Construction method for adopting red copper water stop plate material for basement communication port

By using a combination of copper water stop plates and external rubber water stops in the basement communication port construction, the water seepage problems caused by settlement and stress concentration in traditional construction methods are solved, and a higher quality waterproof effect is achieved.

CN118911425AActive Publication Date: 2024-11-08CHINA MCC20 GRP CORP LTD

Patent Information

Application Number
CN202411190685.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-28
Publication Date
2024-11-08
Estimated Expiration
2044-08-28

AI Technical Summary

Technical Problem

The traditional basement communication port construction method is difficult to solve the problem of water seepage in construction joints caused by settlement and stress concentration caused by construction at different stages.

Method used

Using the construction method of combining copper water stop plates and external rubber water stop belts, the pre-embedded copper water stop plates and external rubber water stop belts are used, and the polyurethane waterproof coating and extruded polystyrene board protective layer is combined to optimize the construction process to prevent Water seepage.

Benefits of technology

It effectively strengthens the construction quality of the construction joints of the basement communication port, avoids water seepage caused by cracks caused by settlement and stress concentration, and improves the stability and waterproofing effect of construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911425A_ABST
    Figure CN118911425A_ABST
Patent Text Reader

Abstract

The invention provides a construction method for adopting a red copper water stop plate material for a basement communication port, which comprises the following steps of: pasting a rubber water stop belt: placing an externally pasted rubber water stop belt at a construction joint position before a structure is bound with reinforcing steel bars; reinforcing steel bars are bound, specifically, the reinforcing steel bars reserved in the communication port bottom plate, the communication port side wall and the communication port top plate are bound; red copper water stop plates are pre-buried in the positions of the bottom plate, the side walls and the top plate; the rubber waterstop is pasted again, and the rubber waterstop is pasted outside the outer side of the construction joint of the bottom plate, the side wall and the top plate of the communication opening; and outer wall construction joint waterproofing is conducted, specifically, polyurethane waterproof paint with the preset thickness is sprayed to the outer wall construction joint position, and waterproof coiled materials are attached to the outer side. According to the construction method, the new material red copper water stop plate is used, the construction technology is changed, the construction procedure is optimized, the problem of water seepage of the construction joint which cannot be solved through a traditional communication port construction method is solved, the construction quality of the basement communication port construction joint can be effectively improved, and therefore the water seepage phenomenon caused by cracks caused by sedimentation and stress concentration is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of waterproofing of basement connecting openings in building construction, and in particular to a construction method for waterproofing a basement connecting opening by using a copper water stop plate. Background Art

[0002] As an important part of a building, the waterproofing of the basement is directly related to the structural safety of the building. Once the basement leaks, the foundation soil will lose its supporting effect, leading to serious consequences such as the building sinking and tilting. In addition, waterproofing of the basement can also prevent moisture in the basement, corrosion of building materials, mold growth, and other problems, which seriously affect the indoor air quality and use effect. More importantly, waterproofing can protect the lives and property of residents. Once the basement is attacked by water leakage, it will not only cause problems such as electrical equipment failure and failure of fire-fighting facilities, but may also cause safety accidents such as fire and short circuit.

[0003] At present, the conventional design of the construction structure of the basement connecting opening adopts a reserved steel plate waterstop system. During the second phase of construction, the reserved steel plate waterstop of the first phase is cleaned, the concrete is roughened, and the scum is removed before pouring the concrete. This method is difficult to solve the settlement caused by construction at different times and the water seepage problem of construction joints caused by stress concentration. Summary of the invention

[0004] In view of this, the present invention proposes a construction method for a basement communication port using a copper water stop plate material, comprising: Apply rubber water stop. Before tying the steel bars of the structure, place an external rubber water stop at the construction joint. Tie up the steel bars, including the steel bars reserved for the bottom plate, side wall and top plate of the connecting opening; Pre-buried copper water stop plates, the bottom plate, side wall and top plate are pre-buried with copper water stop plates; Apply the rubber water stop again, and apply the rubber water stop on the outside of the construction joints of the bottom plate, side wall and top plate of the connecting port; For waterproofing of exterior wall construction joints, spray a preset thickness of polyurethane waterproof coating on the exterior wall construction joints and attach waterproof membrane to the outside.

[0005] Furthermore, an external rubber waterstop is placed centrally at the construction joint.

[0006] Furthermore, the lap length of the reserved steel bars is greater than or equal to Lae of the steel bars.

[0007] Furthermore, the exposed portion of the reserved steel bars is wrapped with tin foil.

[0008] Furthermore, the copper water stop plate is centrally located, with a cross section 20-30 mm closer to the inner side.

[0009] Furthermore, when the rubber waterstop is affixed to the outside of the construction joints of the bottom plate, side wall and top plate of the connecting opening, the end is overlapped by bonding.

[0010] Furthermore, the spraying thickness of the polyurethane waterproof material is 1.5-3.0 mm.

[0011] Furthermore, after the waterproofing of the exterior wall construction joint is completed, an extruded polystyrene board protective layer is applied.

[0012] Furthermore, the soil is backfilled after the construction of the extruded polystyrene board protective layer is completed.

[0013] Furthermore, when placing the copper water stop plate, after chiseling off the loose stones and the surface, the expansion head is inserted, welded to form an intersection, and poured together with the concrete.

[0014] The present invention provides a construction method for a basement connecting opening using a copper waterstop plate material, which has the following advantages: by using the new material copper waterstop plate, changing the construction process, and optimizing the construction process, the problem of water seepage in the construction joint that cannot be solved by the traditional connecting opening construction method is solved, and the construction quality of the construction joint of the basement connecting opening can be effectively enhanced, thereby avoiding water seepage caused by cracks caused by settlement and stress concentration. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present invention. Moreover, the same reference symbols are used throughout the accompanying drawings to represent the same components. In the accompanying drawings: Figure 1 A flowchart of a construction method provided by an embodiment of the present invention; Figure 2 A schematic cross-sectional structure diagram of a copper water stop plate in use according to an embodiment of the present invention; Figure 3 A schematic diagram of the top view of the structure of the copper water stop plate in use provided by an embodiment of the present invention; Figure 4 A schematic structural diagram of a large sample of a copper water stop plate provided in an embodiment of the present invention; Figure 5 A schematic diagram of the structure of a water stop provided by an embodiment of the present invention; Figure 6 A schematic diagram of the structure of a rubber waterstop affixed to the outside before the reserved steel bars are tied provided in an embodiment of the present invention. DETAILED DESCRIPTION

[0016] Exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although exemplary embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided in order to enable a more thorough understanding of the present disclosure and to be able to fully convey the scope of the present disclosure to those skilled in the art. It should be noted that, in the absence of conflict, the embodiments of the present invention and the features described in the embodiments can be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0017] See also Figure 1 As shown, it is a construction method of a basement communication port using a copper water stop plate material provided by an embodiment of the present invention, comprising the following steps: Step 1: Paste the rubber water stop. Before tying the steel bars on the structure, place the external rubber water stop at the construction joint. Step 2: Tie the steel bars, including the steel bars reserved for the bottom plate, side wall and top plate of the connecting opening; Step 3: Pre-embed copper water stop plates at the bottom plate, side wall and top plate positions; Step 4: Paste the rubber water stop again, and paste the rubber water stop on the outside of the construction joints of the bottom plate, side wall and top plate of the connecting port; Step 5: Waterproof the exterior wall construction joints. Spray a preset thickness of polyurethane waterproof coating on the exterior wall construction joints and attach waterproof membranes to the exterior.

[0018] Furthermore, an external rubber waterstop is placed centrally at the construction joint.

[0019] Furthermore, the lap length of the reserved steel bars is greater than or equal to Lae of the steel bars.

[0020] Furthermore, the exposed portion of the reserved steel bars is wrapped with tin foil.

[0021] Furthermore, the copper water stop plate is centrally located, with a cross section 20-30 mm closer to the inner side.

[0022] Furthermore, when the rubber waterstop is affixed to the outside of the construction joints of the bottom plate, side wall and top plate of the connecting opening, the end is overlapped by bonding.

[0023] Furthermore, the spraying thickness of the polyurethane waterproof material is 1.5-3.0 mm.

[0024] Furthermore, after the waterproofing of the exterior wall construction joint is completed, an extruded polystyrene board protective layer is applied.

[0025] Furthermore, the soil is backfilled after the construction of the extruded polystyrene board protective layer is completed.

[0026] Furthermore, when placing the copper water stop plate, after chiseling off the loose stones and the surface, the expansion head is inserted, welded to form an intersection, and poured together with the concrete.

[0027] The preferred embodiment of the construction method of the present invention is as follows: 1) Before tying the steel bars, place an external rubber water stop in the center of the construction joint. Figure 5-6 As shown; 2) Tie up the bottom plate, side wall and top plate of the connection port, and reserve steel bars with a lap length not less than Lae (seismic steel bars), and wrap the exposed parts with tin foil (the steel bars will be severely rusted and unusable during the later waterproofing construction); 3) The copper water stop plate is embedded in the middle of the bottom plate, side wall and top plate, with the section 20-30mm inside. Figure 2-3 As shown, during the second phase of construction, after the loose stones and the surface are chiseled off, the telescopic head is centered, welded to form a cross circle, and poured together with the concrete. Foam rods are embedded in the groove of the copper water stop plate to prevent the concrete from being plugged. The copper water stop plate has good toughness and can withstand certain bending deformation during the construction process without cracks or breaks, ensuring the stability of the project. Figure 4 As shown; 4) Attach rubber water stop strips to the outside of the construction joints of the bottom plate, side wall and top plate of the connecting port, refer to Figure 2-3 As shown, the ends are bonded and overlapped, which is firm and ensures that there is no leakage at the overlap points; 5) Spray 2mm thick polyurethane waterproof coating on the construction joint of the exterior wall to enhance the waterproof effect, apply a waterproof layer of roll material on the outside, and add an additional layer of roll material at the construction joint; 6) Make a protective layer of extruded polystyrene board before backfilling the soil.

[0028] An embodiment of the present invention discloses a construction method for waterproofing a basement connecting opening using a copper waterstop plate. By using a new material copper waterstop plate, changing the construction process, and optimizing the construction process, the problem of water seepage in construction joints that cannot be solved by traditional connecting opening construction methods is solved, and the construction quality of the construction joints of basement connecting openings can be effectively enhanced, thereby avoiding water seepage caused by cracks caused by settlement and stress concentration.

[0029] It should be noted that, in the description of the present invention, terms such as "up", "down", "left", "right", "inside" and "outside" indicating directions or positional relationships are based on the directions or positional relationships shown in the drawings. This is merely for the convenience of description and does not indicate or imply that the device or element must have a specific orientation, be constructed and operated in a specific orientation. Therefore, it cannot be understood as a limitation on the present invention.

[0030] In addition, it should be noted that in the description of the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0031] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.

Claims

1. A construction method for using copper water stop plate material for a basement connection port, characterized in that: include: Apply rubber water stop. Before tying the steel bars of the structure, place an external rubber water stop at the construction joint. Tie up the steel bars, including the steel bars reserved for the bottom plate, side wall and top plate of the connecting opening; Pre-buried copper water stop plates, the bottom plate, side wall and top plate are pre-buried with copper water stop plates; Apply the rubber water stop again, and apply the rubber water stop on the outside of the construction joints of the bottom plate, side wall and top plate of the connecting port; For waterproofing of exterior wall construction joints, spray a preset thickness of polyurethane waterproof coating on the exterior wall construction joints and attach waterproof membrane to the outside.

2. The construction method of using copper water stop plate material for basement communication opening according to claim 1 is characterized in that: Place an external rubber waterstop in the center of the construction joint.

3. The construction method of using copper water stop plate material for basement communication opening according to claim 1 is characterized in that: The lap length of the reserved steel bars is greater than or equal to the Lae steel bars.

4. The construction method of using copper water stop plate material for basement communication opening according to claim 1 is characterized in that: The exposed portion of the reserved steel bars is wrapped with tin foil.

5. The construction method of using copper water stop plate material for basement communication opening according to claim 1 is characterized in that: The copper water stop plate is centrally located, with a cross section of 20-30 mm on the inner side.

6. The construction method of using copper water stop plate material for basement communication opening according to claim 1 is characterized in that: When affixing rubber waterstop strips to the outside of the construction joints of the connecting bottom plate, side wall and top plate, the ends are bonded and overlapped.

7. The construction method of using copper water stop plate material for basement communication opening according to claim 1 is characterized in that: The spraying thickness of the polyurethane waterproof material is 1.5-3.0 mm.

8. The construction method of using copper water stop plate material for basement communication opening according to claim 1 is characterized in that: After the waterproofing of the exterior wall construction joint is completed, an extruded polystyrene board protective layer is applied.

9. The construction method of using copper water stop plate material for basement communication opening according to claim 8 is characterized in that: Backfill the soil after the construction of the extruded polystyrene board protective layer is completed.

10. The construction method of using copper water stop plate material for basement communication opening according to claim 5, characterized in that: When placing the copper water stop plate, after chiseling off the loose stones and the surface, the expansion head is placed in the middle, welded to form an intersection, and poured together with the concrete.

Citation Information

Patent Citations

  • Waterproof node for expansion joint of oversized basement

    CN114164866A

  • Water stop structure for deformation joint of comprehensive pipe gallery

    CN216664214U

Cited By

  • Modular combined basement connection port high-efficiency water-stop module

    CN120174909B