Shallow-buried tunnel super-long large pipe shed drilling intelligent rack device and construction method

Through the design of the intelligent bench device, the power part and sensing positioning mechanism are used to solve the problem that manual operation in the construction of super-long pipe shed of shallow buried tunnels is difficult to ensure the accuracy and low level of equipment intelligence, and efficient and safe drilling is achieved Hole construction.

CN118911661APending Publication Date: 2024-11-08CHINA TIESIJU CIVIL ENGINEERING GROUP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410959641.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-17
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

In the construction of super-long pipe sheds in shallow buried tunnels, manual operation is difficult to ensure high accuracy, resulting in the position of the pipe sheds being offset, the construction speed is slow, the equipment intelligence and automation level is low, and it is impossible to monitor and adjust dynamically in real time, and it is difficult to deal with it. Complex geological conditions affect construction quality and safety.

Method used

Design an intelligent bench device including a power part, a sliding part, a telescopic part, a drill rod frame and a sensing positioning mechanism. Through data analysis control device and a sensing positioning module, the drill hole position can be monitored and adjusted in real time to ensure the drill rod frame. Precise movement and safety of drilling process.

Benefits of technology

It realizes high-precision and efficient drilling construction, can monitor and feedback the drilling status in real time, improves the safety and efficiency of construction, and adapts to changes in different geological conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911661A_ABST
    Figure CN118911661A_ABST
Patent Text Reader

Abstract

The invention discloses a shallow-buried tunnel ultra-long large pipe shed drilling intelligent rack device and a construction method. The shallow-buried tunnel ultra-long large pipe shed drilling intelligent rack device comprises a power part; a sliding part; the telescopic part is connected with the power part, and the telescopic part slides on the sliding part; the drill rod frame is arranged on the telescopic part, the telescopic part drives the drill rod frame to move in the vertical direction, and the power part drives the telescopic part to move transversely; the sensing and positioning mechanism is arranged on the telescopic part, and the sensing and positioning mechanism is used for monitoring the working state of the drill rod in real time; according to the shallow-buried tunnel ultra-long large pipe shed drilling intelligent rack device and the construction method, the drilling construction precision can be guaranteed, meanwhile, the drilling state can be fed back in real time, and then high efficiency and safety of shallow-buried tunnel ultra-long large pipe shed drilling construction are guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of tunnel engineering, and in particular to an intelligent platform device and a construction method for drilling an extra-long pipe shed in a shallow buried tunnel. Background Art

[0002] In tunnel construction, shallow buried tunnels are difficult to construct due to their shallow depth, heavy surface load, and complex geological conditions. In order to improve the safety and efficiency of tunnel construction, super-long pipe-roof support technology is usually used. Pipe-roof support technology is to pre-install steel pipes around the tunnel before tunnel excavation to form a support structure to prevent ground collapse during tunnel excavation.

[0003] In the pipe-roof construction process of the existing technology, manual operation still occupies a dominant position. Manual operation is difficult to ensure high precision, and the pipe-roof position is prone to deviation, resulting in unsatisfactory tunnel support effect. The accumulated errors of equipment and labor will affect the construction quality and the safety of the tunnel structure. The existing methods rely on manual operation and simple mechanical equipment, the construction speed is slow, and the drilling process is complicated and time-consuming. Especially in the construction of ultra-long pipe-roofs, the efficiency problem is more prominent. The manual operation method is not flexible enough when dealing with different geological conditions. For example, the processing difficulty of soft soil layers and hard rock layers is different, and it is difficult to adjust the construction parameters according to the real-time geological conditions, which affects the construction effect and stability. The existing pipe-roof construction equipment has a low level of intelligence and automation, relies on manual judgment and operation, cannot be monitored and adjusted dynamically in real time, and is difficult to cope with complex and changing construction environments. Summary of the invention

[0004] The purpose of the present invention is to provide an intelligent platform device and construction method for drilling super-long pipe roofs in shallow buried tunnels, so as to solve the problems that it is difficult to ensure high precision in manual operation in the prior art, and the pipe roof position is prone to deviation, resulting in unsatisfactory tunnel support effect, and the accumulated errors of equipment and labor will affect the construction quality and the safety of the tunnel structure; relying on manual operation and simple mechanical equipment, the construction speed is slow, the drilling process is complicated and time-consuming, especially in the construction of super-long pipe roofs, the efficiency problem is more prominent, and the manual operation method is not flexible enough when dealing with different geological conditions, which affects the construction effect and stability; and the existing pipe roof construction equipment has a low level of intelligence and automation, relies on manual judgment and operation, cannot be monitored and dynamically adjusted in real time, and is difficult to cope with complex and changing construction environments.

[0005] To achieve the above object, the present invention provides the following technical solution: an intelligent drilling platform device for super-long pipe shed in shallow buried tunnel, comprising:

[0006] Power Department;

[0007] Sliding part;

[0008] A telescopic part, the telescopic part is connected to the power part, and the telescopic part slides on the sliding part;

[0009] A drill rod rack, which is arranged on the telescopic part, the telescopic part drives the drill rod rack to move vertically, and the power part drives the telescopic part to move horizontally; and

[0010] The sensor positioning mechanism is arranged on the telescopic part and is used for real-time monitoring of the working status of the drill rod.

[0011] Preferably, the power unit includes a motor.

[0012] Preferably, the motor is electrically connected to a data analysis control device.

[0013] Preferably, the sliding part comprises a transverse slide rail and a vertical slide rail, the transverse slide rail and the vertical slide rail are perpendicular to each other, a rotatable transverse pulley is provided on the transverse slide rail, and a rotatable vertical pulley is provided on the vertical slide rail.

[0014] Preferably, the telescopic part comprises two hydraulic rods arranged in parallel on the transverse slide rail, the fixed ends of the two hydraulic rods are slidably connected to the transverse slide rail, and the output ends of the two hydraulic rods are fixedly connected to a horizontally arranged connecting rod.

[0015] Preferably, the drill rod rack is fixedly connected to one side of the outer surface of the connecting rod.

[0016] Preferably, the sensor positioning mechanism comprises a sensor positioning module fixedly connected to a side of the outer surface of the connecting rod facing away from the drill rod rack.

[0017] Preferably, the sensor positioning module is electrically connected to the data analysis control device.

[0018] A construction method of an intelligent platform device for drilling a shallow buried tunnel with an extra-long pipe shed, using the intelligent platform device for drilling a shallow buried tunnel with an extra-long pipe shed according to any one of claims 1 to 8, the construction method comprising the following steps:

[0019] S1: input the drilling position information into the data analysis control device, and compare it with the position information transmitted back by the sensor positioning module to analyze the difference between the existing drill rod rack position and the position information of the hole to be drilled;

[0020] S2: The data processing control device controls the motor to drive the hydraulic rod to work, so that the horizontal pulley and the vertical pulley move along the slide rail to ensure that the drill rod rack moves to the predetermined position;

[0021] S3: insert the drill rod into the drill rod rack and start drilling. The sensor positioning module monitors the working status of the drill rod in real time and feeds back to the data analysis and control device to analyze and evaluate the drilling process until the drilling is completed.

[0022] S4: Repeat the above steps S1, S2 and S3 to drill a hole at the next location.

[0023] It can be seen from the above technical solution that the present invention has the following beneficial effects:

[0024] The intelligent stand device and construction method for drilling super-long pipe racks in shallow buried tunnels inputs drilling position information into a data analysis control device, compares the position information transmitted back by a sensor positioning module, analyzes the difference between the existing drill rod rack position and the position information of the hole to be drilled, controls the motor by the data processing control device, and then drives the hydraulic rod to work, so that the horizontal pulley and the vertical pulley move along the slide rail to ensure that the drill rod rack moves to a predetermined position, inserts the drill rod into the drill rod rack, starts drilling, and monitors the working status of the drill rod in real time by the sensor positioning module, and feeds back to the data analysis control device to analyze and evaluate the drilling process until the drilling is completed, and repeats the steps to drill the next position, thereby ensuring the drilling construction accuracy and providing real-time feedback on the drilling status, thereby ensuring the accuracy of the drilling construction. The high efficiency and safety of the drilling construction of super-long pipe-roofs in shallow buried tunnels solves the problems that the existing technology is difficult to ensure high precision through manual operation, and the pipe-roof position is prone to deviation, resulting in unsatisfactory tunnel support effect, and the accumulation of errors in equipment and labor, which will affect the construction quality and the safety of the tunnel structure; it relies on manual operation and simple mechanical equipment, the construction speed is slow, and the drilling process is complicated and time-consuming, especially in the construction of super-long pipe-roofs, the efficiency problem is more prominent, and the manual operation method is not flexible enough when dealing with different geological conditions, affecting the construction effect and stability; and the existing pipe-roof construction equipment has a low level of intelligence and automation, relies on manual judgment and operation, cannot be monitored and adjusted dynamically in real time, and is difficult to cope with complex and changing construction environments. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 is a flow chart of the method of the present invention;

[0026] Figure 2 It is a schematic diagram of the overall structure of the present invention.

[0027] In the figure: 1. power unit; 11. motor; 2. sliding unit; 21. horizontal slide rail; 22. vertical slide rail; 23. horizontal pulley; 24. vertical pulley; 3. telescopic unit; 31. hydraulic rod; 32. connecting rod; 4. drill rod rack; 5. sensor positioning mechanism; 51. sensor positioning module; 6. data analysis control device. DETAILED DESCRIPTION

[0028] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0029] like Figure 2 As shown, an intelligent stand device for drilling super-long pipe sheds in shallow buried tunnels comprises a power unit 1, a sliding unit 2, a telescopic unit 3, a drill rod rack 4 and a sensor positioning mechanism 5, wherein the telescopic unit 3 is connected to the power unit 1, the drill rod rack 4 is arranged on the telescopic unit 3, the sensor positioning mechanism 5 is arranged on the telescopic unit 3, the telescopic unit 3 slides on the sliding unit 2, the telescopic unit 3 drives the drill rod rack 4 to move vertically, and the power unit 1 drives the telescopic unit 3 to move horizontally. The function of the sensor positioning mechanism 5 is to monitor the working status of the drill rod in real time, thereby ensuring the drilling construction accuracy and providing real-time feedback on the drilling status, thereby ensuring the high efficiency and safety of the drilling construction of super-long pipe sheds in shallow buried tunnels.

[0030] like Figure 2 As shown, the power unit 1 includes a motor 11, which is electrically connected to a data analysis control device 6. The sliding unit 2 includes a transverse slide rail 21 and a vertical slide rail 22. The transverse slide rail 21 and the vertical slide rail 22 are perpendicular to each other. A transverse slide rail 21 is arranged between the two vertical slide rails 22. A rotatable transverse pulley 23 is arranged on the transverse slide rail 21. The vertical slide rail 21 slides on the transverse slide rail 21 through the transverse pulley 23. A rotatable vertical pulley 24 is arranged on the vertical slide rail 22. The telescopic unit 3 includes two hydraulic rods 31, which are arranged in parallel on the transverse slide rail 21. The fixed ends of the two hydraulic rods 31 are slidably connected to the transverse slide rail 21. The output ends of the two hydraulic rods 31 are fixedly connected to a horizontally arranged connecting rod 32. The connecting rod 32 slides on the vertical slide rail 22 through the vertical pulley 24. The drill rod rack 4 is fixedly connected to the outer surface of the connecting rod 32 On one side, because the drill rod rack 4 is fixed on the connecting rod 32, the drill rod rack 32 can be moved horizontally and vertically, ensuring that the drilling rig can perform drilling operations at the specified position, which is convenient for the drill rod rack 32 to move to the drilling position. The sensor positioning mechanism 5 includes a sensor positioning module 51, and the sensor positioning module 51 is fixedly connected to the side of the outer surface of the connecting rod 32 facing away from the drill rod rack 4. The sensor positioning module 51 includes a sensor and a data collector, which monitors various parameters in the drilling process in real time, such as drilling speed, drilling pressure, torque, etc., and monitors the drilling status in real time. The data feedback is timely, and abnormal situations can be discovered and handled in time. The sensor positioning module 51 is electrically connected to the data analysis and control device 6. The data analysis and control device 6 includes a data transmission module, data analysis software, etc., which transmits and analyzes the collected positioning data and drilling data, and can provide scientific guidance for construction.

[0031] like Figure 1 As shown, a construction method of an intelligent platform device for drilling an extra-long pipe shed in a shallow buried tunnel is also provided, using an intelligent platform device for drilling an extra-long pipe shed in a shallow buried tunnel. The construction method comprises the following steps:

[0032] S1: input the drilling position information into the data analysis control device, and compare it with the position information transmitted back by the sensor positioning module to analyze the difference between the existing drill rod rack position and the position information of the hole to be drilled;

[0033] S2: The data processing control device controls the motor to drive the hydraulic rod to work, so that the horizontal pulley and the vertical pulley move along the slide rail to ensure that the drill rod rack moves to the predetermined position;

[0034] S3: insert the drill rod into the drill rod rack and start drilling. The sensor positioning module monitors the working status of the drill rod in real time and feeds back to the data analysis and control device to analyze and evaluate the drilling process until the drilling is completed.

[0035] S4: Repeat the above steps S1, S2 and S3 to drill a hole at the next location.

[0036] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. An intelligent drilling platform device for super-long pipe sheds in shallow buried tunnels. It is characterized in that include: Power Department (1); Sliding portion (2); A telescopic part (3), the telescopic part (3) is connected to the power part (1), and the telescopic part (3) slides on the sliding part (2); A drill rod rack (4), the drill rod rack (4) being arranged on the telescopic part (3), the telescopic part (3) driving the drill rod rack (4) to move vertically, and the power part (1) driving the telescopic part (3) to move horizontally; and A sensor positioning mechanism (5) is arranged on the telescopic part (3), and the sensor positioning mechanism (5) is used to monitor the working state of the drill rod in real time.

2. According to claim 1, an intelligent platform device for drilling super-long pipe sheds in shallow buried tunnels, Features: The power unit (1) comprises a motor (11).

3. According to claim 2, an intelligent drilling platform device for super-long pipe sheds in shallow buried tunnels, Features: The motor (11) is electrically connected to a data analysis control device (6).

4. According to claim 1, an intelligent platform device for drilling super-long pipe sheds in shallow buried tunnels, Features: The sliding part (2) comprises a transverse slide rail (21) and a vertical slide rail (22); the transverse slide rail (21) and the vertical slide rail (22) are perpendicular to each other; a rotatable transverse pulley (23) is provided on the transverse slide rail (21); and a rotatable vertical pulley (24) is provided on the vertical slide rail (22).

5. According to claim 4, an intelligent platform device for drilling super-long pipe sheds in shallow buried tunnels, Features: The telescopic part (3) comprises two hydraulic rods (31) arranged in parallel on the transverse slide rail (21), the fixed ends of the two hydraulic rods (31) are slidably connected to the transverse slide rail (21), and the output ends of the two hydraulic rods (31) are fixedly connected to a horizontally arranged connecting rod (32).

6. According to claim 5, an intelligent platform device for drilling super-long pipe sheds in shallow buried tunnels, Features: The drill rod rack (4) is fixedly connected to one side of the outer surface of the connecting rod (32).

7. According to claim 5, an intelligent drilling platform device for super-long pipe sheds in shallow buried tunnels, Features: The sensor positioning mechanism (5) comprises a sensor positioning module (51) fixedly connected to a side of the outer surface of the connecting rod (32) facing away from the drill rod rack (4).

8. According to claim 7, an intelligent platform device for drilling super-long pipe sheds in shallow buried tunnels, Features: The sensor positioning module (51) is electrically connected to the data analysis control device (6).

9. A construction method of an intelligent gantry device for drilling super-long pipe sheds in shallow buried tunnels. It is characterized in that Using the shallow buried tunnel super-long pipe shed drilling intelligent platform device according to any one of claims 1 to 8, the construction method comprises the following steps: S1: input the drilling position information into the data analysis control device, and compare it with the position information transmitted back by the sensor positioning module to analyze the difference between the existing drill rod rack position and the position information of the hole to be drilled; S2: The data processing control device controls the motor to drive the hydraulic rod to work, so that the horizontal pulley and the vertical pulley move along the slide rail to ensure that the drill rod rack moves to the predetermined position; S3: insert the drill rod into the drill rod rack and start drilling. The sensor positioning module monitors the working status of the drill rod in real time and feeds back to the data analysis and control device to analyze and evaluate the drilling process until the drilling is completed. S4: Repeat the above steps S1, S2 and S3 to drill a hole at the next location.