation middle ring beam formwork, the ring beam support vertical bar, the ring beam support cross bar 3-D, the hollow foundation middle ring beam formwork, the hollow foundation bottom side wall formwork, the foundation top side wall formwork 2-A and the foundation bottom outer wall formwork are removed.
[0079] It is easy to understand that the hollow foundation bottom side wall template 2-B includes multiple pieces, and two adjacent hollow foundation bottom side wall templates 2-B are welded or bolted together, and ears are set on the side of each hollow foundation bottom side wall template to facilitate welding or bolting of two adjacent hollow foundation bottom side wall templates;
[0080] Of course, reference Figure 6 As shown, the steel template used for the foundation bottom outer wall template includes multiple pieces, each of which is an arc-shaped block, and two adjacent foundation bottom outer wall templates are connected. Similarly, the hollow foundation middle ring beam template, the hollow foundation cylindrical side wall template, and the foundation top side wall template all include multiple pieces, and two adjacent corresponding templates are connected by welding or bolts.
[0081] In addition, outer hoops are respectively arranged on the outside of the foundation top side wall formwork and the foundation bottom outer wall formwork, and the outer hoops on the outside of the foundation top side wall formwork and the foundation bottom outer wall formwork are arranged in one or more layers to ensure the foundation top side wall formwork and the foundation bottom outer wall formwork to prevent deformation caused by concrete extrusion and ensure that there is no leakage or running of the formwork during the construction process.
[0082] The outer hoop on the outside of the foundation bottom outer wall template includes multiple arc segments, which are arranged across two adjacent foundation bottom outer wall templates and are respectively connected to two adjacent foundation bottom outer wall templates, and the two adjacent arc segments are fixedly connected by bolts; specifically, vertical rods are arranged on the outside of each foundation bottom outer wall template (all steel templates used in this embodiment), and there is a distance between two adjacent vertical rods. Multiple layers of horizontal convex strips are supported by multiple vertical rods, and multiple openings are arranged at the convex strips. The arc segments are also provided with openings, and the arc segment openings and the convex strip openings are connected by bolts and locked with nuts; an oblique support rod is arranged between the outer hoop on the outside of the foundation bottom outer wall template and the ground, and one end of the oblique support rod is against the ground.
[0083] It is easy to understand that the outer hoop on the outside of the foundation top side wall template also includes multiple arc segments, which are arranged across two adjacent foundation top side wall templates and are respectively connected to two adjacent foundation bottom outer side wall templates. The outer hoop on the outside of the foundation top side wall template adopts the outer hoop on the outside of the foundation bottom outer side wall template.
[0084] In this embodiment, the cross-section of the hollow foundation bottom side wall template is circular. Of course, in other examples, the cross-section of the hollow foundation bottom side wall template may also be square. The inner diameter of the circular hollow foundation bottom side wall template is larger than the inner diameter of the hollow foundation cylindrical side wall template, so that the inner diameter of the above-ground part of the formed fan foundation is smaller than the inner diameter of the ground part. The concrete of the underground part is integrated with the brick template to ensure the structural strength of the bottom side. The reduction in the inner diameter of the above-ground part is conducive to enhancing the structural strength of the above-ground part, ensuring reliable support for larger and taller fans.
[0085] In addition, the cross-section of the side wall formwork at the top of the foundation is circular;
[0086] It is easy to understand that the outer side surface of the foundation top side wall formwork is flush with the outer side surface of the brick formwork, and the outer side surface of the foundation pit side wall cushion layer exceeds the outer side surface of the foundation top side wall formwork; the top side of the foundation top side wall formwork is flush with the top side of the hollow foundation cylindrical side wall formwork, and the bottom side of the foundation top side wall formwork is higher than the bottom side of the hollow foundation cylindrical side wall formwork.
[0087] In this embodiment, the height of the hollow foundation cylindrical side wall template is higher than the height setting of the hollow foundation bottom side wall template; the hollow foundation middle ring beam template is higher than the ground setting of the foundation pit side; the top of the foundation bottom outer wall template is lower than the bottom setting of the foundation top side wall template, so that the concrete between the two forms a slope, the bottom of the foundation bottom outer wall template is fixed to the ground, and the height of the foundation bottom outer wall template is higher than the height of the foundation top side wall template.
[0088] The construction method provided in this embodiment sets up steel formwork at places where brick formwork is inconvenient to use, giving full play to the advantages of steel formwork, such as being sturdy, durable, having a high safety factor and being reusable; using brick formwork at the side wall cushion layer of the foundation pit where brick formwork is convenient to use, avoiding the disadvantages of steel formwork, such as being heavy in weight and troublesome to assemble, and having a high cost, and reducing a demolding process, giving full play to the advantages of brick formwork, such as fast construction speed, labor saving, and reduced material cost, which is beneficial to ensuring construction quality; the scaffolding uprights are inserted into the second sleeve, and the ring beam support uprights are inserted into the first sleeve, avoiding the step of cutting the scaffolding pipe from the top of the base plate when dismantling after the foundation base plate is cast, saving materials, labor costs and time costs, avoiding dangerous points such as mechanical injuries and electric shock injuries caused by the use of cutting machines, ensuring construction safety, and increasing construction speed.
[0089] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A one-time pouring construction method for large-volume concrete of a hollow fan foundation, characterized in that: It includes the following: Support the foundation pit formwork, and pour the foundation pit side wall cushion between the foundation pit formwork and the foundation pit side wall; Tie up the bottom plate steel mesh in the fan foundation bottom plate and the internal steel mesh inside the brick formwork, and connect the internal steel mesh with the bottom steel mesh; A support member is arranged in the bottom plate of the wind turbine foundation to support the hollow foundation bottom side wall template, and the hollow foundation bottom side wall template is supported, and the hollow foundation bottom side wall template is located on the inner side of the internal steel mesh; A hollow foundation middle ring beam template is supported on the top of the hollow foundation bottom side wall template, and the hollow foundation middle ring beam template forms an annular ring; A hollow foundation cylindrical side wall formwork is supported on the inner side of the ring beam formwork in the middle of the hollow foundation; The foundation top side wall formwork is supported on the outer peripheral side of the hollow foundation cylindrical side wall formwork; A foundation bottom outer wall template is supported on the outer peripheral side of the hollow foundation cylindrical side wall template, the foundation bottom outer wall template is set lower than the foundation top side wall template, and the foundation bottom outer wall template is located in the outer peripheral direction of the foundation top side wall template; During the process of setting up each formwork, external steel mesh is tied between the hollow foundation cylindrical side wall formwork and the foundation top side wall formwork and the foundation bottom outer side wall formwork; Start grouting through the space between the outer side wall form at the bottom of the foundation and the side wall form at the top of the foundation.
2. A one-time pouring construction method for large-volume concrete of a hollow fan foundation according to claim 1, characterized in that: The hollow foundation bottom side wall template, the hollow foundation middle ring beam template, the hollow foundation cylindrical side wall template, the foundation top side wall template and the foundation bottom outer side wall template are all made of steel templates; The foundation pit template adopts a brick template.
3. A one-time pouring construction method for large-volume concrete of a hollow fan foundation according to claim 1, characterized in that: The middle ring beam template of the hollow foundation is supported by ring beam support vertical rods and ring beam support cross rods. The ring beam support vertical rods support the ring beam support cross rods. Along the inner side of the bottom side wall template of the hollow foundation, multiple ring beam support cross rods are arranged. Along the height direction of the bottom side wall template of the hollow foundation, multiple ring beam support cross rods are arranged. The topmost ring beam support cross rod supports the middle ring beam template of the hollow foundation, and one end of the ring beam support cross rod is against the bottom side wall template of the hollow foundation. The bottom of the ring beam support pole is inserted into the fan foundation bottom plate; during the binding process of the bottom steel mesh of the fan foundation bottom plate, a first sleeve is arranged on the fan foundation bottom plate, the first sleeve is exposed outside the fan foundation bottom plate, and the bottom of the ring beam support pole is inserted into the first sleeve.
4. A one-time pouring construction method for a large volume of concrete for a hollow fan foundation according to claim 1, characterized in that: During the installation of the hollow foundation cylindrical side wall formwork, it is necessary to set up a scaffolding on the inner side of the hollow foundation cylindrical side wall formwork, the scaffolding includes a scaffolding main body cross bar and a scaffolding main body upright bar, the scaffolding main body upright bar is connected to the scaffolding three-dimensional cross bar, some of the scaffolding main body cross bars are located in the radial direction of the hollow foundation middle ring beam formwork, some of the scaffolding main body cross bars connect the scaffolding main body cross bars in two adjacent radial directions, the ends of some of the scaffolding three-dimensional cross bars are against the hollow foundation bottom side wall formwork, and the ends of some of the scaffolding three-dimensional cross bars are against the hollow foundation bottom side wall formwork.
5. A one-time pouring construction method for large-volume concrete of a hollow fan foundation according to claim 1, characterized in that: The main cross bars of the scaffolding are arranged in multiple layers, and the main cross bars of two adjacent layers of the scaffolding are arranged in a staggered manner; A second sleeve is arranged in the fan foundation bottom plate, the second sleeve is exposed outside the fan foundation bottom plate, and the bottom of the scaffold main body upright pole is inserted into the second sleeve.
6. A one-time pouring construction method for large-volume concrete of a hollow fan foundation according to claim 1, characterized in that: The hollow foundation bottom side wall templates include multiple pieces, and two adjacent hollow foundation bottom side wall templates are welded or bolted; The foundation bottom outer side wall template comprises a plurality of pieces, and two adjacent pieces of the foundation bottom outer side wall template are connected; Outer hoops are respectively arranged on the outer sides of the foundation top side wall template and the foundation bottom outer side wall template, and the outer hoops are arranged in multiple layers.
7. A one-time pouring construction method for large-volume concrete of a hollow fan foundation according to claim 6, characterized in that: The outer hoop outside the foundation bottom outer side wall template includes a plurality of arc segments, the arc segments are arranged across two adjacent foundation bottom outer side wall templates, and are respectively connected to the two adjacent foundation bottom outer side wall templates, and the two adjacent arc segments are fixedly connected; An oblique support rod is arranged between the outer hoop outside the outer side wall template of the bottom of the foundation and the ground.
8. A one-time pouring construction method for large-volume concrete of a hollow fan foundation according to claim 1, characterized in that: The cross section of the side wall template at the bottom of the hollow foundation is circular or square; The inner diameter or side length of the hollow foundation bottom side wall template is greater than the inner diameter of the hollow foundation cylindrical side wall template.
9. A one-time pouring construction method for large-volume concrete of a hollow fan foundation according to claim 1, characterized in that: The cross section of the side wall template at the top of the foundation is circular; The outer side surface of the foundation top side wall template is flush with the outer side surface of the brick tire template, and the outer side surface of the foundation pit side wall cushion layer is set beyond the outer side surface of the foundation top side wall template; The top side of the foundation top side wall template is flush with the top side of the hollow foundation cylindrical side wall template, and the bottom side of the foundation top side wall template is set higher than the bottom side of the hollow foundation cylindrical side wall template.
10. A one-time pouring construction method for large-volume concrete of a hollow fan foundation according to claim 1, characterized in that: The height of the hollow foundation cylindrical side wall template is higher than the height of the hollow foundation bottom side wall template; The ring beam template in the middle of the hollow foundation is arranged higher than the ground surface on the side of the foundation pit; The top of the foundation bottom outer side wall template is lower than the foundation top side wall template, and the bottom of the foundation bottom outer side wall template is fixed to the ground.