Construction platform and construction method of super high-rise giant frame building

By designing an integrated construction platform, the synchronous construction of giant frame buildings is achieved using hydraulic control systems and support systems, and the problems of poor stability and low efficiency of construction platforms in the existing technology are solved, the construction safety and efficiency are improved, and high-altitude construction is reduced Risk and mechanical costs.

CN118911400APending Publication Date: 2024-11-08NO 1 CONSTR ENG CO LTD OF CHINA CONSTR THIRD ENG BUREAU CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411025120.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-29
Publication Date
2024-11-08

Smart Images

  • Figure CN118911400A_ABST
    Figure CN118911400A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of giant frame buildings, and provides a construction platform and method for a super high-rise giant frame building, and the construction platform comprises a truss platform system, a hanging frame system, a supporting system and a hydraulic control system; the multiple supporting systems are distributed on the outer side of the steel pipe column. The truss platform system comprises a truss platform and an auxiliary platform; the truss platform is arranged around the giant frame building and is connected with an upper supporting system of the supporting system; the auxiliary platform is connected with the truss platform and surrounds the steel pipe column; and the hanger system is hung below the truss platform system. Synchronous construction of the horizontal structure and the vertical structure of the ultrahigh giant frame is achieved, and the construction efficiency and the construction safety are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of giant frame buildings, and in particular relates to a construction platform and a construction method for a super-high-rise giant frame building. Background Art

[0002] At present, most super high-rise buildings adopt the "mega frame-core tube-cantilever truss" system. Through the cantilever truss and the ring belt truss, the mega frame and the core tube play a synergistic role to jointly resist the horizontal load. The patent with the publication number CN206245482U discloses a super high-rise steel structure mega frame building structure. The building includes a mega frame, which includes a plurality of giant columns arranged outside the core tube and a ring belt truss connecting the plurality of giant columns together.

[0003] However, the current construction of giant frame building structures all uses tower cranes or other lifting equipment to hoist and install steel components, and uses a temporary steel pipe column platform for construction. For example, the patent with publication number CN103899093A discloses a step-by-step hoisting construction method for giant frame steel truss beams, which uses a tower crane hoisting method to construct giant frames. For another example, the patent with publication number CN111236607A discloses a super-high-rise steel pipe column operating platform and its disassembly and assembly method, which uses a temporary steel pipe column platform to construct super-high-rise steel structures. The above method has the disadvantages of poor platform stability, small construction range, low construction efficiency, high construction risk, and lack of tool placement platform. At the same time, since some steel beams of the giant frame are welded in the middle of the main beam span, there is a situation where a general steel column platform cannot provide a construction platform. Summary of the invention

[0004] In response to the above-mentioned problems in the prior art, the present application proposes a construction platform and construction method for a super-high-rise giant frame building, aiming to achieve the synchronous construction of the horizontal structure and the vertical structure of the super-high giant frame, thereby improving construction efficiency and construction safety.

[0005] In the first aspect, the present invention proposes a construction platform for a super-high-rise giant frame building, wherein the giant frame building includes a plurality of steel pipe columns with a maintained spacing and a ring-belt truss connecting the plurality of steel pipe columns together; the construction platform includes: a truss platform system, a hanger system, a support system and a hydraulic control system; the plurality of support systems are distributed on the outside of the steel pipe columns; each of the support systems includes an upper support system and a lower support system, which are respectively connected to the steel pipe columns by detachable clamp-type support brackets; the hydraulic control system connects the upper support system and the lower support system, and is used to drive the upper support system or the lower support system to lift along the steel pipe columns; the truss platform system includes a truss platform and an auxiliary platform; the truss platform is arranged around the giant frame building and is connected to the upper support system; the auxiliary platform is connected to the truss platform and surrounds the steel pipe columns; the hanger system is hung below the truss platform system.

[0006] Furthermore, the upper support system includes a lifting column and an upper attachment; the lifting column is connected to the truss platform system, and the truss column is also connected to the steel pipe column through the upper attachment; the lower support system includes an outer frame and a lower attachment; the outer frame is mounted on the outside of the lifting column; the outer frame is connected to the steel pipe column through the lower attachment; the hydraulic control system connects the lifting column and the outer frame.

[0007] Further, the hydraulic control system includes: a lifting cylinder, a telescopic bracket of a lifting column, a lifting guide beam, and a telescopic bracket of the lifting guide beam; a plurality of limit channels and a plurality of lifting channels are alternately arranged on the outer frame along its height direction; the lifting guide beam is connected to the lifting column; the lifting cylinder connects the lifting guide beam and the lifting column; the fixed end of the telescopic bracket of the lifting column is connected to the lifting column, and the telescopic end faces the limit channel or the lifting channel; the fixed end of the telescopic bracket of the lifting guide beam is connected to the lifting guide beam, and the telescopic end faces the limit channel or the lifting channel;

[0008] Furthermore, the upper support system also includes a lifting column flip claw; one end of the lifting column flip claw is connected to the upper attachment, and the other end is mounted on the lifting column; the lower support system also includes a coat rack flip claw; one end of the coat rack flip claw is connected to the lower attachment, and the other end is mounted on the coat rack.

[0009] Furthermore, the support system also includes a plurality of guide wheel groups; at least one guide wheel group is respectively connected to the lifting column and the outer frame; the guide wheel group includes a plurality of guide wheels surrounding the steel pipe column and in close contact with the steel pipe column.

[0010] Furthermore, the rack system includes multiple layers of assembled rack standard sections; a hanging ladder is provided between each layer of rack standard sections; and the truss platform system is reserved with an upper and lower passage opening for connecting with the uppermost rack standard section.

[0011] In a second aspect, the present invention further proposes a construction method for a super high-rise giant frame building, using the above-mentioned construction platform, comprising the following steps:

[0012] Install the support system and hydraulic control system of the construction platform on the outside of the Nth steel pipe column of the giant frame building, where N is greater than or equal to 1; hoist the truss platform system to connect with the support system; hang the bracket system below the truss platform system;

[0013] The truss platform system is used to weld the N+1th steel pipe column of the giant frame building; the bracket system is used to weld the ring belt truss of the floor where the Nth steel pipe column of the giant frame building is located;

[0014] Using the hydraulic control system to lift the support system to the outside of the N+1th steel pipe column;

[0015] The truss platform system is used to perform welding work on the N+2 section of steel pipe columns; the bracket system is used to perform welding work on the ring belt truss of the floor where the N+1 section of steel pipe columns are located;

[0016] The process is repeated successively until the welding of all the steel pipe columns of the mega frame building is completed.

[0017] Furthermore, the support system includes a lifting column, an upper attachment, an outer frame and a lower attachment; the lifting column is installed on the outer side of the steel pipe column by using the upper attachment, and the outer frame is installed on the outer side of the steel pipe column by using the lower attachment, and the outer frame is sleeved on the outside of the lifting column;

[0018] The step of using the hydraulic control system to lift the support system includes:

[0019] Release the connection between the upper attachment piece on the steel pipe column and the lifting column;

[0020] Lifting the lifting column to a first target height using the hydraulic control system;

[0021] Connecting the upper attachment on the steel pipe column to the lifting column, and releasing the connection between the lower attachment on the steel pipe column and the outer frame;

[0022] utilizing the hydraulic control system to elevate the outer frame to a second target height;

[0023] The lower attachment on the steel pipe column is connected to the outer frame.

[0024] Further, the hydraulic control system includes: a lifting cylinder, a telescopic bracket of a lifting column, a lifting guide beam, and a telescopic bracket of the lifting guide beam; a plurality of limit channels and a plurality of lifting channels are alternately arranged on the outer frame along its height direction; the lifting guide beam is connected to the lifting column; the lifting cylinder is connected to the lifting guide beam and the lifting column; the fixed end of the telescopic bracket of the lifting column is connected to the lifting column; the fixed end of the telescopic bracket of the lifting guide beam is connected to the lifting guide beam; the telescopic ends of the telescopic bracket of the lifting column and the telescopic bracket of the lifting guide beam are both facing the limiting channel or the lifting channel;

[0025] The step of lifting the lifting column to a first target height by using the hydraulic control system comprises:

[0026] Extend the telescopic end of the telescopic bracket of the lifting guide beam into the limiting channel; retract the telescopic end of the telescopic bracket of the lifting column from the limiting channel; lift the lifting column by the lifting cylinder so that the telescopic end of the telescopic bracket of the lifting column can be extended into the lifting channel; lift the lifting column again by the lifting cylinder, and the telescopic end of the telescopic bracket of the lifting column rises along the lifting channel following the lifting column; retract the telescopic end of the telescopic bracket of the lifting column from the lifting channel, and lift the lifting column again by the lifting cylinder so that the telescopic end of the telescopic bracket of the lifting column extends into the limiting channel; retract the telescopic end of the telescopic bracket of the lifting guide beam from the limiting channel; lift the lifting guide beam by the lifting cylinder;

[0027] Repeat the above steps until the lifting cylinder lifts the lifting column to the first target height.

[0028] Furthermore, the welding work of the ring-belt truss includes: steel beam welding, weld detection and protective paint spraying.

[0029] The beneficial effects of the present invention include:

[0030] 1. The present invention has high functional integration. By installing the truss platform system connected to the hanging frame system on the supporting system equipped with the hydraulic control system, it can integrate various functions such as protective measures, operating platform, pedestrian passage, etc., which can provide construction workers with great construction convenience and safety guarantee in a limited high-altitude platform, and can realize the synchronous construction of the horizontal structure and the vertical structure of the super-high giant frame, thereby improving construction efficiency and construction safety.

[0031] 2. The present invention has good scalability. The truss platform system and the bracket system can provide a platform for various high-altitude robots, steel structure construction robots and other intelligent equipment and weld detection, anti-corrosion and fire-proof spraying, which is convenient for the fixation and use of intelligent equipment. It can greatly improve the scope of use of intelligent construction equipment, increase work efficiency, and reduce labor costs. At the same time, it can reduce the number of people in high-altitude construction and effectively reduce the risk of high-altitude construction.

[0032] 3. The present invention has the ability of self-climbing. Through the cooperation of the support system and the hydraulic control system, the relevant mechanical equipment can be transported while the truss platform system and the hanging frame system are lifted. It can effectively reduce the frequency of use of tower cranes and other lifting equipment in existing construction methods, reduce machinery costs, and increase construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] Figure 1 It is a structural schematic diagram of the construction platform of the super high-rise giant frame building of the present invention.

[0034] Figure 2 for Figure 1 Schematic diagram of the plan structure of the truss platform system.

[0035] Figure 3 for Figure 1 Schematic diagram of the facade structure of the rack system.

[0036] Figure 4 for Figure 1 An enlarged elevational structural diagram of the support system and hydraulic control system.

[0037] Figure 5 for Figure 4 Schematic diagram of the AA section.

[0038] Figure 6 for Figure 4 Schematic diagram of BB cross section.

[0039] Figure 7 for Figure 4 Schematic diagram of CC cross section.

[0040] In the figure: 1-truss platform system; 2-hanging frame system; 3-support system; 4-hydraulic control system; 5-standard Bailey plate; 6-planking; 7-auxiliary platform; 8-access opening for upper and lower personnel; 9-hanging frame standard section; 10-hanging frame special connecting piece; 11-hanging ladder; 12-upper clamp hoist; 13-lifting column flip hanging claw; 14-upper attachment; 15-guide wheel group; 16-outer rack flip hanging claw; 17-lower attachment; 18-lifting cylinder; 19-lifting column telescopic bracket; 20-outer rack; 21-lifting guide beam; 22-lifting guide beam telescopic bracket; 23-lifting column. DETAILED DESCRIPTION

[0041] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments.

[0042] The mega frame building of the present invention comprises a plurality of steel pipe columns maintaining spacing and a ring belt truss connecting the plurality of steel pipe columns together; the mega frame building in this embodiment comprises four steel pipe columns, such as Figure 2 As shown. The belt truss consists of steel beams connecting steel tubular columns.

[0043] like Figure 1-Figure 7 As shown, the construction platform of the super high-rise giant frame building includes: a truss platform system 1, a hanging frame system 2, a support system 3 and a hydraulic control system 4.

[0044] Among them, the support system 3 and the hydraulic control system 4 are provided as a set. In this embodiment, the construction platform is equipped with four sets of support systems 3 and hydraulic control systems 4, which are distributed one by one on the diagonally opposite sides of the four steel pipe columns. Each set of support system 3 and hydraulic control system 4 includes a supporting system 3 and a hydraulic control system 4 that match each other.

[0045] Each support system 3 includes an upper support system 3 and a lower support system 3, which are respectively connected to the steel pipe column by a detachable hoop-type support bracket. That is, the upper support system 3 is connected to the steel pipe column by at least one detachable hoop-type support bracket, and the lower support system 3 is connected to the steel pipe column by at least one detachable hoop-type support bracket.

[0046] The hydraulic control system 4 is connected to the upper support system 3 and the lower support system 3, and is used to drive the upper support system 3 or the lower support system 3 to be lifted along the steel pipe column.

[0047] The truss platform system 1 includes a truss platform and an auxiliary platform 7; the truss platform is arranged around the giant frame building and is connected to the upper support system 3; the plan view of the truss platform is as follows Figure 2 As shown, it is a square-shaped structure. The auxiliary platform 7 is connected to the truss platform and surrounds the steel pipe column. Figure 2 As shown, there are four auxiliary platforms 7, which are distributed one by one on the diagonally opposite inner sides of the four steel pipe columns. The four auxiliary platforms 7 are distributed at the four corners of the truss platform, surrounding the steel pipe columns.

[0048] The truss platform is formed of a frame made of standard Bailey sheets 5, and then a deck 6 is installed to form a platform. The deck 6 includes a patterned steel plate and an angle steel.

[0049] like Figure 2 , Figure 3 As shown, the hanging frame system 2 is hung below the truss platform of the truss platform system 1 .

[0050] The rack system 2 includes multiple layers of assembled rack standard sections 9, which are connected by rack-specific connectors 10; a hanging ladder 11 is provided between each layer of rack standard sections 9; and the truss platform system 1 is reserved with an upper and lower passage opening 8 for connecting to the top rack standard section 9.

[0051] like Figure 4 As shown, the upper support system 3 includes a lifting column 23, a lifting column flip claw 13 and an upper attachment 14; the top of the lifting column 23 is connected to the truss platform system 1, and the end of the truss column facing the steel pipe column is also provided with an upper attachment 14 connected to the steel pipe column, one end of the lifting column flip claw 13 is connected to the upper attachment 14, and the other end is mounted on the lifting column 23, and the lifting column 23 can be released by flipping the lifting column flip claw 13.

[0052] The lower support system 3 includes a coat rack 20, a coat rack flip hook 16 and a lower attachment 17; the coat rack 20 is mounted on the outside of the lifting column 23; the coat rack 20 is connected to the steel pipe column through the lower attachment 17; the end of the coat rack 20 facing the steel pipe column is provided with the lower attachment 17 connected to the steel pipe column, one end of the coat rack flip hook 16 is connected to the lower attachment 17, and the other end is mounted on the coat rack 20, and the coat rack 20 can be released by flipping the coat rack flip hook 16.

[0053] The upper attachment 14 and the lower attachment 17 in this embodiment both adopt detachable hoop-type support brackets. The detachable hoop-type support brackets of the upper attachment 14 are removed by the upper hoop hoist 12 arranged on the truss platform.

[0054] Both the lifting column 23 and the outer frame 20 are vertical steel frame structures. The horizontal dimension of the outer frame 20 is larger than that of the lifting column 23, and at least the lower area of ​​the lifting column 23 is located inside the outer frame 20. The height directions of the lifting column 23 and the outer frame 20 are parallel to the height direction of the steel pipe column.

[0055] like Figure 4 , Figure 5 As shown, the support system 3 also includes a plurality of guide wheel groups 15; at least one guide wheel group 15 is connected to each of the lifting column 23 and the outer frame 20; the guide wheel group 15 includes a plurality of guide wheels surrounding the steel pipe column and closely attached to the steel pipe column. Under the action of the guide wheel group 15, the lifting column 23 and the outer frame 20 are smoothly lifted along the steel pipe column to ensure the stability of the construction platform.

[0056] The hydraulic control system 4 connects the lifting column 23 and the outer frame 20, and drives the lifting column 23 and the outer frame 20 to alternately lift along the height direction of the steel pipe column.

[0057] like Figure 4-Figure 7The hydraulic control system 4 includes: a lifting cylinder 18, a telescopic bracket 19 of a lifting column, a lifting guide beam 21, and a telescopic bracket 22 of a lifting guide beam; a plurality of limit channels and a plurality of lifting channels are alternately arranged on the outer frame 20 along its height direction. The lifting guide beam 21 is connected to the bottom of the lifting column 23; the vertically arranged lifting cylinder 18 connects the lifting guide beam 21 and the lifting column 23; the telescopic bracket 19 of the lifting column is arranged horizontally, and its fixed end is connected to the lifting column 23, and its telescopic end faces the limit channel or the lifting channel. The telescopic bracket 22 of the lifting guide beam is arranged horizontally, and its fixed end is connected to the lifting guide beam 21, and its telescopic end faces the limit channel or the lifting channel.

[0058] Based on the same inventive concept, the method for constructing a super-high-rise giant frame building using the above-mentioned construction platform proposed by the present invention comprises the following steps:

[0059] Step 1: Install the support system 3 and hydraulic control system 4 of the construction platform on the outside of the Nth steel pipe column of the giant frame building, where N is greater than or equal to 1; hoist the truss platform system 1 to connect with the support system 3; hang the bracket system 2 below the truss platform system 1.

[0060] If the value of N is 1, then the step 1 specifically includes:

[0061] Step 11. Assemble and install the support system 3 and the hydraulic control system 4 first.

[0062] After the first section of the steel pipe column of the giant frame building is hoisted and fixed, the upper attachment 14 and the lower attachment 17 on the first section of the steel pipe column are installed, and the installation height of the upper attachment 14 must exceed the length of the support system 3; then the support system 3 and the hydraulic control system 4 at the four corners of the giant frame building are assembled on the ground, and the support system 3 and the hydraulic control system 4 corresponding to each steel pipe column are connected and fixed to form a whole. The whole connected by the support system 3 and the hydraulic control system 4 is hoisted by a tower crane, and the whole connected by the support system 3 and the hydraulic control system 4 is fixed to the outside of the first section of the steel pipe column by the lifting column flip hook 13 and the outer frame flip hook 16.

[0063] Step 12: Assemble and hoist the truss platform system 1.

[0064] The truss platform system 1 is assembled in a suitable area on the ground. First, the frame is assembled using standard Bailey sheets 5. After the frame is assembled, the truss platform decking 6 is installed. After the decking 6 is completed, the access opening is constructed. Then, the auxiliary platform 7 is installed according to the actual steel pipe column hoisting positioning. Finally, the upper hoop hoist 12 or hoist lifting device is installed. The upper hoop hoist 12 or hoist lifting device is used to hoist the steel fixed beams required for connecting the bottom of the truss platform with the hanging frame system 2 and the support system 3. The upper hoop hoist 12 or hoist lifting device is also used to lift the hanging frame system 2. After the truss platform system 1 is assembled, the truss platform system 1 is hoisted by a tower crane from the top of the first section of the steel pipe column and aligned with the support system 3, and fixedly connected to the support system 3 through the steel sections welded at the bottom of the truss platform.

[0065] Step 13: Assemble and install the rack system 2.

[0066] The topmost standard section 9 of the pylon system 2 is assembled in a suitable area on the ground. After the assembly is completed, the pylon system 2 is lifted by the upper hoop hoist 12 or hoist lifting device pre-installed on the truss platform system 1. When the height of the topmost standard section 9 is just slightly higher than the height of the second-layer standard section 9 to be installed, the second-layer standard section 9 is assembled. The topmost standard section 9 is connected to the second-layer standard section 9 by using the special pylon connector 10, and the hanging ladder 11 is installed between the topmost standard section 9 and the second-layer standard section 9. The installation of all the standard sections 9 of the pylon system 2 is completed in sequence later.

[0067] Step 2. Use the truss platform system 1 to weld the N+1th steel pipe column of the giant frame building; use the bracket system 2 to weld the ring truss on the floor where the Nth steel pipe column of the giant frame building is located; wherein the welding work of the ring truss includes: steel beam welding, weld detection and protective paint spraying.

[0068] Step 3. Use the hydraulic control system 4 to lift the support system 3 to the outside of the N+1th steel pipe column;

[0069] Step 4. Use the truss platform system 1 to weld the N+2 section of steel pipe column; use the bracket system 2 to weld the ring belt truss on the floor where the N+1 section of steel pipe column is located; use the hydraulic control system 4 to lift the support system 3 to the outside of the N+2 section of steel pipe column; repeat in sequence until the welding of all sections of steel pipe columns of the giant frame building is completed.

[0070] The step of using the hydraulic control system 4 to lift the support system 3 in the above step 3 includes:

[0071] Step 31. Use the upper hoist hoist 12 to release the connection between the upper attachment 14 on the steel pipe column and the lifting column 23. In this state, only the outer frame 20 of the lifting support system 3 is connected to the steel pipe column.

[0072] Step 33. Use the hydraulic control system 4 to lift the lifting column 23 to the first target height; the specific situation of the first target height depends on the site conditions and the stroke of the lifting cylinder 18. For example, when the stroke of the lifting cylinder 18 is 1600mm and the initial height of the lifting column 23 is 1000mm, the first target height is the initial height + the stroke of the lifting cylinder 18, that is, 1000mm+1600mm.

[0073] Step 33. After the lifting column 23 reaches the first target height, the upper attachment 14 on the steel pipe column is connected to the lifting column 23, and then the connection between the lower attachment 17 on the steel pipe column and the outer frame 20 is released. In this state, only the lifting column 23 is connected to the steel pipe column of the lifting support system 3.

[0074] Step 34: Use the hydraulic control system 4 to lift the outerwear rack 20 to a second target height, where the second target height is lower than the first target height.

[0075] Step 35: Connect the lower attachment 17 on the steel pipe column to the outer frame 20.

[0076] In the above step 33, the step of lifting the lifting column 23 to the first target height by using the hydraulic control system 4 includes:

[0077] The telescopic end of the telescopic bracket 22 of the lifting guide beam is extended into the first-layer limiting channel of the lowest layer, and the lifting guide beam 21 is restricted from lifting; the telescopic end of the telescopic bracket 19 of the lifting column is retracted from the second-layer limiting channel. The second-layer limiting channel is higher than the first-layer limiting channel, and the lifting column 23 can be lifted; the lifting column 23 is lifted by the lifting cylinder 18 to a certain height, such as 100mm, so that the telescopic end of the telescopic bracket 19 of the lifting column passes over the second-layer limiting channel and can be extended into the second-layer lifting channel located above the second-layer limiting channel; the lifting column 23 is lifted by the lifting cylinder 18 to a certain height, such as 400mm, which is the length of the second-layer lifting channel, and the telescopic end of the telescopic bracket 19 of the lifting column Rise 400mm along the second-layer lifting channel following the lifting column 23 to reach the top of the second-layer lifting channel; retract the telescopic end of the telescopic bracket 19 of the lifting column from the second-layer lifting channel, and use the lifting cylinder 18 to lift the lifting column 23 to a certain height, such as 100mm, so that the telescopic end of the telescopic bracket 19 of the lifting column extends into the third-layer limiting channel; retract the telescopic end of the telescopic bracket 22 of the lifting guide beam from the first-layer limiting channel; use the lifting cylinder 18 to lift the lifting guide beam 21, so that the telescopic end of the telescopic bracket 22 of the lifting guide beam extends into the second-layer limiting channel, and the lifting guide beam 21 is restricted from lifting; repeat the above steps until the lifting cylinder 18 lifts the lifting column 23 to the first target height.

[0078] It can be seen from the above steps that in the present invention, the lifting column 23 is not lifted to the first target height in one step, but is lifted in multiple times, and the stroke of each lifting is the length of the lifting channel, and in each lifting process, the telescopic end of the telescopic bracket 22 of the lifting guide beam or the telescopic end of the telescopic bracket 19 of the lifting column is always located in the limiting channel, ensuring the safe and smooth lifting of the lifting column 23 and improving construction safety.

[0079] The above are only preferred embodiments of the present invention, and the protection scope of the present invention is not limited to the above embodiments. All technical solutions under the concept of the present invention belong to the protection scope of the present invention. It should be pointed out that for ordinary technicians in this technical field, some improvements and modifications without departing from the principle of the present invention should also be regarded as the protection scope of the present invention.

Claims

1. A construction platform for a super high-rise giant frame building, characterized in that: The mega frame building includes a plurality of steel pipe columns maintaining spacing and a belt truss connecting the plurality of steel pipe columns together; The construction platform includes: a truss platform system, a pylon system, a support system and a hydraulic control system; A plurality of the support systems are distributed on the outside of the steel pipe column; each of the support systems includes an upper support system and a lower support system, which are respectively connected to the steel pipe column by a detachable hoop-type support bracket; The hydraulic control system is connected to the upper support system and the lower support system, and is used to drive the upper support system or the lower support system to lift along the steel pipe column; The truss platform system includes a truss platform and an auxiliary platform; the truss platform is arranged around the giant frame building and connected to the upper support system; the auxiliary platform is connected to the truss platform and surrounds the steel pipe column; The hanging frame system is hung below the truss platform system.

2. The construction platform of a super high-rise giant frame building according to claim 1, characterized in that: The upper support system includes a lifting column and an upper attachment; the lifting column is connected to the truss platform system, and the truss column is also connected to the steel pipe column through the upper attachment; The lower support system includes an outer frame and a lower attachment; the outer frame is sleeved on the outside of the lifting column; the outer frame is connected to the steel pipe column through the lower attachment; The hydraulic control system connects the lifting column and the outer coat rack.

3. The construction platform of a super high-rise giant frame building according to claim 2, characterized in that: The hydraulic control system includes: a lifting cylinder, a telescopic bracket of a lifting column, a lifting guide beam, and a telescopic bracket of a lifting guide beam; a plurality of limit channels and a plurality of lifting channels are alternately arranged on the outer frame along its height direction; The lifting guide beam is connected to the lifting column; The lifting cylinder is connected to the lifting guide beam and the lifting column; The fixed end of the telescopic bracket of the lifting column is connected to the lifting column, and the telescopic end faces the limiting channel or the lifting channel; The fixed end of the telescopic bracket of the lifting guide beam is connected to the lifting guide beam, and the telescopic end faces the limiting channel or the lifting channel.

4. The construction platform of a super high-rise giant frame building according to claim 2, characterized in that: The upper support system further includes a lifting column flip hook; one end of the lifting column flip hook is connected to the upper attachment, and the other end is mounted on the lifting column; The lower support system also includes a coat rack flip hanging claw; one end of the coat rack flip hanging claw is connected to the lower attachment, and the other end is used to hang the coat rack.

5. The construction platform of a super high-rise giant frame building according to claim 2, characterized in that: The support system further comprises a plurality of guide wheel groups; at least one guide wheel group is respectively connected to the lifting column and the outer frame; the guide wheel group comprises a plurality of guide wheels surrounding the steel pipe column and in close contact with the steel pipe column.

6. The construction platform of a super high-rise giant frame building according to claim 1, characterized in that: The rack system comprises multiple layers of assembled rack standard sections; a hanging ladder is arranged between each layer of rack standard sections; and the truss platform system is reserved with an up-and-down passage opening for connecting with the top layer of the rack standard sections.

7. A construction method for a super high-rise giant frame building, using the construction platform as claimed in claim 1, characterized in that: The following steps are involved: Install the support system and hydraulic control system of the construction platform on the outside of the Nth steel pipe column of the giant frame building, where N is greater than or equal to 1; hoist the truss platform system to connect with the support system; hang the bracket system below the truss platform system; The truss platform system is used to weld the N+1th steel pipe column of the giant frame building; the bracket system is used to weld the ring belt truss of the floor where the Nth steel pipe column of the giant frame building is located; Using the hydraulic control system to lift the support system to the outside of the N+1th steel pipe column; The truss platform system is used to perform welding work on the N+2 section of steel pipe columns; the bracket system is used to perform welding work on the ring belt truss of the floor where the N+1 section of steel pipe columns are located; The process is repeated successively until the welding of all the steel pipe columns of the mega frame building is completed.

8. The construction method of a super high-rise mega frame building according to claim 7, characterized in that: The support system includes a lifting column, an upper attachment, an outer frame and a lower attachment; the lifting column is installed on the outer side of the steel pipe column by using the upper attachment, and the outer frame is installed on the outer side of the steel pipe column by using the lower attachment, and the outer frame is sleeved on the outside of the lifting column; The step of using the hydraulic control system to lift the support system includes: Release the connection between the upper attachment piece on the steel pipe column and the lifting column; Lifting the lifting column to a first target height using the hydraulic control system; Connecting the upper attachment on the steel pipe column to the lifting column, and releasing the connection between the lower attachment on the steel pipe column and the outer frame; utilizing the hydraulic control system to elevate the outer frame to a second target height; The lower attachment on the steel pipe column is connected to the outer frame.

9. The construction method of a super high-rise mega frame building according to claim 8, characterized in that: The hydraulic control system comprises: a lifting cylinder, a telescopic bracket of a lifting column, a lifting guide beam, and a telescopic bracket of the lifting guide beam; a plurality of limit channels and a plurality of lifting channels are alternately arranged on the outer frame along its height direction; the lifting guide beam is connected to the lifting column; the lifting cylinder is connected to the lifting guide beam and the lifting column; the fixed end of the telescopic bracket of the lifting column is connected to the lifting column; the fixed end of the telescopic bracket of the lifting guide beam is connected to the lifting guide beam; the telescopic ends of the telescopic bracket of the lifting column and the telescopic bracket of the lifting guide beam are both facing the limit channel or the lifting channel; The step of lifting the lifting column to a first target height by using the hydraulic control system comprises: Extend the telescopic end of the telescopic bracket of the lifting guide beam into the limiting channel; retract the telescopic end of the telescopic bracket of the lifting column from the limiting channel; lift the lifting column by the lifting cylinder so that the telescopic end of the telescopic bracket of the lifting column can be extended into the lifting channel; lift the lifting column again by the lifting cylinder, and the telescopic end of the telescopic bracket of the lifting column rises along the lifting channel following the lifting column; retract the telescopic end of the telescopic bracket of the lifting column from the lifting channel, and lift the lifting column again by the lifting cylinder so that the telescopic end of the telescopic bracket of the lifting column extends into the limiting channel; retract the telescopic end of the telescopic bracket of the lifting guide beam from the limiting channel; lift the lifting guide beam by the lifting cylinder; Repeat the above steps until the lifting cylinder lifts the lifting column to the first target height.

10. The construction method of a super high-rise mega frame building according to claim 7, characterized in that: The welding work of the ring-belt truss includes: steel beam welding, weld detection and protective paint spraying.